1
Responsibilities & Responsibilities & PlanningPlanningDCS WS 13.06.05
L.Jirdén
![Page 2: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/2.jpg)
2
ResponsibilitiesResponsibilities ACC (and its CERN partners) will provide
DCS H/W Infrastructure Back-End System Common Services Interface to TRG, DAQ, HLT, LHC via ECS S/W Infrastructure for Detector Applications
Detectors will provide Detector Sub-System Devices and Cabling Detector Specific Networking (Ethernet switches) Detector Applications for each Sub-System Detector Specific Services Integration of all Detector Sub-Systems to a full
Detector Control System Interface to the Alice Detector Control System layer
![Page 3: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/3.jpg)
3
ACC will provide:ACC will provide:DCS H/W infrastructureDCS H/W infrastructure
DCS Racks in CR3 1 for Back-end PC’s 1 for ELMB power 6 for Front-end (detector) PC’s
Network DCS network ports in all racks with DCS computers & devices
detectors to specify requirements: “rack content meetings” Computers
Back-end: prototype installation exists Front-end: detectors to specify requirements: ACC will propose PCI interfaces: detectors to specify requirements: ACC will
propose Peripherals
Printers, displays, etc
![Page 4: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/4.jpg)
4
Firewall
Terminal Server
Terminal Server
IP Reach for KVM
Domain Controller
Domain ControllerDB Server (Config.)
DB Server (Archive)File Server
Network and Security
FSMAlarms
General DCSElectricity & Racks
Gas & Cooling
EnvironmentGeneral servicesLHC & Access
Alignment
Information Server
CERN
System ManagementDCS Operator
DCS Status
Safety Status
Consoles Remote Access Backend Servers
Worker Nodes
Detector Front-end PC’s
ACR Consoles
DB Server (Archive)
Infrastructure, network
Racks, network, cablingKVM switchescontrolled power plugs
Hot swap spare serversDisks & memories
Spares
DCS network
DCS H/W infrastructureDCS H/W infrastructure
![Page 5: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/5.jpg)
5
And
réA
ugustinus
Ca
vern
Insid
e m
agne
tC
ountin
g room
[FE
D]
Chambers
ISEG
PCI-CAN
ISEG OPCserver
PVSS II PVSS II
Chambers
Wiener
PCI-CAN
Wiener OPCserver
Ethernet
User interface
Database(s)
RCU
OPCclient
DIMclient
108288
1..3 1..22
?
PVSS II
Chambers,detector
ELMB
1..18
~400?
PVSS IIRS232
HVrod
Heinzinger
1
1
18?
3
22
1
216
High Voltage Low Voltage FEETemp. Monitor Very High Voltage
PVSS IIOPC client
PVSS IIOPC client
PCI-CAN
ELMB OPCserver
PVSS IIOPC client
TPC(1)
C C
HV LV
EC
HV
S
[FSM?]C
on
tro
l ro
om
(A
CR
)
108?
26/11/04
Eth. Switch
Eth. Switch
?
?
E
E
LV monitor
DIMsrv
DIMsrv
DIMcl
DD
L
PVSS II
DIMclient
HVrod
ELMB?
1?
2
VHV Curr. Monitor
PCI-CANELMB OPCserver
PVSS IIOPC client
CFront-End
OPC client
ACC WILL PROVIDE: SOFTWARE INFRASTRUCTURE FOR F-END’s
WXP/Linux
PCI
OPCserver
PVSS II
FW
LIBRARIES
Detectors to specify requirements: ACC will propose
![Page 6: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/6.jpg)
6
And
réA
ugustinus
Ca
vern
Insid
e m
agne
tC
ountin
g room
[FE
D]
Chambers
ISEG
PCI-CAN
ISEG OPCserver
PVSS II PVSS II
Chambers
Wiener
PCI-CAN
Wiener OPCserver
Ethernet
User interface
Database(s)
RCU
OPCclient
DIMclient
108288
1..3 1..22
?
PVSS II
Chambers,detector
ELMB
1..18
~400?
PVSS IIRS232
HVrod
Heinzinger
1
1
18?
3
22
1
216
High Voltage Low Voltage FEETemp. Monitor Very High Voltage
PVSS IIOPC client
PVSS IIOPC client
PCI-CAN
ELMB OPCserver
PVSS IIOPC client
TPC(1)
C C
HV LV
EC
HV
S
[FSM?]C
on
tro
l ro
om
(A
CR
)
108?
26/11/04
Eth. Switch
Eth. Switch
?
?
E
E
LV monitor
DIMsrv
DIMsrv
DIMcl
DD
L
PVSS II
DIMclient
HVrod
ELMB?
