1. DESIGNCivil Works Design & Tender Documents 30-Apr-11
Systemwide E&M Design & Tender Documents 31-Mar-12
Trackwork Design & Tender Documents 30-Nov-10
2. CONTRACT PROCUREMENTCivil Construction Contracts 31-Oct-11
E&M Works Contracts 18-Mar-13
3. RRIW & EPIW / ENABLING WORKSRRIW 8-Mar-18
EPIW 31-Dec-17
Property Development Enabling Works 31-Dec-17
WKCD Interface Enabling Works 7-Nov-17
Removal & Reprovisioning of Nam Cheong Property Foundation 31-Dec-15
Removal of CLP Substation at Shum Mong Road 27-Oct-11
Modification Works for MTR Tsuen Wan Line Pump Sump 23-May-12
Obstruction Removal of 4 Existing Box Culverts Along Sham Mong Road (Note 1) 21-Dec-12
Completion of Boundary Control Facilities at West Kowloon Terminus (WKT) 31-Dec-17
4. RAILWAY WORKS 30-Sep-18
(A) CIVIL CONSTRUCTION
Tunnel Obstruction Removal 7-Sep-13
Tunnels (Mai Po to Hoi Ting Road) 31-May-16
Tunnels (Huanggang to Mai Po - HK Section) 8-Jun-16
Tunnel Ventilation Buildings 26-Nov-16
Shek Kong Stabling Sidings (SSS) and Emergency Rescue Siding (ERS) 31-Dec-16
Piling Works of West Kowloon Terminus (Site A & WKCD) 2-Nov-11
WKT and Approach Tunnels 31-Dec-17
Trackwork & Overhead Line 30-Jun-17
Commencement of Testing and Commissioning 30-Oct-16
Completion of Testing and Commissioning 30-Mar-18
(B) E&M CONSTRUCTION WORKS
(a) Rolling Stock
Design, Manufacturing & Delivery 31-Dec-16
Testing & Commissioning 17-Nov-17
(b) WKT / Vent Buildings / SSS
Design, Manufacturing & Delivery 30-Sep-16
Installation & Testing 8-Dec-17
(c) Track Related Works
Design, Manufacturing & Delivery 30-Sep-16
Installation & Testing 17-Nov-17
(C) TEST & TRIAL RUNNING
Test & Trial Running 30-Sep-18
J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
RevisionDate
ST
BC/KC
0
1
30-Jul-15
24-Nov-15
ML/DM
BC/KC
ST
2012 2013 2015
Appendix C
2A
2015
ApprovedChecked
28-May-14
ACTIVITY DESCRIPTION 2009 2010 2011 2014COMPLETION DATE
2
2009 2010 2011 2012 2013 2014
25-Jan-10
Prog. No.: XRL/O/00/XRL/N30/10025/0
2018
2018
2017
2017
EXPRESS RAIL LINK PROJECTENTRUSTMENT PROGRAMME (PTC2)
2016
2016
BC/KC
BC
ST
Land Available
Land Available
Land Available
CommenceTrackwork
CommenceTest Running
Entrustment Agreement Signed& Funding Available
CommenceTRIP
Land Available
Estimated Commercial Operation: 30 Sep 18
Land Available
Land Available
Land Available
Land Available
Notes:
1. Excluding reinstatement works.
Land Available
Provision of Access to BCF in phases from 15 Aug 17
Guangzhou-Shenzhen-HK Passenger Dedicated Line Co. Ltd. Contractor to handover Tunnel Boring Machines at Boundary
Land Available
6 Months Programme Contingency
6 Months Programme Contingency