    00. Common Standards00. Common Standards

    . Scope and Application of Inspection Standards ........................................1

    . Considerations in Inspection .................................................................... 3

    . General ....................................................................................................4

    1. Equipment Inspection Code and General Standards ...........................4

    2. Scope and Reference per Code ..........................................................5

    3. Symbol of Each Inspection Item ........................................................14

    4. Inspection Item for Each of the Regulatory Facilities .........................15

    5. Common Standards for Inspection ....................................................18

    6. Related Codes (legend) .....................................................................20

    PS-N-05-00

  • 7/30/2019 00 Common Standards

    2/21

    . Scope and Application of Inspection Standards. Scope and Application of Inspection Standards

    1. Scope

    Used as the standard applicable to the inspection of facilities and equipment ordered and purchased by

    POSCO

    2. ApplicationA. In principle, refer to this Inspection Standard.

    B. Any and all contracted specifications, approved drawings, or comments shall have precedence in case

    they have any discrepancy with this Inspection Standard.

    C. Notwithstanding the provisions of this Inspection Standard, the legal inspection items provided by

    suppliers shall be inspected by the relevant authorities. When carrying in tested equipment, suppliers

    shall submit related documents and test reports to the authorities.

    D. Test reports on the inspection items specified in this Inspection Standard shall be submitted by and

    accepted from suppliers.

    E. All suppliers including those whose equipment have been tested by POSCO shall have the

    responsibility for ensuring the quality of the equipment and extend their cooperation during POSCOs

    inspection (or test/inspection commissioned by POSCO) at the manufacturing sites.

    3. Inspection Procedures

    A. As per the approved inspection standard, suppliers shall conduct their own preliminary inspection and

    make the necessary preparations before requesting POSCO for an inspection.

    B. When requesting POSCO for an inspection, suppliers shall submit to POSCO a written application for

    inspection specifying the test date, place, and test objects and items.

    C. POSCO may conduct witness inspection together with the supplier on the following test objects and

    items (note, however, that said inspection shall be discussed and notified prior to the start of

    manufacture of each of the facilities):

    [List of test objects subject to witness inspection]Equipment

    NameTest Item Test Name Reasons

    Hook PF Proof test

    - Commissioning companies with appropriatetesting facilities to conduct test

    - Potential damage to product in case of repeatedoverload test

    Tank,Pressure vessel

    LK Full water test

    - Large-volume vessel requiring excessive volume

    of water and posing potential risk of freeze burstonce it is filled up

    PR Pressure test- High-pressure test taking too much pressurization

    time and posing potential risk of keeping pressurehigh

    Weldedstructure

    SPPre-painting surfacetreatment test

    - Retreatment required after at least 4 hours withno measures taken following surface treatment

    PA, WA Assembly test- Process delayed due to unavailability of lab

    (waiting for inspection)Reducer or itsequivalent

    PA, PF, BL,NV

    Assembly andperformance test

    - Too much time spent in waiting for inspection

    Air conditioner PF

    Cooling capacity test

    (air con. capacity of10RT or higher)

    - Difficulties in installing in test room, piping work,etc. (too much time spent)

    - 1 -

  • 7/30/2019 00 Common Standards

    3/21

    Transformer PFImpulse test(impulse voltagestrength test)

    - Deteriorating insulation with repeated tests

    Motor,Transformer,Generator,Power supply

    PF Temperature rise test- Too much time spent in inspection (average of

    5~6 hours)

    EquipmentName

    Test Item Test Name Reasons

    Common

    MAPerception of testspecimen, physicalproperty test

    - Machining test specimens taking too much timeand incurring excessive costs

    DM(machining)

    Machining dimensiontest for largemachined

    equipments

    - Considerable time spent in setting during theprecision dimension test involving large targetobjects (steel-fabricated apparatus or casting,etc.); no work requiring the machining equipmentallowed pending the completion of witness

    inspection (usually, inspection is conducted on therelevant machines upon machining work)

    NT(RT, MT, UT,

    PT)

    In-house/Externalnon-destructiveinspection

    - Inspection taking too much time and incurringexcessive costs

    PK Packaging test - Preventing any delay in the release schedule

    Rejecteditem

    Retest- Correction and confirmation for objects deemed

    unacceptable

    4. Major Points to be Considered for Quality Control Prior to Manufacture

    In case of detailed specifications and drawings are approved, the following should be considered carefully

    since they may affect product quality:

    A. Vibration and noise generated by the rotating machine (fan, blower, pump, compressor, reducer, motor,

    etc.)

    B. Non-destruction (RT, UT, MT, PT) and heat treatment of welded structures (crane, vessels, noxious gas

    duct, transfer car, ladle, major welded structures, etc.)

