1 copyright © 2013 tech mahindra. all rights reserved. 1
TRANSCRIPT
1Copyright © 2013 Tech Mahindra. All rights reserved. 1
2Copyright © 2013 Tech Mahindra. All rights reserved.
2013
Tech Mahindra
Business Continuity ManagementBCP Educator Pack for Support Functions
3Copyright © 2013 Tech Mahindra. All rights reserved.
Confidential © Tech Mahindra Limited – 2013
All rights reserved
The contents of this document are provided in confidence to client name
No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, electronic, mechanical, recording,
photocopying or otherwise without the prior permission of Tech Mahindra
Limited
4Copyright © 2013 Tech Mahindra. All rights reserved.
BCM - Orientation Walk Thru
Need for BCP
BCM standard and Terminologies
Disaster Mgt and Org Structure – communication flow
Roles & Responsibilities
Test Conduct & Assessment
Exhibits – BIA and BCP
5Copyright © 2013 Tech Mahindra. All rights reserved.
Concept of BCP
BCP (Business Continuity Plan) is- Business Continuity Plan is a documented collection of procedures and information that is
developed, compiled and maintained in readiness for use during a disaster to enable an organization to continue to deliver its critical activities at an acceptable predefined level.
A process to minimize the impact of a major disruption to normal operations. A process to restore normalcy to business as soon as possible after a crisis. It is phase of crisis management that follows immediate actions taken to protect life and
property.
Note- BCP is the Least Expensive Insurance any company can have.
6Copyright © 2013 Tech Mahindra. All rights reserved.
Need for BCP in today’s world
The need for BCP in an organization arises-
– To identify the impact of potential loss, to formulate and implement viable recovery plans that ensure continuity of services.
– To minimize the loss of productivity in case of any calamity and to ensure faster resumptions of operations from alternate site.
– To ensure full commitment on the safety of employees, to protect company assets & to provide a high level of service to clients and users.
Note-
We live in a world where every minute of downtime can result in huge loss in business
7Copyright © 2013 Tech Mahindra. All rights reserved.
ISO22301:2012 Standard for BCM
Why ISO22301 ?
ISO 22301 - Societal Security Business Continuity Management Systems, the world’s first international standard for Business Continuity Management (BCM), has been developed to help organizations minimize the risk of such disruptions.
8Copyright © 2013 Tech Mahindra. All rights reserved.
ISO22301:2012 Standard for BCM
ISO 22301:2012 standard is :
- an upgrade from BS 25999 and is expected to become a leading Business Continuity framework worldwide. TechM is certified for BS25999 since 2009. - officially recognized and accepted worldwide internationally by national standards institutes in 163 countries. Whereas BS 25999 is officially recognized in UK only; but implemented worldwide. - puts a much greater emphasis on setting the objectives, monitoring performance evaluation and metrics – aligning BC to top management strategic thinking -The biggest similarity is that all core business continuity elements in BS 25999-2 are present in ISO 22301 too: business continuity policy, business impact analysis, risk assessment, business continuity strategy, business continuity plans, exercising and testing etc.
9Copyright © 2013 Tech Mahindra. All rights reserved.
Key differentiators of ISO22301:2012 (earlier BS25999:2007)
Business Continuity Policy linkage with Organization objectives and Overall Organization Risk Management strategy.
Greater Emphasis on setting objectives , monitoring performance and Metrics.
Aligning BC to top management strategic thinking.
External and Internal Issues to be considered while determining the Scope of BCMS.
Communicate Business Continuity Policy to Organization.
10Copyright © 2013 Tech Mahindra. All rights reserved.
Top Management leadership shall be more demonstrable and active in BCM.
BCM requirements to have procedures which identify Legal and Regulatory requirements.
Documented Recovery procedures to restore and return business activities to normal state.
Key differentiators of ISO22301:2012 (earlier BS25999:2007)
11Copyright © 2013 Tech Mahindra. All rights reserved.
