1 july-05-2013 gem r&d activity in ustc yi zhou university of science & technology of china
TRANSCRIPT
![Page 1: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/1.jpg)
1
July-05-2013
GEM R&D Activity in USTC
Yi Zhou
University of Science & Technology of China
![Page 2: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/2.jpg)
2
Outline
The NS2 Self-stretching Technique
The 30cm×30cm GEM of USTC
![Page 3: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/3.jpg)
3
The self-stretching technique
Readout PCB
Readout PCB
GEMs
GEMs
Drift
Drift
NS1 is relaying on the elastic properties of the periphery frame
The screw is pushing the frame before the stretching.
The screw is pulling out the console
Detector Base
Detector Base
NS1
NS2
L. Franconi, A. Marinov, R. De Oliveira Status of no-stretch no-spacer GEM assembly
![Page 4: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/4.jpg)
4
The advantages of NS2
The whole construct progress is driving the screws, it is very easy and very fast, so that we can assemble a detector in 2 hours;
All the GEM foils are self-stretched, the detector doesn’t need support frames anymore. It means that there is no dead area inside the detector, no glue aging and gas flow problems anymore;
All the screws can be released and tightened again, so that any part of the detector is replaceable, it means that the cost of the GEM project can be greatly decreased;
![Page 5: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/5.jpg)
5
3D model of NS2 GEM
![Page 6: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/6.jpg)
6
10M
RGEM1
RGEM2
RGEM3
10M
10M
10M
100k Drift
dI=2mm
dT2=2mm
dT1=2mm
dD=3mm
HV 100k100k100k100k100k
2.2nF2.2nF2.2nF2.2nF
Connection of HV divider & filter
RD=1M
RGEM1=0.55M
RT1=1M
RGEM2=0.5M
RT2=1M
RGEM3=0.45M
RI=1M
Low Pass Filter
![Page 7: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/7.jpg)
7
The temperature of the dividers
HV=4500V
![Page 8: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/8.jpg)
8
Inefficiency estimate
LCR Meter
Capacity of 10cm×10cm GEM foil: ~4.5nF
After each discharge, the GEM sector need recharge, if the protected resistor is 10MΩ, the recharge time is about:
T = 4.5nF × 10MΩ ≈ 45ms this 45ms charging time causes
the inefficiency.
If we require the inefficiency < 1%, we need P×Φ×S×T < 1% , we have:
Here: P: the discharge probability; Φ: the flux of the beam; S: the area of a GEM sector; T: the recharge time(~45ms)
%1SP
T
![Page 9: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/9.jpg)
9
Foil assemblage
![Page 10: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/10.jpg)
10
Gas tight test
![Page 11: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/11.jpg)
11
Detector assemblage
![Page 12: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/12.jpg)
12
HV discharge problem & solution
![Page 13: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/13.jpg)
13
GEM system
![Page 14: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/14.jpg)
14
Signal of 30cm×30cm GEM from Rui
![Page 15: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/15.jpg)
15
We need the Cu-target X-ray tube
![Page 16: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/16.jpg)
16
Ultrasonic bath for detector clean
![Page 17: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China](https://reader031.vdocuments.us/reader031/viewer/2022032804/56649e575503460f94b4f12c/html5/thumbnails/17.jpg)
17
Summary & near future work
System calibration for gain measurement; uniformity test for gain and energy resolution;
Setup the clean system;
The NS2 self-stretching technique is a very efficient way for the GEM detector construction; The HV part on the GEM detector should be sealed;
Summary:
Near future work: