108th hsjv weekly meeting
TRANSCRIPT
-
7/29/2019 108th HSJV Weekly Meeting
1/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
P ease Turn o your
mobile! Or Switch to
vibration mode!
BARAKAH NUCLEAR POWER PLANT PROJECT
Check! Right Now!
-
7/29/2019 108th HSJV Weekly Meeting
2/24
-
7/29/2019 108th HSJV Weekly Meeting
3/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
4/24
3/3/20
NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS
ACTIONACTION
BYBY
DUEDUE
DATEDATE STATUSSTATUS
Two organizations will come back on next Seoyong
1ow u msson
of HSE Findings
improve HSE reporting on site at their
respective workplaces.
Younchang
PB
Meeting
2High HSE
Findings
Findings were rated as per established
scoring system. Advan got the highest HSE
findings. The organization will come back on
next meeting with a comprehensive plans.
AdvanNext
Meeting
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
5/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion ::
HSE Personnel mu st be vis ible at al l t imes in si te, his work mott oHSE Personnel mu st be vis ible at al l t imes in si te, his work mott o the f i rs t the f i rs t
to come and t he last to leave the siteto come and t he last to leave the site . Where task is cri t ic al he should be in. Where task is cri t ic al he should be in
constant watch and work closely with supervisor in charge.constant watch and work closely with supervisor in charge.
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
6/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion ::
HJSV made a ceremonial meeting to launch 100HJSV made a ceremonial m eeting to l aunch 100--days of f ree incidents anddays of f ree incidents and
quali ty problems. During such occasion monthl y awards were also givenquali ty problems. During such occasion monthl y awards were also given
to the best subcontractor, individual and spot awards.to the best subcontractor, individual and spot awards.
4
4
1. Signage for notifying the
facility
2. Person in charge signage
2
3
4
1
6
5. Hand Sanitizing Solution
(Hand Sanitizers)
6. Patch & Sand
. a y ec s or ean ng
4. Ventilation o f all dir ection
BARAKAH NUCLEAR POWER PLANT PROJECT
- Prevent urine leakage on
the ground
Descript ionDescript ion ::
Recommended standard for t oi let to be used in Power Block.Recommended standard for t oi let to be used in Power Block.
-
7/29/2019 108th HSJV Weekly Meeting
7/24
3/3/20
7. Deodorizing Balls
- To minimize bad odor.
7
9
8. White bucket for urine &
maximum level marked
BARAKAH NUCLEAR POWER PLANT PROJECT
89. Disinfectants
-To decontaminate u rineinstantly.
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
8/24
3/3/20
Item
Ancil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total
For theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
Cum
Near Misses 0 0 0 0 0 2 0 5 0 0 0 0 0 7 0 0
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0
(This Week From Feb 23 Mar 1, 2013)
First Aid Cases(FA) 0 1 0 0 0 0 0 6 0 3 0 2 0 12 0 0
MedicalTreatment Cases
(MTC)0 0 0 0 0 3 0 3 0 0 0 0 0 6 0 0
Restricted Work
Cases (RWC) 0 1 0 1 0 0 0 1 0 0 0 0 0 3 0 0
LTIs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Property/Vehicle
Accid ents 0 1 0 1 0 2 1 5 0 1 0 0 1 10 0 0
Environmental0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop
Power Block Cut Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 6 (2013)
e ease
