    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Operational Phases

    Phaseno.

    DescriptionEstimatedEstimated Est. cost

    !antit" #nit $ost % Php &

     Phase 1   Site Preparation

    Phase 2   Dismantling / Rigging down o old !iln shell Phase 3   Rigging up / "ounting / #lignment o the new !iln shell

    Phase $   %ouse&eeping

    'otal  

    (a)or

    Phaseno.

    DescriptionEstimatedEstimated Est. cost

    N° o* +enN° o* ,o!rs % Php &

     Phase 1   "echanical 1  'ontractor ( lot

     Phase 2  "echanical 1

      'ontractor ( lot

     Phase 3  "echanical 1

      'ontractor ( lot

     Phase $  "echanical 1

      'ontractor ( lot

      Page 1 o 32 

    APPENDICESAPPENDICESSUMMARYSUMMARY DESCRIPTIONDESCRIPTION FORMSFORMS

    Description :  $#''-N / REP($E+EN' OF -(N 2,E((2E$'-ON

    Ser)ice / Department * +E$,N-$(

    Duration o Stoppage * '3E(VE %14& Da"s %455 ,rs&

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    2/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    'otal  

    +aterials

    Phaseno.

    DescriptionEstimatedEstimated Est. cost

    !antit" #nit $ost % Php &

     Phase 1

    Sca+olding pipes ,assorted lengths- clamps 1 lot

    ood loc&s 12 12 45 10 pcs

    6( pipes 47 205 sch $0 1 lot

    6( pipes 87 20 sch $0 1 lot

    Structural steel 1 lot

    9ygen gas $ cyls

    #cetylene gas 2 cylselding rod :018 ; 1/87 10 &gs

     Phase 2

    9ygen gas 4 cyls

    #cetylene gas 3 cyls

    elding rod :018 ; 1/87 1< &gs

    6( pipes $7 205 sch $0 1 lot

    Plate "S =12mm $5 85 1 pc

    >rinding disc ? $ 8 10 pcs

     Phase 3

    9ygen gas 4 cyls

    #cetylene gas 3 cyls

    elding rod :018 ; 1/87 2< &gs

    elding rod :018 =

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    3/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

     Toolo 2 oes

    ire rope sling 2t 1t 4 pcs

    Shac&les 12mm7 20mm7

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    4/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Proced!res

    Phase 1*2ite Preparation

    2tep 1.1: or&ers shall at all times wear saety helmets saety shoessaety goggles when doing grinding or chipping wor&s

    welding mas& during welding wor&ing and welding glo)es

    human harness or saety elts when climing more that three, 3- meters.

    2tep 1.4: Prepare inspect test integrity o chain loc&s le)er loc&s toe used or the Ao. Bi&ewise inspect chec& the integrity wirerope or we slings shac&les to e used or liting. Cnsure thatthese tools euipment are sae @t or use.

    2tep 1.7* Prepare inspect test integrity o the oygen;acetylene hoses gauges to e used or the Ao.. Prepare inspect the integrityo the welding cales to e used. Test the welding machines toe used or the Ao. Cnsure these euipment accessories aresae @t or use.

    2tep 1.8:  Site preparation ac& @lling o area where the crane is to epositioned and mounted. 6ac&@lled material must e le)eled compacted in order to ensure that the crane can e properly steadily positioned. Secure all eisting canals trenches yinstalling temporary co)ers.

    2tep 1.9: (nstallation o power distriution control panel or 'ontractor5stools and euipment such as welding machines grinders drillstroule lights etc. at the tapping location assigned y ER''electrical department.

    2tep 1.:  Earication o spider supports ull welding inside the spare &ilnshell.See Eig.1 elow.

      Page $ o 32 

    Remar&s y*

    Cecutioner

    Fuality#ssessment'hec&ed*

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    5/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Fi;. 1 

    2tep 1.

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    6/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    2tep 1.14: Earication o temporary structural steel supports using 1$ 8: ls/t or columns eams and girders. Earication o wedges

     Aigs strong o mounting plates using 1Hmm thic& mild steel

    plates.(nstallation ull welding o all o all necessary supports to the!iln Shell. See @gure 3 elow. Details o supports on separatesheet.

