Automated Meter Management roll-outEnel’s experience
Fabio BorgheseInternational Business Development Network TechnologiesNetwork TechnologiesInfrastructure and Network Division
Rome – March, 5th 2010
![Page 2: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/2.jpg)
2
Introduction
Italian Telegestore successful experience
Extend the benefits to other Utilities
Agenda
![Page 3: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/3.jpg)
3Source: McKinsey Power Distribution Benchmarking Initiative 2009
1st Q UK
Player A
Player B
Player D
Enel
Player N
Player O
Best Performer europeo per eccellenza operativa e qualità del servizio
Enel Benchmark
€/customer
CAPEX 2007
€/customer
Milioni di clienti km rete (x 1.000)44,0
64,5
93,0
112,8
47,2
68,0
86,5
Ø 74
OPEX 2007
45,6
76,2
50,7
41,1
110,6
139,9
Ø 77
87% Clienti Italia su rete Enel
![Page 4: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/4.jpg)
4
Telegestore is fully operational on > 32 Mln CustomersLeading TechnologyExcellence in operation
Benefits are targeting Enel and the Italian Electricity System
Italian Authority AEEG has published the resolution 292/06: all Italian electricity customers will be equipped with AMMS (Automatic Meter Management System) by 2011
Enel Automated Meter Management System:the TelegestoreSummary
![Page 5: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/5.jpg)
5
Remote activities and readings(mln)
142
187
2004 2005 2006
13
96
0.93.5
5.7
2007
912
260
2008
Remote activities
Readings
Automatic Meter ManagementItalian pioneering experience and leadership
Digital meters installed, controlled and read in December 2008: 32 mln
New Generation based on Italian unique experience
with state of the art functionalities
13 million Customers in Spain
![Page 6: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/6.jpg)
6
AMM roll out Drivers
Improving the efficiency of customer relationship processes
Innovating the customer relationship
Laying the foundation of Smart Grids
![Page 7: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/7.jpg)
7
AMR/AMI experiences in Europe Regulation road map
All Italian electricity customers shall be equipped with smart meters by 2011, due to resolution 292/06 issued by Italian Authority AEEG
Enel completed in 2006 the installation of 32Mln meters at its customer premises.
All Spanish electricity customers shall be equipped with smart meters by 2018, due to Royal Decree 1110 issued by Spanish Government in 2008.
Enel has developed a new generation of its smart meter to be installed to the 13Mln customers of Endesa, the main Spanish energy utility and a company of Enel Group
EDF has announced the start of replacement of its 35 electromechanical meters with new smart meter
3rd energy package
80% European electricity customers shall be equipped with smart meters within 2020.
3rd energy package
80% European electricity customers shall be equipped with smart meters within 2020.
Swedish energy utilities have install smart meters to 100% electricity customers
Norway Authority sent out regulation to install smart meters within 2015
The regulation would all 3,3Mln customers equipped with smart meters within 2015
Authority requires to install at least 80% smart meters of the total 3,2Mln by 2014
![Page 8: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/8.jpg)
8
Introduction
Italian Telegestore successful experience
Extend the benefits to other Utilities
Agenda
![Page 9: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/9.jpg)
9
Telegestore deployment plan
Completed Measures ManagementRemote Management of Commercial and Technical Work OrderMeasures Pre-billing Sub-System implementation
1999 200119991999 20012001 200220022002 200320032003 200420042004 200520052005 2006…20062006……
Remote Management of Commercial Work OrderRemote Management of Technical Work OrderPDA application for commercial and technical Work OrderRemote Meter Reading
Periodic (bi-monthly) Meter Reading and advanced Billing Tariff schemasRemote Management of fraudulent Customers
Evolution to Meter Data Management System, monthly Remote Reading Consumption ProfilesStart deployment of New Generation Meters and LVC with ST PLC chipset.