Forthisweek Cumulative
OneStrike Policy 4 111*
Source: CAR, Near Miss, Observation Cards and Walkthrough
AreaNo. of No. of KEPCO
SUBCON
(This Week From Feb 23 March 01 , 2013)
KEPCO&HSJV SUBCON
Anc il lary
Area5 68 11 57
Camp
Area4 19 16 3
Office
Area5 88 8 80
Power
150
200
250
300
243
BARAKAH NUCLEAR POWER PLANT PROJECT
Block 5 300 57 243
Village 1 5 82 9 73
Village 2 5 8 0 8
Total Findings 565
0
50
AncillaryArea
CampArea
OfficeArea
PowerBlock
Village1 Village2
11 16 8
57
90
57
3
73
8
-
7/29/2019 108th HSJV Weekly Meeting
9/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From Feb 23 March 01 , 2013)
Issued
NearMissNearMiss
CARCAR
0 0 0 0
0 59 177 236
Findings TotalKE
P
C
O
H
S
J
V
S
U
B
C
O
N
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 0 0 0 0 0
0 1 0 0 58 177
BARAKAH NUCLEAR POWER PLANT PROJECT
TOTALTOTAL
OC&
WFOC
&
WF 0 42 287 329
0 101 464 565
0 0 0 0 42 287
0 1 0 0 100 464
-
7/29/2019 108th HSJV Weekly Meeting
10/24
3/3/20
for the Period Total Open
CompanyFe bru ar y TOTA L
2013 OPEN
Youn Chang 1 1
Total 1 1
Company
Feb23 March01,2013
CCAP CAR/NM
YounChang 1
Total 1
BARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From Feb 23 March 01, 2013)
3741
4751
68
ElectricalSafetySigns,Barriers&barricades
MaterialManagementAccess&Egress
PPE
77
81111
1515
1618
2225
2829
35
H f
PTW
HotWorksEnvironmental
Training
Hand&PowerToolsFallProtection
Lifting
Documents
ColorCodingPlant&EquipmentWorkingatHeight
WasteManagementFirePrevention
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
111
23
56
0 10 20 30 40 50 60 70 80
ManualHandlingConfinedSpace
LOTO
RoadSafetyExcavation
PoorIlluminationSupervision
Source: CAR, Near Miss, Walkthrough and Observation Card
-
7/29/2019 108th HSJV Weekly Meeting
11/24
3/3/20
Management personnelshould lead in the use of
mandatory PPE ( Power
Proper storage of chemical at
the workplace (Batch Install handrail for stairway
utilized as access & egress
1 32
Block, Advan)
Use of appro ved PPE whenperforming welding works
(TGB1, D&I)
Electricians must wear full
body harness during
termination works at height
(CWDC, Gusan PB)
,
Removal of unnecessary
combustible material from the
shop (Ancillary, Younchang
PB)
Transfer of cement materials
blocking entrance of building(STC, Hanlim E&C)
(Power Block, Samjin)
Clearing of spoil materials at
entrance of CWIC.
(CWIC, WBG)
Ladder must be clamped at
both sides (RCB, Seoyong
PB)
BARAKAH NUCLEAR POWER PLANT PROJECT
Replacement of damaged
gloves (Ancillary, Younchang
PB)
PPE Material Management
Observe proper arrangement
of tools and materials kept
inside the building
(STC, Jonghap)
Access and Egress
Removal of obstruc tion
(timber & jacks) at the access
way (Village 1, Towers Tech)
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
12/24
3/3/20
700
8004550
KEPCO/HSJV
SUBCON
(This Week From Feb 23 March 01, 2013)
100
200
300
400
500
600
101520253035 Manpower
BARAKAH NUCLEAR POWER PLANT PROJECT
00
Seoyo
ng
Seoyong(PB)
TowersTech
Gusan
Gusan(PB)
Eunm
in
Jongh
ap
Jonghap(PB)
YounCha
ng
YounChang(PB)
Hwach
on
W
BG
Hila
lco
Advan
Hanlim
Uw
ell
YooA
HyundaiC&I
Sam
jin
Euge
ne
Daemyu
ng
Seob
on
D
&I
AlRa
eel
DO
W
Sam
ho
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
13/24
3/3/20
14.0
FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)
Source: CAR, Near Miss, Walkthroughand Observation Card reported by
KEPCO & HSJV
0.0
2.0
4.0
6.0
8.0
10.0
.