    Fi;. 7

    2tep 1.17: Earication machining o our ,$- pieces ac&ing plates,machined rectangular 2< mm thic&ness- These plates to ewelded to the &iln shell. These ac&ing plates will wor& asstoppers and must e positioned precisely or the @nal positiono the tyre

    2tep 1.18:  Earication o one , 1 - spider supports to e welded inside thespare shell. Eig.1#nother two , 2 - spider supports to e welded inside theeisting shell. See Eig.$

     

    Phase 2*Dismantlin; A$!ttin; / Ri;;in; do=n o* theold iln shell section %-ncl!din; t"re&

    2tep 4.1: #ter !iln shell cooling down perorm an 9)ality chec& o &ilnshell eore cutting. Record your readings or reerence.

      Page 4 o 32 

    Remar&s y*

    Cecutioner

    Fuality#ssessment'hec&ed*

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    7/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    2tep 4.4: 'hec& the radial runout o the tyre in the actual installation."easurement should e ta&en in 3 and H oIcloc& position atthe same time. Please use Polysius measuring Protocol #nne

    6. Record your readings or reerence.

    2tep 4.7: "ar&ing on &iln shell or cutting. "ar& reerence lines net tothe &iln section that has to e remo)ed. The reerence linesha)e to e mar&ed on the remaining part o the &iln not onthe scrap tyre sectionJ These reerence lines ha)e to e madey means o a scrier. Kse )isile and permanent mar&ing in&.

    2tep 4.8: Eour ac&ing plates ,machined rectangular 2< mm thic&ness-ha)e to e welded to the &iln shell. These ac&ing plates arewor&ing as stoppers and must e positioned precisely or the@nal position o the tyre. Eig. 13

    2tep 4.9:  Eull welding o two , 2 - spider supports inside the eisting shellappro ,1- 9LC meter ac& rom the replacement section

     Aoints. #ngle sections :

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    8/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Fi;. 9

    2tep 4.8:  #rrest the damaged &iln section ,including tyre- with litingwe /wire rope slings shac&les. Cnsure that all liting

    euipment are capale o liting the total weight o the damageshell M the riding ringJ

    'rane outrigger must e properly spread in place on @rm stale grounds / surace. Biting angle heights and tolerancesmust e strictly oser)ed. Slings and liting cales must e o adeuate siGes to withhold the load eing lited.

    2tep 4.9:  'onnect the liting slings to the 120;t moile crane the hoo&positioned perpendicularly on top o the &iln shell and is onstandy.

    2tep 4.:  'areully position the magnetic trac& automatic cutting machinearound the circumerence o the &iln and secure with clampspaying attention to the mar&ed lines. See photos elow.

     Fi;. %First $!t& Fi;. < %'r!e (en;th $!t line&

    2tep 4.

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    9/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Fi; 5.

    2tep 4.@: Swi)el the magnetic trac& automatic cutting head at 30N angle repeat the process on the true cut line. Eig.H = this will e+ecta chamer lea)ing a 2mm wide root ace ull nose. Eig 10.Bea)e the our , $ - uncut sections as with pre)ious cuts.

     

    Fi;. @ Fi;.@Fi;.10

    Page H o 32 

    Remar&s y*

    Cecutioner

    Fuality#ssessment'hec&ed*

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    10/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    2tep 4.10: 'arry out the same cutting process in this manner on the otherend o the damaged shell section so as to lea)e a truemeasure or the aricated &iln cylinder. Eig.11.

    Fi; 11

    2tep 4.11: ith the 120;t moile crane ready to lit the damaged shell,including tyre- cut the our ,$- remaining uncut portions o the shell on oth ends.

    2tep 4.14: Slowly with precise timing lit the cut &iln shell out o thearea. Slowly swing the oom eastward position thedamaged shell on the space near P9B'(D. Bower down theshell release the liting cales shac&les rom the hoo& o themoile crane.

    2tep 4.17: "anual grinding to smoothen the cut edges o eisting shellon oth ends lea)ing clean smooth e)eled edges.

    2tep 4.18:  Ksing compressed air gouging machine remo)e all weldedportions on the stopper loc&s o the @ller ars ,aial radialstoppers- around the shell. Eig.12. %aul store thesepieces to designated sae area or re;use later.

     Fi;. 14

    2tep 4.19: #s soon as the tyre has een stripped rom the old shell thetyre has to e thoroughly inspected or signs o wear crac&sall throughout the circumerence.

      Page 10 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    11/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Phase 3*

    +o!ntin; A Ri;;in; !p / li;nment o* thene= iln shell section %-ncl!din; tr"e&

    2tep 7.1: Eour ac&ing plates ,machined rectangular 2< mm thic&ness-ha)e to e welded to the &iln shell. These ac&ing plates arewor&ing as stoppers and must e positioned precisely or the@nal position o the tyre.% Re*erence: Pol"si!s +onta;e (a!*rin; ;ro) e &.Reer to installation o tyre Eig 1$.

    2tep 7.4:   The tyre has to e shited against these stoppers centered inradial direction and then another $ ac&ing plates ,Eig.1$-ha)e to e positioned against the tyre and then welded to the&iln shell.

    2tep 7.7: #ter that the tyre @ation as to e installed step y step in 12;oIcloc& position and tac& welded. #ter the installation o all@ations the welding o the @ations can e started. The aial@ation or the tyre must not e welded at this point o thepre;assemly

     Biting o tyre (nstallation o the tyre unto the shell

      Page 11 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    12/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

     

    'leaning o plates wedges aial @ation 'entering o tyre y means o shims,radial wise- stopper ,aial wise-

     

    Positioning o tyre @ation Tac& welding o tyre @ation

      Page 12 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    13/32

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    14/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    $enterin; o* t"re to Ciln shell section

    Fi;. 18

    Centering of tyre to kiln shell section

    Distance E to e measured y means o shim plates to e made uniorm on thecircumerence.Shim plates to e remo)ed eore start;up o &ilnJ

      Fi; 19 

    Page 1$ o 32 

    F

    F

    F

    F

    F

    F

    F

    F

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    15/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    NO'E: 3hen =eldin; is carried> RO#ND %Ret!rn& ca)lem!st )e directl" connected to the part )ein;=elded ???

    2tep 7.8: #rrest the new &iln shell assemly with we / wire rope slings shac&les = securely hoo&ed on the moile crane ready orliting.

    2tep 7.9: Slowly swing the oom westward position new &iln shell on thespace or replacement. Eig.14.

    Fi;. 1

    2tep 4.7:  Slowly precisely lower down the new &iln shell assemly to rest aligned on the eisting &iln shell. The oom should e steady.

    2tep 7.7: (nstall ull weld a series o rac&ets or draw olts inside the old

    &iln shell. They should e welded uniormly around the insidepart o the old &iln shell at oth ends and are spaced appro.$00mm apart.

     Two ,2- main )ersions o draw olt rac&ets are used.P9BQS(KS recommend an angle cleat design ,while E.B.S.choose a K section ormat-. Pre;assemly / (nstallationtolerances = reer to #nne #

     Fi;.1<

    2tep 7.8:  9n alignment there may e some trimming reuired or a good@t up. hen positioned the Aoint or welding should e a 40Nincluded angle = single V preparation with a 2mm root aceull nose to oth parts.

    Page 1< o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    16/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    2tep 7.9:  'hec& alignment and completely weld along one side ,eisting&iln shell- a series o appro. 1< strong ac&s across the two

     Aoints. Eig. 18.

      Fi;.15  

    2tep 7.:  eld the draw olt rac&ets to the new &iln shell section. (nsert30mm ully threaded draw olts across the Aoint attach our

    , $ - heagonal nuts per olt , 2pcs outside 2 pcs inside - =this is to create a push pull mechanism.

    2tep 7.

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    17/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    2tep 7.10:  ( the test pro)es unsatisactory the strong ac&s are releasedy gouging and the draw olts are adAusted where necessary.

    Strong ac&s then re;welded and a urther alignment chec& isconducted until the &iln measures a true alignment. Eig. 21.

    Fi;. 41

    Dierences in the diameters have to )e !ni*orml" distri)!tedon the circ!m*erence to avoid ed;e misali;nment.+a. dierences in the ed;e misali;nment are 1 mm.%Pol"si!s data&

    2tep 7.11:  Prior to welding PRC;%C#T (S 'R(T('#B. The correct pre;heattemperature has een calculated on #nne 6. ,"ethod casestudy or the welding o !iln sections pro)ided or Rugy'ement 'rown %ouse y "i&e 6edord-

    Pre;heat o 120N' to a distance o 1

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    18/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    (nspect or inclusions i present grind out re;weld. Seenet page ,Eull welding procedures = reer top #nne ' -

      Fi;. 47

    Page 18 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    19/32

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    20/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    During the complete repair the &iln should e rotated manually asnecessary to assist con)enient weld positioning , $.2m &iln 8 spo&es $.8m &iln m 10 spo&es -.

