02 march 2020 public meeting feedback report · since the initial public meeting in november and...
TRANSCRIPT
![Page 1: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/1.jpg)
a community space for tustin02 march 2020 public meeting Feedback report
![Page 2: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/2.jpg)
Tustin public meeting Feedback 02 march 2020
Option 1 – Maintain
Maintain for the next 30 years to Decent Homes and Southwark Standards (new kitchens
and bathrooms) and Estate Repairs
Option 2 – Refurbishment
Refurbishment to Decent Homes Standards and Southwark Standard (new kitchens,
bathrooms, block enhancements, new build infill homes and estate improvements
Option 3 – Partial Refurbishment and Part Demolition and Rebuild
Bowness and Heversham and Manor Grove council properties are refurbished.
Other blocks are demolished and rebuilt. Estate Improvements.
Option 4 - Tustin Common
All demolition and rebuild to maximise number of new Council Homes
Option 4 A – Tustin Common and Manor Grove Infill
Demolition and rebuild excluding Manor Grove. Rebuild to maximise number of new
Council Homes. Manor Grove Council properties are refurbished, improvements to the
surrounding area some infill.
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 2
Old Kent Road
options explained
About the selected options
REFURBISHMENT PARTIAL REFURBISHMENT, DEMO & REBUILD• 575 - 625 homes (including 528 retained)• Infill building heights ranging from 2 - 8 storeys
• 825 - 875 homes (including 411 retained)• New building heights ranging from 2 - 21 storeys
TUSTIN COMMON + MANOR GROVE INFILL
• 528 Retained homes (including 230 in the towers)• Existing building heights ranging from 2 - 18 storeys
TUSTIN COMMON• 1000 - 1050 homes (including 230 retained)• New building heights ranging from 2 - 21 storeys
• 1000 - 1050 homes (including 279 retained)• New building heights ranging from 2 - 21 storeys
MAINTAIN
2
4
3
4a
1
Old Kent Road
Old Kent Road
Old Kent Road
Old Kent Road
introduction & orientation
Start hereWe are happy to talk you through the panels, or please speak to one of the Common Grounds or Southwark team with any questions.
Thank you for visiting this meeting on the final options for Tustin Estate. These are the final options which have been developed based on all the feedback received from residents to date:
1. Maintain Tustin2. Maintain the Estate with new infill homes3. Partial refurbishment and partial demolition and rebuild4. Redeveloping the Estate
We want resident’s to vote for their preferred option in the ‘whittling down’ vote at the end of March.
Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related to options for the Estate which are being shown today.
The panels provide a summary of the key objectives about new homes, size and mix of homes, design, community and outdoor spaces, phasing to prioritise one move for residents. The principles of good place-making create streets with entrances and activity to promote safety and open space for quiet activity as well as sociable space for play and exercise to improve wellbeing.
Above all, the aim is to improve the quality of life of all existing residents on the estate and to explore the possibility of providing additional homes for Southwark residents too. The Council Plan commits to delivering a target of 11,000 new council homes for social rent by 2043 and has also launched a Great Estates Programme, with the aim of guaranteeing that every estate is clean, safe and cared for, and for giving residents the opportunity to improve the estate.
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 3
site observations & masterplan principles
31
Draft and Confidential
NEW BUILD: masterplan principles
School at the centre
33
Draft and Confidential
Town Centre
Intergenerational Housing
Lowrise terraces
Linear blocks
Elegant towers
0101
0102
0101
01020103
0103
0104
0104
0105
0105
Typology diversity
NEW BUILD: masterplan principles
32
Draft and Confidential
Green areas
NEW BUILD: masterplan principles
TU
ST
IN S
TR
EE
T
HIL
LBE
CK
CLO
SE
PEDESTRIAN MOVEMENTLocal movements through the estate for residents to engage with nature
PILGRIMS WAY SCHOOLThe school remains at the heart of Tustin.
STREETS & CONNECTIONSClear street connections through Tustin connecting new opportunities and quieter green connections east-west.
Old Kent Road
Old Kent Road
Old Kent Road
Old Kent Road
Old Kent Road
EXISTING GREEN AREASProtect existing ecology & encourage biodiversity.
TUSTIN ESTATE BLOCKSVariety of housing types: houses, flats, maisonettes.
SHARED PUBLIC SPACESMake sure green space is accessible and safe so that it has value to residents.
BOUNDARIES & THRESHOLDSEntry points onto the estate should be welcoming and delightful.
SAFETY & SECURITY
Site analysis
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 4
YOU HAVE TOLD US YOU LIKE:
YOU HAVE TOLD US YOU DO NOT LIKE:
Old Kent Road
residents feedback
5 February Latest Ideas Consultation
26 November 2019 Initial Ideas Consultation
Weekly Drop-in Sessions Common Grounds Coffee Mornings
“I love the shops in OKR”3
“Trees in OKR should be retained”
2
“It´s a nice spot for people to sit and gather”
1
“The flats are good size and it’s good to have balconies”4
6“The back gardens and roof terraces are nice”
5 “It feels safe and quiet”
9 “The flats are good size and it’s good to have balconies”
8“I love the view of mature trees from my window”
7“It’s great to have private gardens”
4
32 1
98
6
7
5
“The access to the building doesn’t feel safe ”
4
“Smells from back of retail units”
3
“Noise from people hanging out in OKR” 2
“The covered area doesn’t feel safe. Non residents get into the building”
1
“Very bad smells from recycling plant”
6
“There is not enough lighting”
8
“Poor lighting ”7
“Parking is an issue, specially on weekends”9
“The footpath in front of Kentmere House is used for motorcycles as a shortcut”
10
“The flats are too small”11
“Only dog owners use the green space”
12
“The entrances are damp and dirty”
14
16“The bin stores are disgusting and lead to fly-tipping and mice infestation”
“The green area off Ilderton Road doesn’t get used”
15
“There is no play areas for kids or a place for youths from the estate”
13
6
8
9 10 11
7
5 “Flats are too small”
14
8
9
5
4
3
21
1213
Precedents
MaisonettesRight: Silchester Estate, Kensington
Left: Agar Grove, Camden
+ Street level entrance
+Private front and back gardens
New HomesLeft: South Gardens, Southwark
Right: Anne Mews, Barking
+ Individual private entrances
+ Private gardens at ground floor level
+ Shared green spaces
New Homes: Back to Back HousesLeft: Kidbrooke Village, Greenwich
Right: Signal Townhouses, Greenwich
+ Individual private entrances
+ Private roof gardens
Flats with Deck AccessBourne Estate, Camden
+ Views over shared space
+ Views from both sides of the home
Podium FlatsLeft: Trafalgar Place, Southwark
Right: Blossom Court, Southwark
+ Raised communal garden
+ Secure parking
Here are examples of the ideas proposed for new homes on the Tustin Estate
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 5
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 6
What do the works to the estate mean for the size of homes?Tustin Estate was built in the 1960’s, since then a lot has changed regarding the standards that new homes currently
meet. If new homes are built on the estate, these homes will be built to current standards. Below are comparisons of
how much bigger existing homes and balconies would be if they were built today.
