Page 1: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

Pre-feasibility report

for

Suryadev Alloys & Power Pvt. Ltd. [Expansion]

Sirupuzhalpet Village, Gummidipoondi Taluk Tiruvollur District, Tamilnadu

Page 2: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

1

Chapter - 1

EXECUTIVE SUMMARY

1.1 ABOUT PROJECT PROPONENT

SURYADEV ALLOYS & POWER PVT. LTD. [here in after referred as SAPPL] i s s teel plant,

the fi rst of its kind in India, i s located in New Gummidipoondi , Gummidipoondi Ta luk,

Ti ruvallur District, Tamilnadu, with a production capacity of 1,40,000 TPA of Sponge Iron,

1,40,000 TPA of Bi llets & 1,40,000 TPA of Rol led products. The Company was promoted

by a young entrepreneur Mr. Mukesh Agarwal with his brother Mr. Pankaj Agarwal . The

promoters are in iron and s teel businesses and having good reputation in the market,

which was gained with good business practices . Seeing the huge gap in demand and

supply of Steel; SAPPL proposed to set up a new unit by installing Sponge Iron, Induction

furnace, Rolling mill, Oxygen plant and Power plant (WHRB and Pulverized Coal Fi re

boi ler) at Sirupuzhalpet and New Gummidipoondi Vi l lage, Gummidipoondi Ta luk,

Ti ruvol lur Dis trict, Tami l Nadu.

The fol lowing i s the plant configuration & production capaci ty:

S.No Products Production Capacity as per EC issued on 20

th May 2011

Present Proposal After the Present proposal

(Total Capacities) 1 Bi l lets 12,50,000 TPA 7,00,000 TPA

(4 x 40 MT) 19,50,000 TPA

2 Rol led products 12,00,000 TPA 6,50,000 TPA 18,50,000 TPA 3 Sponge Iron 2,31,000 TPA

(4 x 175 TPD) (This i s yet to be

implemented and same is now proposed to be replaced with 1 X 500

TPD in present proposal )

4,95,000 TPA (3 x 500 TPD)

4,95,000 TPA (3 x 500 TPD)

4 Power Plant WHRB

18 MW 45 MW (3 x 15 MW)

45 MW (3 x 15 MW)

Page 3: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

2

[Instead of exis ting 18 MW]

5 Power Plant CFBC 2 x 80 MW 180 MW (PCF based)

340 MW

6 Ferro Manganese 12000 TPA --- 12000 TPA 7 Si l ico Manganese 24000 TPA --- 24000 TPA 8 Oxygen plant --- 250 MT 250MT

1.2 Total available land with the management i s 164.01 acres , i .e. 119.01 acres i s exis ting

plant and 45 acres of land is adjoining the exis ting land.

1.3 Water i s required for process of manufacturing, cooling and domestic purpose, which will

be met from Ground water source.

1.4 The project cost estimated for the proposed s teel plant i s Rs . 1350 Crores . This i s

inclusive of equipment cost as erected including Civil and structural works, taxes & duties

and contingencies .

As mentioned above the promoters & key personal are experienced, energetic and resourceful

men with good reputation and business links. The promoters are also financially s table & will be

able to execute the project successfully & in specified time & run it profi tabi l i ty & smoothly in

future too.

Page 4: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

3

Chapter - 2 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION

2.1 Identification of project

M/s. Suryadev Alloys & Power Pvt. Ltd. has proposed to go for expans ion of exis ting

s teel plant by setting up DRI Kiln with WHRB power plant, Induction Furnace unit, Rolling

Mi l l uni t, Power plant (PCF based) and Oxygen plant unit at Si rupuzhalpet & New

Gummidipoondi Vi l lage, Gummidipoondi Ta l uk, Ti ruvol lur Dis trict, Tami l Nadu.

