    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 2 of 16

    VECO Doc. No. 20298-MR-EJ50-105

    PREPARED BY

     Adnan Zubairy

    CHECKED BY

    PramodWaghulde

     APPROVED BY

     Aadil Imitiaz

    REQ’N FOR

    QUOTE PURCHASE

    REQUISITION NO.

    12-MGDP-I-9015

    PROJECT NO.

    20298

    CLIENT

    PCPL

    DATE PREPARED

    8-Nov-08

    DATE REQUIRED ACCOUNT CODE

    PROJECT NAME 

    MEHAR GAS DEVELOPMENT

     AFE NUMBER AFE ITEM NUMBER BUDGET

    RECOMMENDED SUPPLIER:

    ISSUED FOR REVIEW

    SHIP TO

    Pakistan

    PURCHASING

    PROJECT MANAGER:

     ADEL ELKEY

    TAG NUMBER:

    Refer to datasheets listed in Attachment A

    FINAL

    ITEM QTY DESCRIPTION/SCOPE OF SUPPLY UNIT PRICE TOTAL

    Design, manufacture, assembly, calibration, testing & delivery of fieldinstruments as per specification listed in Attachment A.: 

    1 Pressure Gauge, as per datasheet 12-MGDP-I-2106

    1.a 38½” NPTM, Provided by Diaphragm Seal with ¾” NPTF process

    connection Monel

    1.c 6 ½” NPTM Process connection, with 316SS L Material

    2 1 Lot Start-up & Commissioning Spares, Consumable & Special Tools

    3 1 LotList of spare parts for 2 year normal operation (itemised price) in SPIRform

    FOLLOWING SECTION FOR USE BY PURCHASING

    ORDER NO. PURCHASED FROM DELPROM’D

    ORDERDATE

    F.O.B. TERMS TAX

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    3/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 3 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

    TECHNICAL DOCUMENTS & ATTACHMENTS

    DOCUMENT / ATTACHMENT NO.

    DOCUMENT/ATTACHMENT TITLE REV

     ATTACHMENT A Technical Documents / Drawings & Attachments

    12-MGDP-I-1124 Specification for General Instruments 1

    12-MGDP-I-2106  Instrument Datasheet – Pressure Gauge  0

     ATTACHMENT B Vendor Drawing & Data Requirement Form

     ATTACHMENT C Spare Parts

     ATTACHMENT D Source Inspection Plan

     ATTACHMENT E Inspection Levels

     ATTACHMENT F Table of compliance

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    4/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 4 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

     ATTACHMENT – A

    TECHNICAL DOCUMENTS / DRAWINGS AND ATTACHMENTS

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    5/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 5 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

     ATTACHMENT – B

    VENDOR DRAWINGS AND DATA REQUIREMENT FORM

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    6/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 6 of 16

    VECO Doc. No. 20298-MR-EJ50-105

    VENDOR DRAWING AND DATA REQUIREMENT FORM

    Equipment Description & Tag No.: Refer to datasheet listed in Attachment A  

    Material Requisition for: Pressure Gauge 

    REQUIRED WITH BID - 3 copies

    SUBMIT FOR REVIEW AND APPROVAL. FABRICATION NOT TO COMMENCE UNTIL REVIEW & ACCEPTANCE - 4 cop ies

    CERTIFIED & FINAL SUBMITTAL APPROVED BY PURCHASER - 6 copies, 1 reproducible and 1 electronic (CD ROM)

    TO BE SUBMITTED FOR INFORMATION ONLY - 6 copies

    DESCRIPTION

    REQUIREDBY BUYER

    WEEKS ARO

     AGREEDBY

    SELLERDATE*

    X X Inspection And Test Plan (generic for bid, detailed ARO) 2

    X X Fabrication, Quality Surveill ance and Delivery Schedule 2

    X X Priced recommended list for spare parts and special tools 8

    X Signed Vendor Drawing and Data requirements form with “ Agreed by Seller, Date” 2

    X X List of any and all exceptions to specifications 2

    X X Document Index (Drawings, Procedures, etc) and Submis sion Schedule 2

    Welding Procedures, Procedures Qualification Records and Weld maps

    NDE Procedures

    PWHT procedur es

    X X Hydrotest procedur es 4

    X X General Arrangement Drawings 4

    X X Cross Section Drawings and comp lete bill s of materials 4

    X X Assembly, Construction and Erection Drawings 4

    Shop Detail Drawings showi ng piece match-marki ng, as applicable 4X X Equip ment Detail Drawings / internal sections 4

    Performance Curve(s)

