1 ensuring a 'flexible use of airspace'…. patrick delmouzée head of atm unit dss/cm...
TRANSCRIPT
1
Ensuring a 'Flexible Use of Airspace'….Ensuring a 'Flexible Use of Airspace'….
Patrick DelmouzéeHead of ATM UnitDSS/CMEUROCONTROL
Moving towards an Integrated ASM/ATFCM/ATS Approach
EUROCONTROL HQ, 20-21 Sep 2012
Current ASM processCurrent ASM process
2
Flexible Use of Airspace (FUA) Concept
Flexible use of airspace is an airspace management concept described by the International Civil Aviation Organisation (ICAO) and developed by the European Organisation for the Safety of Air Navigation (Eurocontrol), according to which airspace should not be designated as either purely civil or purely military airspace, but should rather be considered as one continuum in which all users’ requirements have to be accommodated to the maximum extent possible.
3
ASM process Network Manager
National AMC
Mili
tary
plan
ning
NEGOTIATION
Military UsersCivil Service Providers
Civil usersCivil demand
Network Consistency
NATIONAL PLAN
4
Enablers at Local, FAB and Network level
• Consistent Airspace Data
• National AMCs
• Sharing airspace demands at regular times(from snapshots to rolling airspace plans)
• Collaborative Decision Making (CDM)
• System support
5
Ensuring a 'Flexible Use of Airspace'….Ensuring a 'Flexible Use of Airspace'….
Current ASM/ATFCMCurrent ASM/ATFCM
ANDERS HALLGRENManager ASM proceduresDNM/COO/NOM/OPL/PROEUROCONTROL
Moving towards an Integrated ASM/ATFCM/ATS Approach
EUROCONTROL HQ, 20-21 Sep 2012
Processes and Interfaces
6
Click to edit Master title styleExploit airspace
availabilityConsistent
application of FUA
Safe, efficient and accurate
data flows
Rolling UUPProcedure 2&3EAWCDR network TRA/TSA clarification
FL publication CBA designationSupport StakeholdersCDR inconsistencies
B2BNOP portalCIAMASM Support Systems
ASM Improvements Initiative
7
Click to edit Master title styleDeliverables Achieved
8
Click to edit Master title styleImproved Processes and Procedures
Procedure 1: –At pre-tactical level assess impact by
expected airspace allocation
• Procedure 2: –Better exploitation of airspace
opportunities on the day of operation
9
Click to edit Master title styleImproved Processes and Procedures
Procedure 3– Enhanced flexibility on the day of operations
• ATCO: – Tactical rerouting Rerouting via IFPS reprocessing
= lower workload
• AO: – less overbooking on D-1 more capacity, – predictability, – less tactical actions by air crew
10
Click to edit Master title style2012 ASM/ATFCM Process
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
Netw
ork im
pact
assessm
ent
NM
AUP
12.00-13.00
UUP 1
Notification
UUP 2
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
FPLsReact (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
CF
MU
EN
V
Database U
pdate
eAUP
Coo
rdin
ation
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
11
Click to edit Master title style2012 ASM/ATFCM Process
Netw
ork im
pact
assessm
ent
Coo
rdin
ation
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
NM
AUP
12.00-13.00
UUP 1
Notification
UUP 2
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
FPLsReact (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
CF
MU
EN
V
Database U
pdate
eAUP
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
Network impact assessment
Coordination
12
Click to edit Master title style2012 ASM/ATFCM Process
FPLsC
FM
U E
NV
D
atabase U
pdate
eAUP
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
Netw
ork im
pact
assessm
ent
NM
AUP
12.00-13.00
UUP 1
Notification
UUP 2
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
React (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
Coo
rdin
ation
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
CFMU ENV Database Update
eAUP
FPLs
13
Click to edit Master title style
UUP 2
2012 ASM/ATFCM Process
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
Netw
ork im
pact
assessm
ent
NM
AUP
12.00-13.00
UUP 1
Notification
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
FPLsReact (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
CF
MU
EN
V
Database U
pdate
eAUP
Coo
rdin
ation
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
UUP 1 UUP 2
14
Click to edit Master title style2012 ASM/ATFCM Process
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
Netw
ork im
pact
assessm
ent
NM
AUP
12.00-13.00
UUP 1
Notification
UUP 2
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
FPLsReact (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
CF
MU
EN
V
Database U
pdate
eAUP
Coo
rdin
ation
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
Notification Notification
15
Click to edit Master title style2012 ASM/ATFCM Process
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
Netw
ork im
pact
assessm
ent
NM
AUP
12.00-13.00
UUP 1
Notification
UUP 2
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
FPLsReact (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
CF
MU
EN
V
Database U
pdate
eAUP
Coo
rdin
ation
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
Rerouting Proposals
to AOs
Rerouting Proposals
to AOs
16
Click to edit Master title style2012 ASM/ATFCM Process
Airspace
Users
AMCs
FMP
AO
Draft AUP
Time
Axis(Summer) 14.00 15.00
15.00-16.00
17.00 17.1512.00 09.00 09.15
Netw
ork im
pact
assessm
ent
NM
AUP
12.00-13.00
UUP 1
Notification
UUP 2
Notification
Earlier area
deactivation
Coordin. with other
Users
D-1 D
Final airspace Request
> 12.00
Earlier area
deactivation
>08.00
FPLsReact (CGH, CNL or
new FPL)
Rerouting Proposals to AOs
17.15> 09.15>
React (CGH, CNL
or new FPL)
Coordin. with AMC
CFMU ENV
UpdateRerouting Proposals to AOs
CFMU ENV
Update
Coordin. with other
Users
Coordin. with AMC
Final CDR
Request
CF
MU
EN
V
Database U
pdate
eAUP
Coo
rdin
ation
Draft UUP 1 N
etwo
rk an
d Lo
cal a
ssessm
en
ts
16.0016.00-17.00
Coordination w
ith Users
08.00
Draft UUP
2
08.00-09.00
Netw
ork a
nd
Loca
l asse
ssme
nts
Coordination w
ith Users
Coordination w
ith A
MC
Coordination w
ith A
MC
Requests fine-tuning
(D)
Requests fine-tuning
(D)
13.00-14.00
React (CHG, CNL
or new FPL)
React (CHG, CNL
or new FPL)
17
Click to edit Master title styleUUP PUBLICATION D-1
16.00 17.00 18.00 19.00 20.00 06.00
D-1 D-OPS
Winter time
18
Click to edit Master title styleUUP PUBLICATION D-OPS
07.00 08.00 09.00 10.00 11.00 12.00 20.00
D-OPS
Winter time
19
Click to edit Master title style
CDR number of segments
0
1000
2000
3000
4000
2007 2008 2009 2010 2011
CDR2
CDR1/2
CDR1
CDR Network
20
Click to edit Master title styleUptake CDRs
CDR segments used
0
100
200
300
400
500
600
700
800
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2007
2008
2009
2010
2011
21
Click to edit Master title style
UUP vs. AUP CDR1 closure time reduction
-200
-175
-150
-125
-100
-75
-50
-25
0
25
Dec
-01
Dec
-02
Dec
-03
Dec
-04
Dec
-05
Dec
-06
Dec
-07
Dec
-08
Dec
-09
Dec
-10
Dec
-11
Dec
-12
Dec
-13
Dec
-14
Dec
-15
Dec
-16R
edu
ced
ho
urs
of
clo
sure
Rolling UUP
22
Click to edit Master title style
UUP vs. AUP CDR2 opening time increase
-2000
-1750
-1500
-1250
-1000
-750
-500
-250
0
250
Dec
-01
Dec
-02
Dec
-03
Dec
-04
Dec
-05
Dec
-06
Dec
-07
Dec
-08
Dec
-09
Dec
-10
Dec
-11
Dec
-12
Dec
-13
Dec
-14
Dec
-15
Dec
-16In
crea
sed
hour
s of
ope
ning
Rolling UUP
23
Click to edit Master title styleUUP Publication March 2012UUP Publication March 2012
Not Using CIAM
Using UUP
Not Using UUP
24
Click to edit Master title styleImproved Economies
166592
262342
233066
257104
278695
0
50000
100000
150000
200000
250000
300000
Tons
fuel
2007 2008 2009 2010 2011
CDR fuel savings
25
Click to edit Master title styleEnvironmental Benefits
524765
826058
734977
809875868657
0
100000
200000
300000
400000
500000
600000
700000
800000
900000
Tons
CO
2
2007 2008 2009 2010 2011
CDR CO2 emissions savings
26
Click to edit Master title styleEnsuring a 'Flexible Use of Airspace'….
Thank you for attention!