2.2 Brief description of nature of the project

SAPPL Unit # 1, i s an existing steel plant and has obtained Environmental Clearance vide

letter F. No. J-11011/11/2010-IA-II (I) dated 20th

May, 2011 with the below mentioned

capaci ty:

S.No. Products Existing EC obtained 1. Sponge Iron ---- 231000 TPA 2. Bi l lets 140000 TPA 1250000 TPA 3. Rol led Products

(Wire Rods & Bars) 140000 TPA 1200000 TPA

4. Power Plant (WHRB) ---- 18 MW 5. Power Plant (CFBC) ---- 2 x 80 MW 6. Ferro Manganese ---- 12000 TPA 7. Si l ico Manganese ---- 24000 TPA

8. Oxygen plant ---- 50 TPD

Now due the huge gap in demand and supply of Steel; SAPPL proposed to set up a new

unit by installing Sponge Iron, Induction furnace, Rolling mi l l , Oxygen plant and Power

plant (WHRB and Pulverized Coal Fire boiler) at Sirupuzhalpet and New Gummidipoondi

Vi l lage, Gummidipoondi Taluk, Tiruvollur District, Tamil Nadu and naming i t as Suryadev

Alloys & Power Pvt. Ltd.

Page 5: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

4

2.3 Need for the project and its importance to the country and or region.

The demand for steel in India is expected to ri se 7 percent in the next f inancia l year

beginning April 1 as compared to the sluggish 5.5 percent projected growth in 2012-13.

The overall outlook for the s teel sector is positive and the demand was likely to pick up in

the next financial year on the back of revival in economic growth and the government's

measures to ease infrastructure investment rules. In fiscal 2012-13, growth in domestic

s teel demand is expected to be around 5.5 percent. Total demand is e xpected to be

around 75 mi llion tonnes, up from 71 mi llion tonnes in 2011-12. In 2013-14, demand is

expected to be higher at around seven percent.

India is currently the world's fourth largest producer of crude s teel after China, Japan and

the US. Major public as well as private sector fi rms including Tata Steel , SAIL and JSW

Steel are expanding production capacity. The s teel production is expected to reach 200

mi l lion tonnes by 2020 as compared to 71 mi ll ion tonnes recorded last year. In s teel

production, India i s expected to leave behind USA and Japan in a couple of years .

However, it will substantially lag behind China that produces almost 700 mi llion tonnes of

s teel per year.

2.4 Employment Generation (Direct and Indirect) due to the project.

The local areas will be benefited by way of generation of employment opportunities ,

increased demand for local products and services. There will be an overall improvement

in the income level of the loca l people.

The project creates employment to about 150 persons once the plant comes to the

operational s tage and for 300 persons during construction s tage. Top priori ty wi l l be

given to locals for Semi-Skilled and Unskilled jobs. With the development of this Plant

there will be lot of scope for more ancillary development, which in turn wi l l benefi t the

nation.

Page 6: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

5

There will be a certain enhancement of educational and medical standards of people in

the s tudy area. There wi l l be genera l ly pos i tive and beneficia l impacts by way of

economic improvements , transportation, aesthetic environment and bus iness

generation. There will be an overall upliftment of socio-economic s tatus of people in the

area with the implementation of the project.

*****

Page 7: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

6

Chapter - 3

PROJECT DESCRIPTION

3.1. Type of Project:

M/s. Suryadev Alloys & Power Pvt. Ltd. as a part of expansion of the proposed project,

they have decided to produce the following product through different routes:

Unit : Description

Sponge i ron : Us ing Iron Ore, Coal and Dolomite as raw materia ls

Ingots / Bi l lets : By us ing DRI, MS scrap as raw materia ls in Induction Furnace

Wire rods / TMT bars : By us ing Ingots/ Billets as raw materials in Rol l ing mi l l

Power generation : By uti lizing hot waste flue gases from DRI kilns in WHRB.

By uti l i zing coal fines in Pulvervised coal boi ler.