4.4 4.7
0.9 1.0
7.9
1.0 1.0
3.1
0.5
2.32.9
9.4
2.5 3.03.6
6.2
0.2
BARAKAH NUCLEAR POWER PLANT PROJECT
ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem
1.JointInspection willbecarriedoutbyAreaManagementTeam.2.SpotTrainingwillbegiven toworkersaboutmajorfindings3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby ADVAN
Legend : (I) Infra, (PB) Power Block
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
14/24
3/3/20
Total No. of Findings: 54Access&Egress,10
MaterialManagement,2
WorkingatHeight,2
Plant&Equipment,1
ColorCoding,1 HotWorks,1Documents,
1 Training,1
Cause Nos
Access&Egress 10
PPE 10
Control Measure Due Date
Clearingof materialsthat
blocksaccess.Maintain
accessfreeofobstruction
Alw ays
Signs,Barriers&Housekeeping,2
WasteManagement,2
Lifting,2
BARAKAH NUCLEAR POWER PLANT PROJECT
Motivatemanagement
personneltoleadintheuse
ofmandatory
PPE
Alw ays
PPE,10Scaffolding,6ElectricalSafety,4
FallProtection,3FirePrevention,3
Barricades,3
Source: CAR, Near Miss, Walkthrough and Observation Card
Top Hazards
Total No. of Findings: 50
Access&Egress,6
Plant&Equipment,2
ColorCoding,1ConfinedSpace,1 Documents,1 excavation,1
FallProtection,1
PPE,1
Cause Nos
Access &Egress 6
Scaffolding 5
Control Measure Due Date
Ensureaccessareingood
condition(nonslip),even
distanceofstairsteps,and
removal of obstruction.
Alw ays
Scaffolding,5
ElectricalSafety,3Housekeeping,3
Lifting,3Environmental,2
BARAKAH NUCLEAR POWER PLANT PROJECT
Workers shoulduse
inspectedscaffold,
completeguardrails,and
mobilewithengaged
outriggers.
Alw ays
FirePrevention,4
MaterialManagement,4
Signs,Barriers&Barricades,4
WasteManagement,4
WorkingatHeight,4
Source: CAR, Near Miss, Walkthrough and Observation Card
-
7/29/2019 108th HSJV Weekly Meeting
15/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
AREAAREA : In take Basin(Al: Intake Basin (Al RaeelRaeel) February 27,2013) February 27,2013
Initial Action TakenInitial Action Taken
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
16/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
InspectionInspection DateDate AttendeesAtt endees RemarkRemark
Commit tee Inspec tion 2013-02-26 HSJV, KEPCO, HSE Managemen t Team 03 Find ings
Weekly Inspection 2013-02-27 HSJV HSE Team 18 Findings
-
7/29/2019 108th HSJV Weekly Meeting
17/24
3/3/20
4
5
6
FindingsperCompany Total
4NotHookingFindingsperCausal
3
5
21 1
21
21
0
1
2
D&I Gusan(PB) Hilalco JongHap Seobon Seoyong(PB) WBG YounChang YounChang(PB)
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
1
1
2
2
3
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
IncompleteLanyardNoSignage
LackAwarenessScaffoldNoInspection
IncompleteAccess/PlatformAbsenceofFallProtection
WrongPosition
Key item : Working At Heights
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
18/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Around Inter sect ion betw een war ehouse and rebar sho p i n Anc ill ary Area.
Description STP without f ences and proper signage, all control valves are exposed to potentialaccidents/incidents.
Actiontaken Installed full barricade and appropriate signage.
Status CLOSED
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Between AB wall and CPB at power block area
Description Stagnant water that may lead to generate algae/bacteria.
Actiontaken Dewatering operation immediately conducted t o drain the stagnant w ater
Status CLOSED
-
7/29/2019 108th HSJV Weekly Meeting
19/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Around dewat ering pond at i ntak e basi n area
Description Oil leakage from the shovel oil tank due to hitt ing the rocks while operating.
