CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE
![Page 2: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/2.jpg)
2
Technical Guidance 580-2200-011 Sinking of Shafts
and Slopes for Underground Mines
![Page 3: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/3.jpg)
3
Effective Date: October 1, 2005
![Page 4: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/4.jpg)
4
Request in writing
• 30 CFR Part 77 Subpart T (Underground Coal Mines-Health and Safety Standards-Slope and Shaft Sinking).
![Page 5: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/5.jpg)
5
Shaft and Slope Construction Supervisor
• 21 years of age• 2 years practical experience sinking of slopes and
shafts• 1 year practical experience sinking of slopes and
shafts – Bachelor of Science Degree in mining engineering– Coal mine foreman or Assistant mine foreman certificate– Industrial mineral underground mine foreman certificate– An acceptable certificate of qualification issued by
another state– Trained in the detection of oxygen and explosive gases /
mechanics of all gas detection devices– Passed a written test with a score of 80 %
![Page 6: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/6.jpg)
6
Blaster
• Possess a license issued pursuant to Chapter 210
![Page 7: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/7.jpg)
7
Pennsylvania code
![Page 8: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/8.jpg)
8
Chapter 210
![Page 9: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/9.jpg)
9
Chapter 210.11
• 210.11 Definitions– Blaster– Blaster Learner– Blaster License– Demolition Blasting– Person
![Page 10: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/10.jpg)
10
210.13 General
• 210.13 (a) A person may not detonate explosives or supervise blasting activities unless the person has obtained a blaster's license
• 210.13(c) Upon request, a blaster shall exhibit a blasters license – Authorized Department Representative– Blaster's employer– Police Officer
• 210.13(d) Blaster's license is not transferable
![Page 11: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/11.jpg)
11
210.14 Eligibility requirements
![Page 12: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/12.jpg)
12
BLASTERS LICENSE
• 21 YRS OLD• blaster learner
– 1YRS PRACTICAL BLASTER EXPERIENCE SHAFT AND SLOPE
• AND TAKEN DEP CLASS ON EXPLOSIVES
• AND PASSED DEP EXAMINATION FOR BLASTERS 80 PERCENT SCORE
![Page 13: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/13.jpg)
13
210.15 License Application
![Page 14: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/14.jpg)
14
Department forms
• $50 check payable to the Commonwealth of Pennsylvania– Submitted 2 week prior to test
![Page 15: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/15.jpg)
15
Notarized statement
• Experience as blaster leaner• Competence
![Page 16: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/16.jpg)
16
210.17 Issuance and renewal of licenses
• Blasters license will be issued for 3 years• Within the 3 year period have had 8
Hours CEU in Department approved Blasting and Safety courses– Submit a copy of the 8 hr CEU Certificate– Submit a $30 check payable to the
Commonwealth– Renewed within 1 year of its expiration date
![Page 17: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/17.jpg)
17
210.18 Out of State Blaster License
• Another States licensing program provides training on the storage, handling and use of explosives
• Examination that is equivalent to Chapter 210
• Copies of the other state's explosives training and exam materials
• Subtopic• Proof of License
![Page 18: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/18.jpg)
18
210.19 Suspension, Modification and Revocation• The Department may suspend,
modify or revoke a blaster's license for violations of Chapter 210 / Chapter 211
![Page 19: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/19.jpg)
19
ATF Background Check Sec. 555.33
![Page 20: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/20.jpg)
20
Safe Explosives Act
• Effective date November 25, 2002• Prohibited Persons Categories;
– Aliens– Persons who have dishonorably discharged from the
military– Citizens of the US who have renounced their citizenship– Felons– Fugitives– Users of, and persons addicted to, controlled substances– Persons who have been adjudicated metal defectives or
committed to mental institutions
• All prohibited persons are permitted to apply to the BATF for relief from Federal explosives disabilities
![Page 21: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/21.jpg)
21
Samples
• When requested by ATF, manufacturers and importers of explosives must submit samples, as well as information on their chemical composition
![Page 22: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/22.jpg)
22
Intrastate Permit
• limited permit – farmers or construction companies that
acquire and use explosives infrequently and within their State of residence
– will allow the purchaser to receive explosive materials from an in-State explosives licensee or permittee on no more than six (6) occasions during the period of the permit
– Will be valid for one year
![Page 23: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/23.jpg)
23
Required Industry Information
• Responsible persons are required to submit to ATF identifying information, fingerprints, and photographs
• Employee of licensees and permittees who will be possessing explosive materials must submit identifying information
• ATF must issue letters of clearance for those responsible persons and possessor employees who are not prohibited from possessing explosives
• Responsible person or employee subject o an explosives prohibition, ATF must provide information on the appeal process
![Page 24: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/24.jpg)
24
Inspections
• ATF will have to physically inspect all ATF licensees and permittees at least once every three calendar years
• User permits and licenses, ATF must verify by visual inspection that new applicants and renewal applicants have places of storage for explosive materials
![Page 25: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/25.jpg)
25
chapter 211
![Page 26: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/26.jpg)
26
211.101 Definitions
• access point• air blast• blast site• blast area• barricade• misfire• blaster• magazine• inner perimeter security• outer perimeter security
![Page 27: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/27.jpg)
27
211.101 Definitions (2)
• scaled distance• scaled table of distance• required distance for seismograph
readings
![Page 28: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/28.jpg)
28
211.112 Magazine license and fees
• 211.112(a) Shall store explosives in a magazine licensed by the Department– A person may not construct, install or modify a
magazine
• 211.112(b) magazine license specifications – types of explosives– quantities of explosives– conditions to comply with other standards
• 211.112(c) license expires DEC 31 each year
![Page 29: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/29.jpg)
29
211.113 Application Content
• Applicant's name, address and telephone number• Contact person• Types and quantities of explosives• Map, plan or sketch of the site location showing
– nearest buildings– nearest railways– nearest highways – existing barricades– proposed barricades
• Plan showing the design and specifications of the magazine
![Page 30: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/30.jpg)
30
211.113 Application Content (2)
• Plan showing the design and specifications, dimensions and locations of all security measures
• The latitude and longitude of outdoor magazines– except Type 3
• The latitude and longitude of indoor magazines containing high explosives
![Page 31: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/31.jpg)
31
211.114 Displaying the license
• Magazine license or legible copy shall be conspicuously displayed– Shall be displayed inside the magazine
or adjacent to the magazine
![Page 32: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/32.jpg)
32
211.115 Explosive storage
![Page 33: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/33.jpg)
33
27 CFR Part 555 Subpart K (relating to storage), are incorporated herein by
reference.
