Distribution List :

1. Member (Power Systems) Central Electricity Authority Sewa Bhawan, R K Puram New Delhi-110 066 FAX : 011-26102045

2. Shri K. K. Arya Chief Engineer(SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 FAX : 011-26102045

3. CEO POSOCO B-9, Qutab Institutional Area Katwaria Sarai, New Delhi-110 016 FAX : 011-26852747

4. Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri (E) Mumbai 400 093 FAX : 022-28370193

5. Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore 560 009. FAX : 080-22259343

6. Member Secretary NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi – 110 016

7. Member Secretary Eastern Region Power Committee 14, Golf Club Road, Tollygange, Kolkata – 700 033

Western Region Constituents

1. Managing Director Gujarat Energy Transmission Corp. Ltd, Sardar Patel Vidyut Bhawan, Race Course, Vadodra -390 007 FAX : 0265-2338164

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur-482 008 FAX : 0761-2664141

3. Director (Operation) MSETCL. 4th Floor, “Prakashganga” Plot No. C-19, E-Block Bandra – Kurla Complex, Bandra(East), Mumbai- 400051 FAX : 022-26390383/26595258

4. Managing Director Chhattisgarh State Transmission Co. Ltd. Dangania Raipur- 492 013 FAX : 0771-2574246

5. The Chief Engineer Electricity Department The Government of Goa Panaji

6. Executive Engineer UT of Daman & Diu Administration, OIDC Corporate Office, Plot No. 35

FAX : 0832-2222354 Somnath, Daman,Pin 396210 FAX : 0269-2250889/2254745

7. Executive Engineer Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235 Silvassa FAX : 0260 – 2642338/2330771

8. GM, WRLDC F-3, M.I.D.C. Area Marol, Andheri (E) Mumbai-400 093 FAX : 022-28235434

Southern Region Constituents

1. Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. Vidyut Soudha Hyderabad – 500 082. FAX : 040-66665137

2. Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore 560 009. FAX : 080 -22228367

3. Member (Transmission) Kerala State Electricity Board Vidyuthi Bhawanam, Pattom, P.B. No. 1028 Thiruvananthapuram – 695 004. FAX : 0471-2444738

4. Director (TANTRANSCO) Tamil Nadu electricity Board (TNEB) 6th Floor, Eastern Wing, 800 Anna Salai, Chennai – 600 002. FAX : 044-28516362

5. Superintending Engineer –I First Floor, Electricity Department Gingy Salai Puducherry – 605 001. FAX : 0413-2334277/2331556

6. ED (SRLDC) Southern Regional Load Dispatch Centre 29, Race Course Road Bangalore 560 009.

FAX : 080-22268725

Northern Region Constituents

1. Chief Engineer(Planning), HVPNL, Shakti Bhawan, Sector-6, Panchkula-134109, Haryana

2. Director (W&P) UPPTCL Shakti Bhawan Extn, 3rd Floor, 14, Asok Marg, Lucknow – 226 001

3. Superintending Engineer, Electricity Operation Circle, Room No.-511, 5th Floor, Delux Building, Sector-9D, U.T Chandigarh.

4. Development Commissioner (Power), Power Development Department, Grid Sub Station Complex, Janipur, Jammu - 180 001

5. Director, H.P. Power Transmission Corporation Ltd. Barowalias House, Khalini, Shimla - 171002

6. GM(Technical), Delhi Transco Ltd., Shakti Sadan, Kotla Marg, New Delhi-110 002

7 Director(Technical), Punjab State Transmission Corporation Ltd. (PSTCL), Head Office, The Mall, Patiala-147001

8 Chief Engineer(MM), RRVPNL, VidyutBhawan, Jyoti Nagar, Janpath, Jaipur, Rajasthan-302005

9 Chief Engineer (P), Power Transmission Corporation of Uttarakhand Limited(PTCUL), Vidyut Bhawan, Saharanpur Road, Majra, Near ISBT, Dehradun-248001,Uttarakhand