Basic Terms Used in the ISO 22301 Standard
1. Maximum Acceptable Outage (MAO) – the maximum amount of time an activity can be disrupted without incurring unacceptable damage (also Maximum Tolerable Period of Disruption – MTPoD) : MAO: New term
2. Minimum Business Continuity Objective (MBCO) – the minimum level of services or products an organization needs to produce after resuming its business operations (~MOL) : : MBCO : New term
• Recovery Time Objective (RTO) – the pre-determined time at which an activity must be resumed, or resources must be recovered
• Recovery Point Objective (RPO) – maximum data loss, i.e., minimum amount of data that needs to be restored
12Copyright © 2013 Tech Mahindra. All rights reserved.
Fitting Business Continuity in Overall Management
Business continuity is part of overall risk management in a company,
with overlapping areas of: Information Security
management IT management
13Copyright © 2013 Tech Mahindra. All rights reserved.
Mandatory Implementation Steps for ISO 22301
1. Management support2. Identification of requirements3. Business continuity policy & objectives4. Support documents for management system5. Risk assessment & treatment6. Business impact analysis7. Business continuity strategy8. Business continuity plan9. Training & awareness10. Documentation maintenance to be continued …
14Copyright © 2013 Tech Mahindra. All rights reserved.
Mandatory Implementation Steps for ISO 22301
11. Exercising & testing12. Post-incident reviews13. Communication with interested parties14. Measurement and evaluation15. Internal audit16. Corrective actions17. Management review
15Copyright © 2013 Tech Mahindra. All rights reserved.Company Confidential15
BCM Overview
16Copyright © 2013 Tech Mahindra. All rights reserved.
Interoperability in Continuity Terms:
1. Everyone speaking the same language2. Everyone adhering to the same standard3. Everyone employing the same broad processes4. Everyone able to be judge against common criteria.
17Copyright © 2013 Tech Mahindra. All rights reserved.
Concept of Business Continuity Management (BCM)
Business Continuity Management (BCM) is a process to identify potential impacts that threaten an organisation and provides a framework for building resilience and the capability for an effective response which safeguards the interests of its key stake holders, reputation, brand and value creating activities.
Business Continuity Management involves managing the critical Business process for Functions, Projects IBU/SSU/CDU’s which can be maintained or restored in a timely fashion in accordance with the agreed SLA in the event of disruption arising from internal or external events.
The purpose of BCM is to minimize the financial, legal, reputational or other material consequences arising from disruption.
It involves achieving business continuity plan and incident management plan in the simplest, easiest way.
18Copyright © 2013 Tech Mahindra. All rights reserved.
Tech Mahindra BCMS Process
RA- Risk AssessmentBC- Business Continuity
19Copyright © 2013 Tech Mahindra. All rights reserved.
Business Continuity Management Flow
Incident
Disaster?
Activate appropriate DRP
Assessment of:Damage and
Likely resumption
duration
Recovery complete
Plan for Resumption
Resumption Complete
Yes
No
Phases Mgt ActionResponse Flowchart
Normal Operations
Emergency Response
Disaster Recovery
Resumption Phase
Monitor
Monitor and Report
Monitor and Report
Incident
Disaster?
Activate appropriate DRP
Assessment of:Damage and
Likely resumption
duration
Recovery complete
Plan for Resumption
Resumption Complete
Yes
No
Phases Mgt ActionResponse Flowchart
Normal Operations
Emergency Response
Disaster Recovery
Resumption Phase
Monitor
Monitor and Report
Monitor and Report
20Copyright © 2013 Tech Mahindra. All rights reserved.
Company Confidential
20
BCM Organization Chart
Management Security Forum – COO Declares Disaster
Central DR team – BCM Manager, CISO, Location Security Managers
DIRECTION
STATUS
I NFO
Potential Disaster Management Team – TIM, CS, ISG
Location Disaster Management Team
Security Coordinators
TIM OIC CS ManagerLocation Security
Manager
PM/ BCL & IBU/SSU/CDU Heads
Sys Ad & Vendors
Suppliers/ Team ISG group
21Copyright © 2013 Tech Mahindra. All rights reserved.
HR – Response activities
Company Confidential
22Copyright © 2013 Tech Mahindra. All rights reserved.
