113th hsjv weekly meeting

24
4/7/2013 1 BARAKAH NUCLEAR POWER PLANT PROJECT  P ease Turn o your mobile! Or Switch to vibration mode! BARAKAH NUCLEAR POWER PLANT PROJECT Check! Right Now!

Upload: humpy-dumpy

Post on 14-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 1/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

 P ease Turn o your

mobile! Or Switch to

vibration mode!

BARAKAH NUCLEAR POWER PLANT PROJECT

Check! Right Now!

Page 2: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 2/24

4/7/20

SCREEN

Don’t Panic11

Switch Off All Electrical Equipment22

BARAKAH NUCLEAR POWER PLANT PROJECT

Don’t Run, Walk Fast!33

Go to the Assembly Point44

Wait for the Final Instruction55

1. Safety Moment

2. Previous Meeting

 

1. Safety Moment

2. Previous Meeting

 

6. Incident Reports

7. Weekly Inspection

Committee Inspection

6. Incident Reports

7. Weekly Inspection

Committee Inspection. rograms

4. HSE Statistics

Performance per Area and Total

5. HSE Findings Summary

Findings analysis- cause

. rograms

4. HSE Statistics

Performance per Area and Total

5. HSE Findings Summary

Findings analysis- cause

Weekly Inspection

8. Environmental Issues

9. Action Plans

Advan

Sung Chang

Weekly Inspection

8. Environmental Issues

9. Action Plans

Advan

Sung Chang

BARAKAH NUCLEAR POWER PLANT PROJECT

w se, ompany, an rea HSE Findings by Company 

Reported Near Miss

Evaluation by Findings Score

w se, ompany, an rea HSE Findings by Company 

Reported Near Miss

Evaluation by Findings Score

Page 3: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 3/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

NO.NO. ITEMSITEMS ACTION ACTION PLANSPLANS  ACTION BY ACTION BYDUEDUE

DATEDATESTATUSSTATUS

1High HSE

Findings

Top findings issued by KEPCO & HSJV

ADVAN got the highest findings landing to 

16.1 for this week. Advised to report their 

Corrective Action Plan next meeting.

AdvanNext

Meeting

The or anization raised low number of HSE

BARAKAH NUCLEAR POWER PLANT PROJECT

2 Low HSEFindings

 

noncompliance compare

 to

 Contractors

 

number of  HSE issues.

Sungchang NextMeeting

Page 4: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 4/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

Descripti on :Descripti on :

Clear GlassClear Glass

 

Combination GlassCombination Glass

a ety ass tan ar y ana ety ass tan ar y an --

Z87.1,Z87.1,

1.1. Glasses must have s ide shieldsGlasses must have side shields

2.2. Tinted lenses are not al lowed unlessTinted lenses are not al lowed unl ess

required (for example, welding w orks)required (for example, welding w orks)

3.3. Frames must bear manufacturer ’sFrames must bear manufacturer’s

ident i f icat ion trademark for both frontsident i f icat ion trademark for both fronts

and tem le.and tem le.

BARAKAH NUCLEAR POWER PLANT PROJECT

Reading GlassReadi ng Gl as s Glas ses im properl y u sedGlasses imp roper ly used Us ing sung lassesUsing sunglasses

 

4.4. Lenses made of 3 mm. th ickLenses made of 3 mm. thick

5.5. Lenses must be marked wi th the let ter  Lenses must be marked with th e let ter “ H” and “ CE” .“ H” and “ CE” .

Page 5: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 5/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

Descript ion :Descript ion :

Monthly HSE and Quality Recognit ion Ceremony, awards given to BestMonthly HSE and Quality Recognit ion Ceremony, awards given to Best

Subcontractor , Indiv idual and Spot Awards, Slogan and Poster contest awards.Subcontractor , Indiv idual and Spot Awards, Slogan and Poster contest awards.

Total o f Total o f 3535 awards given this month.awards given this month.

BARAKAH NUCLEAR POWER PLANT PROJECT

Descript ion :Descript ion :

The Subcontractor shou ld correct unsafe condit ion s present in their workp lace.The Subcontractor shou ld correct unsafe condit ion s present in their workp lace.

