1 overview of chennai metro rail limited phase 1
TRANSCRIPT
![Page 1: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/1.jpg)
1
OVERVIEW OF
CHENNAI METRO RAIL LIMITED
PHASE 1
![Page 2: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/2.jpg)
2
CHENNAI CITY MAP
![Page 3: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/3.jpg)
3
PRESENT TRAFFIC SCENARIO IN
CHENNAI CITY
![Page 4: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/4.jpg)
4
Main Arterial Roads In Chennai City
Anna Salai / Mount Road
E V R Salai / Poonamalle High Road
Inner Ring Road / Jawaharlal Nehru Road/100 feet Road
![Page 5: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/5.jpg)
5
Distribution Of Road Net Work In Chennai City
Right Of Way (ROW)
ROW(m) Length(km) Percentage
<10* 6.43 1.74
10-15* 146.15 39.44
15-20* 159.06 42.93
20-30 57.83** 15.61
30-40 1.05 0.28
Total 370.52 100.00
* ROW of 84 % of the city roads <20 m** Out of this 57.83km, Phase I Metro will run through 40km
![Page 6: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/6.jpg)
6
Growth of Population in Chennai City / CMA
1971 1981 1991 2001 2008
Chennai City 2.64 3.29 3.84 4.32 4.75
Other than City 0.86 1.32 1.98 2.72 3.52
CMA 3.50 4.61 5.82 7.04 8.27
In Million
![Page 7: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/7.jpg)
7
CHENNAI CITY LIMTS
![Page 8: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/8.jpg)
8
Steady increase in the growth of Bus transport
Year Routes Fleet Bus Fleet per One Lakh Population
1980-81 298 1794 25
1990-91 439 2296 34
2000-01 580 2816 40
2008-09 640 3300 40
![Page 9: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/9.jpg)
9
Share Of Public Transport
The share of public transport has reduced
1992- 60%
2003- 53%
2008- 41%
Ideally this should be 70%
![Page 10: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/10.jpg)
10
Growth of Vehicle Population
1984 1992 2000 2008
Cars 24%(34,000)
21%(1,20,000)
20%(2,28,000)
19%(5,04,000)
Twowheelers
61%(87,000)
71%(4,05,000)
73%(8,32,000)
76%(20,15,000)
![Page 11: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/11.jpg)
11
Road vehicles, especially two wheelers have substantially increased.
Whereas the infrastructure facilities of the city not proportionately increased.
Due to increase in vehicle population, the average journey time has increased
Growth of Vehicle Population
![Page 12: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/12.jpg)
3%
▄Chennai is the fourth- largest city in India with a population of about 8 million
▄11 million trips in a day, of which about 6 million vehicular trip
▄Many areas in city and suburbs are not served by rail based system
▄Suburban and MRTS traffic have increased, but NOT in tune with the traffic
demand
▄Rail network expansion failed to keep pace with demand resulting in severe
congestion on road network & Environmental pollution
Present Scenario of Transport Infrastructure
12
26% 71%
![Page 13: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/13.jpg)
13
The options are…………
1. ROAD BASED SYSTEM
2. RAIL BASED MASS TRANSIT SYSTEM
![Page 14: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/14.jpg)
14
ROAD BASED SYSTEM
Widening of Roads Involves large scale land and building acquisition in the heart of the City- not feasible
Elevated Bus bay systemDedicated bus bays/expressways not feasible because: -numerous existing flyovers ;
-city landscape intervened with commercial/residential buildings and walkways
![Page 15: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/15.jpg)
15
RAIL BASED MASS TRANSIT SYSTEM
Mono Rail: Suitable as a feeder serviceLimited capacity <10000 phpdt
Light Rail Transit (LRT): Suitable for low to medium capacity trafficbetween 10000 and 25000 phpdt
The arterial roads of Chennai is already having traffic in the order of 30000phpdt and growing steadily
![Page 16: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/16.jpg)
16
RAIL BASED MASS TRANSIT SYSTEM
Medium Capacity Metro System
Suitable for traffic demand of 30000-40000 phpdt
Most economically suited system for the saturated corridors of the Chennai City
![Page 17: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/17.jpg)
17
Advantages of Metro System Requires 1/5th energy per passenger km compared to road
based system
More reliable, Comfortable and Safer
Fully air conditioned
Carries same amount of traffic as 7 lanes of bus traffic or 22 lanes of private cars
Reduces journey time by 50 to75%
Washermanpet to Airport
-by road will take 90 to 100 minutes
-Metro Rail will take 45 minutes
![Page 18: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/18.jpg)
18
Advantages of Metro System
Tangible & non Tangible SavingsSocio Economic Benefits
Vehicle operating costs (VOC) savedPassenger time savedLess air and noise pollutionReduction in number of road accidentsReduction in Road infrastructure and consequent
maintenanceChennai city will be placed in global Metro map
![Page 19: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/19.jpg)
19
CHENNAI METRO SELECTION OF CORRIDOR
Detailed Feasibility Study was carried out, and 7 (Seven) corridors prioritised
Detailed traffic survey was done for the
3 (Three) main corridors
![Page 20: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/20.jpg)
Cor
r 1Corr 7
Corr 2
Corr 3
Co
rr 3
Corr 4
Co
rr 5
Corr 6
Corr 1
CHENNAI METRO SELECTION OF CORRIDOR
![Page 21: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/21.jpg)
CHENNAI METRO SELECTION OF CORRIDOR
CORRIDOR - 1
Airport - GST Road- Anna Salai- Central - Broad Way- Washermanpet- Tiruvottiur
CORRIDOR - 2
Alandur - JN Road - Koyambedu - EVR Salai - Egmore - Chennai Central - Fort – Beach Station
CORRIDOR - 3
Ambattur - Ring Road - Arcot Road - Panagal Park - Eldams
Road- Luz Church Road - RK Mutt Road - Adyar Bridge - Lattice
Bridge Road -Thiruvanmiyur
21
![Page 22: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/22.jpg)
22
Govt. decided to take up Corridor 1 & Corridor 2, under Phase-I based on maximum ridership
Subsequently both these corridors slightly modified-extent reduced.