Bowness House HC/UH/KH HH 2B/3P HH 3B/5PBowness House HC/UH/KH HH 2B/3P HH 3B/5PBowness House HC/UH/KH HH 2B/3P HH 3B/5PBowness House HC/UH/KH HH 2B/3P HH 3B/5P
house types & space standards
Internal Areas
Balconies
Bowness House Hillbeck CloseUllswater House
Manor Grove Heversham House
7 Ullswater House - Bedsit Flat (Ground Floor).GIA 31.2m² / 335 sq ft
FLOOR PLAN
Entrance
FireExit
Bedroom
Living
Kitchenette
C - 1150W - 1020
C - 1150W - 1020
C - 1150W - 1020
CH - 2520
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF7 ULLSWATER HOUSE - BEDSIT FLAT
EXISTING PLANS
G9114 AGA050 P1
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
29 Hillbeck Close - 1 Bed Flat (Ground Floor - End Unit).GIA 35m² / 377 sq ft
FLOOR PLAN
Entrance
hwc
C - 1050W - 1050
C - 1200W - 900
Kitchen
Bathroom
c
Hall
CH - 2450
C - 750W - 1250
Living / Dining
Bedroom
C - 750W - 1250
C - 750W - 1250
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF29 HILLBECK CLOSE - 1 BED FLAT
EXISTING PLANS
G9114 AGA021 P1
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
33 Bowness House - 3 Bed Maisonette (3rd & 4th Floors) GIA 73m² / 785 sq ft
HallKitchen
Living / Dining
UP
Stor
e
CH - 2450
Store Store
high levelwindow
W - 2450
C - 1100W - 900
THIRD FLOOR PLAN FOURTH FLOOR PLAN
WC Bathroom
Bedroom 1
wardrobe
overhead soffit
Bedroom 2
Bedroom 3
hwc
C - 1050W - 1050 W - 2450
C - 1050W - 1050
CH - 2450
Landing
Entrance
balcony
balustrade
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF33 BOWNESS HOUSE - 3 BED MAISONETTE
EXISTING PLANS
G9114 AGA002 P2
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
GIA added.MB13.01.20P2
33 Bowness House - 3 Bed Maisonette (3rd & 4th Floors) GIA 73m² / 785 sq ft
HallKitchen
Living / Dining
UP
Stor
e
CH - 2450
Store Store
high levelwindow
W - 2450
C - 1100W - 900
THIRD FLOOR PLAN FOURTH FLOOR PLAN
WC Bathroom
Bedroom 1
wardrobe
overhead soffit
Bedroom 2
Bedroom 3
hwc
C - 1050W - 1050 W - 2450
C - 1050W - 1050
CH - 2450
Landing
Entrance
balcony
balustrade
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF33 BOWNESS HOUSE - 3 BED MAISONETTE
EXISTING PLANS
G9114 AGA002 P2
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
GIA added.MB13.01.20P2
Lower floor Upper floor
35 Manor Grove - 2 Bed House (Terrace).GIA 71.4m² / 768 sq ft
GROUND FLOOR PLAN
UP
FIRST FLOOR PLAN
slid
ing
door
Bathroom
Kitchen
Living / Dining
Entrance
WCStoreStore
Store
CH - 2450
Hall
wardrobeStore
Bedroom 2Bedroom 1
Store
CH - 2450
Landing
C - 900W - 1550
C - 900W - 1550
C - 1600W - 1050W - 2400
C - 900W - 1550
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF35 MANOR GROVE - 2 BED HOUSE
EXISTING PLANS
G9114 AGA044 P1
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
35 Manor Grove - 2 Bed House (Terrace).GIA 71.4m² / 768 sq ft
GROUND FLOOR PLAN
UP
FIRST FLOOR PLAN
slid
ing
door
Bathroom
Kitchen
Living / Dining
Entrance
WCStoreStore
Store
CH - 2450
Hall
wardrobeStore
Bedroom 2Bedroom 1
Store
CH - 2450
Landing
C - 900W - 1550
C - 900W - 1550
C - 1600W - 1050W - 2400
C - 900W - 1550
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF35 MANOR GROVE - 2 BED HOUSE
EXISTING PLANS
G9114 AGA044 P1
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
Ground floor First floor
Lower floor Upper floor42 Haversham House - 3 Bed Maisonette (Gr. Floor). GIA 77.9m² / 838 sq ft
HallKitchen
Living / Dining
UP
Stor
e
CH - 2450
Store
W - 2450
C - 1100W - 900
GROUND FLOOR PLAN FIRST FLOOR PLAN
WC Bathroom
Bedroom 1
wardrobe
Bedroom 2
Bedroom 3
hwc
C - 1050W - 1050
C - 1050W - 1050
CH - 2450
Landing
Entrance
overhead soffit
C - 1050W - 1050
C - 1050W - 1500
overhead soffit
W - 2450
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF42 HEVERSHAM HOUSE - 3 BED MAIS.