1?
2
VHV Curr. Monitor
PCI-CANELMB OPCserver
PVSS IIOPC client
C
DETECTORS will provideDETECTORS will provide** SUB-SYSTEM DEVICES; HVPS, LVPS, etcSUB-SYSTEM DEVICES; HVPS, LVPS, etc * ELMB’s and ELMB + CAN power by ACC * ELMB’s and ELMB + CAN power by ACC * CABLES* CABLES; CAN and Interlock cables by ACC; CAN and Interlock cables by ACC** SPECIFIC NETWORKING; switch to RCU, etc. SPECIFIC NETWORKING; switch to RCU, etc. ** DETECTOR SPECIFIC SERVICES (GAS, DETECTOR SPECIFIC SERVICES (GAS, COOLING)COOLING)
![Page 7: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/7.jpg)
7
PVSS
CONNECTION: OPC, DIM, DIP
FW CORE
FRAMEWORK
DEVICE COMPONENTS
APPLICATIONS
ALARM
CONFIGURAT
ACCESS
ARCHIVAL
TRENDING
TOOLS
JCOP
ARCHIVAL
PVSSCONFIG
ALICE STANDARDS:ALICE STANDARDS:- ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS)- ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS)- Guidelines & Conventions for ALICE PVSSII Control SoftwareGuidelines & Conventions for ALICE PVSSII Control Software- ALICE DCS Computing RulesALICE DCS Computing Rules
FEECONFIG
CONDITION
ACCDETECTOR APPLICATIONS
DETECTORS
PVSS applications
![Page 8: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/8.jpg)
8
ACC will provideACC will provide* integration of services* integration of services* interface to ECS* interface to ECS
sub-sys 1
device a
Control Units
DeviceUnits
To physical devices
det B
sub-sys 2
device b
…
…
gas
DCS
ECS
power
det Edet D
…
…
…
racks
sub-sys 1 sub-sys 2
device e…
Detectors will provideDetectors will provide* Integration of subsystems* Integration of subsystems* Interface to DCS* Interface to DCS
![Page 9: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/9.jpg)
9
Installation Installation scheduleschedule
HMPID
TOF / TRD
PHOS
TPC/ITS VacuumFMD/V0/T0 RB26
Muon spectrometer
FMD/V0/T0 RB24
PMD
Stage2VacuumL3 doorsShieldingFinal Installation
PHASE 1 PHASE 2 PHASE 3 PHASE 4
April 2007Jan 06 Aug 06 Mar 2007
TPC
HMPID
INFRASTRUCTURE
Pre-Installation
Nov 05
![Page 10: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/10.jpg)
10
TPC pre-installation TPC pre-installation exampleexample
July
No
v
Jun
e
FebJa
n
Au
g
TPC CHAMBER MOUNT TPC FEE TPC COMMISSIONING
Dec
Mar
Ap
r
Sep Oct
July
2005 2006
May
Jun
e
GCS
B-END
DSS
NETWORK
RACKS
TPC DCS INTEGRATION
GOOFIE
PULSER
LASER
ALICE DCS INTEGRATION
ECS – DAQ INTEGRATION
PC and PLC H/W
RODC
VHV
FEE
TMON
LV
HV
![Page 11: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/11.jpg)
11
CR4
SX2 SGSXL2
CR3
F-endcomp
TPCTPC GASSYSTEM
DSS
HMPIDB-endcomp
F-endcomp
DSS
NETWORK MAY 05
Plans for 2005Plans for 2005
OCT 05
F-END
OCT 05
F-END
JUL 05
DSS
JUL 05
B-END
JUL 05
DSS
SEP 05
TPC GAS
TPC and HMPID Pre-installation at P2
![Page 12: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén](https://reader030.vdocuments.us/reader030/viewer/2022032805/56649ee55503460f94bf4f4f/html5/thumbnails/12.jpg)
12
PURCH
REQ
GUIDE
TEST
Final InstallationFinal Installation
Muon spectrometer
FMD/V0/T0 RB24
PMD
Stage2VacuumL3 doorsShield
B-END
F-END:HMPID
TOFTRD
PHOSMTGMTK
F-END:TPCITS
FMD/V0/T0PMD
PHASE 1 PHASE 2 PHASE 3 PHASE 4
April 2007Jan 06 Aug 06 Mar 2007Jan 05
HMPID
TOF / TRD
PHOS
TPC/ITS VacuumFMD/V0/T0 RB26
INSTALLATION AND VALIDATION
DETECTOR APPLICATIONS SOFTWARE Detector groups:Central Team: