1 item 11, presentation to the tpb, september 15, 2010

20
1 Item 11, Presentation to the TPB, September 15, 2010

Upload: abdiel-merlin

Post on 29-Mar-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Item 11, Presentation to the TPB, September 15, 2010

1

Item 11, Presentation to the TPB, September 15, 2010

Page 2: 1 Item 11, Presentation to the TPB, September 15, 2010

2

Page 3: 1 Item 11, Presentation to the TPB, September 15, 2010

3

Page 4: 1 Item 11, Presentation to the TPB, September 15, 2010

4

Page 5: 1 Item 11, Presentation to the TPB, September 15, 2010

5

Page 6: 1 Item 11, Presentation to the TPB, September 15, 2010

6

Page 7: 1 Item 11, Presentation to the TPB, September 15, 2010

7

Page 8: 1 Item 11, Presentation to the TPB, September 15, 2010

8

Page 9: 1 Item 11, Presentation to the TPB, September 15, 2010

9

Page 10: 1 Item 11, Presentation to the TPB, September 15, 2010

10

Page 11: 1 Item 11, Presentation to the TPB, September 15, 2010

11

Page 12: 1 Item 11, Presentation to the TPB, September 15, 2010

12

Page 13: 1 Item 11, Presentation to the TPB, September 15, 2010

13

Page 14: 1 Item 11, Presentation to the TPB, September 15, 2010

14

Page 15: 1 Item 11, Presentation to the TPB, September 15, 2010

15

Page 16: 1 Item 11, Presentation to the TPB, September 15, 2010

16

Page 17: 1 Item 11, Presentation to the TPB, September 15, 2010

Major Corridor Studies Considering Managed / Priced Lanes

Under Construction1. Capital Beltway in Virginia

HOT Lane Project2. Intercounty Connector (ICC)

Included in CLRP3. I-95/395 HOV/Bus/HOT Lanes

Plan

Corridor Studies4. 14th Street Bridge Corridor 5. South Side Mobility Study6. West Side Mobility Study7. Capital Beltway Study8. I-270/US 15 Multi-Modal

Corridor Study 9. Interstate 66 Studies10. MD 5 Corridor Transportation

Study

Network Analysis Study11. MDOT Maryland Managed

Lanes Study

Page 18: 1 Item 11, Presentation to the TPB, September 15, 2010

Public Acceptability of Regional Road Pricing:

Can it be Designed to Garner Public Support?

• New TPB study will examine the public acceptability of various regional road pricing scenarios

• Funded Through the Value Pricing (VPP) Program of the Federal Highway Administration (FHWA)

• Proposal submitted on November 3, 2009• Grant awarded on August 2, 2010

18

Page 19: 1 Item 11, Presentation to the TPB, September 15, 2010

Conducting the Study

• Working group of 10-14 experts will frame options/scenarios for comprehensive regional road-use pricing

• Consultant(s) will conduct telephone survey and convene stakeholder focus groups to discuss scenarios; results to be significant at regional and jurisdictional levels

• Report results to TPB

19

Page 20: 1 Item 11, Presentation to the TPB, September 15, 2010

Administering the Study• Submitted by VDOT on behalf of TPB to FHWA on

Nov. 3

• TPB will be lead implementing agency, with support from Brookings Greater Washington

• Total Budget = $400,000– $320,000 Federal with $80,000 COG match

• One-year project, beginning Oct. 2010 (estimated)