![Page 34: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/34.jpg)
34
211.115(a1) Classify explosives
![Page 35: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/35.jpg)
35
211.115(a2)Determine which class of explosive may be stored in each
type of magazine
![Page 36: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/36.jpg)
36
211.115(a3)Determine quantity of explosive
stored
![Page 37: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/37.jpg)
37
211.115(a-4) Determine construction standards
![Page 38: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/38.jpg)
38
211.115(a5) Site the magazine
![Page 39: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/39.jpg)
39
211.115(a6) Specify maintenance and
housekeeping
![Page 40: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/40.jpg)
40
211.115(a7) Grant variances
![Page 41: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/41.jpg)
41
Security measures (211.115.d)
![Page 42: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/42.jpg)
42
211.115(d1) Each magazine site shall be
inspected at least daily at approximately 24-hour
intervals
![Page 43: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/43.jpg)
43
Equipped with electronic intrusion detection devices
![Page 44: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/44.jpg)
44
Inspected daily (24 hour intervals)
![Page 45: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/45.jpg)
45
magazines containing no explosive are not required
to be inspected• Must reflect date last explosives
were removed
![Page 46: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/46.jpg)
46
Each inspection
• Include the magazine• Access points and perimeter security
– Inspection can be in person or electronically by remote cameras
• Record of Inspection– Maintained 3 years– Name of person – Date and time inspection began /ended– Remarks– Action taken on problems– Dates no inspection / no explosives
![Page 47: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/47.jpg)
47
Magazine and outer perimeter gates at the site
are equipped with electronic intrusion detection devices
![Page 48: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/48.jpg)
48
Outer perimeter
![Page 49: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/49.jpg)
49
Obstructs, wheeled vehicles
![Page 50: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/50.jpg)
50
surround the entire magazine site
• 25 feet away from the exterior of any magazine
• 25 feet away from the inner perimeter security measures
![Page 51: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/51.jpg)
51
Subsection (g)
![Page 52: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/52.jpg)
52
Sufficient number of personnel assigned to physically insect each
magazine once every hour• All persons with communications
capable of providing direct verbal communications with Police Dept. or another person capable of contacting Police
![Page 53: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/53.jpg)
53
Closed Circuit Television (CCTV)
• Continuously monitoring the entire outer perimeter
• Any portion of the outer perimeter that is not protected by another measure
• Images shall be recorded and maintained at least until magazine integrity is confirmed
• Latest output images of all CCTV cameras shall be viewed at least once every hour by a person having direct verbal communications
![Page 54: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/54.jpg)
54
Electronic intrusion detection devices
• Microwave sensors• Seismic detectors• Vehicle detectors• Alarms or infrared motion detectors• Zone of detection shall encompass entire outer
perimeter• All systems shall provide initial notification of an
alert within 15 minutes of an event and onsite presence in response to an alert within 1 hour
• All systems shall have backup power and provide an alert
![Page 55: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/55.jpg)
55
Earthen Barrier
• 7 feet in height• Constructed to obstruct access, to
the greatest extent possible, by wheeled vehicles
• Made of loose soils the earthen barrier shall be compacted
• Vegetated
![Page 56: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/56.jpg)
56
Boulder Barrier
• Boulders shall be of a size and weight to deter, to the greatest extent possible, defeat of the barrier by wheeled vehicles
![Page 57: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/57.jpg)
57
Highwall Barrier
• minimum of 7 feet in height– Face or slopes are sufficient to obstruct,
to the greatest extent possible, unauthorized access by wheeled vehicles
![Page 58: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/58.jpg)
58
Natural Barrier
• Composed of natural terrain features which are impassable, to the greatest extent possible, to wheeled vehicles
![Page 59: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/59.jpg)
59
Fencing Systems
• Constructed of members that of sufficient size, strength and anchorage – To deter, to the greatest extent
possible, the fencing system from being bent over, broken through or uprooted by a wheeled vehicle
![Page 60: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/60.jpg)
60
Inner Barrier 211.115
![Page 61: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/61.jpg)
61
6 feet away from exterior of magazine (211.115-4 )
![Page 62: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/62.jpg)
62
25 feet inside and away from the outer perimeter
security (211.115-4)
![Page 63: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/63.jpg)
63
Inner perimeter security can be met by measures
approved by the Department as provided in
subsection (g)
![Page 64: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/64.jpg)
64
Personal assigned to physically inspect each
magazine• Once every hour• Equipped with communications
device capable of providing direct verbal communications– Police Department– Another person with the ability to
contact the Police Department
![Page 65: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/65.jpg)
65
CCTV
• Images shall be recorded and maintained at least until magazine integrity is confirmed during the next required site inspection
• The latest images of all CCTV cameras shall be viewed once every hour by persons having direct verbal communication with the Police Department
![Page 66: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/66.jpg)
66
Electronic intrusion devices
• Shall be installed on each magazine containing high explosives or detonators
• Installed on all magazine doors• Infrared motion detectors and other
similar devices shall be installed on the interior of each magazine
![Page 67: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/67.jpg)
67
Microwave sensors, seismic sensors
• Zone of detection shall encompass the inner perimeter, or any portion of the inner perimeter that is not protected by another measure
![Page 68: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/68.jpg)
68
All systems
• Shall have the capability of providing initial notification of an alert within 15 minutes of an event
• An on site presence in response to an alert with 1 hour
• Backup power supply– Shall provide and alert in the event of
power loss or a compromise of the system integrity
![Page 69: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/69.jpg)
69
Highwall
• minimum of 20 feet in height• face or slopes are sufficient to
obstruct, to the greatest extent possible, access by unauthorized persons.
![Page 70: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/70.jpg)
70
Fence construction• minimum of 9 gauge chain link fencing
– maximum 2-inch mesh that is kept in a condition which maintains its original functionality.
• Buried at least 1 foot at the base– Or equipped with a minimum 1.66 inch outside diameter
bottom rail• Minimum height of 8 feet above the ground• Top rail with a minimum 1.66 inch outside diameter• Firmly anchored posts 10 feet or less on center
– End, corner and pull posts shall have a minimum outside diameter of 2.875 inches if round or 2.5-inch square
– Intermediate posts shall have a minimum outside diameter of 2.375 inches if round or 2.25-inche C-Section.
– Posts shall be set in concrete at a minimum depth of 33 inches.– Post holes shall be a minimum of 12 inches in diameter and
completely filled with concrete
![Page 71: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/71.jpg)
71
Fence construction (2)
• Outriggers at the top– concertina razor wire attached
• Concertina razor wire attached on the inside at the bottom
• Gates– as many gates as necessary to provide for the
safe exit in event of an emergency
• Vegetation– Trimmed or suppressed to a distance of 6 feet
from each side of the fence
![Page 72: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/72.jpg)
72
Inner perimeter security gates
![Page 73: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/73.jpg)
73
Constructed at all access points
• firmly anchored posts• good condition• Padlocked whenever the site is
unoccupied
![Page 74: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/74.jpg)
74
Gates shall be constructed of a minimum of 9 gauge chain link fencing with a maximum 2-inch mesh
![Page 75: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/75.jpg)
75
Gate frame members minimum outside
diameter of 1.9 inches if round or 2.0-inch if square
![Page 76: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/76.jpg)
76
Gate Posts with a minimum 6.625-inch
outside diameter
![Page 77: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/77.jpg)
77
Posts set in concrete at a minimum depth of 42
inches
![Page 78: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/78.jpg)
78
Postholes shall be a minimum of 16 inches in diameter and filled with
concrete
![Page 79: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/79.jpg)
79
Outriggers at the top with concertina razor wire
![Page 80: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/80.jpg)
80
Two Locks
• Separate hasps and staples• Hood of at least 1/4-inch thick steel
– must prevent sawing or lever-cutting on the locks, hasps, and staples
• Each lock shall have at least five tumblers – case-hardened shackle of at least 3/8 inches in
diameter
• Lock and chain used to secure gate– minimum specification of the chain shall be 3/8
inch Grade 70, Transport
![Page 81: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/81.jpg)
81
Outer perimeter security gates
![Page 82: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/82.jpg)
82
Constructed at all access points
![Page 83: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/83.jpg)
83
Deter to the greatest extent possible, defeat of
the gate by wheeled vehicles
![Page 84: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/84.jpg)
84
firmly anchored posts
• Guideposts shall be a minimum 6.625-inch outside diameter
• Posts set in concrete at a minimum depth of 42 inches
• Postholes shall be a minimum of 16 inches in diameter – filled with concrete
• Department may approve, in writing, least equivalent security
![Page 85: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/85.jpg)
85
good condition
![Page 86: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/86.jpg)
86
Padlocked whenever the site is unoccupied
![Page 87: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/87.jpg)
87
Two Locks
• Separate hasps and staples• Hood of at least 1/4-inch thick steel
– must prevent sawing or lever-cutting on the locks, hasps, and staples
• Each lock shall have at least five tumblers – case-hardened shackle of at least 3/8 inches in
diameter
• Lock and chain used to secure gate– minimum specification of the chain shall be 3/8
inch Grade 70, Transport
![Page 88: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/88.jpg)
88
"No Trespassing" signs
![Page 89: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/89.jpg)
89
Placed around outer perimeter of site
![Page 90: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/90.jpg)
90
Shall be spaced so that, except for corners,
adjacent signs are visible
![Page 91: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/91.jpg)
91
Warning signs shall be placed at all access points
• Shall provide notice of private property
• No trespassing • Providing a notice substantially
conforming to the following: "Danger, never fight explosives fires, explosives are stored on this site"– to warn first responders and public– Shall provide an emergency contact
phone number
![Page 92: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/92.jpg)
92
Signs shall be well maintained
![Page 93: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/93.jpg)
93
Signs shall be placed so that a bullet passing
directly through the sign will not impact a magazine
![Page 94: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/94.jpg)
94
Signs may not be obscured by vegetation or
other obstructions
![Page 95: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/95.jpg)
95
Constructed of a durable, weather-resistant material
• Letters and numbers shall be a minimum height of 2 inches
![Page 96: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/96.jpg)
96
In addition to outer perimeter security
![Page 97: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/97.jpg)
97
All portable magazines being used as stationary
magazines • Having an a volume of less than 3
cubic yards – shall be immobilized by fastening the
magazine securely to the earth or terrain
– sufficient to prevent displacement of the magazine by wheeled vehicle
![Page 98: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/98.jpg)
98
Requirements may be satisfied by any single layer
of perimeter security measures that obstructs
• unauthorized access to the magazine wheeled vehicles
• Access by unauthorized persons• 25 feet away from the exterior of any
magazine• 6 feet from any magazine
![Page 99: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/99.jpg)
99
Magazines shall be constructed according to
the construction standards found in 27 CFR Part555,
Subpart K (relating to storage) with the following
additions
![Page 100: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/100.jpg)
100
Mobile type 5 magazines being used as stationary magazines for more than 1 year must be located
within the outer perimeter security
![Page 101: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/101.jpg)
101
Immobilized in accordance with 27 CFR 555.211
(relating to construction of type 5 magazines
![Page 102: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/102.jpg)
102
Fastened securely to earth or terrain feature to
prevent movement of the magazine by a motor
vehicle
![Page 103: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/103.jpg)
103
Motor vehicles used to transport bulk blasting
agents that are left unattended at a magazine
site
![Page 104: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/104.jpg)
104
Must have two department approved methods of
disabling the vehicles to render tem effectively
immobilized
![Page 105: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/105.jpg)
105
Vehicles must be kept within the outer perimeter
security
![Page 106: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/106.jpg)
106
Disabling methods may include
• Steering locking device• Pedal locking device• Fuel or electrical system disablers• Other equivalent disabling measures
