12 q b a c k p a g e the himalayan mail

1
NEW DELHI, MAR 01: The Federation of Auto- mobile Dealers Associations (FADA), the apex National Body of Automobile Retail in India, has announced the appointment of Sanjay Ag- garwal – Managing Direc- tor, Jammu Motors (P) Ltd, as the State Chairperson of FADA’s Jammu Chapter for 2020-22. M/s Jammu Motors (P) Ltd, Jammu, a Life Member of FADA, has dealerships of Maruti Suzuki and Bajaj Auto. “We are sure that to- gether, we will take the FADA Movement in Jammu Chapter to the next orbit of Momentum & Growth,” FADA said. The Managing Commit- tee has thanked Sanjay Ag- garwal for stepping forward in taking up this responsi- bility and sparing his time and efforts and helping fur- ther strengthen FADA in Jammu Chapter. The committee, with Ag- garwal as the chairperson, has unanimously appointed the following members as Jammu Regional Directors: Sanjay Mahajan, Jammu Automart Pvt Ltd, Hyundai, Sahil Mahajan, Pace Au- toaids Pvt Ltd, Hyundai, Vikram Mahajan, Astro In- dia Automobile Pvt Ltd, M&M, Rohit Gandotra, Fairdeal Motors & Work- shop Pvt Ltd, Tata Motors, and Taranjit Singh Sahni, Devika Automobiles, Hero Motocorp. FADA appoints State Chairperson, 5 Regional Directors of its Jammu Chapter MUMBAI, MARCH 01: "Need of the hour is to lead our lives as true hu- man beings which can be achieved by embracing human valuesonly"was the clarion call given by Satguru Mata SudikshaJiMaharaj at the concluding session of 54th Annual Nirankari Sant Samagam of Maharashtra on 28th February, 2021. To stay firm on this path ,we need to introspect frequently and avoid negativity to set in; Her Holiness fur- ther guided and urged to cultivate the spirit of love, humility and magna- nimity, to ignore the demerits instead accept the merit and to empathize with one another. SatguruMataJi further general- ized,while all humans consider them- selves religious and reserve the teach- ings of the Prophets,Seers and Gurus, who have taught the world thathu- manity is the true religionthat can make life meaningful by connecting themselves to God. God Realization leads to Self Realizationand this can be achieved at any age. God Knowl- edge can be attained in a fraction of a moment from the True Master. The three day Samagam was web- casted on Mission's website and tele- casted on Sanskar TV channel. Ni- rankari devotees across the globe and God loving people enjoyed this blissful event. On the firstday ofSamagam, Sat- guru MataJi said in Her Holy dis- course that God is Formless, Om- nipresent and can be addressed by any name. Every soul is a part of the Divine Super soul and for this reali- sation; God Realisation is a must. By connecting with the Eternal God, one can attain stability, peace and con- tentment. Once we realize that God is the doer of everything then accep- tance leads to contentment in all up- heavals of life. When we take support of the Formless God then acceptance makes life blissful. SEWADAL RALLY The second day commenced with the Sewadal Rally wherein Sewadal volunteers,both men and women hailing from various parts of Maha- rashtra showcased their talents and feats by performing fitness drills such as Mallakhamba and aerial acts. There were various skits which showcased the teachings and the ide- ologies of the Mission. The first step to selfless service is to surrender to the Almighty, asService to Mankind is Service to God and to attain this one should abandon the ego of the mind and maintain modesty and discipline. Addressing the second day evening session, Her Holiness said that to es- tablish stability in our lives; right choices, awareness and wisdom is es- sential. Negative emotions reside only when we give them place in our hearts. On the other hand, when we give place to God in our hearts, our mind becomes pure. Life is short; to err is human hence, we need to en- sure that we do not repeat our mis- takes. In this way we can contribute positively in everyone's life and make our life happy here and hereafter. The modern generation does not give credence to the past and future births and are just concerned about the present;SatguruMataJi exhorted to better our present by invoking God asHe is the only source to provide sta- bility. MataJi referred to the saints from the past, who have left a message for the world that seeing God through open eyes is possible and after receiv- ing God Knowledge when we realize ourselves in the form of a soul and not a body. Saints from the past have all along maintained that life can be meaningful by connecting with God and treading the path of devotion so that our soul can be released from the bondages and attain salvation. A Multi-Lingual Poetic Symposium (KaviDarbar) The main attraction of the third day of the Samagam was a Multilingual Poetic Symposium. The topic of this