Page 2: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

SSFM International, Inc.SSFM International, Inc.

•Project Management, Planning & Engineering

•Hawaii, Pacific Islands & Asia

•Corey Matsuoka, P.E., PMP, LEED AP

•Civil Engineer by License

•Structural Engineer by Education

Page 3: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

PURPOSEPURPOSE

•Developed an Understanding of the Importance of Risk Management

•10 Foundations of Risk Management

•Tools for Risk Management

Page 4: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

HYATT REGENCYKANSAS CITYHYATT REGENCYKANSAS CITY

•Constructed in 1978

•40 Story Building (MO tallest)

•Lobby with a Multi Story Atrium

• Suspended walkways

• Column-less Staircases

•A Triumph of Modern Architecture and Engineering

Page 5: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

HYATT REGENCYKANSAS CITYHYATT REGENCYKANSAS CITY

•July 17, 1981 Dance Contest

•2nd and 4th Floor Walkways Collapsed

•144 Dead, 200+ Injured

Page 6: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

HYATT REGENCYKANSAS CITYHYATT REGENCYKANSAS CITY

•During Construction Design was Modified

•New Design was Inadequate

•Poor Communication

•Poor Quality Control/Assurance

Investigation

Page 7: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

HYATT REGENCYKANSAS CITYHYATT REGENCYKANSAS CITY

•Engineers convicted of gross negligence, misconduct and unprofessional conduct

•Engineers lost their licenses

•Company lost license

•$140 Million in Damages

Aftermath

Page 8: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

10 FOUNDATIONS OFRISK MANAGEMENT10 FOUNDATIONS OFRISK MANAGEMENT

Business Practices

1. Culture

2. Prevention and Proactivity

3. Planning

4. Communication

5. Education

Business Practices

1. Culture

2. Prevention and Proactivity

3. Planning

4. Communication

5. Education

Project Management

6. Scope

7. Compensation

8. Contracts

9. Contract Documents

10.Construction Phase

Project Management

6. Scope

7. Compensation

8. Contracts

9. Contract Documents

10.Construction Phase

Page 9: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Create a Culture of Managing Risks and Preventing Claims

CULTURECULTURE11

•Involves all levels of Staff and even Clients

•A conscious commitment that leads to unconscious actions

Tool: Guide to Create Culture

Page 10: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Guide to Create Culture***

CULTURECULTURE11

•Artifacts

•Shared Values, Knowledge, and Learning

•Basic Unspoken Assumptions

Page 11: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Guide to Create Culture***Artifacts

CULTURECULTURE11

•Meeting Agendas

•Post Reminders – Screen Savers, Posters

•Risk Manager

Page 12: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Guide to Create Culture***Shared Values, Knowledge, and Learning

CULTURECULTURE11

•Horror Stories and Statistics

•Tie Risk to Monetary Value

•Role Play

•Presentations

Page 13: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Guide to Create Culture***Basic Unspoken Assumptions

CULTURECULTURE11

•Developed through Artifacts

•Developed through Shared Values, Knowledge and Learning

•Employee Interviews

Page 14: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Act with preventive techniques, don’t just react

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

•Risk Management Plans

•Develop Process and Systems

Tool: Employee Interview Guide

Tool: Project Risk Evaluation Checklist

Page 15: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Project Risk Evaluation Checklist***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

•Microsoft Access Program

• General Company Questions

• Client/Owner Questions

• Project Questions

•Responses to Answers that Trigger Risk

Page 16: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Project Risk Evaluation Checklist***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

Page 17: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Project Risk Evaluation Checklist***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

Page 18: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Employee Interview Guide & Template***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

•Hard Skills, Talent & Soft Skills

•Outline / Agenda

•Sample Questions

•Template

Page 19: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Employee Interview Guide & Template***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

•Hard Skills

“Success in any business is 85% ability to relate to

other people and attitude and only 15% job knowledge

and technical skills.”

– Carnegie Foundation, 2005.

Page 20: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Employee Interview Guide & Template***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

•Talent

“People don’t change that much. Don’t waste time

trying to put in what was left out. Try to draw out what

was left in. That is hard enough.”

