  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    1/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    NOPEC grant-Mayfield Rd street lights 408.4000.44152 46,428

    Energy Conservation Grant 408.4000.44156 0

    Grants-Miscellaneous 408.4000.44199 0

    Refunds 408.8000.48102 0

    Insurance reimbursements 408.8000-48103 110,049

    Playground of Possibilities 408.8000.48115 7,416Miscellaneous 408.8000.48999 6,068

    OAQDA Loan proceeds 408.9000.49107 374,441

    Transfers In from the General Fund 408.9000.49101 235,000

    Total $779,402

    Unencumbered Balance 1/1/13 $2,436

    2013 Certified Estimated Revenues

    Donations - Playground of Possibilities

    Insurance reimbursement-Playground of PossNOPEC grant - Mayfield Rd traffic lamps

    OAQDA Loan proceeds

    Nopec grant - OAQDA project

    Transfers In from the General Fund 252,050

    2013 Appropriations are not to exceed: $254,486

    current budget $252,050

    ending balance $2,436

    Revenues Received in 2012:

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    2/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0

    Materials and Supplies 0 0 0 0

    Contractual Services 265,284 296,566 1,289,268 987,356 252,050

    Other Charges 0 0 0 0

    $265,284 $296,566 $1,289,268 $987,356 $252,050

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    3/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Police

    Building/structures 1110.52502 60,000 0 0 2,100

    Vehicles 1110.52507 15,274 63,085 49,816 51,421 0

    Equipment 1110.52508 0 0 0 0

    Pistol Range 1110.52515 0 0

    narrow band 1110.52535 25,000 25,000 47,529 0

    Fire

    Building/structures 1120.52502 0 0 0 0

    Vehicles 1120.52507 12,085 12,085 0 0

    Equipment 1120.52508 0 0

    Recreation

    Land/ land improvements 3310.52501 0 0 0 0

    Streets 3310.52503 0 0 0 0

    Park equip & repairs 3310.52508 0 0 4,034 8,913 0

    Playground 3310.52521 1,437 (35) 564,430 76 0

    Pools

    Building/structures 3320.52502 0 0 17,742 4,774 0

    Equipment (83,000 grant) 3320.52508 6,605 216 0 100,000

    Community Center

    Furniture/Fixtures 3350.52407 7,743 0 0

    Building/structures 3350.52502 0 0 84,875 4,325

    Parking lots 3350.52505 0 0 0

    Equipment 3350.52508 8,068 9,858

    Computerization 3350.52516 0 0 0 1,3503/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    4/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Building Department

    4410.52502 0 0 0

    Vehicles 4410.52507 8,567 8,567 0

    Computerization 4410.52516 0 80 0 4,286 9,150

    Economic Development

    Master plan study 4430.52351 0 0 0

    Community Relations

    Computerization 4440.52516 1,570 0

    Sewer Maintenance

    Sewers 5540.52506 0 0 0

    Ramblewood Sanitary Sewer 5540.52520 0 0 0

    Flood Control

    5550.52501 0 0 0

    Service Department

    Building/structures 6610.52502 0 0 0

    Vehicles 6610.52507 139,190 149,172 39,198 108,160 109,000

    Equipment 6610.52508 0 0 44,374 79,864

    Fuel Storage 6610.52517 0 0 0

    Emulsion Distribution 6610.52518 0 0 0

    Computerization 6610.52516 0 0 4,939

    Service Garage3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    5/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Consultants 6620.52354 0 0 0

    Building/structures 6620.52502 0 0 0 112,549

    Sewers 6620.52506 0 0 0

    Equipment 6620.52508 0 0 0

    Street Construction & Maintenance

    Streets 6630.52503 0 0 0

    Crack Sealing 6630.52504 11,528 14,987 15,000 28,163 30,000

    Sidewalk repairs

    Parking Lots

    Parking Lots 6650.52505 0 0 0

    Miscellaneous 6650.52799 0 0 0

    Mayor

    Vehicles 7710.52507 2,856 2,856 0

    Computerization 7710.52516 1,530 0 450

    Finance Department

    Computerization 7730.52516 0 9,077 0 234

    Court

    Furniture & Fixtures 7750.52407 0 0 0

    Building/structures 7750.52502 0 0 0

    Equipment 7750.52508 0 0 0

    Computerization 7750.52516 0 0 0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    6/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Municipal Complex

