zte - cbts i2 installation manual

194
ZXC10 CBTS I2 CDMA2000 Compact Base Transceiver Station - I2 Installation Manual ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 800-9830-9830 Fax: (86) 755 26772236 URL: http://support.zte.com.cn E-mail: [email protected]

Upload: constatinedoe

Post on 12-Mar-2015

1.644 views

Category:

Documents


17 download

TRANSCRIPT

Page 1: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 CDMA2000 Compact Base Transceiver

Station - I2Installation Manual

ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 800-9830-9830 Fax: (86) 755 26772236 URL: http://support.zte.com.cn E-mail: [email protected]

Page 2: ZTE - CBTS I2 Installation Manual

LEGAL INFORMATION Copyright © 2006 ZTE CORPORATION. The contents of this document are protected by copyright laws and international treaties. Any reproduction or distribution of this document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations. All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE CORPORATION or of their respective owners. This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose, title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on the information contained herein. ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications covering the subject matter of this document. Except as expressly provided in any written license between ZTE CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter herein. The contents of this document and all policies of ZTE CORPORATION, including without limitation policies related to support or training are subject to change without notice.

Revision History

Date Revision No. Serial No. Reason for Revision

05/08/2006 R1.0 sjzl20061488 First edition

02/03/2007 R1.1 sjzl20061488

1. Description of PWSC I2 installation is added;

2. Upgraded some figures in PWSB I2 installation;

3. Optimized main antennas and feeder system installation, including some figure update and some requirement supplement. The lightning arrestor installation is rewritten.

4. Optimized GPS antenna installation. And 1/4” cable installation is added.

5. Description of PWSB I2 installation is added with some upgrades in the first edition

6. The power-on procedure is improved and simplified.

7. Added the weight of PWSB I2 and PWSC I2.

02/06/2007 R1.2 sjzl20061488

Page 3: ZTE - CBTS I2 Installation Manual

ZTE CORPORATION Values Your Comments & Suggestions! Your opinion is of great value and will help us improve the quality of our product documentation and offer better services to our customers.

Please fax to: (86) 755-26772236; or mail to Documentation R&D Department, ZTE CORPORATION, ZTE Plaza, A Wing, Keji Road South, Hi-Tech Industrial Park, Shenzhen, P. R. China 518057.

Thank you for your cooperation!

Document Name

ZXC10 CBTS I2 CDMA2000 Compact Base Transceiver Station -I2 Installation Manual

Product Version

- Document Revision Number

R1.2

Equipment Installation Date

Presentation:

(Introductions, Procedures, Illustrations, Completeness, Level of Detail, Organization, Appearance)

Good Fair Average Poor Bad N/A

Accessibility:

(Contents, Index, Headings, Numbering, Glossary)

Good Fair Average Poor Bad N/A

Your evaluation of this documentation

Intelligibility:

(Language, Vocabulary, Readability & Clarity, Technical Accuracy, Content)

Good Fair Average Poor Bad N/A

Your suggestions for improvement of this documentation

Please check the suggestions which you feel can improve this documentation:

Improve the overview/introduction Make it more concise/brief

Improve the Contents Add more step-by-step procedures/tutorials

Improve the organization Add more troubleshooting information

Include more figures Make it less technical

Add more examples Add more/better quick reference aids

Add more detail Improve the index

Other suggestions

__________________________________________________________________________

# Please feel free to write any comments on an attached sheet.

If you wish to be contacted regarding your comments, please complete the following:

Name Company

Postcode Address

Telephone E-mail

Page 4: ZTE - CBTS I2 Installation Manual

This page is intentionally blank.

Page 5: ZTE - CBTS I2 Installation Manual

Contents

About this Manual............................................................. i

Purpose................................................................................ i Intended Audience ................................................................. i Prerequisite Skill and Knowledge .............................................. i What Is in This Manual ........................................................... i Related Documentation.......................................................... ii Metric and British Measurement Systems................................. iii Conventions......................................................................... v How to Get in Touch............................................................. vi

Chapter 1..........................................................................1

Installation Preparation ..................................................1

Hardware Installation Flow ...............................................2

Preparation of Tools/Instruments ......................................3

Onsite Documents...........................................................4

Engineering Condition Check.............................................5 Equipment Room Layout ........................................................5 Indoor Environment ..............................................................5 Power Supply .......................................................................7 Grounding System ................................................................7 Antenna Feeder System.........................................................7 Accessory Devices.................................................................8

Unpacking and Handover..................................................8

Chapter 2........................................................................11

Cabinet Installation .......................................................11

Cabinet Dimensions....................................................... 12

Installation Modes Introduction ....................................... 13

Installation Requirements............................................... 13 Space Requirements............................................................ 13 Installation Precaution ......................................................... 14

Page 6: ZTE - CBTS I2 Installation Manual

Direct Installation Mode ................................................. 15 Installation Preparation ........................................................15 Installation Flow..................................................................15 Installation Procedure ..........................................................16

Ajustable Base Installation Mode ..................................... 23 Installation Preparation ........................................................23 Installation Flow..................................................................25 Installation Procedure ..........................................................26

CBTS I2 Cabinet Installation with PWSB I2/ PWSC I2 ......... 32

Converter Panel Installation............................................ 34

Chapter 3........................................................................35

Cable Installation...........................................................35

Power and Grounding Cables Installation .......................... 36 Cable Preparation................................................................36 Installation Requirements.....................................................37 Installation Procedure ..........................................................38

Trunk Cable Installation ................................................. 39 Installation Requirements.....................................................39 Preparing 75 ohm E1 Connector ............................................40 Installing 75 ohm E1 Cables..................................................42 Installing 120 ohm E1 Cables ................................................43 Installing T1 Cable...............................................................45

Monitoring System Cables Installation.............................. 48 Installing Temperature and Humidity Sensor ...........................48 Installing Smog Sensor ........................................................50 Installing Infrared Sensor .....................................................52 Installing Power Monitoring Cables.........................................55 Installing Switch Input Cables ...............................................56 Installing Control Output Cable..............................................59 Installing External Monitoring Conversion Cables......................60

Connecting Jumper Cable ............................................... 62

Chapter 4........................................................................65

Main Antenna Feeder System Installation....................65

Main Antenna Feeder System Overview............................ 66

Main Antenna Feeder System Structure ..................................66 Various Combination of Main Feeder Cable and Jumper Cable ....67

Page 7: ZTE - CBTS I2 Installation Manual

Installation Preparation.................................................. 68 Personnel .......................................................................... 68 Environment ...................................................................... 68 Tools and Instruments......................................................... 69 Safety Precaution................................................................ 69

Installation Flow Chart ................................................... 70

Antenna Installation ...................................................... 71 Antenna Installation Flow..................................................... 71 Directional Antenna Installation ............................................ 72 Omni Antenna Installation.................................................... 77

Feeder Window Installation............................................. 78

Main Feeder Installation ................................................. 80 Installation Preparations ...................................................... 80 Installation Flow Chart......................................................... 82 Installation Procedure.......................................................... 83

Lightning Arrester Installation ......................................... 95

Installing Cabinet Jumper............................................... 99

VSWR Test ................................................................. 100

Waterproofing Joints.................................................... 100

Chapter 5......................................................................103

GPS Antenna Feeder System Installation...................103

GPS Antenna Feeder System Structure........................... 104

Installation Position Requirements ................................. 105

GPS Antenna Feeder System Installation Flow ................. 107

GPS Antenna Feeder System Installation with 1/4” cables . 108 Prepare 1/4” Feeder Cable N-model Connector ...................... 108 GPS 1/4" Feeder Grounding Clip Installation ......................... 114

Chapter 6......................................................................117

Board Installation ........................................................117

CBTS I2 Board Slot ..................................................... 118

Installation Flow Chart ................................................. 118

Installation Precautions................................................ 119

Installing CBTS I2 Boards............................................. 119

Installing RFS Board.......................................................... 119 Installing BDS Board ......................................................... 119 Board Wiring .................................................................... 122

Page 8: ZTE - CBTS I2 Installation Manual

Chapter 7......................................................................125

Hardware Installation Check.......................................125

Cabinet Installation Check ............................................ 126

Cable Installation Check............................................... 127 Cabling Rack Installation Check ........................................... 127 Power and Grounding Cables............................................... 127 Trunk and RF Cables.......................................................... 128

Board Installation Check .............................................. 128

Antenna Feeder System Installation Check .................... 129 1/2” Indoor Jumper Check.................................................. 129 Lightning Arrester Check .................................................... 129 Main Feeder Cable Check................................................... 129 GPS Feeder Cable Check .................................................... 130 Feeder Window and Sealing Check....................................... 130 Three–way Feeder Clip Check.............................................. 131 1/2” Outdoor Jumper Check................................................ 131 Antenna Installation Check ................................................. 131 Feeder SWR Check ............................................................ 132

Environment Check ..................................................... 132

Base Station Information Collection ............................... 133

Chapter 8......................................................................135

Power On and Off Mechanism .....................................135

Power On................................................................... 136 Power On Preparations....................................................... 136 First Time Power-on Procedure ............................................ 136 Normal Power-on Procedure................................................ 138

Power-off................................................................... 138

Appendix A...................................................................139

PWS Cabinet.................................................................139

Cabinet Installation ..................................................... 140

PWSB I2 Cable Installation ........................................... 144

PWSB I2 Pre-commissioning Checks .............................. 146

PWSB I2 Power-on ...................................................... 147

PWSB I2 Power-off ...................................................... 148

PWSC I2 Cable Installation ........................................... 149

Page 9: ZTE - CBTS I2 Installation Manual

Appendix B...................................................................153

Compact BDS Module (CBM) .......................................153

Salient Features.......................................................... 154

CBTS I2 Configuration with CBM.................................... 155

Appendix C ...................................................................159

SiteMaster Usage .........................................................159

Selecting Frequency Range........................................... 160

Checking SiteMaster .................................................... 160

Feeder Input Parameters.............................................. 161

Installing Tester.......................................................... 161

Measuring SWR .......................................................... 161

Measuring DTF............................................................ 162

Appendix D...................................................................165

Cabinet Working Modes...............................................165

Cabinet Working Modes................................................ 166

Cabling...................................................................... 166

Abbreviation.................................................................169

Figures..........................................................................171

Tables...........................................................................175

Index............................................................................177

Page 10: ZTE - CBTS I2 Installation Manual

This page is intentionally blank.

Page 11: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION i

About this Manual

Purpose

This manual provides procedures and guidelines that support ZXC10 CBTS I2 Installation and PWSB I2/PWSC I2 installation.

Intended Audience

This document is intended for engineers and technicians who perform installation activities on ZXC10 CBTS I2.

Prerequisite Skill and Knowledge

To use this document effectively, users should have a general understanding of wireless telecommunications technology. Familiarity with following is helpful:

ZXC10 system structure.

Basic BTS installation skills.

ZXC10 CBTS I2 system and its various components.

What Is in This Manual

This Manual contains the following chapters:

T AB L E 1 - C H AP T E R S U M M AR Y

Chapter Summary

Chapter 1

Installation Preparation

This chapter introduces necessary preparations to be done before starting ZXC10 CBTS I2 installation.

Chapter 2

Cabinet Installation

This chapter describes ZXC10 CBTS I2 cabinet installation procedures about direct and adjustable base installation modes, cabinet accessories and interfaces.

Page 12: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

ii Confidential and Proprietary Information of ZTE CORPORATION

Chapter Summary

Chapter 3

Cable Installation

This chapter describes ZXC10 CBTS I2 cable installation procedures and their requirements.

Chapter 4

Monitoring System Installation

This chapter describes ZXC10 CBTS I2 monitoring system installation procedures and monitoring cable definition.

Chapter 5

Main Antenna Feeder System Installation

This chapter describes ZXC10 CBTS I2 main antenna feeder system installation procedures.

Chapter 6

GPS Antenna Feeder System Installation

This chapter describes ZXC10 CBTS I2 GPS antenna feeder system installation procedures.

Chapter 7

Board Installation

This chapter describes ZXC10 CBTS I2 board installation procedures, precautions and their corresponding positions.

Chapter 8

Hardware Installation Check

This chapter describes ZXC10 CBTS I2 hardware installation checks to verify correct hardware installation.

Chapter 9

Power On and Off Mechanism

This chapter describes procedure to power on and power off ZXC10 CBTS I2 cabinet.

Appendix A

PWS Cabinet

This appendix describes the PWS cabinet, such as the dimensions, interfaces, boards and installation.

Appendix B This appendix describes installation procedures for CBTS I2 with CBM board.

Appendix C

SiteMaster Usage

This appendix describes how to use a SiteMaster to test the VSWR value of the antenna feeder system.

Appendix D

Cabinet Working Modes

This appendix describes the six cabinet working modes and their cabling.

Related Documentation

The following documentation is related to this manual:

ZXC10 CBTS I2 Compact Base Transceiver Station I2 General Description

ZXC10 CBTS I2 Compact Base Transceiver Station I2 Hardware Manual

ZXC10 CBTS I2 Compact Base Transceiver Station I2 Maintenance Manual

Page 13: ZTE - CBTS I2 Installation Manual

About this Manual

Confidential and Proprietary Information of ZTE CORPORATION iii

Metric and British Measurement Systems

Metric and British measurement systems are the two widely used systems in different countries. To make this manual understandable to all readers, both metric and British measures are used to describe a value.

In text, the value is expressed in metric measure and then in British measure in parentheses.

Example:

Floor bearing capacity greater than 377 kg/m2 (77 lb/ft2) .

In tables, data is usually expressed in two measures separately in two rows.

Example:

T AB L E 2 - M E T R I C AN D B R I T I S H M E AS U R E S E X AM P L E ( I N T AB L E )

Item Working range Recommended range

-5 ~ +45 °C +15 ~ +35 °C Temperature

+23 ~ +113 °F +59 ~ + 95 ° F

Humidity 15 ~ 93% RH 40 ~ 60% RH

Page 14: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

iv Confidential and Proprietary Information of ZTE CORPORATION

In figures, metric measure and British measure are usually expressed in two figures.

Example:

F I G U R E 1 - ME T R I C AN D B R I T I S H M E AS U R E S E X AM P L E ( I N F I G U R E )

(Unit: mm)

(Unit: inches)

In some figures, space is enough. So both metric and British measures are marked in one figure.

Page 15: ZTE - CBTS I2 Installation Manual

About this Manual

Confidential and Proprietary Information of ZTE CORPORATION v

Conventions

ZTE documents employ the following typographical conventions.

T AB L E 3 - TY P O G R AP H I C AL C O N V E N T I O N S

Typeface Meaning

Italics References to other Manuals and documents.

“Quotes” Links on screens.

Bold Menus, menu options, function names, input fields, radio button names, check boxes, drop-down lists, dialog box names, window names.

CAPS Keys on the keyboard and buttons on screens and company name.

Constant width Text that you type, program code, files and directory names, and function names.

[ ] Optional parameters.

Mandatory parameters.

| Select one of the parameters that are delimited by it.

Note: Provides additional information about a certain topic.

Checkpoint: Indicates that a particular step needs to be checked before proceeding further.

Tip: Indicates a suggestion or hint to make things easier or more productive for the reader.

T AB L E 4 - M O U S E OP E R AT I O N C O N V E N T I O N S

Typeface Meaning

Click Refers to clicking the primary mouse button (usually the left mouse button) once.

Double-click Refers to quickly clicking the primary mouse button (usually the left mouse button) twice.

Right-click Refers to clicking the secondary mouse button (usually the right mouse button) once.

Drag Refers to pressing and holding a mouse button and moving the mouse.

Typographical Conventions

Mouse Operation

Conventions

Page 16: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

vi Confidential and Proprietary Information of ZTE CORPORATION

How to Get in Touch

The following sections provide information on how to obtain support for the documentation and the software.

If you have problems, questions, comments, or suggestions regarding your product, contact us by e-mail at [email protected]. You can also call our customer support center at (86) 755 26771900 and (86) 800-9830-9830.

ZTE welcomes your comments and suggestions on the quality and usefulness of this document. For further questions, comments, or suggestions on the documentation, you can contact us by e-mail at [email protected]; or you can fax your comments and suggestions to (86) 755 26772236. You can also browse our website at http://support.zte.com.cn, which contains various interesting subjects like documentation, knowledge base, forum and service request.

Customer Support

Documentation Support

Page 17: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 1

C h a p t e r 1

Installation Preparation

This chapter describes:

Hardware Installation Flow

Preparation of Tools/Instruments

Onsite Documents

Engineering Condition Check

Equipment Room

Indoor Environment Check

Power Supply

Grounding System

Antenna Feeder System

Tools and Meters

Accessory Devices

Unpacking and handover

Page 18: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

2 Confidential and Proprietary Information of ZTE CORPORATION

Hardware Installation Flow Figure 2 shows CBTS I2 hardware installation flow.

F I G U R E 2 - HAR D W AR E I N S T AL L AT I O N FL O W

Begin

Engineering environment acceptance (survey)

Second engineering environment acceptance

Environment Acceptance report

Cabling TrayAntenna Pole

Grounding SystemAccessories

Unpacking for inspection

Goods consistent with listPacking list

Goods mistake feedback form

Goods replacement application form

Install cabinet

Install power supply system

Install cables

Install monitoring system

Install main feeder system

Install GPS antenna system

Install boards

Check hardware installation

End

Engineering design

Survey report

Design documents

Power on

Page 19: ZTE - CBTS I2 Installation Manual

Chapter 1 Installation Preparation

Confidential and Proprietary Information of ZTE CORPORATION 3

Preparation of Tools/Instruments Check the availability of tools and meter required for CBTS I2 installation. Table 5 shows tools and meters list required during installation.

T AB L E 5 - TO O L AN D M E T E R L I S T

Category Name

Special-purpose tools

One feeder connector knife

One wire stripper for 75 Ω coaxial cables

One crimping pliers (for 75 Ω E1 coaxial cables)

One wire punch down tool (for T1 cables)

One multi-functional crimping pliers

Earth resistance tester

Concrete drilling tools

One electric percussion drill

Auxiliary and sample bits

One vacuum cleaner

Power socket (two-phase and three-phase socket, with current capacity greater than 15 A)

General-purpose tools

Cross screwdrivers (4”, 6” and 8” each)

Flathead screwdrivers (4”, 6” and 8” each)

Adjustable wrenches (6’, 8’, 10’ and 12’)

Dual-purpose spanners (17” and 19” each)

One set of socket wrench

5 kg (11 lb) nail hammer

One 300 W iron

One 40 W iron

Solder wires

Measurement tools

One 50 m (164 feet) tape measure

One 5 m (16 feet) steel tape

One 400 mm (16 inches) level bar

One angle meter

One compass

Plumb

Protection tools

Antistatic wrist strap

Safety helmet

Pair of gloves

Page 20: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

4 Confidential and Proprietary Information of ZTE CORPORATION

Category Name

Small tools

One hacksaw (with several saw blades)

One pair of sharp-nose pliers (8”)

One pair of diagonal pliers (8”)

One pair of slip joint pliers (8")

One pair of vices (8”)

One needle file set (medium sized)

Tweezers

One paintbrush

One pair of scissors

One hot blower

One solder sucker

One pair of hydraulic pliers

Crowbar

Auxiliary tools

Pulley block

Rope

Ladder

Forklift

Meter

Spectrum analyzer (only provided in some cases)

SITE MASTER BS tester

Qualcomm test MS

Compass

Multimeter

Field strength tester (only provided in some cases)

Note: All meters and tools must be strictly calibrated and qualified.

Onsite Documents Prepare following technical documents for Installation:

Project Survey Report

Engineering staff should prepare a Project Survey Report during onsite survey.

Engineering Design Documents

Engineering design documents should be completed by the designing unit that the subscriber entrusts. Its duplication copy should be provided to the equipment provider before equipment delivery.

Environment Acceptance Report

Environment Acceptance Report is used for first environment acceptance in BTS survey, showing whether CBTS I2 installation requirements are satisfied. If installation

Page 21: ZTE - CBTS I2 Installation Manual

Chapter 1 Installation Preparation

Confidential and Proprietary Information of ZTE CORPORATION 5

environment is not appropriate, the customer should improve the conditions and solve the problems. Conduct second environment inspection before the engineering starts.

Acceptance Reports

Installation Acceptance Report and Test Acceptance Report are post commissioning acceptance documents. The installation staff should complete these documents in presence of the customer after CBTS I2 system commissioning.

Engineering Condition Check Equipment Room Layout

Prepare the equipment room according to the engineering requirements. Table 6 lists equipment room basic requirements.

T AB L E 6 - E Q U I P M E N T R O O M S P E C I F I C AT I O N S

Item Requirements

Space Enough space for installation. And extra space for future expansion if necessary.

Doors and windows

Dust proof doors and windows

Floor bearing

Floor bearing capacity greater than 450 kg/m2

(92 lb/ft2)

Cabling Tray

Cabling tray is 2.5 ~ 3 m (8 ~ 10 ft) higher than ground. The width of tray is 0.4 m (15 12/16 inches).

Air conditioning

Air-conditioning facilities are available to maintain required temperature and humidity.

Anti-seismic design

Equipment room is designed to overcome anti-seismic factor

Indoor Environment

Check the temperature and humidity range and it must be with in the specified range. Table 7 shows CBTS I2 temperature and humidity range.

T AB L E 7 - TE M P E R AT U R E A N D H U M I D I T Y R AN G E

Item Working range Recommended range

Temperature -5 ~ +45 +15 ~ +35

Temperature and Humidity

Page 22: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

6 Confidential and Proprietary Information of ZTE CORPORATION

Item Working range Recommended range

+23 ~ +113 +59 ~ + 95

Humidity 15 ~ 95% RH 40 ~ 60% RH

Electromagnetic radiations must be with in specified range. Table 8 shows radiation protection requirements.

T AB L E 8 - R A D I AT I O N P R O T E C T I O N R E Q U I R E M E N T S

Item Requirements

Public exposure

In 24 hours of a day, average value of electromagnetic power density (in six consecutive minutes) should be less than 0.4 W/m2 (0.04 W/ft2) (30 ~ 3000 MHz)

Professional radiation

In 8 hours of a day, average value of electromagnetic power density (in six consecutive minutes) should be less than 2 W/m2 (0.19 W/ft2) (30 ~ 3000 MHz)

The cleanness requirements are as follows:

Dusts with the diameter of more than 5 μm are less than or equal to 3 x 104 grains/m3 (8.5 x 102 grains/ft3) in density.

