101010 cv english
TRANSCRIPT
FERNANDO SANCHEZ TOVAR
Certified Technical ArchitectProject Manager
C.V.Professional career
IC ASOCIADOS2010 KEY ACCOUNT MANAGER
• Construction company specialized inShop fitting and installation.
• International luxury brands.
BOVIS LEND LEASE
2006-2009 PROJECT & CONSTRUCTION MANAGEMENT2006-2009 PROJECT & CONSTRUCTION MANAGEMENT
• Due Diligence: New football stadium Zaragoza. Project analysis and report.New football stadium Zaragoza. Project analysis and report.
• Mandarin Barcelona:Mandarin Barcelona: 120 M€. 110 key 5* and Spa Luxury Hotel. Construction 120 M€. 110 key 5* and Spa Luxury Hotel. Construction Manager for all the Common Areas, Reception, Restaurant/Bars and Spa.Manager for all the Common Areas, Reception, Restaurant/Bars and Spa. • Prestige Lucena (Córdoba)Prestige Lucena (Córdoba) – 30M € 158 key, 4 * Hotel development at Parque – 30M € 158 key, 4 * Hotel development at Parque Empresarial Príncipe Felipe business (Lucena, Córdoba). Developer and operator Empresarial Príncipe Felipe business (Lucena, Córdoba). Developer and operator Prestige Hotels.15.000m² of built area plus 10.000m² landscape Prestige Hotels.15.000m² of built area plus 10.000m² landscape
• Madrid 2010 UEFA Champions League Final.Madrid 2010 UEFA Champions League Final. (Real Madrid CF). Professional (Real Madrid CF). Professional Services for the event Organization. (Champions Village, Champions Festival, Services for the event Organization. (Champions Village, Champions Festival, Fan Zones, Accreditation, Security & Mobility, Health & Safety)Fan Zones, Accreditation, Security & Mobility, Health & Safety)
2009-2010 SPORT EVENT ORGANIZATI ON2009-2010 SPORT EVENT ORGANIZATI ON
Uefa Champions League Final 2010Uefa Champions League Final 2010
Prestige Lucena 4* HotelPrestige Lucena 4* Hotel
Mandarin Barcelona 5* Luxury HotelMandarin Barcelona 5* Luxury Hotel
MARRIOTT VACATION CLUB INT.Architecture & Construction Dep. Europe & ME
• Project& Construction Manager.
• Development, design & construction.
• Resort projects in Spain (Mallorca & Estepona) and France (Paris)
• Construction Management on site.
• Planning and cost objectives,
• Tendering & Contracting
• Consultants Coordination.
• Facilities and Team Coordination.
• Facility Management
• Health& Safety
2002-2006 CONSTRUCTION PROJECT MANAGEMENT2002-2006 CONSTRUCTION PROJECT MANAGEMENT
Marriott Mallorca Son AntemSpa & Golf Resort
• Plot area 135.000 sqm.• 232 villas (29 blocks + 11 pools)• Spa built area 4000 sqm (Pools, Treatment areas)• 2 Golf Courses & Golf Club• Villas total built area 27.000 sqm.• Landscape areas 120.000 sqm.• Budget: 60M€• 8 phases.
Marriott Playa AndaluzaBeach Resort
• Beach resort.• 225 units <2B & 3B apartments>• Spa 400 sqm.• Plot area 40.000 sqm.• Budget 70M€. 7 phases• Pool areas + landscaping.• Parking structures.• Reception building.
Marriott Marne la Vallé (Disney Paris)
• 190 villas.• Budget 60m€ (4 phases).• Plot area 80.000 sqm.• Built surface 23.000 sqm.• Facility Manager
MCDONALD´S Development & Construction Dept.
• Construction and Development department. • Development & design of 11 new projects. • Restaurant´s Refurbishment.• Furniture and equipment.• Tendering and Contracting. • Consultant Team Coordination.• Restaurants maintenance• Rlationship with suppliers and franchises.
1999-2002 PROJECT & CONSTRUCTION MANAGEMENT1999-2002 PROJECT & CONSTRUCTION MANAGEMENT
• Construction Coordinator/Manager: shopping centres
• 1999. - Shopping Center Continente Puertollano (15 shops)
• 1998. - Shopping Center Continente de Pontevedra (18 shops)
• 1996. - Shopping Center Continente Torrelavega (15 shops).
• 1993. - Shopping Center Continente Zaratán Valladolid (47 shops)
Shopping Malls and Retail.
1993-1999. CONSTRUCTION MANAGEMENT1993-1999. CONSTRUCTION MANAGEMENT
Shopping Malls-Retail-ECOP´s
• 1998. -Simago/Champion supermarkets.
• Reform and Architectural Restructuring of Simago supermarkets, according to the new corporate brand Champion.
• 1998. -Continente Mall, New commercial Centre in Puertollano (Ciudad Real) (7.000 sm 6M€)
• 1998. -Ecore Getafe. Distribution Store for Ecore supermarkets, Los Angeles, Getafe. (25.000 m2 -6M€)
• 1997. -GOFY Self service Restaurant. Reform Project for a self-service restaurant GOFY in Continente Commercial Centre, Sevilla.
• 1997. -Continente Mall, Torrelavega. Oil station Project. Continente Torrelavega (Cantabria). (300k€)
• 1996. C&A Store - Commercial Centre Parquesol (Valladolid). Mall Reform and Enlargement with creation of a mid-size store for C&A. (2.000 sqr m - 1,1M€)
• 1996. ECORE Supermarket, Madrid. Mid-size Supermarket in Madrid, (Sinesio Delgado) (3.000 sqr m. - 2,5M€)
• 1996. AUTOCENTER, Torrelavega. Vehicle maintenance and repair centre in Torrelavega (650sqr. Mt. 500k€)
• 1992: Trainee. Starting my Professional career collaborating in various projects with Riva Suárez Architects, S.L. Madrid.
1993-1999. CONSTRUCTION MANAGEMENT. 1993-1999. CONSTRUCTION MANAGEMENT.
• 1998. Comercial Centre Continente Puertollano• 1998. Distribution store. Ecore Supermarket. Polígono Los Ángeles, Getafe.• 1996. Shopping Center Continente Zaratán Valladoli>• 1997. Ecore Supermaket Madrid• 1995. Toys´r Us León
Shopping Malls and Retail.
1995-1998 . Health & Safety projects and ECOP´s1995-1998 . Health & Safety projects and ECOP´s
APPRAISER
• 1995-1999. Regional Director of GESTVAL SOCIEDAD DE TASACION in Asturias (Appraiser’s Association). Negotiation & Agreements with Bank entities. Handling of accounts. Technical Appraiser’s tasks for the Mortgage Market.
• 1995. Official Appraiser. Certified by the Central Bank of Spain, for the Company VASA VALORACIONES SA, in Madrid
FERNANDO SANCHEZ
Technical ArchitectConstruction Project Manager
+34 651 99 26 27f.sanchezt @ orange.es