zhjv w a1 st 0002 abutment a1 elevation & details

1
ABUTMENT A1 ELEVATION AND DETAILS PROJECT DOCUMENT NUMBER: company phase SCALE : FILE NAME: zone document number DRAWING TITLE: ENGINEERING CONSULTANT: REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT. GOVERNMENT OF UGANDA NEW BRIDGE ACROSS RIVER NILE AT JINJA EMPLOYER: UGANDA NATIONAL ROADS AUTHORITY PLOT 11, YUSUF LULE ROAD P O BOX 28487 KAMPALA - UGANDA Email: [email protected] ENGINEERING CONTRACTOR: SCALE : FILE NAME: DRAWING TITLE: ENGINEERING CONSULTANT: DATE EMPLOYER: ENGINEERING CONTRACTOR: RONALD 0 NISHIO AKIYAMA SCALE : WORKING DRAWING SCALE : 04/08/15

Upload: asaale-gloria

Post on 03-Feb-2016

214 views

Category:

Documents


0 download

DESCRIPTION

Handbook of Concrete EngineeringFilename: ZHJV-W-A1-ST-0002-ABUTMENT A1 - Elevation & Details.pdfZhjv w a1 St 0002 Abutment a1 Elevation & DetailsASAALE GLORIAHandbook of Concrete EngineeringFilename: ZHJV-W-A1-ST-0002-ABUTMENT A1 - Elevation & Details.pdfPreview in a new tab

TRANSCRIPT

Page 1: Zhjv w a1 St 0002 Abutment a1 Elevation & Details

ABUTMENT A1

ELEVATION AND DETAILS

PROJECT DOCUMENT NUMBER:

companyphase

SCALE :

FILE NAME:

zonedocument number

DRAWING TITLE:ENGINEERING CONSULTANT:

REVESTABLISHED CHECKED

APPROVED

DATE DESCRIPTION

STAT.

GOVERNMENT OF UGANDA

NEW BRIDGE ACROSS RIVER

NILE AT JINJA

EMPLOYER:

UGANDA NATIONAL ROADS AUTHORITY

PLOT 11, YUSUF LULE ROAD

P O BOX 28487

KAMPALA - UGANDA

Email: [email protected]

ENGINEERING CONTRACTOR:

SCALE :

FILE NAME:

DRAWING TITLE:ENGINEERING CONSULTANT:

DATE

EMPLOYER:

ENGINEERING CONTRACTOR:

RONALD0 NISHIO AKIYAMA

SCALE :

WORKING DRAWING

SCALE :

04/08/15