Advanced Management of Distribution NetworkDemand and Energy ProcurementMulti meteringBidirectional Meter for Micro Generation ManagementIntegration with WFM System for Real-time Work Orders Assignment and OptimizationMeter & LVC Problem Manager Sub-SystemMass installation completed
…2008……20082008
Resi
den
tial
an
d S
mall
Bu
sin
ess
Cu
sto
mers
Commercial and Technical Agreements with Meters Manufacturers (Actaris, Iskraemeco, ABB Elster and Siemens Landis), to support AMR System development
Trial start with Actaris MetersFirst release of Measures Management Module: acquisition, validation, storage, …
Med
ium
an
d L
arg
eB
usi
ness
Cu
sto
mers
Start InstallationPlan of Multiphase Digital MetersLV concentrators CommissioningMassive installation (700.000/month)
Kick-off (1999)Laboratory Prototype (2000-2001)Industrial pre-series (2000-2001)Strategic Agreements Stipulation with EchelonTrial start with new MetersStart Installation plan of single phase digital meters and Low Voltage concentrator
>30 Millions meters replaced and put in operation in 5 years without any
related benchmark project worldwide
>30 Millions meters replaced and put in operation in 5 years without any
related benchmark project worldwide
……to be continuedto be continued……
![Page 10: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/10.jpg)
10
Telegestore ProjectMain figures
> 3.500 third-party installers
500 Enel.si agencies
120 ICT Project technicians
8.500 Palmtops
127 Enel Distribuzione Zones
One High Availability
System
![Page 11: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/11.jpg)
11
Telegestore Technical Infrastructure
![Page 12: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/12.jpg)
12
Assignment ↓ andFeedbacks ↑
Connect:Direct / Tibco
MobileMobile
GME
CBT / CE
SIAG/AMM/BLSIAG/AMM/BL
Data storageData
storage
Backup SIAG
Backup SIAGDLNSDLNS
PDA/Tablet
PPNSPPNS
Batch
DBlink
BatchOnline
Backup
Online
Online
Online
Online
Online
Online
Online
Batch
AttuatoreBatch
BatchBatch
SGMSGM
Network Management Systems Commercial Systems
Field force and Control Room (http://tgs.enel)
Analysisservice and
Reporting
Dashboards
SMILE
Telegestore in Enel’s existing systemsSMILE (Sistema MIsure Lavori Enel)
…to a fully integrated system
Public Communication
Network
Intranet
PLC 2,5 Kbps
MV/LVSubstation
Commercial System (CRM)Centralised Remote Management System
Interface Communication Software
ConcentratorConcentrator
Meters
Data Communication
Centre
Control Centres
Total: 30 Millions
Total: 350,000
From a front end system…
![Page 13: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/13.jpg)
13
Equipment family
Poly-phase indirect (with CT)
Mod. GET4S/GISS
Poly-phase direct (without CT)
Mod. GET1/GET3A/GIST
Single phase
Mod. GEM/GISM
LV Data Concentrator
GSM/GPRS module
![Page 14: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/14.jpg)
14
Installation in Italy*
32.540.000Meter remotely managed
Concentrators installed in MV/LV substations 368.000
* up to 31 december 2009
![Page 15: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/15.jpg)
15
Telegestore: a proven solutionRemote management readings and operations
Load profile 46.000.000
Total 209.700.000
Montly-bimontly 204.700.000
Spot readings 5.000.000
Activations 845.000
Contract management 15.263.000
Contract termination 759.000
Bad payers management 2.958.000
Total 19.825.000
Final ‘09
READINGSREADINGS
600.000/day
50.000/day
PEAKS of 300.000
OPERATIONSOPERATIONS
Successful remote readings 99.9%*
Successful remote operations 98%*
*Yearly Data
![Page 16: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/16.jpg)
16
Telegestore performancesSuccess rate
Daily Reachability 99,9 %
(meter reached in 24 h – attempts each 35min)
Reachability index 98,5 %
(well done attempts/total attempts in 1 year)
PLC communication
Work order remote execution
LV Concentrator
PLC
Meters
PERFORMANCE ACTUALPERFORMANCE PREVIOUS MONTH
DD_PILDF_LOM
DG_TRI
DH_ERM
DI_TOU
DM_LAMDO_CMP
DP_PUB
DQ_CAL
DR_SIC
DS_SARPublic
Communication
Network
Intranet
PLC 2,5 Kbps
MV/LVSubstatio
n
Commercial System (CRM)Centralised Remote Management
SystemInterface Communication Software
Concentr
ator
Concentr
ator
Meters
Data Communication Centre
Control Centres
Total: 30 Millions
Total: 350,000
average success rate in 2009 98%
![Page 17: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/17.jpg)
17
A guaranteed solution Dedicated test plant
conformity with International Standard (mandatory)
minimum lifetime of HW components
communication performances
quality control
new developments
• 4 secondary cabin(630, 400, 250 e 100 kVA)
• 16 feeder(6 metropolitan, 4 urban, 4 semi urban, and 2 rural)