EXISTING PLANS
G9114 AGA010 P3
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
Rear door added.MB18.02.19P2GIA added.MB13.01.20P3
42 Haversham House - 3 Bed Maisonette (Gr. Floor). GIA 77.9m² / 838 sq ft
HallKitchen
Living / Dining
UP
Stor
e
CH - 2450
Store
W - 2450
C - 1100W - 900
GROUND FLOOR PLAN FIRST FLOOR PLAN
WC Bathroom
Bedroom 1
wardrobe
Bedroom 2
Bedroom 3
hwc
C - 1050W - 1050
C - 1050W - 1050
CH - 2450
Landing
Entrance
overhead soffit
C - 1050W - 1050
C - 1050W - 1500
overhead soffit
W - 2450
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF42 HEVERSHAM HOUSE - 3 BED MAIS.
EXISTING PLANS
G9114 AGA010 P3
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
Rear door added.MB18.02.19P2GIA added.MB13.01.20P3
Existing area of home
Additional area to meet current housing standards
Existing area of home
Additional area to meet current housing standards
3B/5P House
78M2
15M2
93M2
Kentmere House
6 Kentmere House - Bedsit Flat (Ground Floor).GIA 34.7m² / 373 sq ft
FLOOR PLANEntrance
Bathroom
KitchenHall
CH - 2450
Store
C - 1150W - 1050
C - 1300W - 900
W - 2450C - 1050W - 1300
Bedsit
cupboard
Store
5
SCALE BAR. 1:50@A3
0 1 2 3 4
Revision
Space One Beadon RoadLondon W6 0EA
T 020 8237 8200F 020 8741 [email protected]
www.hunters.co.uk
project name:
status:
job number: drawing number: revision:
date:
sheet:
scale:
cad ref:
Use figured dimensions only. All levels and dimensions to bechecked on site. This drawing is to be read in conjunctionwith all other relevant drawings and specifications.Hunters is a trading name of Hunter & Partners Limited.© Hunter & Partners Limited. All rights reserved.
drawn:
checked:
drawing reference:
TUSTIN ESTATE, LONDON SE15 1EF6 KENTMERE HOUSE - BEDSIT FLAT
EXISTING PLANS
G9114 AGA032 P1
S U R V E Y
05.12.19
1:50 @ A3
MGB
G9114 Tustin Estate P1B - Existing layouts.dwg
Bedsit
35M2
15M2
50M2
2B/4P House
71M2
8M2
79M2
1B Bedsit
35M2
15M2
50M2
1B Bedsit
31M2
19M2
50M2
3 B/4P Maisonette
Existing area of home
Additional area to meet current housing standards
Total new home area
Existing area of home
Additional area to meet current housing standards
Total new home area
Existing area of home
Additional area to meet current housing standards
Total new home area
Existing area of home
Additional area to meet current housing standards
Total new home area
Existing area of home
Additional area to meet current housing standards
Total new home area
Existing area of home
Additional area to meet current housing standards
Total new home area
73M2
11M2
84M2
3B/4P Maisonette 2B/3P Maisonette 3B/5P Maisonette
Bowness House Heversham House Heversham House
Existing area of balcony
Additional area to meet current housing standards
Total new balcony area
Existing area of balcony
Additional area to meet current housing standards
Total new balcony area
Existing area of balcony
Additional area to meet current housing standards
Total new balcony area
Existing area of balcony
Additional area to meet current housing standards
Total new balcony area
5.6M2
1.4M2
7M2
6M2
0M2
6M2
6M2
2M2
8M2
Bedsits and 1B/2P Flats
Hillbeck Close, Ullswater House and Kentmere House
0M2
5M2
5M2
Michael Faraday Community Schools, Aylesbury
• Uibusam, utae. Itatiore volorumquo illandion
cuptatibusda volorem cor a sda volorem cor a
• Illandion cuptatibusda volorem cor Uibusam, utae.
Itatiore volorumquo illandion cuptatibusda volorem co
olorem cor a sda volorem
• Uibusam, utae. Itatiore volorumquo illandion
cuptatibusda volorem sda voloolorem cor a sda
voloremuptatibusda volorem
• Uibusam, utae. Itatiore volorumquo illandion
cuptatibusda volorem cor a busam, utae. Itatiore
volorumquo illandion cuptatibusda volorem cor a
• Itatiore volorumquo illandionibusda volorem cor a
Itatiouo illandion busda volorem cor acuptatibusda
volorem cor atatibusda volorem cor a busam, utae.
