City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
NOPEC grant-Mayfield Rd street lights 408.4000.44152 46,428
Energy Conservation Grant 408.4000.44156 0
Grants-Miscellaneous 408.4000.44199 0
Refunds 408.8000.48102 0
Insurance reimbursements 408.8000-48103 110,049
Playground of Possibilities 408.8000.48115 7,416Miscellaneous 408.8000.48999 6,068
OAQDA Loan proceeds 408.9000.49107 374,441
Transfers In from the General Fund 408.9000.49101 235,000
Total $779,402
Unencumbered Balance 1/1/13 $2,436
2013 Certified Estimated Revenues
Donations - Playground of Possibilities
Insurance reimbursement-Playground of PossNOPEC grant - Mayfield Rd traffic lamps
OAQDA Loan proceeds
Nopec grant - OAQDA project
Transfers In from the General Fund 252,050
2013 Appropriations are not to exceed: $254,486
current budget $252,050
ending balance $2,436
Revenues Received in 2012:
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
2/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0
Materials and Supplies 0 0 0 0
Contractual Services 265,284 296,566 1,289,268 987,356 252,050
Other Charges 0 0 0 0
$265,284 $296,566 $1,289,268 $987,356 $252,050
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
3/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Police
Building/structures 1110.52502 60,000 0 0 2,100
Vehicles 1110.52507 15,274 63,085 49,816 51,421 0
Equipment 1110.52508 0 0 0 0
Pistol Range 1110.52515 0 0
narrow band 1110.52535 25,000 25,000 47,529 0
Fire
Building/structures 1120.52502 0 0 0 0
Vehicles 1120.52507 12,085 12,085 0 0
Equipment 1120.52508 0 0
Recreation
Land/ land improvements 3310.52501 0 0 0 0
Streets 3310.52503 0 0 0 0
Park equip & repairs 3310.52508 0 0 4,034 8,913 0
Playground 3310.52521 1,437 (35) 564,430 76 0
Pools
Building/structures 3320.52502 0 0 17,742 4,774 0
Equipment (83,000 grant) 3320.52508 6,605 216 0 100,000
Community Center
Furniture/Fixtures 3350.52407 7,743 0 0
Building/structures 3350.52502 0 0 84,875 4,325
Parking lots 3350.52505 0 0 0
Equipment 3350.52508 8,068 9,858
Computerization 3350.52516 0 0 0 1,3503/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
4/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Building Department
4410.52502 0 0 0
Vehicles 4410.52507 8,567 8,567 0
Computerization 4410.52516 0 80 0 4,286 9,150
Economic Development
Master plan study 4430.52351 0 0 0
Community Relations
Computerization 4440.52516 1,570 0
Sewer Maintenance
Sewers 5540.52506 0 0 0
Ramblewood Sanitary Sewer 5540.52520 0 0 0
Flood Control
5550.52501 0 0 0
Service Department
Building/structures 6610.52502 0 0 0
Vehicles 6610.52507 139,190 149,172 39,198 108,160 109,000
Equipment 6610.52508 0 0 44,374 79,864
Fuel Storage 6610.52517 0 0 0
Emulsion Distribution 6610.52518 0 0 0
Computerization 6610.52516 0 0 4,939
Service Garage3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
5/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Consultants 6620.52354 0 0 0
Building/structures 6620.52502 0 0 0 112,549
Sewers 6620.52506 0 0 0
Equipment 6620.52508 0 0 0
Street Construction & Maintenance
Streets 6630.52503 0 0 0
Crack Sealing 6630.52504 11,528 14,987 15,000 28,163 30,000
Sidewalk repairs
Parking Lots
Parking Lots 6650.52505 0 0 0
Miscellaneous 6650.52799 0 0 0
Mayor
Vehicles 7710.52507 2,856 2,856 0
Computerization 7710.52516 1,530 0 450
Finance Department
Computerization 7730.52516 0 9,077 0 234
Court
Furniture & Fixtures 7750.52407 0 0 0
Building/structures 7750.52502 0 0 0
Equipment 7750.52508 0 0 0
Computerization 7750.52516 0 0 0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
6/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Municipal Complex
Land/ land improvements 7780.52501 0 0
Building/structures 7780.52502 0 0 45,396 4,239
Equipment 7780.52508 26,120 33,605
Telephone System 7780.52510 0 0 1,015
H.V.A.C. 7780.52511 0 0 298,516 452,696
Computerization 7780.52516 0 8,376 2,506 0
General Services
Consultants 7790.52354 0 0 28,238 36,664