Dusts with the diameter of more than 0.5 μm are less than or equal to 3.5 x 106 grains/m3 (9.9 x 104 grains/ft3) in density.

The dust particles should be non-conductive, non-magnetic and non-corrosive.

The joint grounding mode is adopted with the impedance less than 5 ohm.

In equipment room, three kinds of illumination are required:

Daily illumination

Standby illumination

Emergent illumination

The illumination is required to be able to satisfy the requirement of equipment maintenance.

The equipment rooms must be equipped with enough fire extinguishers.

Electromagnetic Radiation

Cleanness requirements

Grounding requirements

Illumination requirements

Fire protection requirements

Page 23: ZTE - CBTS I2 Installation Manual

Chapter 1 Installation Preparation

Confidential and Proprietary Information of ZTE CORPORATION 7

Power Supply

Power supply must meet specific requirements. Table 9 illustrates ZXC10 CBTS I2 power supply requirements under normal operation.

T AB L E 9 - P O W E R S U P P L Y IN D I C E S

Indices Name Index Requirements

Power system range

-48 V power supply in range of

-40 V ~ -57 V

Power noise level

Satisfies Ministry of Post and Telecom technical specifications

DC power supply

Power protection

Includes Over-voltage/Over-current protection and indication

110 V power supply wit in the range of 85 V ~ 135 V Power

system range 220 V power supply with in the range of

150 V ~ 300 V

Power noise level

Satisfies Ministry of Post and Telecom technical specifications

AC power supply

Power protection

Includes Over-voltage/Over-current protection and indication

Grounding System

Ensure that the joint grounding mode is adopted with the impedance less than 5 ohm.

Antenna Feeder System

Check whether items listed in Table 10 comply with CBTS I2 requirements and project design.

T AB L E 10 - AN T E N N A FE E D E R S Y S T E M CH E C K

Item Requirements

Feeder window Height and dimensions are consistent with engineering design.

Page 24: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

8 Confidential and Proprietary Information of ZTE CORPORATION

Item Requirements

Outdoor cable rack

Height, weight bearing capacity and grounding

Indoor cable rack Height, weight bearing capacity and grounding

Antenna pole Height, diameter, weight bearing capacity, wind resisting, grounding, lightning protection, and direction

Accessory Devices

Also check whether following items are available:

Cables for external power supply and cabinet

Grounding network (mesh) and grounding bars

E1 or T1 or FE cables connecting CBTS I2 and BSC according to requirements

Unpacking and Handover Perform this procedure to unpack the wooden boxes and cartons that are used to pack the equipment delivered to the customer, so as to inspect and accept the equipment.

The representative of customer and the project supervisor must be present on site during unpacking. If any party is not present at that time then transporter must hold the responsibility for any discrepancies in goods.

To unpack the equipment, perform the following steps:

1. Check Delivery Checklist of ZTE CORPORATION. Check total number of goods, intactness of packing boxes, and check whether arrival place is actual installation place against packing list number attached to packing boxes. If goods are intact, start to unpack and inspect them.

Important! If any short, wrong shipment or goods damage is found, contact ZTE office immediately.

2. Unpack the boxes that are generally used for packing heavy goods like cabinet according to the following steps:

i. Prepare appropriate tools such as nail hammer, pliers, straight screwdriver and crowbar.

ii. Remove packing sheet iron. Insert a straight screwdriver into the slit between box and front cover board to make it loose; then insert crowbar to unclench cover board.

Purpose

Prerequisite

Steps

Page 25: ZTE - CBTS I2 Installation Manual

Chapter 1 Installation Preparation

Confidential and Proprietary Information of ZTE CORPORATION 9

iii. Erect the box. Make sure that supports face downwards. Pull cabinet out from the box.

iv. Remove packing adhesive tape of cabinet.

3. Check cabinet outer appearance and ensure the following:

Cabinet stands vertical on horizontal ground and cabinet outer surface is free from dents, bulges, scratches, peels, and, blisters or stains.

There is no damage or distortion of bus bars, fans and installation position on the cabinet.

The slots for plug-in boxes on the cabinet are intact. Guide rails of plug-in slots are in good condition.

All screws are tightly fastened.

4. Unpack the cartons according to the following steps:

i. Use diagonal pliers to cut packing straps.

ii. Use a paper knife to cut adhesive tape along the slits on carton cover, avoid damaging goods inside.

iii. Take the boards out and check the outer appearance for any PCB damage, component disconnection, and other defects.

Note: Cartons are used for packaging of boards, terminals, and other accessories. Boards are kept in anti-static bags during the shipment. Bags usually have a small package of desiccant to keep bags dry inside.

Important! Take antistatic measures to avoid damages to boards. While the equipment is moved to a hotter and damper place, wait for 30 minutes before unpacking the equipment. Otherwise, moisture may condense on the surface of the equipment and cause damage. Properly dispose of recycle desiccants.

5. Upon completion of unpacking, representative of customer and project supervisor should sign Unpacking for Inspection Report to acknowledge acceptance. Each party should have a copy of Unpacking for Inspection Report.

END OF STEPS.

The boxes and cartons are unpacked handed over.

Result

Page 26: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

10 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 27: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 11

C h a p t e r 2

Cabinet Installation

This chapter describes:

Cabinet Dimensions

Installation mode Introduction

Installation Requirements

Space Requirements

Installation Precautions

Direct Installation Mode

Installation Preparation

Installation Flow

Installation Procedure

Ajustable Base Installation Mode

Installation Preparation

Installation Flow

Installation Procedure

CBTS I2 Cabinet Installation with PWSB I2/ PWSC I2

Converter Panel Installation

Page 28: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

12 Confidential and Proprietary Information of ZTE CORPORATION

Cabinet Dimensions Cabinet dimensions (mm): 850 × 600 × 600 (H × D × W)

Cabinet dimensions (Inch): 33 7/16 × 23 10/16 × 23 10/16 (H × D × W)

Cabinet total height with base: 900 mm (35 7/16 inches)

Single cabinet with full configuration (4C3S) weighs about 155.5 kg (343 lb).

Figure 3 shows CBTS I2 cabinet outer view.

F I G U R E 3 - CAB I N E T OU T E R V I E W

Page 29: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 13

Installation Modes Introduction There are two modes for ZXC10 CBTS I2 cabinet installation:

Direct installation mode

Install cabinet in direct installation mode when equipment room is without antistatic floor.

Adjustable base installation mode

Install cabinet in adjustable base installation mode when equipment room has antistatic floor.

Installation Requirements Space Requirements

Following are installation space requirements:

From top view distance between walls and cabinet must be more than 50 mm (1 15/16 inches) indicated by letter C.

When cabinet is installed with other equipment distance between cabinets must be installed as close as possible. When cabinet is installed beside walls distance between cabinet and wall must be more than 100 mm (3 15/16 inches) indicated by letter A and B.

Page 30: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

14 Confidential and Proprietary Information of ZTE CORPORATION

Minimum distance between cabinet top and roof must be more than 500 mm (19 11/16 inches). Minimum distance between front cabinet and wall or other cabinet must be more than 800 mm (31 8/16 inches). Figure 4 shows CBTS I2 cabinet installation location specification.

F I G U R E 4 - I N S T AL L AT I O N L O C AT I O N S P E C I F I C AT I O N

(Unit: mm)

(Unit: inches) C

BA

23 1

0/1

6

2 3 10 /16

NOTE: The above installation equipment room specification is only for CBTS I2 stand-alone installation.

Installation Precaution

Following are CBTS I2 cabinet installation precautions:

Install cabinet according to engineering design specifications.

Vertical and horizontal errors should be both less than 3 mm (2/16 inches).

CBTS I2 cabinet should be in a straight line with other cabinets in front door plane, and the error should be less than 5 mm (3/16 inches).

Adjacent cabinets should be as close as possible.

Screw all nuts and bolts tightly.

Handle equipment carefully.

Page 31: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 15

Direct Installation Mode Installation Preparation

Select a proper installation location for easy installation, maintenance and expansion.

Installation Flow

Figure 5 illustrates direct installation mode flow chart.

F I G U R E 5 - D I R E C T I N S T AL L AT I O N M O D E FL O W C H AR T

Flow chart

Page 32: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

16 Confidential and Proprietary Information of ZTE CORPORATION

Installation Procedure

Perform following procedure to install CBTS I2 in direct installation mode.

Take following steps to install cabinet in direct base installation mode:

1. Cabinet positioning

Determine cabinet location according to specific engineering design drawing.

2. Holes Marking

Use lineation model to determine holes position of cabinet base and draw lines according to provided template. If template is not available refer to Figure 6 to determine holes position.

Purpose

Steps

Page 33: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 17

F I G U R E 6 - HO L E S P O S I T I O N I N D I R E C T IN S T AL L AT I O N M O D E

(Unit: mm)

(Unit: inches)

3. Drilling holes

For M12 expansion bolt, use φ 14 drilling bit to drill 80 mm (3 2/16 inches) deep hole. Use vacuum cleaner to clean dust meanwhile.

If the ground is too smooth chisel a hole on ground, and then drill with percussion drill.

Caution: Do not touch drill bit during or just after drilling to avoid personal injury.

Page 34: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

18 Confidential and Proprietary Information of ZTE CORPORATION

4. Installing expansion bolts

Measure the position of holes again to check error. Adjust the position of holes and drill again if error is found. Put the expansion bolts’ tubes in drilled hole and hammer them.

Figure 7 illustrates this process.

F I G U R E 7 - E X P AN S I O N B O L T S I N S T AL L AT I O N

5. Fixing cabinet base

Perform following steps to fix cabinet base:

i. Move cabinet base to installation position. Put all items onto the bolt in sequence.

NOTE: Cabinet base has front side and back side. Put the side with two guiding pole in the back.

Figure 8 illustrates to install all items one by one on foundation.

F I G U R E 8 - CAB I N E T B AS E F I X I N G

1. Includes 5 ~ 8 2. Frame

3. Insulation board 4. Level adjusting washer

5. Hexagonal nut 6. Spring washer

7. Plain washer 8. Insulating washer

ii. Put level bar onto two adjacent inner sides of base to check whether the base is level. If not, adjust base level with adjusting washer.

Page 35: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 19

Note: ZTE provides two models of adjusting washer 1 mm and 2 mm (0.039 inch and 0.078 inch).

Figure 9 shows the two types of washers.

F I G U R E 9 - WAS H E R S S P E C I F I C AT I O N S

1. 1 mm washer 2. 2 mm washer

iii. Tight expansion bolts screw with wrench.

Figure 10 shows cabinet base installation final view.

F I G U R E 10 - CAB I N E T B AS E I N S T AL L AT I O N

6. Insulation test

Use multimeter to measure resistance between expansion bolts and base. Open circuit indicates proper insulation. If result is otherwise, check insulation again, such as whether the insulation washer is not installed, whether the insulation washer is broken. Repeat the test until the result is “open circuit”.

NOTE: After fixing an expansion bolt, measure resistance at once.

Page 36: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

20 Confidential and Proprietary Information of ZTE CORPORATION

7. Cabinet fixing

Take following steps to fix cabinet:

i. Take out front side screws and washer from cabinet base to fix cabinet. Figure 11 illustrates this process.

F I G U R E 11 - UN I N S T AL L I N G S C R E W S AN D W AS H E R S

1. Screw

ii. Place cabinet on cabinet base from front side.

Figure 12 illustrates this process.

F I G U R E 12 - PL AC I N G C AB I N E T O N B AS E

iii. Push cabinet gently and slide on rails until it adjusts at cabinet base ends.

Figure 13 illustrates this process.

F I G U R E 13 - AD J U S T I N G C AB I N E T O N B AS E

Page 37: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 21

iv. Use screws and washers to fix cabinet with base.

Figure 14 illustrates this process.

F I G U R E 14 - F I X I N G C AB I N E T AN D B AS E

1.Hexagonal-head screw, spring washer and plate washer

Page 38: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

22 Confidential and Proprietary Information of ZTE CORPORATION

Figure 15 shows CBTS I2 direct installation mode final view.

F I G U R E 15 - D I R E C T I N S T AL L AT I O N M O D E F I N AL V I E W

END OF STEPS.

The cabinet is installed in direct installation mode. Result

Page 39: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 23

Ajustable Base Installation Mode Installation Preparation

Prepare installation space for the cabinet by cutting antistatic floor.

Note: Check whether the designed position of adjustable base coincide with antistatic floor frame. If so, adjust the installation location.

Figure 16 shows position of antistatic floor, adjustable base and cemented floor.

F I G U R E 16 - AJ U S T AB L E B A S E I N S T AL L AT I O N M O D E

1. Antistatic floor 2. Adjustable base

3. Cemented floor

Note: There are two types of cabinet bases to be installed: fixed and adjustable. To open door easily, keep distance between antistatic floor and door in range of 10~40 mm (6/16~1 9/16 inch). Adjust base according to antistatic floor height in 25 mm (1 inch) steps each time.

There are three adjustable base types: A, B and C. This section describes type A.

Note: Use hexagonal nut to adjust base height according to conditions.

Page 40: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

24 Confidential and Proprietary Information of ZTE CORPORATION

Figure 17 shows adjustable base structure.

F I G U R E 17 - AD J U S T AB L E B AS E

1

2

3

4

567

1. Upper frame 2. Upper leg

3. Lower leg 4. Lower frame

5. Hexagonal nut 6. Adjusting washer 1

7. Adjusting washer 2

Table 11 illustrates selection of adjustable base type according to antistatic floor height.

T AB L E 11 - AD J U S T AB L E B AS E S E L E C T I O N

Model Antistatic floor height

160 ~ 210 mm A

6 5/16 ~ 8 4/16 inches

210 ~ 310 mm B

8 4/16 ~ 12 3/16 inches

310 ~ 510 mm C

12 3/16 ~ 20 1/16 inches

Page 41: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 25

Installation Flow

Figure 18 shows adjustable base installation mode flow chart.

F I G U R E 18 - AD J U S T AB L E B AS E I N S T AL L A T I O N M O D E FL O W C H AR T

Page 42: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

26 Confidential and Proprietary Information of ZTE CORPORATION

Installation Procedure

Perform following procedure to install CBTS I2 cabinet in adjustable base installation mode.

Perform the following steps to install cabinet in adjustable base installation mode:

1. Cabinet positioning

Determine cabinet location according to specific engineering design drawing.

2. Adjustable base positioning

Use lineation model to determine position of cabinet base and draw lines according to provided template. If template is not available, determine holes position according to Figure 19.

F I G U R E 19 - HO L E S P O S I T I O N I N AD J U S T A B L E B AS E I N S T AL L AT I O N M O D E

3. Drilling holes

For M12 expansion bolt, use φ14 drilling bit to drill 80 mm (3 2/16 inches) deep hole. Keep drill bit vertical while drilling holes with a percussion drill. Hold driller firmly and press downwards. Use vacuum cleaner to clean dust while drilling.

Caution: Do not touch drill bit during or just after drilling to avoid personal injury.

Purpose

Steps

Page 43: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 27

Note: If the ground is too smooth chisel a hole on ground, and then drill with percussion drill.

4. Installing expansion bolt

Measure the position of holes again to check error. Adjust the position of holes and drill again if error is found. Put the expansion bolts’ tubes in drilled holes and hammer them.

Figure 20 - illustrates this process.

F I G U R E 20 - EX P AN S I O N B O L T S I N S T AL L A T I O N

5. Fixing adjustable base

Take following steps to fix adjustable base:

i. Clean cabinet base and cemented floor, fix lower adjustable base on floor with corresponding expansion bolts. Use plain and spring washers with expansion bolts. Fix adjustable base on floor with screw caps. Ensure that torque should be at least 45 N·m (34 lbm·ft). Follow the sequence shown in Figure 21.

F I G U R E 21 - LO W E R AD J U S T AB L E B AS E A N D C E M E N T E D FL O O R

1. Adjustable base lower part 2. Screw cap

3. Spring Washer 4. Plain washer

Page 44: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

28 Confidential and Proprietary Information of ZTE CORPORATION

ii. Put level bar onto adjustable base to check whether the base is level. If not, adjust base level with adjusting washer.

Note: ZTE provides two models of adjusting washer 1 mm and 2 mm (0.039 inch and 0.078 inch), as shown in Figure 22.

F I G U R E 22 - W AS H E R S S P E C I F I C AT I O N S

1. 1 mm washer 2. 2 mm washer

iii. Determine base upper part height according to antistatic floor height. Fix upper and lower parts of base with bolts.

Figure 23 illustrates this process.

F I G U R E 23 - BAS E U P P E R PAR T I N S T AL L A T I O N

1. Base upper part 2. Plain washer

3. Spring washer 4. Hexagonal bolt

Page 45: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 29

Figure 24 shows adjustable base and floor after installation.

F I G U R E 24 - AD J U S T AB L E B AS E AN D FL O O R I N S T AL L AT I O N F I N AL V I E W

6. Fixing cabinet base

Perform the following steps to fix the cabinet base:

i. Put insulating board on adjustable base and align all holes.

Figure 25 illustrates to assemble cabinet base, spring washer and plain washer.

F I G U R E 25 - F I X I N G C AB I N E T B AS E

7

5

6

23

1

4

1. Screw 2. Plain washer

3. Insulating washer 4. Frame

5. Insulating board 6. Adjusting washer

Page 46: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

30 Confidential and Proprietary Information of ZTE CORPORATION

ii. Use wrench to fix adjustable base and cabinet tightly.

NOTE: The cabinet base has front side and back side. Make sure the front side is facing forward.

Figure 26 shows adjustable base installation final view.

F I G U R E 26 - AD J U S T AB L E B AS E I N S T AL L A T I O N F I N AL V I E W

7. Insulation Test

Use multimeter to measure resistance between expansion bolts and base. Open circuit indicates proper insulation. If result is otherwise, check insulation again, such as whether the insulation washer is not installed, whether the insulation washer is broken. Repeat the test until the result is “open circuit”.

NOTE: After fixing an expansion bolt, measure resistance at once.

Page 47: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 31

8. Cabinet fixing

Cabinet fixing procedure is same as in direct installation mode.

Figure 27 shows adjustable base installation mode final view.

F I G U R E 27 - AD J U S T AB L E B AS E I N S T AL L A T I O N M O D E F I N AL V I E W

END OF STEPS.

The cabinet is installed in adjustable installation mode. Result

Page 48: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

32 Confidential and Proprietary Information of ZTE CORPORATION

CBTS I2 Cabinet Installation with PWSB I2/ PWSC I2 Perform the following procedure to install PWSB I2/ PWSC I2 cabinet with CBTS I2.

The width of PWSB I2 is 100 mm (3 15/16 inches), and the width of PWSC I2 is 150 mm (5 14/16 inches). So if PWSB I2 / PWSC I2 is equipped, more space is required.

Space Requirement with PWSB I2

If CBTS I2 is equipped with PWSB I2, follow these space requirements:

Reserve 110 mm (4 5/16 inches) in the left of CBTS cabinet for PWSB I2 installation.

Figure 28 shows CBTS I2 cabinet installation location specification.

F I G U R E 28 - IN S T AL L AT I O N LO C AT I O N S P E C I F I C AT I O N

(Unit: mm)

(Unit: inches)

C

BA

23 1

0/1

6

2 3 10/16

From top view distance between walls and cabinet must be more than 50 mm (1 15/16 inches) indicated by letter C.

Purpose

Prerequisites

Page 49: ZTE - CBTS I2 Installation Manual

Chapter 2 Cabinet Installation

Confidential and Proprietary Information of ZTE CORPORATION 33

When cabinet is installed with other equipment, the distance between CBTS I2 and left equipment (A) ≥ 110 mm (4 5/16 inches), and the distance between CBTS I2 and right equipment (B) should be as short as possible.

When cabinet is installed beside walls, the distance between CBTS I2 and left wall (A) ≥ 210 mm (8 4/16 inches), and the distance between CBTS I2 and other cabinet (B) ≥ 100 mm (3 15/16 inches).

Minimum distance between cabinet top and roof must be more than 500 mm (19 11/16 inches). Minimum distance between front cabinet and wall or other cabinet must be more than 800 mm (31 8/16 inches).

Space Requirement with PWSC I2

If CBTS I2 is equipped with PWSC I2, follow these space requirements:

Reserve 160 mm (6 5/16 inches) in the left of CBTS cabinet for PWSC I2 installation.

From top view distance between walls and cabinet must be more than 50 mm (1 15/16 inches) indicated by letter C.

When cabinet is installed with other equipment, the distance between CBTS I2 and left equipment (A) ≥ 160 mm (6 5/16 inches), and the distance between CBTS I2 and right equipment (B) should be as short as possible.

When cabinet is installed beside walls, the distance between CBTS I2 and left wall (A) ≥ 260 mm (10 4/16 inches), and the distance between CBTS I2 and other cabinet (B) ≥ 100 mm (3 15/16 inches).

Minimum distance between cabinet top and roof must be more than 500 mm (19 11/16 inches). Minimum distance between front cabinet and wall or other cabinet must be more than 800 mm (31 8/16 inches).

Following are the recommended steps to install PWSB/PWSC with CBTS I2 cabinet:

1. When CBTS I2 is equipped with PWSB I2/PWSC I2, PWSB I2/ PWSC I2 cabinet base is required to be fixed onto left side of CBTS I2 cabinet before CBTS I2 cabinet is pushed on to CBTS I2 cabinet base both in direct installation mode and adjustable base installation mode.

2. After the above step, push CBTS I2 cabinet and PWSB I2/ PWSC I2 cabinet base onto CBTS I2 cabinet base together.

3. Refer to “Cabinet” for the detailed installation method of PWSB I2/ PWSC I2 cabinet base installation.

END OF STEPS.

Steps

Page 50: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

34 Confidential and Proprietary Information of ZTE CORPORATION

Converter Panel Installation Perform following procedure to install converter panel.

The cabinet must be installed before converter panel installation.

Take following steps to install converter panel:

1. Install stand at cabinet top with four M4 X 10 bolts.

2. Install converter panel on stand with four M3 X 12 bolts.

Figure 29 shows converter panel installation.

F I G U R E 29 - CO N V E R T E R P AN E L AN D S T AN D

1. M3 X 12 bolt 2. Converter panel

3. Stand 4. M4 x 10 bolt

END OF STEPS.

The converter panel is installed on cabinet top.