Corridor 3 will be taken up under Phase-II Extension of Corridor 1 (to Tiruvottiyur) will be taken
up shortly
CHENNAI METRO SELECTION OF CORRIDOR
![Page 23: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/23.jpg)
U/G Station
Elevated Station
23
CHENNAI METRO RAIL ALIGNMENT
![Page 24: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/24.jpg)
24
Chennai Metro Rail Project Phase I
Largest infrastructure project ever in Tamil Nadu
Cost - Rs. 14,600 Crores (US $ 3.2 Billion)
59% funding from Japan International Cooperation
Agency, 20% by Central Govt. and 21% by State
Govt.
![Page 25: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/25.jpg)
25
Implementation Module
A special purpose vehicle formed – Chennai Metro Rail Limited (CMRL)
Stake Holders- Govt of India and Govt of Tamil Nadu
![Page 26: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/26.jpg)
26
Chennai Metro Rail Phase - 1 Salient Features
Description Under Ground (Km) Elevated (Km) Total (Km)
Corridor I 13.8 8.7 22.5
Corridor II 9.6 11.8 21.4
Total 23.4 20.5 43.9
Description Under Ground (Nos) Elevated (Nos) Total (Nos)
Corridor I 11 6 17
Corridor II 8 7 15
Total 19 13 32
1. No of Corridors – 2 Nos
2. Route length
3. No. of Stations
![Page 27: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/27.jpg)
27
Under Ground StationsCorridor - 1 Corridor - 2
1 Washermanpet 1 Chennai Central
2 Mannadi 2 Egmore
3 High Court 3 Nehru Park
4 Chennai Central 4 K M C
5 Government Estate 5 Pachaiappa’s College
6 L I C Building 6 Shenoy Nagar
7 Thousand Lights 7 Anna Nagar East
8 Gemini 8 Anna Nagar Tower
9 Teynampet 9 Thirumangalam
10 Chamiers Road
11 Saidapet
Elevated StationsCorridor - 1 Corridor - 2
1 Little Mount 1 Koyambedu
2 Guindy 2 CMBT
3 Alandur 3 Arumbakkam
4 Officers Training Academy
4 Vadapalani
5 Meenambakkam 5 Ashok Nagar - K. K. Nagar
6 Chennai Airport 6 SIDCO
7 Alandur
8 St. Thomas Mount
CHENNAI METRO List of Stations
![Page 28: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/28.jpg)
Integration with other modes of Transport
28
![Page 29: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/29.jpg)
29
CONNECTIVITY TO BUS STATIONS
WASHERMANPET BUS STATION
ESPLANADE BUS STATION
KOYAMBEDU INTERSTATE BUS TERMINUS
SAIDAPET BUS
STATION
PROPOSED ST.THOMAS MOUNT BUS
STATION
![Page 30: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/30.jpg)
Integration with other modes of Transport
30
Chennai Mofussil Bus Terminus (CMBT) Koyambedu
• Largest Interstate Bus Terminus in Asia
• Handle over 2000 Buses / Day (270 buses parked at a time) • Handle over 2 lakh Passengers / Day
![Page 31: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/31.jpg)
31
CONNECTIVITY TO CHENNAI AIRPORT
PROPOSED AIRPORT
STATION
![Page 32: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/32.jpg)
32
Chennai International Airport
• Rs. 2000 Crore Expansion and Modernization of Domestic and International Airports is on going
• Target handling capacity in 2011 - 23 million passengers per annum or 66,000 passengers per day
• Expected traffic flow to Airport in 2011- 1 lakh / day
• Cannot be handled by Road
• CHENNAI METRO the only alternative
Integration with other modes of Transport
![Page 33: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/33.jpg)
33
WASHERMANPET
WASHERMANPET METRO STATION
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 2
CORRIDOR 1
![Page 34: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/34.jpg)
34
HIGH COURT
FORT STATION
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 2
CORRIDOR 1
![Page 35: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/35.jpg)
35
HIGH COURT
ELEVATED SKY WALK FROM HIGHCOURT
STATION TO FORT STATION FOOT BRIDGE
![Page 36: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/36.jpg)
36
CHENNAI CENTRAL
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 1
CORRIDOR 2
CENTRAL METRO STATION
![Page 37: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/37.jpg)
CHENNAI CENTRALSUB URBAN (MMC)
37
Chennai Central Station
(long distance)
1.75 lakh passengers / day
MMTC Suburban Station
4.75 lakh passengers / day
Park Suburban Station 4.4
lakh passengers / dayPark MRTS Station 25,000
passengers / day
![Page 38: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/38.jpg)
38
EGMORE
EGMORE METRO
STATION
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 2
CORRIDOR 1
Egmore Station (long distance) 1.0 lakh
passengers / day
![Page 39: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/39.jpg)
39
GOVERNMENT ESTATE
CHINTHADRIPET
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 2
CORRIDOR 1