TIM– Response activities
Company Confidential
23Copyright © 2013 Tech Mahindra. All rights reserved.
CS – Response activities
Company Confidential
24Copyright © 2013 Tech Mahindra. All rights reserved.
BCM Implementation
Organization Level BCM PolicyDisaster Management HandbookBusiness Continuity Management FrameworkIT and Non–IT DR plans
Location/Building LevelBusiness Impact Analysis Location BCPSupport Function Specific BCP.
Project/ Business Unit LevelProject/ Business Unit Specific BCP
25Copyright © 2013 Tech Mahindra. All rights reserved.
Tech Mahindra Global BCM Framework
26Copyright © 2013 Tech Mahindra. All rights reserved. Company Confidential
Scope of the BCM Framework
Sr Inclusions Brief Description
1 Projects Includes all Critical projects from each IDU and projects run by CSU’s
2 CSU All critical activity performed by the CSU to support Delivery
3 Functions Finance, HR,FMG,TIM, and RMG as the key functions in business operations considered
4 Corporate Applications All Critical applications supported by CIO function.
5 Corporate Services IT Services critical for operations – WAN, AD, E-mail Proxy, Firewall services as examples
27Copyright © 2013 Tech Mahindra. All rights reserved.
Command Matrix Flow
COMMAND
MATRIX
CISO
Center Head
1st Person Responsible for
Disaster Declaration
2nd Person Responsible for
LOCAL Disaster Declaration with Appraisal to COO
Person Responsible
To Activate Disaster Recovery in Consultation of Members of Management
Security Forum
COO
28Copyright © 2013 Tech Mahindra. All rights reserved.
BCM : Incident Timeline
Incident Management
Business Continuity
Business Recovery
Back to Normalcy
60%
20%10%
100%
BCPs Assess
Improvements
Internal Audit
Exercise
INCIDENTBusiness As Usual
RTO : 8 Hours
MBCO : 20% of Normal Operations
8 Hours
48 Hours 1 weekMAO
29Copyright © 2013 Tech Mahindra. All rights reserved.
Baseline BCM Posture for TechM Centers
People Processes Technology
1. Offshore Split Teams
2. Onsite ~ Offshore Model
3. Named Critical Team Members
4. Skill Database for alternate Resourcing
BCM Baseline
1. Data Backup Procedure offered as a baseline for all customers
2. Onsite & Offsite backup tape vaulting
3. Documented SOP’s
1. Common LAN Redundancy & Communication Link
2. Dual ISP, Dual Path
3. Alternate Desktops, File & Print, Email & NAS available
4. Secure Computing at Warm Sites
29
30Copyright © 2013 Tech Mahindra. All rights reserved.
Roles & Responsibilities
Key roles and responsibilities defined are related to
The Crisis Management/ Disaster Recovery(DR) Team
Damage Assessment & Prioritization Team
The BCM Manager - Responsibilities
The Location Security Manager/ Business Continuity Leaders
The Security Coordinator
The IDU Heads
The Critical team members
31Copyright © 2013 Tech Mahindra. All rights reserved.
Crisis Management/ Disaster Recovery(DR) Team
• The CMT/DR team is a multi-layered cross functional team comprising of Centre head , Support Unit BC Leaders, Business Unit BC Leaders/Project Manager/Delivery Manager.
• The CMT/DR team would be activated depending upon nature and magnitude of impact to the business.
• The CMT/DR team will have appropriate representations depending upon the disruption at different levels namely at Building, City, Location or Country level and holds responsibility for managing the recovery effort.
• Manage Recovery of Technology such as desktops, network , applications and also to Manage financial aspects of Recovery, such as tracking disaster related purchasing, identifying disaster related costs etc.
• Their key responsibilities are tackles crisis on site, take appropriate decisions, communicate to internal & external customers, undertake RA and conduct BIA for their respective Business/ Function.
32Copyright © 2013 Tech Mahindra. All rights reserved.