    2tep 7.17:  The hot pass intermediate welding can e completed instages to @ll 2/3 o the weld preparation. D9 L9T '#P. Tootain optimum mechanical soundness = wea)ing must ea)oided thereore use stringer eads up to a deposit widtho twice the electrode diameter.

    2tep 7.18:  Return to the inside o the &iln and y gouging remo)e therac&ets screw loc&s spider supports. >rind to smooth@nish gouged areas. Eig. 2$.

    Fi; 48

    Ksing 8mm7 caron electrodes the air arc gouging processconduct an internal root preparation y ac& gouging into theeternal root weld to a depth o appro. 10;1rind properly the

    K to remo)e all gouging residues.

    2tep 7.19:  Cnsure that the pre;heat is maintained deposit an internalroot weld Eig.2< using 3.2mm7 electrodes. 'omplete hotpass cap with $.0mm7 electrodes. >rind internal suraceUush as welds let proud undercut can ha)e the e+ect o multiplying the stress.

      Fi;. 49

    2tep 7.1:  Return to outside o the &iln shell continue / complete @llingand capping weld deposits ensuring stringer ead ormatusing $.0mm7 or

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    21/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    2tep 7.1ouge re;weld any deects.

    2tep 7.1@:  Reinstallation o &iln shell cooling ans ducting and other &ilnaccessories in place. Eull welding o ducts supports.

    NO'E: 3hen =eldin; is carried> RO#ND %Ret!rn& ca)lem!st )e directl" connected to the part )ein;=elded ???

    .

    Phase $*2a*eCeepin;

    2tep 8.1: Remo)al o all temporary welded supports pad eyes grindingto smoothen area.

    2tep 7.4: Remo)al o all sca+olding pipes ,y the Sca+olding 'ontractor-

    2tep 7.7: Disconnect the welding cales , ground cale - rom the &ilnarea. %ouse&eeping o all oygen acetylene cylinders.Cmpty cylinders should e returned ac& to the warehouse.

    2tep 7.8: >eneral cleaning o wor& area and remo)al o ac&@lledmaterials to ER'' designated area. Ksing the Payloader loadall these scrap haul to the scrap yard or proper disposal.

    2tep 7.9:  Tra)el the moile crane outside the &iln area.

      Page 21 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    22/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

      Page 22 o 32 

    dditional 2a*et" aspectsdditional 2a*et" aspects

    dditional $ommentsdditional $omments

    Re*erence Doc!mentsRe*erence Doc!ments

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    23/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    nne :

    Preassem)l" A -nstallation tolerances

    Rotar" Ciln: -nstallation o* Ciln shell section

    Section 1 Section 2

     

    ,Distance o the measuring points rom the peripheral weld appro. 100 mm-

    (n case the )alue measured at # is mm the maimum permissile de)iation o the )alue measuredat 6 is M/; 1< mm.

      Page 23 o 32 

    A B

    "easurement not ta&en in thearea o the longitudinal weld appro. M/; 300 mm

    Distance etween supports B

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    24/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    "a. radial runout* M/; 00< o distance B ut not more than M/; < mm.Readings in a distance o M/; 300 mm rom longitudinal Aoints ha)e not to e considered.

     These tolerances are also applicale or the preassemly o transport units on supports ,on rollerloc&s etc.-.

    (n case o a repair ,o the old &iln- the measured )alues may e

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    25/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    D

    "aimum aial runout ,mm-*

    D %mm& +a. aial r!no!t %mm&

    W

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    26/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

     The ollowing only applies to new girth gears*

    9utside diam. o girth gear ,mm- 3100 3$00 3:00 $300 $H00

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    27/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    Regarding the position and numer o measuring points see measuring protocolX1001 #lignment o &iln sections.

    #ttachment* ; 1002 #lignment o &iln sections; 101$ #lignment o girth gear

    nne B:

      Page 2: o 32 

    ma. M/; 01 o the diameter

    ma. M/; 02 o the diameter

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    28/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

      Page 28 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    29/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    nne B:PreG,eatin; Re6!irement %p.1&

      Page 2H o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    30/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    nne B:

      Page 30 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    31/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00

    PreG,eatin; Re6!irement %p.4&

      Page 31 o 32 

  • 8/18/2019 011-Repl of Kiln Shell Under Tyre

    32/32

    REF:  Polysius Tech. Doc. Vol.23

    REV:  13/10/2003

      Kiln Shell under Tyre: BP010 – Rev. N° 00