    Land/ land improvements 7780.52501 0 0

    Building/structures 7780.52502 0 0 45,396 4,239

    Equipment 7780.52508 26,120 33,605

    Telephone System 7780.52510 0 0 1,015

    H.V.A.C. 7780.52511 0 0 298,516 452,696

    Computerization 7780.52516 0 8,376 2,506 0

    General Services

    Consultants 7790.52354 0 0 28,238 36,664

    Land/ land improvements 7790.52501 0 0 0

    Parking Lots 7790.52505 0 0 0

    Traffic signals/control devices 7790.52509 0 0 30,000

    Parking Meters 7790.52512 0 0 0

    City Signage 7790.52513 0 0 0

    Dumpster & Enclosures 7790.52514 0 0 0

    Computerization 7790.52516 0

    Fuel Storage 7790.52517 0

    Wireless- parks & Community Center 7790.52530 0 0 0

    War Memorial 7790.52730 0 0 0

    Demolition 7790.52737 0 0 0

    Miscellaneous 7790.52799 0 0 0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    7/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    GENERAL IMPROVEMENT & REPAIR - FUND #408

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Transfers

    TOTALS $265,284 $296,566 $1,289,268 $987,356 $252,050

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    8/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    SAFETY FORCES VEHICLE FUND - FUND #409

    Interest Income 409.7000.47102 745Miscellaneous 409.8000.48141 $0

    Insurance reimbursement 409.8000.48103 $0

    Reverse 911 409.8000.48514 $0

    Transfer from General Fund 409.9000.49101 $0

    Total $0

    Unencumbered Balance 1/1/13 $648,757

    2013 Certified Estimated Revenues

    EMS interest -PNC Bank 1,000

    2013 Appropriations are not to exceed: $649,757

    current budget $622,000

    ending balance $27,757

    This fund was established by Ordinance #08-01 to account for the accumulation of funds for the subsequent purchase of safety vehicles.

    Revenue in this Fund will be derived from transfers from the General Fund in an amount not to exceed $200,000 annually.

    Revenues Received in 2012:

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    9/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    SAFETY FORCES VEHICLE FUND - FUND #409

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0

    Materials and Supplies 0 0 0 0

    Contractual Services 0 0 0 0 0

    Other Charges 5,876 5,414 635,799 216,875 622,000

    $5,876 $5,414 $635,799 $216,875 $622,000

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    10/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    SAFETY FORCES VEHICLE FUND - FUND #409

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Bank fees (new 2012) 52359 $0 $0 $0 $0

    $0 $0 $0 $0 $0

    Actual Actual Actual Actual Budget

    OTHER CHARGES 2009 2010 2011 2012 2013

    Vehicles 52507 $0 $0 $630,385 $185,500 $162,000

    Equipment (new 2012) 52743 $31,324 $52,000

    Reverse 911 52713 $5,876 $5,414 $5,414 $0 $8,000

    Miscellaneous 52799 $51

    Transfer out 52901 $0 $400,000

    TOTALS $5,876 $5,414 $635,799 $216,875 $622,000

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    11/37

    CAPITAL PROJECTS

    POLICE VEHICLES & EQUIPMENT FUND -FUND 411

    Transfer from General Fund 411.9000.49101 $0

    Total $0

    Unencumbered Balance 1/1/13 $2,077

    2013 Certified Estimated Revenues

    Transfer from General Fund

    2013 Appropriations are not to exceed: $2,077

    current budget $2,077

    ending balance $0

    This fund was established by Ordinance #36-09 to account for the accumulation of funds for the subsequent

    purchase of Police vehicles and equipment. Revenue in this Fund will be derived from net revevue from the

    Revenues Received in 2012:

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    12/37

    CAPITAL PROJECTS

    POLICE VEHICLES & EQUIPMENT FUND -FUND 411

    Actual Actual Actual Actual Actual Budget

    2000 2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 0 0 0 0 21,589 2,077

    Other Charges 0 0 0 0 0 0

    $0 $0 $0 $0 $21,589 $2,077

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    13/37

    CAPITAL PROJECTS

    POLICE VEHICLES & EQUIPMENT FUND -FUND 411

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICE 2009 2010 2011 2012 2013

    Equipment 52743 $21,589 $2,077

    TOTALS $0 $0 $0 $21,589 $2,077

    Actual Actual Actual Actual Budget

    OTHER CHARGES 2009 2010 2011 2012 2013

    Transfer out 52901

    TOTALS $0 $0 $0 $0 $0

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    14/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    RECREATION CONTINGENCY - FUND #418

    This amount is appropriated every year in the event that City Council may approve expenditures from this fund.