Oxygen gas : By a i r separation process based on low pressure cryogenic cycle and double column rectification system for puri ty of various gases in order to meet the requirement of Oxygen, Nitrogen and Argon.

3.2 General Location:

Proposed project will be establishment in the existing plant premises and land adjacent

to the existing plant. Total land envisaged for the entire project is 164.01 acres (Exis ting

plant – 119.01 acres + adjacent land – 45.0 acres). The proposed s teel plant wi l l be

installed at Sirupuzhalpet and New Gummidipoondi Vi l lage, Gummidipoondi Ta luk,

Ti ruvol lur Dis trict, Tami l Nadu.

Exis ting Plant (119.01 acres) UNIT # 1

Survey no.s 281 to 290, 293-296, 297/2, 297/1A to 297/1D, 298 of New Gummidipoondi Vi l lage and 78,80 to 111 of Si rupuzhalpetta i Vi l lage

Proposed land (45 acres) UNIT # 2

Survey no.s 287/1A, 287/2, 287/3, 290/1, 291/1A, 291/1B, 291/4, 291/5 of New Gummidipoondi Vi l lage and 78/1, 78/2A1, 78/2A2, 78/2C, 78/2D, 78/2E, 81/1B, 81/2A, 81/2B, 81/2C of Si rupuzhalpetta i Vi l lage

The location map is shown below:

Page 8: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

7

Page 9: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

8

3.3 Details of alternate sites considered:

No a l ternative site have been examined, as proposed expans ion wi l l be carried in the

exis ting plant premises and partly in the land adjacent to the exis ting plant.

3.4 Size or magnitude of operation.

The plant configuration & production capacity of proposed expans ion of s teel pl ant i s

given as below:

S.No Products Production Capacity as per EC issued on 20th May 2011

Present Proposal After the Present proposal

(Total Capacities)

1 Bi l lets 12,50,000 TPA 7,00,000 TPA (4 x 40 MT)

19,50,000 TPA

2 Rol led products 12,00,000 TPA 6,50,000 TPA 18,50,000 TPA 3 Sponge Iron 2,31,000 TPA

(4 x 175 TPD) (This i s yet to be

implemented and same is now proposed to be replaced with 1 X 500

TPD in present proposal )

4,95,000 TPA (3 x 500 TPD)

4,95,000 TPA (3 x 500 TPD)

4 Power Plant WHRB

18 MW 45 MW (3 x 15 MW)

[Instead of exis ting 18 MW]

45 MW (3 x 15 MW)

5 Power Plant CFBC 2 x 80 MW 180 MW (PCF based)

340 MW

6 Ferro Manganese 12000 TPA --- 12000 TPA 7 Si l ico Manganese 24000 TPA --- 24000 TPA

8 Oxygen plant --- 250 MT 250MT

3.5 Manufacturing Process and Flow Diagram:

3.5.1 Manufacturing Process Sponge Iron

For the direct reduction of iron ore, the main furnace used is Rotary Ki ln. The rotary ki ln

i s a refractory l ines vessel on which several blowers are mounted. From the blowers , a i r

pipes go through the shell and refractory. Vertically and delivers the required amount of

a i r required for process, axially. The kiln has conical outlet and inlet holds the material in

the ki ln. Ki ln i s placed in a s lope from feed end s ide at a s lope of 2 ½ degrees .

Page 10: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

9

Iron ore, Coal, Dolomite/ Limestone is fed in the weighed quantity and the kiln is rotated

at the speed of about 0.5 rpm. A temperature between 1000OC to 1050 OC is maintained

in about 70% of the ki ln length towards discharge and s ide for required reaction.

After the reaction, the product is taken into an indirect cooling drum cooler. The product

i s cooled to 100OC and taken for product separation. The product screened into lumps

and fines i s separated from the coal ash and coal char and th en taken for fina l use.