    C. Painting specifications (surface treatment grade, paints, number of painting, paint thickness, etc.)D. Welding methods (welding type , shop welding, scope of

    installation welding work, etc.)

    - 2 -

  • 7/30/2019 00 Common Standards

    4/21

    . Considerations in Inspection. Considerations in Inspection

    This Inspection Standard includes inspection standards, items, tact, and methods

    applicable to manufacture. The followings are the major considerations in inspection:

    1. General

    - Reference for vibration, noise, temperature rise, centering, and dimension

    - Symbol of inspection item (material, non-destruction, exterior view, dimension, assembly, performance,

    painting, packaging, etc.)

    - Inspection item for each of the facilities required by regulation

    - Common standards for inspection

    - Related codes (Legend)

    2. Object-specific Inspection Standards

    Mechanical equipments (41) Electrical equipments (13) Common equipments (7)

    1)Crane (including Tong,

    Magnet)

    2)Hoist

    3)Pump

    4)Compressor

    5)Fan & Blower

    6)Valve7)Expansion Joint

    8)Agitator

    9)Belt Conveyor

    (including Roller and Pulley)

    10)Heat Exchanger

    11)Pressure Vessel

    12)Dust collector

    13)Water Treatment

    14)Cooling Tower

    15)Reducer

    16)Welded Structure

    17)Cylinder

    18)Transfer car (Ladle Car)

    19)Traveling Ass'y

    20)Lining

    (for Tank and Rubber Roll)

    21)BF Top

    22)BF Proper

    23)Hot Stove

    24)Stave Cooler

    25)Stacker & Reclaimer

    26)Sintering M/C

    27)Sintering M/C

    Cooler

    28)Converter

    29)Casting Bow

    30)Mold

    31)Segment32)Ladle Turret

    33)Torpedo Ladle Car

    34)Hot Rolling Mill

    35)Roller table & Roll

    Assy

    36)Cold-colled Shear

    37)Down Coiler

    38)Side Trimmer

    39)Tension Reel &

    Payoff Reel

    40)Bridge Type Crane

    (BTC)

    41)Bucket Elevator-

    type Continuous

    Unloader

    1)Transformer

    2)Power Distribution

    Facility

    3)Panel

    4)Motor

    5)Generator

    6)Elevator7)Air Conditioner

    8)Communication

    Devices

    9)Cable

    10)Cable Reel

    11)Brake

    12)Insulated trolley

    equipment

    13)Resistor

    1)Painting, Packaging

    2)Non-destruction

    3)Balancing

    4)Hard Facing

    5)Coupling

    6)Universal Joint

    7)Reinforced Plastic(FRP)

    - 3 -

  • 7/30/2019 00 Common Standards

    5/21

    . General. General

    1. Equipment Inspection Code and General Standards

    No. Test Type CODE Applied Codes and Scope Remarks

    1 Vibration - ISO10816-1

    :1995 (E)

    - KS B 6301

    - KS B 6311

    - ISO10816-1:1995 (E): All objects graded

    B or higher

    - Apply after

    additionalapproval, in

    special cases

    2 Noise - IEC34-9(1990)

    - NEMA-MGI-12.49

    - KS B 6301

    - KS B 6311

    - IEC34-9(1990): All objects specified in

    Table or Table

    - Apply after

    additional

    approval, in

    special cases

    3 Temperature

    Rise

    - KS B 6301

    - NEMA-MGI-12.42

    - KS B 6301: Bearing section

    - NEMA-MGI-12.42: Motor section

    - Apply after

    additionalapproval, in

    special cases4 Centering - KS B 1551

    - KS B 1552

    - KS B 1553

    - KS B 1554

    - KS B 1557

    - Flange-type, fixed shaft joint: KS B 1551

    - Flange-type, flexible shaft joint: KS B 1552

    - Gear-type shaft joint: KS B 1553

    - Universal ball joint: KS B 1554

    - Grid-type, flexible shaft joint: KS B 1557

    5 Dimension - DIN8570 PART1

    - DIN8570 PART3- DIN7168 PART1

    - DIN7168 PART2

    - JIS B 0405

    - FEM SEC.1

    - AWS D1.1

    - POSCO SZ-5

    - ASME SEC.

