  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    1/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    2/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Please Turn off your

    mobile! Or Switch to

    vibration mode!

    Check! Right Now!

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    3/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Panic1

    Switch Off All Electrical Equipment2

    Dont Run, Walk Fast!3

    Go to the Assembly Point4

    Wait for the Final Instruction5

    SCREEN

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    4/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    http://localhost/var/www/apps/conversion/tmp/scratch_1/Action%20Plan-wordhttp://localhost/var/www/apps/conversion/tmp/scratch_1/Action%20Plan-wordhttp://localhost/var/www/apps/conversion/tmp/scratch_1/Dow-Safety%20Moment%20(Working%20at%20height).pptx
  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    5/48BARAKAH NUCLEAR POWER PLANT PROJECT

    1. Previous Meeting

    2. HSE Programs

    3. HSE Statistics

    Performance per Area and Total

    4. HSE Findings Summary

    Findings analysis- cause wise,

    Company, and Area

    HSE Findings by Company

    Reported Near Miss

    Evaluation by Findings Score

    5. Weekly Inspection

    6. Medical Cases

    7. Environmental Issues

    8. Action Plans

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    6/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    7/48BARAKAH NUCLEAR POWER PLANT PROJECT

    NO. ITEMS ACTION PLANSACTION

    BY

    DUE

    DATESTATUS

    1Weekly

    Findings

    ENEC HSE representative had recommendedanalysis of recurring findings such access and

    egress, housekeeping, and scaffolding. The analysis

    will cover past 3 months, trend be known whether

    performance is following a positive trend.

    HSJVNext

    MeetingDone

    2 No. ofInspections

    The slide on HSE Findings per Area must have

    additional column showing no. of inspections inspecific area. For example, reported findings at camp

    is zero but number of inspections unknown.

    HSJV NextMeeting

    Done

    3High

    Findings

    Advan company discussed action plans on the 43

    findings this week. Planning and Engineering

    Manager from Advan explained corrective actions to

    address findings related to scaffolding, fall protection,

    etc. Due to high rating of HSE findings, the

    organization will come back next week presenting

    their complete plans.

    HSJVNext

    MeetingDone

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    8/48BARAKAH NUCLEAR POWER PLANT PROJECT

    5104 5243

    5744

    3000

    3500

    4000

    4500

    5000

    5500

    6000

    0

    50

    100

    150

    200

    250

    October (2012) November (2012) December (2012)

    Manpower Access & Egress Housekeeping Scaffolding

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    9/48BARAKAH NUCLEAR POWER PLANT PROJECT

    NO. ITEMS ACTION PLANSACTION

    BY

    DUE

    DATESTATUS

    1

    Access and

    Egress, 62%

    total findings at

    Power Block

    Subcontractors should focus on condition of

    ladders in the areas of Power Block. These

    organizations can make use of HSJV ladder

    checklist to upgrade current conditions of

    ladders in Power Block

    Seoyong

    Advan

    Gusan

    Immediate OPEN

    2

    Scaffolding

    44 % of total

    findings at

    Power Block

    Half of the total findings are related to require tagging,

    and condition of ladder. Awareness on tagging

    requirements is necessary to all workers. Ladder will

    be checked again at all aspects ensuring compliance

    to standard requirements.

    Note : additional trainings must be reinforced to

    improve awareness of workers

    Advan

    D&I

    Gusan

    Hilalco

    SamjinSeoyong

    Immediate

    OPEN

    Findings related to conditions of guard rails, planks,

    and toe boards are either missing or in bad state

    shall be corrected as per standard.

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    10/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    11/48BARAKAH NUCLEAR POWER PLANT PROJECT

    DATE :

    8-12 January 2013

    TIME :

    1-hour session

    Training Provider :

    HSJV HSE Training

    Team

    Regulations :

    ADEHSMS

    requirement

    BNPP ratio of 1:25

    Purpose :

    Review first aid role

    and techniques

    As of 01/12

    Total ATTENDANCE 127

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    12/48BARAKAH NUCLEAR POWER PLANT PROJECT

    System support :

    Any temporary structures

    used in construction to

    support spanning or arched

    structures.

    Erectors :

    Trained scaffolders

    Reference Procedure :

    Scaffolding, P21

    False work, P29

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    13/48BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    14/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    DESCRIPTION

    Basic PPE acquires intentional damage and vandalism.

    Workers apply artistic writings, drawings, stickers on PPE making it

    untidy.