symposium was "Sthir se NaataJod- keMan kaJeevanko Hum Sehaj Ba- naye". Enriches life with newvision, energy and positivity 12 JAMMU Q TUESDAY Q MARCH 02, 2021 B A C K P A G E CMYK CMYK CMYK CMYK Owner/Printed/Publisher by: Sahil Mahajan and Published from 13-B/C, Gandhi Nagar Jammu Pin: 180004 and Printed from The Himalayan Mail Printing Press, Jeevan Nagar/Deeli, Jammu Editor:- Harinder Mahajan Phone: 0191-7968906, Fax: 0191-7968906, Phone Marketing: 0191 -7968906, 94191-19286, E-mail : [email protected] www.himalayanmail.com The Himalayan Mail JAL SHAKTI DEPARTMENT, JAMMU OFFICE OF THE EXECUTIVE ENGINEERJAL SHAKTI (PHE) DIVISION SAMBA NO TICE INVITING e- TENDER e-NIT No: PHES/171 of 2020-21 Dated: 20-02-2021 For and on behalf of the Lt. Governor of UT of J&K e-tenders (Two cover System)Turn Key Basisare invited from reputed and resourceful contractors/Firms/companies/joint venture of repute, which should be uploaded on the e-Procurement web portal http://www.jktenders.gov.in up to last bidding date:- 03-03-2021 up to 16.00 PMfor the subject work referred below and as per the details mentioned in this e-tender notification and to whom all the terms and conditions of detailed NIT /Tender Documents/ PWD Form No:- 25 double are acceptable. The detailed tender document andSpecificatioPns etc. can be downloaded on the e-procurement Portal http://www.jktenders.gov.in.The cost of tender documents (Non-refundable/ Non- Transferable)should bein the shape of e-challan/Treasury Receipt to be deposited in MH:0215-WSS (Revenue Head) or through RTGS in J&K Bank Branch SAMBA bearing Bank Account No. 0640010200000058, IFSC code JAKA0NANDAN in favour of Executive Engineer,Jal Shakti (PHE), Division SAMBA. Position of Funds = Available Administrative Approval: Accorded 1.0 TERMS AND CONDITIONS: 1.1 The tenderer should in his own interest inspect and examine the site, its surroundings/topography, nature of ground, climatic conditions, accessibility or other relevant information at his own expenses and responsibility to satisfy himself before tendering for the advertised work. The bidder shall have to conduct the Soil Tests as required for Designing of The Filtration Plants , RSFP's or SSFP's(Rapid Sand Filtration Plants/Slow Sand Filtration Plants) , Service Reservoirs , Over Head Tanks , Impounding Reservoirs, Retaining or Breast / Retaining walls and all charges shall be included in the Turn Key Quoted rates , no extra rate or amount shall be paid to the agency including the quality control tests as referred in this e-Nit tender Document. The test should be conducted by the Inspection & Quality Control Department of UT of J&K or any other agency nominated/to be nominated by the Jal Shakti Department in this regard to whom the vetting Charges shall be paid by the bidder himself including the charges of the Designer through whom the design is prepared/vetted. 1.2 If L-1 bidder fails to start the work within 15 days of the issuance of letter of intent or allotment, whichever is earlier, the department shall allot the work to the other willing lowest bidder like L2, L3, L4 and EMD of the L-1, including the additional Security Performance, shall be forfeited, besides debar- ring the Contractor for a period of two years from participating in the tenders issued by the Jal Shakti (PHE) Department Jammu. 1.3 All Materials like Cement, TMT Steel, Admixtures, pipes, fittings, pumps, motors etc. shall be arranged by the Contractor himself as per instructions as contained in this tender document. 1.4 The bidder will ensure the quality of Elctro-mechanical components from reputed manufacturer like Kirlsokar , ABB, Mathern Platt etc. 1.5 The bidder will get all the drawing and design vetted by the Govt. Authority like Design Directorate, NIT, IIT,GCET & any other Govt. Engineering Colleges. 1.6 The electric transformer shall be of level -2 irrespective of capacity manufactured by reputed /registered concerned and erection of Sub-Station will include the feeding 11 KV HT Line form the existing source. 1.7 The G.I Pipes to be consumed shall be of Parkash Surya, Jindal or any other standard Make and is to be inspected by third party from the Govt. reg- istered authority. 1.8 The electric cables to be used shall be of Finolex, Gloster etc. standard make. 1.9 The switch gear and switches to be used in the execution shall have to be manufactured by reputed firm like L&T, Kirlosker, Havels, Crompton Greeves, ABB etc. standard make. 1.10 The FHTC's shall be paid as per actual execution/installation in nos. at site. 1.11 The contractor should have to get the feasibility report of sustainability report of source from the Central Ground water board prior to start of sinking of Tube Well. 1.12 The bidder should have to obtained power connection from JKPDC Department on behalf of Jal Shakti, PHE Department at his own expenses run- ning of Tube well/ Pumping Station. 