1 study on the measures to improve the ...docs.trb.org/prp/15-1322.pdf1 study on the measures to...

13
STUDY ON THE MEASURES TO IMPROVE THE DURABILITY OF CHINESE CRTS 1 SLAB TRACK 2 3 4 5 Hongsong Lin 6 Senior Engineer, Ph.D. 7 China Railway Eryuan Engineering Group Co., Ltd. 8 No. 3 Tongjin Road, Chengdu, China 9 Tel: 8613880993080 Fax: 86-28-86445035; Email: [email protected] 10 11 Hua Yan 12 Professorate Senior Engineer 13 China Railway Eryuan Engineering Group Co., Ltd. 14 No. 3 Tongjin Road, Chengdu, China 15 Tel: 86-28-86445959 Fax: 86-28-86445035; Email: [email protected] 16 17 18 19 20 21 Word count: 3,659 words text + 10 tables/figures x 250 words (each) = 6,159words 22 23 24 25 Submission Date: July 31, 2014 26 Revision Date: Nov. 15, 2014 27

Upload: vukhue

Post on 30-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

STUDY ON THE MEASURES TO IMPROVE THE DURABILITY OF CHINESE CRTS1 ⅠSLAB TRACK 2 3 4 5 Hongsong Lin 6 Senior Engineer, Ph.D. 7 China Railway Eryuan Engineering Group Co., Ltd. 8 No. 3 Tongjin Road, Chengdu, China 9 Tel: 8613880993080 Fax: 86-28-86445035; Email: [email protected] 10 11 Hua Yan 12 Professorate Senior Engineer 13 China Railway Eryuan Engineering Group Co., Ltd. 14 No. 3 Tongjin Road, Chengdu, China 15 Tel: 86-28-86445959 Fax: 86-28-86445035; Email: [email protected] 16 17 18 19 20 21 Word count: 3,659 words text + 10 tables/figures x 250 words (each) = 6,159words 22 23 24 25 Submission Date: July 31, 2014 26 Revision Date: Nov. 15, 2014 27

Lin, Yan 2 1 ABSTRACT 2 China has built the world’s largest high-speed railway network with the ballastless track. CRTSⅠ3 slab track runs well and the expected purposes of high ride comfort, high stability, low 4 maintenance were achieved. However, worldwide experience of ballastless track shows that 5 defects and deterioration were inevitable. At present, there is a lack of the systematic research for 6 the durability of ballastless track in China. In this paper, on the basis of summarizing the structural 7 characteristics of CRTS (Chinese Railway Track System)Ⅰslab track, combined with the field 8 application of slab track, the typical damages and its influencing factors were discussed. Damages 9 include: (a) anchor point cracks and bars fracture of prestressed slab, (b) convex block cracks of 10 slab track at the large-span bridge end, (c) cracks between cement asphalt mortar layer and slab, 11 (d) mud pumping of surface layer of subgrade bed, and (e) poor drainage of prestressed concrete 12 frame slab track. Additionally, for enhancing the durability of CRTSⅠslab track, measures based 13 on material, design, construction and operational maintenance were proposed. Enhancing 14 measures include: (a) improving the requirements of material performance for prestressed steel 15 bars, (b) drawing up water resistance indicator of cement asphalt mortar, and adopting sealant 16 material with high flexibility and anti-aging performance, (c) using pretensioned prestressed slab, 17 optimizing drainage system, setting rail expansion joint reasonably on large span bridge, (d) 18 optimizing pouring technology of cement asphalt mortar, (e) improving the construction accuracy 19 of drainage slope of concrete base bed, and (f) filling in cracks timely. 20 21 22 23 24 Keywords: High-speed railway, Ballastless track, Durability 25