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    15/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    16/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop

    Power Block CutOff Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 0 (2013)

    ItemAncillary Area Camp Area Office Area Power Block Village 1 Village 2 HSJV Total NMDC Total

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    Near Misses 0 0 0 0 1 1 1 1 0 0 0 0 2 2 0 0

    Over speeding 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0First Aid Cases

    (FA) 0 0 0 0 0 0 0 0 1 1 0 1 1 2 0 0

    Medical

    Treatment Cases

    (MTC)0 0 0 0 2 2 1 1 0 0 0 0 3 3 0 0

    Restricted Work

    Cases (RWC) 0 0 1 1 0 0 1 1 0 0 0 0 2 2 0 0

    LTIs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Property

    Damages 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Vehicle

    Accidents 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    EnvironmentalRelease 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    For this week Cumulative

    One Strike Policy 0 105*

    (This Week From Jan 5Jan 11, 2013)

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    17/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Source: CAR, Near Miss, Observation Cards and Walkthrough

    AreaNo. of

    Inspections

    No. of

    Findings

    KEPCO

    & HSJVSUBCON

    Ancillary

    Area5 109 47 62

    CampArea

    4 14 14 0

    Office

    Area5 65 27 38

    Power

    Block5 336 47 289

    Village 1 5 31 1 30

    Village 2 5 36 2 34

    Total Findings 591

    (This Week From Jan 5Jan 11, 2013)

    0

    50

    100

    150

    200

    250

    300

    47

    1427

    47

    1 2

    62

    0

    38

    289

    30 34

    KEPCO & HSJV SUBCON

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    18/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    19/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From Jan 5Jan 11, 2013)

    TOTAL

    Near Miss

    CAR

    OC & WF

    0 1 1 2

    1 114 174 275

    0 22 278 300

    1 137 453 591

    Findings

    Issued

    TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Status

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 1 0 1 0

    1 36 2 0 78 172

    0 0 0 0 22 278

    1 36 3 0 101 450

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    20/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    CompanyJan 5 Jan 11, 2013

    Company December2012 January2013 TOTALOPENCCAP CAR/NM

    D&I 3 D&I 2 3 5

    Gusan 1 Geumhwa 1 1

    HSJV 1 14 Gusan 1 1

    Hyundai C&I 1 Hyundai C&I 1 1

    Isam Kabbani 2 Isam Kabbani 3 3

    Samho 5 Samho 3 3

    Seobon 1 Seobon 2 2

    Seoyong 6 Seoyong 6 6

    Sungchang 1 Sung Chang 1 1

    Yoo A 2 Yoo A 1 2 3

    Youn Chang 3 Youn Chang 2 2 4TOTAL 1 39 TOTAL 6 24 30

    for the Period Total Open

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    21/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    11111

    34

    66

    912

    1516

    1920

    2123

    2424

    2729

    3737

    4344

    4445

    0 5 10 15 20 25 30 35 40 45 50

    Manual Handling

    Confined Space

    Steel Erection

    LOTO

    Road Safety

    Hot Works

    Training

    Poor Illumination

    Supervision

    Excavation

    Hand & Power Tools

    Health & Welfare

    Environmental

    Fall Protection

    Working at Height

    PTW

    Lifting

    Waste Management

    Electrical Safety

    Color Coding

    Material Management

    Signs, Barriers & barricades

    Scaffolding

    Access & EgressPPE

    Plant & Equipment

    Fire Prevention

    (This Week From Jan 5Jan 11, 2013)

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    22/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Secure acetylene cylinders

    by chain (Power Block, DOW)

    Flammable material storage

    must be made of non-

    combustible material

    (Ancillary, Younchang)

    Keeping flammable materials

    at designated point (RCB1,

    Seoyong PB)

    Allocate fire extinguisher in

    the tower light (Office Area,

    Seobon)

    Fire Prevention PPE

    Use of face shield and hearing

    protection on chipping

    works(CP-I2, Seobon)

    Cleaning by air blast, workers

    require use of face shield,

    mask, and hearing protection

    (Power Block, Gusan)

    Worker s engaged in grinding

    works to use face shield

    (Power Block, Younchang)

    Use of safety helmet when

    working downside of

    scaffolding(CP-I2 , Jonghap)

    Plant & Equipment

    Ensure correct positioning of

    MEWP outrigger pads

    (Ancillary, Samho)

    Repair leaking MEWP, clean

    out any spill (Village 1,

    Hanlim)

    Maintain safe clearance of

    cranes counterweight and

    structure (Power Block,

    Hilalco )

    Replace damaged welding

    clip.(Power Block, Advan)

    1 32

    BARAKAH NUC EAR POWER P ANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    23/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    24/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    100

    200

    300

    400

    500

    600

    700

    800

    0

    10

    2030

    40

    50

    60

    70

    Seoy

    ong

    Seoyong(PB)

    TowersT

    ech

    Gu

    san

    Gusan(PB)

    Eun

    min

    Jong

    hap

    Jonghap(PB)

    YounCh

    ang

    YounChang(PB)