The waste gas from the kiln contain lot of combustible l ike coal volati les , unused CO,

about 10 to 12% carbon particles and lot of other dust. The gas i s taken to an after

burner chamber and after the combustibles are burnt, the gas is cooled to about 160OC

ei ther passing through a gas cool ing tower or through a waste heat recovery boi ler

before going to Stack via ESP and ID fans .

The construction of Kiln and Cooler i s made in such a way that no outside air i s a l lowed

to go into the system. The outs ide a i r i f goes to the ki ln, re -oxidizes the product

ul timately upsetting the temperature profile. To avoid this, ID fan damper is throttled to

maintained positive pressure in the Ki ln. The pressure of about +5mm water column is

mainta ined at Ki ln fi ring hood.

The rotational speed of the ki ln i s adjusted as per the feed rate and percentage of

metallization. The % of inclination, rotational speed, the length of time the materia l i s

exposed to atmosphere, the kiln temperature, are all to be taken into consideration. So

the ki ln has three functions :

1. It i s heat exchanger.

2. It i s a vessel for Chemical reaction.

3. It i s a conveyor of sol ids .

Page 11: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

10

Figure of manufacturing process is shown below:

Page 12: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

11

3.6 Raw material requirement

3.6.1 Raw Material and its consumption:

Raw Material Consumption

(TPA)

For manufacturing of Sponge Iron

Iron Ore 5,28,000

Coal Indian 6,43,500

Imported 3,96,000

Dolomite 16,500

For manufacturing of Ingots/ billets

Sponge Iron 7,00,000

Scrap 1,00,000

Ferro Al loys 10,500

For manufacturing of TMT bars / Structural steel / Wire rod &

Bars

Steel billets / Ingots 6,82,500

For Generation of Power through Pulverized Coal Fired boiler

[180 MW]

Coal Indian 9,50,400

Imported 5,82,120

For Oxygen plant

Air 250 MT

3.6.2 Mode of Transport for Raw materials and finished products:

The aforesaid raw materials are transported through ra i l up to the nearest avai lable

s iding and thereafter the same will be transported to the s ite through tarpaulin covered

trucks .

3.6.3 Market of Final Products:

It i s proposed to install s teel plant with specia l rol led products faci l i ty. As the s teel/

power sector had huge demand and supply gap. Hence marketing of the product has no

problem.

Page 13: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

12

3.8 Availability of water its source, Energy / power requirement and source:

3.8.1 Water Requirement and its sources:

Water required for the expansion project will be 1950 KLD. The desired quantity of water

wi l l be drawn met from Ground water resource. Water drawl permission CGWA wi l l be

obtained.

3.8.2 Sources of Energy/ Power and its sources:

The type of Energy/ power sources for proposed s teel plant i s given as below:

S.No Units

Sources Energy/ Power

Its origin

1. Sponge Iron Electric Power TNEB grids/CPP

3.9 Generation and disposal of Wastes [Waste Water and Solid Wastes]:

3.9.1 Waste Water Generation:

There will be no effluent generation in the DRI as closed ci rcui t cool ing system wi l l be

adopted.

Effluent from power plant such as boiler blowdown, DM Plant regeneration. Initia l ly the

acidic and alkaline effluent s treams coming from cation and anion units of DM plant wi l l

be neutralized in a neutrali zation tank. Service water wi l l then pass through an Oi l

Separator to remove the oil content in the effluent. The pH of Boiler blowdown wi l l be

between 9.5 and 10.5. Hence this effluent s tream shall be neutralized in a neutralization

tank before mixing with other effluent streams. Al l these effluent streams will be mixed

in a Central Monitoring Basin along with cooling tower blowdown. Treated effluent wi l l

be used for ash conditioning, dust suppress ion and for greenbelt development.

The sanitary wastewater will be treated in septic tank followed by soak pit. Hence there

wi l l not be any chance of contamination of water bodies due to proposed project.

Page 14: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

13

3.9.2 Solid Waste Generation and its disposal

Dolochar generated from the Sponge i ron will be uti l i zed in the Power plant, Fly Ash

generated will be given to Asbestos Cement sheet units . Bottom ash wi l l be given to

Cement / Brick manufacturers etc. are the solid wastes to be generate due to operation

of proposed s teel plant. The following table depicts the expected quanti ties of various

sol id wastes :

The fol lowing table depicts the expected quanti ties of various sol id wa stes :

S.No Solid wastes Quantity 1. Dolochar Uti l i zed in exis ting FBC boi ler 2. Accretion slag Wi l l be Used in Road construction 3. Wet scraper s ludge Wi l l be given to brick manufacturers

4. Ash & Dust from DRI Wi l l be given to Cement plant

Page 15: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

14

Chapter - 4

SITE ANALYSIS

4.1 Connectivity.

The proposed site i s well connected with Rail and Road connectivi ty. The nearest railway

s tation is Gummdipundi RS. The following table gives brief regarding connectivi ty of the

proposed s i te:

Component Description Road : NH – 5 at dis tance of 2.5 Kms. Rai l : Nearest s tation – 2.7 km is Gummdipundi RS Air : Chennai – 45 km

Sea Port : Chennai – 45 km

4.2 Land Form, Land use and Land ownership.

4.2.1 Land Form

Present land use i s a l ready converted for industria l purpose.

4.2.2 Land Use of the Project Site

Present land use i s a l ready converted for industria l purpose.

4.3 Topography

Topography of land is more or less flat terra in without much undulation.

4.4 Existing land use pattern:

4.4.1 Land use pattern of the Project site:

Total land in possession of management is 164.01 acres i.e. 119.01 acres of existing plant

and 45 acres of land adjoining land.

4.4.2 Environmental Setting of the Project Site:

The following is the environmental setting within the 10 Km. radius of the project site:

The proposed project area does not fall under the industrial areas / cluster, w hich

are l i s ted in MoEF office memorandum dated 13th January 2010 and i ts

subsequent amedments .

Tandalacheri is the nearest habitation at a dis tance of 1.0 Km. from the project

s i te.

Page 16: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

15

There are no National Parks, Wild life Sanctuaries and Bird Sanctuaries within 10

Km. radius of the project s i te.

No forest land is involved in the proposed s i te.

Arani river flows at dis tance of 3.4 Kms. from the project s i te.

Gumadipoondi Railway Station is at a distance of 3.0 Kms. from the project s i te.

Palavakkam RF exis ts within 10 Km. radius of the project s i te.

Gumadipoondi Industrial area is present within 10 Km. radius of the project s i te.

There are no habitations in the land earmarked for the project. Hence no

rehabi l i tation and resettlement i s involved.

4.5 Existing Infrastructure

Al l required infrastructure i s prevai l ing in the s i te.

4.6 Soil classification

The soils in the area are generally of clayey loam types with sandy loam soi l in some

areas .

4.7 Climatic data from secondary sources

The cl imatic condition of this area is semi-arid. The maximum temperature goes upto

48ºC during summer in the month of May and the minimum temperature goes down to

10.0ºC during winter in the month of January-February. The winds in the area are light to

moderate during summer and winter. The rainfall of the district i s 1000 mm. General ly

l ight to moderate winds prevails throughout the year. Winds were l ight and moderate

particularly during the morning hours. While during the afternoon hours the winds were

s tronger.

Page 17: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

16

Chapter - 5

PLANNING BRIEF

5.1 Planning Concept:

M/s. Suryadev Alloys & Power Pvt. Ltd. has proposed to go for expansion of existing s teel

plant by setting up DRI Kiln with WHRB power plant, Induction Furnace unit, Rolling Mi l l

uni t, Power plant (PCF based) and Oxygen plant unit at Si rupuzhalpet & New

Gummidipoondi Vi l lage, Gummidipoondi Ta luk, Ti ruvol lur Dis trict, Tami l Nadu.