approved by the Department• Systems of pumps or tanks, or both, used
to store, mix or dispense bulk blasting agents at magazine site– Shall be equipped with locks – Shall be constructed to prevent the
unauthorized removal of blasting agent from the system
![Page 107: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/107.jpg)
107
Person who stores explosive materials
![Page 108: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/108.jpg)
108
Shall notify both the local police having jurisdiction
and the Pennsylvania State Police
• Notification made in the manner of and in addition to the notification requirements in 27 CFR 555.201 (f) (relating to general)
![Page 109: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/109.jpg)
109
Shall immediately notify the Department, Pennsylvania
State Police, and local Police• Evidence is discovered of Break-in or theft at the magazine• an attempted theft or break-in has occurred• Security measures required by this section have been
breached or disabled or disabled or partially breached or disabled
• Short-term partial breaches of security of less than 48-hour duration need not be reported under this subsection if all the following apply:– Partial breach was due to equipment failure or accidental or
natural causes– An account of the partial breach was recorded under
paragraph 1– Immediate measures are being taken to repair or replace the
partial breach
![Page 110: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/110.jpg)
110
Notification to State and Local police are in addition
to any notification by agencies of the United
States• Immediately upon June 18, 2005, the
inspection and notification requirements shall be implemented
• Within 180 days of approval of the plan outer or inner perimeter security measure requirements shall be implemented
• Within 360 days of approval of the required plan the remaining perimeter security measures required
![Page 111: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/111.jpg)
111
Unauthorized persons exhibiting suspicious
behavior are observed in the vicinity of the
magazine
![Page 112: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/112.jpg)
112
Inventory records indicate that explosive material is missing and unaccounted
for
![Page 113: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/113.jpg)
113
Permissible explosives / Shot -firing units 77.1909
![Page 114: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/114.jpg)
114
Evacuate personal from shaft prior to firing shot
• ALL PLANS SUBMITTED TO MSHA WILL BE SUBMITTED TO THE STATE
![Page 115: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/115.jpg)
115
Chapter 211 Incorporates Sub Part k
![Page 116: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/116.jpg)
116
211.122 Permit to sell explosives
• Identify the applicant's name, address, telephone number and type of business
• Identify a contact person• Specify type of explosives to be sold• Specify the type of explosives to be sold• State whether the applicant will purchase or
manufacture the explosives to be sold• Permits to sell explosives are not
transferable• Permits to sell explosives expire on April 30
![Page 117: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/117.jpg)
117
211.123 Permits to purchase explosives
• Identify the applicant's name, address, telephone number and type of business
• Identify a contact person, including name, address, telephone number and type of business
• Identify the location and license number of the magazine to be used for storing the explosives
• Specify the type of explosives that will be purchased
• Specify whether the explosives are being purchased for sale or use by the permittee
![Page 118: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/118.jpg)
118
211.123 Permits to purchase explosives (2)
• Permits to purchase explosives are not transferable
• Permits to purchase explosives expire on April 30 of each year
![Page 119: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/119.jpg)
119
211.124 Blasting Activity Permit
• Blast-in-charge– Supervise the blasting activity– Two people present to fire blast– Blaster-In-Charge and up to Six Assistants
• Operating Equipment– Within 50 feet 211.154
• Blaster shall prepare application for blasting activity report– Applicant's name, address, telephone number, type business– Contact person / name, title, telephone number– Identity of subcontractor who will perform the blasting activity– Type of explosive used– Maximum amount of explosives that will be detonated per delay interval of less than 8
milliseconds– Maximum amount of explosives that will be detonated in any one blast– Map indicating the location where the explosives will be used– Purpose for which the explosives will be used– Location and license number of magazine that will be used to store the explosives– Description of how the monitoring requlirements will be satisfied– 3rd part general liability insurance in the amount of $300,000 or greater per occurrence.– anticipated duration of blasting activity – Anticipated days of the week and times when blasting may occur– Distance and direction to the closest building– Printed name, signature and license number of blaster– Proof of notification of blast to resident's within 200 feet– Blast activity permits are not transferable
![Page 120: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/120.jpg)
120
211.125 Blasting permit-by- rule
• Blasts are designed and performed for a scaled distance of 90 or greater
• No more than 15 pound of explosives are detonated per delay interval of less than 8 milliseconds
• Total charge weight per blast does not exceed 150 pounds
• Person notifies the Department – verbally– in writing
![Page 121: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/121.jpg)
121
211.131 Sales Record
• Shall keep accurate record of every sale of explosives for 3 years– Shall identify the purchaser's name and
address– Department purchase permit number – Date of the sale– Amount and types of explosives
![Page 122: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/122.jpg)
122
211.132 Purchase records
• Shall keep a record of all purchases of explosives for 3 years– Records shall identify the date– types and amounts of explosives
purchased– name and address of the seller
![Page 123: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/123.jpg)
123
211.133 Blast reports 211.133
![Page 124: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/124.jpg)
124
Blaster-In-Charge
• Shall prepare a report for each blast– Sufficient information to reconstruct the
conditions and events surrounding a blast
– Maintained 3 years
![Page 125: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/125.jpg)
125
Location of blast and monitor readings
![Page 126: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/126.jpg)
126
Name of blasting activity permittee
![Page 127: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/127.jpg)
127
Blasting activity permit / mining permit number
![Page 128: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/128.jpg)
128
Date and time of blast
![Page 129: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/129.jpg)
129
Printed name , signature and license number Blaster-In-Charge
![Page 130: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/130.jpg)
130
Type of material blasted
![Page 131: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/131.jpg)
131
Sketch showing
• number of holes• burden• pattern dimensions• point of initiation
![Page 132: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/132.jpg)
132
Diameter / Depth of blast holes
![Page 133: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/133.jpg)
133
Height / length of stemming
![Page 134: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/134.jpg)
134