– Marcus Buckingham, First, Break All The Rules: What the World’s

Greatest Managers Do Differently

Page 21: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Employee Interview Guide & Template***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

•Soft Skills

“There is a growing recognition that interpersonal

(soft) skills are not simply helpful in business today;

they are essential…”

– Kelly Pierce, eSight Trend Watch: Increased Value of Soft Skills

Page 22: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Employee Interview Guide & Template***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

Page 23: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Employee Interview Guide & Template***

PREVENTION & PROACTIVITYPREVENTION & PROACTIVITY22

Page 24: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Plan to be Claims Free

PLANNINGPLANNING33

•Staff Hiring & Retention

•Client & Project Selection

•Training & Quality Assurance

•Project Planning

Tool: Corporate Risk Management Plan

Page 25: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Corporate Risk Management Plan***

PLANNINGPLANNING33

Page 26: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Communicate to Match Expectations with Perceptions

COMMUNICATIONCOMMUNICATION44

•Communications Plan

•Templates (correspondence logs, etc)

•Protocols (telephone, e-mail, etc)

Tool: Project Status Report Template

Page 27: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Project Status Report***

COMMUNICATIONCOMMUNICATION44

•Activities Completed

•Action Items

•Schedule

•Comments / Announcements

Page 28: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Project Status Report***

COMMUNICATIONCOMMUNICATION44

Page 29: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Educate All the Stakeholders

EDUCATIONEDUCATION55

•Staff Training

•Mentoring / Coaching

•Communication with Owner / Client / Sponsor

Tool: Guide to the Practice of Structural Engineering

Page 30: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

EDUCATIONEDUCATION55

•CASE Document

•Guide for new Engineers

•Searchable, Electronic

Document

•Test Questions

***Tool: Guide to the Practice of Structural Engineering***

Page 31: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Develop and Manage a Clearly Defined Scope of Services

SCOPESCOPE66

•Provides Understanding

•Serves as a Basis for Negotiation

•Work Breakdown Structure

Tool: Scope Template

Page 32: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Scope Template***

SCOPESCOPE66

Page 33: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Prepare and Negotiate Fees that Allow for Quality and Profit

COMPENSATIONCOMPENSATION77

•Effort or Value Based

•Don’t be Afraid to Walk

•Fee Proposal Template

•Sanity Checks

Tool: Revenue vs. Profit (Client Evaluation)

Page 34: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Revenue vs. Profit (Client Evaluation)***

COMPENSATIONCOMPENSATION77

Page 35: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Revenue vs. Profit (Client Evaluation)***

COMPENSATIONCOMPENSATION77

Page 36: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Revenue vs. Profit (Client Evaluation)***

COMPENSATIONCOMPENSATION77

Page 37: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Negotiate Clear and Fair Agreements:Risk Should be Fairly Proportioned to Each Party

CONTRACTSCONTRACTS88

•Standard Templates

•Insurable?

•Standard of Care

Tool: Red Flag Word Search

Page 38: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

CONTRACTSCONTRACTS88

•Best

•Certify

•Guarantee

•Insure

•Warrantee

***Tool: Red Flag Word Search***

•Total

•All

•Approve

•Complete

•Every

•Indemnify

•Liquidated Damages

•Ensure

•Full

•Defend

Page 39: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

***Tool: Red Flag Word Search***

CONTRACTSCONTRACTS88

Page 40: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Produce Quality Construction Documents

CONSTRUCTION DOCUMENTSCONSTRUCTION DOCUMENTS99

•QA/QC Procedures

•Quality Management Plan

•Guidelines / Codes

Tool: A Guideline Addressing Coordination and Completeness of Structural Construction Documents

Page 41: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

CONSTRUCTION DOCUMENTSCONSTRUCTION DOCUMENTS99

•CASE Document

•Guide for new Engineers

•Searchable, Electronic

Document

•Test Questions

***Tool: A Guideline Addressing Coordination

and Completeness of Structural Construction

Documents ***

Page 42: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Provide Services to Complete the Risk Management Process

CONSTRUCTION PHASE SERVICESCONSTRUCTION PHASE SERVICES1010

•Provide Timely Responses

•Establish Good Relationships

•Keep Good Records

•Lessons Learned

Tool: Site Visit Cards

Page 43: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

CONSTRUCTION PHASE SERVICESCONSTRUCTION PHASE SERVICES1010

***Tool: Site Visit Cards***

•Prior to the Site Visit – What to Do

•What to Take

•During the Site Visit – What to Observe

•After the Site Visit – What to Do

Page 44: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

CONSTRUCTION PHASE SERVICESCONSTRUCTION PHASE SERVICES1010

***Tool: Site Visit Cards***

Page 45: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

CONSTRUCTION PHASE SERVICESCONSTRUCTION PHASE SERVICES1010

***Tool: Site Visit Cards***

•General Guidance and Rules of Thumb

•Composite Slab on Metal Deck

•Reinforced Concrete Flat Slabs

•Concrete Spread and Wall Footings

•Reinforced Concrete Masonry Unit Walls

•Structural Steel – General Framing

•Wood Framing – Sheer Walls

Page 46: 1. SSFM International, Inc. Project Management, Planning & Engineering Hawaii, Pacific Islands & Asia Corey Matsuoka, P.E., PMP, LEED AP Civil Engineer

Questions?Questions?

•Corey Matsuoka, P.E., PMP, LEED AP SSFM International, Inc. (808) 531-1308 [email protected]