Findings related to scaf folding nonconformance ( incomplete plat form, open edge,Findings related to scaf folding nonconformance ( incomplete plat form, open edge,

no toe boards, & others). Structure open edge and housekeeping are another no toe boards, & others). Structure open edge and housekeeping are another 

concerns which the organizat ion need to act .concerns which the organizat ion need to act .

Page 6: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 6/24

4/7/20

Descript ion :Descript ion :

1.1 . Gas fue led and e lec t r ical ly poweredGas fueled and electrically powered

stoves are st r ic t ly prohi bi ted ins idestoves are st r ic t ly prohi bi ted ins ide

the room accommodat ions tothe room accommodat ions to

ensure that no occupants w i l lensure that no occupants w i l l

at tempt to cook ins ide their rooms.at tempt to cook ins ide their rooms.

2.2 . Any one f ound w i t h cook ing An y one found wi th cooking

utensi ls shal l be quest ioned i f theyutensi ls shal l be quest ioned i f they

have cooking stoves ins ide their  have cooking stoves ins ide their  

rooms.rooms.

BARAKAH NUCLEAR POWER PLANT PROJECT

COOKING INSIDE ACCOMODATION ROOM ARECOOKING INSIDE ACCOMODATION ROOM ARE

STRICKTLY “PROHIBITEDSTRICKTLY “PROHIBITED”

Descript ion :Descript ion :

Date : 2013 Apri l 4 ~ 15Date : 2013 Apri l 4 ~ 15

Time : 16:30 PMTime : 16:30 PM

Locat ion : HSE TrainingLocat ion : HSE Training

Center Center 

 At ten dee At ten dee

Sub Contractor ForemanSub Contractor Foreman

Site Manager Site Manager 

Trainer Trainer 

BARAKAH NUCLEAR POWER PLANT PROJECT

ENEC Safety Cu ltur e(SC)ENEC Safety Cu ltur e(SC)Team (Team (Mr Mr. Christopher . Christo pher))

HSJV HSE Train er HSJV HSE Train er 

TopicTopic

Safety AwarenessSafety Awareness

Page 7: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 7/24

4/7/20

DAILY NOISE

 LEVEL

 MONITORING

 @

 POWER

 BLOCK

No . Date

Measurement, dB(A) in these locations

L3 RCB 1

Hearin Protection Pro ramHearin Protection Pro ram

AB 2/4 AB 1/3 TGB 1 TGB 1 CPB CPBOutside Topside Inside

1 02 April 2013 82.1 81.5 95.9 87.4 89.2 85.5 6 7. 7 75 .1 79 .5

2 03 April 2013 88.1 81.8 89.1 86.4 93.8 83.9 81.3 75.8 82.5

3 04 April 2013 86.8 82.6 83.3 87.6 92.8 81.2 84.1 82.6 87.9

BARAKAH NUCLEAR POWER PLANT PROJECT

 

AccordingAccording toto HSEHSE‐‐PP5353 NoiseNoise procedure,procedure, whenwhen employeesemployees areare exposedexposed toto

noisenoise levelslevels of of 8585dBdB andand above,above, hearinghearing protectionprotection andand suitablesuitable warningwarning

signssigns shouldshould bebe providedprovided..

TheThe noisenoise levelslevels of of 8585dBdB isis similarsimilar withwith belowbelow

11.. HairHair drierdrier

22.. CityCity TrafficTraffic (inside(inside car)car)

Daily Noise Level MonitoringDaily Noise Level Monitoring

Provision of  Controls Provision of  Controls 

1.1. Warning SignsWarning Signs

2.2. Ear plugs or muffsEar plugs or muffs

BARAKAH NUCLEAR POWER PLANT PROJECT

Page 8: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 8/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

Item Ancil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total

For theWeek

CumFor theWeek

CumFor theWeek

CumFor theWeek

CumFor theWeek

CumFor theWeek

CumFor theWeek

CumFor theWeek

Cum

Near Misses 0 0 0 0 0 2 1 11 0 0 0 0 1 13 0 0

Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0

(This Week From March 30 – April 5, 2013)