Types of explosives used
• Arrangement in blast holes
![Page 135: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/135.jpg)
135
Total weight in pounds of explosives and primer
cartridge
![Page 136: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/136.jpg)
136
The maximum weight in pounds of explosives detonated per delay period of less than 8
milliseconds
![Page 137: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/137.jpg)
137
Type of circuit, if electric was used
![Page 138: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/138.jpg)
138
Direction / Distance in feet from blast site to nearest
building
![Page 139: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/139.jpg)
139
A description of the nearest building not
owned based on local landmarks
![Page 140: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/140.jpg)
140
Scaled Distance
![Page 141: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/141.jpg)
141
Weather Conditions
![Page 142: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/142.jpg)
142
Direction from which the wind was coming
![Page 143: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/143.jpg)
143
Measures taken to control flyrock (whether or not
mats were used)
![Page 144: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/144.jpg)
144
Total quantity and type of detonators and delays
used
![Page 145: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/145.jpg)
145
Number of individuals on blast crew
![Page 146: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/146.jpg)
146
Monitoring records shall be made part of blast report within 7 days
![Page 147: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/147.jpg)
147
Misfire
![Page 148: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/148.jpg)
148
211.141 Transportation of Explosives
![Page 149: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/149.jpg)
149
Fueling
![Page 150: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/150.jpg)
150
Repairs
![Page 151: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/151.jpg)
151
Fire Extinguishers
![Page 152: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/152.jpg)
152
No Smoking
• 100 feet
![Page 153: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/153.jpg)
153
Loading / Unloading
![Page 154: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/154.jpg)
154
IME #22 Separation
• Non sparking tools• Wooden bed on vehicle • Separated from tools
![Page 155: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/155.jpg)
155
State Inspected Vehicles
![Page 156: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/156.jpg)
156
Vehicle Exhaust
• avoid hot gases and sparks• in tack
![Page 157: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/157.jpg)
157
Fire Extinguisher
• 10 BC or more– Readily Accessible
![Page 158: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/158.jpg)
158
Engine Off / Tires Chocked
![Page 159: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/159.jpg)
159
No Smoking within 100 ft
• NO SMOKING signs posted while parked
![Page 160: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/160.jpg)
160
DOT Placards
![Page 161: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/161.jpg)
161
Immediately
![Page 162: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/162.jpg)
162
Less than 2000 pounds of explosives
• Open Body– Sides and ends high enough– fire resistant tarpaulin– magazine attached to vehicle
![Page 163: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/163.jpg)
163
More than 2000 pounds of explosives
• Closed Body
![Page 164: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/164.jpg)
164
No firearms, combustible materials
![Page 165: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/165.jpg)
165
Damaged or Deteriorated explosives
• Manufactures Recommendations
![Page 166: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/166.jpg)
166
211.151 Prevention of Damage
![Page 167: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/167.jpg)
167
flyrock or damage to real property
• Blaster-in-charge– report to Department within 4 hours
![Page 168: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/168.jpg)
168
Air Blast
• 133 dbl peak
![Page 169: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/169.jpg)
169
Scaled Distance
• 90
![Page 170: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/170.jpg)
170
Peak Particle Velocity
• 2 inches per second
![Page 171: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/171.jpg)
171
211.152 Control of Noxious Gases
• Health and Safety of individuals– Evacuate people– interrupt path of gas flow– Vent gases to atmosphere
![Page 172: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/172.jpg)
172
211.153 Handling Explosives
![Page 173: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/173.jpg)
173
Nonferrous, non sparking tools
![Page 174: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/174.jpg)
174
No Smoking
• within 100 ft of where explosives are used or stored
![Page 175: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/175.jpg)
175
Damaged or Deteriorated Explosives
• destroy as per Manufacturer recommendations
![Page 176: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/176.jpg)
176
Cast Boosters
• detonators shall not be forced into cartridges of explosives or cast boosters
• detonators shall be completely inserted into the cartridge of explosive
• detonators shall be completely inserted into detonator well of a cast booster
![Page 177: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/177.jpg)
177
licensed magazine
• Stored– Explosives may not be left unattended– Kept under control and supervision of
Permittee
![Page 178: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/178.jpg)
178
Loaded Blast
• loaded blast shall always be under the continuous observation of the blaster-in-charge or a designee
![Page 179: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/179.jpg)
179
Blast Site
• No shooting or carrying of ammunition or firearms
![Page 180: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/180.jpg)
180
Electric Lines
• test shall be made for stray electrical current
• electric blasting caps may not be used in excess of 50 milliamperes
![Page 181: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/181.jpg)
181
Packages of Explosives
• shall not be thrown or slid along floor, over other packages, and handled roughly
• Non-sparking tools
![Page 182: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/182.jpg)
182
Electrical Storms
• Area clear of all people• Guards posted to all approaches to
prevent trespass
![Page 183: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/183.jpg)
183
Explosives
• damaged and deteriorated shall not be used
• May not be abandoned
![Page 184: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/184.jpg)
184
211.154 Preparing the Blast
![Page 185: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/185.jpg)
185
211.154(a) Blaster-in-charge
![Page 186: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/186.jpg)
186
211.154(a) Must be designated by Blasting
Activity Permittee
![Page 187: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/187.jpg)
187
211.154 (a)Shall control and supervise the blasting
activities
![Page 188: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/188.jpg)
188
211.154 (a) Responsible for all effects of the blast
![Page 189: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/189.jpg)
189
211.154(c) May not prepare or detonate a blast unless another
person is present, ready to render assistant in the event of an accident or
injury
![Page 190: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/190.jpg)
190
211.154(d) Shall make every effort to determine
the condition of the material to be blasted
from the individual who drilled the blast holes or
from the drill log.
![Page 191: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/191.jpg)
191
211.154(e) Only blaster in charge, other blasters, and up to six assistants per blaster may be at a
blast site once loading of blast holes begins
![Page 192: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/192.jpg)
192
211.154(f) While loading a blast hole the following shall
be followed:• 211.154(f-1) Ferrous material may not be
used– This includes the use of steel casings, ferrous
tools and retrieving equipment
• 211.154(f-2) Nonsparking tamping sticks• 211.154(f-3) Pneumatic loading device,
every precaution shall be taken to prevent an static electricity– Loading operation shall be stopped immediately
if static electricity or stray electric currents are detected
![Page 193: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/193.jpg)
193
211.154(f) While loading a blast hole the following shall
be followed: (2)• 211.154(f-4) Blast holes shall be carefully
checked for obstructions– Explosives may not be forced past and
obstruction in blast hole
• 211.154(f-5) Each blast hole shall be logged and recorded on the blast report
• 211.154(f-6) Blast hole containing loose dynamite shall be stemmed (not tamped)
• 211.154(f-7) The Department may specify the type and amount of stemming
![Page 194: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/194.jpg)
194
211.154(g) Before connecting blast holes, all
activity within the blast area shall cease
• All nonessential persons shall retreat to a safe place
• The blaster-in-charge shall determine the blast area
![Page 195: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/195.jpg)
195
211.154(h) Primers shall be prepared only at the hole to
be loaded• Primers shall be prepared only at the
hole to be loaded,immediately prior to loading
• Components of the primer are to be kept separated at the collar of the blast hole
• The primer may not be slit, dropped, deformed or carelessly handled and tamped or forced into blast hole
![Page 196: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/196.jpg)
196
211.154(I) Upon completing the loading of a blast hole
• Wood, paper or other materials used to pack explosives shall be inspected for explosives and removed to and isolated area
• materials may be burned after the blast has been fired
• Persons may not be within 100 feet of burning materials
![Page 197: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/197.jpg)
197
211.154(j) Measures shall be taken to reduce the
chance of flyrock• Use of blasting mats or other
protective devices• Blasting to an open, vertical face,
checking the face for loose, hanging material or faults prior to loading the blast holes
![Page 198: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/198.jpg)
198
211.154(k) Only enough explosives for the blast may be brought to the blast site
• Surplus explosives may not be stored in the blast site
![Page 199: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/199.jpg)
199
211.154(l) Blast holes shall be checked to ensure that it is cool and does not contain any hot material or smoldering material
from drilling hole
![Page 200: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/200.jpg)
200
211.154(m) Abrasive or sharp stemming shall be
avoided
![Page 201: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/201.jpg)
201
211.154(n) Blasting activities may not be
conducted within 800 feet of a public roadway
• Precautionary measures including stopping or slowing of traffic and posting signs
![Page 202: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/202.jpg)
202
211.154(b) Equipment
• Only equipment necessary loading Blast holes shall operate within 50 ft of the blast site
![Page 203: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/203.jpg)
203
211.155 Preblast measures
![Page 204: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/204.jpg)
204
Prior to detonating a blast, the blaster-in-charge shall:
![Page 205: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/205.jpg)
205
211.155(1) Ensure that all excess explosives have been removed from the
blast area
![Page 206: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/206.jpg)
206
211.155(2) Inspect the blast site to ensure that connections are proper
![Page 207: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/207.jpg)
207
211.155 (3) Ensure that the blast area is cleared
an safeguarded
![Page 208: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/208.jpg)
208
211.155(4) In addition to warning signal, notify all
persons
![Page 209: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/209.jpg)
209
211.155(5) Ensure that precautions are in place to protect the pubic on public
roads
![Page 210: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/210.jpg)
210
211.155(6) At least 1 minute but no more than 2 minutes prior to detonation
• Sound a warning signal of three blasts– each lasting 5 seconds
• Warning signal shall be of sufficient power to heard 1,000 feet from the blast site
![Page 211: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/211.jpg)
211
211.156 Detonating the Blast
• 211.156(a) Blast may be detonated only between sunrise and sunset– Unless the Department authorizes
• 211.156(b) Only the blaster-in-charge may detonate a blast
![Page 212: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/212.jpg)
212
211.157 Postblast measures
![Page 213: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/213.jpg)
213
211.157(a) After a blast has been detonated, no one may return to the
blast area until all smoke and fumes have dissipated
![Page 214: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/214.jpg)
214
211.157(b) Blaster-in-charge shall return to and inspect the blast site to
ensure it is safe
![Page 215: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/215.jpg)
215
211.157(c) the blaster-in-charge shall sound an all-
clear signal• One long blast lasting 10 seconds
– All-clear signal shall be heard 1,000 feet from the blast site
![Page 216: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/216.jpg)
216
211.157(d) Blaster-in-charge shall determine if a
misfire has occurred• Shall take actions necessary to
render the blast site safe• The blast site shall be made safe
before drilling or muck removal begins
![Page 217: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/217.jpg)
217
211.157(e) Blaster-in-charge suspects that
undetonated ammonium nitrate/fuel mixture remains• The muck pile shall be wetted down
with water before any digging • Special attention shall be given to
primers, other explosives or detonators are present in the muck pile
![Page 218: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/218.jpg)
218
211.157(f) Blaster-in-charge shall immediately complete the blast report
![Page 219: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/219.jpg)
219
211.157(g) Blaster-in-charge shall notify the
Department within 24 hours of a misfire
• A copy of the blast report shall be forwarded to the Department
![Page 220: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/220.jpg)
220
211.158 Mudcapping
• 211.158(a) Mudcapping is allowed only when the blaster-in-charge determines that drilling would not be safe– No more than 10 pounds of explosives
shall be used for a blast
![Page 221: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/221.jpg)
221
211.159 Electric detonation
![Page 222: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/222.jpg)
222
211.159(a) Electric blasting caps shall be tested for
continuity with a blaster's galvanometer or Blaster's
Multimeter • 211.159(a-1) Before the primers are
made up• 211.159(a-2)After the blast hole has
been loaded but prior to stemming• 211.159(a-3) As the final connecting