    Source: Transamerica Delaval, Inc. $95,000

    : John & John Jr. Agresta 55,000$150,000

    None $0

    Total $0

    Unencumbered Balance 1/1/13 $0

    2013 Certified Estimated Revenues 02013 Appropriations are not to exceed: $0

    This fund was established in 1985 for the purpose to provide such funds for recreation expenditures and improvements as directed by City

    Council. The $150,000 was established from the sale of land owned by the City which was determined to be not functional for City use.

    Revenues Received in 2012:

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    15/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    RECREATION CONTINGENCY - FUND #418

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 0 0 0 0 0

    Other Charges 0 0 0 0 0

    $0 $0 $0 $0 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    16/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    RECREATION CONTINGENCY - FUND #418.3310

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Buildinds/structures 52502 0 0

    Miscellaneous 52799 5,000 0

    Transfers out 52901 0 0

    TOTALS 0 0 0 0 0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    17/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    WATER DISTRIBUTION INFRUSTRUCTURE - FUND #424

    In 2009, the City of South Euclid entered into a joint economic development agreement with the City of Cleveland whereby the City of Clevelan

    has assumed ownership, including capital improvement and repair responsibilities, for the public water mains within the City of South Euclid,

    in return for South Euclid sharing a portion of any tax revenue that would be generated by any business that might relocate from Cleveland to

    South Euclid.

    Under this agreement South Euclid can elect to replace failing water mains under a municipal public bidding and contract process. The cost of th

    work, including engineering and supervision, is then eligible to reimbursement by the City of Cleveland.

    Water Distribution reimb 424.2000.42120 $709,602

    Total $709,602

    Unencumbered Balance 1/1/13 $157,186

    2013 Certified Estimated Revenues

    Cleveland Water Dept 1,607,622

    2013 Appropriations are not to exceed: $1,764,808

    current budget $1,608,556

    ending balance $156,252

    Revenues Received in 2012:

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    18/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    WATER DISTRIBUTION INFRUSTRUCTURE - FUND #424

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 0 0 2,426,396 863,431 1,608,556

    Other Charges 0 0 0 0 0

    $0 $0 $2,426,396 $863,431 $1,608,556

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    19/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    WATER DISTRIBUTION INFRUSTRUCTURE - FUND #424

    Actual Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2000 2009 2010 2011 2012 2013

    Engineering fees 52326 162,747 157,067 53,639 101,328

    Inspections 52327 29,790 51,167 71,728

    Contractor Fees 52328 803,314 2,239,207 758,315 1,435,000

    Legal Advertising 52715 332 310 500

    TOTALS $0 0 0 2,426,396 863,431 1,608,556

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    20/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    ROAD IMPROVEMENT & RESURFACING - FUND #425

    Real Property Taxes 425.1000.41102 856,433

    Personal Property Taxes 425.1000.41103 33

    10% Rollback 425.2000.42102 61,208

    2.5% Rollback 425.2000.42103 51,948

    Homestead 425.2000.42104 26,294

    Refunds 425.2000.48102 0

    Suburban Watermain 425.8000.48250 0

    OPWC loan proceeds 425.9000.49109 0

    Transfers from General Fund 425.9000.49101 0

    Total $995,916

    Unencumbered Balance 1/1/13 $266,254

    2013 Certified Estimated Revenues 843,892

    DOPWIC Loan

    2013 Appropriations are not to exceed: $1,110,146

    current budget $1,070,785

    ending balance $39,361

    Revenues Received in 2012:

    The source of income for this fund is the 3-Mill property tax levy which is expected to generate $535,000 in 2010. The city issued new debt

    in the amount of $1,000,000 to finance road improvements in the year 2003.