Actiontaken Cleaned, disposed of cont aminated soil properly, sent the shovel to m aintenance shop i nMusafa.
Status CLOSED
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Hilalco work shop at power block.
Description Hazardous materials form oil neglected in front of chemical storage , and mixed with othertypes of substances at the same area.
Actiontaken Form oil kept ins ide the chemical storage, and stored hazardous materials by typescomplying with the BNPP-HSE-P41 procedure.
Status CLOSED
-
7/29/2019 108th HSJV Weekly Meeting
20/24
3/3/20
HAZARDOUS SKIP METAL SKIP WOOD SKIP
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Hilalco workshop at power block area.
Description Improper waste management and segregation.
Actiontaken Arrange t he ho usekeepin g t eam wi th Su perv iso r an d seg regat ed w aste as per EMP-P01.
Status CLOSED
CONCRETE SKIP
METAL SKIP
Hazardous
Cans
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Seoyong workshop at power block area
Description Improper waste management and segregation.
Actiontaken Immediately segregated the waste, and conducted spot training on w aste managementfrom HSJV HSE team.
Status CLOSED
-
7/29/2019 108th HSJV Weekly Meeting
21/24
3/3/20
No.0 DateAction by
CompanyDescription Status
Closing
Date
Expiration
DateRef . No . Mai n Ar ea Su b-Ar ea Is su ed B y
Issuer
Company
1 27- Feb -13 Al RaeelOil leakage from the shovel oil tank du e to
hitting the rocks while operating.Closed 2-Mar-13 5-Mar-13 2013-0588
Intake
Basin
Dewaterin
g PondHSJV
Renato
Ponce
2 27-Feb-13 Hi lal coHazardous materials form oil neglected in
front of chemical storage , and mixed with
other types of substances.
Closed 3-Mar-13 5-Mar-13 2013-0589Power
Block
Workshop
AreaHSJV
Renato
Ponce
3 27- Feb -13 Seo yo ng
Improper waste management and
segregation concrete waste skip bin
dumped with mixed garbage and
construct ion waste. Metal skip bin dumped
with hazardous materials chemical cans.
Closed 3-Mar-13 5-Mar-13 2013-0590 Anci llaryLaydown
YardHSJV
Renato
Ponce
BARAKAH NUCLEAR POWER PLANT PROJECT
4 27-Feb-13 Hi lal co
Improper waste management & segregation,
cross contamination of recyclable waste on
hazardous, metal & wood skip bins,
lack of supervision
Closed 3-Mar-13 5-Mar-13 2013-0593Power
Block
Workshop
AreaHSJV
Renato
Ponce
5 27-Feb-13 HSJV
There was stagnant water that may l ead to
an environment in which Algal/Bacteria
easily proliferate in the area of behind the
AUX bui ldi ng Uni t #1.
Closed 3-Mar-13 9-Mar-13000000161
5
Power
Block
AUX
BuildingENEC
Ahmed Al
Neaimi
WASTEMANAGEMENTUPDATE
Week=21/02/2013 27/02/2013
Thisweek Lastweek
Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)
Paper 88 0 45 72 0 0
Metal 48 0 45 32 0 0
Construction 112 225 0 120 495 90
Concrete 0 0 0 0 0 0Wood(Good) 0 0 45 0 0 0Wood(Bad) 328 450 0 192 180 0
Plastic 120 0 0 72 0 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea
Recycle Treatedwaste(GMET)toRecyclingPlants
Municipal 0 240 0 0 288 0Hazardous 0 90 0 0 16 0
TotalSolidWaste 696 1005 135 13.43% 504 979 90 9.19%
-
7/29/2019 108th HSJV Weekly Meeting
22/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
23/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 108th HSJV Weekly Meeting
24/24
3/3/20
BARAKAH NUCLEAR POWER PLANT PROJECT