Purpose

Prerequisite

Steps

Result

Page 51: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 35

C h a p t e r 3

Cable Installation

This chapter describes:

Power and Grounding Cables Installation

Cable Preparation

Installation Requirements

Installation Procedure

Trunk Cable Installation

Installation Requirements

Preparing 75 ohm E1 Connector

Installing 75 ohm E1 Cables

Installing 120 ohm E1 Cables

Installing T1 Cable

Monitoring System Cables Installation

Installing Temperature and Humidity Sensor

Installing Smog Sensor

Installing Infrared Sensor

Installing Power Monitoring Cables

Installing Switch Input Cables

Installing Control Output Cable

Installing External Monitoring Conversion Cables

Connecting Jumper Cable

Page 52: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

36 Confidential and Proprietary Information of ZTE CORPORATION

Power and Grounding Cables Installation Cable Preparation

Perform following procedure to install power and grounding cables.

There are three types of CBTS I2 power cables, their specifications are as follows:

1. Blue cable with cross section area of 25 mm2 (4 AWG), and it is for -48 V power supply.

2. Black cable with cross section area of 25 mm2 (4 AWG), and it is for -48 V working ground.

3. Yellowish green cable with cross section area of 35 mm2 (2 AWG), and it is for protection ground.

Take following steps to prepare power cables:

1. Cutting

Cut power cable with cutter according to specifications.

2. Stripping

Select power cable length 20~30 mm (13/16~1 3/16 inches) longer than effective crimping area of wiring terminal. Strip the sheath with a cable stripper.

3. Assembling

Select a proper wiring terminal and put it onto the cable, shown in Figure 30.

F I G U R E 30 - AS S E M B L I N G

4. Crimping

Crimp it with a pair of crimping pliers.

Figure 31 - shows tightly crimped wiring terminal.

Purpose

Steps

Page 53: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 37

F I G U R E 31 - CR I M P I N G P L I E R S

1. Clamping position

5. Wrapping

After crimping, wrap up joint with insulation tapes or shrinking pipe.

Note: Use two layers of insulation tapes and one layer overlaps the other. Use same color of insulation tapes for power cable.

6. Labeling

Label power cables 5 mm (3/16 inch) away from wiring terminals on both ends.

END OF STEPS.

The power and grounding cables are prepared.

Installation Requirements

Ensure following requirements during installation:

Install power supply and grounding cables separately.

Ensure that distance between cable bundles is at least 200 mm (7 14/16 inches).

Cut cable ties flat after making cable bundles.

Measure cable lengths before installation. Avoid cable connections or welding.

Figure 32 illustrates this process.

F I G U R E 32 - PO W E R S U P P L Y AN D GR O U N D I N G C AB L E S

Avoid overlapping lugs while connecting two or more cables at same connection stud.

Result

Page 54: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

38 Confidential and Proprietary Information of ZTE CORPORATION

Installation Procedure

Perform following procedure to connect power and grounding cables.

Power and grounding cables must be prepared before connection.

Figure 33 shows CBTS I2 power and grounding cable interfaces top view.

F I G U R E 33 - CBTS I2 P O W E R AN D GR O U N D I N G C AB L E I N T E R F AC E

Perform the following steps to connect CBTS I2 power and ground cables:

1. Connect one end to CBTS I2 -48 V input terminal and the other end to -48 V rectifier output terminal.

2. Connect one end to CBTS I2 -48 V GND terminal and the other end to -48V rectifier GND output terminal.

3. Connect one end to CBTS I2 protection grounding terminal and the other end to indoor grounding bar.

i. Use 6 mm2 (10 AWG) yellow/green shorted line as short-circuiting cable between -48 V GND and PE terminals. Normally, it is already installed before delivery.

ii. Take all measures to guarantee staff and equipment safety.

END OF STEPS.

Purpose

Prerequisite

Structure

Steps

Page 55: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 39

Trunk Cable Installation Installation Requirements

Following are requirements to install E1/T1 cables:

Separately install E1/T1 cable for each single cabinet to ease future expansion.

E1/T1 cable type, quantity, routing, length and installation position must be according to engineering design drawings.

Before cable installation, ensure that are not damaged and all cables have delivery logs and quality certificate to ensure product quality.

Use cable tie or wax cable bundle during cable installation. Keep distance between two cables ties not more than 1m (39 6/16 inches). Ensure cable ties are not too tight.

Use different models of cable strap according to circumstance; avoid connecting two or more cable straps for bundling. Cut cable straps flat after bundling.

Figure 34 shows difference between correct and incorrect bundle.

F I G U R E 34 - CAB L E S T R AP S R E Q U I R E M E N T S

Keep space between each two cable straps up to 3~4 times longer than bundle diameter.

Figure 35 shows this process.

F I G U R E 35 - CAB L E S T R AP S

d

3d~4d

Page 56: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

40 Confidential and Proprietary Information of ZTE CORPORATION

Preparing 75 ohm E1 Connector

Perform following procedure for trunk cable processing.

None

Perform the following steps in case of 75 ohm trunk cable processing.

1. Make CC4Y-J32 connector for E1 cable.

Figure 36 shows procedure to make CBTS I2 side connector.

F I G U R E 36 - CC4Y-J32 C O AX I AL C AB L E C O N N E C T O R AS S E M B L Y

i. Slip parts 1 and 2 around cable, peel cable end, tin the core wire, and open shielding layer.

ii. Connect core wire by soldering and screw part 2 to part 3.

iii. Place crimping tube and crimp the connector.

2. Make coaxial connector on DDF side.

i. Strip cable covering about 14 mm (9/16 inch).

Slip cable connector sheath, heat-shrink tube and crimping tube in sequence. Open shielding net with a net opening sleeve or by hand. Strip internal insulation layer to expose 2.5 mm (2/16 inch) of internal conductor.

ii. Insert core into plug.

Insert core wire into soldering pin at back of inner conductor and solder it. Trim shielding mesh with 6 mm (4/16 inch) crimping tube.

Purpose

Prerequisite

Steps

Page 57: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 41

iii. Push crimping tube and shielding net into connector tail.

Use crimp pliers to crimp the crimping tube into a regular hexahedron. Crimp twice in different angles.

iv. Slip the heat shrink tube onto crimped tube, heat it with an air blower to make it shrink and screw the tail cover.

Figure 37 shows coaxial cable connector on DDF side.

F I G U R E 37 - CO AX I AL C AB L E O N DDF S I D E

Cable connector Socket

Cable connector Socket

Y-shape connectorwith a testing end

Figure 38 illustrates coaxial connector assembly on DDF side.

F I G U R E 38 - CO AX I AL C O N N E C T O R AS S E M B L Y O N DDF S I D E

1. Connector sheath 2. Heat shrink tube

3. Crimping tube 4. Crimping plier

Page 58: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

42 Confidential and Proprietary Information of ZTE CORPORATION

3. Trunk cable test

Solder, connectors internal conductors at both ends and coaxial cables inner conductors leaving no dry joint. Ensure not to short internal and external conductors.

END OF STEPS.

The 75 ohm trunk cable is processed.

Installing 75 ohm E1 Cables

Perform following procedure to install 75 ohm E1 cables.

75 ohm E1 cable contains 8 E1 signals and has two 8-core coaxial cables. Outer diameter of a single core cable is less than 2 mm (1/16 inch).

Note: First E1 cable is marked with a label.

Figure 39 shows 75 ohm E1 cable structure.

F I G U R E 39 - 75Ω E1 C AB L E S T R U C T U R E

Take following steps to connect 75 ohm E1 cables:

1. Connect 75 ohm E1 cable End A to BSC_ E1 interface.

2. Connect 75 ohm E1 cable End B to corresponding E1 interface of converter panel and then to DDF.

Table 12 describes 75 ohm E1 cable internal connections in detail.

T AB L E 12 - 75 Ω E1 C AB L E I N T E R N AL C O N N E C T I O N S

Signal definition

IN0 OUT0 IN1 OUT1

End A pin number

22 23 24 25 1 2 3 4

Cable number

1-1-internal

1-1-

1-2-internal

1-2-

1-3-internal

1-3-

1-4-internal

1-4-

Result

Purpose

75 ohm E1 cable

Steps

Page 59: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 43

external external external external

Signal definition

IN2 OUT2 IN3 OUT3

End A pin number

5 6 7 8 9 10 11 12

Cable number

1-5-internal

1-5-external

1-6-internal

1-6-external

1-7-internal

1-7-external

1-8-internal

1-8-external

Signal definition

IN4 OUT4 IN5 OUT5

End A pin number

13 14 43 44 39 40 41 42

Cable number

2-1-internal

2-1-external

2-2-internal

2-2-external

2-3-internal

2-3-external

2-4-internal

2-4-external

Signal definition

IN6 OUT6 IN7 OUT7

End A pin number

35 36 37 38 31 32 33 34

Cable number

2-5-internal

2-5-external

2-6-internal

2-6-external

2-7-internal

2-7-external

2-8-internal

2-8-external

Note: “1-1-internal and 1-1-external” stands for internal and external conductors of the 1st core in 8 core cable respectively.

END OF STEPS.

The 75 ohm E1 cables are installed.

Installing 120 ohm E1 Cables

Perform following procedure to install 120 ohm E1 cables.

Figure 40 shows 32-core 120 ohm E1 cable structure.

F I G U R E 40 - 120Ω E1 C AB L E S T R U C T U R E

Result

Purpose

120 ohm E1 cable

Page 60: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

44 Confidential and Proprietary Information of ZTE CORPORATION

Take following steps to connect 120 ohm E1 cables.

1. Connect 120 ohm E1 cable End A (left end in Figure 40) to BSC_E1 interface.

2. Connect E1 cable End B (right end in Figure 40) to DDF.

Table 13 describes 120Ω E1 cable internal connection details.

T AB L E 13 – 120 Ω E1 C AB L E I N T E R N AL C O N N E C T I O N S

IN0 OUT0 IN1 OUT1 Signal definition RX0-

RX0+ TX0- TX0+

RX1- RX1+

TX1- TX1+

End A pin number

22 23 24 25 1 2 3 4

Cable color

Blue red 1

Blue black 1

Pink red 1

Pink black 1

Green red 1

Green black 1

Yellow red 1 Yellow black 1

IN2 OUT2 IN3 OUT3 Signal definition RX2-

RX2+ TX2- TX2+

RX3- RX3+

TX3- TX3+

End A pin number

5 6 7 8 9 10 11 12

Cable color Grey red 1 Grey black 1

Blue red 2

Blue black 2

Pink red 2

Pink black 2

Green red 2 Green black 2

IN4 OUT4 IN5 OUT5 Signal definition RX4-

RX4+ TX4- TX4+

RX5- RX5+

TX5- TX5+

End A pin number

13 14 43 44 39 40 41 42

Cable color

Yellow red 2 Yellow black 2

Grey red 2

Grey black 2

Blue red 3

Blue black 3

Pink red 3

Pink black 3

IN6 OUT6 IN7 OUT7 Signal definition RX6-

RX6+ TX6- TX6+

RX7- RX7+

TX7- TX7+

End A pin number

35 36 37 38 31 32 33 34

Cable color

Green red 3 Green black 3

Yellow red 3 Yellow black 3

Grey red 3 Grey black 3

Blue red 4 Blue black 4

Steps

Page 61: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 45

Note: “Blue red 1” stands for there is one red label on blue cable and “Pink red 2” stands for there are two red labels on pink cable.

END OF STEPS.

The 120 ohm E1 cables are installed.

Installing T1 Cable

Perform following procedure to install T1 cables.

None

Figure 41 shows 32-core 100 ohm T1 cable structure.

F I G U R E 41 - 100Ω T1 C AB L E S T R U C T U R E

Take following steps to connect 100 ohm T1 cables:

1. Connect 100 ohm T1 cable End A to BSC_E1 interface of CBTS I2.

2. Connect T1 cable End B to DDF.

Table 14 shows normal 100 ohm T1 cable internal connections in detail. Refer to this table to connect 100 ohm T1 cable to DDF.

T AB L E 14 - 100 Ω I N T E R N AL C AB L E C O N N E C T I O N S 1

Wire color Wire color Wire number

Wire A Wire B

Wire number Wire A Wire

B

1 White Blue 9 Red Brown

Signal definition

TX0+ TX0- TX4+ TX4-

2 White Orange 10 Red Grey

Signal definition

RX0+ RX0- RX4+ RX4-

3 White Green 11 Black Blue

Signal definition

TX1+ TX1- TX5+ TX5-

Result

Purpose

Prerequisite

Steps

Page 62: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

46 Confidential and Proprietary Information of ZTE CORPORATION

Wire color Wire color

4 White Brown 12 Black Orange

Signal definition

RX1+ RX1- RX5+ RX5-

5 White Grey 13 Black Green

Signal definition

TX2+ TX2- TX6+ TX6-

6 Red Blue 14 Black Brown

Signal definition

RX2+ RX0- RX6+ RX6-

7 Red Orange 15 Black Grey

Signal definition

TX3+ TX3- TX7+ TX7-

8 Red Green 16 Yellow Blue

Signal definition

RX3+ RX3- RX7+ RX7-

Some 100 ohm T1 cables may be different in wire color and signal definition. Table 15 shows the second kind of 100 ohm T1 cable internal connections in detail.

T AB L E 15 - 100 Ω I N T E R N AL C AB L E C O N N E C T I O N S 2

Wire color Wire color Wire number

Wire A Wire B

Wire number Wire A Wire B

1 White Blue 9 Black Blue

Signal definition

RX0- RX0+ RX4- RX4+

2 White Orange 10 Black Orange

Signal definition

TX0- TX0+ TX4- TX4+

3 White Green 11 Black Green

Signal definition

RX1- RX1+ RX5- RX5+

4 White Brown 12 Black Brown

Signal definition

TX1- TX1+ TX5- TX5+

5 Red Blue 13 Yellow Blue

Signal definition

RX2- RX2+ RX6- RX6+

6 Red Orange 14 Yellow Orange

Signal TX2- TX0+ TX6- TX6+

Page 63: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 47

Wire color Wire color

definition

7 Red Green 15 Yellow Green

Signal definition

RX3- RX3+ RX7- RX7+

8 Red Brown 16 Yellow Brown

Signal definition

TX3- TX3+ TX7- TX7+

In engineering field, please determine the kind of T1 cable first according to wire color, and then begin to install. It is obvious that the first cable includes grey wire but the second does not.

END OF STEPS.

The T1 cables are installed.

Result

Page 64: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

48 Confidential and Proprietary Information of ZTE CORPORATION

Monitoring System Cables Installation Installing Temperature and Humidity Sensor

Perform following procedure to install temperature and humidity sensor.

None

Perform the following steps to install temperature and humidity sensor:

1. Select an appropriate position on the wall and drill a Φ6 hole. Insert a plastic stuffing tube into hole, fasten a tapping screw, and hang sensor through hole.

Figure 42 shows temperature and humidity sensor installation dimensions.

F I G U R E 42 - TE M P E R AT U R E AN D H U M I D I T Y S E N S O R I N S T AL L AT I O N

(Unit: mm) (Unit: inches)

2. Is installation cable available at the installation field?

If Then

YES Go to step 3

NO Refer to the following table to prepare the cable.

Purpose

Prerequisite

Steps

Page 65: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 49

Table 16 shows temperature and humidity sensor terminal connections.

T AB L E 16 - TE M P E R AT U R E AN D H U M I D I T Y S E N S O R W I R I N G R E L AT I O N S H I P

Signal Pin No at End A

Cable Color

Pin No at End B

HUM 1 White/Blue

3

TEMP 7 Blue 4

GND 3 White/Orange

1

+5V 8 Orange 5

Null 6 Shielded wire

Null

NOTE: Here White/Blue refers to the white wire in white/blue wire-twist.

3. Connect male DB9 at End A to DB9 socket at converter panel. Connect female DB9 at End B to temperature and humidity sensor.

Figure 43 shows that temperature and humidity sensor both ends are DB9 connectors.

F I G U R E 43 - TE M P E R AT U R E AN D H U M I D I T Y S E N S O R C AB L E

END OF STEPS.

The temperature and humidity sensor is installed. Result

Page 66: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

50 Confidential and Proprietary Information of ZTE CORPORATION

Installing Smog Sensor

Perform procedure below to install smog sensor.

None

Note:

Install smog sensor on ceiling close to cabinet.

Use all sensors according to engineering design requirements.

Perform following steps to install smog sensor:

1. Separate smog sensor’s upper and lower parts.

Figure 44 shows smog sensor upper and lower parts.

F I G U R E 44 - SM O G S E N S O R

Lower Part

Upper Part

Figure 45 shows to connect both red and blue wires of End B to pins 1 and 3 at sensor base.

F I G U R E 45 - SM O G S E N S O R C AB L E

25-pin male connector End A

Red

Green30 mm

10 m

Label Label

End B32 13/16 ft

1 3/16 inches

2. Is installation cable available at the installation field?

If Then

YES Go to step 3

NO Refer to the following table to prepare the cable.

Purpose

Prerequisite

Steps

Page 67: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 51

Table 17 shows smog sensor terminal connections.

T AB L E 17 - TE R M I N AL C O N N E C T I O N S

Signal 25-pin Male Connector at End A

Cable Color

Smog Sensor Base at End B

+12V 10 Red 3(+)

-12V 11 Green 1(-)

3. Reassemble sensor upper and lower parts.

Connect DB25 connector at smog sensor End A to DB25 socket at converter panel.

Figure 46 shows terminal connections at smoke sensor base.

F I G U R E 46 - TE R M I N AL C O N N E C T I O N S AT SM O K E S E N S O R B AS E

END OF STEPS.

The smog sensor is installed. Result

Page 68: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

52 Confidential and Proprietary Information of ZTE CORPORATION

Installing Infrared Sensor

Perform following procedure to install infrared sensor.

Figure 47 shows infrared cable sensor cable structure.

F I G U R E 47 - IN F R AR E D S E N S O R C AB L E S T R U C T U R E

Purpose

Page 69: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 53

Figure 48 shows infrared sensor dimensions.

F I G U R E 48 - IN F R AR E D S E N S O R D I M E N S I O N S

(Unit: mm)

1

4

2

3

(Unit: inches)

1. Fixing hole 2. Cable outlet

3. Fixing hole 4. Cable outlet

Page 70: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

54 Confidential and Proprietary Information of ZTE CORPORATION

Perform the following steps to install infrared sensor:

1. Drill two Φ6 holes on the wall, keep hole depth same as that of expansion bolt, no less than 30 mm (1 3/16 inches).

2. Ensure line between the two holes is 80 mm (3 2/16 inches) and is vertical to ground.

3. Hammer expansion bolts into the two holes.

4. Fix infrared sensor to its base. Connect the connection line one end to sensor and other with CBTS I2 external monitoring conversion cable B5 terminal DB9 connector.

5. Route the infrared sensor cable.

i. Lay out cables along wall to upper cabling tray or cabling tray under antistatic floor, then to set top.

ii. Keep cable tail with smooth turn and with no tension.

6. Cover PVC cabling tray after cabling.

END OF STEPS.

The infrared sensor is installed.

Steps

Result

Page 71: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 55

Installing Power Monitoring Cables

ZXC10 CBTS I2 provides external power monitoring capability for PWSB or non-ZTE power equipment. The related interfaces are PWSB and EXT_COM. Physically interfaces are RJ-45 and logically they are RS232 or RS 485. Ensure to use correct signal definition while using RS232 and RS485.

Perform the following steps to install power monitoring cables:

1. Is the logical interface RS232 or RS485?

Logical Interface Action

RS232 Go to step 2

RS485 Go to step 3

2. Prepare RJ45 connector.

Figure 49 shows RS232 cable.

F I G U R E 49 - RS232 C O N N E C T O R

End A End B

i. Assemble RJ-45 connector with FE cable.

Table 18 - illustrates RS232 signal definition.

T AB L E 18 - RS232 S I G N AL D E F I N I T I O N

End A No.

Colour Signal Definition

Remark

6 Green Ground 7 White /

brown O_UART-RX_EM

8 Brown I_UART-TX_EM

a twisted-pair

ii. Use the multi-functional crimping plier to crimp the connector to the FE cable.

Purpose

Steps

Page 72: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

56 Confidential and Proprietary Information of ZTE CORPORATION

3. Assemble RS485 connector

Figure 50 shows RS485 connector.

F I G U R E 50 - RS485 C O N N E C T O R

End A End B

i. Assemble RJ-45 connector with FE cable.

Table 19 illustrates RS485 signal definition.

T AB L E 19 - RS485 S I G N AL D E F I N I T I O N

End A No.

Colour Signal Definition Remark

1 White/orange O_RS485-RX-_EM

2 Orange O_RS485-RX+_EM

a

twisted-pair

3 White/ green GNDD 4 Blue I _RS485-TX-_EM

5 White/ blue I _RS485-TX+_EM

a

twisted-pair

ii. Use the multi-functional crimping plier to crimp the connector to the FE cable.

Installing Switch Input Cables

Perform the following procedure to install switch input cables.

There are 10 on/off input signals transmitted in 1 cable. The connector is DB25. Figure 51 shows switch input cable.

Note:

On /off input signal have only two states either on or off.

Purpose

Page 73: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 57

F I G U R E 51 - SW I T C H I N P U T C AB L E

1. Prepare the Switch Input Cable Connector.

CBTS I2 can be connected to two switch input cables at most. So the maximum switch input signal number is 20. The first switch input cable is connected to B1 interface of the converter panel. Table 20 illustrates switch input signal definition.

T AB L E 20 - SW I T C H I N P U T S I G N AL D E F I N I T I O N

End A No.

Colour Signal Definition

Remark

1 White I_SW-ONA[1]

14 Blue GNDD

First

twisted-pair

2 White I_SW-ONA[1]

15 Orange GNDD

Second

twisted-pair

3 White I_SW-ONA[3]

16 Green GNDD

Third

twisted-pair

4 White I_SW-ONA[3]

17 Brown GNDD

Fourth

twisted-pair

5 Red I_SW-ONA[5]

18 Blue GNDD

Fifth

twisted-pair

6 Red I_SW-ONA[5]

19 Orange GNDD

Sixth

twisted-pair

7 Red I_SW-ONA[7]

20 Green GNDD

Seventh

twisted-pair

8 Red I_SW-ONA[7]

21 Brown GNDD

Eighth

twisted-pair

9 Black I_SW-ONA[9]

22 Blue GNDD

Ninth

twisted-pair

10 Black I_SW-ONA[9]

23 Orange GNDD

Tenth

twisted-pair

Steps

Page 74: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

58 Confidential and Proprietary Information of ZTE CORPORATION

The second switch input cable is connected to B7 interface of the converter panel. Table 21 illustrates switch input signal definition.

T AB L E 21 - SW I T C H I N P U T S I G N AL D E F I N I T I O N

End A No. Colour Signal Definition Remark

1 White I_SW-ONA[0]

14 Blue GNDD

First

twisted-pair

2 White I_SW-ONB[0]

15 Orange GNDD

Second

twisted-pair

3 White I_SW-ONA[2]

16 Green GNDD

Third

twisted-pair

4 White I_SW-ONB[2]

17 Brown GNDD

Fourth

twisted-pair

5 Red I_SW-ONA[4]

18 Blue GNDD

Fifth

twisted-pair

6 Red I_SW-ONB[4]

19 Orange GNDD

Sixth

twisted-pair

7 Red I_SW-ONA[6]

20 Green GNDD

Seventh

twisted-pair

8 Red I_SW-ONB[6]

21 Brown GNDD

Eighth

twisted-pair

9 Black I_SW-ONA[8]

22 Blue GNDD

Ninth

twisted-pair

10 Black I_SW-ONB[8]

23 Orange GNDD

Tenth

twisted-pair

2. Connect the switch input cable connector to corresponding interfaces.

i. Connect the first switch input cable END A to B1 interface of converter panel.

ii. Connect the second switch input cable END A to B7 interface of converter panel.

END OF STEPS.

Page 75: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 59

Installing Control Output Cable

Perform this procedure to install control output cable.

Control output signals have five lines which are at most up to thirty two different values.

1. Prepare control cable

Figure 52 shows control output cable.

F I G U R E 52 - CO N T R O L OU T P U T C AB L E

Table 22 illustrates control output signal definition.

T AB L E 22 - C O N T R O L OU T P U T S I G N AL D E F I N I T I O N

A End No. Colour Signal Definition Remark

1 White O_CONTROL[1]

2 Blue GNDD

First

twisted-pair

3 White O_CONTROL[3]

4 Orange GNDD

Second

twisted-pair

5 White O_CONTROL[0]

6 Green GNDD

Third

twisted-pair

7 White O_CONTROL[2]

8 Brown GNDD

Fourth

twisted-pair

9 Red O_CONTROL[4]

10 Blue GNDD

Fifth

twisted-pair

2. Connect control output cable END A to the B2 interface of converter panel.

END OF STEPS.

Purpose

Steps

Page 76: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

60 Confidential and Proprietary Information of ZTE CORPORATION

Installing External Monitoring Conversion Cables

Perform following procedure to install external monitoring conversion cables.

Figure 53 shows CBTS I2 external monitoring conversion cable structure.

F I G U R E 53 - CBTS I2 E X T E R N AL M O N I T O R I N G C O N V E R S I O N C AB L E

Table 23 describes label details on each socket end.

T AB L E 23 - EX T E R N AL M O N I T O R I N G C O N V E R S I O N C AB L E L AB E L S

End A End B1 End B2 End B3

Cable code /B1

SW_IN_1

Cable code /B2

CTRL_OUT

Cable code /B3

HUM.TEMP_MON

End B4 End B5 End B6

Cable code /B4 DOOR_MON

Cable code /B2

INFRARED_MON

Cable code /B6

SMOG_MON

End B7

Cable code /A

OUT_MON

Cable code/ B7 SW_IN_2

Purpose

Page 77: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 61

Take following steps for external monitoring conversion cable installation:

1. Connect End A to ROOM_MON interface on CBTS I2 cabinet top.

2. Connect B1 ~ B3, B5 ~ B7 ends to converter panel.

Following is their description:

B1 end connects to 10 pairs of input values

B2 end connects to 5 pairs of control output values

B3 end connects to the temperature/humidity sensor.

B4 end connects to the equipment room access control sensor

B5 end connects to the infrared sensor

B6 end connects to the smog sensor

B7 end connects to other 10 pair of input values

END OF STEPS.

The external monitoring conversion cables are installed.

Steps

Result

Page 78: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

62 Confidential and Proprietary Information of ZTE CORPORATION

Connecting Jumper Cable Perform following procedure to connect jumper cable to RFE board.

The cabinet is tested and powered on, and the switches of DPA modules are off.

NOTE: After RFE modules are fixed with jumper cables, they are not able to be unplugged out unless unscrewing the jumper cables off the RFE boards. And when the cabinet is powered on, all boards and modules must be partially seated. So it is recommended to fix jumper cables to cabinet (RFE module) after the CBTS I2 cabinet is powered on.

Important! Ensure NOT to turn on the switch of DPA before fixing jumper cable to RFE module. Otherwise the radiation from RFE module may do harm to people near to the cabinet.

Take following steps to connect jumper cable.

1. Remove cover from cabinet top.

2. Insert RFE board.

3. Put the cover back and tight it with screws.

4. Connect jumper nut with RFE interface and use wrench to fasten nut.

Purpose

Prerequisite

Steps

Page 79: ZTE - CBTS I2 Installation Manual

Chapter 3 Cable Installation

Confidential and Proprietary Information of ZTE CORPORATION 63

Figure 54 illustrates this process.

F I G U R E 54 - CO N N E C T I N G JU M P E R C AB L E

1. Jumper nut 2. Cover

3. Jumper cable installation wrench 4. RFE interface

5. RFE board

END OF STEPS.

The jumper cables are connected to RFE board.

Result

Page 80: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

64 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 81: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 65

C h a p t e r 4

Main Antenna Feeder System Installation

This chapter describes:

Main Antenna Feeder System Overview

Main Antenna Feeder System Structure

Various Combination of Main Feeder Cable and Jumper

Installation Preparations

Personnel

Environment

Tools and Instruments

Safety Precaution

Installation Flow Chart

Antenna Installation

Antenna Installation Flow

Directional Antenna Installation

Omni Antenna Installation

Feeder Window Installation

Main Feeder Installation

Installation Preparations

Installation Flow Chart

Installation Procedure

Lightening Arrester Installation

Lightning Arrester Installation

Installing Cabinet Jumper

VSWR Test

Waterproofing Joints

Page 82: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

66 Confidential and Proprietary Information of ZTE CORPORATION

Main Antenna Feeder System Overview Main Antenna Feeder System Structure

Figure 55 illustrates typical main antenna feeder system structure of a 3-sector cell in tower installation mode, with 7/8″ feeder cable equipped.

F I G U R E 55 - M AI N AN T E N N A FE E D E R S Y S T E M

1

2

34

5

9

4

4

8 10

6 BTSB机

7

11

1. Lightning rod 2. Six antennas

3. Six antenna jumpers 4. Lightning protection grounding clip

5. Six main feeder cables 6. Iron tower

7. Cabling rack 8. Lightning arrester

9. Six cabinet jumpers 10. Equipment room

11. CBTS I2 cabinet

Page 83: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 67

Various Combination of Main Feeder Cable and Jumper Cable

There are three combinations of feeder and jumper cables in ZTE CDMA system corresponding to different length of main feeder system.

When the total length is in between 20 and 80 m (66 and 262 feet, we choose the combination of 1/2″ jumper cable and 7/8″ feeder cable, as is shown in Figure 56.

F I G U R E 56 - FE E D E R AN D J U M P E R C AB L E S C O M B I N AT I O N 1

In Figure 56

DIN mean that the connector type is DIN connector;

M means “male” connector and F means “female” connector.

It is same in and Figure 57.

When the total length is more than 80 m (262 feet), we choose the combination of 1/2″ jumper cable and 5/4″ feeder cable, as is shown in Figure 57.

F I G U R E 57 - FE E D E R AN D J U M P E R C AB L E S C O M B I N AT I O N 2

In engineering, select a proper feeder and jumper combination according to field situation.

Page 84: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

68 Confidential and Proprietary Information of ZTE CORPORATION

Installation Preparation Proper antenna installation is very important to BTS system reliable operation. Before installation, make sure that all installation staffs are qualified and the following requirements are satisfied

Personnel

Normally, supervisors are in charge of direction and supervision, and Installation employees carry out the installation.

Supervisors are required to be familiar with all materials, tools and operation methods. And they are in charge of assigning different work to the proper employee who is good at the operation, especially work on the iron tower. Safety is the most important consideration when assigning work.

Installation employees are required to install antenna system skillfully under the direction of supervisor. Employees on tower must be qualified and in good physical state. And they must have bought personal safety insurance. Installation after drinking is forbidden.

Environment

Please pay attention to following items and check whether they satisfy requirements in engineering design. Normally, they are completed by the network operator.

Lightning rod on iron tower

Grounding system, including grounding bar

Outdoor cabling rack

Diversity distance between two poles of one sector

Antenna pole’s stability. It is required to be able to endure strong wind not less than 150 km/h (93 mile/h).

Prepare installation tools and engineering materials before installation.

Field engineers need to determine route of main feeder with operator engineers before installation.

Antenna can not be installed too near to public electric power cables.

Make sure that CBTS I2 is not powered on during installation.

Page 85: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 69

Tools and Instruments

Measure tools: one compass, one multimeter, one angle meter and one tape measure;

Communication tools: two mobile phones;

Hoisting tools: one pulley block and long ropes;

Special tools: one feeder connector knife;

Regular tools: adjustable wrench, one pair of sharp-nose pliers, one pair of diagonal pliers, one hacksaw (with several saw blades), file set and paper knife, screw drivers;

Protection tools: safety helmet, safety belt, safety rope, pairs of gloves, radiation-shielding clothing and one sealed canvas tool bag;

Other tools: ladder, forklift, electric percussion drill and proper bits, and power socket;

Measure instruments: Site Master, Spectrum analyzer (not necessary) and field strength tester (not necessary).

Safety Precaution

Ensure the following precautions before antenna installation:

Take necessary measures for personal and equipment safety.

Operators on tower must wear safety belt.

Personnel under tower must wear safety helmets.

Never climb tower with loose clothes and wet/slippery shoes.

During active antenna adjustment, wear radiation-shielding clothing and turn off power amplifier to avoid radiation effects.

If possible, install in sunny and windless days. Installation is forbidden in rain, strong wind, thunder and lightning.

Make caution brand in engineering field and keep passengers away from engineering field, especially kids.

When working on tower, put unused tools in a tool bag and prevent them from dropping down from tower to hurt people.

Page 86: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

70 Confidential and Proprietary Information of ZTE CORPORATION

Installation Flow Chart Figure 58 illustrates main antenna feeder system installation flow.

F I G U R E 58 - M AI N AN T E N N A FE E D E R S Y S T E M I N S T AL L AT I O N FL O W C H AR T

This manual will follow the flow illustrated in Figure 58 to introduce main antenna feeder system installation. To be consistent with the installation sequence, antenna jumper installation is included in antenna installation, and feeder clip, grounding clip installation are included in feeder cable installation.

Page 87: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 71

Antenna Installation Antenna Installation Flow

Figure 59 illustrates antenna installation flow

F I G U R E 59 - AN T E N N A I N S T A L L AT I O N FL O W C H AR T

In the following sections, directional antenna and Omni antenna installation are introduced respectively.

Page 88: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

72 Confidential and Proprietary Information of ZTE CORPORATION

Directional Antenna Installation

Perform this procedure to install directional antennas.

Ensure that installation personnel working at tower are qualified and installation tools, materials and equipments are ready.

1. Determine the installation position.

Select the installation position according to engineering design. In case of failure; prepare a secondary engineering design by consulting the customer and design institute

In antenna installation, lightning proof is a key consideration. Antenna and outdoor equipments must be in 45°protection angle coverage of lightening rod. Figure 60 illustrates antenna lightning proof requirement.

F I G U R E 60 - AN T E N N A L I G H T N I N G P R O O F

Lightening rod

Lightening protection

zone

Antenna and outdoors units

45 degree protection angle

Building

Room

NOTE: Make sure that lightning rod is well grounded.

2. Install and seal antenna jumper cable

NOTE: Install and seal antenna jumper cable before hoisting antenna to reduce work time on tower and raise connecting and sealing quality of connectors.

Connect antenna jumper cable to antenna, and fasten the connector. Fix the antenna connector and jumper using suitable torque range (typical value of torque for DIN connector is 1.7 ~ 2.3 N·m (1.25 ~ 1.69 lbm·ft).

To ensure antenna performance, seal connectors with waterproof self-adhesive tape and PVC tape.

Purpose

Prerequisite

Steps

Page 89: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 73

3. Move and hoist antenna and accessories to the installation position:

To mount an antenna onto an iron tower, use ropes and pulley blocks to hoist antennas, antenna jumpers and all accessories such as measuring tools, safety belts, adhesive tapes and straps to the tower top platform and keep them in a safe place.

NOTE:

Put small metal articles like antenna fixing parts and wrenches in a sealed canvas tool bag before hoisting.

Personnel on and under the tower should coordinate in hoisting an antenna. Personnel under the tower should pull antenna away from tower body to avoid damage to antennas.

Knot rope at both ends of antenna for easy coordination of employees both on and under the tower.

Figure 61 illustrates hoisting process.

F I G U R E 61 - HO I S T I N G AN AN T E N N A

2

1

3

4

1. Rope 2. Pulley block

3. Knot rope at both ends of antenna

4. Use this rope to pull antenna away from iron tower to avoid antenna damaged by iron tower

Page 90: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

74 Confidential and Proprietary Information of ZTE CORPORATION

To mount an antenna onto roof, move antenna and installation materials to installation position manually.

4. Assemble antenna accessories

NOTE: Antennas from various companies have some difference. Here is an example of KATHREIN directional antenna.

Directional antennas have a number of installation fasteners. Follow the instructions provided with the antenna.

For example, Kathrein antenna has two types of fasteners: 738516 and 737974. Before fixing antenna, assemble fastener 737974 to antenna ends and then connect fasteners 737974 and 738516. Install all accessories with spring and flat washers.

It is suggested to fix accessories to antenna before hoisting to reduce work on tower.

Figure 62 illustrates the process for assembling the accessories of Kathrein antenna.

F I G U R E 62 - AS S E M B L I N G T H E AC C E S S O R I E S O F K AT H R E I N AN T E N N A

Page 91: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 75

5. Fasten the antenna onto the pole.

Fix the directional antenna with accessories installed on antenna pole. Do not tighten screws too tight to facilitate possible adjustment of azimuth and tilt. Just make sure that antenna does not move down the pole.

6. Adjust the antenna azimuth

i. Determine the antenna azimuth according to engineering design drawing.

ii. Turn the antenna slightly to adjust direction and measure the antenna direction with a compass until direction error satisfies engineering requirement (generally not more than 5°).

iii. Tighten fastener 738516 after adjusting antenna azimuth.

7. Adjusting antenna tilt

i. Determine the antenna tilt according to engineering design drawing.

ii. Rotate a dial on angle meter until the angle indicated by pointer equals to the tilt.

Figure 63 illustrates an angle meter.

F I G U R E 63 - AN G L E M E T E R

1

123

01

23

8080

78

60

465

70

50

8

6050

70

567

234

1215

60

80

90

4

70

87

56

1

40

50

30

1020 20

10

30

2

0

15

560

8090

70

101

432

840

50

12

1

76

DIAL2

2 3

1. Pointer 2. Bubble

3. Dial

Page 92: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

76 Confidential and Proprietary Information of ZTE CORPORATION

iii. Press the angle meter onto antenna inner side, as is shown in Figure 64. Adjust the fastener 737974 until bubble in air bleeder of angle meter stays in middle of two indication rings.

F I G U R E 64 - AD J U S T I N G AN T E N N A T I L T W I T H AN G L E M E T E R

1. Antenna pole 2. Directional antenna

3. Angle meter

iv. After finishing the adjustment, tighten the fastener 737974.

8. After antenna is installed, colligate the antenna jumper to antenna pole and iron tower.

Here are some requirements in colligation:

Route the jumper cables neatly without crossing with each other.

Use anti-ultraviolet straps to colligate jumper cables.

The minimum bending radius of jumper cable can not be less than 20 times the radius of the cable.

As to 1/2” jumper, which is widely used as jumper cable in ZTE CDMA system, the minimum single-bending radius is 80 mm (3 inches), and the minimum multi-bending radius is 125 mm (5 inches).

1/2” jumper cable can not be bent more than 15 times.

END OF STEPS.

The directional antenna is installed. Result

Page 93: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 77

Omni Antenna Installation

Perform this procedure to install omni antennas.

Ensure that installation personnel working at tower are qualified and installation tools, materials and equipments are ready.

1. Determine the installation position.

2. Install and seal the antenna jumper.

3. Move and hoist antenna and accessories to the installation position.

NOTE: Step 1, step 2 and step 3 are same with directional antenna installation. Please refer to “Directional Antenna Installation” for detail.

4. Adjust the antennas to appropriate height.

Figure 65 illustrates U-shaped bolt.

Figure 66 illustrates how to use U-shaped bolts to fix the antenna onto the antenna pole. Ensure that antennas input and output ports face downwards.

F I G U R E 65 - U-S H AP E D B O L T

F I G U R E 66 - OM N I -D I R E C T I O N AL AN T E N N A I N S T AL L AT I O N

1

2

3

1. Omni antenna 2. U-shaped bolt

3. Antenna pole

Purpose

Prerequisite

Steps

Page 94: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

78 Confidential and Proprietary Information of ZTE CORPORATION

5. Measure the verticality of antenna and ensure that antenna is vertical.

6. Fasten screws with a wrench.

7. After antenna is installed, colligate antenna jumper to antenna pole and iron tower.

NOTE: Step 7 is same with directional antenna installation. Please refer to step 8 of “Directional Antenna Installation” for detail.

END OF STEPS.

The Omni antenna is installed.

Feeder Window Installation Feeder window is usually installed on the external wall of equipment room. It lies between indoor cabling rack and outdoor cabling rack.

If feeder window is installed on roof of a building, pay more attention to sealing and waterproof handling. It is required to seal with bitumen or glass glue.

Four models of feeder window are provided by ZTE, as is shown in Table 24

T AB L E 24 - FE E D E R W I N D O W S I Z E T AB L E

NO. Window Model

Unit Feeder Window Size

Hole Size in Wall of Equipment Room

mm 400×400 240×240 1 4 holes

inches 15 12/16×15 12 /16 9 7/16×9 7/16

mm 390×540 240×380 2 6 holes

inches 15 6/16×21 4/16 9 7/16×14 15/16

mm 500×500 360×360 3 9 holes

inches 19 11/16×19 11/16 14 3/16×14 3/16

mm 540×630 380×510

4 12 holes inches 21 4/16×24 13/16

14 15/16×20 1/16

Here, an example of 4-hole feeder window is offered to illustrate feeder window installation. Figure 67 illustrates 4-hole feeder window structure and it can support 12 feeder cables at most.

Result

Purpose

Page 95: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 79

F I G U R E 67 - 4 -H O L E FE E D E R W I N D O W S T R U C T U R E

(Unit: mm)

(Unit: inches)

Equipment room is ready.

1. Determine the feeder window position according to engineering design.

2. Chisel a hole in the specified wall of equipment room. Refer to Table 24 for detailed hole size.

3. Determine the hole position for expansion bolts on the wall according to hole position on feeder window board.

4. Drill the holes in the position determined in step 3,

5. Use expansion bolts to fix the feeder window into the wall.

6. Insulation washer and fixing hoop can be installed when routing feeder into equipment room. Refer to “8. Routing Feeders into Equipment Room”.

7. In cold district with frequent sand storm, even the wall is thick, it is necessary to install a reliable wooden board behind the feeder window in the equipment room to protect

Prerequisite

Steps

Page 96: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

80 Confidential and Proprietary Information of ZTE CORPORATION

equipment room from sand storm and keep the temperature of equipment.

END OF STEPS.

The feeder window is installed.

Main Feeder Installation Installation Preparations

This section describes procedures to install main feeder cables. Install main feeder cables properly to minimize signal loss in transmission and operate reliably in all environments.

In ZTE CDMA radio system, there is a suggestion to main feeder cable selection. Refer to “Various Combination of Main Feeder Cable and Jumper Cable” for detail.

In this manual, 7/8” feeder cable is selected as an example to illustrate main feeder cable installation.

Result

Page 97: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 81

Figure 68 illustrates CBTS I2 main feeder cables connection.

F I G U R E 68 – CBTS I2 M AI N FE E D E R C AB L E C O N N E C T I O N

1. Antenna jumper cable 2. Label

3. Main feeder cable 4. Lightning arrester

5. Cabinet jumper cable

Page 98: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

82 Confidential and Proprietary Information of ZTE CORPORATION

Installation Flow Chart

Figure 69 illustrates main feeder cable installation flow.

F I G U R E 69 - M AI N FE E D E R C AB L E I N S T AL L AT I O N FL O W C H AR T

Page 99: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 83

Installation Procedure

1. Determine Route of Feeder

Determine the route of feeder cables according to engineering design. In case of failure; prepare a secondary engineering design by consulting the customer and design institute.

Feeder cable should be as short as possible to minimize signal loss in transmission.

2. Preparing One Feeder Connector

Note:

Prepare one connector before hoisting feeder cable to tower. And in the end of feeder installation, prepare the other connector.

For feeder connector preparation, refer to the specific manual provided by their manufacturer. Here is an example of ROSENBERGER 7/8" feeder connectors.

i. Take a feeder connector cutting tool for feeder connectors, as is shown in Figure 70.

F I G U R E 70 - CU T T I N G TO O L F O R M AK I N G 7 /8" FE E D E R CO N N E C T O R

ii. Measure a straight feeder section of about 150 mm (5 14/16 inches) to be installed with the connector. Cut and strip the feeder sheath at 50 mm (1 15/16 inches) away from end.

iii. Place the feeder at the opening of cutter, keep a length of four corrugations behind main blade, and turn cutter handle to close the opening. The main blade should be right on the wave crest of a feeder corrugation.

iv. Turn the cutter in direction as marked till handles are completely closed and internal and external copper conductors of feeder are cut completely. Figure 71 illustrates that at the same time, auxiliary blade cuts feeder external plastic protection sheath.

Steps

Page 100: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

84 Confidential and Proprietary Information of ZTE CORPORATION

F I G U R E 71 - CU T T I N G FE E D E R W I T H A C U T T E R

v. Check the length of the cut section.

Figure 72 illustrates the cut section length.

F I G U R E 72 - CH E C K I N G C U T S E C T I O N LE N G T H

vi. Separate the front and back parts of feeder connector, and insert back part into feeder till it contacts with the first corrugation of feeder.

vii. Firmly insert the cutter tube expander into feeder and turn it left and right to expand feeder external copper conductor, so that it is presses against feeder connector back part.

Figure 73 illustrates the procedure of expanding the feeder external conductor.

F I G U R E 73 - EX P AN D I N G FE E D E R E X T E R N AL C O N D U C T O R

Page 101: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 85

viii. Check for residual copper scraps and the external copper sheath is evenly expanded without burrs. Pull feeder connector back part outward to protect it from slipping away from the feeder.

Figure 74 illustrates connecting feeder connector front and back parts.

F I G U R E 74 - CO N N E C T I N G FR O N T AN D B A C K P AR T S

ix. Turn the feeder connector front part and fix it with an appropriate wrench, to restrict its movement against the feeder.

Figure 75 illustrates to turn the feeder connector back part with wrench till it fixes.

F I G U R E 75 - F I X I N G FE E D E R C O N N E C T O R FR O N T AN D B AC K P AR T S

Caution: Feeder connector cutting tool is very sharp. Take care while using cutting tool to avoid serious injury.

Page 102: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

86 Confidential and Proprietary Information of ZTE CORPORATION

3. Feeder Cutting

i. Determine the main feeder length in each sector with a tape measure according to actual route.

ii. Use hacksaw to cut the feeder sufficient length. Usually add some margin about 1 ~ 2 m (4 ~ 7 feet) to measured lengths when cutting cables.

iii. Attach corresponding temporary labels (such as “RFE0-ANT0”, “RFE0-ANT1”, “RFE1-ANT0”, “RFE1-ANT1” and so on) at both main feeder ends after each cut. Attach formal labels after feeder installation.

iv. While feeder cutting, label its both ends and stick temporary labels to the feeder middle. Labels must be correct to get correct connections and sector matching.

NOTE: Labels are very important. Make sure all necessary labels are correctly and reliably stuck.

v. In roof installation, carry cut feeder cables to roof. And in tower installation, refer to “4. Hoisting Feeders to Tower” to take feeder cables to iron tower platform. In this procedure, ensure feeder cables in proper pressure and not damaged.

4. Hoisting Feeders to Tower

i. Wrap the main feeder connector made under the tower with flax (or antistatic packing bag together with foam) and strap it tightly.

ii. Knot and fix the cut feeder cable with hoisting rope at two points. One is 0.4 m (1 5/16 feet) away from the feeder connector and the other is 3.4 m (11 2/16 feet) away. Employees must cooperate to hoist feeder cables to avoid feeder and its connector from colliding with the iron tower.

iii. After hoisting main feeder cables to the tower top, fix upper end of cable at multiple points to prevent it from slipping down the tower.

Page 103: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 87

Figure 76 illustrates hoisting feeder up to tower.

F I G U R E 76 - HO I S T I N G FE E D E R U P T O TO W E R

1

5

2

4Use this rope to pull feeder cable away

from tower to avoid damage to feeder

cable and connector

3

66

1. Pulley block 2. Feeder connector bundling

3. Feeder label 4. Knotting position in the upward rope

5. Downward rope 6. Employees

Caution:

Raise feeder with care to avoid damaging its sheath. If any part of sheath is broken, this feeder cable is unable to work properly and needs to be replaced.

Take care for personnel safety when hoisting the feeders.

5. Connect Feeder and Antenna Jumper

i. Fix the main feeder cable connector and antenna jumper.

ii. To ensure feeder cable performance, seal connectors with waterproof self-adhesive tape and PVC tape.

6. Fixing Feeder Cables

Determine the path of feeder cables while reaching an agreement with owner to avoid any disturbance in future. Satisfy the following requirements during fixing the feeder cables.

Page 104: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

88 Confidential and Proprietary Information of ZTE CORPORATION

Fix the feeder cables neatly without crossing with each other, especially in the part of entering equipment room and on indoor cabling rack.

Make the route clear before fixing feeder cables. It is recommended to note down feeder actual route on paper to avoid rework for crossed feeder cables.

The minimum bending radius of the main feeder cable can not be less than 20 times the radius of the main feeder cable.

As to 1/2” jumper, the minimum single-bending radius is 80 mm (3 inches), and the minimum multi-bending radius is 125 mm (5 inches). The cable can not be bent more than 15 times.

As to 7/8” jumper, the minimum single-bending radius is 125 mm (5 inches), and the minimum multi-bending radius is 250 mm (10 inches). The cable can not be bent more than 15 times.

As to 5/4” jumper, the minimum single-bending radius is 200 mm (8 inches), and the minimum multi-bending radius is 380 mm (15 inches). The cable can not be bent more than 15 times.

Maximum spacing between 3-feeder clips:

As to 1/2” feeder cable, the maximum space is 1 m (3 4/16 feet);

As to 7/8” and 5/4” feeder cable, the maximum space is 1.5 m (5 feet);

In any case, the maximum space between 3-feeder clips can not be more than 1.65 m (5 7/16 feet).

When the wind speed of CBTS I2 site is often over 160 km/h (100 miles/h), reduce the spacing between feeder clips properly.

Here is an example of fixing 7/8” feeder cable. Perform this procedure to fix the feeder cable:

i. Follow above requirements to install 3-feeder clips.

Note: Keep spacing as even as possible and ensure feeder clips installation direction same. While installing two rows of feeder clips inside same cabling ladder or cabling rack, keep the two rows parallel and arrange them neatly.

Page 105: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 89

Figure 77 illustrates the shape of 3-feeder clip.

F I G U R E 77 - 3 -F E E D E R C L I P

Figure 78 illustrate to use 3-feeder clip to fix feeder cables.

F I G U R E 78 - US E 3 -FE E D E R C L I P T O F I X FE E D E R C AB L E S

1. 3-feeder clip 2. Three main feeder cables

3. Bolt

ii. Sort the feeder cables in order.

iii. Fix the main feeder cables from top to bottom and sort them into 3-feeder clips. Fasten the feeder clips after smoothing the main feeder cables. Keep main feeders flat and straight. It is not permitted to fix feeder cables in both ends at same time.

iv. Fix the main feeder cables with 3-feeder clips along the outdoor cabling ladder or the cabling rack to enter equipment room.

7. Installing Feeder Grounding Clips

Ensure these grounding requirements while installing feeder grounding clips:

Roof installation mode

In roof installation, the following items must be grounded to building grounding network:

Main antennas system

Antenna pole

Outdoor cabling rack or cabling ladder

Ground the main feeder cable at two positions:

Page 106: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

90 Confidential and Proprietary Information of ZTE CORPORATION

Where it leaves antenna pole

Where it enters equipment room

If the feeder cable is rather long, add grounding points according to feeder length.

Tower installation mode

Usually at least three feeder grounding clips are required to be installed in tower installation mode. Ground the feeder cable at the following positions:

Where it leaves antenna installation pole

Where it leaves iron tower

Where it enters equipment room.

When feeder cable is longer than 60 m (197 feet), then install a grounding clip on the feeder cable after every 20 m (66 feet) distance.

If outdoor cabling rack or outdoor cabling ladder is used, ground it reliably.

Antenna poles and iron tower need to be grounded reliably.

Page 107: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 91

Figure 79 illustrates CBTS I2 grounding system in tower installation.

F I G U R E 79 – CBTS I2 GR O U N D I N G S Y S T E M

12

4 5

3 10

2

7

1

6

8

11

9

2

1. Iron tower 2. Feeder grounding clip 3. Main feeder cable 4. Outdoor grounding busbar 5. Indoor grounding busbar 6. Grounding network 7. Grounding copper busbar 8. Lightning arrester 9. Cabinet jumper 10. 35 mm2 (2 AWG) Cable 11. Equipment room 12. CBTS I2 cabinet

i. Prepare required tools including paper knife, flathead screwdrivers, and wrench and sharp-nose pliers.

ii. Peel off 7/8" sheath according to size of grounding clip at the positions introduced above.

Page 108: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

92 Confidential and Proprietary Information of ZTE CORPORATION

Figure 80 illustrates structure of grounding clip.

F I G U R E 80 - GR O U N D I N G CL I P

1 23

45

6

1. Grounding end 2. Grounding cable 3. Feeder cable 4. Grounding spring lock 5. Feeder external cooper core 6. Grounding cable copper piece

iii. Clamp the feeder external conductor with grounding cable copper sheet and locking spring plate.

iv. Lay grounding cable facing to the grounding network. Avoid bending or folding. And keep the included angel between grounding cable and feeder cable less than 15°.

In tower installation mode, grounding cable is installed downwards and finally connected to tower;

In roof installation mode, grounding cable is installed in the same direction with feeder cables.

v. Make joint of grounding clip and feeder waterproof using waterproof adhesive tapes, then use insulation tapes to cover the joint.

vi. Connect the grounding end of the grounding clip to the grounding network.

Connect it to the main tower body in tower installation mode.

Connect it to the grounded cabling rack in roof installation mode.

When connecting, remove the paint and oxide at connection place within a radius of 13 mm (8/16 inches) around the joint, and daub the place with antioxidant cream to ensure good electric contact. After connecting, paint the joint with anticorrosive paint.

Caution: Do not install grounding clip in case of any lightning strike.

8. Routing Feeders into Equipment Room

Following are the feeder entering requirements:

Use cabling racks both indoors and outdoors to guide the feeder cables.

Page 109: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 93

Make proper arrangement to avoid rain from flowing into the equipment room through feeders. It is required to route feeder cable in the shape of a bow, as is shown in Figure 81 and Figure 82.

F I G U R E 81 - RU N N I N G FE E D E R S I N T O E Q U I P M E N T R O O M (H O R I Z O N T AL E N T E R I N G )

1. Feeder window 2. Cabling rack

3. Feeder clip

F I G U R E 82 - RU N N I N G FE E D E R S I N T O E Q U I P M E N T R O O M (V E R T I C AL E N T E R I N G )

1. Feeder window 2. Cabling rack

3. Feeder clip

i. Loosen the sealing fixture hoop in the feeder window to a proper degree. Remove the holes covers to run the feeder cables through.

ii. Lead the feeder cables into equipment room.

Page 110: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

94 Confidential and Proprietary Information of ZTE CORPORATION

Two employees are required to stay inside and outside equipment room respectively to cooperate to lead the feeders into equipment room so as to avoid damage to the indoor equipment and hurt to the feeder sheath. Fasten the fixing hoop after pulling the feeders in place.

iii. Measure the required length of feeder cable precisely and cut feeder cables with hacksaw.

Select the cut point according to cabinet position, cabinet jumper length, lightning arrester configuration and lightning arrester position, and take feeder cable bending restriction and equipment room neatness requirement into consideration.

Ensure that the temporary labels on the feeders are complete before and after feeder cutting.

iv. Make the indoor connectors for main feeder cables.

v. Use 3-feeder clips to fix main feeder cables onto indoor cabling rack in proper spacing.

END OF STEPS.

Page 111: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 95

Lightning Arrester Installation

Perform this procedure to install lightning arrester.

Broadband lightning arrester does not need independent grounding system. It is placed between main feeder cables and indoor cabinet jumper.

Lightning arresters that need grounding system must be grounded with 12×M6 copper bar. Adjust each feeder cable to ensure that feeder connector is connected with lightning arrester reliably.

Figure 83 illustrates widely used grounding lightning arrester.

F I G U R E 83 - CO M M O N L I G H T N I N G AR R E S T E R TH AT N E E D S GR O U N D I N G

Figure 84 illustrates 12×M6 grounding copper bar.

F I G U R E 84 - 12×M6 GR O U N D I N G C O P P E R B AR

1. M8 X 10 bolt 2. Copper bar

3. Insulation module

Purpose

Page 112: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

96 Confidential and Proprietary Information of ZTE CORPORATION

Perform the following steps to install lightning arrester:

1. Connect the lightning arrester with main feeder cables and antenna jumper, as is shown in Figure 85.

F I G U R E 85 - CO N N E C T L I G H T N I N G AR R E S T E R W I T H FE E D E R AN D J U M P E R (S I D E V I E W )

41

5

332

500mm500mm20 inches 20 inches

1. Jumper cable 2. Lightning arrester

2. 3-feeder clip 4. Feeder cable

5. Indoor cabling rack

2. Install 12×M6 copper bar

Remove the black rubber parts of the two feeder clips. The metal parts are used to install lightening arrester;

Insert the screw of the copper bar’s insulation module into the feeder clip’s hole, and fix with screw cap. Fix the two insulation module to the two feeder clips;

Fix the two feeder clips’ metal parts onto indoor cabling rack with their fixing screws.

NOTE: The distance between copper bar and lightning arrester can not be bigger than 50 cm (19 11/16 inches).

Figure 86 illustrates fixing copper bar.

F I G U R E 86 - F I X I N G C O P P E R B AR

1. Feeder clip metal part 2. Copper bar’s insulation module

3. 12×M6 copper bar

Steps

Page 113: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 97

3. Connect the lightning arrester and copper bar with 16 mm2 (6 AWG) yellow/green cables. Use lugs at lightning arrester side. Connect the copper bar and outdoor grounding bar with 35 mm2 (2 AWG) yellow/green cables. Use lugs at outdoor grounding bar side.

The cables can be connected to any hole of copper bar. But make sure to lay cables without crossing with each other.

Figure 87 illustrates connecting lugs to lightning arrester.

F I G U R E 87 - CO N N E C T LU G S T O L I G H T N I N G AR R E S T E R

NOTE:

Ensure insulation among lightning arresters, copper bar and indoor cabling rack.

In small equipment room, distance between copper bar and feeder window is required to be less than 1 m (3 4/16 feet). In big equipment room, when BTS cabinet is rather far from feeder window, determine copper bar’s position based on cabinet jumper length and 35 mm2 (2 AWG) yellow/green cable length.

Page 114: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

98 Confidential and Proprietary Information of ZTE CORPORATION

Figure 88 illustrates complete installation top view.

F I G U R E 88 - CO M P L E T E I N S T AL L AT I O N TO P V I E W

3

6

5

1

4

2

7

400 mm

500 m

m

19 1

1/1

6 inch

es

15 12/16 inches

1. 12×M6 copper bar 2. 16 mm2 (4 AWG) yellow/green cable

3. Indoor cabling rack 4. Main feeder cable

5. Lightning arrester 6. 1/2” cabinet jumper cable

7. 35 mm2 (2 AWG) yellow/green cable

Figure 89 illustrates complete installation side view.

F I G U R E 89 - CO M P L E T E I N S T AL L AT I O N S I D E V I E W

500 mm 500 mm

1 2 2

53 4

6 19 11/16 inches 19 11/16 inches

1. Lightning arrester 2. 3-way feeder clip 3. 16 mm2 grounding cable 4. 12 x M6 copper bar 5. 35 mm2 grounding cable 6. Indoor cabling rack

Note: Yellow wires in above figures refer to the yellow/green cables.

Page 115: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 99

Figure 90 illustrates lightning arrester installation photo.

F I G U R E 90 - L I G H T N I N G AR R E S T E R I N S T AL L AT I O N P H O T O

END OF STEPS.

The lightening arrester is installed.

Installing Cabinet Jumper Perform this procedure to install cabinet jumper.

2 m (7 feet) 1/2'' cabinet jumper is ready.

NOTE:

If cabinet jumper is not available or there are special requirements in field, make it with materials.

The jumper cables are usually installed to RFE modules after the cabinet is powered on.

Perform the following steps to install cabinet jumper.

1. Connect the cabinet jumpers to lightning arrester.

2. Connect the cabinet jumpers to “RFE0-ANT0”, “RFE0-ANT1” and other RF interfaces on cabinet.

NOTE: Step 2 is recommended to be carried out after VSWR Test, just in power-on steps.

END OF STEPS.

The cabinet jumper is installed.

Result

Purpose

Prerequisite

Steps

Result

Page 116: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

100 Confidential and Proprietary Information of ZTE CORPORATION

VSWR Test After installing all antenna feeders and jumpers, conduct SWR test. The SWR must be less than 1.5. Otherwise, check all main antenna and feeder system, including:

Feeder connecter

antenna and jumpers

whether the sheath is broken

whether the bending radius is too small

whether the lightning arresters are not installed properly

Adjust until VSWR is less than 1.5.

Waterproofing Joints Perform this procedure to seal joints between feeder and jumper. It is an example for waterproofing all kinds of joints.

The 1/2'' jumper and the main feeder are connected.

Seal 1/2'' jumper and feeder connectors for waterproof treatment as follows:

1. Wrap one layer of insulation tape to feeder and jumper connectors. Cover the lower layer with upper layer about 1/2. The tape coverage is required to be 10 mm (6/16 inches) longer than connector tails. When wrapping, pull the tape with enough strength.

2. Wrap waterproof adhesive tapes from lower position of connectors and fill the lower-lying parts of the connectors, is as shown in Figure 91.

F I G U R E 91 - W R AP P I N G W AT E R P R O O F AD H E S I V E T AP E S (1 )

NOTE: If waterproof adhesive tape is wider than the lower-lying part. Fold the tape first, and then fill the lower-lying part.

Purpose

Prerequisite

Steps

Page 117: ZTE - CBTS I2 Installation Manual

Chapter 4 Main Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 101

3. While wrapping, extend the adhesive tapes to double their length. Use 60 mm (24 inches) waterproof adhesive tape in a connector and wrap three layers of tape on one connector.

Keep wrapping direction same with that of screwing the feeder connector, to avoid the feeder connector from loose.

4. Wrap adhesive tapes layer by layer and later in the reverse direction. Cover the lower layer with upper layer about 1/3 to avoid water penetration. Apply the tape with three layers without any cut in the entire process. Wrap the tapes around the feeder connector till they protrude about 20 mm (13/16 inches) from the feeder connector.

Figure 92 illustrates wrapping waterproof adhesive tape.

F I G U R E 92 - W R AP P I N G W AT E R P R O O F AD H E S I V E T AP E S (2 )

5. Grip the waterproof adhesive tapes after wrapping to ensure firm bonding between the tapes and the feeder connectors.

Figure 93 illustrates this process.

F I G U R E 93 - W R AP P I N G 9 W AT E R P R O O F AD H E S I V E T A P E S (3 )

6. Apply two layers of PVC tape above waterproof adhesive tape. Ensure that the upper layer overlaps the lower layer by 1/2 the width of tape.

Wrap PVC tapes around adhesive tapes till they protrude about 20 mm (6/16 inches) from adhesive tapes.

7. Grip PVC tapes and waterproof adhesive tapes to make them tightly adhered to each other.

8. To ensure waterproof effect, bundle anti-ultraviolet straps tightly at tapes on both ends.

END OF STEPS.

Page 118: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

102 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 119: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 103

C h a p t e r 5

GPS Antenna Feeder System Installation

This chapter describes:

GPS Antenna Feeder System Structure

Installation Position Requirements

GPS Antenna Feeder System Installation Flow

GPS Antenna System Installation with 1/4" Cables

Prepare 1/4" Feeder Cable N-model Connector

GPS 1/4" Feeder Grounding Clip Installation

Page 120: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

104 Confidential and Proprietary Information of ZTE CORPORATION

GPS Antenna Feeder System Structure This section describes GPS Antenna feeder system’s structure with 1/4” cables.

NOTE: The GPS antenna feeder system structure is different in indoor and outdoor BTS systems. The following introduction is only applicable to indoor BTS.

Figure 94 illustrates GPS antenna feeder system structure with 1/4” cables.

F I G U R E 94 - GPS AN T E N N A FE E D E R S Y S T E M W I T H 1 /4” C AB L E S

Page 121: ZTE - CBTS I2 Installation Manual

Chapter 5 GPS Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 105

Installation Position Requirements There are two types of GPS antenna installation positions:

Tower Mounted

Roof Mounted

The vertical distance between GPS antenna and the ground must be shorter than 5 m (16 6/16 feet). And the horizontal distance between GPS antenna and the iron tower is required to be 30 cm (11 13/16 inches)

Figure 95 illustrates position of a tower mounted GPS antenna.

F I G U R E 95 - TO W E R M O U N T E D GPS AN T E N N A

1. GPS antenna

GPS antennas must be installed in the shadow of lightning rod in roof installation mode.

Tower Mounted

Roof Mounted

Page 122: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

106 Confidential and Proprietary Information of ZTE CORPORATION

Figure 96 illustrates position of a roof mounted GPS antenna.

F I G U R E 96 - RO O F M O U N T E D GPS AN T E N N A

<45°

1

2

1. Lightning rod 2. GPS antenna

Following are GPS antenna installation requirements:

GPS antenna installation position should have a broader view to track on maximum satellites. Ensure that there are no obstacles in 150° GPS antenna elevation for both installation modes.

Keep GPS feeder cable short as possible to reduce signal loss and lightning induction.

Do not install GPS antenna under microwave antenna, high-voltage lines, television transmitting tower, or within radiation range of a mobile system antenna.

Following are lightning protection requirements to install a GPS antenna:

Install GPS antenna within 45° lightning protection coverage area of tower.

Place GPS antenna away from lightning strikes. If it is tower mounted, install it in a safe place on the roof or in tower lower part.

Installation Position

Requirements

Lightning Protection

Requirements

Page 123: ZTE - CBTS I2 Installation Manual

Chapter 5 GPS Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 107

GPS Antenna Feeder System Installation Flow Figure 97 illustrates the installation flow of GPS Antenna system with 1/4” cables.

F I G U R E 97 - GPS AN T E N N A S Y S T E M (W I T H 1 /4” C AB L E S ) I N S T AL L A T I O N FL O W

Prepare the connector in the other end

Begin

End

Route and fix GPS feeder cable

Fix the tube to the antenna pole with antenna fixing clip

Prepare the connector in one end

Put the prepared connector through the

antenna tube

Connect the connector of GPS cable to CBTS

O1 cabinet

Fix the antenna tube to the antenna

Cut GPS feeder cable

Fix the connector to the GPS antenna

Most of the installation is similar to the main antenna feeder system. So in the following sections, only some key installation steps are introduced.

Page 124: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

108 Confidential and Proprietary Information of ZTE CORPORATION

GPS Antenna Feeder System Installation with 1/4” cables Most of the installation is similar to the main antenna feeder system. So in the following sections, only some key installation steps are introduced.

Prepare 1/4” Feeder Cable N-model Connector

Perform this procedure to prepare 1/4” feeder cable N-model connectors.

It is suggested to prepare following tools:

A ruler with minimum scale of 1 mm ( or 1/16 inches);

Paper knife;

Wrench;

A file;

A brush.

If a feeder connector knife is equipped, it will be much easier to prepare a connector.

