Page 1: 02 drilling preparation   ui 15 sep 2007

By

R. Harry EddyarsoPT. SARIPARI PERTIWI ABADI

15 September 2006

“KMI Goes to Campus Program”Komunitas Migas Indonesia – Universitas Indonesia

Page 2: 02 drilling preparation   ui 15 sep 2007

1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)

2. Rig Size Calculation

3. Torque & Drag Calculation

4. Casing / Liner Design & Cementing Procedures

5. Wellhead Design & Installation

6. Mud Engineering & Design

7. Directional Drilling Plan & Drill String Design

8. Drilling Hydraulic Optimization

9. Bit Selection

10.Formation Evaluation (Logging, Coring)

11.BOP Stack Diagram & Well Control Procedures

12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion

13.Health, Safety, Environment

14.Emergency Response Plan (ERP)

15. Etc

Page 3: 02 drilling preparation   ui 15 sep 2007
Page 4: 02 drilling preparation   ui 15 sep 2007
Page 5: 02 drilling preparation   ui 15 sep 2007
Page 6: 02 drilling preparation   ui 15 sep 2007
Page 7: 02 drilling preparation   ui 15 sep 2007
Page 8: 02 drilling preparation   ui 15 sep 2007
Page 9: 02 drilling preparation   ui 15 sep 2007
Page 10: 02 drilling preparation   ui 15 sep 2007

Closest location between fault and well path at depth –3064’ tvdss

Closest distance from the fault = 95 mtr.Fault position error bar = 30 mtr.Drilling target radius = 50 ft.

Page 11: 02 drilling preparation   ui 15 sep 2007

Open Hole Logging Package:

1. Resistivity / Sonic

2. Density / Porosity

3. Core Sampling

4. Dipmeter

5. RFT

6. Velocity Survey

Cased Hole Logging Package:

1. CBL/VDL/CET

Page 12: 02 drilling preparation   ui 15 sep 2007

Net to Gross map

GrossNet

Net

B-29A2 Net to Gross Map

Page 13: 02 drilling preparation   ui 15 sep 2007
Page 14: 02 drilling preparation   ui 15 sep 2007
Page 15: 02 drilling preparation   ui 15 sep 2007
Page 16: 02 drilling preparation   ui 15 sep 2007
Page 17: 02 drilling preparation   ui 15 sep 2007
Page 18: 02 drilling preparation   ui 15 sep 2007