    DIV.I

    - Steel-fabricated apparatus for welded

    structures: DIN8570 PART1, 3

    - Machined parts: DIN7168 PART1, 2

    - Crane and tracks (transfer cars): POSCO SZ-5

    - Pressure vessel: ASME SEC. DIV.I

    Test method: Conduct test according to the measurement methods of the relevant Code.Acceptance criteria: Reference (value) of the applicable Code

    - 4 -

  • 7/30/2019 00 Common Standards

    6/21

    2. Scope and Reference Value as per Code

    A. Vibration

    CODE Scope and Reference Remarks

    ISO 10816-1:1995 (E)

    - Acceptance criteria Reference:Grade B or

    higherRMS

    VibrationVelocity

    (/s)

    Class Class Class Class

    0.28 A A A A

    0.45

    0.71

    1.12 B

    1.8 B

    2.8 C B

    4.5 C B

    7.1 D C11.2 D C

    18 D

    28 D

    45

    (A: Good; B: Satisfactory; C: Unsatisfactory; D: Unacceptable)

    - Scope

    * Class : Small machines (15 motor and below)

    * Class : Medium-sized machines (15-75 motor; 300 motor and

    below in case special foundation is installed)* Class : Large machines (300 motor and above assuming firm

    foundation)

    * Class : Turbo machines (300 motor and above assuming weak

    foundation)

    Reference value for vibration acceleration

    * Reference value: actual data of POSCO

    * Acceptable:

    Within 0.710E-8N2D(g)

    - N: Revolutions per minute (rpm)- D: Shaft diameter ()

    * Range of vibration frequency permissible band for measuring instruments: 10~40 (ball and roller

    native frequency)

    * 1g=980.665cm/sec2

    (Note) - Application: No load test (motor only) and actual load test on-site

    - Measurement position: Bearing housing (H, V, and A directions)

    - Target: Ball and roller bearing

    - Limits: 300rpm and above, 15 and above

    (note, however, that the DC motors limits are subject to the maximum speed)

    Perform test following discussions between the supplier and POSCO regarding the objects to be

    measured for vibration acceleration.

    - 5 -

  • 7/30/2019 00 Common Standards

    7/21

    B. Noise

    CODE Scope and Reference

    IEC-34-9(1990)

    Table 1-Maximum permissible A-weighted sound power level LW*Method of cooling, IC Code, see IEC 34-6 Degree of protection IP code, see IEC 34-5

    Rated SpeednN

    Re`v/minnN960 960

  • 7/30/2019 00 Common Standards

    8/21

    C. Temperature

    - 7 -

    CODE Scope and Reference Remarks

    KS B

    6301

    - Acceptance criteria

    Classification

    Allowable Temperature Rise ( )()(for ambient temperature of less than

    40 )Max. Allowable Temperature ( )

    OnBearing

    Measured with BimetalThermometer Sensor

    On

    Bearing

    Measured with BimetalThermometer Sensor

    Temp.of

    Drained Oil

    Air cooling-type,normal lubricant

    40 45 75 80 -

    Air cooling-type,heat-resistant

    lubricant55 60 90 95 -

    Water coolingtype

    - Refer to agreement - 80 -

    Forced-type,normal lubricant

    - - 75 80 80

    (the maximum allowable temperature should not be exceeded, however)

    - Scope* Bearing section

    CODE Scope and Reference Remarks

    IEC34-9

    (1990)

    Table 2-Maximum Sound Power Level LWA for 3-phase Cage Induction

    Motor with Cooling Corresponding to IC01, IC11,

    IC21, IC411, IC511, and IC611 Codes

    Number of Poles 8 6 42

    50Hz

    2

    60Hz

    Rated Output, PN

    Maximum Sound Power Level LWA

    dB(A)

    1.0 2.2 71 71 71 81 85

    2.2 5.5 76 76 76 86 88

    5.5 11 80 80 81 91 91

    11 22 84 84 88 94 94

    22 37 87 87 91 96 100

    37 55 89* 90* 94* 98 101

    55 110 92* 94* 97* 100 104

    110 220 96* 98* 101* 103 107

    220 400 98* 101* 105* 107 110

    *Applies only to 50Hz; increase by 1 dB for 60HzNOTES:1. For motors having cooling corresponding to the codes IC01, IC11and IC21, typical enclosure classifications are IP22 and IP23.2. For motors having cooling corresponding to the codes IC411,

    IC511 and IC611, typical enclosure classifications are IP44 and IP55

  • 7/30/2019 00 Common Standards

    9/21

    CODE Scope and Reference Remarks

    NEMA

    - MG1

    - 12.42

    - Acceptance criteria

    Reference specification: IEEE114, 112A

    - Scope

    * Single Phase and Poly phase Induction Motors

    D. Centering

    - 8 -

    CODE Scope and Reference Remarks

    KS B

    1551

    - Acceptance criteria

    * For the center of the shaft hole, waving on the shaft joint approximating the shaft joints

    outer diameter

    Tolerance: 0.03

    * When assembling the shaft joint, waving of one shaft hole to the center of the other

    shaft hole

    Tolerance: 0.05

    - Scope

    * Flange-type, fixed shaft joint (rigid flanged shaft couplings)