    - Dimensioned Equipment Outline Drawings, Detailed Foundation/ SupportingDrawings com plete with Anchor bolt size and locations- Equipment mass, shipping weights, support loads (for all load cases) includingany uplift forces

    X X X Filled-In Instrum ent Data Sheet(s) 4

    X X All Calculations 4

    X Surface preparation and Painting/Galvanizing Procedure 4

    X Complete Manufacturer’s Record Book 2 weeks A/C

    X Certified As-Bui lt Drawings 2 weeks A/C

    Inspection Travel Sheets

    X Material Specification (Material Test Reports, Mill Certificates, etc) 8

    NDE Test Reports and Maps

    PWHT records including chartsX Certified Hydrostatic Test Data 8

    NOTE:

    1. VENDOR SHALL SUBMIT ALL DELIVERABLES WITHIN THE PERIOD AS INDICATED.2. VENDOR SHALL; SUBMIT ALL THE DOCUMENTS & DRAWINGS REQUESTED ALONG WITH THEIR

    BID WITHOUT WHICH THE OFFER WILL BE DEEMED INCOMPLETE & LIABLE FOR REJECTION

    3. FINAL CERTIFIED DRAWINGS AND DOCUMENTS MUST BE SUBMITTED WITHIN TWO WEEKS OFFABRICATION AND TESTING COMPLETION.

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    7/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 7 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

     ATTACHMENT – C

    SPARE PARTS – INTERCHANGEABILITY RECORDS

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    8/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. R

    12 MGDP I 9015

    TABLE I

    RECOMMENDED ACCESSORIES (Spares): Start Up and CommissionVENDOR NAME AND ADDRESS.

    CONTRACT NO. MAIN EQUIPMENT NO.VEN

    REFERENCE DRAWINGS NOS.

    Parts Description Vendor’sSerial/Parts No.

    Interchangeability(See Note 2)

    RecommendedQuantity

    Delivery Total Weight(Kg)

    PoMan

     A B

    Notes: 1) A separate form shall be completed for each Main Equipment number.2) A indicates the number of times the identical part occurs in each Main Equipment item/ B indicates the to

    used in the part.

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    9/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. R

    12 MGDP I 9015

    TABLE II

    RECOMMENDED ACCESSORIES (Spares): Two Years OperationVENDOR NAME AND ADDRESS.

    CONTRACT NO. MAIN EQUIPMENT NO.VEN

    REFERENCE DRAWINGS NOS.

    Parts Description Vendor’sSerial/Parts No.

    Interchangeability(See Note 2)

    RecommendedQuantity

    Delivery Total Weight(Kg)

    PoMan

     A B

    Notes: 1) A separate form shall be completed for each Main Equipment number.

    2) A indicates the number of times the identical part occurs in each Main Equipment item/ B indicates the toused in the part.

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    10/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. R

    12 MGDP I 9015

    TABLE III

    RECOMMENDED ACCESSORIES (Spares): Capital and InsuranceVENDOR NAME AND ADDRESS.

    CONTRACT NO. MAIN EQUIPMENT NO.VEN

    REFERENCE DRAWINGS NOS.

    Parts Description Vendor’sSerial/Parts No.

    Interchangeability(See Note 2)

    RecommendedQuantity

    Delivery Total Weight(Kg)

    PoMan

     A B

    Notes: 1) A separate form shall be completed for each Main Equipment number.

    2) A indicates the number of times the identical part occurs in each Main Equipment item/ B indicates the toused in the part.

    Insurance Spares are parts of equipment, assemblies or complete items that are required for replacement of items that are not subject to deterioratiocontinuous and safe operation of the Equipment or Plant. It is understood that such spares may have Long Lead Items.

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    11/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 11 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

     ATTACHMENT – D

    SOURCE INSPECTION PLAN

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    12/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 12 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     SOURCE INSPECTION PLAN

    1. EQUIPMENT: Pressure Gauges

    2. INSP BY:

    SUPPLEMENTARY INSPECTION CHECKLIST ATTACHED

    YES NO 

    DOCUMENTATION: IN ADDITION TO THE COPIES REQUIRED IN SECTION III, ONE COPY OF THE DOCUMENTSCHECKED BELOW MUST BE PROVIDED BY VENDOR TO INSPECTOR WHEN REQUESTED.

     ASME Code data reports Certificate of compliance (hydro tests)

    Other Code Data Reports - Specify: Union label (describe)

    Manufacturer's Affidavit Vendor’s Test & Quality Control Data Report

    Material test reports (Mech. & Chem. Test Reports) Inspection & Testing as per Owner Specifications

    Charpy impact tests (if required) Radiography Test Reports

    Stress relief/Heat treat/Hardness chart (if required) NDT Reports

    Performance test curves Certificate of parts

    Nameplate rubbings or facsimile Manufacturers Data Book

    Certificate of compliance (test runs) Hazardous Area Certification

    PROCEDURES: REPRESENTATIVE WILL AT HIS DISCRETION, CHECK (C), REVIEW (R) OR APPROVE (A)THE PROCEDURES AND QUALIFICATIONS WHICH ARE MARKED BELOW

    High Pot Test Procedures Routine Electrical Procedures (R)

    Motor Test Procedures (A) Tube Rolling Procedures

    Machine Procedures Tube Cleaning and Installation Procedure

    Welding Procedures (A) Quality Control Procedures (R)

    Welding Repair Procedures (A) Surface Preparation, Painting & Coating Procedure(A)

    Noise Test Procedures (A) Material Hardness Test ProcedureNDT Procedures (A) Routine Motor Test

    Performance Test Procedure (A) FAT Procedure

    Galvanizing Procedure

    INSPECTION CHECK LIST: THE INSPECTOR WILL CHECK (C), REVIEW (R), APPROVE (A) AND / OR WITNESS (W) THEFOLLOWING:

    R/C A W R/C A W

    Level of Inspection - Specify: Level 1 Final Release Documentation X

    Welder’s Qualifications Nameplates and Tagging X

    Drawings and Procedures X Machining Tolerances X

    Materials and Components X Tube Cleaning and Installation

    Hydrotest X Tube Bundle Insertion

    Performance Test X Shop Fit Up Prior to Assembly

    Dimensional Checks X X Compliance With Specifications X

    NDT Cleanliness Prior to Shipping X

    NPSH Test (if Specified in data sheet) Electrical Test

    Balancing Test Electrical and Mechanical Runout

    Sandblast, Painting and Coating X X Spare Parts Included and list provided X

    Final Inspection X X Transportation / Security / Packaging X

    Mechanical/Electrical/Pneumatic Run Test X Sandblast and Coating Acceptance Tests X X

    Take Photograph (R) File Submittal   Functional test of Instrumentation &Controls

    X X

    COMMENTS:

     All field instruments shall be provided with calibration certificates.

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    13/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 13 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

     ATTACHMENT – E

    INSPECTION LEVELS

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    14/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 14 of 16

    VECO Doc. No. 20298-MR-EJ50-105

    INSPECTION LEVELS

    Level 0

    No Quality Surveillance required.

    Level 1 

    Release for Shipment Surveillance. This level requires final surveillance inspection only toensure that the complete equipment/material is:

    •  in compliance with the purchase order•  properly identified

    •  adequately prepared for shipment

    •  documentation requirements have been fulfilled

    Level 2 

    Limited Scope Surveillance. This level requires, in addition to surveillance activities outlinedunder level 1, a prefabrication visit to review the quality requirements established by purchaseorder plus witnessing of all verification and hold points outlined in the Quality Surveillance Plan.

    Level 3

    Full Scope Surveillance. This level requires, in addition to surveillance activities outlined underlevel 2, random visits during the fabrication cycle with the purpose of monitoring and verifyingthe Supplier’s compliance with his own Quality Control Program and purchase orderspecifications, on a spot check basis. The frequency of visits shall be based on the complexityof the equipment and the Supplier’s performance.

    Level 4 

    Extreme Surveillance and Residency Surveillance. This level requires, in addition tosurveillance activities outlined under level 3, daily visits or full residency as directed by theproject. The Supplier’s Quality Program execution shall be monitored on an ongoing basis andall specified tests shall be witnessed.

    .

     

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    15/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 15 of 16

    VECO Doc. No. 20298-MR-EJ50-105

     

     ATTACHMENT – F

    TABLE OF COMPLIANCE

  • 8/19/2019 12-MGDP-I-9015-0 (M R for Pressure Gauge)

    16/16

     

    Project Title

    MEHAR GAS DEVELOPMENT PROJECT

     Area Location Discipline Document No. Rev. Page

    12 MGDP I 9015 0 16 of 16

    VECO Doc. No. 20298-MR-EJ50-105

    TABLE OF COMPLIANCEThe Vendor shall confirm below the Sections of the Requisition / Specification that he hascomplied with / accepted or further clarifications are desired, or Vendor has taken a deviationwith reasons there to. Columns 2, 3, 4 and 5 must be answered and initialed.

    1 2 3 4 5

    Specification No.12-MGDP-I-1124

    *Conforms *Deviations Noted @Clarification orReasons

    for DeviationsSection No. Yes / No Yes / No Yes / No

    6.0

    6.1

    Datasheets: 

    12-MGDP-I-2106