First Aid Cases

(FA) 1 2 0 0 0 1 3 16 0 4 0 2 4 25 0 0

Medical

Treatment Cases(MTC)

0 1 0 1 0 4 0 4 0 0 0 1 0 11 0 0

Restricted WorkCases (RWC) 0 1 0 1 0 0 0 2 0 0 0 0 0 4 0 0

LTI’s 0 0 0 0 0 0 0 3 0 0 0 0 0 3 0 0

Property/Vehicle

 Accid ents 0 2 0 1 0 2 0 6 0 1 0 1 0 13 0 0

Environmental

BARAKAH NUCLEAR POWER PLANT PROJECT

Legend : Ancill ary – Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

Power Block – Cut –Off Wall, Wharf Area, Concrete Block Area

* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 10 (2013)

Release

For this week Cumulative

One Strike Policy 0 115*

Page 9: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 9/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From March 30 – April 5, 2013)

Issued

Near MissNear Miss

CARCAR

0 1 0 1

0 68 174 242

Findings TotalK

E

P

C

O

H

S

J

V

S

U

B

C

O

N

Open Closed

KEPCO HSJV Subcon KEPCO SubconHSJV

0 0 0 0 1 0

0 8 0 0 60 174

BARAKAH NUCLEAR POWER PLANT PROJECT

TOTALTOTAL

OC &

 WFOC

 &

 WF 0 30 426 456

0 99 600 699

0 0 0 0 30 426

0 8 0 0 91 600

Page 10: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 10/24

4/7/20

4445

4950

57

Material Management

Electrical Safety

Scaffolding

PPE

Access & Egress

(This Week From March 30 – April 5, 2013)

1314

2020

2425

273030

3139

43

Documents

Excavation

Fall Protection

Training

Lifting

Health & Welfare

Working at Height

Hand & Power Tools

Waste Management

Plant & Equipment

Color Coding

Signs, Barriers & barricades

Fire Prevention

BARAKAH NUCLEAR POWER PLANT PROJECT

11

26 7

810

12

0 10 20 30 40 50 60

Manual Handling

Confined Space

Road Safety

Supervision

Poor Illumination

Environmental

Hot Works

PTW

Source: CAR, Near Miss, Walkthrough and Observation Card

 Arrangemen t of weld ingcable obstructing pathway

( Power Block,( Power Block, YounYoun ChangChang Damaged and rusted scaffold

Securing ladder with

approved clamps

( CPB,( CPB, Advan Advan))

1 32

PB)PB)

Proper keeping of 

protruding nails scattered

on ground (Power (Power Block,Block, Advan Advan))

Practice proper cable

management.

(CWDC,(CWDC, GusanGusan))

p p es s ou no e use .(Power Block,(Power Block, SamjinSamjin))

Toe boards shoul d be

installed in any scaffold

(TGB,(TGB, IsamIsam KabbaniKabbani))

Workers will use only

inspected scaffold

(RCB/AB1,(RCB/AB1, JonghapJonghap))

Scaffold should have the

appropriate handrails (Power (Power 

Block,Block, SamjinSamjin))

Close the gap on access

located across a concrete

slab.

(CWDC,(CWDC, GusanGusan))

BARAKAH NUCLEAR POWER PLANT PROJECT

 Access & Egress Scaff old ingPPE

Observe good

housekeeping at floor areas

(ADB, Hyundai C&I)(ADB, Hyundai C&I)

Scaffold tag should beinspected and updated in

timely manner. (Village(Village

2,2, HanlimHanl im))

Provide access for carpenters working i n

vertical form erection.

(TGB, D & I)(TGB, D & I)

Page 11: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 11/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

61

5148

60

13

31

10 119

20

30

40

BARAKAH NUCLEAR POWER PLANT PROJECT

2 1 2 1 1 1 2 1 1 1 2

0

Page 12: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 12/24

4/7/20

60

70Poor Illumination3

Supervision2Emergency & Evacuation

Road Safety

Supervision

Manual Handling

20

30

40

Environmental

Poor Illumination

PTW

Documents

Health & Welfare

Hot Works

Fall Protection

Hand & Power Tools

Training

Color Coding

Excavation

LIfting

Fire Prevention

BARAKAH NUCLEAR POWER PLANT PROJECT

0

10Plant & Equipment

Waste Management

Working at Height

Electrical Safety

Material Management

Signs, Barriers & Barricades

PPE

Scaffolding

Housekeeping

Access & Egress

700

800

70

80KEPCO/HSJV

SUBCON

(This Week From March 30 – April 5, 2013)

100

200

300

400

500

600

10

20

30

40

50

60 Manpower

BARAKAH NUCLEAR POWER PLANT PROJECT

00

    S   e   o   y   o   n   g

    S   e   o   y   o   n   g    (    P    B    )

    T   o   w   e   r   s    T   e   c    h

    G   u   s   a   n

    G   u   s   a   n    (    P    B    )

    E   u   n   m    i   n

    J   o   n   g    h   a   p

    J   o   n   g    h   a   p    (    P    B    )

    Y   o   u   n    C    h   a   n   g

    Y   o   u   n    C    h   a   n   g    (    P    B    )

    H   w   a   c    h   o   n

    W    B    G

    H    i    l   a    l   c   o

    A    d   v   a   n

    H   a   n    l    i   m

    U   w   e    l    l

    Y   o   o    A

    H   y   u   n    d   a    i    C    &    I

    S   a   m    j    i   n

    E   u   g   e   n   e

    D   a   e   m   y   u   n   g

    S   e   o    b   o   n

    D    &    I

    A    l    R   a   e   e    l

    D    O    W

    S   a   m    h   o

    S   u   n   g   c    h   a   n   g

    S   e    i    l

Page 13: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 13/24

4/7/20

10.0

12.0

8.6

Findings Score = Number of  Causal x Risk(Factor Score)Findings Score = Number of  Causal x Risk(Factor Score)

Source: CAR, Near Miss, Walkthrough and

Observation Card reported by KEPCO & HSJV

0.0

2.0

4.0

6.0

8.0

4.4

6.6

0.7 1.0 1.22.2 1.9

1.0

3.5

.

1.51.0 1.0

2.02.9

1.0

2.51.5

0.2

2.0

BARAKAH NUCLEAR POWER PLANT PROJECT

Action PlanAction Plan for Company requiring assistance and support from the systemfor Company requiring assistance and support from the system

1. Joint Inspection will be carried out by Area Management Team.

2. Spot Training will be given to workers about major findings

3. Action plan will be submitted to HSJV HSE Team develop by  D&I

Legend : (I) Infra, (PB) Power Block

BARAKAH NUCLEAR POWER PLANT PROJECT

Page 14: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 14/24

4/7/20

Top Hazards

Total No. of Findings: 45 Access & Egress, 11

Electrical Safety, 1

Health & Welfare, 1

Working at Height,

 1

PTW, 1Lifting, 1

Poor  Illumination,

 1

Access & Egress 11

Scaffolding 6

Control Measure Due Date

Ladder should be fixed by 

suitable part, access must 

be clear of  obstruction

 Alw ays

Waste Management, 3

Color  Coding, 2

Signs, Barriers & Barricades, 2

BARAKAH NUCLEAR POWER PLANT PROJECT

Ensurethat toe boards & 

platform are properly 

installed

 Alw ays

Scaffolding, 6

Hand & Power  Tools, 5

Housekeeping, 4Fire Prevention, 3

PPE, 3

Source: CAR, Near Miss, Walkthrough and Observation Card

Top Hazards

Total No. of Findings: 42

Fire Prevention, 7

Color  Coding, 2Fall Protection, 1

Plant & Equipment, 1 Working at 

Height, 1Hand & Power  

Tools, 1 Waste Management, 1

Cause Nos

Fire Prevention 7

Signs & Barriers 7

Control Measure Due Date

Proper handling and 

inspection of  cylinder gas 

regularly.