    KS B

    1552

    Pitch Circle Pitch Circle , Pitch TolerancePitch Circle , Waving

    Tolerance

    60,67,75 0.16 0.12

    85,100,115,132,145 0.20 0.14

    170,180,200,236 0.26 0.18

    260,300,355,450,530 0.32 0.22

    - Scope

    * Flexible Flanged Shaft Couplings

    KS B

    1557

    - Acceptance criteria

    * Waving tolerance of each hub section

    to the center of the shaft hole

    - Scope* Grid Type Flexible Shaft Couplings

    Tolerance (unit: )

    a b

    Below 0.05 Below 0.08 A

    aA bA

    InsulationGrade

    Type A class Type E class Type B class Type F class Type H class

    How toMeasure

    Temp.Gauge

    OhmMeter

    Temp.Gauge

    OhmMeter

    Temp.Gauge

    OhmMeter

    Temp.Gauge

    OhmMeter

    Temp.Gauge

    OhmMeter

    Open Type 50 60 65 75 70 80 85 100 105 125Front,

    Closed Type55 60 70 75 75 80 90 100 110 125

  • 7/30/2019 00 Common Standards

    10/21

    - 9 -

    CODE Scope and Reference Remarks

    KS B

    1553

    - Acceptance criteria* Measure the waving of each section based on the shaft coupling face and insertion for the

    outer tube or considering the center of the shaft hole for the inner tube and fixed flange.Tolerance shall comply with the table below:

    - Scope

    * Geared Type Shaft Coupling

    (shaft coupling outer circumference rate 40m/s, shaft couplings revolution 4000rpm)

    - Types of shaft coupling

    KS B

    1554

    - Acceptance criteria* Tolerance for the waving of the shaft center on both sides and tolerance for torsion

    between both bodies of the joint

    - Scope

    * Universal Ball Joints

    Reference:

    Normal

    Type Tolerance (unit: )

    a b

    SS, SM, SE 0.05 0.03

    CC, CE 0.08 0.05

    Type SymbolRange of Shaft Joints Nominal

    Outer Range of Max. Shaft Hole

    Both sides normalNormal mill motorNormal shaft extension

    SSSMSE

    100~ 400 25~180

    Both sides coverSide cover extension

    CCCE 450~1,250 200~560

    Nominal

    d()

    Waving of Shaft Center (Type A and B) Torsion (min)

    Normal Grade A Type A and B Type AA and BB

    6

    8

    10

    12

    14

    16

    20

    25

    30

    32

    35

    40

    50

    0.1

    0.1

    0.14

    0.14

    0.14

    0.14

    0.2

    0.2

    0.25

    0.25

    0.25

    0.25

    0.25

    0.05

    0.05

    0.07

    0.07

    0.07

    0.07

    0.1

    0.1

    0.12

    0.12

    0.12

    0.12

    0.12

    200

    200

    180

    180

    180

    180

    180

    80

    80

    80

    80

    80

    80

    500

    500

    450

    450

    450

    450

    450

    200

    200

    200

    200

    200

    200

    aAB

    A

    Bb C

    b C

    C

    D

    aD

    aD

  • 7/30/2019 00 Common Standards

    11/21

    E. Dimension

    - 10 -

    CODE Scope and Reference Remarks

    DIN 8570

    (Part-1)

    - Acceptance criteria

    * Linear dimensions

    * Angle measurements

    - Scope* General Tolerances For Welding Constructions (Dimensions For Lengths And Angles)

    Reference:

    "B"

    Degreeof

    Accuracy

    Nominal Dimension Range ()

    30~120

    120~315

    315~1,000

    1,000~

    2,000

    2,000~

    4,000

    4,000~

    8,000

    8,000~

    12,000

    12,000~

    16,000

    16,000~

    20,000

    20,00

    0

    A 1 1 2 3 4 5 6 7 8 9

    B 2 2 3 4 6 8 10 12 14 16

    C 3 4 6 8 11 14 18 21 24 27

    D 4 7 9 12 16 21 27 32 36 40

    Degreeof

    Accuracy

    Nominal Dimension Range ()

    Allowable Variation (degree) Allowable Variation (/m)

    315 315~1,000 1,000 315 315~1,000 1,000

    A 20' 15' 10' 6 4.5 3

    B 45' 30' 20' 13 9 6

    C 1 45' 30' 18 13 9

    D 130' 115' 1 26 22 18

    90200

    300

    13/m 2.6

    45'

    (ex.)

    (ex.)

