What we’ve achieved in Luton

•The team

•Caseloads

•Training and education

•Funding from WDC

•Links & modernisation

•Patient database in place

•Retrieval of data

Page 3: 1 Critical Interfaces within the Project Luton NHS tPCT

What we know about our patients?

3% of >65’s make up 47% of total emergency admits

Page 4: 1 Critical Interfaces within the Project Luton NHS tPCT

Key challenges faced in Luton

•Pace

•Funding

•Data capture

•Building key relationships

•Limited resources

Page 5: 1 Critical Interfaces within the Project Luton NHS tPCT

5

Key intervention – GP PracticesKey intervention – GP Practices

Advanced Primary

Nurse

GP’s

Receptionists

District Nurse

PracticeNurse

Practice Manager

Practice staff

Page 6: 1 Critical Interfaces within the Project Luton NHS tPCT

6

What we did….What we did….

Page 7: 1 Critical Interfaces within the Project Luton NHS tPCT

Ups and Downs

•How they reacted

•How we felt

Page 8: 1 Critical Interfaces within the Project Luton NHS tPCT

Process

(The Sell)

•Collaborative meetings

•1-2-1 meetings

•Lead Nurse involvement

•Feedback

•Action Learning

•Celebrating Success Conference

•Gave it some time

Page 9: 1 Critical Interfaces within the Project Luton NHS tPCT

How are we getting on• Joint visits

• The system works!!!!

• referrals to APN from GP

• referrals to DN from APN

• messages being passed on

• Smiles

• Invite to xmas party!!!

Page 10: 1 Critical Interfaces within the Project Luton NHS tPCT

10

Other Key Primary Care InterfacesOther Key Primary Care Interfaces

Social services• Home care on prescription• training

Out of hours• Patient identification• Communications

                             

Page 11: 1 Critical Interfaces within the Project Luton NHS tPCT

11

Walk in Centre

Treatment Centre

Evercare Learning & Research

Primary Care Contractors

Page 12: 1 Critical Interfaces within the Project Luton NHS tPCT

12

Walk In

Centre

Evercare Evercare ModelModel

•P2•Autonomy

•Patient Choice•Nurse Led Services

•Training & Development Luton Treatment

Centre

Ref

erra

l & m

onito

ring

Referral & diagnosis

Referral &

Rehab.

The Future of the WorkforceThe Future of the Workforce

Page 13: 1 Critical Interfaces within the Project Luton NHS tPCT

13

Tre

atm

en

t C

en

tre

Walk

in C

entre

Everc

are

Nurse-led

Nurse

-led

Single

enco

unte

r

Acute

& m

inor i

njury

& ailm

ents

Main

ly 1:

1

Drop-

in with

som

e

book

ed g

roup

ses

sions

Self-re

ferra

l and

prim

ary c

are

refe

rral

Long-term case management

Prevention & management of chronic conditions

1:1 and with carers/families

Case management: anticipatory care

Primary and secondary care Ter

m a

ppr

oach

Sho

rt/lo

ng t

erm

Chr

onic

dis

ease

Mul

ti-di

scip

linar

y as

sess

men

tM

ainl

y bo

oked

app

oin

tmen

tsS

elf-

refe

rral

and

prim

ary

& s

econ

dar

y ca

re

3 Dimensional Integration

Page 14: 1 Critical Interfaces within the Project Luton NHS tPCT

14

GP

APN/P

PN/PTrained, Skilled Staff

Cadet Scheme

Modern Practice Underpinned/Enabled

by Education

Skills Escalator

“High Level Practice”

Page 15: 1 Critical Interfaces within the Project Luton NHS tPCT

What we learned•Role definition & clarity

•How people react to change

•Don’t avoid difficult situations

•Don’t underestimate how difficult this is for all involved

•It takes time – well 8 months!!!

•Humour can be powerful