1 program frank linde (45’) marcel vreeswijk (45’) jan spelt (45’) robert hart (15’) tours:...

6
1 Program Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review @ NIKHEF, 10-July-2001 Lunch (13:00-13:45) 16:30-19:00 Discussion 9:30-10:30 Introduction & Movie 10:30-11:30 BOL-0/1 11:30-12:30 BOL-2/96 12:30-13:00 Database

Upload: ursula-mccormick

Post on 20-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review

1

ProgramProgramFrank Linde (45’)

Marcel Vreeswijk (45’)Jan Spelt (45’)

Robert Hart (15’)

Tours: 14:00-15:00 CAVE (60’)

15:00-16:30 BOL-room (60’)

Site Review @ NIKHEF, 10-July-2001

Lunch (13:00-13:45)

16:30-19:00 Discussion

9:30-10:30 Introduction & Movie10:30-11:30 BOL-0/1

11:30-12:30 BOL-2/9612:30-13:00 Database

Page 2: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review

2

End Cap ToroidsEnd Cap Toroids

Vacuum Vessels

(Schelde Exotech)

First Vessel: Assembly in progress to CERN: fall 2001 (6 months delay)

Second Vessel: Machining in progress to CERN: spring 2002 (on time)

Coil Winding

(HMA power systems)

Conductor delivery problematic; other materials & tools in place

Company claims cost overruns

Page 3: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review

3

Muon-Spectrometer: Muon-Spectrometer: AlignmentAlignment

Alignment

Key issue: RASNIK 3-point monitorStatus: Sensors delivered to MDT sites; DAQ prototypedOutstanding: Radiation tolerance of the multiplexers (first test: ok!)Difficulties: Cost (mechanics!) & lens quality (finally understood!)

Many other interested parties

MasterMux

USA15Mux

On-chamber Off-chamber

mask

CCD

lensmultiplexer

25 multiplexers on order

Page 4: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review

4

Muon-Spectrometer: Detector Muon-Spectrometer: Detector ControlControl

Detector control (NIKHEF/CERN R&D collaboration)

Key issue: Modular: CAN CPU with many sensor types precise Hall B-sensors; cheap T-sensors, …Status: Being delivered to MDT sitesOutstanding: Radiation tolerance of the CAN CPUs

Used also by: D0, Saclay,

CMS(?), LAr (H8), …

T-sensors30 max

T0.2 oCB-sensorsB/B10-4

CAN

Network

digital busses to MDT front-end

extra bus(insuranc

e)

On-chamber

25 DCS nodes on order

Page 5: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review

5

(Muon-Spectrometer:)(Muon-Spectrometer:) Read-Out DriverRead-Out Driver

Read-Out Driver

Difficulty: Cost (ROD+CSM doubles CORE)

Status: R&D phase Test bed: cosmic ray set-up Dec/01

1.28 Gbit/s S-Link to ROB

6 x

CSM-Link

CSM-Link

TDC 1

TDC 18

CSM18 x

TDC 1

TDC 18

CSM18 x

MDT chambers

MROD(NIKHEF)

USA15

ROB

Surface

ROD or ROB “IN”

ROD or ROB “OUT”CSM

Page 6: 1 Program Frank Linde (45’) Marcel Vreeswijk (45’) Jan Spelt (45’) Robert Hart (15’) Tours: 14:00-15:00 CAVE (60’) 15:00-16:30 BOL-room (60’) Site Review

6

ATLAS efforts on realization of CORE commitments

(We realize our participation in ATLAS physics studies is not in line with our ambition ………)

Muon SpectrometerEnd cap Toroids

Vacuum vessels: progressing well (minor delays)Coil winding: company claims cost overruns

MDT chamber construction:R&D basically completed (and it took a lot of time)Huge “serial” production effort in 2001-2005

Alignment, Detector Control & MDT Read-Out DriversCompleted or near completionPoint of concern: radiation tolerance

Silicon Tracker: Design closure urgently required (else we get squeezed)Significant assembly & test effort in 2002-2003/4

Trigger & DAQ:Many R&D contributions; synergy with MDT-Read-Out Driver project

SummarySummary