26

Lin, Yan 3 1 INTRODUCTION 2 With the rapid development of railway in recent years, China currently has built the largest 3 high-speed railway network with the maximum operation speed in the world. Ballastless track is 4 the main type of Chinese high-speed railway track (1-2). Since ballastless track is a layered 5 reinforced concrete structure composed of a variety of materials, track and its components are in a 6 continuous deteriorated state under the influence of repeated vibration loads and climatic 7 environmental changes (3-6). Thus, under a proper maintenance condition in track’s life cycle, 8 how to ensure the capacity of ballastless track structure to resist deterioration is the key to 9 achieving the ballastless track’s durability. With the operation of ballastless track on high-speed 10 railway , part of it has a few different forms of damages, which will affect the durability of track 11 structure. However, for the durability of ballastless track structure there is a lack of systematic 12 research because of its short operation time. This paper focuses on Chinese CRTSⅠslab track, 13 summarizing track typical damages’ characteristics and discussing its influencing factors, and 14 proposing some measures to improve its durability in terms of material, design, construction as 15 well as operational maintenance. 16 17 CHARACTERISTICS OF CRTSⅠSLAB TRACK 18 CRTSⅠslab track is one type of Chinese ballastless track. It has many advantages including a 19 simple transfer mechanism, fast speed of construction, mature construction process as well as 20 better repairability, and has been applied widely in Chinese high-speed railway including 21 Wuhan-Guangzhou Passenger Dedicated Line (PDL), Shanghai-Nanjing intercity rail, 22 Guangzhou-Zhuhai intercity rail transit, Harbin-Dalian high-speed railway transit, and 23 Mianyang-Chengdu-Leshan PDL. Figure 1shows the CRTSⅠslab track on a bridge. 24 25

26 27 FIGURE 1 CRTSⅠslab track on bridge 28 29

Lin, Yan 4 CRTSⅠslab track structure consists of rail, elastic fastenings, track slab, cement asphalt mortar 1 fillings, concrete base bed, convex block with the resin fillings surrounded, etc. (7). The track slab 2 is classified as two types. One type is the plain slab, a bidirectional post-tensioned concrete 3 structure. The other type is the frame slab, a longitudinal post-tensioned concrete structure or 4 reinforced concrete structure. Cement asphalt mortar fillings underneath track slab, could adjust 5 the track construction error and distribute train load from track slab to concrete base bed. Convex 6 block on the concrete base bed can prevent the lateral and longitudinal movement of the track slab. 7 The concrete base bed is a reinforced concrete structure with the length of 5.0 m on bridge and in 8 tunnel, or 10-20 m on subgrade. In addition, the anti-vibration slab track supported by elastomeric 9 mats on concrete base bed could reduce the vertical vibrations of the track compared to 10 conventional track. 11 12 TYPICAL DAMAGES OF SLAB TRACK IN JAPAN 13 CRTSⅠslab track has the similar structural components as Shinkansen salb track in Japan, of 14 which damages were also found. Typical damages of Shinkansen salb track include (a) cracks of cement 15 asphalt mortar, and (b) fragmentation of cement asphalt mortar, as shown in Figure 2. (8) 16 17

18 19 FIGURE 2 Cracks (left) and fragmentation (right) of cement asphalt mortar 20 21 TYPICAL DAMAGES AND ITS INFLUENCING FACTORS IN CHINA 22 Field application shows that, CRTSⅠslab track runs well and achieves its expected purpose of 23 high ride comfort, high stability and low maintenance. Inevitably, a few of track damages were 24 found, which include (a) anchor point cracks and bars fracture of prestressed slab, (b) convex 25 block cracks of slab track at large span bridge end, (c) cracks between cement asphalt mortar layer 26 and slab, (d) mud pumping of surface layer of subgrade bed, and (e) poor drainage of prestressed 27 concrete frame slab track etc. It should be noted that most of these damages were found in freight 28 line. 29 30 Anchor point cracks and bars fracture of prestressed slab 31 The field investigation of CRTSⅠslab track shows that anchor point cracks and bars fracture of 32 prestressed slab were found, as shown in Figure 3 and Figure 4, respectively, which will affect 33 track’s durability. 34 35