Itatiore volorumquo illandion cuptatib
• Solupta cumqui toreperum senda ped quibusam,
utae. Itatiore volvolorumquo Itatiore volorumquo
Itatiore volorumquo
• illandion cuptatibusda volorem cor Uibusam, utae.
Itatiore volorumquo illandion cuptatibusda volorem co
• Utae. Itatiore volorumquo illandion cuptatibusda
volorem ciouo illandion busda volorem cor
acuptatibusda volorem busam, utae. Itatiore
volorumquo illandion cuptatib
Your blockYour home Your estate
About this option
About this optionSi ut inctam a dolore pra por mintiatum ventinctist quid que conet asperun demodi as nimenia sitatem fuga.
Odit plabore mquam, soluptur si optatur aut dignam, occusa as que dolo to inciaep ediscid quatemqui comnihil exeribere non nobitasim volo expedio eatatibusa num inis as auditatur atias aut est apel moluptatur, con con cus dolutem porruptur solorere volorum vernam expellorat liquossitas
rerferferios ab ium, solupta cumqui toreperum senda ped quibusam, utae. Itatiore volorumquo illandion cuptatibusda volorem cor animus aut fugiass editati bea necaeped mi, omnissi maioratur aperaes aut fugiass editati bea necaeped mi, omnissi maioratur aperaes
1
2
3
5
4
6
4B TUSTIN COMMON
What might the impacts of this option be?
Pilgrims’ way
Examples of new school buildings
Could school spaces be created that have views out to public green spaces?
Tiger Way, Hackney Downs
Could new housing be built over a new school?
Tidemill Academy, Deptford
Could a new school building also house community spaces?
Could external play areas also be above ground level?
Could the entrance to a new school create a warm welcome to visitors?
Could a ‘heart space’ be created in the centre of the school?
What do the options for the estate mean for the school?
Might a new school building be an option?
What are the next steps with the school?
Pilgrims’ Way Primary School has been consulted on how the school fits within the different
options for the estate and where works might be done to the school building and to the school
site with each option.
A condition survey of the school building has been carried out. This survey has indicated where
works will be required to the school, children’s centre, nursery buildings and to the external
areas over the next 30 years to keep them operational. We have also met with the school to
understand what they feel works well with their building and where it might be improved.
If options 3 or 4 are selected at the ballot the shape of the school site may change and a new
school building may be built. Some of the considerations that necessary with these options are:
• What are the advantages and disadvantages of building a new school?
• Where could a new school be located?
• How should a new school relate to the new and existing homes?
• Where should the entrance to the new school be?
• How many floors should a new school have?
• How big is the new school site?
• Could a new school building have spaces that can be used by the community?
The school will have their say on the options so that they are developed with their input. The next
steps in the development of the options will be to engage the school in:
• Discussions on the options for the estate and how the school sits within these
• Discussions on the findings of the condition survey of the existing school building
• Evaluate the advantages and disadvantages of building a new school
• Determine what finance is available to upgrade the existing school building or to rebuild a
new school
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 7
What do the options for the estate mean for the businesses?
Tell us your thoughts about Businesses on Tustin Estate:
We would like to establish your needs
Option 1 – Maintain:
Existing premises retained and essential maintenance work undertaken
Option 2 – Refurbishment and Option 3 – Partial Refurbishment and Part
Demolition and Rebuild:
Shop front enhancements and essential maintenance work undertaken.
New homes on Ilderton Road provide a stronger presence with the potential for
additional commercial space at ground floor.
Option 4 - Tustin Common:
New shop units provided with improved public green space on Old Kent Road,
as a mores successful setting for businesses in the area. The new shop units are
to be based on established need through detailed conversations with Southwark
Officers and yourselves. Businesses temporarily relocated on Tustin Estate or
nearby with the aim to minimise disruption by maximizing single moves where
possible.
Businesses on Tustin Estate will be consulted with to discuss what the different options
for the estate mean to their premises and be given the opportunity to have their say.