of the circuit progresses
![Page 223: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/223.jpg)
223
211.159(b) When shunt is removed from electric
blasting cap leg wires, the exposed wires shall be
reshunted
![Page 224: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/224.jpg)
224
211.159(c) Electric blasting caps may not be employed near overhead
electric lines
![Page 225: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/225.jpg)
225
211.159(d) Blasting caps may not be reused if the
leg wires are broken
![Page 226: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/226.jpg)
226
211.159(e) Leg wires shall extend above the top of the
blast hole• Wire connections and splices are not
allowed in the blast hole
![Page 227: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/227.jpg)
227
211.159(f) Only solid wire shall be used in a blasting
circuit• Stranded wire is prohibited
![Page 228: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/228.jpg)
228
211.159(g) Electric detonation near public
roads • Signs shall be erected at least 500
feet from the blast area– Reading "Blast area -shut off all two -
way radios"
![Page 229: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/229.jpg)
229
211.159(h) Permissible blasting machines shall be used to detonate the blast
![Page 230: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/230.jpg)
230
211.159(i) Blasting circuit shall remain shunted until
the time for detonation• Unless the circuit is being tested• connections are being made
![Page 231: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/231.jpg)
231
211.159(j) All blasting machines shall be
calibrated every 30 days by procedures
recommended by the manufacturer or supplier
![Page 232: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/232.jpg)
232
211.159(k) Blaster-in-charge shall determine that there is adequate
current to properly energize the detonators
![Page 233: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/233.jpg)
233
211.160 Nonelectric detonation
• Nonelectric initiation systems shall be checked and tested in accordance with manufacturer recommendations
![Page 234: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/234.jpg)
234
211.160 Detonating cords
![Page 235: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/235.jpg)
235
211.161(a) Shall be cut from the supply roll immediately after
placement in the blast hole
![Page 236: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/236.jpg)
236
A sufficient length of downlines shall be left at the top of the blast ole for connections to trunk lines
• The supply roll shall be immediately removed from the site– Scrap pieces of detonating cord shall be
destroyed after connections are made
![Page 237: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/237.jpg)
237
211.161(b) Trunk line shall be covered with at least
12 inches of earth or sand
![Page 238: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/238.jpg)
238
211.161(c) Detonating cord may not be spliced if the splice will fall within a
blast hole
![Page 239: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/239.jpg)
239
211.162 Safety Fuse
• 211.162(a) Shall be long enough to provide a burn time of 120 seconds or longer
• 211.162(b) Blaster-in-charge shall conduct a test burn– Test burn will utilize at least a 12 inch section of
fuse
• 211.162(c) A proper crimping tool shall be used to crimp a blasting cap to a safety fuse– A blasting cap may not be attached to a safety
fuse in or within 10 feet of a magazine
![Page 240: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/240.jpg)
240
211.171General provisions for monitoring
• 211.171(a) Scaled Distance of a blast is 90 or numerically less at the closest building not owned or leased
• 211.171(b) Blasting without monitoring • 211.171(c) A ground vibration and airblast
record of each blast shall be made part of the blast report
• 211.171(d) The trigger for ground vibration shall be set at a particle velocity of no more than .25 inches per second
![Page 241: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/241.jpg)
241
211.171General provisions for monitoring (2)
• 211.171(e) A printout from the instrument shall be attached to the blast report– the printout shall provide date and time
when instrument was turned on and off, set trigger levels
![Page 242: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/242.jpg)
242
211.172 Monitoring instruments
![Page 243: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/243.jpg)
243
211.172 Monitoring instrument shall provide a permanent record of each
blast• 211.172(1) A monitoring instrument for recording
ground vibration shall have– Frequency range of 2 Hz to 100 Hz– Particle velocity range of 0.2 to4.0 inches per second or
greater– An internal dynamic calibration system
• 211.172(2) A monitoring instrument used to record airblast shall have– A lower frequency limit of 0.1 ,2.0 or 6.0 HZ– An upper end flat-frequency response of at least 200 Hz– A dynamic range that, at a minimum, extends from 106
to 142 dbl
![Page 244: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/244.jpg)
244
211.172 Monitoring instrument shall provide a permanent record of each
blast (2)• 211.172(3) Shall be calibrated
annually– Also when repairs are made– Calibration procedures and
documentation of calibration shall be made available for review by the Department
• 211.172(4) Nonalterable calibration sticker affixed to the instrument
![Page 245: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/245.jpg)
245
211.173 Monitoring records
![Page 246: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/246.jpg)
246
211.173(a) Everyone using the monitoring instrument
shall be trained• A record of the training is to be
maintained and available for review by the Department
![Page 247: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/247.jpg)
247
211.173(b) Monitoring records at a minimum shall
contain• 211.173(b-1)Calibration pulse on each of the
mutually-perpendicular ground vibration traces
• 211.173(b-2) The time history of particle velocities of three mutually perpendicular round vibration traces and one air-overpressure trace, including time base, amplitude scales and peak values for all traces
• 211.173(b-3) The results of a field calibration test for each channel
![Page 248: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/248.jpg)
248
211.173(b) Monitoring records at a minimum shall
contain (2)• 211.173(b-4) The frequency content of all vibration signals using either single degree of freedom (SDF) response spectrum or half-cycle zero-crossing analysis method
• 211.173(b-5) Frequency versus particle velocity plots
• 211.173(b-6) The name and signature of the individual taking the recording
• 211.173(b-7) The location of the monitoring instrument, date and time of the recording
![Page 249: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/249.jpg)
249
211.173(b) Monitoring records at a minimum shall
contain (3)• 211.173(b-8) The last calibration
date of the monitoring instrument
![Page 250: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/250.jpg)
250
211.173(c) If the Department questions the
validity of a ground vibration or airblast record or the interpretation of the
record, the Department may require
• Ground vibration or airblast recording to be analyzed or certified by an independent, qualified consultant– It shall be performed and included with
the blast report within 30 days
![Page 251: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/251.jpg)
251
Title 25 Chapter 87
![Page 252: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/252.jpg)
252
Public highways and entrances to the operation
• Barricade / Guard– If highway is within 1,000 feet of blast to
be shot
![Page 253: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/253.jpg)
253
30 CFR PART 77 SUBPART T
![Page 254: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/254.jpg)
254
Top man on Duty
![Page 255: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/255.jpg)
255
check in and out system
![Page 256: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/256.jpg)
256
Examinations 77.1901
• Pre shift - 90 minutes prior to start of shift– Certified Person
• On shift while men are at work – Certified Person
• Before and after Blasting– Certified Person
![Page 257: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/257.jpg)
257
all exams must include 77.1901
![Page 258: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/258.jpg)
258
![Page 259: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/259.jpg)
259
Continuous Monitoring of Atmosphere
![Page 260: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/260.jpg)
260
Check Coping
![Page 261: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/261.jpg)
261
• Air Reading at Fan– Magnahelic Reading
![Page 262: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/262.jpg)
262
• Check Service Lines
![Page 263: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/263.jpg)
263
check water ring gas test
![Page 264: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/264.jpg)
264
examine ribs below concrete
![Page 265: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/265.jpg)
265
make gas test around ribs
![Page 266: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/266.jpg)
266
make gas tests at bottom
• methane• oxygen• carbon monoxide
![Page 267: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/267.jpg)
267
Correct all hazards found on pre shift / on shift exam
![Page 268: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/268.jpg)
268
Record keeping
• air reading (CFM)(Location)• gas readings
– CH4 and O2 deficiency CO approved devices 77.1901-1
• violations or hazards observed• miss fires• corrective actions taken• date / time • signature
![Page 269: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/269.jpg)
269
surface area exam 77.1901
• tripping and stumbling obstacles• general housekeeping• illumination• walk through compressor house
– note temperature– airline leaks – unusual smells– oil spillage– Subtopic
• record examination
![Page 270: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/270.jpg)
270
Excessive gas encountered 77.1901
• 1.0 % Methane– Make changes or adjustment to ventilation– Do not start any equipment– De-energize power– Re-examine area
• 50 PPM Carbon Monoxide– Make changes or adjustment to ventilation– Re-examine area
• 19.5% Oxygen
![Page 271: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/271.jpg)
271
Excessive gas encountered 77.1901 (2)
• 1.5% Methane– Remove all personal– De-energize equipment– Ventilate– Re-examine area
![Page 272: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/272.jpg)
272
Diesel 77.1902 - 1
• Permissible Part 36
![Page 273: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/273.jpg)
273
Hoists 77.1903
![Page 274: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/274.jpg)
274
Communications 77.1904
• Two independent means of signaling– one audible – signal codes posted– communications tested daily
![Page 275: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/275.jpg)
275
Hoist Construction 77.1907
• Hooks shall be self-closing
![Page 276: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/276.jpg)
276
Daily Inspections 77. 1906
• Insure daily inspections are completed and signed
• Records to be maintained for 1Year
![Page 277: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/277.jpg)
277
Hoist Installation 77.1908
![Page 278: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/278.jpg)
278
Hoist rope suspended from substantial housing
![Page 279: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/279.jpg)
279
Shaft guide and guide attachments installed
77.1908-c
![Page 280: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/280.jpg)
280
emergency escape 77.1908-f
• hoist• Ladder
![Page 281: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/281.jpg)
281
embark / disembark landing over shaft
77.1908-e
![Page 282: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/282.jpg)
282
Hoist bucket
• Shall not ride rim or loaded bucket 77.1908-g
• Mantrip number of people77.1908-h– Speed 500 fpm / 200fpm within100 ft of
stop– speed posted for hoistman– hoist stopped within 15 ft. of landing – all bucket shall be trimmed
![Page 283: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/283.jpg)
283
Wire Ropes 77.1430
![Page 284: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/284.jpg)
284
visual examination 77.1433
• every 14 calendar days• broken wires, stress points,
distortions
![Page 285: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/285.jpg)
285
End attachment retermination 77.1437
![Page 286: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/286.jpg)
286
Drum End Attachment 77.1436
• attached securely to drum• minimum of three full turns of wire
rope on drum
![Page 287: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/287.jpg)
287
Load end attachments 77.1435
![Page 288: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/288.jpg)
288
Retirement criteria 77.1434
• 6% wear• Broken wires• Subtopic
![Page 289: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/289.jpg)
289
Minimum rope strength 77.1431
![Page 290: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/290.jpg)
290
Initial measurement 77.1432
• After initial stretch - before wear is shown
• Baseline measurement – three measurements
• Records shall be retained with cable
![Page 291: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/291.jpg)
291
Hoistman Qualification
![Page 292: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/292.jpg)
292
Ventilation 77.1911
![Page 293: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/293.jpg)
293
Mechanical ventilation
![Page 294: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/294.jpg)
294
Installation• On Surface• Fireproof• Design to permit air reversal• Equipped with automatic signal device• Offset 15 feet• duct work grounded to prevent electrical • Duct work extended as close a possible to
ventilate properly• qualified person designated by the operator to
maintain ventilation system• Fans shall operated continuously while men are
underground– Accidental stoppage
![Page 295: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/295.jpg)
295
examined before each shift
• Quantity of air • Measured by Certified Person• Recorded
![Page 296: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/296.jpg)
296
Electrical equipment 77.1914
• Permissible• Flame resistant• Approved by Bureau of Mines
![Page 297: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/297.jpg)
297
Combustible Materials 77.1915
• Compressed and liquefied gas, oil gasoline and other – Not stored within 100 feet of shaft or
slope
• Other combustible materials and supplies– Not stored with 25 feet of shaft or slope
• Oily rags,waste, waste paper shall be stored in metal containers
![Page 298: 1 CERTIFIED PERSON STUDY GUIDE SHAFT AND SLOPE. 2 Technical Guidance 580-2200- 011 Sinking of Shafts and Slopes for Underground Mines](https://reader031.vdocuments.us/reader031/viewer/2022012916/56649e3c5503460f94b2ec65/html5/thumbnails/298.jpg)
298
Welding, cutting; Fire Protection 77.1916
• One portable fire extinguisher • Welding, cutting in the vicinity of any
shaft or slope• Exams for Methane
– 1,0% Methane
• Noncombustible barriers shall be used