1013a. toolbox meeting form

2
NOKIA SIEMENS NETWORKS (NSN) Doc. Number : NSN/H&S/Form/06 B Revision : 01 Date of Issue : 6 May 2008 Doc. Status : Controlled 2008 Nokia Siemens Networks Page : 1 of 2 Internal Use Only TOOLBOX MEETING RECORD Page 1 of 2 Project Name: Project No.: Location: Meeting Date: ACTION ITEMS FEEDBACK FROM LAST WEEKS MEETING: (Including completed follow up actions) Actioned By: Date: THIS WEEKS TOPIC: Actioned By: Date: Verbal / OHP / Video / PPT / Handouts. (Please circle) Conducted By: Signature: Position: Date: RECORD OF MEETING FURTHER FOLLOW UP ACTION REQUIRED. Detail: By Whom: Date: Zone Manager Approval Name: Signature:

Upload: ainnurrofiq

Post on 01-Feb-2016

11 views

Category:

Documents


2 download

DESCRIPTION

Manual

TRANSCRIPT

Page 1: 1013a. Toolbox Meeting Form

NOKIA SIEMENS NETWORKS (NSN)

Doc. Number :

NSN/H&S/Form/06B

Revision : 01 Date of Issue :

6 May 2008

Doc. Status :

Controlled 2008 Nokia Siemens Networks

Page : 1 of 2

Internal Use Only

TOOLBOX MEETING RECORD

Page 1 of 2

Project Name:

Project No.:

Location:

Meeting Date:

ACTION ITEMS

FEEDBACK FROM LAST WEEKS MEETING:

(Including completed follow up actions)

Actioned By:

Date:

THIS WEEKS TOPIC: Actioned By:

Date:

Verbal / OHP / Video / PPT / Handouts. (Please circle)

Conducted By:

Signature:

Position:

Date:

RECORD OF MEETING

FURTHER FOLLOW UP ACTION REQUIRED.

Detail: By Whom: Date:

Zone Manager Approval

Name:

Signature:

Page 2: 1013a. Toolbox Meeting Form

NOKIA SIEMENS NETWORKS (NSN)

Doc. Number :

NSN/H&S/Form/06B

Revision : 01 Date of Issue :

6 May 2008

Doc. Status :

Controlled 2008 Nokia Siemens Networks

Page : 2 of 2

Internal Use Only

TOOLBOX MEETING RECORD

Page 2 of 2

Project Name: Project No.:

Location: Meeting Date:

Company:

ATTENDEES

No: Name: Signature: No: Name: Signature: