Page 1: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

1

Responsibilities & Responsibilities & PlanningPlanningDCS WS 13.06.05

L.Jirdén

Page 2: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

2

ResponsibilitiesResponsibilities ACC (and its CERN partners) will provide

DCS H/W Infrastructure Back-End System Common Services Interface to TRG, DAQ, HLT, LHC via ECS S/W Infrastructure for Detector Applications

Detectors will provide Detector Sub-System Devices and Cabling Detector Specific Networking (Ethernet switches) Detector Applications for each Sub-System Detector Specific Services Integration of all Detector Sub-Systems to a full

Detector Control System Interface to the Alice Detector Control System layer

Page 3: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

3

ACC will provide:ACC will provide:DCS H/W infrastructureDCS H/W infrastructure

DCS Racks in CR3 1 for Back-end PC’s 1 for ELMB power 6 for Front-end (detector) PC’s

Network DCS network ports in all racks with DCS computers & devices

detectors to specify requirements: “rack content meetings” Computers

Back-end: prototype installation exists Front-end: detectors to specify requirements: ACC will propose PCI interfaces: detectors to specify requirements: ACC will

propose Peripherals

Printers, displays, etc

Page 4: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

4

Firewall

Terminal Server

Terminal Server

IP Reach for KVM

Domain Controller

Domain ControllerDB Server (Config.)

DB Server (Archive)File Server

Network and Security

FSMAlarms

General DCSElectricity & Racks

Gas & Cooling

EnvironmentGeneral servicesLHC & Access

Alignment

Information Server

CERN

System ManagementDCS Operator

DCS Status

Safety Status

Consoles Remote Access Backend Servers

Worker Nodes

Detector Front-end PC’s

ACR Consoles

DB Server (Archive)

Infrastructure, network

Racks, network, cablingKVM switchescontrolled power plugs

Hot swap spare serversDisks & memories

Spares

DCS network

DCS H/W infrastructureDCS H/W infrastructure

Page 5: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

5

And

réA

ugustinus

Ca

vern

Insid

e m

agne

tC

ountin

g room

[FE

D]

Chambers

ISEG

PCI-CAN

ISEG OPCserver

PVSS II PVSS II

Chambers

Wiener

PCI-CAN

Wiener OPCserver

Ethernet

User interface

Database(s)

RCU

OPCclient

DIMclient

108288

1..3 1..22

?

PVSS II

Chambers,detector

ELMB

1..18

~400?

PVSS IIRS232

HVrod

Heinzinger

1

1

18?

3

22

1

216

High Voltage Low Voltage FEETemp. Monitor Very High Voltage

PVSS IIOPC client

PVSS IIOPC client

PCI-CAN

ELMB OPCserver

PVSS IIOPC client

TPC(1)

C C

HV LV

EC

HV

S

[FSM?]C

on

tro

l ro

om

(A

CR

)

108?

26/11/04

Eth. Switch

Eth. Switch

?

?

E

E

LV monitor

DIMsrv

DIMsrv

DIMcl

DD

L

PVSS II

DIMclient

HVrod

ELMB?

1?

2

VHV Curr. Monitor

PCI-CANELMB OPCserver

PVSS IIOPC client

CFront-End

OPC client

ACC WILL PROVIDE: SOFTWARE INFRASTRUCTURE FOR F-END’s

WXP/Linux

PCI

OPCserver

PVSS II

FW

LIBRARIES

Detectors to specify requirements: ACC will propose

Page 6: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

6

And

réA

ugustinus

Ca

vern

Insid

e m

agne

tC

ountin

g room

[FE

D]

Chambers

ISEG

PCI-CAN

ISEG OPCserver

PVSS II PVSS II

Chambers

Wiener

PCI-CAN

Wiener OPCserver

Ethernet

User interface

Database(s)

RCU

OPCclient

DIMclient

108288

1..3 1..22

?

PVSS II

Chambers,detector

ELMB

1..18

~400?

PVSS IIRS232

HVrod

Heinzinger

1

1

18?

3

22

1

216

High Voltage Low Voltage FEETemp. Monitor Very High Voltage

PVSS IIOPC client

PVSS IIOPC client

PCI-CAN

ELMB OPCserver

PVSS IIOPC client

TPC(1)

C C

HV LV

EC

HV

S

[FSM?]C

on

tro

l ro

om

(A

CR

)

108?

26/11/04

Eth. Switch

Eth. Switch

?

?