Important! 1/4” cable’s copper bellow is thin and easy to be broken. So in engineering field, it is forbidden to stand on the 1/4” cables. And other operations which are probable to damage 1/4” cables are forbidden, too.

Purpose

Prerequisite

Page 125: ZTE - CBTS I2 Installation Manual

Chapter 5 GPS Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 109

Figure 98 illustrates the dimension requirements of preparing the connector.

F I G U R E 98 - D I M E N S I O N R E Q U I R E M E N T S O F P R E P AR I N G 1 /4” C AB L E N-M O D E L C O N N E C T O R

1/85 inches x45°

31 2

0.3 mmx45°

21/97 ± 1/51 inches

5.5± 0.5 mm15± 0.5 mm

13/22 ± 1/51 inches

1. Wave crest of a feeder corrugation.

2. O-shape sealing ring 3. 1/4” feeder cable

Perform the following steps to prepare GPS 1/4” cable connector:

1. Measure a straight feeder section of about 50 mm (1 15/16 inches) to be installed with the connector. Cut and strip the feeder sheath at 20 mm (13/16 inches) away from end.

Figure 99 illustrates this procedure.

F I G U R E 99 - CU T AN D S T R I P T H E 1 /4” C AB L E S H E AT H

2. Use paper knife to cut the external conductor of feeder cable. Figure 100 illustrates the position to cut external conductor.

Steps

Page 126: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

110 Confidential and Proprietary Information of ZTE CORPORATION

NOTE:

i. The cut position is just 14.5 mm (9/16 inches) away from the cable sheath edge. (The metric measure value is the exact value, and there are small errors in the British measure value.)

ii. Ensure that the cut position is just on the wave crest of a feeder corrugation.

iii. If the above two requirement can not be satisfied simultaneously, measure and adjust the cable sheath edge’s position until two requirements are both satisfied.

F I G U R E 100 - P O S I T I O N T O C U T T H E E X T E R N AL C O N D U C T O R

Figure 101 illustrates cutting the external conductor.

F I G U R E 101 - C U T T I N G T H E E X T E R N AL C O N D U C T O R

3. Use a file to file the inner conductor gently, and make it satisfy the requirement of “0.3×45°”. “0.3×45°” means:

File the top of the external conductor flat and smooth. And the length of the stuck-out inner conductor must be 5.5 mm (21/97 inches);

File a slope at the edge of inner conductor’s top. Ensure the angle between the slope and the inner conductor just

Page 127: ZTE - CBTS I2 Installation Manual

Chapter 5 GPS Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 111

45°, and the inner conductor length corresponding to the slope is 0.3 mm (1/85 inches).

Ensure that no burr is on the surface of inner conductor. If any burr exists on the surface, the GPS signal quality will reduce a lot.

Figure 102 illustrates the inner conductor dimension requirements.

F I G U R E 102 - I N N E R C O N D U C T O R D I M E N S I O N R E Q U I R E M E N T

1. 1/4” cable inner conductor

2. 1/4” cable external conductor

Figure 103 illustrates the 1/4” cable view after above processing.

F I G U R E 103 - 1 /4” C AB L E V I E W AF T E R P R O C E S S I N G

Page 128: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

112 Confidential and Proprietary Information of ZTE CORPORATION

4. Brush off the copper powders on the conductor and cable. Wipe a coating of lubricant onto the bare conductors, and pack the O-shape sealing ring to the fourth trough of the external conductor.

Figure 104 illustrates the position of O-shape ring.

F I G U R E 104 - F I X TH E O-S H AP E S E AL I N G R I N G

5. Separate the front and rear parts of feeder connector. Insert the feeder cable into the rear part firmly. When the rear part touches the first wave crest of a feeder corrugation, turn it left and right to expand feeder external conductor, so that the rear part of the connector is fixed on the first trough of the external conductor.

Figure 105 illustrates the final view of this step.

F I G U R E 105 - I N S T AL L I N G TH E R E AR P AR T O F C AB L E C O N N E C T O R

Page 129: ZTE - CBTS I2 Installation Manual

Chapter 5 GPS Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 113

6. Screw the front part of connector onto the rear part. Then fix the front part and rear part with wrenches. During fixing, keep the rear part still and screw the front part until they are firmly fixed. The recommended torque is between 7 and 10 N·m.

Figure 106 illustrates this procedure.

F I G U R E 106 - F I X TH E FR O N T P AR T O N T O TH E R E AR P A R T

END OF STEPS.

The 1/4” feeder connector is prepared. Result

Page 130: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

114 Confidential and Proprietary Information of ZTE CORPORATION

GPS 1/4" Feeder Grounding Clip Installation

Perform this procedure to install GPS 1/4" Feeder Grounding Clip.

GPS 1/4" feeder grounding clip’s structure is shown in Figure 107.

F I G U R E 107 - GPS 1 /4" FE E D E R GR O U N D I N G C L I P S T R U C T U R E

1

2

3

1. 1/4" Feeder Grounding Clip

2. M6 bolt (including plane washer and spring washer)

3. Grounding Cable

GPS 1/4" feeder grounding clip is easy to install. It has waterproof material inside, so waterproofing operation is not necessary during installation.

The material to the field includes:

Grounding clip (including tin-covered iron belt), two M6×25 bolts (including spring washer and plane washer)

0.8 m grounding cable

One M8 × 25 bolt (including spring washer and plane washer)

A small package of copper oil (10 ml)

M8 × 25 copper bolts are used to connect grounding cable and grounding bar.

Sometimes it is possible that installation engineers need to prepare the grounding cable. To prepare grounding cable, the following materials are required:

Purpose

Page 131: ZTE - CBTS I2 Installation Manual

Chapter 5 GPS Antenna Feeder System Installation

Confidential and Proprietary Information of ZTE CORPORATION 115

Black 10 mm2 (8 AWG) copper-core grounding cable

Grounding terminal (grounding cable side)

Grounding terminal (grounding bar side)

Black shrinking pipe

The structure of grounding cable is shown in Figure 108.

F I G U R E 108 – GR O U N D I N G C AB L E S T R U C T U R E

3

2

1

4

2

1. Grounding Terminal 2. Φ12 Shrinking Pipe

3. 10 mm2 Copper-core Cable 4. Grounding Terminal

1. Check whether the grounding cable is prepared?

If Then

YES Go to Step 3

NO Go to Step 2

2. Cable Preparations

i. Stripping

Strip about 13 mm (8/16 inch) sheath at the two ends of copper-core cable.

Steps

Page 132: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

116 Confidential and Proprietary Information of ZTE CORPORATION

ii. Assembling

Insert the two ends of copper-core cable into two Φ12 shrinking pipes. Then insert two ends of copper-core cable into two grounding terminals.

iii. Crimping

Crimp two terminals with a pair of crimping pliers. Use hot blower to blow shrinking pipes to make them shrink to the surface of cable and terminal.

NOTE: Cut two ends of shrinking pipe flat, and make sure that the shrinking pipes touches terminals and cables closely. If the shrinking pipe is broken, please remove the broken one and prepare a new one.

3. Determine the position of 1/4" feeder cable grounding point. Cut off the cable’s sheath about 25 mm (1 inch) according to the clip’s size.

4. Insert the cable into the grounding clip. And put the clip just at the cut-off position.

5. Use M6 bolt to fix the grounding terminal with two fixing points onto the grounding clip. Tighten the bolt to fix the clip and make it close. Note that the plane washer and spring washer of M6 bolt are required to be installed between bolt and grounding terminal.

6. Fix the grounding terminal of the other end onto the grounding bar with M8 bolt. Note that the plane washer and spring washer of M6 bolt are required to be installed between bolt and grounding terminal.

7. Brush a layer of copper oil onto the bare metal surface evenly to avoid rusting.

END OF STEPS.

This section describes GPS connector installation check.

Pin should be at same level inside the shell.

Connector strength must be more than 60 N. Incase if measurement tool is not present to measured the strength, it should be verified by using both hands. At least it should not be opened by using both hands.

Insulation resistance between pin and shell must “infinity”.

Check resistance between feeder cable pins and conductors head.

Check resistance between conductors head.

Follow-up Action

Page 133: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 117

C h a p t e r 6

Board Installation

This chapter describes:

CBTS I2 board slot

Installation flow Chart

Installation precautions

Installing CBTS I2 boards

Installing RFS Board

Installing BDS Board

Board Wiring

Page 134: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

118 Confidential and Proprietary Information of ZTE CORPORATION

CBTS I2 Board Slot This section describes CBTS I2 board slots.

Figure 109 shows CBTS I2 board slot.

F I G U R E 109 - CBTS I2 B O AR D S L O T

Installation Flow Chart This section describes CBTS I2 boards installation flow.

Figure 110 shows board installation flow chart.

F I G U R E 110 - B O AR D I N S T A L L AT I O N FL O W C H AR T

Page 135: ZTE - CBTS I2 Installation Manual

Chapter 6 Board Installation

Confidential and Proprietary Information of ZTE CORPORATION 119

Installation Precautions Following are boards’ installation precautions:

Ensure anti-static wrist strap is grounded before operation.

Ensure that slots for installing boards are consistent with required slots.

To avoid damage, push boards slowly along the guide rail.

Installing CBTS I2 Boards This section describes RFS and BDS board installation procedure.

Installing RFS Board

Perform following procedure to install RFS boards.

Before installation, take boards out of antistatic bag and check them. If any damages are found, register fault types, and pack them for repair.

Take following steps to install RFS boards:

1. Select slot position for board installation.

2. Gently insert board vertically along the guide slot.

3. Lock board by pressing down screws.

Installing BDS Board

Perform following procedure to install BDS boards.

Before installation, take boards out of antistatic bag and check them. If any damages are found, register fault types, and pack them for repair.

Overview

Purpose

Prerequisite

Steps

Purpose

Prerequisite

Page 136: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

120 Confidential and Proprietary Information of ZTE CORPORATION

Take following steps to install BDS board:

1. Insert boards in the plug-in box

i. During board insertion, determine board type and its slot, keep ejector lever in de-locking position. Push board along guide rail slowly into slot. Figure 111 shows to push board along guide rails till it reaches bayonet of extraction tool.

F I G U R E 111 - B O AR D P L U G G I N G (S T E P 1 )

Steps

Page 137: ZTE - CBTS I2 Installation Manual

Chapter 6 Board Installation

Confidential and Proprietary Information of ZTE CORPORATION 121

ii. Push board forward and turn down extraction tool ejector levers on both sides. A click indicates that extraction tool is in the position and its ejector levers are hooked.

Figure 112 shows this process.

F I G U R E 112 - B O AR D P L U G G I N G (S T E P 2 )

Page 138: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

122 Confidential and Proprietary Information of ZTE CORPORATION

2. Tightening screws

Tighten captive screws on extraction tools with flathead or cross screwdrivers.

Figure 113 shows this process.

F I G U R E 113 - B O AR D P L U G G I N G (S T E P 3 )

Note: To uninstall a board follow the reverse process that of installation.

Board Wiring

Perform following procedure to complete board wiring after their installation.

Take following steps for board wiring:

1. Connect GPS cable to GCM board and connect RFE board and DPA board.

2. Connect inner GPS wire to antenna socket (ANT).

3. Connect corresponding RFE-DPA cables to each other as shown in Figure 114.

Purpose

Steps

Page 139: ZTE - CBTS I2 Installation Manual

Chapter 6 Board Installation

Confidential and Proprietary Information of ZTE CORPORATION 123

F I G U R E 114 - C O N N E C T I O N O F DPA AN D RFE B O AR D S

1. Inner GPS wire 2. RFE-DPA connecting cable

END OF STEPS.

The CBTS I2 boards are installed.

Result

Page 140: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

124 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 141: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 125

C h a p t e r 7

Hardware Installation Check

This chapter describes:

Cabinet Installation Check

Cable Installation Check

Cabling Rack Installation Check

Power and Grounding Cables

Trunk and RF Cables

Board Installation Check

Antenna Feeder System Installation Check

1/2” Indoor Jumper Check

Lightning Arrester Check

Main Feeder Cable Check

GPS Feeder Cable Check

Feeder Window and Sealing Check

Three-way Feeder Clip Check

1/2” Outdoor Jumper Check

Antenna Installation Check

Feeder SWR Check

Environment Check

Base Station Information Collection

Page 142: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

126 Confidential and Proprietary Information of ZTE CORPORATION

Cabinet Installation Check Check following after CBTS I2 cabinet installation.

1. Ensure that cabinet installation location complies with the engineering design drawing.

2. Erect cabinet firmly that must resist an earthquake measuring up to 7.0 on Richter scale.

3. Ensure that horizontal and verticality error and the gap between adjacent bases is less than 0.12 inch (3 mm).

4. Ensure all other equipment and cabinet front door are in one line.

5. Ensure cabinet front and rear parts are at a distance of 31.50 inch (0.8 m) and 1.97 inch (0.05 m) away from the walls respectively.

6. Ensure that all cabinet components are present.

7. Ensure that all cabinet parts are fixed properly.

8. Ensure inside cabinet is clean and all screws are tight with flat washers or spring washers.

9. Ensure each base is equipped with four insulation spacers and base supporters are consistent with expansion screws holes.

END OF STEPS.

Steps

Page 143: ZTE - CBTS I2 Installation Manual

Chapter 7 Hardware Installation Check

Confidential and Proprietary Information of ZTE CORPORATION 127

Cable Installation Check This section describes cable installation check. Check following CBTS I2 cables after installation.

Cabling Rack Installation Check

This section describes cabling rack installation check. Ensure following after cabling rack installation:

1. Cabling rack location and height meet the engineering design requirements.

2. Cabling rack is in good shape.

3. Cabling rack is laid out with a grounding cable.

END OF STEPS.

Power and Grounding Cables

Check for following after laying power and grounding cables:

1. Ensure that the equipment room power and grounding cables are in accordance with engineering design specifications.

2. PGND protective grounding wire on a CBTS I2 cabinet employs 35 mm2 yellowish green or yellow copper-core cable connected with indoor PGND grounding copper bars.

3. Ensure that grounding cable is black copper core cable of 25 mm2, -48 V power cable is blue copper core cable of 25 mm2, and grounding bus has a diameter more than 35 mm2.

4. Protective grounding and AC neutral cables are laid out separately.

5. AC neutral line in power room is independently grounded.

6. The outdoor grounding resistance is less than 5 ohm.

7. Labels on both ends of power and grounding cables are correct.

8. Avoid cable overlapping. All lengthy cables must be shortened or well coiled up.

9. Copper lugs on both ends of power and grounding cables are soldered or pressed firmly.

10. Entire power and grounding cables are made from one material with no connections in between.

11. Connection of power supply to cabinet terminals is correct.

Purpose

Steps

Steps

Page 144: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

128 Confidential and Proprietary Information of ZTE CORPORATION

12. Insulating protective sleeves are installed on both power supply connecting terminals.

13. Power and grounding cables are not damaged.

14. Wires at connecting terminals and lug handle are properly insulated.

15. Flat washers and spring washers are used when required.

END OF STEPS.

Trunk and RF Cables

Check following after laying trunk and RF cables.

1. Trunk cable connectors are properly installed, labeled and are not loose.

2. Cable shell is properly connected with grounding system.

3. RF cables between modules in cabinet are properly connected.

4. Unused RF connectors are screwed on with a matching terminal.

END OF STEPS.

Board Installation Check Ensure following after board and sensor installation:

1. Slots for board installation comply with the engineering design.

2. Board screws on cabinet are tightened properly.

3. Board is properly connected with backplane. 4

END OF STEPS.

Steps

Steps

Page 145: ZTE - CBTS I2 Installation Manual

Chapter 7 Hardware Installation Check

Confidential and Proprietary Information of ZTE CORPORATION 129

Antenna Feeder System Installation Check This section describes antenna and GPS feeder system installation check which involves following:

1/2” Indoor Jumper Check

Ensure following after ½” indoor jumper installation:

1. Indoor jumper is properly connected to terminal on cabinet top.

2. Indoor jumpers are tidy, in appropriate length and bound on cabling rack in order.

3. Jumpers are laid in layers according to sectors.

END OF STEPS.

Lightning Arrester Check

Ensure following after lightening arrester installation:

1. RF lightning arrester is connected to feeder connector and fastened tightly.

2. Lightning arrester is insulated from cabling rack.

3. Lightning arrester bar grounding cable is grounded and routed to outdoor grounding bar for reliable grounding.

END OF STEPS.

Main Feeder Cable Check

Ensure following after main feeder cable installation:

1. Ensure the main feeder profile is flat and smooth. Feeder connectors are connected tightly. Use a special cutter to prepare main feeder connector.

2. 7/8" feeder connector is installed properly and tightened well to avoid any abnormal SWR caused by false connections.

3. Feeder between the tower top and the equipment room is grounded in at least three points. Grounding points are bound firmly with proper waterproof measures.

Steps

Steps

Steps

Page 146: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

130 Confidential and Proprietary Information of ZTE CORPORATION

4. When tower is 196.85 feet (60 m) above and needs a longer feeder, place another feeder grounding clip in middle of the tower.

5. Feeder grounding clip terminals are fixed on steel plate of a nearby tower.

6. Outer grounding copper busbar employs a special reliable path to an underground ground grid. The line width is more than 50 mm2.

7. For a building without a tower, antenna feeder grounding at top is connected with nearby lightning protection ground grid on the roof.

8. Feeder grounding cable is led from top to bottom. Separation angle between feeder and grounding cable is no more than 15º.

9. Feeder cabling has no crisscrossing. Cables are arranged properly without twists and turns.

10. Main feeder cabling is well planned. Main feeder cables within a sector are arranged in a row and column consistently.

11. Two name labels are bound on both feeder terminals, to ensure that feeders correspond to antennas with corresponding lengths on a feeder name plate.

END OF STEPS.

GPS Feeder Cable Check

Ensure following after GPS feeder cable installation:

1. GPS copper core and outer layer are not short-circuited.

2. GPS feeder connectors are tight.

END OF STEPS.

Feeder Window and Sealing Check

Ensure following after installing feeder window:

1. Feeder window is fixed on indoor wall and feeder hole faces outdoors.

2. Glue injection hole is sealed upward and window boards are installed on indoor wall.

3. Feeder window installed at building top is well sealed.

4. Necessary waterproof bents are made. Minimum bending radius of feeder is not less than 20 times the feeder radius. Single bending radius of main feeder is more than 4.92 inch

Steps

Steps

Page 147: ZTE - CBTS I2 Installation Manual

Chapter 7 Hardware Installation Check

Confidential and Proprietary Information of ZTE CORPORATION 131

(125 mm), and multiple bending radius of main feeder is more than 7.87 inch (200 mm).

Three–way Feeder Clip Check

Ensure following after three-way feeder clip installation:

1. Three-way feeder clip is fixed on outdoor cabling rack.

2. A feeder clip is installed every 1.2 m (3.93 ft) on primary feeder.

END OF STEPS.

1/2” Outdoor Jumper Check

Ensure following after 1/2" inch outdoor jumper installation:

1. Antenna and 1/2" jumper, 1/2" jumper and main feeder are properly connected. Connector threads are tightened and wrapped with waterproof adhesive tape.

2. Jumper and antenna are parallel to each other with 11.81 inch (300 mm) distance in between at the joint.

3. All outdoor jumper connectors are made waterproof.

END OF STEPS.

Antenna Installation Check

After the installation of antenna and GPS system check the followings:

1. Antenna support and tower are properly installed.

2. Antenna model is according to networking planning design.

3. Actual hanging height of an antenna is according to network planning design.

4. RF and GPS antennas are included in the protection area of a lightning rod (area within 45° down tilt from lightning arrester).

5. Azimuth of antenna is according to network planning. Azimuth error of directional antenna is no more than 5°.

6. Actual mechanical down tilt of an antenna is according to network planning and two uni-polarization antennas have same down tilts.

7. Actual electrically controlled down tilt of an antenna is according to network planning and two uni-polarization antennas have consistent down tilt.

Steps

Steps

Steps

Page 148: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

132 Confidential and Proprietary Information of ZTE CORPORATION

8. All antenna poles are firmly installed and properly grounded. Vertical error is less than 2°. GPS antenna must be vertical to ground.

9. An Omni-directional antenna is at least 59.05 inch (1.5 m) away from the tower while a directional antenna is at least 39.37 inch (1 m) away from the tower.

10. During installing an Omni-directional antenna on a roof, horizontal interval between Omni-directional antenna and antenna lightning rod is not less than 98.42 inch (2.5 m).

11. An Omni-directional antenna is not installed in blind area.

12. Connections of antenna ports with RFE must be consistence.

13.Diversity distance is 137.79 inch (3.5 m) for 800 MHz system, 59.05 inch (1.5 m) for 1.9G system, and 263.7 inch (6.7 m) for 450 MHz system.

14. Vertical interval between directional antennas within different sectors, installed on same antenna support is more than 23.62 inch (0.6 m).

15. GPS spatial angle is more than 90°.

END OF STEPS.

Feeder SWR Check

Measure SWR after installation of antennas and all feeders and ensure the following:

1. Related Voltage Standing Wave Ratio (VSWR) value is specified, and a VSWR test diagram is available.

2. 1/2" Indoor jumper terminal is connected with an SWR tester for testing. SWR should be less than 1.5.

END OF STEPS.

Environment Check Ensure following during environment check:

1. Outdoor engineering wastes are cleaned.

2. Front, rear doors and cabinet sides are cleaned.

3. There should be no fingerprint and other stains on cabinet surface.

4. Indoor unused materials are put away. Material in equipment room is kept in order. Everything indoor is clean and tidy.

Steps

Steps

Page 149: ZTE - CBTS I2 Installation Manual

Chapter 7 Hardware Installation Check

Confidential and Proprietary Information of ZTE CORPORATION 133

5. Any engineering waste materials are disposed off. There should be no cable clips or sundries left at the installation site.

END OF STEPS.

Base Station Information Collection During BTS installation, record component’s model and serial number to collect BTS information required in the engineering acceptance report.

Page 150: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

134 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 151: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 135

C h a p t e r 8

Power On and Off Mechanism

This chapter describes: Power on

Power on Preparation

First time Power-on Procedure

Normal Power-on

Page 152: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

136 Confidential and Proprietary Information of ZTE CORPORATION

Power On Power On Preparations

Check following requirements before powering up a system.

AC or DC power supply cables are correctly installed.

PWSB input and output power supply cables are connected correctly.

