110324 ue ia

33
Jip Nelissen, Innovation Advisor | UE presentation 24-03 2011 | entremedio

Upload: urbanemergenciesht

Post on 30-Jun-2015

275 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 110324 ue ia

Jip Nelissen, Innovation Advisor | UE presentation 24-03 2011 |

entremedio

Page 2: 110324 ue ia

2.

Barefoot Architect | Innovation for Relief and Development |Innovation for Relief and Development |

Page 3: 110324 ue ia

3.

Experience vs Fresh insight.| Groundwork as a starting point..

Page 4: 110324 ue ia

4.

Grand Goave

Grand Goave - Section Communale 7

Léogane - Section Communale 1 & 3: Lompré

Port-au Prince 6eme Turgeau; St Marie & Villa Rosa

Carrefour Nan ti sous & Nan Cocteau

Different approaches for different Operational Area’s.| Vernacular Rural environment VS Urban informal context.

Page 5: 110324 ue ia

5.

Getting to know the people and the area’s.| Social Assesments.

Page 6: 110324 ue ia

6.

Understanding the typology, damage and the need.| Technical Assesments.

Page 7: 110324 ue ia

7.

Approach and Strategy; Emergency to Transitional IDEJEN local carpentry interns built high quality Core structure T-Shelters.

Page 8: 110324 ue ia

8.

Process After construction of 152 core-structures

Technical and Social evaluation of the PILOT phase took place, to have lessons-learnt for the up-scaling of the project.

Page 9: 110324 ue ia

9.

Strategy Evaluation; Social.Implementing of Community Action Planning.

Page 10: 110324 ue ia

10.

Cordaid T Shelter Core-Structure Approved by UNOPS calcs for 108 mph.Specifi cations quaranteed for 15 years at least.

Strategy Evaluation; Technical up-grading of architectural design & specs.

Page 11: 110324 ue ia

11.

Appropriate approach for Rual Area’s.| Fits the local typology.

| Good starting point for sustainable (neighborhood) development

Page 12: 110324 ue ia

12.

Strategy shift; Emergency to DevelopmentInitial Transitional Shelters with tarps upgraded towards permanent Shelters.

Page 13: 110324 ue ia

13.

Research Transition to permanent; Walling prototype.

Patchwork of 11 different techniques, used as a Research and Communication tool.

Page 14: 110324 ue ia

14.

Research Transition to permanent; Walling prototype.

11 X Walls are based on vernacular techniques, previous experiences and lessons from

Cordaid Indonesia, and other NGO’s:

Transition to permanent | Research permanent walls.

Page 15: 110324 ue ia

15. Transition to permanent | Comparing Sustainability and Vulnerability Criteria.

Nimewo < number >

Deskripsyon < techniquer >

A klisade avek bwa lokal < klissade of local trees, finshed >

B mi ak ròch < wall of rocks >

C planch palmis < plancks made of palm tree >

D blòk ak planch mango < concrete blocks and plancks Mango >

E blòk ak plywood < concrete blocks and plywood >

F blòk ak tòl < concrete blocks and roofsheets >

G klisad ak bwa entrange < wattle and daub of imported wood, with finish >

H tablo siman < sheets of fiber cementboard >

I mi ki f è t ak debri < wall of rubble >

J randwi ak nas banbou < cement rendering with a mesh of bamboo >

K randwi ak nas gabyon < cement rendering with metal chain-link >

Chema < Design >

uraje mache <

rket stimilus >

Enkouraje travaye lokal < local labour >

2 2 12 242 3 17 332 3 16 273 3 14 263 3 16 283 2 14 261 3 14 261 1 14 303 3 19 353 3 18 351 3 17 34

Rezilta Total (sou 39) < total Score of 39 >

Profi < profit >

Rezilta Viabilite (sou 21) < Sustainability Score of 21 >Rezilta Vilnerab (sou 18) <

Vulnerability Score of 18 >Aseptans < acceptability >

Adaptasyon < adaptability >

Mentnans < maintenance >

Dirabilite < durability >

Efe ekolojik < eco-load >

Enkouraje mache lokal < local market stimilus >

Enkouraje travaye lokal < local labour >

12 3 1 1 2 1 2 2 12 2416 3 1 3 3 2 2 3 17 3311 3 2 2 3 1 2 3 16 2712 2 1 2 2 1 3 3 14 2612 2 1 2 2 3 3 3 16 2812 1 1 2 2 3 3 2 14 2612 3 1 1 2 3 1 3 14 2616 2 1 3 3 3 1 1 14 3016 3 1 3 3 3 3 3 19 3517 3 1 3 3 2 3 3 18 3517 3 1 3 3 3 1 3 17 34

Rezilta Total (sou 39) < total Score of 39 >

Pep < people > Planet < planet > Profi < profit >

Sustainability / Viabilite

Rezilta Viabilite (sou 21) < Sustainability Score of 21 >

B.

D.

F.

E.

K. G. H. I.J.

C.

A.

Page 16: 110324 ue ia

16.

wattle and daub of imported wood, with fi nish

< klisad ak bwa entrange >

G.vulnerability score

< rezilta vilnerab sou >12/18

sustainability score< rezilta Viabilite sou >14/21

Traditional wattle and daub wall of local trees, with fi nish

< klisade avek bwa lokal >

A.vulnerability score

< rezilta vilnerab sou >12/18

sustainability score< rezilta Viabilite sou >12/21

Transition to permanent | Best Rated.

Page 17: 110324 ue ia

17.

Ferro-cement rendering with a mesh of bamboo

< andwi ak nas banbou >

J.vulnerability score

< rezilta vilnerab sou >17/18

sustainability score< rezilta Viabilite sou >18/21

Ferro-cement rendering with metal chain-link

< randwi ak nas gabyon >K.

vulnerability score < rezilta vilnerab sou >17/18

sustainability score< rezilta Viabilite sou >17/21

Transition to permanent | Best Rated.

Page 18: 110324 ue ia

18.

Wall of Debris< mi ki fèt ak debri > I.

vulnerability score < rezilta vilnerab sou >16/18

sustainability score< rezilta Viabilite sou >19/21

Traditional wall of rocks< mi ak ròch > B.

vulnerability score < rezilta vilnerab sou >16/18

sustainability score< rezilta Viabilite sou >17/21

Transition to permanent | Best Rated.

Page 19: 110324 ue ia

19.

Barefoot Architect | Innovation for Relief and Development |Barefoot Architect |

Page 20: 110324 ue ia

20.Position | Innovation Advisor

IA Bridging, initating and facilitating between SPM, AM’s, other departments and actors.

AM’s & Teams Leogane AM’s & Teams PauP

SPM

Cordaid | HaitiActors

IA

Suppliers

Local Partners

Int. Partners

Community

Logistics

Page 21: 110324 ue ia

21.

Sustainable sourcing and technical assistance.

Page 22: 110324 ue ia

22.

Partnership Build Change.| All the local Bosses of Cordaid Area’s trained and certifi ed.

| Owner Driven reconstruction support.

Page 23: 110324 ue ia

23.

Process; Transition to Permanent Shelters Local Bosses built Walls and Floor.

Page 24: 110324 ue ia

24.

Transition to permanent.| All the Walls & Floors made by trained local Bosses.

| Implementation process and system design.| Manuals, design and technical detailling.

Page 25: 110324 ue ia

25.

Page 26: 110324 ue ia

26.

Urban Area’s need alternative strategy. KEYCHALLENGE | Integral interventions for sustainable (neighborhood) development,

>>Mandate Cordaid; 8100 Shelters, including 2000 Repairs.

Page 27: 110324 ue ia

27.

Urban Area’s need alternative strategy.KEYCHALLENGE | That fi ts the urban reality.

KEYCHALLENGE | That is sustainable and replicable.

Page 28: 110324 ue ia

28.

Redesign of the Core-Sructure.| All the Panels are interchangeable.

| Flexible width 3mtr to 4,5mtr

Page 29: 110324 ue ia

29.Approaches & Key Challenges | Owner Driven Reconstruction Strategies.

KEYCHALLENGE Support self-building & Owner Driven Reconstruction Strategies.

| Knowledge based.| Improving quality on existing typology of confi ned measonry.

| Aimed on increasing capacity on resources and material sourcing.

Page 30: 110324 ue ia

30.

KEYCHALLENGE | Rubble removal, -management and -recycling.

Page 31: 110324 ue ia

31.

Partnership Foyer st Marie on rubble recycling.|1st Entrepreneur is being trained and will produce materials.

| Partner in community driven site preperation.

Page 32: 110324 ue ia

32.

KEYCHALLENGE | Land improvement, stabilization and infrastructural interventions

Page 33: 110324 ue ia

33.

Integral Community Driven Site Preparation.| Community prepares land and work.

| Cordaid buys recycled materials, community produces.| Cordaid monitors and assists with knowledge.

Integral Community Driven Site Preparation.| Community prepares land and work.

| Cordaid buys recycled materials, community produces.|Cordaid monitors and assists with knowledge.