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    21/37

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    22/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    ROAD IMPROVEMENT & RESURFACING - FUND #425

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Outside legal fees 6630.52324 1,351 1,422 1,492 2,000

    Engineer fees 6630.52326 39,924 62,738 74,428 70,333 49,285

    Inspection fees 6630.52327 13,301 30,400 25,479 24,320 22,500

    Contractor fees 6630.52328 546,709 201,602 1,475,322 537,786 645,000

    Suburban Watermain 6630.52337 0 0

    Auditor/treasurer collection fees 6630.52358 3,592 8,750 17,118 17,523 18,000

    Legal Adversing (new 2010) 6630.52715 1,604 312 950 1,000

    Bond Principal 8850.52601 240,000 250,000 255,300 263,500 275,000

    Bond Interest 8850.52602 95,510 88,310 80,530 63,386 58,000

    Note Principal 8850.52603 0 0 0 0

    Note Interest 8850.52604 0 0 0

    Transfer 0

    TOTALS $940,387 $644,826 $1,929,981 $977,798 $1,070,785

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    23/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    FLOOD CONTROL - FUND #426

    Special Assessments 426.3000.43101 2,074,114

    Special Assess-Ramblewood 426.3000.43104 22,278Federal Funds 426.4000.44101 0

    OPWC grant 426.4000.44112 0

    County Grant 426.4000.44120 0

    Suburban Watermain Ren 426.8000.48250 0

    Transfers in 426.9000.49101 464,650

    OPWC Loan Proceeds 426.9000.49109 453,337

    Total Revenues Received in 2012: $3,014,379

    Unencumbered Balance 1/1/13 $803,583

    2013 Certified Estimated Revenues 1,950,000OPWC loan proceeds

    SWIF Grant 166,000

    cleveland water dept

    Ramblewood assessments 21,000

    2013 Appropriations are not to exceed: $2,940,583

    current budget $2,586,713

    ending balance $353,870

    On December 23, 1996, City Council passed Ordinance 55-96, an Ordinance permitting the City to certify special assessments for improvingthe City sewerage system. This increased the sewer rental fee from $33 per unit to $132. These fees help pay for the first phase of the

    program. Due to the time frame of assessments to the County by September, it was the desire of Council to establish the Flood Control Fund

    (Ordinance 16-97) and also issue a bond anticipation note to start the program (Ordinance 13-97). In June, 2000, the Council increased the

    fee per connection by $99, bringing the total to $231 a year. In 2001 an additional bond anticipation note was issued for $4,900,000 to

    assist in financing major sewer projects including the City's share to the Bexley Infrastructure Project. In 2003, the principal was reduced by

    $500,000. A 15 year Bond was be issued for the balance of $4,400,000.

    Revenues Received in 2012:

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    24/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    FLOOD CONTROL - FUND #426

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 2,189,237 1,749,274 2,737,718 3,742,033 2,586,713

    Other Charges 0 0 0 0

    $2,189,237 $1,749,274 $2,737,718 $3,742,033 $2,586,713

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    25/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    FLOOD CONTROL - FUND #426

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013Outside Legal Expense 5550.52324 1,524 1,603 1,683 2,000

    Engineer fees 5550.52326 144,078 112,896 249,294 139,357 141,000

    Inspections 5550.52327 45,922 25,247 56,326 71,440 34,000

    Contractor 5550.52328 $1,251,907 $917,885 $1,600,262 $2,697,960 $1,532,000

    Backflow devices 5550.52329 $2,000 $1,000 $0 $2,000

    Consultants 5550.52354 12,571 4,500 10,000 0 5,000

    Auditor / treasurer collection fees 5550.52358 19,890 20,309 19,601 20,815

    Sewer Maintenance-Contractor 5550.52374 99,017 101,650 100,000

    Miscellaneous 5550.52799 2,566 3,609 11,846 12,526 12,000Legal Advertising (new 2010) 6630.52715 0 675 0 1,000

    Bond principal 8850.52601 325,000 340,000 344,700 356,500 371,000

    Bond interest 8850.52602 128,794 119,044 86,330 84,799 79,000

    Note principal 8850.52603 83,163 85,887 88,701 91,608 93,000

    Note interest 8850.52604 64,216 61,491 58,677 55,771 55,000

    OPWC principal 8850.52605 109,607 54,803 109,607 109,607 159,713

    Other Principal 52697 0 0

    Other Interest 52698 0 0

    Easements (new 2006) 52720 0

    Transfer- City Share Issue II Projects 0

    TOTALS $2,189,237 $1,749,274 $2,737,718 $3,742,033 $2,586,713

    Huntington - Sewer bond OPWC 52605

    Principal-52601 371,000 Nine Mile Creek 25,600

    Interest-52602 79,000 Bexley Drainage 62,372

    Liberty Rd Bridge 37,800

    Ohio Water Development Auth loan Whitehall Rd Bridge 9,441

    Principal-52603 92,000 Argonne Rd 24,500

    Interest-52604 56,000 159,7133/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    26/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    SIDEWALK IMPROVEMENT - FUND #427

    Assessments Received

    Total $0

    Unencumbered Balance 1/1/13 $7

    2013 Certified Estimated Revenues 0

    Transfer from General Fund 0

    2013 Appropriations are not to exceed: $7

    Revenues Received in 2012:

    This fund accounts for the activities associated with the City's Sidewalk Inspection program. The program is designed to provide systematic

    inspection of all the sidewalks within the City's borders by inspecting specific areas each year. The revenues and expenses each year may

    vary greatly and are contingent upon the size and condition of sidewalks targeted for repair/replacement.

