Question 7 (7.1)
10-CYCLE
INSTRUMENT X
INSTRUMENT Y2 CYCLES
Instrument X V = 1 p.u.Instrument Y V = 1.043p.u.Error = 4.3% for 200ms intervalOver 3 s interval Error = 0.29% > Class A accuracy limit = 0.1%
![Page 2: ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona 12-15 May 2003 1 Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%](https://reader036.vdocuments.us/reader036/viewer/2022082908/5a4d1aea7f8b9ab05997a773/html5/thumbnails/2.jpg)
2ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 8 (8.1, 8.2, 8.3)Definition of events• System events• Complex events examples
Methods of processing dips, swells and short interruptions• Summation• Phase aggregation (IEC 61000-4-30)• Temporal aggregation (one-minute) (IEC 61000-2-8, IEEE 1159)
– On a phase-by-phase basis– On a 3-phase basis– Severity and duration of aggregated events
Statistical processing of voltage dips and short interruption data• Extrapolation up to one year not recommended
![Page 3: ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona 12-15 May 2003 1 Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%](https://reader036.vdocuments.us/reader036/viewer/2022082908/5a4d1aea7f8b9ab05997a773/html5/thumbnails/3.jpg)
3ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 8 (8.1, 8.2, 8.3)
![Page 4: ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona 12-15 May 2003 1 Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%](https://reader036.vdocuments.us/reader036/viewer/2022082908/5a4d1aea7f8b9ab05997a773/html5/thumbnails/4.jpg)
4ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 13(13.2, 13.3, 13.4)
An Overhead Distribution Line has the potential to provide PQ raw and processed data from:• Substation Located Circuit Breaker Controller (MV) or PQ Analyser connected to the
Substation Busbar• Reclosers Controllers (MV)• Voltage Regulator Controller (MV)• Intelligent Revenue Meters (LV)• PQ Analysers connected to the distribution line at strategic locations (if necessary)
Substation
Recloser Recloser
Revenue Meter Revenue Meter
Voltage regulator