Damage Assessment & Prioritization Team
• TIM would assess the Technical Damage where as Facilities would assess the Building damage facilitated by ISG
• Custodian of the BIA assessment workbook in hard copy & soft form
• Identify projects rated “Critical” and “INCLUDE” in BCP/DR for recovery during an emergency
• Identify critical functions and services “INCLUDED” in BCP/DR for recovery during an emergency
• Coordinate with IDU & Function to ascertain the affected projects / business processes / activities
• Prioritize Recovery considering factors related to • Days Delivery• Criticality to business for legal deadlines• Other Strategic reasons
33Copyright © 2013 Tech Mahindra. All rights reserved.
BCM Manager - Responsibilities
• Key Role is to Develop, Document & Maintain the BCM Framework & BIA for Functions, Corporate Services, Corporate Services, CSU & IDU
• Ensure Conduct of DR Drills as per the Global Drill Schedule
• Facilitate the complete operation to bring back business to recovery state
• Coordinate with cross functional DR Teams across the organization for relevant actions
• Inform CISO of the progress and status of the Disaster recovery process
• Escalate any identified bottleneck to CISO for necessary resolution with IDU heads or Function heads
• Track the happening & Report closure of the incident
• Prepare Management Review Presentation for STATUS INFO & Corrective Action Plans
34Copyright © 2013 Tech Mahindra. All rights reserved.
Location Security Manager
• Lead the DR team at the Location to take the right direction for recovery & Facilitate the Damage Assessment with TIM & Facilities management groups
• Coordinate for Location based DR Drills with respective DR Teams
• Participate actively in the DR Drills conducted
• Keep BCM Manager informed of the location DR Status for global status update
• Inform Alternate Site Location Manager for necessary support & coordination requirements
• Identify owners to implement the continuity implementation plans for the location and track the same
• Overall Site coordination would be the prime responsibility
35Copyright © 2013 Tech Mahindra. All rights reserved.
Security Coordinator
• Custodian of the Contact List of all Project Managers/ Business Continuity Leader who are identified as Critical in the IBU/SSU/CDU in the BIA
• Coordinate using the contact list all such Projects/ Business Units at site which are affected
• Inform IBU/SSU/CDU Heads about the actions taken at the IBU/SSU/CDU level in coordination with the Project Managers/ Business Continuity Leaders
• Collate and consolidate the Project/ Business Unit Damage Information Status at an IBU/SSU/CDU level and share the same with the IBU/SSU/CDU Head and BCM Manager.
• Overall Spokesperson for status information for the IBU/SSU/CDU continuity would be a key responsibility
36Copyright © 2013 Tech Mahindra. All rights reserved.
IDU Heads
• Coordinate with Project managers prioritizing within the IDU
• Steer inputs to the Disaster Assessment & Prioritization Team to safe recovery
• Customer Communication and briefing thru e-mail or telephone
• Elimination of bottlenecks within the IDU if identified
• Attend to all escalations from the Project Managers & Security Coordinator for the IDU
• Authorize movement of people, alternate seating arrangement, alternate computing requirements for the IDU
• Maintain a Status of the IDU recovery to keep informedCustomersSenior Management
37Copyright © 2013 Tech Mahindra. All rights reserved.
Critical Team Members
• Be aware of being identified as a Critical Team Member for your Function.
• Ensure that your contact details are updated with your Function Manager.
• Maintain your user names, passwords safely.
• Possess your secure-id cards safely to enable computation from home or alternate site
• Be prepared to travel to alternate site for operational continuity.
• Be prepared to work in shifts if required at the alternate site.
• When in DOUBT – ESCALATE to Your Function Manager for correct guidance
38Copyright © 2013 Tech Mahindra. All rights reserved.
What’s in a BCP document?
Critical Processes
All Operational locations and Alternate locations
Contact Details
Documents
Tasks
Equipment & Suppliers
Vital Records
Critical Resources
Client
Vendor
Software's
39Copyright © 2013 Tech Mahindra. All rights reserved.