Eastern Region Constituents

1. Managing Director Bihar State Power Transmission Company Vidyut Bhavan, Baily Road, Patna – 800 021.

2. Director (System) Damodar Valley Corporation DVC Tower, VIP Road, Kolkata- 700 054.

3. Member (Transmission) Jharkhand State Electricity Board In front of Main Secretariat Doranda, Ranchi – 834 002

4. Director ( System Operation) West Bengal State Electricity Transmission Company Ltd Vidyut Bhavan, 5th Floor, Block – D Bidhannagar Sector II Kolkata – 700 091

5. Director (Techincal) Orissa Power Transmission Company Ltd Jan Path, Bhubaneshwar – 751 022.

6. General Manager Eastern Region Load Dispatch Centre 14, Golf Club Road, Tollygange, Kolkata – 700 033.

7 Principal Chief Engineer cum Secretary Power Department Govt. Of Sikkim Sikkim

Generation Developers 1. Sh. N. Ramakrishnan

Sr. GM – Business Development KSK Mahanadi Power Company Ltd. 8-2-293/82/A/431/A Road No.22, Jubilee Hills, Hyderabad- 500033, Andhra Pradesh, India

2. Sh. B. J. Amritkar General Manager EMCO Energy Ltd. Plot no., F-5, Road No. 28 Wagle Industrial Area, Thane Maharashtra-400604

3 Sh. Goutam Ghosal Dy.General Manager DHARIWAL INFRASTRUCTURE LIMITED Barik Bhawan, 5th Floor, 8 C.R.Avenue, Kolkata 700072

4 Sh.Atanu Ghosh Chowdhury

Vice President Bharat Aluminium Company Ltd. Balco Nagar, Korba-495450 Chhattisgarh

5 Sh. Nirmal Kumar Agarwal Adhunik Power & Natural Resources Limited Director 701, 7th Floor, World Trade Tower Barakhamba Lane New Delhi – 110 001

Sh. Bhaskar Sarkar Chief Executive Officer Maithon Power Limited Jeevan Bharati, 10th Floor tower-I, 124 Connaught Circus New Delhi - 110001

1

Agenda for LTA Requests in ISTS for Generation Projects

in WR and ER

1.0 POWERGRID has received LTA requests as per CERC Regulation 2009 from the

following applicants as per details given below:-

Sl. No. Applicant LTA Quantum

(MW)

LTA Start Date

sought

End Date sought

(a) KSK Mahanadi

Power

Company Ltd.

500 MW to

TANGEDCO

1st

June 2014 30th

September 2028

(b) Bharat

Aluminium

Company Ltd.

100 MW to

TANGEDCO

1st

June 2014 30th

September 2028

(c) Dhariwal

Industries Ltd.

100 MW to

TANGEDCO

1st

June 2014 30th

September 2028

(d) EMCO Energy

Ltd.

150 MW to

TANGEDCO

1st

June 2014 30th

September 2028

(e) Kerala State

Electricity

Board

140.5 MW

from Maithon

Power Ltd.

1st

January 2014 31st

December, 2038

(f) Adhunik

Power &

Natural

Resources Ltd.

100 MW to

TANGEDCO

1st

June 2014 30th

September 2028

The above IPPs have already been granted Long-term Access based on target

regions. As per CERC, Regulations 2009, a generating company after firming up the

beneficiaries through signing of Long term Power Purchase Agreement(s) shall be

required to notify the same to CTU along with the copy of the PPA. Accordingly, IPPs

have submitted a copy of PPA and requested for change in region. The details are

given below:

(a) KSK Mahanadi Power Company Ltd. – 500 MW

Long-term Access (LTA) to KSK Mahandi Power Company Ltd. (KMPCL) Limited was

earlier granted by CTU vide our letter dated 01.10.2009 for 2340 MW from the

above generation project with target beneficiaries as WR-2340 MW alongwith

Chhattisgarh High Capacity corridor. Subsequently KMPCL signed BPTA with

POWERGRID and submitted requisite construction Bank Guarantee.

2

KMPCL vide its letter dated 27th November 2013 has submitted PPA for 500 MW with

TANGEDCO and requested CTU to allocate 500 MW to SR from earlier LTA granted

for 2340 MW to WR.

(b) Bharat Aluminium Company Ltd. – 100 MW

Long-term Access (LTA) to Bharat Aluminium Company Ltd. (BALCO) was earlier

granted by CTU vide our letter dated 01.10.2009 for 200 MW from the above

generation project with target beneficiaries as WR-100 MW and NR-100 MW

alongwith Chhattisgarh High Capacity corridor. Subsequently BALCO signed BPTA

with POWERGRID and submitted requisite construction Bank Guarantee.

Alongwith other developers, BALCO was granted LTA for 100 MW to TANGEDCO

from 01.08.2014 onwards vide our letter dated 20th December, 2013.

Subsequently, BALCO vide its letter dated 18th December 2013 has submitted copy of

PPA for another 100 MW with TANGEDCO and requested CTU to allocate additional

100 MW to SR from earlier LTA granted for 200 MW.

(c) Dhariwal Infrastructure Ltd. – 100 MW

Long-term Access (LTA) to Dhariwal Infrastructure Ltd. (DIL) was earlier granted by

CTU vide our letter dated 07.02.2011 for 300 MW from the above generation project

to target beneficiaries in WR/NR with LILO of one circuit of Bhadrawati – Parli 400 kV

D/c at DIL TPS. Subsequently LTA was amended to 270 MW vide our letter dated

27.12.2013 with target beneficiaries as WR-120 MW and NR-150 MW. DIL earlier

signed BPTA with POWERGRID.

Now DIL vide its letter dated 18th December 2013 has submitted PPA for 100 MW

with TANGEDCO and requested CTU to allocate 100 MW to SR from earlier LTA

granted for 270 MW to WR/NR.

(d) EMCO Energy Ltd. – 150 MW

Long-term Access (LTA) to EMCO Energy Ltd. (EMCO) was earlier granted by CTU vide

our letter dated 22.10.2007 for 520 MW from the above generation project with

target beneficiaries as WR-520 MW. Subsequently EMCO has signed BPTA for 520

3

MW with POWERGRID and the power plant is already connected with injection at

Bhadrawati substation of POWERGRID.

EMCO vide its letter dated 18th December 2013 has submitted PPA for 150 MW with

TANGEDCO and requested CTU to allocate 150 MW to SR from earlier LTA granted

for 520 MW to WR.

(e) Kerala State Electricity Board – 140.5 MW

Kerala State Electricity Board (KSEB) has requested for LTA from 01.01.2014 for

140.5MW from Maithon Power Ltd.

In this regard, Long-term Access (LTA) to Maithon Power Limited is already effective

(Installed Capacity 1050 MW; 140.5 MW with ER as target beneficiary). The power

plant is connected to Maithon & Ranchi 400 kV substations of POWERGRID through

400 kV D/c lines and is under operation.

(f) Adhunik Power & Natural Resources Ltd. – 100 MW

Long-term Access (LTA) to Adhunik Power & Natural Resources Ltd. (APNRL) was

granted by CTU for 450 MW from the above generation project with target

beneficiaries as ER-300 MW, NR-100 MW and WR-50 MW with Jharkand High

Capacity corridor. Subsequently APNRL has signed BPTA for 450 MW with

POWERGRID and submitted requisite construction Bank Guarantee. The power plant

is connected to existing Jamshedpur substation of POWERGRID and is under

operation.

APNRL vide its letter dated 19th December 2014 has submitted PPA for 100 MW with

TANGEDCO and requested CTU to allocate 100 MW to SR from earlier LTA granted

for 300 MW to ER.

2.0 ATC of NEW Grid & Southern Region

All the generation projects are located in WR & ER. The existing ATC is 3450 MW

between NEW grid & SR and additional ATC of 1250 MW shall be available with

effect from 01.08.2014 subject to availability of transmission lines at Annexure-A.

4

Out of the available ATC of 4,700 MW between NEW Grid & SR, with effect from

01.08.2014, 4450 MW to various LTA/MTOA applicants has already been granted.

Therefore ATC of 250 MW is available for further allocation to above LTA

applicants w.e.f 01.08.2014. However the total quantum of LTA sought is 1090.5

MW.

Some of the on-going MTOA transactions which were granted on the existing

transmission system shall expire from November, 2015 onwards with details as given

below. The available ATC with the expiry of MTOA transactions shall be allocated to

above LTA applicants.

Sl. No.