    50008

  • 7/30/2019 00 Common Standards

    12/21

    - 11 -

    CODE Scope and Reference Remarks

    DIN 8570

    (Part-3)

    - Acceptance criteria

    * Straightness, Flatness And Parallelism

    - Scope* General Tolerances For Welded Structures (Form And Position)

    Reference:

    "F"

    DIN 7168

    (Part-1)

    - Acceptance criteria

    * Linear Dimensions (Excluding Radius and Chamfer Heights)

    Reference:

    "M"

    Degreeof

    Accuracy

    Nominal Dimension Range ()-Larger Side Length of Surface

    30~120

    120~315

    315~1,000

    1,000~2,000

    2,000~4,000

    4,000~8,000

    8,000~12,000

    12,000~16,000

    16,000~20,000

    20,000

    E 0.5 1 1.5 2 3 4 5 6 7 8

    F 1 1.5 3 4.5 6 8 10 12 14 16

    G 1.5 3 5.5 9 11 16 20 22 25 25

    H 2.5 3 9 14 18 26 32 36 40 40

    Degreeof

    Accuracy

    Nominal Size Range ()

    0.5~3

    3~6

    6~30

    30~

    120

    120~

    400

    400~

    1,000

    1,000~

    2,000

    2,000~

    4,000

    4,000~

    8,000

    8,000~

    12,000

    12,000~

    16,000

    16,000~

    20,000

    F 0.05 0.05 0.1 0.15 0.2 0.3 0.5 0.8

    M 0.1 0.1 0.2 0.3 0.5 0.8 1.2 2 3 4 5 6

    G 0.15 0.2 0.5 0.8 1.2 2 3 4 5 6 7 8

    SG 0.2 0.5 1 1.5 2 3 4 6 8 10 12 12

    1500

    4.5

    5000

    8

    PLAT

    ex.

    700.35000.8

    ex.

    700.3

  • 7/30/2019 00 Common Standards

    13/21

    - 12 -

    CODE Scope and Reference Remarks

    DIN 7168

    (Part-1)

    * Radius, Chamfer

    * Angular dimensions

    (F: Fine; M: Medium; G: Coarse; SG: Very Coarse)

    - Scope

    * General Tolerances (Linear & Angular Dimensions): Machined products

    Reference:

    "M"

    Reference:

    "M"

    Degree of

    Accuracy

    Nominal Size Range ()

    0.5~3 3~6 6~30 30~120 120~400

    F0.2 0.5 1 2 4

    M

    G0.2 1 2 4 8

    SG

    Degree of

    Accuracy

    Nominal Size Range ()

    10 10~50 50~120 120~400 400

    F1 30' 20' 10' 5'

    M

    G 130' 50' 25' 15' 10'

    SG 3 2 1 30' 20'

    90200

    300

    10'

    ex.

    10R1ex.

    C101

  • 7/30/2019 00 Common Standards

    14/21

    - 13 -

    CODE Scope and Reference Remarks

    DIN 7168

    (Part 2)

    - Acceptance criteria

    * Straightness And Flatness

    * Symmetry * Radial and Axial Runout

    - Scope

    * General Tolerances (Form and Position): Machined products

    References

    : "S"

    Reference:

    :"S"

    Degree

    of

    Accuracy

    Nominal Size Range ()

    66~30

    30~120

    120~400

    400~1,000

    1,000~2,000

    2,000~4,000

    4,000~

    8,000

    8,000

    R 0.004 0.01 0.02 0.04 0.07 0.1

    S 0.008 0.02 0.04 0.08 0.15 0.2 0.3 0.4

    T 0.025 0.06 0.12 0.25 0.4 0.6 0.9 1.2 1.8

    U 0.1 0.25 0.5 1 1.5 2.5 3.5 5 7

    Degree ofAccuracy

    Tolerance()

    R 0.3

    S 0.5

    T 1

    U 2

    Degree ofAccuracy

    Tolerance()

    R 0.1

    S 0.2

    T 0.5

    U 1

    1500

    0.2

    ex.

    0.5

    R L

    Surface table

    ex.

  • 7/30/2019 00 Common Standards

    15/21

    3. Symbol of Each Inspection Item

    Symbol - Uppercase: Witness (witness inspection by supervisor or inspector)

    - Lowercase: Review (review of test report within the supplier/manufacturer)

    Materials excluded from MA: SS000, SM000, FC000, S45C, SUS304, SGP (SPP)

    - 14 -

    Group Symbol Description

    MaterialMA

    HT

    Material: Chemical, Mechanical properties

    Heat treatment

    NDT NT RT, UT, MT, PT (as required by the design)

    VisualVI

    FT

    Appearance, Type, Model, Welding Visual

    Edge Preparation & Fit-up Condition

    Dimension DM Dimension (Including Runout)

    AssemblyPA

    WA

    Partial Assembly, Match Mark

    Whole Assembly, Match Mark

    Function,

    Performance

    Test

    PR

    LK

    BT

    ST

    FC

    PF

    NV

    BL

    HA

    LB

    LN

    Pressure Test

    Leakage Test (Water Flooding & Air Tightness)

