![Page 1: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review](https://reader035.vdocuments.us/reader035/viewer/2022062315/56649d9c5503460f94a84e14/html5/thumbnails/1.jpg)
1
ProgramProgramFrank Linde (45’)
Marcel Vreeswijk (45’)Jan Spelt (45’)
Robert Hart (15’)
Tours: 14:00-15:00 CAVE (60’)
15:00-16:30 BOL-room (60’)
Site Review @ NIKHEF, 10-July-2001
Lunch (13:00-13:45)
16:30-19:00 Discussion
9:30-10:30 Introduction & Movie10:30-11:30 BOL-0/1
11:30-12:30 BOL-2/9612:30-13:00 Database
![Page 2: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review](https://reader035.vdocuments.us/reader035/viewer/2022062315/56649d9c5503460f94a84e14/html5/thumbnails/2.jpg)
2
End Cap ToroidsEnd Cap Toroids
Vacuum Vessels
(Schelde Exotech)
First Vessel: Assembly in progress to CERN: fall 2001 (6 months delay)
Second Vessel: Machining in progress to CERN: spring 2002 (on time)
Coil Winding
(HMA power systems)
Conductor delivery problematic; other materials & tools in place
Company claims cost overruns
![Page 3: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review](https://reader035.vdocuments.us/reader035/viewer/2022062315/56649d9c5503460f94a84e14/html5/thumbnails/3.jpg)
3
Muon-Spectrometer: Muon-Spectrometer: AlignmentAlignment
Alignment
Key issue: RASNIK 3-point monitorStatus: Sensors delivered to MDT sites; DAQ prototypedOutstanding: Radiation tolerance of the multiplexers (first test: ok!)Difficulties: Cost (mechanics!) & lens quality (finally understood!)
Many other interested parties
MasterMux
USA15Mux
On-chamber Off-chamber
mask
CCD
lensmultiplexer
25 multiplexers on order
![Page 4: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review](https://reader035.vdocuments.us/reader035/viewer/2022062315/56649d9c5503460f94a84e14/html5/thumbnails/4.jpg)
4
Muon-Spectrometer: Detector Muon-Spectrometer: Detector ControlControl
Detector control (NIKHEF/CERN R&D collaboration)
Key issue: Modular: CAN CPU with many sensor types precise Hall B-sensors; cheap T-sensors, …Status: Being delivered to MDT sitesOutstanding: Radiation tolerance of the CAN CPUs
Used also by: D0, Saclay,
CMS(?), LAr (H8), …
T-sensors30 max
T0.2 oCB-sensorsB/B10-4
CAN
Network
digital busses to MDT front-end
extra bus(insuranc
e)
On-chamber
25 DCS nodes on order
![Page 5: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review](https://reader035.vdocuments.us/reader035/viewer/2022062315/56649d9c5503460f94a84e14/html5/thumbnails/5.jpg)
5
(Muon-Spectrometer:)(Muon-Spectrometer:) Read-Out DriverRead-Out Driver
Read-Out Driver
Difficulty: Cost (ROD+CSM doubles CORE)
Status: R&D phase Test bed: cosmic ray set-up Dec/01
1.28 Gbit/s S-Link to ROB
6 x
CSM-Link
CSM-Link
TDC 1
TDC 18
CSM18 x
TDC 1
TDC 18
CSM18 x
MDT chambers
MROD(NIKHEF)
USA15
ROB
Surface
ROD or ROB “IN”
ROD or ROB “OUT”CSM
![Page 6: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review](https://reader035.vdocuments.us/reader035/viewer/2022062315/56649d9c5503460f94a84e14/html5/thumbnails/6.jpg)
6
ATLAS efforts on realization of CORE commitments
(We realize our participation in ATLAS physics studies is not in line with our ambition ………)
Muon SpectrometerEnd cap Toroids
Vacuum vessels: progressing well (minor delays)Coil winding: company claims cost overruns
MDT chamber construction:R&D basically completed (and it took a lot of time)Huge “serial” production effort in 2001-2005
Alignment, Detector Control & MDT Read-Out DriversCompleted or near completionPoint of concern: radiation tolerance
Silicon Tracker: Design closure urgently required (else we get squeezed)Significant assembly & test effort in 2002-2003/4
Trigger & DAQ:Many R&D contributions; synergy with MDT-Read-Out Driver project
SummarySummary