Disaster Events Classified
IT Disaster Events :- Data Communication Failure (IPLC,VPN connectivity for data transfer) Voice Communication Failure(EPBAX failures, telecom operator failures) Denial of Service (DOS and DDOS and Virus Attack scenarios) Equipment Failures (Failure of RISC Servers, Routers, Firewall) Software Configuration Failures (failures due to Operating System crashes,
Application failures, RDBMS crash) Core IT Service Provider Failure (service disruption due to ISP, ASP, Telecom
Operator , Ocean Cable operators outages.)
Non IT disaster :- Natural Calamities (Fire, Earthquake, Flood ,Epidemics) Utility Related (No Public Transport, No Power) Human Related (War, Terrorist Attack, Civic Unrest)
IT/Non-IT disaster events and Incident sc
40Copyright © 2013 Tech Mahindra. All rights reserved.
BCP Scenarios - Provisioning for Threat & Availability Scenarios
BUILDING PARTIALLY AVAILABLE
BUILDING NOT AVAILABLE
COUNTRY NOT AVAILABLE
CITY NOT AVAILABLE
NATURAL CALAMITIES
TECHNICALTHREATS
HUMANTHREATS
&
FAILURES
41Copyright © 2013 Tech Mahindra. All rights reserved.
MBCO stands for Minimum Business Continuity Objectives
Minimum level of services and/or products that is acceptable to the organization to achieve its business objectives during a disruption.
MBCO (Earlier know as MOL)
42Copyright © 2013 Tech Mahindra. All rights reserved.
RTO
RTO stands for Recovery Time Objective.
This is the level up to which the project can remain without delivering to the customer. No business loss occurs. Acceptable and agreed by the customer.
43Copyright © 2013 Tech Mahindra. All rights reserved.
MAO stands for Maximum Acceptable outage.
MAO is the maximum period of time that an organization can tolerate the disruption of a critical business function, before the achievement of objectives is adversely affected
This is the level at which- All the requirements of the client are met. All Legal obligations are followed.
Note – MAO can never be less than the RTO.
MAO (Earlier known as MTPOD)
44Copyright © 2013 Tech Mahindra. All rights reserved.
RPO
RPO stands for Recovery Point Objective
The measurement of the point in time to which data must be restored in order to resume processing transactions.
It is a measure of how much data can be lost in case disaster occurs.
Note- The RTO and RPO will significantly determine the cost of BCP/DR.
45Copyright © 2013 Tech Mahindra. All rights reserved.
Periodic reviews/ updates
Update BCP once in a 6 months and as and when changes are required.
Update BCP as per review comments provided by ISG BCP team.
Update drill assessment report as per review comments provided by ISG BCP team.
Function Manager to maintain latest hard copy.
Function Manager along with critical team members to attend BCP related awareness sessions regularly.
46Copyright © 2013 Tech Mahindra. All rights reserved.
Why DR drills are needed?
The DR drills are conducted in order to:-
Test if the resumption of operations are possible in case of disaster. Ensure that the associates are trained and are aware of their roles in the
implementation of BCP for their projects. Make sure that BCP is reviewed and updated to reflect the current operating
environment of the project. Provide confidence in the continuity of business processes at the time of
disaster Assess the actual preparedness of the individuals involved in the recovery
process.
47Copyright © 2013 Tech Mahindra. All rights reserved.
What are different types of DR drills?
DR Drills are required to ensure the viability of BCP document. The different types of DR drills are:-
Call Tree drill Table Top drill Technical Environment rebuild drill for critical servers and desktops Data Restoration drill Fail Over drill Vendor Preparedness drill
48Copyright © 2013 Tech Mahindra. All rights reserved.
What happens in a CALL TREE Drill
1. Call tree can be executed either In person at a conference room Over an E-mail Dial In Check
2. Calling the numbers listed in the Contact Directory for Crisis Management , critical resources mentioned in BCP and the concerned stakeholders.
3. Verification of the numbers4. Corrections if any5. Assessment prior to Closure
Wrong numbers Missing numbers Changed numbers Correct numbers
6. Circulate the contact list to team members on email and maintain as a drill evidence.
7. Close Drill and Update the Contact List on ISG Dashboard with results and Assessment.
49Copyright © 2013 Tech Mahindra. All rights reserved.