UPS cable is correctly installed and provides voltage in range of -40 V DC ~ -57 V DC.

Reliable grounding is provided.

Power supply switch is at OFF position.

Power supply satisfies requirement.

Specific labels are attached with all cables.

Take following precautions during CBTS I2 power on off mechanism:

During plugging and unplugging boards, wear anti static wrist strap.

Plug and unplug all boards gently.

Ensure right position of each board according to engineering design.

Do not touch any component, connector or wiring slot when holding a board.

First Time Power-on Procedure

Following section describes procedure for first time power–on and normal power-on test.

Perform power supply inspection before powering on CBTS I2 cabinet. Ensure that power switches are in OFF state and boards are half inserted.

Purpose

Prerequisite

Page 153: ZTE - CBTS I2 Installation Manual

Chapter 8 Power On and Off Mechanism

Confidential and Proprietary Information of ZTE CORPORATION 137

Perform the following steps to power-on CBTS I2 for the first time.

1. Ensure that all power switches of power supply equipment, PWSB I2/PWSC I2 and CBTS I2 are turned off.

2. Insert all boards and modules completely into the cabinet, but don’t tighten the screws on the front panels of all boards and modules.

3. Turn on the switch of CBTS I2 and keep other switches off. Put the two probes of a multimeter onto the “-48V GND” and “-48V” power connection poles of CBTS I2 to test. If it is detected to be short-circuited, the cabinet can not be powered on, and it is required that a ZTE engineer check all boards, modules and backplanes, find the short-circuited component and replace it, then test again. If the cabinet passed the test, turn off the switch of CBTS I2.

4. Unplug all boards and modules to half position (partially seated).

5. Turn on the switch of main power equipment, and test the input voltage of PWSB I2/PWSC I2. The input voltage should satisfy the requirement of PWSB I2/PWSC I2. If not, please check the main power equipment.

6. Turn on the switch of PWSB I2/PWSC I2, and insert the PRM/PTM modules into PWSB I2/PWSC I2. There should be no alarm. If alarm occurs, please check PWSB I2/PWSC I2.

7. Test the output voltage of PWSB I2/PWSC I2 to confirm that the voltage is between -40VDC and -57VDC. If the voltage is normal, turn on CBTS I2 power supply switch. There should be no alarm.

8. Turn on UPS, and there should be no alarm.

9. Insert all boards and modules completely into the cabinet, and there should be no alarm.

10. Connect jumper cables to the RFE module, and use the specified tool to tighten them.

11. Turn on the switch of DPA, and there should be no alarm.

12. After finishing all tests, tighten the screws on the front panel of all boards and modules, and lock the front door of CBTS I2.

Important! Ensure that the RFE modules and jumper cables are connected well before the switches of DPA are turned on. Otherwise the radiation from RFE module may hurt the health of people around the cabinet.

END OF STEPS.

Steps

Page 154: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

138 Confidential and Proprietary Information of ZTE CORPORATION

Normal Power-on Procedure

Perform the following steps to power-on CBTS I2 normally:

1. Turn on AC main power switch.

2. Turn on PWSB AC power or PWSC DC power input switch.

3. Turn on the UPS switch.

4. Turn on CBTS I2 power supply switch.

5. Finally, turn on power amplifier (PA) switch.

Caution: If anything goes wrong in any of above steps, shut down power supply immediately, find fault and repeat the step again. Do not power on cabinet until fault is removed.

END OF STEPS.

The CBTS I2 cabinet is powered on.

Power-off Perform following procedure to power off CBTS I2.

Perform the following steps to power-off CBTS I2:

1. Turn off power amplifier (PA) switch.

2. Turn off CBTS I2 power supply switch.

3. Turn off UPS switch.

4. Turn off PWSB AC power or PWSC DC power supply switch.

5. Finally, turn off -48 V main power switch.

END OF STEPS.

The CBTS I2 cabinet is powered off.

Steps

Result

Purpose Steps

Result

Page 155: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 139

A p p e n d i x A

PWS Cabinet

This appendix describes:

Cabinet Installation

PWSB I2 Cable Installation

PWSC I2 Pre-Commissioning Checks

PWSB I2 Power-on

PWSC I2 Power-off

PWSB I2 Cable Installation

Note:

PWSB I2 or PWSC I2 can be used for CBTS I2 according to requirements.

PWSB I2 and PWSC I2 have almost same shape, size and installation method (only the width is different).

PWSB I2 cabinet is an optional part to convert 220 V AC supply into - 48 V DC power supply.

PWSC I2 is used to convert +24V DC (Voltage in the range of 19V ~ 29 V) to -48V DC.

PWS stands for both PWSB I2 and PWSC I2.

Page 156: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

140 Confidential and Proprietary Information of ZTE CORPORATION

Cabinet Installation Perform following procedure to Install PWS Cabinet.

Take following steps to install PWS cabinet on left side of CBTS I2 cabinet:

1. Keep an extra space for PWS cabinet installation while installing CBTS I2 cabinet.

2. Place the PWS cabinet base to left side of CBTS I2 cabinet. Ensure that PWS cabinet installation holes coincides with CBTS I2 screws holes. Fix PWS base and CBTS I2 cabinet with screws. Figure 115 shows this process.

F I G U R E 115 - PWS C AB I N E T I N S T AL L AT I O N

1. CBTS I2 cabinet 2. PWS base

3. Screws 4. Square holes

Note: PWS cabinet base is hollow from inside. There are square holes on left and screw holes on right side of base.

Purpose

Steps

Page 157: ZTE - CBTS I2 Installation Manual

Appendix A PWS Cabinet

Confidential and Proprietary Information of ZTE CORPORATION 141

Tip: If there are other cabinet to the left side of PWS installation position. There may be no enough space for screwdriver to fix PWS base to CBTS cabinet. In this situation, fix PWS base to CBTS I2 cabinet just after the CBTS I2 cabinet base is installed, and then push CBTS I2 cabinet onto base.

3. Place the PWS cabinet on the PWS cabinet base and insert the rod on PWS cabinet base into respective holes position in PWS cabinet. Figure 116 shows this process.

F I G U R E 116 - PWS C AB I N E T I N S T AL L AT I O N

1. CBTS I2 cabinet 2. PWS cabinet

3. Rod 4. Base

Page 158: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

142 Confidential and Proprietary Information of ZTE CORPORATION

4. Open the front panel of PWS cabinet. Connect PWS cabinet and PWS cabinet base through the fixing hole using screws. Figure 117 shows this process.

F I G U R E 117 - PWS C AB I N E T F I X I N G

1. CBTS I2 cabinet 2. Connecting plate

3. PWS cabinet 4. PWS cabinet front panel

5. Holes to fix PWS cabinet

Page 159: ZTE - CBTS I2 Installation Manual

Appendix A PWS Cabinet

Confidential and Proprietary Information of ZTE CORPORATION 143

5. Fix PWS cabinet connecting plate with CBTS I2 cabinet with screws as shown in Figure 117.

Figure 118 shows PWS cabinet after its complete installation.

F I G U R E 118 - PWS C AB I N E T AF T E R C O M P L E T E I N S T AL L AT I O N

END OF STEPS.

The PWS cabinet is installed. Result

Page 160: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

144 Confidential and Proprietary Information of ZTE CORPORATION

PWSB I2 Cable Installation Following are the PWSB I2 cabinet interfaces and its description:

1. Monitoring FE interface

Monitoring FE interface connects to PWSB I2 port of CBTS I2. This port sends all internal messages to CBTS I2 and receives messages from OMC to PWSB I2 through CBTS I2.

2. Battery temperature monitoring interface

Battery temperature monitoring interface is connected to battery storage group. Through this port PWSB I2 receives monitoring information, such as temperature of battery storage group. It is a DB9 interface.

3. DC output interface

DC output interface provides -48 V DC power to CBTS I2 cabinet and battery storage group. Figure 119 shows DC output interfaces

F I G U R E 119 - DC OU T P U T IN T E R F AC E S

There are total eight DC output interfaces. There are two rows of interfaces and every row has four interfaces. Connections of upper row interface from left to right are listed below:

Connects to -48 V working ground of battery storage group.

Connects to -48 V working ground of battery storage group.

Connects to -48 V working ground of CBTS I2 cabinet.

Connects to -48 V working ground of CBTS I2 cabinet.

Connections of lower row interface from left to right are listed below:

Purpose

Page 161: ZTE - CBTS I2 Installation Manual

Appendix A PWS Cabinet

Confidential and Proprietary Information of ZTE CORPORATION 145

Connects to -48 V input of battery storage group.

Connects to -48 V input of battery storage group.

Connects to -48 V input of CBTS I2 cabinet.

Connects to -48 V input of CBTS I2 cabinet.

Note:

All upper row all interfaces are internally short circuited.

In lower row the two leftmost and two rightmost interfaces are internally short circuited respectively.

During PWSB I2 cabinet installation, refer to specified marks on the top interfaces.

4. AC input interface:

PWSB I2 provides three phase AC input interfaces. There are six interfaces in AC input module. Figure 120 shows AC input interfaces.

F I G U R E 120 - AC I N P U T I N T E R F AC E S

Six interfaces from left to right are described below:

Interface 1 connects to PE port of CBTS I2 cabinet.

Interface 2 connects to AC cable working ground cable.

Interface 3 connects to AC cable neutral input.

Interface 4 connects of first phase AC input cable (L3).

Interface 5 connects to second phase AC input cable (L2) (if provided).

Interface 6 connects to second phase AC input cable (L1) (if provided).

Note: L1, L2, L3 is already connected to a single interface before delivery. If only one phase is required in the engineering field, just remove the interconnection wire in L1, L2, L3 and use only L3 interface.

During PWSB I2 cabinet installation, refer to specified marks on the top interfaces.

Page 162: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

146 Confidential and Proprietary Information of ZTE CORPORATION

Take following steps to install PWSB I2 cables.

1. Remove PWSB I2 cabinet top plane.

2. Connect interfaces according to the description above.

3. Tie all the cable and put them in cable entrance tray orderly.

4. Put the top panels back and fix it.

END OF STEPS.

The PWSB I2 cables are installed.

PWSB I2 Pre-commissioning Checks Perform this procedure to make sure that all the components of PWSB I2 are intact and working normally. Moreover, all the PWSB I2 cabling is proper and reliable.

After system installation, there might be a case that some assembly or connection faults may exist. This could result in serious damage if the system is powered on. Therefore, system commissioning should be carried out cautiously. Observe the system reactions in commissioning. Power off the system immediately if any malfunction occurs. Do not carry on the commissioning until the malfunction cause is found.

The following operations are needed before powering on the system.

1. Checking air-switch

Table 25 illustrates the recommended status of the power switches before commissioning. OFF indicates the open state. ON indicates the close state.

T AB L E 25 S W I T C H S T AT E S

Switch State

AC input air-switch OFF

Storage battery air-switch 1 OFF

Storage battery air-switch 2 OFF

2. Checking cabling

All cabling should be reliable, and make sure that there is no short-circuit.

3. Checking power supply voltage

Use multimeter to measure the AC input voltage. The recommended AC voltage level is 80 V ~ 300 V. Make sure that AC voltage level is within the recommended value otherwise PWSB I2 can not be powered on.

END OF STEPS.

Steps

Result

Purpose

Steps

Page 163: ZTE - CBTS I2 Installation Manual

Appendix A PWS Cabinet

Confidential and Proprietary Information of ZTE CORPORATION 147

PWSB I2 Power-on This procedure lists the steps that are required to reliably power-on the PWSB I2.

Make sure that all the post installation check and pre-commissioning check are carried out.

Following are the steps required to power-on PWSB I2:

1. Change the state of AC power switch (outside the PWSB I2 system) to ON.

2. Observe the system to see,

If Then

There is any malfunction

Change state of AC power switch to OFF, and then locate and remove fault.

No malfunction Proceed to Step 3

3. Change the status of AC power switch to ON that is located at the front panel of PWSB I2. This will result in the following:

i. The PRMs will begin to work. Their input indicator (IN) will change to on. If the alarm indicator (ALM) is on, perhaps the PRM is not installed correctly. Reinsert it without powering off the system. When the PRM is inserted properly, alarm indicator (ALM) will turn off. Contact the maintenance personnel if the alarm persists.

ii. PMM2 will be powered on when PRMs will start working normally.

NOTE:

If the PWSB I2 is powered on without connecting with CBTS I2, the monitoring unit cannot startup as it would fail to obtain a logical address. In this case, use a PC on which hawk software is installed to communicate with monitoring unit via RS232 serial port.

END OF STEPS.

The PWSB I2 is powered-on successfully and is working normally.

错误!未找到引用源。 lists the storage battery management configuration parameters. After powering on PWSB I2, modify these parameters according to onsite requirements. For more details, refer to Hawk Operational Instructions.

Examine the PRMs indicators, and real time data of monitoring unit to check if the all PRMs are runs normally.

Check the PRMs average current feature according to the real time data in monitoring unit. If the difference between numbers of the indicators that is on is greater than 1, the

Purpose

Preliminary Setup

Steps

Result

Follow-up Action

Page 164: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

148 Confidential and Proprietary Information of ZTE CORPORATION

system average current is unsatisfactory. Take the following actions step by step:

Measure the output voltage of each PRM to see if they are equivalent. If they are not, adjust the output voltage.

If the system average current is unsatisfactory due to internal circuit failure in a PRM, repair it.

If the system average current is unsatisfactory because of loose contact of a PRM with backplane, reinstall it.

Tip:

The averaged current index makes sense if the current of the system load is greater than system rated output current by 20%.

Before closing the air-switch of PPD, set the batteries floating charging voltage equal to 50 V.

After connecting with storage battery group, reconfigure the system floating charging voltage. The default value is 53.5 V.

When PWSB I2 becomes normal, close the DC air-switches. PWSB I2 will begin to floating charge the battery.

Check the load current and system to see if they are normal according to the usage of load. When the current is limited, check the limited current to see if it is normal according to current limitation indicator (CL).

PWSB I2 Power-off This topic lists the recommended steps to power off PWSB I2.

Following are the recommended steps:

1. Change the status of DC air-switches to OFF state.

2. Change the status of AC air-switch to OFF state. The PMM, PPD, and PRMs will stop working.

3. Disconnect the AC protection air-switch outside the system. System is completely powered off.

END OF STEPS.

Purpose

Steps

Page 165: ZTE - CBTS I2 Installation Manual

Appendix A PWS Cabinet

Confidential and Proprietary Information of ZTE CORPORATION 149

PWSC I2 Cable Installation Remove cover to see PWSC I2 cabinet interfaces. Figure 121 shows PWSC I2 cabinet interfaces.

F I G U R E 121 - PWSC I2 C AB I N E T I N T E R F AC E S

1. Monitoring FE interface 2. DC output interface

3. DC input terminal

Following are the PWSC I2 cabinet interfaces and its description:

1. Monitoring FE interface

Monitoring FE interface is used to connect PWSB interface of CBTS I2. CBTS I2 and PWSC I2 exchange messages through this interface.

Purpose

Page 166: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

150 Confidential and Proprietary Information of ZTE CORPORATION

2. DC output interface

DC output interface provides -48 V DC power to CBTS I2 cabinet and battery storage group. Figure 122 shows DC output interfaces.

F I G U R E 122 - DC OU T P U T IN T E R F AC E

Figure 123 shows printed marks for DC output terminals on the cover.

F I G U R E 123 - DC OU T P U T TE R M I N AL P R I N T E D M AR K S

Four interfaces from left to right are used to:

Connect -48V interface of CBTS I2

Connect -48V interface of CBTS I2

Connect -48V working GND interface of CBTS I2

Connect -48V working GND interface of CBTS I2

Note:

During PWSC I2 cabinet installation, refer to specified marks on the top interfaces.

The first two and the last two interfaces are short-circuited, each interface has same function.

Page 167: ZTE - CBTS I2 Installation Manual

Appendix A PWS Cabinet

Confidential and Proprietary Information of ZTE CORPORATION 151

3. DC input terminals

PWSC I2 provides +24V DC input. Figure 124 shows DC input terminals.

F I G U R E 124 - DC I N P U T TE R M I N AL S

321

1. + 24 V DC input terminal 2. PE terminal

3. – 24 V DC input terminal

Figure 125 shows printed marks of DC input terminals on the cover.

F I G U R E 125 - P R I N T E D M AR K S O N DC IN P U T TE R M I N AL

The interface connections are described below:

The left terminal is +24V DC input terminal, and it connects to +24V DC input

The right terminal is -24V DC input terminal, and it connects to -24V DC input

The middle terminal is PE terminal, and it connects to PE interface of CBTS I2.

Note: During PWSC I2 cabinet installation, refer to specified marks on the top interfaces.

Page 168: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

152 Confidential and Proprietary Information of ZTE CORPORATION

Take following steps to install PWSC I2 cables.

1. Remove PWSC I2 cabinet top plane.

2. Connect interfaces according to the description above.

3. Tie all the cable and put them in cable entrance tray orderly.

4. Put the top panels back and fix it.

END OF STEPS.

The PWSC I2 cables are installed.

Steps

Result

Page 169: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 153

Appendix B

Compact BDS Module (CBM)

This Appendix describes the following topics:

Salient features of CBM

CBTS I2 configuration with CBM.

Page 170: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

154 Confidential and Proprietary Information of ZTE CORPORATION

Salient Features A single Compact BDS Module (CBM) replaces CCM, CHM, RIM, RMM, GCM, and DSM. A single CBM board can provide all the functions of BDS subsystem (except SAM and BIM), and that of RIM board. However, configuration supported by the CBTS I2 with CBM board is less as compared to CBTS I2 without CBM board.

CBM board performs the following functions:

Provide functions of GCM board, such as receives and process the GPS signal. At the front panel of CBM board, there is an interface for connecting with GPS antenna. In addition, there are two test interfaces at the front panel of CBM board for PP2S and 10 MHz clock respectively.

Provide functions of DSM board, such as it provides eight E1/T1 interfaces, and process the Abis data from 8 E1/T1 interfaces.

Provide functions of CHM board, such as performing baseband modulation and demodulation, diversity, etc. With typical configuration a single CBM board supports 6 Carrier-Sector 1X configuration. With extended configuration (either CEB5 (6700) or CEB4 (6800)), a single CBM board can support 12 Carrier-Sector 1X configuration (Using CEB5 (6700) Sub-card), or can support 6 Carrier-Sector 1X configuration and 3 Carrier-Sector DO configuration (Using CEB4 (6800) Sub-card).

Provide functions of RMM board, such as Local RFS centralized control, including a TRX module, a PA module and a RFE module. It provides six interfaces to connect with TRX boards. In addition, it collects all the alarm information from PIM module.

Provide functions of RIM board, such as it provides three fiber interfaces to connect with RRFS. Like RIM board, these fiber interfaces are located at the front panel of CBM board.

Provide functions of CCM board, such as controlling the entire CBTS I2, communicating with OMC, etc.

CBTS I2 with CBM does not support extended cabinet configuration.

CBM board does not support 1+1 backup.

CBM board does not support Abis fiber links.

Page 171: ZTE - CBTS I2 Installation Manual

Appendix A Compact BDS Module (CBM)

Confidential and Proprietary Information of ZTE CORPORATION 155

CBTS I2 Configuration with CBM

Figure 126 shows the typical CBTS I2 configuration when CBM board is used in place of CCM, CHM, RIM, RMM, GCM, and DSM.

F I G U R E 126 TY P I C AL C O N F I G U R AT I O N

Note: The Type of SAM board is SAM3, and Type of BIM board is BIM7-E.

The description of CBTS I2 with CBM is as follows:

CBM board is plugged in to slot earlier used for RMM board. CBM board does not support backup. There is one fan in lower row under the CBM as compared to earlier CBTS I2 because the right part of baseband frame has no board.

CBM board has a DB44 interface connected with BIM board DB44 interface via internal cable. Figure 127 illustrates this scenario.

Typical Configuration

Description

Page 172: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

156 Confidential and Proprietary Information of ZTE CORPORATION

F I G U R E 127 IN T E R N AL E1 /T1 C O N N E C T I O N

1. DB44 Interface 2. Internal Cable

When CBTS I2 is configured with CBM, one fan is reduced.

The power consumed by CBTS I2 with CBM is 150 W less when compared with power consumption of CBTS I2 without CBM.

To enhance the baseband resources and Carrier-Sector configuration, additional sub-cards can be installed on CBM board.

Either CEB5 (6700) or CEB4 (6800) can be added to CBM board. One CEB5 Sub-card can support 6 Carrier-Sector 1X service, while one CEB4 sub-card can support 3 carrier-sector DO service.

To support RRFS, add OIB2 sub-card. A single OIB2 sub-card supports three pairs of fiber. Figure 128 shows a maximum RRFS configuration.

F I G U R E 128 3 RRFS C O N N E C T E D W I T H CBM

Page 173: ZTE - CBTS I2 Installation Manual

Appendix A Compact BDS Module (CBM)

Confidential and Proprietary Information of ZTE CORPORATION 157

CBTS I2 with CBM provides GPS interface that connects with GPS antenna. Figure 129 illustrates this connection.

F I G U R E 129 GPS AN T E N N A C O N N E C T I O N

1. Lightening Arrester

CBTS I2 with CBM does not support extended cabinet configuration, so EXT_BDS, S_FE1, M_FE1, S_FE0, M_FE0, EXT_MON, M_TEST, and S_TEST interfaces are not used. Moreover, CBM support 8 E1/T1 Abis interface, so BSC_E1_G1 is not used. In addition, CBM support the BSC_FE interface. The functions of all other interfaces are same as CBTS I2 without CBM board.

Page 174: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

158 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 175: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 159

A p p e n d i x C

SiteMaster Usage

This appendix describes:

Selecting Frequency range

Checking SiteMaster

Feeder input parameters

Installing Tester

Measuring SWR

Measuring DTF

Page 176: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

160 Confidential and Proprietary Information of ZTE CORPORATION

Note: SiteMaster usage depends on model type used. Refer to device usage documents attached for usage.

Selecting Frequency Range Perform following procedure to select frequency range.

Take following steps to select a frequency range using SiteMaster:

1. Press <ON> to turn on SiteMaster meter.

2. Press <FREQ> on the main menu.

3. Press <F1> on the [Frequency] menu.

4. Input [Lower] frequency, such as 825 MHz, and press <Enter> for confirmation.

5. Press <F1> on the [Frequency] menu.

6. Input [Higher] frequency, such as 880 MHz, and press <Enter>for confirmation.

7. After confirmation, press [Main] to return to the main menu.

END OF STEPS.