5.2 Population Projection:

There are no major human settlements in the vicinity of the project s ite. The manpower

requirement will be sourced from the local areas to the extent possible; hence not much

of settlement of outside people in the area. However population concentration may

increase around the project s i te due to increase in anci l lary activi ties .

5.3 Land use planning:

Proposed project will be establishment in the existing plant premises and land adjacent

to the existing plant. Total land envisaged for the entire project is 164.01 acres (Exis ting

plant – 119.01 acres + adjacent land – 45.0 acres). The proposed s teel plant wi l l be

installed at Sirupuzhalpet and New Gummidipoondi Vi l lage, Gummidipoondi Ta luk,

Ti ruvol lur Dis trict, Tami l Nadu.

Exis ting Plant (119.01 acres) UNIT # 1

Survey no.s 281 to 290, 293-296, 297/2, 297/1A to 297/1D, 298 of New Gummidipoondi Vi l lage and 78,80 to 111 of Si rupuzhalpetta i Vi l lage

Proposed land (45 acres) UNIT # 2

Survey no.s 287/1A, 287/2, 287/3, 290/1, 291/1A, 291/1B, 291/4, 291/5 of New Gummidipoondi Vi l lage and 78/1, 78/2A1, 78/2A2, 78/2C, 78/2D, 78/2E, 81/1B, 81/2A, 81/2B, 81/2C of Si rupuzhalpetta i Vi l lage

5.4 Amenities/Facilities.

Faci lities like canteen, rest room and indoor games faci l i ties wi l l be provided in the

proposed plant as basic facilities to workers. No other additional facilities are proposed.

Page 18: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

17

Chapter - 6

PROPOSED INFRASTRUCTURE

6.0 Proposed Infrastructure

As mentioned earlier that the tentative land area s tatement of proposed 164.01 Acres of

project s i te i s given as below:

Item Area in Acres Bui lt up area 70.00 Internal roads 12.00

Other Anci llary Area 8.00 Storage yard 11.00 Greenbelt 47.00 Open area 16.01 Total land 164.01

6.1 Industrial Area (Processing Area).

The main plant area comprises of Furnace sheds, Rolling mill area, raw materia l s torage

and product s torage etc.

6.2 Residential Area (Non Processing Area).

No colonization is proposed; however facilities like canteen, rest room and indoor games

faci lities will be provided in the proposed plant and one Admin building is also proposed.

6.3 Green Belt.

About 1/3rd of tota l land avai labi l i ty i s reserved for pl antation.

6.4 Social Infrastructure.

Social infrastructure will be developed as per need based in the Villages of the vicini ty of

the project.

6.5 Connectivity:

The proposed site i s well connected with Rail and Road connectivi ty. The nearest railway

s tation is Gummdipundi RS. The following table gives brief regarding connectivi ty of the

proposed s i te:

Page 19: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

18

Component Description Road : NH – 5 at dis tance of 2.5 Kms. Rai l : Nearest s tation – 2.7 km is Gummdipundi RS Air : Chennai – 45 km Sea Port : Chennai – 45 km

6.6 Drinking Water Management

Drinking water supply wi l l be mainta ined at the proposed project s i te.

6.7 Sewerage System

Domestic effluent collected through toilet blocks will be collected through well designed

sewer network and send to Septic tanks fol lowed by soak pi ts .

6.8 Industrial Waste Management

There will be no effluent generation in the DRI as closed ci rcui t cool ing system wi l l be

adopted.

Effluent from power plant such as boiler blowdown, DM Plant regeneration. Initia l ly the

acidic and alkaline effluent s treams coming from cation and anion units of DM plant wi l l

be neutralized in a neutrali zation tank. Service water wi l l then pass through an Oi l

Separator to remove the oil content in the effluent. The pH of Boiler blowdown wi l l be

between 9.5 and 10.5. Hence this effluent s tream shall be neutralized in a neutralization

tank before mixing with other effluent streams. Al l these effluent streams will be mixed

in a Central Monitoring Basin along with cooling tower blowdown. Treated effluent wi l l

be used for ash conditioning, dust suppress ion and for greenbelt development.