    How

    sys

    W

    BG

    L

    ima

    Hilalco

    Ad

    van

    Hanlim

    Uwell

    Yo

    oA

    Hyundai

    C&I

    Sam

    jin

    Eug

    ene

    Daemy

    ung

    Seobon

    D&I

    AlRaeel

    D

    OW

    Sam

    ho

    KEPCO/HSJVSUBCON

    Manpower

    (This Week From Jan 5Jan 11, 2013)

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    25/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Action Plan for Company requiring assistance and support from the system

    1. Joint Inspection will be carried out by Area Management Team.

    2. Spot Training will be given to workers about major findings

    3. Action plan will be submitted to HSJV HSE Team develop by SEOBON

    0

    2

    4

    6

    8

    10

    4.4

    5.8

    0.4 0.7

    5.4

    2.7

    1.2 0.7

    2.5

    1 0.6 0.5

    7.5

    6.2

    2

    Findings Score = Number of Causal x Risk(Factor Score)

    Source: CAR, Near Miss, Walkthroughand Observation Card reported by

    KEPCO & HSJV

    Legend : (I) Infra, (PB) Power Block

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    26/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    27/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Housekeeping 6

    PPE 4

    Control Measure Due Date

    Construction waste

    materials to be disposed on

    designated areas and clear

    all protruding nails.

    Done

    Ensure that personal

    protective equipment are in

    good condition and no

    damages.

    Always

    Total No. of Findings: 30

    Housekeeping, 6

    PPE, 4

    Working at

    Height, 3Electrical Safety, 2

    Fire Prevention, 2Health & Welfare,

    2

    Lifting, 2

    Supervision, 2

    Signs, Barriers &

    Barricades, 2

    Scaffolding, 2

    Fall Protection, 1Training, 1

    Color Coding, 1

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    28/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Access & Egress 8

    Signs, Barriers & Barricades 7

    Control Measure Due DateProvide access in good

    condition and remove

    obstructions from

    walkways.

    Done

    Protruding angle bars and

    steel rebars should be

    provided with caps as a

    protection from workers.

    Done

    Total No. of Findings: 23 Access & Egress,8

    Signs, Barriers &Barricades, 7

    Housekeeping, 6

    Fire Prevention, 3

    Fall Protection, 2

    PPE, 2

    Material

    Management, 2

    Plant &

    Equipment, 1

    Scaffolding, 1

    Waste

    Management, 1

    PTW, 1

    Excavation, 1 Health & Welfare,

    1

    Lifting, 1

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    29/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    30/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AREA : Power Block (Advan) January 9,2013

    CORRECTIVE ACTION:

    PLANNED SUPERVISOR PREVENTIVE ACTION

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    31/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AREA : MCO1 (SAMHO) January 9,2013

    CORRECTIVE ACTION:

    PLANNED SUPERVISOR PREVENTIVE ACTION

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    32/48

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    33/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Inspection Date Attendees Remark

    Committee inspection 2013-01-08 HSJV, KEPCO, HSE Management Team 4 Findings

    Weekly Inspection 2013-01-09 HSJV HSE Team 21 Findings

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    34/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    2

    3

    4

    5

    6

    0 1 2 3 4 5 6 7

    Fire Extinguisher Empty

    Damaged Fire Equipment

    Unoperational Alarm

    No Inspection of Fire Equipment

    Flammable Materials

    No Fire Extiguisher

    Findings per Causal

    Key item : Fire Prevention

    1 1

    2

    1 1

    2 2

    1

    2

    0

    0.5

    1

    1.5

    2

    2.5

    Advan D&I Gusan (PB) Hwangchon Hyundai C&I Samho Seoyong Seoyong (PB) Youn Chang

    Findings per Company Total

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    35/48

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    36/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    Injury

    Area DescriptionImmediate

    Action

    Planned Supervisor

    Preventive Action

    1Pain, swelling

    right foot

    Advan

    Concrete

    Worker

    Power Block

    (AB and K Line)

    06-01-201310:30

    The patient was working

    downside of cantilever

    when a ply board

    accidentally fell down

    from a 2 meter height

    landing on his right foot

    Assessment done

    Elastic bandage

    applied

    Analgesic cream

    applied

    2Swelling, right

    hand

    HSJV (O&M)

    Cleaner

    Labor Camp

    08-01-2013

    07:00

    Patient was cleaning one

    of the rooms in Labor

    Camp. He was moving the

    bed and accidentally

    trapped his hand in

    between the bed and thewall, thus causing the

    injury.

    Assessment done

    Referred to Ruwais

    Hospital for X-ray

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    37/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Description

    Immediate

    Action

    Planned Supervisor

    Preventive Action

    3

    Pain, injured on

    his right leg

    foot pit

    Seobon

    Carpenter

    CPI-2 ADB

    07-01-2013

    16:30

    when he walk on the

    ground for arrange

    plywood suddenly he

    stepping on the

    protruding nail and get

    injured on his right leg

    foot pit.