 Alw ays

Signs, Barriers & Barricades, 7

Scaffolding, 3

Electrical Safety, 2

Material Management, 2

Hot Works, 2

BARAKAH NUCLEAR POWER PLANT PROJECT

Protruding rebarsand 

sharp edges should be 

provided with proper 

protectionand precaution.

 Alw ays

Access & Egress, 6

Housekeeping, 5LIfting, 5

PPE, 4

Source: CAR, Near Miss, Walkthrough and Observation Card

Page 15: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 15/24

4/7/20

Top Hazards

Total No. of Findings : 24

Material Management, 5

Electrical Safety, 1Fall Protection, 1

Waste Management, 1 Health & 

Welfare, 1 Excavation, 1

Cause Nos

Material Management 5

Housekeeping 3

Control Measure Due Date

Construction materials 

should be stacked and

properly segregated.

 Alw ays

 Plant & Lifting, 1

Confined Space, 1

Documents, 1

BARAKAH NUCLEAR POWER PLANT PROJECT

Removal of   protruding 

nails and providing of  cable 

hangers. 

 Alw ays

ouse eep ng, 3

Access &

 Egress,

 2

PPE, 2Poor  

Illumination, 1Hand & Power  

Tools, 1

PTW, 1 

Equipment, 1

Source: CAR, Near Miss, Walkthrough and Observation Card

BARAKAH NUCLEAR POWER PLANT PROJECT

Page 16: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 16/24

4/7/20

 AREA AREA : Power B lock AB (Seoyong): Power Block AB (Seoyong) Apri l 4, 2012 Apr il 4, 2012

CORRECTIVE ACTION:CORRECTIVE ACTION:

BARAKAH NUCLEAR POWER PLANT PROJECT

PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION

BARAKAH NUCLEAR POWER PLANT PROJECT

Page 17: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 17/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

InspectionInspection DateDate Attendees Att endees RemarkRemark

Commit tee Inspec tion 2013-04-02 HSJV, KEPCO, HSE Managemen t Team 0 Find ings

Weekly Inspection 2013-04-03 HSJV HSE Team 15 Findings

4

5

6

Findings per Company Total

3

4

Improper Storage

Poor Management

Findings per Causal

5

1 1 12

4

10

1

2

Advan D&I Geumhwa Seoyong (PB)  Yoo A Youn Chang Youn Chang (PB)

BARAKAH NUCLEAR POWER PLANT PROJECT

1

1

1

1

2

2

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5

No Color Coding

Damaged Hose

Damaged Regulator

No PTW

No Fire Extinguisher

Poor Housekeeping

Key item : Gas Cutting

Page 18: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 18/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

No.Source of 

In jury Area Descr iption

Immediate

 Act ion

Planned

Supervisor 

1Pain, low 

back

HSJV 

(Work Shop)

Concrete Pump 

Operator

The worker was helping 

with the cleaning of  his 

Concrete pump using a 

hose. He was bending 

forward while holding the 

Assessment 

done by Dr. Kim

Topical Analgesic 

applied

Oral Analgesic 

BARAKAH NUCLEAR POWER PLANT PROJECT

or s op  rea

31‐03‐2013

13:30

hose when

 felt

 a sudden

 pain on his back and thus 

brought to the clinic.

Instructed of 

 

proper body 

mechanics

Page 19: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 19/24

4/7/20

No.Source of 

Injury Area Descr iption

Immediate

 Act ion

Planned

Supervisor 

2

Pain and 

swelling in 

the left ring 

Seoyong

Carpenter

RCB AB UNIT‐2

While performing as a 

steel fixer helper when 

accidently his finger was 

pinch in between rebar 

size‐32 mm  that result 

his finger to get swollen 

he was rush to safety 

Cleaning and 

dressing done

Analgesic spray 

given

Referral to 

BARAKAH NUCLEAR POWER PLANT PROJECT

finger02‐04‐2013

08:30 am

office cabin for first aid, 

first aid given and was 

brought to Kepco Clinic 

for treatment

hospital‐

orthopedic 

surgeon

No.Source of 

In jury Area Descr iption

Immediate

 Act ion

Planned

Supervisor 

3Wound on 

left arm

Seoyong

Carpenter

RCB AB ‐3

POWER BLOCK

While performing from 

dismantling on RCBAD‐3 

area together with his 

foreman when accidently 

his left  hand finger 

puncture with  nail that 

Cleaning and 

wound dressing 

done

Injection Tetanus 

BARAKAH NUCLEAR POWER PLANT PROJECT

02‐04‐2013

10:30 am

  . 