Lin, Yan 5

1 2 FIGURE 3 Anchor point cracks 3 4

5 6 FIGURE 4 Bars fracture of prestressed slab 7 8 According to the characteristics of bars fracture, related influencing factors include: 9 (a) Defects of bar steel. Steel wire mixed with iron oxide in rolling process. 10 (b) Defects of bar manufacturing process. Quenching and tempering, the two key processes of 11 steel bar manufacturing, did not meet the quality control requirements, which resulted in temper 12 brittleness. 13 (c) A small portion of steel bars were not assembled with non-bonding process as required but 14 oiled coating process. Rainwater flowed into the gap between the bars and the sleeve, which 15 caused tensioned steel bar corrosion and even fracture under fatigue load. 16 17

Lin, Yan 6 Convex block cracks of slab track at large span bridge end 1 Convex block cracks of slab track occurred at the end of the continuous beam with large 2 temperature range. Maximum width of convex block crack is up to 5mm and angle of inclination is 3 about 45°, as shown in Figure 5. 4 5

6 7 FIGURE 5 Convex block crack 8 9 According to the characteristics of cracks and analysis of track structure design, related reasons 10 may include: 11 (a) Strong interaction between rail and bridge. Long span continuous beam usually has a large 12 temperature range, and consequently has a long expansion displacement under temperature load. 13 Also, strong interaction between rail and bridge will lead to large shear force and bending moment 14 of convex block, as shown in Figure 6. In this case, rail expansion joint is proposed. 15 16

17

Ub: bridge displacementwhen temperature drops

Ub

railfasteningtrack slabcement asphalt mortarconcrete base bedcontinuous beam

convex block

track slab

railfastening resistance

crack

convexblock

concrete base bed

Lin, Yan 7 1 FIGURE 6 Interaction between track and bridge 2 3 (b) Bolt torque of low resistance fastening is larger than its requirement, and composite pad has 4 corrosion, which leads to larger longitudinal fastening resistance and a larger force of convex 5 block. 6 (c) Inadequate strength of convex block. Strength calculation of convex block at the end of long 7 span continuous beam is necessary. 8 9 Cracks between cement asphalt mortar layer and slab 10 Cement asphalt mortar layer is a filling and adjusting layer of CRTS I slab track, and the weak part 11 prone to diseases. There are two construction methods for cement asphalt mortar layer, 12 formworking and bag filling. For formworking cement asphalt mortar, interface between cement 13 asphalt mortar layer and track slab usually develops as the interface cracks, especially at the edge 14 of track slab. Under the train load and water erosion, the interface crack will develop as crushed 15 particles. For bag filling cement asphalt mortar, initial interface crack always exists because of 16 empty interface. The typical defect of cement asphalt mortar is shown as in Figure 7. 17 18

19 20 FIGURE 7 Cracks between cement asphalt mortar layer and slab 21 22 Related reasons for cracks between cement asphalt mortar layer and slab may include: 23 (a) Bonding between track slab and cement asphalt mortar layer was not strong enough to resist the 24 warping of track slab under temperature gradient load. 25 (b) Under train load and rainwater erosion, cement asphalt mortar frost boiling emerged, and even 26 gradually developed to void under track slab. 27 Studies show that the deterioration of cement asphalt mortar, the key structural material of slab 28 track, has a significant influence on the slab track. The Cracks between cement asphalt mortar 29 layer and slab could accelerate slab track’s vibration, and even lead to damages of track 30

Lin, Yan 8 components, which would have a impact on slab track’s durability (4, 9). Therefore, it is necessary 1 to pay more attention to cracks between cement asphalt mortar layer and slab. 2 3 Mud pumping of surface layer of subgrade bed 4 The site investigation shows that the surface layer of subgrade bed of part of slab track have the 5 diseases of cracks, water erosion, and mud pumping, as shown in figure 8. These diseases are 6 gradually worsened under the repeated train load. 7 8

9 10 FIGURE 8 Mud pumping of surface layer of subgrade bed 11 12 Preliminary analysis shows that the main reasons include: 13 (a) Hot asphalt is usually used as the sealing material, and its sealing effect is not enough to prevent 14 water from entering. 15 (b) Water permeability of surface layer of subgrade bed is poor and rain water could not be 16 permeated in time, which leads to the pumping effect of base bed. 17 (c) Part section of subgrade has a settlement deformation. 18 19 Poor drainage of prestressed concrete frame slab track 20 Poor drainage of prestressed concrete frame slab track was found in the site investigation, as 21 shown in Figure 9. Rain water has a significant effect on the performance of slab track especially 22 cement asphalt mortar. If cement asphalt mortar is flooded in a long time, cement asphalt could be 23 loose and the performance of the mortar could be changed. Additionally, water could lead to bar 24 corrosion if the track slab or base bed had cracks. 25 26

Lin, Yan 9

1 2 FIGURE 9 Poor drainage of prestressed concrete frame slab track 3 4 Reasons of poor drainage include: 5 (a) Drainage channel capacity is inadequate. Rain water is discharged through the channel of the 6 two sides of convex block, whose width is only 80mm, as shown in Figure 10. Rain water cannot 7 be discharged in time. 8 (b) Drainage channel is easily blocked and difficult to clear. Even long time after rain, there is still 9 some water in the framework. 10 11

12 (a) Water flow direction in plane view 13

14

water flow direciton

drainage channel

Lin, Yan 10 (b) Drainage channel in section A-A 1 2 FIGURE 10 Drainage design of prestressed concrete frame slab track 3 4 MEASURES TO IMPROVE DURABILITY OF CRTS I BALLASTLESS TRACK 5 Based on the causes and influencing factors, combined with the site situations from the aspects of 6 material, structure design, construction, maintenance and so on, the measures of improving track 7 durability have been studied and proposed. 8 9 Material 10 Prestressing steel bar (4) 11 Unbonded crafts must be under a rigorous control. Based on the requirements of relevant standard, 12 examinations of manufacturing equipments and crafts should be strengthened. Simultaneously, the 13 internal groove of anchor hole should be disposed strictly according to design requirements. 14 The requirements of material and technology for heating processing should be explicit further. 15 Harmful elements like H, N, P and S must be under control rigorously in order to improve wire 16 rolling quality. 17 18 Cement asphalt mortar 19 The basic working environment of cement asphalt mortar is soaking in water and in a dry-damp 20 loop. The current cement asphalt mixture mainly uses acidic aggregates (sands or quartz sands), 21 which weakens the binding force between aggregates and asphalt, and lead to poor water 22 resistance even spalling. In addition, elements like carboxylic acid, fatty amine, acid amide and 23 ester in asphalt are easliy combined with water, and lead to swelling and softening. Test results 24 show that strength and elasticity modulus decreased to 40%, which mean that cement asphalt 25 mortar has a low water resistance (4). The measures to improve water resistance of cement asphalt 26 mortar are listed as follows: 27 (a) Using alkaline aggregates or aggregates with alkalization treatment. Machine-made sands of 28 limestone and diorite crushed for classification are recommended to enhance the bonding force 29 between aggregates and asphalts. 30 (b) Anti-stripping agents like amine and amide are recommended to mix in cement asphalt mortar, 31 which could enhance the bonding force between aggregates and asphalts and improve the 32 resistance to water damage. 33 (c) Hydrophobic polymer emulsion or hydrophobic groups such as polyurethane, poly urea, 34 silicone -acrylic can be mixed to improve the water resistance. 35 (d) Drawing up water resistance indicator of cement asphalt mortar. The softening coefficient is 36 recommended to be greater than 50%. 37 38 Sealing materials 39 There are many different structural joints in the ballastless slab track, such as the joint between 40 concrete base bed and protective layer of bridge, the joint between base bed and surface layer of 41 subgrade bed, the expansion joints of concrete base bed, the interlayer between track slab and 42 cement asphalt mortar layer. If sealing material performance is not as good as its requirements or 43 even becomes invalid, rain water may easily infiltrate and accumulate in structure joints. 44 Hydrodynamic pressure under train load can lead to the disease of mud pumping, or frost heave of 45 subgrade in cold areas, and security risks of may appear. 46

