Process/Timeline
PHASE I
Benchmark• Gather user data• Define success • Create project plan
PHASE II
Image Deployment• Create one
Master Image• Deploy remotely• Restore with
personalizations
PHASE III
Validate and Measure Success• ID and fix
performance issues• Disaster recovery and
repair, as needed• Quantify success
4
PHASE IIPHASE I
Horizon Mirage ™
Create one Master Image
Deploy remotely
Restore with personalizations
5
PHASE IIIPHASE IIPHASE I
Stratusphere ™ UX
ID and fix performance issues
Disaster recovery and repair, as needed
Quantify success
6
Process / Timeline
PHASE I
Benchmark• Gather user data• Define success • Create project plan
PHASE II
Image Deployment• Create one
Master Image• Deploy remotely• Restore with
personalizations
PHASE III
Validate and Measure Success• ID and fix
performance issues• Disaster recovery and
repair, as needed• Quantify success
7
PHASE I
Benchmark with Stratusphere™ FIT
Assess and quantify machine, user, and infrastructure metrics.
Provide visibility into user persona and authored data.
Access applications for usage and master image strategy.
Define the baseline user experience.
Design base image on actual usage metrics.
Group users into appropriate tiers based on consumption.
8
PHASE I
Visibility Throughout Is Key
Workers’ Desktops
Target Image
How are users spending their time?
What are they consuming?
What is the baseline user experience?
Are image resources adequate and available?
Are problems developing?
Constraints and/or avoidable crashes ahead?
9
PHASE I
Summary of Benefits
Collect data automatically.
Accurate data — no lost work time for users.
Reduce migration labor costs.
Accurate metrics lead to accurate planning.
Save on licensing costs.
Identify apps that users have but never use.
10
Process / Timeline
PHASE I
Benchmark• Gather user data• Define success • Create project plan
PHASE II
Image Deployment• Create one
Master Image• Deploy remotely• Restore with
personalizations
PHASE III
Validate and Measure Success• ID and fix
performance issues• Disaster recovery and
repair, as needed• Quantify success
11
PHASE IIPHASE I
Mirage™ Server
Centralized Images
Network-OptimizedSynchronization and Streaming
Windows® 7 Image
Desktops/Laptops with Mirage Client
Local Copies
Migrate Image Centrally and In-Place
12
PHASE IIPHASE I
Windows 7Reference Machine
Reference CVD
Base Image CVD2
CVD1
Base Image is capturedfrom the Reference CVD.
Horizon Mirage™ Server
CVD3
Branch Reflector
The BI is downloaded to one or more Branch Reflectors.
Endpoints leverage Reflector to load new Base Image.
13
PHASE IIPHASE I
Summary of Benefits
Better manage and optimize image creation.
Manage one Master Image vs. 300.
Achieve more migrations per day.
Centralized migration operations eliminate most or all PC visits.
Avoid loss of user files.
Quickly revert to original Windows XP, preserving user
personalizations and data.
14
Process / Timeline
PHASE I
Benchmark• Gather user data• Define success • Create project plan
PHASE II
Image Deployment• Create one
Master Image• Deploy remotely• Restore with
personalizations
PHASE III
Validate and Measure Success• ID and fix
performance issues• Disaster recovery and
repair, as needed• Quantify success
15
PHASE IIIPHASE IIPHASE I
Validate with Stratusphere™ UX
Ongoing and proactive monitoring—the ability to quantify UX.
Validate image changes to ensure optimal performance.
Identify rogue entities and/or bottlenecks to quickly remediate issues.
Enable "what-if" scenarios to plan for growth and changes.
Get support for mixed VMware Mirage and VMware View environments with single pane-of-glass monitoring.
16
PHASE IIIPHASE IIPHASE I
Measure for SuccessReporting to ensure equal-to-better user experience
At-a-glance comparison of physical machines to Mirage-managed machines
Easy to see results to quickly determine if users are reaping the benefits of the transformation
17
PHASE IIIPHASE IIPHASE I
Summary of Benefits
Prevent unplanned downtime.
Get fewer post-migration calls to the Help Desk.
Track system performance.
See from the desktop to the data center, and across all networks.
Measure success.
Built-in reports provide accurate ROI and TCO data.
18
What a migration looks like when you simplify the process:
Save money. Reduce migration labor costs; save on licensing costs.
Save time. Reduce user downtime during migration; manage one image instead of 300.
Use fewer resources. Centralize migration operations; manage fewer post-migration calls.
Monitor proactively. Alert administrators to issues; prevent unplanned downtime.
Keep end-users productive. Optimize performance; provision resources quickly.
19
Simplify the migration process — and execute it with speed and confidence.
Migration Timeline
T-3 T-2 T-1 T-0 Post-Migration
Monitor and measureall hardware,operating systems,and applications.
Easily discover allthe metrics you need before the move. Define what migration success will mean to you.
Define baselineof usage and userexperience.
Produce reports and use them to put a project plantogether.
Create a masterimage.
Create and deploy a mirror-perfect image (and manage one image instead of 300).
Conduct phasedimage deployment.
Set triggers to let you know when post-migrationperformance is less than ideal — and drill down to see where theproblem really is.Fix it before anyone reports it as an issue.
Monitor and compare.
Validate that migration worked properly.
Generate reports that quantify success.
Disaster recovery.
Use pre-migration snapshot for recovery and repair, as needed.
Recover systems due to lost, stolen, or broken PCs.