2.0 CRITERIA FOR PARTICIPATION OF TENDERS: - 2.1 TECHNICAL The contractor should have successfully completed similar* works during last five years ending 31st March 2020, either of the following; a) One similar completed work costing not less than 80% of advertised cost b) Two similar completed works costing not less than 50% of advertised cost each c) Three similar completed works costing not less than the 40% of advertised cost each. *Similar work for a Civil contractor means, works pertaining to water supply sector like Laying & fitting of Pipes, construction of Rapid Sand Filtration Plants/Slow Sand Filtration Plants, Overhead Tanks, or the RCC Service Reservoirs, etc., having relevance to the scope of the present work. Sd/- No: PHES/27310-59 Executive Engineer, Dated:-20-02-2021 Jal Shakti, PHE Division, Samba. DIP/J-12514/20 Dated: 01-03-2021 S. No Name of work Adv. Cost of Work(s) (Rs. in lacs) Earnest Money Class of Contractor Cost of Document Period of completion MH of Account 1 A) AUGMENTATION OF WATER SUPPLY SCHEME SIMBLANA PATHWAL AND ITS ADJOINING AREA UNDER JAL JEEVAN MISSION (as per the scope of works mentioned in the SBD) Including civil work, con- ducting complete necessary survey, soil tests & design as required at selected site, as per the Parameters/ spec- ifications. 280.77 Lacs Rs. 561540/- "A" Rs. 6000/- 04 Months JJM B) Operation & Maintenance of critical components as per SBD for a period of two years. i) 1st year ii) 2nd year NIL __ __ __ 1st year 2nd year JJM Fax: 01923-243239 e-mail: [email protected] OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI (PHE) DIVISION KATHUA SHOR T NO TICE INVITING TENDER Fresh e-NIT No. 37 of 2020-21 Dated: 24-02-2021 For and on behalf of President of India Tenders are invited by the Executive Engineer PHE Division Kathua by e-tendering mode on item rate basis from approved and eligible Contractors with J&K Govt/UT or CPWD/MES and Railways for the following works with sufficient e3xperience and finan- cial resources dealing. Position of AAA = Submitted Position of Funds = Budgetary The NIT consisting of qualifying information, eligibility criteria, bill of quantities (BOQ), terms and conditions of contract can be seen down loaded from the departmental website (www.jktenders.gov.in) as per the dates shown below:- Sd/- No: PHEk/4168-99 Executive Engineer, Dated:-23-02-2021 Jal Shaksi PHE Division-Kathua. DIP/J-12548/20 Dated: 01-03-2021 S. No. Name of work Estt. Cost of Work Cost of Document Earnest Money Time allowed for completiong Class of contractor Bid Validity 1 Providing, Laying and fitting of Distribution Pipe line to Mohalla Dalbir Singh and Moh. Sushil Kumar at Shiva Nagar under WSS Kathua Town (MNP). 0.69 Rs. 200/- Rs. 1380/- 15 Days D 90 Days 2 Providing Laying and fixing of Distribution System at W.NO. 3, 5 and 6 of Govindsar under WSS Govindsar (NRDWP) 2.24 Rs. 300/- Rs. 4480/- 15 Days ABCD 90 Days 3 Providing, Laying and fitting of Rising Main Line Hanuman Temple to 50000 Glns Sump Tank at Shamshan Ghat Billawar WSS Billawar Town under Languishing 4.12 Rs. 200/- Rs. 8240/- 30 Days ABCD 90 Days a Publishing date of NIT 24-02-2021 b Download Start Date 24-02-2021 from 10 am c Download End Date 02/03/2021 up to 4 00 p.m d Bid submission Start Date 24 02 2021 From 10 00 a.m e Bid submission End Date 02/03/2021 up to 4 00 p.m f Bid Opening Date 03-03-2021, 1200 Hrs HIMALAYAN MAIL NEWS JAMMU, MAR 01 On Ist March 2021, day lighting of 666 mtrs long, 9.0 mtrdiaHorse Shoe shaped, Diversion Tunnel of Kiru HE Project was achieved ahead of schedule inspite of lockdown in be- tween due to covid pan- demic. This milestone paves the way for diversion of river Chenab during Octo- ber'2021followed by start of construction of 135 mtrs high Concrete Gravity Dam. Simultaneously work on Main Access Tunnel to Power House, Cable cum Ventilation Tunnel, Adit to Pressure Shaft Top and stripping of Dam Abut- ments are also in progress. Kiru HE Project (624 MW) is the run of the river scheme being constructed on river Chenab in Kisht- warDistt of J&K. Founda- tion stone of the project was laid by Hon'ble Prime Minister ShNarendera Modi on 3rd February 2019 and the project is sched- uled to be commissioned in 54 months at an estimated cost of Rs. 4287.59 Crores (July' 18 price level). All out efforts are being made to complete the pro- ject ahead of schedule by providing Real time solu- tion to the problems, re- source mobilization and their optimum utilization with better Management and Monitoring of progress of works. Diversion Tunnel of 624 MW Kiru HE Project day lighted Mr Sanjay Agarwal Mr Sanjay Mahajan Mr Sahil Mahajan Mr Vikram Mahajan Mr Rohit Gandotra Mr Taranjit Singh Sahni Maharashtra’s 54th Nirankari Sant Samagam