Land/ land improvements 7790.52501 0 0 0
Parking Lots 7790.52505 0 0 0
Traffic signals/control devices 7790.52509 0 0 30,000
Parking Meters 7790.52512 0 0 0
City Signage 7790.52513 0 0 0
Dumpster & Enclosures 7790.52514 0 0 0
Computerization 7790.52516 0
Fuel Storage 7790.52517 0
Wireless- parks & Community Center 7790.52530 0 0 0
War Memorial 7790.52730 0 0 0
Demolition 7790.52737 0 0 0
Miscellaneous 7790.52799 0 0 0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
7/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
GENERAL IMPROVEMENT & REPAIR - FUND #408
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Transfers
TOTALS $265,284 $296,566 $1,289,268 $987,356 $252,050
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
8/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
SAFETY FORCES VEHICLE FUND - FUND #409
Interest Income 409.7000.47102 745Miscellaneous 409.8000.48141 $0
Insurance reimbursement 409.8000.48103 $0
Reverse 911 409.8000.48514 $0
Transfer from General Fund 409.9000.49101 $0
Total $0
Unencumbered Balance 1/1/13 $648,757
2013 Certified Estimated Revenues
EMS interest -PNC Bank 1,000
2013 Appropriations are not to exceed: $649,757
current budget $622,000
ending balance $27,757
This fund was established by Ordinance #08-01 to account for the accumulation of funds for the subsequent purchase of safety vehicles.
Revenue in this Fund will be derived from transfers from the General Fund in an amount not to exceed $200,000 annually.
Revenues Received in 2012:
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
9/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
SAFETY FORCES VEHICLE FUND - FUND #409
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0
Materials and Supplies 0 0 0 0
Contractual Services 0 0 0 0 0
Other Charges 5,876 5,414 635,799 216,875 622,000
$5,876 $5,414 $635,799 $216,875 $622,000
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
10/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
SAFETY FORCES VEHICLE FUND - FUND #409
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Bank fees (new 2012) 52359 $0 $0 $0 $0
$0 $0 $0 $0 $0
Actual Actual Actual Actual Budget
OTHER CHARGES 2009 2010 2011 2012 2013
Vehicles 52507 $0 $0 $630,385 $185,500 $162,000
Equipment (new 2012) 52743 $31,324 $52,000
Reverse 911 52713 $5,876 $5,414 $5,414 $0 $8,000
Miscellaneous 52799 $51
Transfer out 52901 $0 $400,000
TOTALS $5,876 $5,414 $635,799 $216,875 $622,000
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
11/37
CAPITAL PROJECTS
POLICE VEHICLES & EQUIPMENT FUND -FUND 411
Transfer from General Fund 411.9000.49101 $0
Total $0
Unencumbered Balance 1/1/13 $2,077
2013 Certified Estimated Revenues
Transfer from General Fund
2013 Appropriations are not to exceed: $2,077
current budget $2,077
ending balance $0
This fund was established by Ordinance #36-09 to account for the accumulation of funds for the subsequent
purchase of Police vehicles and equipment. Revenue in this Fund will be derived from net revevue from the
Revenues Received in 2012:
-
7/28/2019 10 Book Capital Projects - 2013 Budget
12/37
CAPITAL PROJECTS
POLICE VEHICLES & EQUIPMENT FUND -FUND 411
Actual Actual Actual Actual Actual Budget
2000 2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 0 0 0 0 21,589 2,077
Other Charges 0 0 0 0 0 0
$0 $0 $0 $0 $21,589 $2,077
-
7/28/2019 10 Book Capital Projects - 2013 Budget
13/37
CAPITAL PROJECTS
POLICE VEHICLES & EQUIPMENT FUND -FUND 411
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICE 2009 2010 2011 2012 2013
Equipment 52743 $21,589 $2,077
TOTALS $0 $0 $0 $21,589 $2,077
Actual Actual Actual Actual Budget
OTHER CHARGES 2009 2010 2011 2012 2013
Transfer out 52901
TOTALS $0 $0 $0 $0 $0
-
7/28/2019 10 Book Capital Projects - 2013 Budget
14/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
RECREATION CONTINGENCY - FUND #418
This amount is appropriated every year in the event that City Council may approve expenditures from this fund.
Source: Transamerica Delaval, Inc. $95,000
: John & John Jr. Agresta 55,000$150,000
None $0
Total $0
Unencumbered Balance 1/1/13 $0
2013 Certified Estimated Revenues 02013 Appropriations are not to exceed: $0
This fund was established in 1985 for the purpose to provide such funds for recreation expenditures and improvements as directed by City
Council. The $150,000 was established from the sale of land owned by the City which was determined to be not functional for City use.
Revenues Received in 2012:
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
15/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
RECREATION CONTINGENCY - FUND #418
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 0 0 0 0 0
Other Charges 0 0 0 0 0
$0 $0 $0 $0 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
16/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
RECREATION CONTINGENCY - FUND #418.3310
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Buildinds/structures 52502 0 0
Miscellaneous 52799 5,000 0
Transfers out 52901 0 0
TOTALS 0 0 0 0 0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
17/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
WATER DISTRIBUTION INFRUSTRUCTURE - FUND #424
In 2009, the City of South Euclid entered into a joint economic development agreement with the City of Cleveland whereby the City of Clevelan
has assumed ownership, including capital improvement and repair responsibilities, for the public water mains within the City of South Euclid,
in return for South Euclid sharing a portion of any tax revenue that would be generated by any business that might relocate from Cleveland to
South Euclid.
Under this agreement South Euclid can elect to replace failing water mains under a municipal public bidding and contract process. The cost of th
work, including engineering and supervision, is then eligible to reimbursement by the City of Cleveland.
Water Distribution reimb 424.2000.42120 $709,602
Total $709,602
Unencumbered Balance 1/1/13 $157,186
2013 Certified Estimated Revenues
Cleveland Water Dept 1,607,622
2013 Appropriations are not to exceed: $1,764,808
current budget $1,608,556
ending balance $156,252
Revenues Received in 2012:
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
18/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
WATER DISTRIBUTION INFRUSTRUCTURE - FUND #424
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 0 0 2,426,396 863,431 1,608,556
Other Charges 0 0 0 0 0
$0 $0 $2,426,396 $863,431 $1,608,556
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
19/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
WATER DISTRIBUTION INFRUSTRUCTURE - FUND #424
Actual Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2000 2009 2010 2011 2012 2013
Engineering fees 52326 162,747 157,067 53,639 101,328
Inspections 52327 29,790 51,167 71,728
Contractor Fees 52328 803,314 2,239,207 758,315 1,435,000
Legal Advertising 52715 332 310 500
TOTALS $0 0 0 2,426,396 863,431 1,608,556
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
20/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
ROAD IMPROVEMENT & RESURFACING - FUND #425
Real Property Taxes 425.1000.41102 856,433
Personal Property Taxes 425.1000.41103 33
10% Rollback 425.2000.42102 61,208
2.5% Rollback 425.2000.42103 51,948
Homestead 425.2000.42104 26,294
Refunds 425.2000.48102 0
Suburban Watermain 425.8000.48250 0
OPWC loan proceeds 425.9000.49109 0
Transfers from General Fund 425.9000.49101 0
Total $995,916
Unencumbered Balance 1/1/13 $266,254
2013 Certified Estimated Revenues 843,892
DOPWIC Loan
2013 Appropriations are not to exceed: $1,110,146
current budget $1,070,785
ending balance $39,361
Revenues Received in 2012:
The source of income for this fund is the 3-Mill property tax levy which is expected to generate $535,000 in 2010. The city issued new debt
in the amount of $1,000,000 to finance road improvements in the year 2003.
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
21/37
-
7/28/2019 10 Book Capital Projects - 2013 Budget
22/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
ROAD IMPROVEMENT & RESURFACING - FUND #425
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Outside legal fees 6630.52324 1,351 1,422 1,492 2,000
Engineer fees 6630.52326 39,924 62,738 74,428 70,333 49,285
Inspection fees 6630.52327 13,301 30,400 25,479 24,320 22,500
Contractor fees 6630.52328 546,709 201,602 1,475,322 537,786 645,000
Suburban Watermain 6630.52337 0 0
Auditor/treasurer collection fees 6630.52358 3,592 8,750 17,118 17,523 18,000
Legal Adversing (new 2010) 6630.52715 1,604 312 950 1,000
Bond Principal 8850.52601 240,000 250,000 255,300 263,500 275,000
Bond Interest 8850.52602 95,510 88,310 80,530 63,386 58,000
Note Principal 8850.52603 0 0 0 0
Note Interest 8850.52604 0 0 0
Transfer 0
TOTALS $940,387 $644,826 $1,929,981 $977,798 $1,070,785
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
23/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
FLOOD CONTROL - FUND #426
Special Assessments 426.3000.43101 2,074,114
Special Assess-Ramblewood 426.3000.43104 22,278Federal Funds 426.4000.44101 0
OPWC grant 426.4000.44112 0
County Grant 426.4000.44120 0
Suburban Watermain Ren 426.8000.48250 0
Transfers in 426.9000.49101 464,650
OPWC Loan Proceeds 426.9000.49109 453,337
Total Revenues Received in 2012: $3,014,379
Unencumbered Balance 1/1/13 $803,583
2013 Certified Estimated Revenues 1,950,000OPWC loan proceeds
SWIF Grant 166,000
cleveland water dept
Ramblewood assessments 21,000
2013 Appropriations are not to exceed: $2,940,583
current budget $2,586,713
ending balance $353,870
On December 23, 1996, City Council passed Ordinance 55-96, an Ordinance permitting the City to certify special assessments for improvingthe City sewerage system. This increased the sewer rental fee from $33 per unit to $132. These fees help pay for the first phase of the
program. Due to the time frame of assessments to the County by September, it was the desire of Council to establish the Flood Control Fund
(Ordinance 16-97) and also issue a bond anticipation note to start the program (Ordinance 13-97). In June, 2000, the Council increased the
fee per connection by $99, bringing the total to $231 a year. In 2001 an additional bond anticipation note was issued for $4,900,000 to
assist in financing major sewer projects including the City's share to the Bexley Infrastructure Project. In 2003, the principal was reduced by
$500,000. A 15 year Bond was be issued for the balance of $4,400,000.
Revenues Received in 2012:
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
24/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
FLOOD CONTROL - FUND #426
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 2,189,237 1,749,274 2,737,718 3,742,033 2,586,713
Other Charges 0 0 0 0
$2,189,237 $1,749,274 $2,737,718 $3,742,033 $2,586,713
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
25/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
FLOOD CONTROL - FUND #426
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013Outside Legal Expense 5550.52324 1,524 1,603 1,683 2,000
Engineer fees 5550.52326 144,078 112,896 249,294 139,357 141,000
Inspections 5550.52327 45,922 25,247 56,326 71,440 34,000
Contractor 5550.52328 $1,251,907 $917,885 $1,600,262 $2,697,960 $1,532,000
Backflow devices 5550.52329 $2,000 $1,000 $0 $2,000
Consultants 5550.52354 12,571 4,500 10,000 0 5,000
Auditor / treasurer collection fees 5550.52358 19,890 20,309 19,601 20,815
Sewer Maintenance-Contractor 5550.52374 99,017 101,650 100,000
Miscellaneous 5550.52799 2,566 3,609 11,846 12,526 12,000Legal Advertising (new 2010) 6630.52715 0 675 0 1,000
Bond principal 8850.52601 325,000 340,000 344,700 356,500 371,000
Bond interest 8850.52602 128,794 119,044 86,330 84,799 79,000
Note principal 8850.52603 83,163 85,887 88,701 91,608 93,000
Note interest 8850.52604 64,216 61,491 58,677 55,771 55,000
OPWC principal 8850.52605 109,607 54,803 109,607 109,607 159,713
Other Principal 52697 0 0
Other Interest 52698 0 0
Easements (new 2006) 52720 0
Transfer- City Share Issue II Projects 0
TOTALS $2,189,237 $1,749,274 $2,737,718 $3,742,033 $2,586,713
Huntington - Sewer bond OPWC 52605
Principal-52601 371,000 Nine Mile Creek 25,600
Interest-52602 79,000 Bexley Drainage 62,372
Liberty Rd Bridge 37,800
Ohio Water Development Auth loan Whitehall Rd Bridge 9,441
Principal-52603 92,000 Argonne Rd 24,500
Interest-52604 56,000 159,7133/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
26/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
SIDEWALK IMPROVEMENT - FUND #427
Assessments Received
Total $0
Unencumbered Balance 1/1/13 $7
2013 Certified Estimated Revenues 0
Transfer from General Fund 0
2013 Appropriations are not to exceed: $7
Revenues Received in 2012:
This fund accounts for the activities associated with the City's Sidewalk Inspection program. The program is designed to provide systematic
inspection of all the sidewalks within the City's borders by inspecting specific areas each year. The revenues and expenses each year may
vary greatly and are contingent upon the size and condition of sidewalks targeted for repair/replacement.
General Fund was subject to the approval of the Tax Commissioner of the State of Ohio and Cuyahoga County Common Please Court. The
transfer has been approved by both the State Tax Commissioner and the Common Pleas Court. This money and future assesments received
will be transferred into the General Fund and this fund will be closed.
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
27/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
SIDEWALK IMPROVEMENT - FUND #427
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 0 0 0 0 0
Other Charges 0 0 0 0 0
$0 $0 $0 $0 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
28/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
SIDEWALK IMPROVEMENT - FUND #427
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Engineer 52326 0
Inspections 52327 0
Contractor 52328 $0
Transfers 52901 0
Miscellaneous 52999 0
Principal - Note Payment 0
Interest on Notes 0
TOTALS $0 $0 $0 $0 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
29/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
STANHOPE PARKING LOT - FUND #430
Assessments Received
Total $0
Unencumbered Balance 1/1/13 $2,852
2013 Certified Estimated Revenues
Transfer from General Fund 0
2013 Appropriations are not to exceed: $2,852
current budget $0
ending balance $2,852
Revenues Received in 2012:
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
30/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
STANHOPE PARKING LOT - FUND #430
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013
Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 0 0 0 0 0
Other Charges 0 0 0 0 0
$0 $0 $0 $0 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
31/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
STANHOPE PARKING LOT - FUND #430
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Engineer 52326 0
Inspections 52327 0
Contractor 52328 $0
Transfers 52901 0
Miscellaneous 52999 0
Principal - Note Payment 0
Interest on Notes 0
TOTALS $0 $0 $0 $0 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
32/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
ISSUE II PROJECTS - #431
Reimbursements from State of Ohio
Interest on loan proceeds (City portion)
Total $0
Unencumbered Balance 1/1/13
2013 Appropriations are not to exceed: $0
current budget $0
ending balance $0
This fund accounts for the expenses related to the construction of projects financed completely or in part by Issue II awards.
In the year 2003, the Whitehall Bridge Replacement project was approved for Issue II funding. The project will be financed with a 30%
grant, 30% zero-interest, 20 year loan, and a 40% City contribution. Construction expenses are approved by the City, and then forwarded
to the State for payment on our behalf which creates a draw on our grant/loan.
Revenues Received in 2012:
In the year 2001, the Bexley-Ellison Sewer project was approved for Issue II funding. This project is being done in conjunction with the
City of Cleveland Heights. Since we are considered the lead City, we will account for the entire project and be reimbursed from Cleveland
Heights for their share. The City of South Euclid's share of the project cost (appox. $1.8 million) was funded from the issuance of Notes
in 2001.
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
33/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
ISSUE II PROJECTS - FUND #431
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 0 0 0 464,650 0
Other Charges 0 0 0 0 0
$0 $0 $0 $464,650 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
34/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
ISSUE II PROJECTS - FUND #431
Actual Actual Actual Actual Budget
Liberty Road Bridge Project 2009 2010 2011 2012 2013Construction $0
Engineering 0
Inspection 0
Miscellaneous 0
Transfers 0
Return of Temporary Advance 0TOTALS $0 $0 $0 $0 $0
Bexley Infrastructure Phase I 2009 2010 2011 2012 2013Construction $0
Engineering 0
Inspection 0
Miscellaneous 0TOTALS $0 $0 $0 $0 $0
Whitehall Bridge Replacement 2009 2010 2011 2012 2013
Construction
Engineering 52326 0
Inspection 52327 0Miscellaneous 0
TOTALS $0 $0 $0 $0 $0
Other 52799transfers out 52901 464,650
Total $0 $464,650 $0
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
35/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
LAND ACQUISITION FUND - FUND # 440
Reimbursements for expenses paid 440.8000.48104 77,307
Sale of Land 440.8000.48154 209,515
Advance from General Fund 440.9000.49102 0
BRF CRF Loan Proceeds 440.9000-49110 0
Bond Proceeds 440.9000.49112 14,130,000
Note Proceeds 440.9000.49113 3,900,000
Premium on Debt Issuance 440.9000.49114 1,464,751
Total $19,781,573
Unencumbered Balance 1/1/13 $1,685,553
Advance from General Fund
Sale of land to GFS
Greenvale note $1,800,000Cedar Center Note Proceeds $2,100,000
Refund Real estate taxes paid GFS property
Reimb from GFS for road
2013 Certified Estimated Revenues
2013 Appropriations are not to exceed: $5,585,553
current budget $4,788,690
ending balance $796,863
Revenues Received in 2012:
In January 2007 the City issued $17,000,000 5.5% Taxable Real Estate Acquisition and Urban Redevelopment General Obligation Bond
Anticipation Notes for the purchase of Cedar Center. In January of 2009 the 2008 note was paid and a new note of $18,550,000 was issued to
cover the principal and interst of the old note. This note will mature in January 2010. The note was again renewed with a maturity date of
September 30, 2010
In December 2006 the City took out a $1,800,000 Special Obligation Note for the purchase of 9 properties on Greenvale Rd. The note was
renewed in 2007,2008 and 2009. Interest only has been paid.
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
36/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
LAND ACQUISITION - FUND #440
Actual Actual Actual Actual Budget
2009 2010 2011 2012 2013Personal Services $0 $0 $0 $0 $0
Materials and Supplies 0 0 0 0 0
Contractual Services 124,013 0 1,521,476 11,958 0
Other Charges 20,701,991 40,729,457 0 19,640,083 4,788,690
$20,826,004 $40,729,457 $1,521,476 $19,652,041 $4,788,690
3/22/2013
-
7/28/2019 10 Book Capital Projects - 2013 Budget
37/37
City of South Euclid 2012 Budget Workpapers
CAPITAL PROJECTS
LAND ACQUISITION - FUND #440
Actual Actual Actual Actual Budget
CONTRACTUAL SERVICES 2009 2010 2011 2012 2013
Water 7790-52303 205.41
Outside Legal Expenses 7790-52324 $124,013 $0 $90,053 $1,200Engineering 7790-52326 $55,937 $0
inspections 7790-52327 $8,588 $0
Contractor fees 7790-52328 $0 $244,715 $3,272
Real property appraisal 7790-52348 $5,950
Real eastate taxes 7790-52397 $0 $0 $130,845 $801
Land/land improvements 7790-52501 $0 $0 $986,615 $0
Demolition 7790-52737 $0 $0 $0 $0
Miscellaneous 7790-52799 $16,856 $0 $4,723 $530
TOTALS $124,013 $0 $1,521,476 $11,958 $0
Actual Actual Actual Actual Budget
OTHER 2009 2010 2011 2012 2013
Advances out (new 2010) 9910-59102 0
DEBT SERVICE
Note Principal - Greenvale 8850-52603 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000
Note Interest - Greenvale 8850-52604 59,235 59,235 26,028 25,060 26,100
Note Principal - Cedar Center 8850-52603 18,010,000 37,775,000 19,270,000 17,270,000 2,100,000
Note Interest - Cedar Center 8850-52604 808,199 792,970 220,489 227,236
Cedar Center G.O Bond Principal 705,000
Cedar Center G.O Bond Interest 157,590
BRF/CRF Loan Interest 8850-52606 24,557 79,514 32,407
BRF/CRF Loan Principal 8850-52607 864,252
Debt Issuance cost 8850-52680 222,738 131,642 317,787
TOTAL OTHER 20,701,991 40,729,457 19,640,083 4,788,690
TOTAL 20,826,004 40,729,457 1,521,476 19,652,041 4,788,690
Principal interest total
CEDAR CENTER NOTE 2,100,000 0 2,100,000
CEDAR CENTER G.O. Bond 705,000 157,590 862,590
Greenvale Note 1,800,000 26,100 1,826,100
4,605,000 183,690 4,788,690
Create a new line item for
Bond Principal and Interest
3/22/2013