Date of Expiry of MTOA transaction

Applicant MTOA Quantum (MW)

Drawl Point ATC Availability

1 30 November 2015 Jindal Power Limited

200 TANGEDCO 250+200= 450 MW

2 31 December 2015 Adani Power Limited

200 TANGEDCO 450+200= 650 MW

3 31 May 2016 Lanco Anpara Limited

100 TANGEDCO 650+100= 750 MW

4 15 June 2016 KSK Mahanadi Power Company Limited

400 APCPDCL 750+400= 1150 MW

5 15 June 2016 Corporate Power Limited

150 APCPDCL 1150+150=1300 MW

Total 1050

Further, POWERGRID is implementing Kolhapur-Narendra 765 kV D/c (charged at

400 kV) transmission line and in the event of increase of ATC with above line, the LTA

quantum shall be reviewed accordingly.

3.0 Proposal for Grant of LTA

The LTA to above applicants on pro-rata basis is proposed to be granted from

01.08.2014 onwards as per enclosed Annexure-B. Further the grant of Long-term

Access is subject to :

Availability of transmission lines at Annexure-A. In the event of delay in any of

the transmission system, CTU shall review the ATC and accordingly LTA quantum

and start date shall be revised.

The relinquishment of LTA by IPPs in WR/ER/NR and change of region shall be as

per CERC regulations as amended from time to time.

5

With the availability of Kolhapur – Narendra 765 kV D/c (initially charged at 400

kV) and in the event of increase of ATC with above line, LTA quantum shall be

accordingly revised.

The applicant/beneficiaries shall enter into long term access agreement(s) with

CTU within thirty days of receipt of draft LTA Agreement.

The sharing of transmission charges shall be as per CERC Regulations and its

amendments thereof.

The applicant shall abide by all provisions of the Electricity Act, 2003, the CERC

regulation 2009 (Grant of Connectivity, Long-term Access and Medium-term

Open Access in inter-State Transmission and related matters), Central Electricity

Authority (Technical Standards for connectivity to the Grid) and Indian Electricity

Grid Code as amended from time to time.

---xxxx---

6

Annexure-A

Inter-regional Line (Under implementation by Private Sector)

Solapur – Raichur 765 kV S/c line

Western Region (Under implementation by POWERGRID)

Raipur – Wardha 765 kV D/c line

Wardha – Aurangabad 765 kV D/c line

Solapur-Pune 765 kV S/c line

Southern Region (Under implementation by POWERGRID)

Gooty - Madhugiri 400 kV D/c line

Madhugiri – Yelahanka 400 kV D/c line

Raichur – Kurnool 765 kV S/c

Kurnool – Thiruvalem 765 kV D/c line

Vijayawada – Nellore 400 kV D/c line

Nellore – Thiruvalem 400 kV D/c line

Thiruvalem – Malekottaiyur 400 kV D/c line.

7

Annexure-B

Proposed Grant of LTA to different Applicants to Southern Region

Sl. No.

Applicant Injection Point LTA Start Date & Quantum Proposed End Date

Quantum from 01-Aug-2014

Quantum from 01-Dec-2015

Quantum from 01-Jan-2016

Quantum from 01-Jun-2016

Quantum from 16-Jun-2016

1. KSK Mahanadi Power Company Ltd.

Champa Pooling Station

115 MW 206 MW 298 MW 344 MW 500 MW 30-Sep-2028

2. Bharat Aluminium Company Ltd.

Dharamjaigarh Pooling Station

23 MW 41 MW 60 MW 69 MW 100 MW 30-Sep-2028

3. Dhariwal Industries Ltd.

LILO of Bhadrawati-Parli 400 kV S/c at Dhariwal

23 MW 41 MW 60 MW 69 MW 100 MW 30-Sep-2028

4. EMCO Energy Ltd.

Bhadrawati 34 MW 62 MW 89 MW 103 MW 150 MW 30-Sep-2028

5. Kerala State Electricity Board

Maithon Power Ltd.

32 MW 59 MW 83 MW 96 MW 140.5 MW 31-Dec-2028

6. Adhunik Power & Natural Resources Ltd.

Jamshedpur 23 MW 41 MW 60 MW 69 MW 100 MW 30-Sep-2028

Total 250 MW 450 MW 650 MW 750 MW 1090.5 MW