1 colorado 811 brent sumner this presentation will probably involve audience discussion, which will...

37
1 Colorado 811 Brent Sumner

Upload: caitlin-butler

Post on 23-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

1

Colorado 811Brent Sumner

Page 2: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

2

Page 3: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

3

Thank You Utility Notification Center of

Colorado 1300+ Facility Members Statewide Messaging and Education Damage Prevention

Brent Sumner - UNCCDamage Prevention & Public Awareness

Page 4: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

4

Who is UNCC

Non-Profit

Page 5: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

5

Who is UNCC

Non-Governmental

Page 6: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

6

Who is UNCC

Non-Regulatory

Page 7: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

7

APWAStandard Marking

Color Code

Page 8: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

8

Page 9: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

9

Page 10: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

10

Page 11: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

11

Page 12: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

What is Excavation ???

Excavation is defined in the state law as any means of operation in which earth is moved or removed by means of any tool, equipment, or explosives and includes auguring, backfilling, boring, ditching, grading, plowing-in, pulling-in, ripping, scraping, trenching and tunneling.

12

Page 13: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

13

Page 14: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

14

Page 15: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

15

Change OUR Attitudes . . .Change OUR Habits . . .

Communicate . . . Coordinate . . .

Cooperate . . .

What Can WE Do?

Page 16: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

16

Too Many Damages!

We all have Reasons damages occur We all are given Mandates from above We all face Obstacles in the field

BUT . . . 65% of damages AT LEAST had a locate requested! And 54% AT LEAST had a locate performed!

MOST are trying to do what is right!

Can WE DO MORE?

Page 17: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

17

A Few Points about Locate Requests and

Marks REQUEST separate locates (Get your own)

Locate marks EXPIRE 30 days after laid down or until no longer visible

Maintain YOUR Documentation!Request#, sketches, measurements, pictures

Excavator NOTIFY UNCC and facility owner (immediately) if underground facility is damaged

Facility owner REPORT damage within 90 days

CALL 911 FIRST when appropriate

Page 18: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

18

Civil Fines-when locate NOT

requested-

Penalty for not calling is $200 If a facility is damaged and locate NOT

requested, penalties are as follows: $5,000 for the first offense Up to $25,000 for each subsequent

event in a 12-month period Up to $75,000 for more than three

in a 12-month period

Page 19: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

19

Second Notice Request

Excavator requests and UNCC re-notifies member facilities when Some or all scheduled meets not kept Some or all facility locates not complete by due date Some or all markings are inaccurate Some or all markings are not complete

Specify which member facilities need to respond Request must be processed within 5 business days

from due date of original ticket Law permits “Proceed with caution and care” after 2nd

notice – not liable for damage

Page 20: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

20

Relocate/Refresh Excavator requests and UNCC re-notifies

member facilities when Marks are no longer clearly visible Facility owner must respond as soon as

practical Specify which member facilities need to respond Request must be processed within 5 business

days from due date of original ticket Original locate instructions must remain the

same

Page 21: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

21

Reasonable Care Standard Excavator

Requires excavators use reasonable care when excavating around marked facilities

The following are acceptable methods of verifying facility and excavating within 18 inches from either side of facility. Visual verification of the facility Pot Holing to visually verify facility Vacuum Excavation Use of non-mechanized excavation tools Hand digging with reasonable care

Page 22: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

22

Tolerance Zone is the area 18” from the outside dimensions in all horizontal directions of an underground facility (reasonable care required).

(18 inches) (18 inches)

Page 23: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

23

Locate Documentation

Excavator must maintain documentation regarding locate at the excavation site

Documentation includes but is not limited to: UNCC Ticket Number Locator Sketch if provided Excavator Sketch Photographs Video Positive Response – All Clear

Page 24: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

24

Civil Fines -for NON membership-

Penalty for Non-Membership in UNCC is $200

If a facility is damaged and NOT a UNCC member, penalties are as follows: $5,000 for the first offense Up to $25,000 for each subsequent

event in a 12-month period Up to $75,000 for more than three in

a 12-month period

Page 25: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

25

Reasonable Care Standard Facility Owner

Requires owners/operators to use reasonable care to respond and mark their facilities

Reasonable care includes: Marking accurately within 18” Marking within 3 business days Mark with paint, flags, whiskers Appropriate color (APWA Code)

Page 26: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

26

Identification of Abandoned Facilities

Requires the identification of abandoned facilities in the proposed excavation area

Facilities abandoned after January 1, 2001

Marked “if known” Excavator should treat all

abandoned facilities as live

Page 27: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

27

Polygon MappingMEMBERS

Reduces notification area

Member access to maintenance

Fewer Locates!

EXCAVTORS

Shorter member list

Fewer TIER II calls

Page 28: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

28

Damage Reporting

Excavator MUST CALL UNCC and report ALL facility damages immediately! ( Please call 911 first, if needed)

Facility owner is required to report ALL facility damages to UNCC within 90 days of damage

Statistical data made available to all stakeholders to help with damage prevention efforts

Report is available on website: www.uncc.org

Page 29: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

29

WTE Benefits 24-hour availability Eliminate hold time Reduce process time Mapping application Schedule a meet Request 2nd Notice Direct member notify Web-Chat support Email confirmations

Page 30: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

30

Page 31: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

Damage Prevention Councils Denver Metro Weld County El Paso County Las Animas Western Slope Mesa County PEGDPC

NWCDPC Summit Area DPC Montrose Area

DPC Larimer County

DPC Four Corners DPC Fremont County

31

Page 32: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

32

Page 33: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

33

Brent SumnerUNCC – Damage Prevention Education

Office: (303) 205-6365E-mail: [email protected]

Page 34: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

34

Page 35: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

35

Page 36: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

36

Page 37: 1 Colorado 811 Brent Sumner This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of

37