We would like to establish what your needs are. Some considerations to be discussed
include the following:
• What are the advantages and disadvantages of new built premises on the estate?
• Where could a temporary businesses be located?
• What shop front improvements would be beneficial ?
• How can visibility and footfall be maximised ?
• What appropriate back of house and servicing space requirements do you have?
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 8
An example of on-site temporary business preminses at Finsbury Square, by DSDHA
Existing shop fronts on Tustin Estate beneath Bowness House.
businesses
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 9
• The block will be improved to meet a 30 year lifetime for tenants, leaseholders and freeholders• Energy efficiency improvements• Improvements to bin stores
• Replanted green spaces as part of the Great Estates Programme• Improvements to parking control
• Every council tenant’s home will be refurbished to achieve decent homes standard• New kitchens and bathrooms for council tenants when
they are due for replacement• Some aspects of improvement to leasehold and freehold
properties and the wider estate may be chargeable in accordance with your property interest.
Your blockYour home Your estate
With no additional homes being provided, this would maintain the look and feel of Tustin, with limited improvements to the homes and landscape over a 30 year programme.
The overall layout, entrances and use of space would not change.
Community engagement would be encouraged to provide opportunities for community gardening spaces and new community play facilities.
528 Retained homes (including 230 in the towers)Existing building heights ranging from 2 - 18 storeysExisting trees are retained
What might the impacts of this option be?
1 - maintain
About this option
32
Draft and Confidential
Green areas
NEW BUILD: masterplan principles
Old Kent Road
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 10
• The block will be improved to meet a 30 year lifetime for tenants, leaseholders and freeholders• Energy efficiency improvements• Improvements to bin stores• Improvements to communal entrances
• Improved green spaces and new benches• Improvements to fencing • Lighting and pavement repairs• Improved garden facilities• Improvements to parking control• Controlled access to pedestrian routes
• Every council tenant’s home will be refurbished to a minimum of a decent homes standard• New kitchens and bathrooms for council tenants when
they are due for replacement• A limited number of new homes• New homes will be built to current building standards and
space standards• A minimum of 50% of new homes would be available to
those in housing need on the estate
Your blockYour home Your estate
2 - refurbishment
What might the impacts of this option be?
About this option
32
Draft and Confidential
Green areas
NEW BUILD: masterplan principles
No existing homes are demolished, but additional “infill” homes are provided where they have least impact on existing homes. This will enhance the sense of security as there are more homes overlooking open spaces.
By creating additional homes, more improvements can be carried out, and more can be invested in the open spaces. For example, creating community allotments and replacing the outdoor games area with exciting play facilities and better security.
New homes will be a mix of Council homes and homes for sale. A minimum of 50% will be for council tenants. These homes will subsidise the costs for an enhanced refurbishment programme.
575 - 625 homes (including 528 retained)Infill building heights ranging from 2 - 8 storeysTrees on Manor Grove and to the front of Bowness are all retained. Across the estate 90% of existing trees retained, the remainder are to be relocated or replanted.
8
Old Kent Road
6
6
8
8
3
Final Options EVENTSummary of Boards Displayed
![Page 3: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/3.jpg)
Tustin public meeting Feedback 02 march 2020
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 12
• Energy efficiency improvements• New entry halls with improved lighting and security• Integrated bin and bike stores• Shared gardens for residents at ground floor,
between blocks.• Secure parking and controlled parking at street level
• Clearer routes • Better external lighting • Secure play space for children• Green space at the heart of the estate• Additional homes on the estate• Relocation of the school within the estate• New family sized homes to meet housing need• Residential block specifically for older people• Reprovision of retail units on Old Kent Road• The majority of trees are retained including those at Manor
Grove and infront of Bowness.
• All new homes built to new building standards and space standards• New homes will meet Council tenants housing needs• A minimum of 50% Council homes• Private external space for every home (e.g. garden, patio or
balcony)• Homes with views over green space• Through a forthcoming phasing plan, the council will aim
to minimise disruption including maximizing single moves. • New terraced housing
Your blockYour home Your estate
Retaining a large open space at the heart of the Estate which is opposite the school entrance creates a safe and friendly focus for the Estate.