Upload: others

Post on 19-Mar-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

NEW DELHI, MAR01: The Federation of Auto-mobile Dealers Associations(FADA), the apex NationalBody of Automobile Retailin India, has announced theappointment of Sanjay Ag-garwal – Managing Direc-tor, Jammu Motors (P) Ltd,as the State Chairperson ofFADA’s Jammu Chapter for2020-22.

M/s Jammu Motors (P)Ltd, Jammu, a Life Memberof FADA, has dealerships ofMaruti Suzuki and BajajAuto.

“We are sure that to-gether, we will take theFADA Movement inJammu Chapter to the nextorbit of Momentum &Growth,” FADA said.

The Managing Commit-

tee has thanked Sanjay Ag-garwal for stepping forwardin taking up this responsi-bility and sparing his timeand efforts and helping fur-ther strengthen FADA inJammu Chapter.

The committee, with Ag-garwal as the chairperson,has unanimously appointedthe following members asJammu Regional Directors:

Sanjay Mahajan, JammuAutomart Pvt Ltd, Hyundai,Sahil Mahajan, Pace Au-toaids Pvt Ltd, Hyundai,Vikram Mahajan, Astro In-dia Automobile Pvt Ltd,M&M, Rohit Gandotra,Fairdeal Motors & Work-shop Pvt Ltd, Tata Motors,and Taranjit Singh Sahni,Devika Automobiles, HeroMotocorp.

FADA appoints State Chairperson, 5 Regional Directors of its Jammu Chapter

MUMBAI, MARCH 01: "Need ofthe hour is to lead our lives as true hu-man beings which can be achieved byembracing human valuesonly"wasthe clarion call given by Satguru MataSudikshaJiMaharaj at the concludingsession of 54th Annual NirankariSant Samagam of Maharashtra on28th February, 2021.

To stay firm on this path ,we needto introspect frequently and avoidnegativity to set in; Her Holiness fur-ther guided and urged to cultivate thespirit of love, humility and magna-nimity, to ignore the demerits insteadaccept the merit and to empathizewith one another.

SatguruMataJi further general-ized,while all humans consider them-selves religious and reserve the teach-ings of the Prophets,Seers and Gurus,who have taught the world thathu-manity is the true religionthat canmake life meaningful by connectingthemselves to God. God Realizationleads to Self Realizationand this canbe achieved at any age. God Knowl-edge can be attained in a fraction of amoment from the True Master.

The three day Samagam was web-casted on Mission's website and tele-casted on Sanskar TV channel. Ni-rankari devotees across the globe andGod loving people enjoyed this blissfulevent.

On the firstday ofSamagam, Sat-guru MataJi said in Her Holy dis-course that God is Formless, Om-nipresent and can be addressed byany name. Every soul is a part of the

Divine Super soul and for this reali-sation; God Realisation is a must. Byconnecting with the Eternal God, onecan attain stability, peace and con-tentment. Once we realize that God isthe doer of everything then accep-tance leads to contentment in all up-heavals of life. When we take supportof the Formless God then acceptancemakes life blissful.

SEWADAL RALLYThe second day commenced with

the Sewadal Rally wherein Sewadalvolunteers,both men and womenhailing from various parts of Maha-rashtra showcased their talents andfeats by performing fitness drills suchas Mallakhamba and aerial acts.

There were various skits whichshowcased the teachings and the ide-ologies of the Mission. The first stepto selfless service is to surrender tothe Almighty, asService to Mankindis Service to God and to attain this oneshould abandon the ego of the mindand maintain modesty and discipline.

Addressing the second day evening

session, Her Holiness said that to es-tablish stability in our lives; rightchoices, awareness and wisdom is es-sential. Negative emotions resideonly when we give them place in ourhearts. On the other hand, when wegive place to God in our hearts, ourmind becomes pure. Life is short; toerr is human hence, we need to en-sure that we do not repeat our mis-takes. In this way we can contributepositively in everyone's life and makeour life happy here and hereafter.

The modern generation does notgive credence to the past and futurebirths and are just concerned aboutthe present;SatguruMataJi exhortedto better our present by invoking GodasHe is the only source to provide sta-bility.

MataJi referred to the saints fromthe past, who have left a message forthe world that seeing God throughopen eyes is possible and after receiv-ing God Knowledge when we realizeourselves in the form of a soul and nota body. Saints from the past have allalong maintained that life can bemeaningful by connecting with Godand treading the path of devotion sothat our soul can be released from thebondages and attain salvation.

A Multi-Lingual Poetic Symposium(KaviDarbar)

The main attraction of the third dayof the Samagam was a MultilingualPoetic Symposium. The topic of thissymposium was "Sthir se NaataJod-keMan kaJeevanko Hum Sehaj Ba-naye".

Enriches life with newvision,energy and positivity

12 JAMMU TUESDAY MARCH 02, 2021 B A C K P A G E

CMYK CMYK CMYK CMYK

Owner/Printed/Publisher by: Sahil Mahajan and Published from 13-B/C, Gandhi Nagar Jammu Pin: 180004 and Printed from The Himalayan Mail Printing Press, Jeevan Nagar/Deeli, Jammu Editor:- Harinder Mahajan Phone: 0191-7968906, Fax: 0191-7968906, Phone Marketing: 0191 -7968906, 94191-19286, E-mail : [email protected]

www.himalayanmail.com

The Himalayan Mail

JAL SHAKTI DEPARTMENT, JAMMUOFFICE OF THE EXECUTIVE ENGINEERJAL SHAKTI (PHE) DIVISION SAMBA

NOTICE INVITING e-TENDERe-NIT No: PHES/171 of 2020-21 Dated: 20-02-2021

For and on behalf of the Lt. Governor of UT of J&K e-tenders (Two cover System)Turn Key Basisare invited from reputed and resourcefulcontractors/Firms/companies/joint venture of repute, which should be uploaded on the e-Procurement web portal http://www.jktenders.gov.in up to lastbidding date:- 03-03-2021 up to 16.00 PMfor the subject work referred below and as per the details mentioned in this e-tender notification and to whomall the terms and conditions of detailed NIT /Tender Documents/ PWD Form No:- 25 double are acceptable. The detailed tender documentandSpecificatioPns etc. can be downloaded on the e-procurement Portal http://www.jktenders.gov.in.The cost of tender documents (Non-refundable/ Non-Transferable)should bein the shape of e-challan/Treasury Receipt to be deposited in MH:0215-WSS (Revenue Head) or through RTGS in J&K BankBranch SAMBA bearing Bank Account No. 0640010200000058, IFSC code JAKA0NANDAN in favour of Executive Engineer,Jal Shakti (PHE), DivisionSAMBA.

Position of Funds = Available Administrative Approval: Accorded1.0 TERMS AND CONDITIONS:1.1 The tenderer should in his own interest inspect and examine the site, its surroundings/topography, nature of ground, climatic conditions, accessibility

or other relevant information at his own expenses and responsibility to satisfy himself before tendering for the advertised work. The bidder shall haveto conduct the Soil Tests as required for Designing of The Filtration Plants , RSFP's or SSFP's(Rapid Sand Filtration Plants/Slow Sand Filtration Plants), Service Reservoirs , Over Head Tanks , Impounding Reservoirs, Retaining or Breast / Retaining walls and all charges shall be included in the TurnKey Quoted rates , no extra rate or amount shall be paid to the agency including the quality control tests as referred in this e-Nit tender Document.The test should be conducted by the Inspection & Quality Control Department of UT of J&K or any other agency nominated/to be nominated by theJal Shakti Department in this regard to whom the vetting Charges shall be paid by the bidder himself including the charges of the Designer throughwhom the design is prepared/vetted.

1.2 If L-1 bidder fails to start the work within 15 days of the issuance of letter of intent or allotment, whichever is earlier, the department shall allot the workto the other willing lowest bidder like L2, L3, L4 and EMD of the L-1, including the additional Security Performance, shall be forfeited, besides debar-ring the Contractor for a period of two years from participating in the tenders issued by the Jal Shakti (PHE) Department Jammu.

1.3 All Materials like Cement, TMT Steel, Admixtures, pipes, fittings, pumps, motors etc. shall be arranged by the Contractor himself as per instructionsas contained in this tender document.

1.4 The bidder will ensure the quality of Elctro-mechanical components from reputed manufacturer like Kirlsokar , ABB, Mathern Platt etc.1.5 The bidder will get all the drawing and design vetted by the Govt. Authority like Design Directorate, NIT, IIT,GCET & any other Govt. Engineering

Colleges.1.6 The electric transformer shall be of level -2 irrespective of capacity manufactured by reputed /registered concerned and erection of Sub-Station will

include the feeding 11 KV HT Line form the existing source.1.7 The G.I Pipes to be consumed shall be of Parkash Surya, Jindal or any other standard Make and is to be inspected by third party from the Govt. reg-

istered authority.1.8 The electric cables to be used shall be of Finolex, Gloster etc. standard make.1.9 The switch gear and switches to be used in the execution shall have to be manufactured by reputed firm like L&T, Kirlosker, Havels, Crompton

Greeves, ABB etc. standard make.1.10 The FHTC's shall be paid as per actual execution/installation in nos. at site.1.11 The contractor should have to get the feasibility report of sustainability report of source from the Central Ground water board prior to start

of sinking of Tube Well.1.12 The bidder should have to obtained power connection from JKPDC Department on behalf of Jal Shakti, PHE Department at his own expenses run-

ning of Tube well/ Pumping Station.2.0 CRITERIA FOR PARTICIPATION OF TENDERS: -2.1 TECHNICALThe contractor should have successfully completed similar* works during last five years ending 31st March 2020, either of the following;

a) One similar completed work costing not less than 80% of advertised costb) Two similar completed works costing not less than 50% of advertised cost each c) Three similar completed works costing not less than the 40% of advertised cost each.

*Similar work for a Civil contractor means, works pertaining to water supply sector like Laying & fitting of Pipes, construction of Rapid Sand FiltrationPlants/Slow Sand Filtration Plants, Overhead Tanks, or the RCC Service Reservoirs, etc., having relevance to the scope of the present work.

Sd/-No: PHES/27310-59 Executive Engineer, Dated:-20-02-2021 Jal Shakti, PHE Division, Samba.DIP/J-12514/20 Dated: 01-03-2021

S.No

Name of work Adv. Cost ofWork(s)

(Rs. in lacs)

Earnest Money

Class ofContractor

Cost of Document

Period ofcompletion

MH ofAccount

1 A) AUGMENTATION OF WATER SUPPLY SCHEMESIMBLANA PATHWAL AND ITS ADJOINING AREAUNDER JAL JEEVAN MISSION (as per the scope ofworks mentioned in the SBD) Including civil work, con-ducting complete necessary survey, soil tests & designas required at selected site, as per the Parameters/ spec-ifications.

280.77Lacs

Rs. 561540/- "A" Rs. 6000/- 04 Months JJM

B) Operation & Maintenance of critical componentsas per SBD for a period of two years.i) 1st year ii) 2nd year

NIL __ __ __ 1st year2nd year

JJM

Fax: 01923-243239 e-mail: [email protected]

OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI (PHE) DIVISION KATHUASHORT NOTICE INVITING TENDER

Fresh e-NIT No. 37 of 2020-21 Dated: 24-02-2021For and on behalf of President of India Tenders are invited by the Executive Engineer PHE Division Kathua by e-tendering mode on item rate basisfrom approved and eligible Contractors with J&K Govt/UT or CPWD/MES and Railways for the following works with sufficient e3xperience and finan-cial resources dealing.

Position of AAA = Submitted Position of Funds = BudgetaryThe NIT consisting of qualifying information, eligibility criteria, bill of quantities (BOQ), terms and conditions of contract can be seendown loaded from the departmental website (www.jktenders.gov.in) as per the dates shown below:-

Sd/-No: PHEk/4168-99 Executive Engineer, Dated:-23-02-2021 Jal Shaksi PHE Division-Kathua.DIP/J-12548/20 Dated: 01-03-2021

S.No.

Name of work Estt. Cost of Work

Cost of Document

Earnest Money

Time allowed for completiong

Class ofcontractor

BidValidity

1 Providing, Laying and fitting of Distribution Pipeline to Mohalla Dalbir Singh and Moh. SushilKumar at Shiva Nagar under WSS Kathua Town(MNP).

0.69 Rs. 200/- Rs. 1380/- 15 Days D 90 Days

2 Providing Laying and fixing of DistributionSystem at W.NO. 3, 5 and 6 of Govindsar underWSS Govindsar (NRDWP)

2.24 Rs. 300/- Rs. 4480/- 15 Days ABCD 90 Days

3 Providing, Laying and fitting of Rising Main LineHanuman Temple to 50000 Glns Sump Tank atShamshan Ghat Billawar WSS Billawar Townunder Languishing

4.12 Rs. 200/- Rs. 8240/- 30 Days ABCD 90 Days

a Publishing date of NIT 24-02-2021b Download Start Date 24-02-2021 from 10 amc Download End Date 02/03/2021 up to 4 00 p.m

d Bid submission Start Date 24 02 2021 From 10 00 a.m

e Bid submission End Date 02/03/2021 up to 4 00 p.m

f Bid Opening Date 03-03-2021, 1200 Hrs

HIMALAYAN MAIL NEWSJAMMU, MAR 01

On Ist March 2021, daylighting of 666 mtrs long,9.0 mtrdiaHorse Shoeshaped, Diversion Tunnelof Kiru HE Project wasachieved ahead of scheduleinspite of lockdown in be-tween due to covid pan-demic.

This milestone paves theway for diversion of riverChenab during Octo-ber'2021followed by startof construction of 135 mtrshigh Concrete GravityDam.

Simultaneously work onMain Access Tunnel toPower House, Cable cumVentilation Tunnel, Adit toPressure Shaft Top andstripping of Dam Abut-ments are also in progress.

Kiru HE Project (624MW) is the run of the riverscheme being constructed

on river Chenab in Kisht-warDistt of J&K. Founda-tion stone of the projectwas laid by Hon'ble PrimeMinister ShNarenderaModi on 3rd February 2019and the project is sched-

uled to be commissioned in54 months at an estimatedcost of Rs. 4287.59 Crores(July' 18 price level).

All out efforts are beingmade to complete the pro-ject ahead of schedule by

providing Real time solu-tion to the problems, re-source mobilization andtheir optimum utilizationwith better Managementand Monitoring of progressof works.

Diversion Tunnel of 624 MW Kiru HE Project day lighted

Mr Sanjay Agarwal

Mr Sanjay Mahajan

Mr SahilMahajan

Mr VikramMahajan

Mr Rohit Gandotra

Mr TaranjitSingh Sahni

Maharashtra’s 54th Nirankari Sant Samagam