What Happens in a Table Top Drill
All DR Team members gather, either on an audio bridge or in person in conference rooms looping [email protected] in the call invite.
A Disaster Event (IT or Non IT) and a Incident scenario is chosen. (Can refer attachment for selecting Disaster scenario and Incident Scenario). The Event can also be related to an IDU, Function, Project, Corporate Application, ODC or Location for Rehearsal.
PM to initiate the drill and action Plan is referred to as documented in BCP. Each DR Team Member calls out the critical tasks that he would perform At the End – Open Discussion on learning's / observations Assessment of the Preparedness would be documented in a standard format
by preparing the MoM for the drill. Observations/Problems faced while conducting the drill, need to be planned
and closed with appropriate action items before the closure date by identified owners in the project.
Continuity Improvement Plans will be the output Drill would be CLOSED Update ISG Dashboard with results and Assessment.
IT/Non-IT disaster events and Incident sc
50Copyright © 2013 Tech Mahindra. All rights reserved.
What Happens in an Environment Rebuild Drill
Step-by-Step Drill process A Disaster Event (IT or Non IT) and a Incident scenario is chosen. (Can refer attachment for selecting Disaster
scenario and Incident Scenario). The Event can also be related to an IDU, Function, Project, Corporate Application, ODC or Location for Rehearsal.
Send Environment Rebuild Drill intimation email to:1. Critical team members in the project, DRP_location_list & [email protected]. RMG – for seat requirements at the alternate location3. TIM – send consolidated details including seat allocation details(received from RMG), software, hardware and
network connectivity requirements4. CS– for logistic arrangements like Physical access ,guest house, ticketing, to the alternate site etc.5. Check all the installations and connectivity requirements required for the resumption of critical processes of
the project.6. Test and confirm the connectivity of development/ testing/support applications is established (via Email).7. Maintain all the possible evidences of the drill. They can be drill related emails and possible screen shots where
ever required.8. The drill gets closed.
Post Drill activities9. Intimate TIM to un-install all the software from those machines which RMG had allocated for the drill, RMG to
release the seats immediately.10. Calculate the time from the initial mail till the completion and compare it with RTO (Recovery Time Objective)
mentioned in BCP document and the same time should be noted and update in BCP document. In case the Time calculated is less than the RTO mentioned in the BCP then the drill result is Fully Successful, else it is treated as Unsuccessful.
11. Send the drill completion email to critical team members, TIM, RMG and [email protected] with Drill Results.
12. Update the Drill Assessment with drill details on ISG dashboard through https://isg.techmahindra.com/dashboard/login.aspx .
13. Ensure to attach the final Drill closure email as an evidence/ reference for the drill.
IT/Non-IT disaster events and Incident sc
51Copyright © 2013 Tech Mahindra. All rights reserved.
What happens in a Data Restore Drill ?
In an Onsite Data Restoration Drill
• Initiate the Drill with an email to TIM • Track the Restoration Process• Complete the Drill with Logs & Validation of Restored Data• Update Assessment Sheet • Close Drill• Share email with [email protected]
In an Offsite Data Restoration Drill
• A Critical Server is identified as per the BIA • An Offsite Data Restore will be planned• The tape is transported from Offsite to Onsite• Travel Time, Restoration Period would be tracked for data records • Logs will be maintained for verification of backed up data Vs Restored Data• Share email with [email protected]
52Copyright © 2013 Tech Mahindra. All rights reserved.
What happens in a Fail Over Test
1. Drill will be conducted by TIM
2. Planning and scheduling would be as per schedules maintained
3. Primary equipment will be made PASSIVE
4. Secondary equipment will be made LIVE
5. Fail over will be tested
6. Pay Load monitoring would be a key activity to validate minimum operating levels maintained
7. Fail over time will be tracked to match Recovery Time Objectives
8. Infrastructure will be reverted back to Working State
9. Drill will be called off
10. Assessment would be conducted
11. Continuity improvement plans in regard to operating procedures, preparedness measures would be tracked and implemented
53Copyright © 2013 Tech Mahindra. All rights reserved.