Lin, Yan 11 Common sealing materials of architectural structure include: (a) Asphalt factice. It is a kind of 1 waterproof material with good cohesive performance, cheap price but poor heat and freeze 2 resistance. It is commonly used in block seams of rigid waterproof roof. (b) Asphalt-rubber factice. 3 It was boiled by reclaimed rubber powder and asphalt. (c) PVC cement. It is synthetized with coal 4 tar and a small amount of PVC resin, and has a good performance of plasticity, low temperature 5 flexibility and heat resistance. It is commonly used in construction joints and structural component 6 seams. (d) Water-stop belt. It is a strip material made of rubber or PVC resin with a special craft. It 7 can adapt to the joint deformation and usually is buried on both sides of the concrete seam in 8 cast-in-situ construction. 9 Sealing materials on cement concrete pavement of express way include two categories (10). One is 10 the general category which contains polyurethane, poly-sulfide, neoprene, emulsified asphalt 11 rubber, etc. The other one is the silicone category which is superior to the general category from 12 the aspect of durability and the ability to resist displacement. 13 Both ballastless track and cement concrete pavement are layered structure systems bearing 14 repeated load of trains or cars. So, sealing material of cement concrete pavement has a strong 15 referential significance to the ballastless tracks. At present, combined with the characteristics of 16 ballastless tracks, the polyurethane sealing materials is gradually adopted instead of asphalt. The 17 further research of sealing materials is suggested to focus on the material with high deformation 18 flexibility, water resistance performance and ageing resistance. 19 20 Structure Design 21 Pre-tensioned track slab 22 Pre-stressed concrete members are divided into the pre-tensioned and the post-tensioned. Based on 23 the design principles and methods of concrete structures, both of the two kinds are possible for the 24 concrete track slabs. According to the existing damages of unbonded prestressed steel rebar 25 system of post-tensioned track slab, the pre-tensioned track slab system technology is being 26 researched, by which the steel rebar problems can be completely avoided. Several remarkable 27 periodic results have been achieved in pre-stressed system design technology, the track slab 28 manufacturing process, static load test, etc. (11) 29 30 Optimization of drainage design 31 Suggests for drainage design are listed as follows: 32 (a) CRTSⅠframe slab track is recommended to lay in tunnels. 33 (b) Slab joints of frame slabs should be further optimized to improve its drainage ability. 34 (c) Longitudinal and lateral drainage slope of base bed should be optimized. A L-shaped transverse 35 drain-pipe on the base bed is proposed to increase the drainage ability of frame slab track. 36 37 Setting rail expansion joint reasonably on the Long-span Bridges 38 For cracks of convex block on the long-span bridge end, there are several suggests as follows. 39 (a) Continuous welded rail design should be further optimized on the long-span bridges. 40 According to the technical requirements, low resistance fastenings and rail expansion joints should 41 be installed reasonably. 42 (b) Structure design of semicircular convex block should be further optimized. The reinforcement 43 between convex block and base bed should be enhanced as well as the reinforcement between the 44 base bed and the bridge. 45