• 64 derivations
• 150 derivation boxes
• 40 km total cabled line (2 km max length for a single line)
• 600 mt line on air
• 600.000 connections in low tension
• 4 secondary cabin(630, 400, 250 e 100 kVA)
• 16 feeder(6 metropolitan, 4 urban, 4 semi urban, and 2 rural)
• 64 derivations
• 150 derivation boxes
• 40 km total cabled line (2 km max length for a single line)
• 600 mt line on air
• 600.000 connections in low tension
FiguresFigures
Enel invested more than 20 ML € to realize a dedicated test plant to carry out tightening tests on Telegestore’scomponents to verify:
• 1 AMM simulator (automatic meter management system)
• 4 concentrator
• 700 meters (600 mono-phase and 100 poly-phase)
• 2.500 household appliances and industrial electronic devices
• constructed with Enel materials
• Allowing the definition and the test of the network management techniques and procedures
• 1 AMM simulator (automatic meter management system)
• 4 concentrator
• 700 meters (600 mono-phase and 100 poly-phase)
• 2.500 household appliances and industrial electronic devices
• constructed with Enel materials
• Allowing the definition and the test of the network management techniques and procedures
![Page 18: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/18.jpg)
18
Investment and savings areas
Failed Accesses
SavingAreas
500 M€€/Y
Purchasing and Logistics
Field OperationsCustomer Service
Revenue Protection
Readings
Replacement Activation Deactivation
Installation and Recovery
Interventions on Failures
Bad Payers Invoicing
Customer Service
Collection
Self Consumption
Warehouses Internal Transportation
Purchasing Revision
R&DCOSTS
PRODUCTION AND INSTALLATION OF
ELECTRONIC METERS
PRODUCTION AND INSTALLATION OF CONCENTRATORS
IT SYSTEM DEVELOPMENT
TOTAL INVESTMENTS 2,100 M€
Thefts and Failures
Checks on Meters
![Page 19: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/19.jpg)
19
INVOICES ON REAL CONSUMPTION
REMOTE CONTRACT MANAGEMENT
TAILORED TARIFFS
SAVINGS IN BILLING
PRE PAYMENT
EASIER FREE MARKET DEVELOPMENT AND MANAGEMENT
INVOICES ON REAL CONSUMPTION
REMOTE CONTRACT MANAGEMENT
TAILORED TARIFFS
SAVINGS IN BILLING
PRE PAYMENT
EASIER FREE MARKET DEVELOPMENT AND MANAGEMENT
FOR CUSTOMERS and other electrical system
operators
FOR CUSTOMERS and other electrical system
operatorsFOR ENELFOR ENELFOR THE ELECTRIC
POWER SYSTEMFOR THE ELECTRIC
POWER SYSTEM
PEAK SHAVING
ENERGY EFFICIENCY AND CO2 REDUCTION
REDUCTION OF COMMERCIAL AND TECHNICAL LOSSES
PEAK SHAVING
ENERGY EFFICIENCY AND CO2 REDUCTION
REDUCTION OF COMMERCIAL AND TECHNICAL LOSSES
CUSTOMER SATISFACTION
EXCELLENCE IN COMMERCIAL AND TECHNICAL QUALITY
OPERATING COST SAVINGS
LEADERSHIP IN INNOVATION
CUSTOMER SATISFACTION
EXCELLENCE IN COMMERCIAL AND TECHNICAL QUALITY
OPERATING COST SAVINGS
LEADERSHIP IN INNOVATION
Benefits
![Page 20: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/20.jpg)
20
Lessons learnt Shared benefits
Tailored tariffs
Switching(ml)
+15%
Y2007 Y2008
1,3 1,5
Energy Balance
Efficient and competitive
market
Success rate of meter verification
from from 5%5% to to 60%60%
~ 150 retailers
![Page 21: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/21.jpg)
21
E-mobility infrastructure description
Adoption of innovative technologies, in compliance with standards
Solution ready to support smart grid functionalities (load management e storage)
Innovative and cost effective solution enabling advanced services for charge management and billing
To develop an infrastructure which overcomes economic and functional barriers, enabling large scale penetration of electric mobility
Other SupplierOther
Suppliers
![Page 22: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/22.jpg)
22
Bidirectional communication channel with the Telegestore infrastructure
Indoor load management and automation
Energy@Home project with Telecom Italia, Indesit and Electrolux to define a common and standard indoor communication platform
Agreement to be signed with Google to integrate Telegestore data into Powermeter solution
Expected costs: 15-20 € by device to be remunerated according to AEEG resolution
Large scale implementation of enabling solutions for the energy customer consciousness and energy efficiency
Smart Info
Central DB
Smart GridSmart Info
![Page 23: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/23.jpg)
23
Introduction
Italian Telegestore successful experience
Extend the benefits to other Utilities
Agenda
![Page 24: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/24.jpg)
24
Smart metering deployment…….an extraordinary revolution!
Not only new products… …but new ways to do it!
Efficiency
Cost
effectiv
enessPro
cess
Optimiz
atio
n
Service
quality
![Page 25: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/25.jpg)
25
Deploy an AMM Solution for residential customersWhat are the main Utilities challenges ?
Face with a new regulatory scenario
Increase cost efficiency
Improve customer satisfaction
Promote energy efficiency
trend towards Smart Grids deployment
Pursue continuous progress on processes’
optimization
Innovate management systems
Assure high standard of service quality
Enhance customer fidelity
Deploy a cost effective and reliable AMM System
Promote technological progress
![Page 26: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/26.jpg)
26
Investment benchmark Why Enel is the best partner for an AMM deployment?
![Page 27: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/27.jpg)
27
Enel Meter CertificationState of the art
IMQ
Telegestore is Certified in all addressed Countries
![Page 28: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/28.jpg)
28
Standard de facto Standard de facto Standard de facto
Custom-tailored system
~ 3.500.000 Meters
Solution fitting utilities’ needs
>95% of Italian points of measurement are equipped with Enel
meter.
Wide and small Italian utilities have adopted the Enel solution
(from 3.500 to 1Ml meters).
Different service models were set up with the support of
technology suppliers and other service companies in order to
enable the easiest ad widest adoption of the AMM technology to
the different size and local utilities.
Italian utilities have chosen Enel solutionItalian utilities have chosen Enel solutionItalian utilities have chosen Enel solution
![Page 29: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/29.jpg)
29
Other Worldwide System Users acquiredFrom 2006
• Pilot Test (Russia)
• 645,000 meters
• 188,000 meters(The Netherlands)
• MoU SEC (Saudi Arabia)
• 250,000 meters
• Pilot Test (India)
• Pilot Test (Romania)
• Pilot Test (Ivory Coast)
• 13 millions meters
●Pilot Test (Hong Kong)
●Feasibility StudyShanghai Power (China)
![Page 30: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/30.jpg)
30
Enel approach for a new AMM generation What is Enel doing …
Enel has designed a new AMM generation system, based on the evolution of the Telegestore.
Enel has designed a new AMM generation system, based on the evolution of the Telegestore.
The new solution will include the last technology evolution in terms of components and functionalities, maintaining the robustness and reliability of
the Telegestore
The new solution will include the last technology evolution in terms of components and functionalities, maintaining the robustness and reliability of
the Telegestore
Enel is actually developing the new field components and the AMM system modules to be deployed in Spain from 2010 with the committment to
produce more than 13ML meters within 2016
Enel is actually developing the new field components and the AMM system modules to be deployed in Spain from 2010 with the committment to
produce more than 13ML meters within 2016
![Page 31: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/31.jpg)
31
“Cervantes” Smart Metering System: MeterCost-efficient and rich in functionality
New generation of robust and New generation of robust and reliable PLC communicationsreliable PLC communications
Optimized relation of features Optimized relation of features versus costsversus costs
Prepared for deployment of all Prepared for deployment of all advanced smart metering and Smart advanced smart metering and Smart Grids functionalitiesGrids functionalities
![Page 32: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/32.jpg)
32
Communication protocol openingEnel strategy
Enel communication protocol (MORE) is:
EU mandate (M/441) assigned to CEN EU mandate (M/441) assigned to CEN -- CENELEC CENELEC –– ETSIETSI
Development of an open architecture for utility meters involving
communication protocols enabling interoperability
proven reliability of the Enel proprietary protocol thanks to 35 Mln meters in operation
upcoming deployment on over 13 Mln meters in Spain
implementation of all the advanced AMM functionalities ready for Smart Grids infrastructure.
Best European experience towards
standardization process
Best European experience towards
standardizationstandardization process
Leveraging onLeveraging on
managed by a neutral and no-profit association;
Accessible, assuring its availability;
enabling evolution certified.
![Page 33: 04_-_Automated_Meter_Management_roll-out_borghese_fabio.pdf](https://reader030.vdocuments.us/reader030/viewer/2022020219/5695cf761a28ab9b028e3568/html5/thumbnails/33.jpg)
33
Enel AMM Solution key factorsIn brief
It is a new generation AMM system that includes the last technology evolution in terms of components and functionalities
Guaranteed robustness and reliability of the Telegestore
Production & maintenance for the entire system lifetime with theguarantee to use the “state of the art” electronic components
Modular solution. Guarantee of evolution maintenance due to new requirements established by Authorities and/or technological evolution
of energy distribution market (i.e. Smart Grid)
Provided by an Utility with unique know how and direct experiences on business processes reengineering and problem management
Open solution. Equipped with an open reliable and proven PLC communication protocol.