What happens in a Vendor Preparedness Test
1. An infrastructure element is identified
2. The Vendor is called upon for an alternate infrastructure
3. His response is tracked
4. The equipment replenishment time at site for recovery is tracked
5. SLA’s are monitored as agreed with Vendor
6. Gaps are identified
7. Recovery Time Objectives are assessed
8. Continuity Improvement Plans are documented
9. Implementation at target planned dates is tracked
10. Vendor is educated post drill in respect to Gaps in Response, SLA variances & Response Time Issues, Other Logistical issues
54Copyright © 2013 Tech Mahindra. All rights reserved.
Project Readiness - Overall
Sr What to Know ? Reference Resource
1 RA & RTP of the Function ISG-TP002
2 BIA of the Function ISG-TP022 for CSISG-TP006 for other Functions
3 BCP/DR test plan hard copy Shared Drive of Function
4 BCP/DR drill evidences ISG Dashboard (DR Drill Schedule) and Shared Drive of Function
5 Location Business Continuity Plan Template.doc
ISG-TP009
6 ERP Incident Report document Shared Drive of Function
7 Global Contact list Refer BCM Framework on BMS
55Copyright © 2013 Tech Mahindra. All rights reserved.
Project Readiness - Overall
Sr What to Know ? Reference Resource
8 Function specific Installation & configuration procedures
Shared Drive of Function
9 Route map, Mode of transport and Distance parameters document
ISG-TP023
10 Common group email id for ALERTS about Potential or DR Incidents
drp <building name> liste.g. drp gigaspace list
56Copyright © 2013 Tech Mahindra. All rights reserved.
Important BCP Reference documents
56
Location BCP - Sharda Centre
Disaster Recovery Handbook
Non-IT Disaster Recovery Action Plan
IT Disaster Recovery Action Plan
Disaster Recovery handbook
Non-IT Disaster Recovery Action Plan
IT Disaster Recovery Action Plan
Location BCP- Sample
57Copyright © 2013 Tech Mahindra. All rights reserved.
In case any BCP related queries please drop a mail to [email protected] mail id.
(or)
You can raise service request at : http://tim.techmahindra.com/tim/
Any queries on BCP??
58Copyright © 2013 Tech Mahindra. All rights reserved.
Conclusion
Lets all at TechM join hands to understand the practicality of
BCP and to strive hard to make it a success.
No Plan is Complete Until Fully Tested
59Copyright © 2013 Tech Mahindra. All rights reserved.
Disclaimer
Tech Mahindra Limited, herein referred to as TechM provide a wide array of presentations and reports, with the contributions of various professionals. These presentations and reports are for informational purposes and private circulation only and do not constitute an offer to buy or sell any securities mentioned therein. They do not purport to be a complete description of the markets conditions or developments referred to in the material. While utmost care has been taken in preparing the above, we claim no responsibility for their accuracy. We shall not be liable for any direct or indirect losses arising from the use thereof and the viewers are requested to use the information contained herein at their own risk. These presentations and reports should not be reproduced, re-circulated, published in any media, website or otherwise, in any form or manner, in part or as a whole, without the express consent in writing of TechM or its subsidiaries. Any unauthorized use, disclosure or public dissemination of information contained herein is prohibited. Unless specifically noted, TechM is not responsible for the content of these presentations and/or the opinions of the presenters. Individual situations and local practices and standards may vary, so viewers and others utilizing information contained within a presentation are free to adopt differing standards and approaches as they see fit. You may not repackage or sell the presentation. Products and names mentioned in materials or presentations are the property of their respective owners and the mention of them does not constitute an endorsement by TechM. Information contained in a presentation hosted or promoted by TechM is provided “as is” without warranty of any kind, either expressed or implied, including any warranty of merchantability or fitness for a particular purpose. TechM assumes no liability or responsibility for the contents of a presentation or the opinions expressed by the presenters. All expressions of opinion are subject to change without notice.
Thank youVisit us at www.techmahindra.com
60Copyright © 2013 Tech Mahindra. All rights reserved.