Lin, Yan 12 (c) Pay much attention to the maintenance and management of bolt torque of low-resistance 1 fastenings on the long-span bridges, and ensure that the bolt actual torque is in the design scope. 2 On the other hand, severe corrosion fastening composite pad should be replaced in time. 3 4 Construction and operational maintenance 5 Optimizing infusion process of cement asphalt mortar 6 The size of the four corners of cement asphalt mortar bags should be appropriately increased, and 7 track slab corners should be supported by special counterforce supports. After infusion and sealing, 8 redundant cement asphalt mortar at corners should be pressed back for a full contact between 9 cement asphalt mortar bags and track slab as well as the base. This process can also improve 10 uniformity to reduce seams and slab void. 11 12 Improving the construction precision of base bed drainage slope 13 Field application shows that whether drainage is obstructed or not has a significant influence on 14 the failure modes emergence and development. Many diseases are related to drainage such as mud 15 pumping between cement asphalt mortar layer and track slab, frost boiling between the concrete 16 base bed and surface of subgrade bed, poor drainage system of the frame track slabs, etc. As a 17 result, it is necessary to pay more attention to drainage system design of ballastless track. 18 Due to the base bed construction precision, the drainage slope is insufficient, and it cannot realize 19 drainage function. It is suggested to increase the drainage slope of the base bed and surface of 20 subgrade bed as much as possible without affecting the mechanical properties of main structures. 21 On the other hand, drainage slope construction precision should be improved. In addition, the 22 construction technology of sealing materials should be met with its requirements. 23 24 Sealing seam in time 25 If seams emerged, it is suggested to seal seams in time to avoid damage deteriorating after the rain 26 was infiltrated. In sealing process, the seam should be cleaned. Expansion joints should be cut out 27 to meet the requirements if necessary. After cleaning, materials such as polyurethane or organic 28 silicone can be used to seal the seams. 29 30 CONCLUSIONS 31 On the basis of summarizing structural characteristics of CRTSⅠslab track, and analyzing 32 influencing factors of typical damages, the measures to enhance the durability of track are 33 proposed as follows: 34 Construction material. (a) Improving the material performance requirements of prestressing steel 35 bars, (b) drawing up water resistance indicator of cement asphalt mortar, and (c) adopting sealant 36 material with high flexibility and anti-aging performance. 37 Structure design. (a) Using pretensioned prestressed slab, (b) optimizing drainage system, and (c) 38 setting rail expansion joint reasonably on large span bridge 39 Construction and operational maintenance. (a) Optimizing pouring technology process of cement 40 asphalt mortar, (b) improving the construction accuracy of drainage slope of concrete base bed, 41 and (c) filling in cracks timely. 42

43

Lin, Yan 13 1 REFERENCES 2 1. Huawu He. Innovation and development of Chinese high-speed railway, Beijing, 3

China. Chinese Railways, Beijing, China, Oct., 2010, pp. 5–8. 4 2. Guodong An. Technical Standards and Quality Control of Ballastless Track on 5

High Speed Railway, China Railway Publishing House, Beijing, 2009. 6 3. Hongsong Lin. Research on the Static and Dynamic Property of Ballastless Track 7

Based on Fracture and Damage Mechanics, doctor degree thesis, Southwest 8 Jiaotong University, Chengdu, China, 2009. 9

4. China Railway Eryuan Engineering Group Co., Ltd. Comprehensive technology research 10 on improving durability of high speed railway ballasltless track, Chengdu, China, China 11 Railway Eryuan Engineering Group Co., Ltd., 2013. 12

5. LIN Hongsong, LI Peigang, YAN Hua and LIU Xueyi. Mechanical Analysis of 13 Ballastless Track with Damaged Cracks under Train Load, Journal of Southwest 14 Jiaotong University, Chengdu, China, Dec., 2010, pp. 904–908. 15

6. JuanJuan Ren, Rui Xiang and Xueyi Liu. Force Characteristics of Longitudinally 16 Coupled Slab Track Turnout on Bridges Under Temperature Action. In Transportation 17 Research Record: Journal of the Transportation Research Board, No. 2159, 18 Transportation Research Board of the National Academies, Washington, D.C., 2010, pp. 19 85–90. 20

7. ZHAO Guotang. High Speed Railway Ballastless Track Structure, China Railway 21 Publishing House, Beijing, China, 2006. 22

8. Wang Qichang. Damage and repair of CA Mortar of slab track in Japan, Chengdu, 23 China, Southwest Jiaotong University, 2007. 24

9. CAI Shi-yu, QUE Xian-ting and YANG Rong-shan. Effect Analysis of CA Mortar 25 Disengaging on Frame-Type Track Slab’s Warping, Railway Standard Design, 26 Beijing, China, Jan., 2013, pp. 21–24. 27

10. JT/T 589-2004. Joint sealing material of cement concrete pavement, Ministry of 28 Transport of the People's Republic of China, Beijing, China, Dec. 2004. 29

11. Song Hailei. The Design of Auxiliary Equipment for the Production of the New Slab 30 Ballastless Track of CRTS III with Pretensioning Method, master degree thesis, 31 Xihua University, Chengdu, China, 2013. 32

33 34 35