1 compressed baryonic matter at fair:jinr participation hadron structure 15, 29 th june- 3 th july,...

18
1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP, JINR ITEP, Moscow

Upload: philomena-carpenter

Post on 12-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

1

Compressed Baryonic Matter at FAIR:JINR participation

Hadron Structure 15, 29th June- 3th July, 2015

P. Kurilkin on behalf of CBM JINR groupVBLHEP, JINRITEP, Moscow

Page 2: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

Introduction:

CBM physics case and observables.

Experimental requirements.

JINR participation in CBM experiment:

• SC dipole magnet.

• Muon detection system.

• Development of STS.

• TRD.

• Methods and algorithms for global tracking.

• Study of multiparticle dynamics at CBM.

Conclusion.

Outline

2

Outline

Page 3: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

The CBM Collaboration: 59 institutions, 500 members

Page 4: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

Charm production and propagation at threshold energies excitation function in p+A collisions (J/ψ, ψ', D0, D) charmonium suppression in cold nuclear matter

The equation-of-state at neutron star core densities collective flow of hadrons particle production at threshold energies (multi-strange hyperons)

Onset of chiral symmetry restoration at high B

in-medium modifications of hadrons (,, e+e-(μ+μ-))

New /mixed phase of strongly-interacting matter

excitation function and flow of lepton pairs excitation function and flow of strangeness (K, , , ,

)

Strange matter (double-) lambda hypernuclei strange meta-stable objects

CBM physics case and observables at SIS100

4https://www.gsi.de/documents/DOC-2009-Sep-120-1.pdf

Page 5: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

• 105 - 107 Au+Au reactions/sec

• determination of displaced vertices (σ 50 m)

• identification of leptons and hadrons

• fast and radiation hard detectors

• free-streaming readout electronics

• high speed data acquisition and high performancecomputer farm for online event selection

• 4-D event reconstruction

Experimental requirementsExperimental requirementsExperimental requirementsExperimental requirements

5

Page 6: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

Time of Flight

ProjectileSpectatorDetector

DAQ/FLES HPC cluster

DipoleMagnet

SiliconTrackingSystem

Experimental requirements

MicroVertexDetector

RingImagingCherenkov

TransitionRadiationDetector(4/12)

MuonDetector

Page 7: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

• Study of multi-particle dynamics in heavy ion collisions at CBM

• Design and production of SC dipole magnet• Development, design and production of a straw tube

tracker prototype• Development of methods and algorithms for global

tracking

• R&D, beam tests

JINR participation in CBM

7

Page 8: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

Steps after CBM Dipole Magnet TDR approval

approved

in 2014

Technical Design Report for CBM superconducting dipole magnet was approved in the final form 2014 year. This document is a good base for the further work on the design of the magnet and preparation of the FAIR-JINR contract.

1. First meeting on the contract documentation preparation took place at GSI in April 2014. A lot of work during last year. Now we have draft of the specification for the FAIR-JINR contract.2. Works on the further design of the magnet, cryostat, support as well as on quench and magnetic field calculations were continued at JINR and GSI.3. Seach for the potential manufactors of the different CBM magnet parts: coils, cryostats and magnet yoke was very active.

8

Page 9: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

9

FAIR-JINR Contract is in preparation

CBM Superconducting Dipole Magnet

Page 10: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

The magnet weigth - 150 t The beam axis from the floor - 2600 mmThe height of the support - 750±20 mmThe support points - 3The maximal load on point - 85 tThe vertical adjustment - ±20 mmThe horizontal adjustment - ±20 mm

The adjustment process is divided on two main stages: horizontal and vertical movements.

The magnet support

CBM Superconducting Dipole Magnet

3 roller skid for horizontal adjustment

3 hydraulic jacks for vertical adjustment

10

Page 11: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

CBM Superconducting Dipole Magnet(quench protection)

11

Page 12: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

The CBM Muon Detection System

Stations 4 & 5: straw-tube tracker

Institutions: Indian muon consortium (12 Univ. and labs), PNPI Gatchina, JINR DubnaFunding: FAIR contributions (India, Russia)TDR: is in progress (will be resubmitted in 2014)

12

Page 13: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

Development of the Silicon Tracking System for CBM Sensor development:

Double-sided microstrips 60 μm pitch, 300 μm thick, read-out via ultra-thin micro-cables

STS in thermal enclosure (-10oC)

Detector layers: Low-weight carbon structures Institutions: GSI, JINR, KRI SPb, SPbSPU, AGH Krakow,

JU Krakow, Moscow St. U, KINR, U Tübingen, industrial partners (Erfurt, Kharkov, Minsk, …)Funding: FAIR contributions (Germany, Russia, Poland), German BMBF Univ. funds, TDR is approved. Many FAIR – Institutes Contracts 13

Page 14: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

The CBM TRD (R&D for SIS300)Requirements:• e/π discrimination of > 100 (p > 1.0 GeV/c)• active area ~1000 m2 (12 stations)• rate capability up to 100 kHz/cm2 • position resolution about 200 μm

Prototype detectors:• no drift region• thickness of gas volume ~1 cm

Test of different small prototype TRDs at CERN

Institutions: U Frankfurt, U. Heidelberg, U Münster, NIPNE Bucharest, JINR DubnaFunding: German BMBF Univ. funds, Romanian FAIR contributionTDR: internal report in progress 14

Page 15: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

15

Development of methods and algorithms for global tracking

• Development of the algorithms and software for track and ring reconstruction in MUCH, TRD, RICH, MVD detectors as well as global track reconstruction. Track reconstruction method is based on the track following and Kalman filter procedures. Ring reconstruction is based on the Hough Transform method.

• Feasibility study of the J/ψ→e+e- decay in AuAu collisions using developed software.

• FLES software development using different manycore CPUs and GPUs platforms.

• 4D event reconstruction (with time slices information).• Data bases for CBM.

Page 16: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

C2 for high PT

pions

STS-TOF-RICH for pion ID

STS-RICH for pion ID tritons

deuterons

Study of multiparticle dynamics at CBM at SIS100

16

Page 17: 1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,

Conclusions• The CBM research program aims at the exploration of the

structure of high density matter. For these purpose the advanced experimental setup will be build for high counting rate conditions expected at FAIR.

• JINR participated in the CBM project very actively and its contribution is large.

• The ultimative goal for 2016-2020 is to construct CBM detector to be ready for data taking at SIS100.

• Experience of the construction of many elements of the CBM (the Superconductive Dipole Magnet, MUCH,STS ) is used for the BM@N at the external Nuclotron beams and MPD (NICA).