Page 1: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

Precast Concrete Solutions.

v.1.0

tunnels & shaftscaisson unitsbrochure

Page 2: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

fpmccann.co.uk

FP McCann is the UK’s market leader in the manufacture, supply and delivery of precast concrete solutions. Our comprehensive precast concrete business extends to include:

Drainage and Water Management

Tunnel and Shaft Solutions

Rail Power and Infrastructure Solutions

Walling Solutions

Fencing Solutions

Rooms and Building Solutions

Agricultural Solutions

Flooring Solutions

Bespoke specialist precast product service

Modern manufacturing plants at Alnwick (Northumberland), Cadeby (Warwickshire), Ellistown (Leicestershire), Grantham (Lincolnshire), Knockloughrim (Northern Ireland), Littleport (Cambridgeshire), Lydney (Gloucestershire), Telford (Shropshire) and Weston Underwood (Derbyshire) incorporate the latest computerised batching, distribution, casting, curing and handling systems and are operated by skilled and experienced workforces to ensure consistency of quality. Their geographical spread gives us an unrivalled ability to serve the construction industry throughout the UK and Ireland.

Page 3: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

caissonunits

Sales & technical enquiries01455 290780fpmccann.co.uk/caisson-units

03

FP McCann manufactures a range of reinforcing units suitable for sinking by the caisson method. Caisson shaft units can be supplied with diameters of 2100mm up to 4000mm. Caissons are manufactured in accordance with the YLX\PYLTLU[Z�VM�):�,5�� ����HUK�OH]L�2P[LTHYR�JLY[PÄJH[PVU�^OLYL�YLSL]HU[�to the scope of BS5911 (2100mm – 3000mm diameters). However 3600mm and 4000mm diameters remain operative within the scope of the ISO9001 accredited Quality Management System.

Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its own weight or with the aid of caisson jacks, in a controlled manner from the surface to a predetermined depth. Caisson shafts are constructed using a metal cutter ring and base section with rings being added on top as excavation proceeds. The technique is suited to shaft construction through weak soils, high-plasticity clays, silts, sands and gravels; particularly below the water table.

introduction

Page 4: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

04

caissonunits

FP McCann Caisson RangeCaissons

Shafts DNAvailable Depths (mm) Barrel DN

Wall

ThicknessLifting Hole

mm 1000 750 500 mm mm Qty per unit

2100 3 3 3 2350 1253 No. RD24 Wavy Tail

Inserts

2400 3 3 3 2680 1403 No. RD30 Wavy Tail

Inserts

2700 3 3 3 3000 1503 No. RD30 Wavy Tail

Inserts

2400 3 3 3 2680 1403 No. RD30 Wavy Tail

Inserts

3600 3 3 3 3970 1853 No. RD30 Wavy Tail

Inserts

2400 3 3 3 2680 1403 No. RD30 Wavy Tail

Inserts

*DN4000 supplied as a two piece unit.

Caisson Rings – Table of Weights (DN 2100-4000)

Caissons

Shafts DNCutting Shoe Weight (Kg)

Approx. Weight p/meter Caisson

(with cutting shoe) (Kg)**

Approx. Weight p/meter

Caisson (without cutting

shoe)**

mm 10mm 20mm 10mm 20mm Kg

2100 320 581 2590 2851 2270

3000 529 953 5209 5633 4680

2700 441 794 3931 4284 3490

3000 529 953 5209 5633 4680

3600 641 1148 6061 6568 5420

3000 529 953 5209 5633 4680

* DN4000 supplied as a two piece unit.

** Nominal weights increase by 5% for sizing lifting equipment and reduce by 5% for floatation design.

Base units may be fitted with a light duty (10mm) or a medium duty (20mm) cutting shoe.

Page 5: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

05

handling &installation caisson

units

Sales & technical enquiries01455 290780fpmccann.co.uk/caisson-units

Caisson Plate

Page 6: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

06

caissonunits

2 piece Caisson exploded

Caisson Installation Stages

Page 7: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

07

Page 8: tunnels & shafts caisson units brochure - FP McCann Ltd Brochures Lo-Res... · Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its

Cadeby Works:Brascote Lane Cadeby Nuneaton Warwickshire CV13 0BB

Tel. 01455 290780 [email protected] fpmccann.co.uk