    Wound dressing done

    Tetanus Injection

    given at right deltoid

    muscle

    Analgesic for pain and

    Antibiotic given

    4

    Punctured

    wound nail

    Right sole

    Seobon

    Carpenter

    CPI2 STC

    building

    10-01-2013

    21:00

    On the way to the bus,

    the worker stepped on a

    protruding nail from a

    wooden block thus

    caused the injury. The

    patient was wearing

    safety shoes..

    Wound cleansing and

    dressing done

    Tetanus injection

    given at right deltoid

    muscle

    Analgesic given for

    pain Antibiotic given

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    38/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No. Source ofInjury

    Area Description ImmediateAction

    Planned SupervisorPreventive Action

    5

    Punctured

    wound, left

    thumb

    Dow Industries

    Foreman

    Power Block

    (AB)

    09-01-2013

    11:00

    The worker was doing

    hammering works in the

    AB area

    when a wire punctured

    his left thumb causing theinjury

    Wound dressing done

    Analgesic given for

    pain

    Antibiotic given

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    39/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No. Source ofInjury

    Area Description ImmediateAction

    Planned SupervisorPreventive Action

    6

    Abrasion right

    thigh secondary

    to accident

    Hyundai C&I

    Banksmen

    Village 01 HDC&I

    Office Area

    09-01-2013

    07:00

    The worker, along withother workers is rolling

    the rope when the other

    end of the rope with

    steel plate hit his right

    thigh thus causing the

    injury.

    Wound dressing done

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    40/48

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    41/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    compressor generator without

    impervious drip tray or spill protection

    CAR # 0039

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    42/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    CAR # 0070

    Improper chemical storage of Hazardous and Flammable liquids on

    Wood cabinet & carton boxes, Combustible and Fire HazardsPaint Spray, Acetone, Butane Gas, WD 40 All are flammable

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    43/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No Bund wall, Drip Tray and Spill kit

    CAR # 0105

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    44/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Date Reported Company Description StatusExpiration

    DateRef. No. Main Area Sub-Area Issued By

    Issuer

    Company/Dep

    t.

    Causal UA/UC

    2-Jan-13 SeobonNeglected full oil drum with plastic without proper

    storageOpen 7-Jan-13 2013-0012 Power Block Power Block Renato Ponce HSJV

    Environmenta

    lUC

    5-Jan-13 Gusan Unsanitized toilet observed Closed 10-Jan-13 2013-0038 Power Block CWIC2 Renato Ponce HSJVHealth &

    WelfareUC

    5-Jan-13 GusanObserved pressurized motor water pump

    operational without drip trayClosed 10-Jan-13 2013-0039 Power Block CWDC Renato Ponce HSJV

    Environmenta

    lUC

    8-Jan-13 Youn ChangImproper chemical storage of hazardous and

    flammable liquidsOpen 13-Jan-13 2013-0070 Ancillary Area Turbine Shop Renato Ponce HSJV

    Environmenta

    lUC

    8-Jan-13 Youn Chang Improper waste management Closed 13-Jan-13 2013-0071 Ancillary Area Turbine Shop Renato Ponce HSJVWaste

    ManagementUC

    9-Jan-13 Yoo AUnbunded chemical storage with hazardous

    materials inside paint shopOpen 14-Jan-13 2013-0104 Ancillary Area Paint Shop Renato Ponce HSJV

    Environmenta

    lUC

    9-Jan-13 Yoo AUnbunded chemical storage with hazardous

    materials inside paint shopOpen 14-Jan-13 2013-0105 Ancillary Area Fabrication Shop Renato Ponce HSJV

    Environmenta

    lUC

    9-Jan-13 Yoo A Paper waste skip bin mixed with plastic waste Closed 14-Jan-13 2013-0106 Ancillary Area Fabrication Shop Renato Ponce HSJVWaste

    ManagementUC

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    45/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:

    Collected - Waste from Site to Temporary Storage Area

    Disposal - Waste from Temporary Storage Area to

    Landfill Area Recycle - Treated waste ( GMET) to

    Recycling Plants

    WASTE MANAGEMENT UPDATE

    Week =03/01/2013

    09/01/2013

    WASTE TYPEThis week Last week

    Collected (m3) Disposal (m3) Recycled (m3) Recycle(%) Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)

    Paper 56 0 0 72 0 0

    Metal 40 0 8 24 0 45

    Construction 104 315 0 104 315 0

    Concrete 0 0 45 0 0 0Wood(Good) 0 0 0 0 0 0

    Wood(Bad) 136 90 0 136 90 0

    Plastic 112 0 0 88 0 0

    Municipal 0 304 0 0 264 0

    Hazardous 8 8 0 16 16 0

    Total Solid Waste 456 717 53 6.90% 440 685 45 6.50%

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    46/48

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    47/48

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 101st HSJV Weekly Meeting Rev 11

    48/48