    General Fund was subject to the approval of the Tax Commissioner of the State of Ohio and Cuyahoga County Common Please Court. The

    transfer has been approved by both the State Tax Commissioner and the Common Pleas Court. This money and future assesments received

    will be transferred into the General Fund and this fund will be closed.

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    27/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    SIDEWALK IMPROVEMENT - FUND #427

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 0 0 0 0 0

    Other Charges 0 0 0 0 0

    $0 $0 $0 $0 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    28/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    SIDEWALK IMPROVEMENT - FUND #427

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Engineer 52326 0

    Inspections 52327 0

    Contractor 52328 $0

    Transfers 52901 0

    Miscellaneous 52999 0

    Principal - Note Payment 0

    Interest on Notes 0

    TOTALS $0 $0 $0 $0 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    29/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    STANHOPE PARKING LOT - FUND #430

    Assessments Received

    Total $0

    Unencumbered Balance 1/1/13 $2,852

    2013 Certified Estimated Revenues

    Transfer from General Fund 0

    2013 Appropriations are not to exceed: $2,852

    current budget $0

    ending balance $2,852

    Revenues Received in 2012:

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    30/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    STANHOPE PARKING LOT - FUND #430

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013

    Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 0 0 0 0 0

    Other Charges 0 0 0 0 0

    $0 $0 $0 $0 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    31/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    STANHOPE PARKING LOT - FUND #430

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Engineer 52326 0

    Inspections 52327 0

    Contractor 52328 $0

    Transfers 52901 0

    Miscellaneous 52999 0

    Principal - Note Payment 0

    Interest on Notes 0

    TOTALS $0 $0 $0 $0 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    32/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    ISSUE II PROJECTS - #431

    Reimbursements from State of Ohio

    Interest on loan proceeds (City portion)

    Total $0

    Unencumbered Balance 1/1/13

    2013 Appropriations are not to exceed: $0

    current budget $0

    ending balance $0

    This fund accounts for the expenses related to the construction of projects financed completely or in part by Issue II awards.

    In the year 2003, the Whitehall Bridge Replacement project was approved for Issue II funding. The project will be financed with a 30%

    grant, 30% zero-interest, 20 year loan, and a 40% City contribution. Construction expenses are approved by the City, and then forwarded

    to the State for payment on our behalf which creates a draw on our grant/loan.

    Revenues Received in 2012:

    In the year 2001, the Bexley-Ellison Sewer project was approved for Issue II funding. This project is being done in conjunction with the

    City of Cleveland Heights. Since we are considered the lead City, we will account for the entire project and be reimbursed from Cleveland

    Heights for their share. The City of South Euclid's share of the project cost (appox. $1.8 million) was funded from the issuance of Notes

    in 2001.

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    33/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    ISSUE II PROJECTS - FUND #431

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 0 0 0 464,650 0

    Other Charges 0 0 0 0 0

    $0 $0 $0 $464,650 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    34/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    ISSUE II PROJECTS - FUND #431

    Actual Actual Actual Actual Budget

    Liberty Road Bridge Project 2009 2010 2011 2012 2013Construction $0

    Engineering 0

    Inspection 0

    Miscellaneous 0

    Transfers 0

    Return of Temporary Advance 0TOTALS $0 $0 $0 $0 $0

    Bexley Infrastructure Phase I 2009 2010 2011 2012 2013Construction $0

    Engineering 0

    Inspection 0

    Miscellaneous 0TOTALS $0 $0 $0 $0 $0

    Whitehall Bridge Replacement 2009 2010 2011 2012 2013

    Construction

    Engineering 52326 0

    Inspection 52327 0Miscellaneous 0

    TOTALS $0 $0 $0 $0 $0

    Other 52799transfers out 52901 464,650

    Total $0 $464,650 $0

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    35/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    LAND ACQUISITION FUND - FUND # 440