E

E

LV monitor

DIMsrv

DIMsrv

DIMcl

DD

L

PVSS II

DIMclient

HVrod

ELMB?

1?

2

VHV Curr. Monitor

PCI-CANELMB OPCserver

PVSS IIOPC client

C

DETECTORS will provideDETECTORS will provide** SUB-SYSTEM DEVICES; HVPS, LVPS, etcSUB-SYSTEM DEVICES; HVPS, LVPS, etc * ELMB’s and ELMB + CAN power by ACC * ELMB’s and ELMB + CAN power by ACC * CABLES* CABLES; CAN and Interlock cables by ACC; CAN and Interlock cables by ACC** SPECIFIC NETWORKING; switch to RCU, etc. SPECIFIC NETWORKING; switch to RCU, etc. ** DETECTOR SPECIFIC SERVICES (GAS, DETECTOR SPECIFIC SERVICES (GAS, COOLING)COOLING)

Page 7: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

7

PVSS

CONNECTION: OPC, DIM, DIP

FW CORE

FRAMEWORK

DEVICE COMPONENTS

APPLICATIONS

ALARM

CONFIGURAT

ACCESS

ARCHIVAL

TRENDING

TOOLS

JCOP

ARCHIVAL

PVSSCONFIG

ALICE STANDARDS:ALICE STANDARDS:- ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS)- ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS)- Guidelines & Conventions for ALICE PVSSII Control SoftwareGuidelines & Conventions for ALICE PVSSII Control Software- ALICE DCS Computing RulesALICE DCS Computing Rules

FEECONFIG

CONDITION

ACCDETECTOR APPLICATIONS

DETECTORS

PVSS applications

Page 8: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

8

ACC will provideACC will provide* integration of services* integration of services* interface to ECS* interface to ECS

sub-sys 1

device a

Control Units

DeviceUnits

To physical devices

det B

sub-sys 2

device b

gas

DCS

ECS

power

det Edet D

racks

sub-sys 1 sub-sys 2

device e…

Detectors will provideDetectors will provide* Integration of subsystems* Integration of subsystems* Interface to DCS* Interface to DCS

Page 9: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

9

Installation Installation scheduleschedule

HMPID

TOF / TRD

PHOS

TPC/ITS VacuumFMD/V0/T0 RB26

Muon spectrometer

FMD/V0/T0 RB24

PMD

Stage2VacuumL3 doorsShieldingFinal Installation

PHASE 1 PHASE 2 PHASE 3 PHASE 4

April 2007Jan 06 Aug 06 Mar 2007

TPC

HMPID

INFRASTRUCTURE

Pre-Installation

Nov 05

Page 10: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

10

TPC pre-installation TPC pre-installation exampleexample

July

No

v

Jun

e

FebJa

n

Au

g

TPC CHAMBER MOUNT TPC FEE TPC COMMISSIONING

Dec

Mar

Ap

r

Sep Oct

July

2005 2006

May

Jun

e

GCS

B-END

DSS

NETWORK

RACKS

TPC DCS INTEGRATION

GOOFIE

PULSER

LASER

ALICE DCS INTEGRATION

ECS – DAQ INTEGRATION

PC and PLC H/W

RODC

VHV

FEE

TMON

LV

HV

Page 11: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

11

CR4

SX2 SGSXL2

CR3

F-endcomp

TPCTPC GASSYSTEM

DSS

HMPIDB-endcomp

F-endcomp

DSS

NETWORK MAY 05

Plans for 2005Plans for 2005

OCT 05

F-END

OCT 05

F-END

JUL 05

DSS

JUL 05

B-END

JUL 05

DSS

SEP 05

TPC GAS

TPC and HMPID Pre-installation at P2

Page 12: 1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

12

PURCH

REQ

GUIDE

TEST

Final InstallationFinal Installation

Muon spectrometer

FMD/V0/T0 RB24

PMD

Stage2VacuumL3 doorsShield

B-END

F-END:HMPID

TOFTRD

PHOSMTGMTK

F-END:TPCITS

FMD/V0/T0PMD

PHASE 1 PHASE 2 PHASE 3 PHASE 4

April 2007Jan 06 Aug 06 Mar 2007Jan 05

HMPID

TOF / TRD

PHOS

TPC/ITS VacuumFMD/V0/T0 RB26

INSTALLATION AND VALIDATION

DETECTOR APPLICATIONS SOFTWARE Detector groups:Central Team:

TOFTRD