    Balance Test (Static and/or Dynamic)

    Simulation Test

    Function(No Load Test)

    Performance(Load Test)

    Noise, Vibration, Temperature Rise

    Back Lash, Tooth Contact

    Hardness Test

    Lubrication Test

    Lining Check (Including Chrome Plate)

    Painting &

    Packing

    SP

    PP

    PK

    Surface Preparation (Including Pickling Condition)

    Painting(Including Rust Preventive Packaging)

    Packing(Shipping Mark & Color Mark, Quantity)

    Electrical

    EL

    SQ

    IR

    Electric Characteristics

    Sequence

    Insulation Resistance, Withstand Voltage Test

    Others ZZ1: Mandatory Inspection (design), Z2: Mandatory Inspection (completion)

    Z : Review of Test report on imported and electric parts

  • 7/30/2019 00 Common Standards

    16/21

    4. Inspection Item for Each of the Facilities Required by Regulation

    Inspection in accordance with the Industrial Safety and Health Regulation (inspection of harmful or

    dangerous machinery, equipment, facilities, etc.)

    - Equipment and facilities to be inspected (not covered by the High-pressure Gas Safety Control Act

    and Rationalized Energy Use Act)

    Item Application Range

    Crane All crane (including hoist)

    Pressure vessel Operating pressure of at least 0.2f/G; [operating pressure(f/G)] x [inner volume()] 1

    Press All press

    Lift Elevation height of at least 18m; movable load 0.5 tons

    Elevator or lifter Passenger elevator or lifter for freight with movable load of more than 1 ton

    Boiler

    The following boiler types shall be excluded from inspection:

    A. Steam boiler with gauge pressure of not more than 1/; body inner 300,length 600

    B. Steam boiler with gauge pressure of not more than 1/; heating area 1C. Hot water boiler with head pressure of not more than 35 m; heating area 14

    D. Tube-type boiler with gauge pressure of not more than 10/ (excluding multi-tube type boiler

    with head inner > 150); heating area 5 (for tube-type boiler with steam separator, make

    sure that its steam separators inner 300 or inner volume 0.07)

    - Required documents for carrying in products (issued by Korea Industrial Safety Corp. (KISCO))

    * Certificate of Acceptance in Design Test

    * Performance Test Report (when carrying in finished products)

    - Witness inspection following completion of installation

    - 15 -

  • 7/30/2019 00 Common Standards

    17/21

    Inspection in accordance with the Industrial Safety and Health Regulation (including protectors for harmful

    or dangerous machinery, equipment, etc.)

    - Type and scope of protectorsType of Dangerous M/C

    and EquipmentProtectors and Their Application Range

    Press or shear

    1. Guard-type or gate guard-type protectors (for mechanism that slide runs while guardis locked and does not open while slide runs)

    2. Hand-pressure protectors (with stroke length of 40mm and longer for slide andbelow 120 SPM)

    3. Pullback protectors (same as hand-pressure protectors)4. Double-handle protectors (can be stopped while slide runs; has one-stroke, one-rest

    mechanism)5. Sensing type protectors (with stopping mechanism while slide runs)

    Acetylene welding M/Cor gas welding M/C

    Including water seal- or dry-type safety device for preventing gas backfire and backflow

    Explosion-proof electricmachines/equipment

    1. Motor 2. Controller 3. Circuit breaker 4. Lighting fixtures 5. Instruments 6. Heater 7.Connection box (including Junction box) 8. Equipment and fittings for wiring 9.Electromagnet for electronic relays 10. Battery for vehicles

    11. Controller 12. Electric machine/equipment radiating flame or heatLifting device Including overload protection device

    Pressure vesselIncluding pressure release device operating below the max. operating pressure ofpressure vessels (equipped with safety valve)Including pressure release device for air compressor

    Boiler Including pressure release device operating below the max. operating pressure

    Roller(for rubber and synthetic

    resin)Including emergency stop mechanism based on power interruption and brake

    Grinder Including grinder wheel cover

    Buzz saw for timberprocessing

    Including repulsion protector and blade protector

    Electric manual planer Including blade protector

    Industrial robot Safety mat

    Working equipment foroff/on line

    Including protector for insulation and equipment for on line work

    Temporary equipmentIncluding steel pile for puncheon; steel pile for scaffold, hand rail, railing, handle, andpiping; metal working platform installed on above 2m scaffold and workbench

    - Be sure to use only the products tested by Korea Industrial Safety Corp. (KISCO). Imported goods must betested for performance.

