zhjv-w-a1-bp-0001-a (bored pile abutment a1 pile no.8)

1
BAR ARRANGEMENT OF BORED PILE ABUTMENT A1 [NO.8] PROJECT DOCUMENT NUMBER: company phase SCALE : FILE NAME: zone document number DRAWING TITLE: ENGINEERING CONSULTANT: REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT. GOVERNMENT OF UGANDA NEW BRIDGE ACROSS RIVER NILE AT JINJA EMPLOYER: UGANDA NATIONAL ROADS AUTHORITY PLOT 11, YUSUF LULE ROAD P O BOX 28487 KAMPALA - UGANDA Email: [email protected] ENGINEERING CONTRACTOR: SCALE : FILE NAME: DRAWING TITLE: ENGINEERING CONSULTANT: DATE EMPLOYER: ENGINEERING CONTRACTOR: PAUL 26-08-2014 0 NISHIO NISHIO PAUL 12-11-2014 1 NISHIO NISHIO FIRST ISSUE AS BUILT AS BUILT

Upload: asaale-gloria

Post on 03-Feb-2016

214 views

Category:

Documents


0 download

DESCRIPTION

978-0-940116-02-3 for Filename: ZHJV-W-A1-BP-0001-A (BORED PILE ABUTMENT A1 PILE NO.8).pdf

TRANSCRIPT

Page 1: Zhjv-w-A1-Bp-0001-A (Bored Pile Abutment a1 Pile No.8)

BAR ARRANGEMENT OF BORED PILE

ABUTMENT A1 [NO.8]

PROJECT DOCUMENT NUMBER:

company phase

SCALE :

FILE NAME:

zonedocument number

DRAWING TITLE:ENGINEERING CONSULTANT:

REVESTABLISHED CHECKED

APPROVEDDATE DESCRIPTION

STAT.

GOVERNMENT OF UGANDA

NEW BRIDGE ACROSS RIVERNILE AT JINJA

EMPLOYER:

UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

ENGINEERING CONTRACTOR:

SCALE :

FILE NAME:

DRAWING TITLE:ENGINEERING CONSULTANT:

DATE

EMPLOYER:

ENGINEERING CONTRACTOR:

PAUL 26-08-20140 NISHIO NISHIO

PAUL 12-11-20141 NISHIO NISHIO

FIRST ISSUE

AS BUILT

AS BUILT