    Reimbursements for expenses paid 440.8000.48104 77,307

    Sale of Land 440.8000.48154 209,515

    Advance from General Fund 440.9000.49102 0

    BRF CRF Loan Proceeds 440.9000-49110 0

    Bond Proceeds 440.9000.49112 14,130,000

    Note Proceeds 440.9000.49113 3,900,000

    Premium on Debt Issuance 440.9000.49114 1,464,751

    Total $19,781,573

    Unencumbered Balance 1/1/13 $1,685,553

    Advance from General Fund

    Sale of land to GFS

    Greenvale note $1,800,000Cedar Center Note Proceeds $2,100,000

    Refund Real estate taxes paid GFS property

    Reimb from GFS for road

    2013 Certified Estimated Revenues

    2013 Appropriations are not to exceed: $5,585,553

    current budget $4,788,690

    ending balance $796,863

    Revenues Received in 2012:

    In January 2007 the City issued $17,000,000 5.5% Taxable Real Estate Acquisition and Urban Redevelopment General Obligation Bond

    Anticipation Notes for the purchase of Cedar Center. In January of 2009 the 2008 note was paid and a new note of $18,550,000 was issued to

    cover the principal and interst of the old note. This note will mature in January 2010. The note was again renewed with a maturity date of

    September 30, 2010

    In December 2006 the City took out a $1,800,000 Special Obligation Note for the purchase of 9 properties on Greenvale Rd. The note was

    renewed in 2007,2008 and 2009. Interest only has been paid.

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    36/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    LAND ACQUISITION - FUND #440

    Actual Actual Actual Actual Budget

    2009 2010 2011 2012 2013Personal Services $0 $0 $0 $0 $0

    Materials and Supplies 0 0 0 0 0

    Contractual Services 124,013 0 1,521,476 11,958 0

    Other Charges 20,701,991 40,729,457 0 19,640,083 4,788,690

    $20,826,004 $40,729,457 $1,521,476 $19,652,041 $4,788,690

    3/22/2013

  • 7/28/2019 10 Book Capital Projects - 2013 Budget

    37/37

    City of South Euclid 2012 Budget Workpapers

    CAPITAL PROJECTS

    LAND ACQUISITION - FUND #440

    Actual Actual Actual Actual Budget

    CONTRACTUAL SERVICES 2009 2010 2011 2012 2013

    Water 7790-52303 205.41

    Outside Legal Expenses 7790-52324 $124,013 $0 $90,053 $1,200Engineering 7790-52326 $55,937 $0

    inspections 7790-52327 $8,588 $0

    Contractor fees 7790-52328 $0 $244,715 $3,272

    Real property appraisal 7790-52348 $5,950

    Real eastate taxes 7790-52397 $0 $0 $130,845 $801

    Land/land improvements 7790-52501 $0 $0 $986,615 $0

    Demolition 7790-52737 $0 $0 $0 $0

    Miscellaneous 7790-52799 $16,856 $0 $4,723 $530

    TOTALS $124,013 $0 $1,521,476 $11,958 $0

    Actual Actual Actual Actual Budget

    OTHER 2009 2010 2011 2012 2013

    Advances out (new 2010) 9910-59102 0

    DEBT SERVICE

    Note Principal - Greenvale 8850-52603 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000

    Note Interest - Greenvale 8850-52604 59,235 59,235 26,028 25,060 26,100

    Note Principal - Cedar Center 8850-52603 18,010,000 37,775,000 19,270,000 17,270,000 2,100,000

    Note Interest - Cedar Center 8850-52604 808,199 792,970 220,489 227,236

    Cedar Center G.O Bond Principal 705,000

    Cedar Center G.O Bond Interest 157,590

    BRF/CRF Loan Interest 8850-52606 24,557 79,514 32,407

    BRF/CRF Loan Principal 8850-52607 864,252

    Debt Issuance cost 8850-52680 222,738 131,642 317,787

    TOTAL OTHER 20,701,991 40,729,457 19,640,083 4,788,690

    TOTAL 20,826,004 40,729,457 1,521,476 19,652,041 4,788,690

    Principal interest total

    CEDAR CENTER NOTE 2,100,000 0 2,100,000

    CEDAR CENTER G.O. Bond 705,000 157,590 862,590

    Greenvale Note 1,800,000 26,100 1,826,100

    4,605,000 183,690 4,788,690

    Create a new line item for

    Bond Principal and Interest

    3/22/2013