    SMED stands forSingle-Minute Exchange of Die.

    SMED system is a set of techniques thatmakes it possible to perform equipmentset up and change over operation inunder 10 minutes in the single-minuterange.

    SMED approach is Simple & Universal

    WHAT IS SMED ?

  • 7/31/2019 01 Smed Trg Summary

    3/19

    Goal of SMED is to dramaticallyshortenchangeover times

    It may not be possible to reach thesingle-minute range for all setups, but

    SMED does dramatically reduce setup

    times in almost all cases.

    GOAL OF SMED

  • 7/31/2019 01 Smed Trg Summary

    4/19

    Customer today want a variety ofproducts in just the quantity they need.

    They expecthighquality,

    a goodprice andspeedydelivery of requisite quantity

    WHY SMED IS IMPORTANT FOR COMPANIES?

    CUSTOMERS REQUIREMENT OF THE DAY?

  • 7/31/2019 01 Smed Trg Summary

    5/19

    Delivering What Customers Want, When They Want, in the Quantity They Want

    CUSTOMER DELIGHT:ANY DAY & EVERY DAY

  • 7/31/2019 01 Smed Trg Summary

    6/19

    Trouble with

    Large-Lot

    Production

  • 7/31/2019 01 Smed Trg Summary

    7/19

    Trouble with Inventory

  • 7/31/2019 01 Smed Trg Summary

    8/19

    Inventory Covers up other problems

  • 7/31/2019 01 Smed Trg Summary

    9/19

    Trouble with Large-Lot Production

  • 7/31/2019 01 Smed Trg Summary

    10/19

    Benefits of SMEDfor Companies

  • 7/31/2019 01 Smed Trg Summary

    11/19

    Benefits of ShorteningChangeover Time with SMED

  • 7/31/2019 01 Smed Trg Summary

    12/19

    Benefits of SMEDfor Individuals

  • 7/31/2019 01 Smed Trg Summary

    13/19

    SMED Makes Daily ProductionGo Smoother

  • 7/31/2019 01 Smed Trg Summary

    14/19

    Steps in Setup Proportion of Setup

    Time Before SMEDImprovements

    Preparation, After-ProcessAdjustments, Checking of

    Materials and Tools

    Mounting and Removing Blades,Tools and Parts

    Measurements Settings, andCalibrations

    Trial Runs and Adjustments

    30%

    5%

    15%

    50%

    Basic Setup Steps & their TimeBreak-up before SMED Improvement

  • 7/31/2019 01 Smed Trg Summary

    15/19

    Using Videotape to Do a SetupAnalysis

    Th Th S f SMED

  • 7/31/2019 01 Smed Trg Summary

    16/19

    The Three Stages of SMEDImplementation

    Before SMED

    Internal and

    External Setup

    not differentiated

    Stage 1

    Separate

    Internal and

    External setup

    Stage 2

    Convert Internal

    setup to

    External setup

    Stage 3

    Streamline

    all aspects of

    setup

    1.Checklists2.Function Checks3.Improved Transport

    of Parts & Tools

    1.Advance Preparationof Operating Conditions

    2.Function Standardization3.Intermediary Jigs

    1.Parallel Operations2.Function Clamps3.Eliminating

    Adjustments

    4.Mechanization

  • 7/31/2019 01 Smed Trg Summary

    17/19

    Stage1: Separating Internal and External

    Setup

    The most important step in implementing SMED is

    distinguishing between internal and externalsetup. By doing obvious things like preparationand transport while the machine is running, thetime needed for internal setup, with the machinestopped, can be usually cut by as much as 30 to50 percent.

    Three Stages of SMED

    Th S f SMED C td

  • 7/31/2019 01 Smed Trg Summary

    18/19

    Stage2:Converting Internal Setup to ExternalSetup

    Further reducing setup time toward the single-minute range involves two important activities:

    1) reexamining operations to see whether any

    steps are wrongly assumed to be internal setup,&

    2) finding ways to convert these steps to externalsetup.

    Operations can often be converted to external setupby looking at their true function.

    Three Stages of SMEDContd

  • 7/31/2019 01 Smed Trg Summary

    19/19

    Step 3: Streamlining All Aspects of the

    Setup Operation

    To further reduce setup time, the basic

    elements of each setup are analyzed in detail. Specific principles are applied to shorten the

    time needed, especially for steps that must bedone as internal setup, with the machine

    stopped.

    Three Stages of SMED Contd.