City of San Diego and Airport Authority Partnering in Development and Growth of San Diego's InfrastructureTRANSCRIPT
NORTH SIDE PROGRAM COORDINATION WITH THE CITY OF SAN DIEGO March 08, 2013 – Presenter: Luis Alarcon
DEVELOPMENT of the SAN DIEGO INTERNATIONAL AIRPORT RCC AND ENABLING PROJECTS
2
North Side Overview
Relocate Portion of Blast Fence
Relocate Triturator
3
Washington Street
4
Interior Road and UtilitiesPermits: 04/15/2013
Permits: Public Access Water (potable/irrigation) Sewer Connection Traffic Loops
5
Easements
6
Utilities
7
Cross-Section ‘A’
8
Cross-Section ‘A’
9
Sassafras Intersection Improvements
10
Port Parking Lot
11
Fixed Base Operator (FBO)Permits: 05/01/2013 Permits:
Building Fire Approval Water (potable/irrigation)
12
FBO Site Plan
13
FBO Rendering
14
San Park 2/Pacific Highway Sidewalk and Landscaping
Permits: Interior Road Easements/Agreements
15
San Park 2 - Waterlines
16
Pacific Highway (Before)
17
Pacific Highway (After)
18
Rental Car Center (RCC)
Permits: Easements/Agreements
19
RCC
20
RCC
21
RCC Permit SchedulePermit/Document Plan/Document Date
City Issues Right-of-Way Permit 42-inch Storm Drain Relocation Plans 3/15/13
City records Dedication @ County 20' Drainage Easement Dedication 3/15/13
City records EMA @ County Encroachment Maintenance Agreement (EMA) 4/31/13*
City Issues Right-of-Way Permit Pedestrian Bridge Demolition Plans 8/15/13
City Issues Right-of-Way Permit Domestic Water Lateral Plans 8/15/13
Fire Marshall Approval Fire Circulation & Fire Hydrant Plan 8/15/13
Fire Marshall Approval Alternate Means & Methods Report for Fueling 8/15/13
No City Permit Required Pkg 1 - RCC Site, Civil, Grading, Utilities 8/15/13
City issues Building Permit Pkg 2 - RCC Foundation Plans 8/15/13
City records Vacation @ County Drainage Easement Vacation 9/30/13
City issues Building Permit Pkg 3 - RCC Superstructure 10/1/13
City issues Building Permit Pkg 4 - RCC Interior Finishes, Roof/ MEP 3/14/14
* Please note this date is dictated by the need to have the FBO site turned over to Landmark on May 1, 2013; the Rental Car Center does not need the EMA in place until 8/15/13 just prior to pulling the initial building permit for the foundations.
22
Terminal Link Road (TLR)
Permits: 06/17/2013 Permits: Building Right-of-Way Coastal Development
Permits: 08/01/2013
23
Triturator Water and Sewer Connection
24
Bus Route Overview
25
Palm Street Improvements
26
Harbor Drive Expansion
27
Harbor Drive Rendering at New Intersection
Plan
ning
Pha
se E
nd
Sche
mat
ic D
esig
n
60%
Pla
ns a
nd S
pecs
100%
Pla
ns a
nd
Spec
s
Adver
tise
men
t
Bid O
peni
ng
Board
Mee
ting
Not
ice
to
Proc
eed
(NTP
)
End
Const
ruct
ion
Terminal Link Road
North Side Interior Road & Utilities 6/04/12
5/7/13
4/15/1311/2/128/13/12 6/6/13 8/15/137/11/13 4/11/14
SanPark Pacific Highway North Parking Lot 6/15/12
4/12/13
3/15/139/21/128/20/12 5/14/13 7/11/136/6/13 1/7/14
10/01/12
1/2/1412/4/13n/a3/22/13 1/31/14 6/9/144/3/14 6/15/15
Enabling Projects Schedule
RCC O
PENS
Summer2015
Summer2015
Summer2015
3/8/13
6/10/135/26/13n/an/a 7/9/13 9/10/138/1/13 1/14/14
Summer2015
3/28/11
7/1/136/9/13n/a4/16/12 7/30/13 10/28/139/12/13 7/25/14
Summer2015
FBO Twy
Storm Drain
29