![Page 40: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/40.jpg)
GOVERNMENT ESTATE
NEW SUBWAY CONNECTING THE EXISTING SUBWAY AT ANNA SALAI WITH
CHINTHADRIPET MRTS STATION
40
![Page 41: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/41.jpg)
41
GUINDY METRO STATION
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 2
CORRIDOR 1
![Page 42: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/42.jpg)
42
ST. THOMAS MOUNT
INTEGRATED STATION FOR MRTS AND METRO
INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS
CORRIDOR 1
CORRIDOR 2
![Page 43: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/43.jpg)
▄Length of the route : 20.5 km (Elevated)
: 23.5 km (Under Ground)
▄Gauge (standard) : 1.435m
▄Tunnel Dia : 5.8m (Internal Diameter)
▄Traction Power : 25 Kv A.C
▄Rail Profile : 60kg (UIC 60)
▄Track Structure : Slab Track / Plinth
▄Track Centre (Under Ground) : 14.05m / 14.50m
▄Track Centre (Elevated) : 4.10m
▄Car Depot location : Koyambedu
43
Chennai Metro Technical Details
![Page 44: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/44.jpg)
44
Typical Underground Station Section
![Page 45: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/45.jpg)
Chennai Central Station - Corridor 2 over Corridor 1
45
![Page 46: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/46.jpg)
46
Underground Station Platform
![Page 47: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/47.jpg)
47
STATION INSIDE VIEW
![Page 48: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/48.jpg)
48
STATION INSIDE VIEW
![Page 49: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/49.jpg)
49
Typical Bored Tunnel Section.
![Page 50: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/50.jpg)
50
INSIDE VIEW OF TUNNELInside View of Tunnel
![Page 51: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/51.jpg)
Cross Section of a typical Cross Passage
51
Cross Passages are provided every 244m
![Page 52: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/52.jpg)
52
Typical Elevated Viaduct Section
![Page 53: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/53.jpg)
53
Viaduct Section-in progress
![Page 54: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/54.jpg)
Typical Elevated Station
Construction by Station Contractor
Construction by Viaduct Contractor
54
![Page 55: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/55.jpg)
Alandur Station - Corridor 2 over Corridor 1
55
![Page 56: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/56.jpg)
56
Elevated Station
![Page 57: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/57.jpg)
57
Elevated Station Platform
![Page 58: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/58.jpg)
58
METRO RAIL INSIDE VIEW
58
![Page 59: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/59.jpg)
59
METRO RAIL INSIDE VIEW
59
![Page 60: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/60.jpg)
METRO Rail Depot
60
![Page 61: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/61.jpg)
METRO Rail Depot
61
![Page 62: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/62.jpg)
62
Progress - Civil Contracts
Elevated :- 3 Viaduct contracts – work in progress- 2 Elevated station contracts (10 stations)- awarded- 2 Elevated station contracts ( 3 stations)- tender will be
called for shortly- Depot – Tender return early August 2010
Under Ground :- 5 Contract packages (19 stations and 18km tunnels)-
Tender return early August 2010
![Page 63: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/63.jpg)
63
Progress - Systems Contracts
- Rolling Stock – Bid evaluation- Power Supply and Overhead Equipment, Track Works -
Call for Tender - Signaling, Platform Screen Doors and Telecommunication, Lifts and Escalators – Tender will be called for shortly- Tunnel Ventilation and Under Ground Station Air
Conditioning System, AFC Equipment – P Q Evaluation
Physical Work Completion for Elevated Portion: 2012 -13 Underground Portion: 2014-15
![Page 64: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/64.jpg)
Chennai Metro – Future WorksCorridor 1 Extension to Tiruvottiyur
64
Preliminary study completed, Financial Sanction in progress
![Page 65: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/65.jpg)
Cor
r 1Corr 7
Corr 2
Corr 3
Co
rr 3
Corr 4
Co
rr 5
Corr 6
Corr 1
Chennai Metro – Future WorksCorridors 3 & 4 - Feasibility study completed, now under active
consideration
65
![Page 66: 1 OVERVIEW OF CHENNAI METRO RAIL LIMITED PHASE 1](https://reader038.vdocuments.us/reader038/viewer/2022103021/56649c895503460f94941ede/html5/thumbnails/66.jpg)
66
Chennai Metro Rail Project
Thank you