expro excellence subsea

1
Subsea Expro Excellence exprogroup.com Contact For further information, please contact: [email protected] www.exprogroup.com/subsea Objectives/background To deliver a suitable landing string for BP’s Quad 204 development in the North Sea This was a technically challenging scope of work due to the rig BOP configuration/orientation as well as the unique completion/installation methods and bespoke SPS interface – this was to suit BP’s rig of convenience which was a new semi-submersible that had been optimised for drilling operations and harsh environments A dual bore vertical xmas tree (VST) solution was selected by BP Expro Excellence Expro’s long-standing relationship and track record using similar technology, allowed the Subsea team to use previous experience and lessons learnt to ensure complete compliance with the customer’s expectations for the project Engineering work was undertaken to provide a landing string that fitted the BOP without compromising our customer’s specific project requirements, nor reducing the landing string functionality Re-engineering work resulted in the creation of a combined Integral Slick Joint (ISJ) and Tubing Hanger Running Tool Adapter (THRTA), reducing the overall landing string assembly length so to accommodate the rig BOP dimensions and configuration Production and annulus access requirements, along with full helix orientation and BOP and SPS interface challenges highlighted the unique features within Expro’s bespoke landing string Engineering analysis for FMECAs, stress analysis and multiple GRAs to account for various scenarios were undertaken Value to client Expro’s modular/flexible subsea system allowed use of a rig of convenience Cost-efficiencies due to a reduction in equipment complexity: Monobore landing String Integral Slick Joint No requirement for dual bore riser due to Expro’s technical solution, single completion string deployment, full well control inclusive within THOJ/orientation helix arrangement Accelerated timeline achieved within nine months, in line with rig delivery / Expro Excellence Expro provides bespoke subsea system for BP’s Quad 204 development, increasing features despite decreasing size Subsea Expro added value with a dual bore VST configuration that allowed: Orientation helix for BOP alignment included in the system (full well control and disconnect features were not compromised) Deployment with monobore tubing, eliminating the need for dual bore riser Primary barriers allowing well flow clean-ups prior to the installation of the dual bore xmas tree Provision of dual bore access for manipulation of the annulus and mechanical access for intervention

Upload: others

Post on 21-Oct-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Expro Excellence Subsea

SubseaExpro Exce l lence exprogroup.com

ContactFor further information, please contact:[email protected]/subsea

Objectives/background

• To deliver a suitable landing string for BP’sQuad 204 development in the North Sea

• This was a technically challenging scope ofwork due to the rig BOPconfiguration/orientation as well as theunique completion/installation methods andbespoke SPS interface – this was to suitBP’s rig of convenience which was a newsemi-submersible that had been optimisedfor drilling operations and harshenvironments

• A dual bore vertical xmas tree (VST) solutionwas selected by BP

Expro Excellence

• Expro’s long-standing relationship and trackrecord using similar technology, allowed theSubsea team to use previous experienceand lessons learnt to ensure completecompliance with the customer’s expectationsfor the project

• Engineering work was undertaken to providea landing string that fitted the BOP withoutcompromising our customer’s specificproject requirements, nor reducing thelanding string functionality

• Re-engineering work resulted in the creationof a combined Integral Slick Joint (ISJ) andTubing Hanger Running Tool Adapter(THRTA), reducing the overall landing stringassembly length so to accommodate the rigBOP dimensions and configuration

• Production and annulus accessrequirements, along with full helix orientationand BOP and SPS interface challengeshighlighted the unique features within Expro’sbespoke landing string

• Engineering analysis for FMECAs, stressanalysis and multiple GRAs to account forvarious scenarios were undertaken

Value to client

• Expro’s modular/flexible subsea systemallowed use of a rig of convenience

• Cost-efficiencies due to a reduction inequipment complexity:

– Monobore landing String

– Integral Slick Joint

• No requirement for dual bore riser due toExpro’s technical solution, single completionstring deployment, full well control inclusivewithin THOJ/orientation helix arrangement

• Accelerated timeline achieved within ninemonths, in line with rig delivery

/ Expro Excellence

Expro provides bespoke subsea system forBP’s Quad 204 development, increasingfeatures despite decreasing size

Subsea

Expro added value with a dual bore VST configuration that allowed:

• Orientation helix for BOP alignment included in the system (full well control anddisconnect features were not compromised)

• Deployment with monobore tubing, eliminating the need for dual bore riser• Primary barriers allowing well flow clean-ups prior to the installation of the dual borexmas tree

• Provision of dual bore access for manipulation of the annulus and mechanical accessfor intervention

SSCS BP Quad_A4 04/09/2018 08:10 Page 1