The sanitary wastewater will be treated in septic tank followed by soak pit. Hence there

wi l l not be any chance of contamination of water bodies due to proposed project.

6.9 Solid Waste Management.

Dolochar generated from the Sponge i ron will be uti l i zed in the Power plant, Fly Ash

generated will be given to Asbestos Cement sheet units . Bottom ash wi l l be given to

Page 20: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

19

Cement / Brick manufacturers etc. are the solid wastes to be generate due to operation

of proposed s teel plant. The following table depicts the expected quanti ties of various

sol id wastes :

The fol lowing table depicts the expected quanti ties of various sol id wastes :

Sr. No Solid wastes Quantity 1. Dolochar Uti l i zed in exis ting FBC boi ler 2. Accretion slag Wi l l be Used in Road construction 3. Wet scraper s ludge Wi l l be given to brick manufacturers 4. Ash & Dust from DRI Wi l l be given to Cement plant

6.10 Power requirement & its source.

Power required for proposed steel plant will be sourced from nearby grid ini tia l ly, later

from CPP.

Page 21: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

20

Chapter - 7

REHABILITATION & RESETTLEMENT (R & R) PLAN

7.0 Rehabilitation and Resettlement Scheme:

No rehabilitation and resettlement is required as there are no habitations in the in the

Project s i te.

Page 22: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

21

Chapter - 8

PROJECT SCHEDULE & COST ESTIMATES

8.1 Likely date of start of construction:

Construction activity pertaining to installation of proposed Steel Plant wi l l be s tarted

within 24 months from the date of Environment Clearance.

8.2 Estimated project cost:

The estimated project cost for the proposed is about Rs . 1350/- crores , i ts breakup is

given as below:

Sr. No. Particulars Amount

(Rs. in Crores) 1. Land & Si te Dev. Charges. 80 2. Bui lding (Factory + Office) 50 3. Plant and Machinery 900

4. Electrical Installation 105 5. Pol lution Control Equipments 105 6. Other Fixed Assets 95 7. Other activities 15

Total 1350

Page 23: 1 Executive Summaryenvironmentclearance.nic.in/writereaddata/Online/...Pre-feasibility Report 1 Chapter - 1 EXECUTIVE SUMMARY 1.1 ABOUT PROJECT PROPONENT SURYADEV ALLOYS & POWER PVT

Pre-feasibility Report

22

Chapter - 9

ANALYSIS OF PROPOSAL

9.1 Financial and social benefits:

With the implementation of the proposed project, the socio-economic s tatus of the local

people will improve substantially. The land rates in the area will improve in the nearby

areas due to the proposed activity. This will help in upliftment of the social status of the

people in the area. Educational insti tutions wi l l a lso come -up and wi l l lead to

improvement of educational s tatus of the people in the area. Primary health centre wi l l

a lso be developed by us and the medica l faci l i ties wi l l certa inly improve due to the

proposed project.

9.2 Socio-Economic Developmental Activities

The management i s committed to upl i ft the s tandards of l iving of the vi l lagers by

undertaking fol lowing activi ties / respons ibi l i ties as the part of Corporate Socia l

Respons ibi l i ty.

Health & hygiene

Drinking water

Education for poor

Vi l lage roads

Lighting

HEALTH & HYGINE

Personal and domestic hygiene,

Maintaining clean neighborhood,

Weekly health camps offering free -check up & medicines

Ambulance services

Education & drug de -addiction, a ids .

DRINKING WATER

Making drinking water avai lable at centra l i zed locations in the vi l lage,

SUPPORTING EDUCATION

Providing books to a l l poor chi ldren,

Conducting annual sports festiva l in the vi l lage schools ,