The improved usability of the green space allows for greater community use and with new residential blocks overlooking the space increase natural surveillance and safety.
The phased replacement of all existing buildings provides new, larger homes for all residents. New houses are designed for Manor Grove, with a variety of dwelling types(flats and maisonettes) across the rest of the Estate.
A new more generous public space provides a green breathing space on Old Kent Road, as a successful setting for commercial businesses in the area.
1000 - 1050 homes (including 230 retained)New building heights ranging from 2 - 21 storeysTrees on Manor Grove and to the front of Bowness are all retained. Across the estate 75% of existing trees are retained, the remainder are to be relocated or replanted on site.
Option 4 - Tustin Common
What might the impacts of this option be?
About this option
32
Draft and Confidential
Green areas
NEW BUILD: masterplan principles
Old Kent Road
10
721
128
11
4 5
5
96
7
7
3
2
2
2
2
5
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 14
COMMENTS
From the information you have seen to date, which of the options shown would you prefer to
see at Tustin?Vote by placing one sticker on your preferred option.
Can you tell us why? Tell us using post-its
option 1 option 2
option 3
option 4
Maintain refurbishment
Partial Refurbishment, Demo and Rebuild
Tustin Common
option 4aTustin Common + Manor Grove Infill
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 13
32
Draft and Confidential
Green areas
NEW BUILD: masterplan principles
• Energy efficiency improvements• New entry halls with improved lighting and security• Integrated bin and bike stores• Shared gardens for residents at ground floor,
between blocks.• Secure parking and controlled parking at street level
• Clearer routes • Better external lighting • Secure play space for children• Green space at the heart of the estate• Additional homes on the estate• Relocation of the school within the estate• New family sized homes to meet housing need• Residential block specifically for older people• Reprovision of retail units on Old Kent Road• The majority of trees are retained including those at Manor
Grove and infront of Bowness. • Some aspects of estate improvements in Manor Grove are
chargeable in accordance with your property interest.
• Existing Manor Grove homes are retained• All new homes built to new building standards and space
standards• New homes will meet Council tenants housing needs• A minimum of 50% of new homes would be available to
those in housing need • Private external space for every home (e.g. garden, patio or
balcony)• Homes with views over green space• Through a forthcoming phasing plan, the council will aim
to minimise disruption including maximizing single moves. • New terraced housing
Your blockYour home Your estate
This option is the same as Option 4 however existing Manor Grove houses and retained and infill homes are built.
Manor Grove Council properties are refurbished and improvements to the surrounding area are undertaken.
The northern estate road and existing garages are replaced with new infill houses and green pedestrian routes that link with the common.
The improved usability of the green space allows for greater community use and with new residential blocks overlooking the space increase natural surveillance and safety.
1000 - 1050 homes (including 279 retained)New building heights ranging from 2 - 21 storeysTrees on Manor Grove and to the front of Bowness are all retained. Across the estate 75% of existing trees are retained, the remainder are to be relocated or replanted on site.
Option 4 A – Tustin Common + Manor Grove Infill
What might the impacts of this option be?
About this option
Old Kent Road
10
721
128
11
4 5
5
96
7
7
2
3
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 15
next steps
Common Grounds are in the TRA hall every Thursday from 3:30 - 6:30pm.
If you are unable to visit or have any further comments you can contact us at
Description
These are the final options you will be selecting a preferred from
Residents will be able to refine the preferred option during April
Residents will be able to vote for or against the final option
Date Event March Voting
April Design Development
July Ballot
Final Options EVENTSummary of Boards Displayed
Residents to vote for their preferred option. The preferred option will be subject to design refinement based on resident feedback and financial viability. 11
• The block will be improved to meet a 30 year lifetime for tenants, leaseholders and freeholders• Energy efficiency improvements• Improvements to bin stores• Improvements to communal entrances• A mix of shared and private communal spaces• Secure parking and controlled parking
• Clearer routes for people passing through the estate • Better external lighting • Green space at the heart of the estate• Additional homes on the estate• Possible relocation of the school within the estate• New family sized homes to meet housing need• Residential block specifically for older people• Retention of some existing homes• New play and community facilities adjacent to school• Some aspects of improvement to leasehold and freehold
properties and the wider estate may be chargeable in accordance with your property interest.
• Every tenant’s home will be refurbished to a minimum of a decent homes standard• New kitchens and bathrooms for tenants when they are
due for replacement• Some New homes• New homes will be built to current standards• A minimum of 50% of new homes would be available to
those in housing need • The phasing plan will aim to minimise disruption including
maximizing single moves.
Your blockYour home Your estate
This involves the demolition of Hillbeck Close, Ullswater House, Kentmere House and the bedsits in little Heversham House to allow more new homes to be built. The new homes will pay for the refurbishment of existing homes and improvements to the estate.
The school can be rebuilt, allowing a clearer route through the estate, and bringing the school’s entrance opposite a new open green space at the heart of the Estate.
The improved usability of the green space allows for greater community use and with new residential blocks overlooking the space increase natural surveillance and safety.
New homes on Ilderton Road provide a strong presence with the potential for commercial space at ground floor.
825 - 875 homes (including 411 retained)New building heights ranging from 2 - 21 storeysTrees on Manor Grove and to the front of Bowness are all retained. Across the estate 75% of existing trees are retained, the remainder are to be relocated or replanted on site.
3 - Part Refurbishment and Part Demolition and Rebuild
What might the impacts of this option be?
About this option
32
Draft and Confidential
Green areas
NEW BUILD: masterplan principles
Old Kent Road
6
6
9
5
3
2
8
7
7
21
3
![Page 4: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/4.jpg)
Tustin public meeting Feedback 02 march 2020
Final Options EVENTThis session allowed residents to hear more about the four options they will be voting on at the end of the month during the whittling down survey.
The options displayed include the following:
(1) Maintain Tustin(2) Refurbishement and infill(3) Part refurbishment and part demolition and rebuild(4) Redeveloping the estate - Tustin Common(4A) Redeveloping the estate - Tustin Common with Manor Grove infill
![Page 5: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/5.jpg)
Tustin public meeting Feedback 02 march 2020
18%BOWNESS HOUSE
13%KENTMERE HOUSE
0%ULLSWATER HOUSE
34%HEVERSHAM HOUSE
7%HILLBECK CLOSE
16%MANOR GROVE
25%THE TOWERS
56 Residents recorded at the meetingThis diagram illustrates the participation rates for residents living in each block on the engagement from 2nd March. It is important to us that participation increases to reach as many residents as possible, during the development of the design options for Tustin.
![Page 6: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/6.jpg)
Final OPTIONS feedbackResidents were asked to indicate their preferred option with a sticker.
This diagram illustrates which of the design options residents from Tustin prefer.
15
12
7
4
4
3
Maintain Tustin
Refurbishment and infill
Part refurbishment and part demolition and
rebuild
Redeveloping the estate - Tustin Common
Redeveloping the estate - Tustin Common with Manor Grove infill
Option 4.1
Option 4.2
Option 1
Option 2
Option 3
![Page 7: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/7.jpg)
Tustin public meeting Feedback 02 march 2020
• I would like one of the options that retains Manor Grove with the infills
• Option 4A with infills on Manor Grove• Option 4A with infills Manor Grove• Most of the flats in the blocks have many
issues. If Manor Grove is more for homeowners preserve and fix but rebuild [the] rest.
Final options COMMENTSDuring the events, residents from Tustin, could add any comments on the proposals presented. These comments are summarised below
comments board
![Page 8: 02 march 2020 public meeting Feedback report · Since the initial public meeting in November and early Februaury consultation we have continued to get feedback on emerging ideas related](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0a71047e708231d42ba65c/html5/thumbnails/8.jpg)
Tustin public meeting Feedback 02 march 2020
NEXT STEPSDuring the following weeks, towards the whittling down survey, there will be regular design meetings, engagement events and drop-in sessions to help residents make an informed decision. 23 March to 5 April - Whittling Down Survey17 March - Tustin Coffee Morning20 March - Community Garden Launch21 March - Tustin Cookout
Design Meetings Community Garden Weekly Drop-in Sessions