The frequency range is selected.

Checking SiteMaster Perform following procedure to check site master for frequency, environment and feeder parameters changes.

Ensure that input frequency range in SiteMaster is correct.

Take following steps to check Site Master:

1. Press <STARTCAL> to start check.

2. Press <Measuring OPEN>, <Measuring SHORT> and <Measuring Load> as indicated to complete the check.

Note: Include extension cable attached with the meter to ensure measurement accuracy.

END OF STEPS.

The Site Master is checked.

Purpose

Steps

Result

Purpose

Prerequisite

Steps

Result

Page 177: ZTE - CBTS I2 Installation Manual

Appendix C SiteMaster Usage

Confidential and Proprietary Information of ZTE CORPORATION 161

Feeder Input Parameters Perform following procedure to input feeder parameters.

Take following steps to input feeder parameters:

1. Press <DIST>

2. Press <MORE>

3. Press <LOSS> to enter input feeder loss (dB) per meter. Press <Enter> for confirmation.

4. Press <PROP V> to enter relative transmission rate. Press <Enter> for confirmation.

5. Press <Main> to return to the main menu.

Installing Tester Perform following procedure to install tester.

Take following steps to install tester:

1. Connect extension cables one end to RFE jumper connector inside the cabinet.

2. Connect other end to Refl meter interface.

Note: Do not connect jumper and top amplifier. If active devices such as tower top amplifier or trunk amplifier are used for feeder measurement, use jumpers to avoid top amplifier.

END OF STEPS.

The tester is installed.

Measuring SWR Perform following procedure to measure SWR values.

Take following steps to measure SWR:

1. Press <OPT>

2. Press <B1> and select [MODE]

3. Press <Up> or <Down> to choose <SWR> and press <Enter> for confirmation.

4. Press <MAIN> to return to the main menu.

5. Input a proper frequency range and check meter if required.

6. Press <MAIN> to return to the main menu.

Purpose

Steps

Purpose

Steps

Result

Purpose

Steps

Page 178: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

162 Confidential and Proprietary Information of ZTE CORPORATION

7. Press <RUN> to take measurement.

8. Press <AUTO SCALE> to adjust screen Y-coordinates.

9. View the frequency SWR values within this frequency band, Figure 130 shows this process.

10. Press <Save Display> to store data.

F I G U R E 130 - AN T E N N A FE E D E R SWR TE S T

END OF STEPS.

The SWR is measured.

Measuring DTF Perform following procedure to measure DTF values.

Take following steps to measure DTF:

1. Press <OPT>

2. Press <B1>and select MODE

3. Press <Up> or <Down> to choose [SWR] and press <Enter> for confirmation.

4. Press <MAIN> to return to the main menu.

5. Input a proper frequency range and check meter if required.

6. Input a proper feeder length.

7. Press <MAIN> to return to the main menu.

8. Press <RUN> to take measurement.

9. Press <AUTO SCALE> to adjust screen Y-coordinates.

Result

Purpose

Steps

Page 179: ZTE - CBTS I2 Installation Manual

Appendix C SiteMaster Usage

Confidential and Proprietary Information of ZTE CORPORATION 163

10. Press <Mark> to view SWR value of each frequency point within this frequency band. Check the fault points. Figure 131 shows DTF measurement.

11. Press <Save Display> to save data.

F I G U R E 131 - M E AS U R E M E N T O F AN T E N N A FE E D E R DTF

END OF STEPS.

The DTF is measured.

Result

Page 180: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

164 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 181: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 165

A p p e n d i x D

Cabinet Working Modes

This appendix describes:

Cabinet Working Modes

Cabling

Page 182: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

166 Confidential and Proprietary Information of ZTE CORPORATION

Cabinet Working Modes Table 26 illustrates six cabinet working modes.

T AB L E 26 - CBTS I2 W O R K I N G M O D E S

Working mode

Description System features

LS Local single mode Supports 4C3S (1X/DO) and most cost effective

RS Remote single mode

Supports 4C3S (1X/DO)

LEA Local extended mode A

This mode use two rack configuration with single BDS rack. It supports up to 24 CS (1X) or 12 CS (DO)

LEB Local extended mode B

This mode uses two BDS rack configuration. It supports up to 48 CS (1X) or 24 CS (DO)

RE Remote extended mode

Use optical fiber to enable remote extension RRFS. It supports up to 24 CS (1X) or 12 CS (DO)

ME Mix extended mode This mode extends RFS/BDS in local side and extends RFS in remote side with optical fiber. It supports 24 CS for EV-DO and 48 CS for 1X. Uses optical fiber to enable remote extension, remote side can be CBTS I2 and MBTS-RFS.

Note: Installation in LS mode is described before.

Cabling Following section introduces cabling for remaining five modes.

In RS mode, baseband module is not needed in remote CBTS I2. Insert optical fibre from baseband side into RMM board on remote CBTS I2.

In RE mode, CBTS I2 is primary base station. Upon completion of other equipments, it is only needed to lead an optical fibre out from RIM board. Then lead optical fibre to remote RF module via transmission device.

LEA refers to extension of CBTS I2 RF module. Use optical fibre to connect RIM on primary CBTS I2 and RMM on extended CBTS

RS

RE

LEA

Page 183: ZTE - CBTS I2 Installation Manual

Appendix D Cabinet Working Modes

Confidential and Proprietary Information of ZTE CORPORATION 167

I2. If SAM configuration is SAM4+SAM5 then connect EXT_MON ports on both primary and extensive CBTS I2.

Figure 132 shows micro coaxial cable connectors on CBTS I2 back plane.

F I G U R E 132 - M I C R O C O AX I AL C O N N E C T O R S

In LEA mode, 6 micro coaxial connectors on primary CBTS I2 must be connected with interfaces on extensive CBTS I2 in 1 to 1 relationship.

LEB refers CBTS I2 cabinet combination of extended RF modules and baseband modules. EXT_BDS interfaces on both cabinet must be connected. If SAM configuration is SAM4+SAM5, connect EXT_MON ports on both primary and extensive CBTS I2. Connect M_FE0,M_FE1, S_FE0 and S_FE1 interfaces on primary cabinet with same interfaces on secondary cabinet.

ME mode is integration of LEB and RE. First implement local cabinet combination to extend baseband/RF and then implement remote extension with remote RF. It only needs to lead optical fibre out after LEB installation is complete.

Note: Refer to CBTS I2 Compact Base Transceiver Station General Description Manual and CBTS I2 Compact Base Transceiver Station Hardware Manual for details about CBTS I2 working modes.

LEB

ME

Page 184: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

168 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 185: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 169

Abbreviation

Abbreviation Full Name

1x EV 1x Evolution

1x EV - DO 1x Evolution Data Only

1x EV - DV 1x Evolution Data & Voice

2C3S Two carriers and three sectors

4C3S Four carriers and three sectors

A A Interface

AAA Authentication, Authorization and Accounting

Abis Abis Interface - Interface between BSC and BTS

ATM Asynchronous Transfer Mode

BDS Baseband Digital System

BIM BDS Interface Module

BSC Base Station Controller

BSS Base Station System

BTS Base Transceiver Station

CBTS Compact Base Transceiver Station

CCM Communication Control Module

CDM Clock Distribution Module

CHM Channel Processing Module

DBS Database Subsystem

DSM Data Service Module

EPLD Electrically Programmable Logic Device

FA Foreign Agent

FER Frame Error Rate

FPGA Field Programmable Gate Arrays

GCM GPS Control Module

GCKM GPS Clock Module

HA Home Agent

HDLC High Level Data Link Control

HDR High Data Rate

Page 186: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

170 Confidential and Proprietary Information of ZTE CORPORATION

Abbreviation Full Name

HLR Home Location Register

HPA High Power Amplifier

LNA Low Noise Amplifier

MAC Media Access Control

MBTS Master BTS

MSC Mobile Switching Center

MTBCF Mean Time Between Critical Failure

MTBF Mean Time Between Failure

MTTR Mean Time To Recovery

O&M Operations and Maintenance

OMC Operation and Maintenance Center

OSS Operating System Subsystem

OTD Orthogonal Transmit Diversity

OW Order Wire

PA Power Amplifier

PCF Packet Control Function

PP2S Pulse Per 2 seconds

RF Radio Frequency

RFS Radio Frequency Subsystem

RIM Radio Interface Module

RRFS Remote RFS

RSSI Received Signal Strength Indicator

RX Receiver

SAM Site Alarm Module

SBTS Slave BTS

SCH Synchronization Channel

SCS System Control Subsystem

SDH Synchronous Digital Hierarchy

SNM SDH Net Module

TOD Time of Date

TX Transmit

Page 187: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 171

Figures

Figure 1 - Metric and British Measures Example (In Figure) ..... iv

Figure 2 - Hardware Installation Flow ....................................2

Figure 3 - Cabinet Outer View ............................................ 12

Figure 4 - Installation Location Specification......................... 14

Figure 5 - Direct Installation Mode Flow Chart....................... 15

Figure 6 - Holes Position in Direct Installation Mode............... 17

Figure 7 - Expansion Bolts Installation................................. 18

Figure 8 - Cabinet Base Fixing............................................ 18

Figure 9 - Washers Specifications ....................................... 19

Figure 10 - Cabinet Base Installation................................... 19

Figure 11 - Uninstalling Screws and Washers........................ 20

Figure 12 - Placing Cabinet on Base .................................... 20

Figure 13 - Adjusting Cabinet on Base ................................. 20

Figure 14 - Fixing Cabinet and Base .................................... 21

Figure 15 - Direct Installation Mode Final View...................... 22

Figure 16 - Ajustable Base Installation Mode ........................ 23

Figure 17 - Adjustable Base ............................................... 24

Figure 18 - Adjustable Base Installation Mode Flow Chart ....... 25

Figure 19 - Holes Position in Adjustable Base Installation Mode26

Figure 20 - Expansion Bolts Installation ............................... 27

Figure 21 - Lower Adjustable Base and Cemented Floor ......... 27

Figure 22 - Washers Specifications...................................... 28

Figure 23 - Base Upper Part Installation............................... 28

Figure 24 - Adjustable Base and Floor Installation Final View .. 29

Figure 25 - Fixing Cabinet Base .......................................... 29

Figure 26 - Adjustable Base Installation Final View ................ 30

Figure 27 - Adjustable Base Installation Mode Final View........ 31

Figure 28 - Installation Location Specification ....................... 32

Figure 29 - Converter Panel and Stand ................................ 34

Page 188: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

172 Confidential and Proprietary Information of ZTE CORPORATION

Figure 30 - Assembling ..................................................... 36

Figure 31 - Crimping Pliers ................................................ 37

Figure 32 - Power Supply and Grounding Cables ................... 37

Figure 33 - CBTS I2 Power and Grounding Cable Interface .... 38

Figure 34 - Cable Straps Requirements................................ 39

Figure 35 - Cable Straps.................................................... 39

Figure 36 - CC4Y-J32 Coaxial Cable Connector Assembly ....... 40

Figure 37 - Coaxial Cable on DDF Side................................. 41

Figure 38 - Coaxial Connector Assembly on DDF Side ............ 41

Figure 39 - 75Ω E1 Cable Structure..................................... 42

Figure 40 - 120Ω E1 Cable Structure................................... 43

Figure 41 - 100Ω T1 Cable Structure................................... 45

Figure 42 - Temperature and Humidity Sensor Installation ..... 48

Figure 43 - Temperature and Humidity Sensor Cable ............. 49

Figure 44 - Smog Sensor................................................... 50

Figure 45 - Smog Sensor Cable .......................................... 50

Figure 46 - Terminal Connections at Smoke Sensor Base ....... 51

Figure 47 - Infrared Sensor Cable Structure ......................... 52

Figure 48 - Infrared Sensor Dimensions............................... 53

Figure 49 - RS232 Connector ............................................. 55

Figure 50 - RS485 Connector ............................................. 56

Figure 51 - Switch Input Cable ........................................... 57

Figure 52 - Control Output Cable ........................................ 59

Figure 53 - CBTS I2 External Monitoring Conversion Cable ..... 60

Figure 54 - Connecting Jumper Cable .................................. 63

Figure 55 - Main Antenna Feeder System............................. 66

Figure 56 - Feeder and Jumper Cables Combination 1............ 67

Figure 57 - Feeder and Jumper Cables Combination 2............ 67

Figure 58 - Main Antenna Feeder System Installation Flow Chart..................................................................................... 70

Figure 59 - Antenna Installation Flow Chart.......................... 71

Figure 60 - Antenna Lightning Proof .................................... 72

Figure 61 - Hoisting an Antenna ......................................... 73

Figure 62 - Assembling the accessories of Kathrein Antenna ... 74

Figure 63 - Angle Meter..................................................... 75

Figure 64 - Adjusting Antenna Tilt with Angle Meter .............. 76

Figure 65 - U-shaped Bolt.................................................. 77

Page 189: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 173

Figure 66 - Omni-Directional Antenna Installation ................. 77

Figure 67 - 4-hole Feeder Window Structure......................... 79

Figure 68 – CBTS I2 Main Feeder Cable Connection ............... 81

Figure 69 - Main Feeder Cable Installation Flow Chart ............ 82

Figure 70 - Cutting Tool for Making 7/8" Feeder Connector ..... 83

Figure 71 - Cutting Feeder with a Cutter .............................. 84

Figure 72 - Checking Cut Section Length.............................. 84

Figure 73 - Expanding Feeder External Conductor ................. 84

Figure 74 - Connecting Front and Back Parts ........................ 85

Figure 75 - Fixing Feeder Connector Front and Back Parts ...... 85

Figure 76 - Hoisting Feeder Up to Tower .............................. 87

Figure 77 - 3-Feeder Clip................................................... 89

Figure 78 - Use 3-Feeder Clip to Fix Feeder Cables ................ 89

Figure 79 – CBTS I2 Grounding System ............................... 91

Figure 80 - Grounding Clip................................................. 92

Figure 81 - Running Feeders into Equipment Room (Horizontal Entering)......................................................................... 93

Figure 82 - Running Feeders into Equipment Room (Vertical Entering)......................................................................... 93

Figure 83 - Common Lightning Arrester That Needs Grounding95

Figure 84 - 12×M6 Grounding Copper Bar............................ 95

Figure 85 - Connect Lightning Arrester with Feeder and Jumper (Side View) ..................................................................... 96

Figure 86 - Fixing Copper Bar............................................. 96

Figure 87 - Connect Lugs to Lightning Arrester ..................... 97

Figure 88 - Complete Installation Top View .......................... 98

Figure 89 - Complete Installation Side View ......................... 98

Figure 90 - Lightning Arrester Installation Photo ................... 99

Figure 91 - Wrapping Waterproof Adhesive Tapes (1) .......... 100

Figure 92 - Wrapping Waterproof Adhesive Tapes (2) .......... 101

Figure 93 - Wrapping 9 Waterproof Adhesive Tapes (3)........ 101

Figure 94 - GPS Antenna Feeder System with 1/4” Cables .... 104

Figure 95 - Tower Mounted GPS Antenna ........................... 105

Figure 96 - Roof Mounted GPS Antenna ............................. 106

Figure 97 - GPS Antenna System (with 1/4” Cables) Installation Flow ............................................................................. 107

Figure 98 - Dimension Requirements of Preparing 1/4” Cable N-model Connector ............................................................ 109

Page 190: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

174 Confidential and Proprietary Information of ZTE CORPORATION

Figure 99 - Cut and Strip the 1/4” Cable Sheath ................. 109

Figure 100 - Position to Cut the External Conductor............. 110

Figure 101 - Cutting the External Conductor....................... 110

Figure 102 - Inner Conductor Dimension Requirement ......... 111

Figure 103 - 1/4” Cable View after Processing .................... 111

Figure 104 - Fix The O-shape Sealing Ring......................... 112

Figure 105 - Installing The Rear Part of Cable Connector...... 112

Figure 106 - Fix The Front Part onto The Rear Part .............. 113

Figure 107 - GPS 1/4" Feeder Grounding Clip Structure ....... 114

Figure 108 – Grounding Cable Structure ............................ 115

Figure 109 - CBTS I2 Board Slot ....................................... 118

Figure 110 - Board Installation Flow Chart ......................... 118

Figure 111 - Board Plugging (Step 1) ................................ 120

Figure 112 - Board Plugging (Step 2) ................................ 121

Figure 113 - Board Plugging (Step 3) ................................ 122

Figure 114 - Connection of DPA and RFE Boards ................. 123

Figure 115 - PWS Cabinet Installation ............................... 140

Figure 116 - PWS Cabinet Installation ............................... 141

Figure 117 - PWS Cabinet Fixing....................................... 142

Figure 118 - PWS Cabinet After Complete Installation.......... 143

Figure 119 - DC Output Interfaces .................................... 144

Figure 120 - AC Input Interfaces ...................................... 145

Figure 121 - PWSC I2 Cabinet Interfaces ........................... 149

Figure 122 - DC Output Interface...................................... 150

Figure 123 - DC Output Terminal Printed Marks .................. 150

Figure 124 - DC Input Terminals....................................... 151

Figure 125 - Printed Marks on DC Input Terminal ................ 151

Figure 126 Typical Configuration...................................... 155

Figure 127 Internal E1/T1 connection............................... 156

Figure 128 3 RRFS Connected with CBM ........................... 156

Figure 129 GPS Antenna Connection ................................ 157

Figure 130 - Antenna Feeder SWR Test.............................. 162

Figure 131 - Measurement of Antenna Feeder DTF .............. 163

Figure 132 - Micro Coaxial Connectors............................... 167

Page 191: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 175

Tables

Table 1 - Chapter Summary ..................................................i

Table 2 - Metric and British Measures Example (In Table)........ iii

Table 3 - Typographical Conventions .....................................v

Table 4 - Mouse Operation Conventions .................................v

Table 5 - Tool and Meter List................................................3

Table 6 - Equipment Room Specifications...............................5

Table 7 - Temperature and Humidity Range ...........................5

Table 8 - Radiation Protection Requirements ..........................6

Table 9 - Power Supply Indices.............................................7

Table 10 - Antenna Feeder System Check ..............................7

Table 11 - Adjustable Base Selection................................... 24

Table 12 - 75 Ω E1 Cable Internal Connections ..................... 42

Table 13 – 120 Ω E1 Cable Internal Connections ................... 44

Table 14 - 100 Ω Internal Cable Connections 1 ..................... 45

Table 15 - 100 Ω Internal Cable Connections 2 ..................... 46

Table 16 - Temperature and Humidity Sensor Wiring relationship..................................................................................... 49

Table 17 - Terminal Connections......................................... 51

Table 18 - RS232 Signal Definition...................................... 55

Table 19 - RS485 Signal Definition...................................... 56

Table 20 - Switch Input Signal Definition ............................. 57

Table 21 - Switch Input Signal Definition ............................. 58

Table 22 - Control Output Signal Definition .......................... 59

Table 23 - External Monitoring Conversion Cable Labels ......... 60

Table 24 - Feeder Window Size Table .................................. 78

Table 25 switch states .................................................... 146

Table 26 - CBTS I2 Working Modes ................................... 166

Page 192: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

176 Confidential and Proprietary Information of ZTE CORPORATION

This page is intentionally blank.

Page 193: ZTE - CBTS I2 Installation Manual

Confidential and Proprietary Information of ZTE CORPORATION 177

Index

4C3S ..........................12, 169 AAA ................................. 169 AC 7, 127, 136, 138, 149 ATM ................................. 169 B 13, 23, 24, 33, 42, 44, 45,

46, 49, 50, 51, 153, 159, 165 BDS ...................119, 120, 169 BIM ................................. 169 BS 4 BSC .....4, 8, 9, 42, 44, 45, 169 BSCB ................................ i, ii BSS ................................. 169 BTS .....................91, 169, 170 CAPS ...................................v CBTS 1, iii, i, ii, 2, 4, 5, 7, 8, 12,

13, 14, 22, 32, 36, 38, 40, 42, 45, 54, 60, 61, 81, 117, 118, 125, 126, 127, 137, 138, 169

CC4Y-J32 ...........................40 CCM ................................. 169 CDMA2000 ........................ 1, iii CHM ................................. 169 DB25 .................................51 DB9 ............................. 49, 54 DBS ................................. 169 DC 7, 136 DOOR .................................60 DOOR_MON ...........................60 DSM ................................. 169 DV 169 E iii, 9, 160, 161, 162 E1 8, 39, 40, 42, 43, 44, 45 E1/T1................................39 EPLD ............................... 169 EV 169 FA 169 FER ................................. 169 FPGA ............................... 169 FREQ ............................... 160 GCM ................................. 169 GND ............................. 38, 49 GPS ...103, 104, 105, 106, 107,

108, 109, 116, 125, 129, 130, 131, 132, 169

HA 169

HDLC ............................... 169 HDR................................. 169 HLR................................. 170 INFRARED........................... 60 LNA................................. 170 LOSS ................................161 MAC................................. 170 MAIN .........................161, 162 MASTER ................................4 MODE .........................161, 162 MS 4 MSC.......................... 169, 170 MTBCF ............................. 170 MTBF ............................... 170 MTTR ............................... 170 N/A.................................... iii O&M................................. 170 OFF................................. 136 OMC................................. 170 OPEN ................................160 OSS................................. 170 OTD................................. 170 OUT................................... 60 OW 170 P iii PA 138, 170 PCB.....................................9 PCF................................. 170 PGND ............................... 127 PP2S ............................... 170 PWS.......................... 136, 138 R&D.................................... iii R1 ii, iii RF 128, 129, 131, 170 RFE.......................62, 63, 161 RFS.......................... 119, 170 RIM................................. 170 ROOM ................................. 61 ROSENBERGER...................... 83 RSSI ............................... 170 RX 170 RX0........................ 44, 45, 46 RX1........................ 44, 45, 46 SAM................................. 170 SCALE ..............................162 SCH................................. 170

Page 194: ZTE - CBTS I2 Installation Manual

ZXC10 CBTS I2 Installation Manual

178 Confidential and Proprietary Information of ZTE CORPORATION

SCS .................................170 SDH .................................170 SHORT .............................. 160 SITE................................... 4 SMOG................................. 60 SNM .................................170 SWR ....100, 129, 132, 159, 161,

162, 163

TOD ................................. 170 TX 170 V 7, 36, 38, 127, 136, 138,

161 VSWR ............................... 132 ZXC10 ..... 1, iii, i, ii, 2, 7, 13, 60