    Inspection in accordance with the High-pressure Gas Safety Control Act

    - Equipment

    Item Application range

    Compressed gas

    vessel

    Pressure of 10f/G and above at normal temperature

    Liquefied gas vessel Pressure of 2f/G and above at normal temperature

    - Required documents for carrying in products (issued by the Korea Gas Safety Corporation)

    * Performance test report (when carrying in finished products)

    - Witness inspection following completion of installation

    - 16 -

  • 7/30/2019 00 Common Standards

    18/21

    Inspection in accordance with the Rationalized Energy Use Act

    - Equipment for inspection

    Item Name of Equipment Application range

    Machine

    Steel boilerCast iron boiler

    Excludes the following:

    1. Boiler with max. operating pressure of 1/; shells inner 300, shells

    length 600

    2. Boiler with max. operating pressure of 11/; heating area 13. Tube-type boiler with heating area of 5

    Hot water boiler Gas boiler with gas consumption of more than 17/h (200,000/h for LPG, LNG)

    Pressurevessel

    Class 1 pressurevessel

    Class 2 pressurevessel

    In accordance with the Scope of Pressure Vessels, Annex 1 (Rules for HeatingEquipment Maintenance)

    Heatingfurnace

    Steel heatingfurnace With rated capacity of over 500,000 /h

    - Required documents for carrying in products

    * Certificate of Welding Inspection (Korea Energy Management Corp. (KEMCO))

    * Certificate of Structural Inspection (Korea Energy Management Corp. (KEMCO))

    - Witness inspection after completion of installation

    Inspection in accordance with the Electric Enterprise Act

    - Equipment for inspection and required documents for carrying in products

    ItemTest Certificate Issued by

    RemarksAuthorizedInstitution

    Manufacturer

    High-voltagepower

    receiving anddistributionequipment

    Circuit breaker

    Protective relayProtective equipment

    Overcurrent relay, ground relay,impedance relay, COS, PF, FDS, etc.

    High-voltagepowerreceivingequipment

    TransducerArresterCircuit breakerTransformerCable (including head andterminal connection)Condenser

    LS, DS, OS, AS, etc.; equipment withoutmetal shield layer is not acceptable

    High-voltage

    powerdistributionequipment

    TransducerArresterCircuit breaker

    TransformerCable (including head andterminal connection)CondenserMotor and motor starter

    LS, DS, OS, AS, etc.; equipment withoutmetal shield layer is not acceptable

    - Witness inspection before using Consolidating the means of confirming the test report on domestic products and imports

    - Electrical equipment with rated voltage of less than 10000V: Manufacturer's test report

    - Electrical equipment with rated voltage of 10000V or higher: Test report issued by an authorized

    institution

    - 17 -

  • 7/30/2019 00 Common Standards

    19/21

    5. Common Standards for Inspection

    Unless stipulated otherwise, the following general standards are applied to the inspection for basic quality

    assurance:

    - 18 -

    No.

    EquipmentName

    Standards for InspectionTestItem

    Remarks

    1 Steel Structure

    Apply primer on Site Welding and Site Bolting sections

    (inorganic Zinc Primer 25). PP

    For long-term

    storage

    2

    Motor, Reducer,

    Pump, Blower,Conveyor,Bucket elevator,Rotary valve,Agitator, otherfunctionalequipment

    1) In principle, extra pad shall be welded on the rotating machineor bed for earthing or on the base with the bearing blockmounted prior to machining ( ).

    2) Equipment using V-belt or chain for power transmission musthave a tension adjusting mechanism.

    3) The rotating part or bearing block (or its equivalent) loaded inthe downward direction must be equipped with a jack-up unit.

    VI

    More durability

    Adjust duringoperation.

    Preventsdeformation

    3

    Rotatingequipment suchas Reducer,Pump, etc.

    Oil seal-assembled section must be subjected to Cr packaging

    (15~50) or ultrasonic heat treatment prior to precisionmachining ( ).

    VI Keep airtight.

    4 Common

    1) Be sure to conduct non-destructive test (MT) and HA(hardness) test on sections subjected to ultrasonic heattreatment.

    2) Apply R machining to Key Way or misaligned section.3) Install a safety cover for the rotating operation section (color:

    Munsell No. 2.5Y8/12) and indicate the rotating directions.4) The surface treatment grade should be set to SIS Sa 2 or

    higher prior to painting.5) As a rule, random welding seam other than those specified in

    drawings is not allowed (as pre-approved in the CuttingPlan).

    6) The jointing bolt under load should be used as high-tensionbolt.

    7) Check materials such as the SUS 316 series via themolybdenum (Mo) detection test.

    8) No asbestos products may be used in accordance with theEnvironmental Conservation Act; use only non-asbestos-basedproducts.

    NT

    VI

    VI, PP

    SP

    VI

    VI,PA

    ma

    VI

    Check for anydefects

    Exclude theweak points

    Secure safety

    Ensure durabilityEnsure quality

    Ensure durabilityand qualityCheck theavailability of thesuitablematerialsLegal

    restrictions(no harmfulsubstancesused)

    FanV-belt

    Belt tensionAdjusting Bolt

    (ex.)

    Downward load Downward

    load

    Jack-up unitStopperWelding

    (ex.)

  • 7/30/2019 00 Common Standards

    20/21

    - 19 -

    No.

    EquipmentName

    Standards for InspectionTestItem

    Remarks

    4 Common

    9) Cr plating should be used for the cylinder tube and on thepiston rod.

    10) Block packaging should be used for a square bar measuringover 100x100mm.

    11) Be sure to inspect the test items indicated in the drawing orspecification.

    12) For the non-destructive inspection of machined products,

    inspect UT following rough machining and MT (PT) after thefinal machining.

    13) Check whether the mandatory test items are inspected beforedelivery.

    VI

    PK

    All

    NT

    VI

    Durability, anti-corrosionEasy handling

    Quality check

    Suitable for judgingdefectsRequired item

    5 Motor

    1) The Terminal Box should be used in the form of molding orsteel plate weighing at least 3t; the contact area should bemachined ( ).

    2) The outdoor motor should be equipped with a space heater toprotect its interior from condensation (for high-voltage andlow-voltage large motors).

    VI

    Durability,airtightness

    Preventcondensation.

    6 TransformerThe access door should be installed to check the BUSconnections in the Terminal Box (oil type).

    VI Maintenance

    7 Panel

    1) The door locking device should be Cr-coated or made ofstainless material.2) For the stand-alone type is installed a door stopper.3) Install common T/B on the front (primary side) of the Ampere

    meter is installed.4) Install concenton the panel with the PCB mounted.

    (The panel equipped with PCB is installed the consent.)5) Check the availability of internal space required for installing

    cable is prepared.6) Install OCRs in all 3-phase, high-voltage (over 3.3KV) main

    lines. (OCR is provided at the three phase for high voltage(over 3.3.kv))

    7) OCR for transformer and 3E- relay for motor is provided.8) Power fuse for motor is to be M type and for transformer is to

    be T type.9) The starting device like reactor is to be provided the

    protection device at the primary side.10) VVVF motor regenerative controlled is to be provided the

    non-directional watt meter.11) CTT and PTT is to be provided at the primary side of the

    relay.12) Circuit breaker and cable are to be selected with considering

    rated current and short circuit current as per voltage level13) Protection relay is to be provided as per the load

    characteristics and grounding method.14) Protection device for emergency feeder is provided with the

    same as per main feeder.

    VI Anti-corrosion

    Easy maintenanceEasy check andmaintenance

    Secure 2nd CablingspaceSecure protection(safety).

    Easy monitoring ofoperation statusSecure protection(safety).

    8 Crane

    Apply RT 100% to the Butt Welding section on the plate at thebottom of the Box.

    NT Durability

    Standards for One-Line Diagram including close switchboard: For details, see Panel Page 13~16, 41, and 63.

    Back gauging (RT: 100%)

    - Butt joint

    6.6KV line

    OC

    RCTT,PTTCTX

    3

    7-11) Diagram6.6KV line

    OC

    R

    OC

    R

    OC

    ROC

    GR

    A

    C

    T

    7-6) Diagram

  • 7/30/2019 00 Common Standards

    21/21

    6. Related Codes (legend)

    POSCO SZ (Standard Zip Code): Common Technical Specification

    ISO: International Organization for Standardization

    DIN: Deutche Industrie-Normen

    ASTM: American Society for Testing and Materials

    ANSI: American National Standards Institute

    NEMA: National Electrical Manufacturers Association

    IEC: International Electrotechnical Commission

    FEM: Federation Europeenne De La Manutention

    AWS: American Welding Society

    ASME: American Society for Mechanical Engineers

    JIS: Japanese Industrial Standard

    JEC: Japanese Electrotechnical Committee

    JEM: Japan Electrical Manufacturers Association

    IEEE: International Electric and Electronics Equipment

    CMAA: Crane Manufacturers Association of America

    AISE: Association of Iron and Steel Engineers

    SIS: Swedish Standards Institution

    BS: British Standards NANE: National Association of Corrosion Engineers

    SSPC: Steel Structure Painting Council

    API: American Petroleum Institute

    MSS SP: Manufacturers Standardization Society for Standard Practices

    EJMA: Expansion Joint Manufacturers Association

    TEMA: Tubular Exchangers Manufacturers Association

    JGMA: Japanese Gear Manufacturers Association

    UL: Underwriters' Laboratories