Safety officers

 took

 him

 to

 

site office for first aid and 

rush him to Kepco Clinic .

toxoid given

Page 20: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 20/24

4/7/20

No.Source of 

Injury Area Descr iption

Immediate

 Act ion

Planned

Supervisor 

Preventive Acti on

4Felt dizzy and 

weak

Advan

HSE Supervisor

Power Block 

(CPB)

While talking to one HSE 

Supervisor, suddenly he 

felt dizzy and weak.

IP brought to 

KEPCO Clinic for 

further 

examination.

BARAKAH NUCLEAR POWER PLANT PROJECT

05‐03‐2013

07:47

BARAKAH NUCLEAR POWER PLANT PROJECT

Page 21: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 21/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

Location TGB Unit 2, Power Block

Description Hazardous substances not contained in a safe and standard storage area. No Spill ki t and no driptray available.

 Act ion taken Installed drip tray in chemical s torage and placed spill kits according to HSE P41 ‘Hazardous

Material Handling’

Status CLOSED

Metallic Waste Metallic Waste 

Skip BinSkip Bin

Uncontained Uncontained 

Metallic WasteMetallic Waste

Wood Waste Wood Waste 

inside the inside the 

Metal Skip BinMetal Skip Bin

BARAKAH NUCLEAR POWER PLANT PROJECT

Location Laydown Area, Power Block

Description  Assorted met al waste w as not con tain ed inside a metal ski p, bu t on t he gro und .

Skip intended for metal w aste contained wood waste.

 Act ion taken Conducted waste management spot training and segregated wood waste from metal w aste.

Status CLOSED

Page 22: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 22/24

4/7/20

No.0 Date Action by

CompanyDescription Status Closing Date

Expiration

DateRef. No.

Main

 AreaSub-Area Issued By

Issuer 

Company

1 01-Ap ri l- 13 Seo yo ngHazardous subst ances not contained in

a safe and standard st orage area. No

Spill kit and Fire Extinguisher available.

CLOSE 06-April-1306-April-13 2013-0821 PB TGB 2 HSJVRenato

Ponce

3 01-April-13 Advan

 Assor ted m etall ic w aste were no t

contained inside an intended skip and

left unattended.

Skip intended for metallic waste contain

ed waste wooden materials.

CLOSE 06-April-13 06-April-12013-0845

PB Laydown HSJVRenato

Ponce

BARAKAH NUCLEAR POWER PLANT PROJECT

WASTE MANAGEMENT UPDATE

Week = 30/03/2013  – 05/04/2013

WASTE TYPEThis week Last week

Collected (m3) Disposal (m3) Recycled (m3) Recycle(%) Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)

Metal 56 0 0 64 0 45

Construction 64 1215 0 88 630 0

Concrete 0 0 0 0 0 0Wood(Good) 0 0 0 0 0 0Wood(Bad) 280 270 0 272 360 0

Plastic 136 0 45 96 0 0Municipal 0 288 0 0 336 0

BARAKAH NUCLEAR POWER PLANT PROJECT

Legend: Collected ‐ Waste from Site to Temporary Storage Area 

Disposal ‐ Waste from Temporary Storage Area to Landfill Area 

Recycle ‐ Treated waste ( GMET) to Recycling Plants

azar ous

0Total Solid Waste 640 1789 45 2.51% 592 1334 90 6.75%

Page 23: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 23/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

Page 24: 113th HSJV Weekly Meeting

7/29/2019 113th HSJV Weekly Meeting

http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 24/24

4/7/20

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT