Yueming Wu, Ph.D., GISPGIS Manager

May 9, 2012

WVDOT GIS Strategic & Business Plan and Its Implementation

Page 2: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Agenda

IntroductionWVDOT Enterprise GIS RoadmapStatus UpdateFuture WorkQuestions & Answers

Page 3: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Introduction

Page 4: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

History

Historically the West Virginia Department of Transportation (WVDOT) has been utilizing geospatial (GIS, Remote Sensing, & GPS) technology for planning, analysis, and mapping purposes ever since the technology became available.

In 2005 the WVDOT GIS Section was created to meet the growing needs for geospatial data and services in transportation.

In 2007 the GIS Section was renamed as the GIS Unit and merged with the Highway Data Services (HDS) Unit, a program responsible for processing changes in roadway information, and the update and maintenance of the Roadway Inventory Log, to form the current Geospatial Transportation Information (GTI) Section.

Page 5: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

- Roadway Inventory Log

-Roadway Statistics

-Public Certified Mileage

- Geospatial Data Management

-Geospatial Services

Geospatial Transportation Information (GTI) Section

Program Planning & Administration Division

Highway Data Services UnitGIS Unit

Page 6: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

GTI Mission & Vision Statements

Mission StatementTo improve customer service to the citizens of West Virginia by supplying the latest geospatial transportation information.

Vision StatementThe West Virginia Department of Transportation Geospatial Transportation Information (GTI) Section is committed to managing an enterprise Geospatial Information System that will improve the productivity of the West Virginia Department of Transportation, meet growing customer needs, and play a leading role in West Virginia’s geospatial community.

Page 7: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

GIS Implementation

Esri Shop Enterprise License Agreement (ELA) Esri Technology

Staff 7 GIS Professionals 2 Cartographers 1 GIS Coordinator at District 7

Enterprise GIS WVDOT Enterprise GIS Roadmap Enterprise Resource Planning (ERP)/Asset Management

System

Page 8: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Major GIS Projects in 2012 Enterprise GIS Implementation

New Transportation GIS Data Model District Level GIS Implementation Workflow Manager

Transportation GIS Data Collection(MS4, Railroad Crossings, Landslides, Outdoor Advertising, Right-of-Way, Trails, Meta Data, etc.) Highway Map Reproduction Web Mapping Applications (STIP, Park & Ride, Functional Classifications, etc.) Mobile GIS Applications (MS4, etc.) 3D GIS Application Development GIS Portal Upgrade ProjectWise Implementation ERP/Asset Management System Implementation

Page 9: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

WVDOT Enterprise GIS Roadmap

Page 10: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Why?

Small Successes + Healthy Growth Relatively New GIS Program Copying Peers Leveraging Professional Services

Then What? Sustainable Growth? DOT’s Uniqueness Growing Needs for Geospatial Technology? Enterprise GIS? Staff’s Skill Advancement? Other Improvements?

Page 11: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

How?

Goal Guide the implementation of a sustainable EGIS

Project Initiated in October 2009Partnership with Esri

Enterprise License Agreement (ELA) Technical Advisor

Online SurveyInformation AssessmentMultiple Versions of DraftRoadmap Delivered in March 2011

Page 12: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

What? Phased Approach

Suggestions Best Practices

Four Phases Phase I: Build enterprise GIS framework Phase II: Application implementation & preparation for GIS

integration for ERP applications Phase III: Pilot new tools & applications Phase IV: Roll out Highway Data Maintenance Solutions & ERP

Five Areas Business Architecture Data Architecture Application Architecture Technical Architecture GIS Staffing

Page 13: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Phase 1

Current State(Now)

Phase 2 Phase 3 Phase 4

Target State(Vision)

Build Enterprise GISFramework

Application Implementation and Preparation for GIS integration with ERP Applications

Pilot New Tools and Applications

Roll out Highway Data Maintenance Solutions and ERP to Production

ArcGIS Desktop10

Default Editing

ArcGIS Desktop10

Editingw/Two-Tier QA

Versioning Strategy

Web MapsArcGIS FLEX AP I

•Airport•Riverport•Facilities

•ARRA•SRIC

Web ServerArcGIS Server

IIS 7

WVDOT Maps and

Shapefile Download

ContractsMaintenance

DistrictsEngineering

Engineeringand

TrafficEngineering

Maintenance,Materials,

ROW,Engineering,

Traffic Engineering

…………….……………………………………………………..

Work OrdersAssets

PavementBridge

PrimaveraP7

AASHTOTrns*port

MicroStationDesign

Cartographic Production

MS4Over heightOverweight

G

MS4 Super loadGot Permit

InRoadsFederal/StateCounty/CityMaps in PDF

PrimaveraInterfaceTrns*portInterface

ReimusSurveyor

Fugro RoadwayDeighton

Bridge Inspect Collector/Manager

Document Management

SLD

ApplicationXtender

RIL

RILInterface

GeoDecisionSLD Application

Manual ETL

GTI_EDIT INGLRS Maintenance

GDB(SQL Server/SDE)

GTI_PUB_WMGDB

(SQL Server/SDE)

GTI_PUB_UTMPublication

GDB(SQL Server/SDE)

SRICMaintenance/Publication

GDB(SQL Server/SDE)

GTIHDSGIS

ITSTraffic MonitoringOutdoor Advertising

Salvage Y ardsCrash

TrafficEngineering

ITSTraffic Server 5

Outdoor Advertising

SalvageCrash Reporting

GeoDecisionsPortal

GDBRIL/SLD

WVDOHWeb Portal

WVDOT Current “As-Is” GIS Conceptual Architecture

GIS Integration

ProductionEnvironment

WV_MAPGDB

(SQL Server/SDE)

Web ServerArcGIS Server

I IS 7

Page 14: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

ArcGIS Desktop10

Default Editing

Web ServerArcGIS Server

IIS 7

ArcGIS Desktop10

w/Two-Tier QAVersioning

Strategy

Web MapsArcGIS FLEX API

•Airport•Riverport•Facilities

•ARRA

Web ServerArcGIS Server

IIS 7

WVDOT Maps and

Shapefile Download

ContractsMaintenance

DistrictsEngineering

Engineeringand

TrafficEngineering

Maintenance,Materials,

ROW,Engineering,

Traffic Engineering

…………….……………………………………………………..

Work OrdersAssets

PavementBridge

PrimaveraP7

AASHTOTrns*port

MicroStationDesign

Cartographic Production

MS4Over heightOverweight

G

MS4 Super loadGot Permit

InRoadsFederal/StateCounty/CityMaps in PDF

PrimaveraInterfaceTrns*portInterface

ReimusSurveyor

Fugro RoadwayDeighton

Bridge Inspect Collector/Manager

Document Management

ApplicationXxtender

RILSLD

RILInterface

GeoDecisionsSLD Application

Manual ETL

Production Environment

GTI EditingLRS Maintenance

GDB(SQL Server/SDE)

GTI PUB WMGDB

(SQL Server/SDE)

GTI PUB UTMPublication

GDB(SQL Server/SDE)

SRICMaintenance/Publication

GDB(SQL Server/SDE)

GTIHDSGIS

ITSTraffic MonitoringOutdoor Advertising

Salvage Y ardsCrash

TrafficEngineering

ITSTraffic Server 5

Outdoor Advertis ing

SalvageCrash Reporting

GeoDecisionsPortal

GDBRIL/SLD

WVDOHWeb Portal

WVDOT Current “As-Is” GIS Conceptual Architecture

GIS Integration

WV MapGDB

(SQL Server/SDE)

Page 15: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

MS4 Super loadGot PermiteBONDS

Web ServerArcGIS Server 10

ArcGIS Flex API 2.0FLEX 4.0

IIS 7

Development

Development Environment

Virtual Server

SRICMaintenance

GDB(SQL Server/SDE)

Production Environment

StagingGDB

(SQL Server/SDE)

GeoDecisionsPortal

Publication GDB

RIL/SLD

WVDOHWeb Portal

LRSSLD

HPMSITAERP

GIS Web ServicesFuture Services

WVDOT “To-Be” Target GIS Conceptual Architecture

One-Way Replication

Automated ETLWVDOT Maps

PDF and

Shapefile Download

10 District Offi ces

MobileField

Crews

Mobile FieldCrewsGDB

(SQL Server/SDE)

District OfficesGDB

(SQL Server/SDE)DGN

(MicroStation)

Two-WayReplicationLive Or Disconnected

GPS Project

LocationAt

Inception

One-WayReplication One-Way

Replication

TransportationMaintenanceLRS/Events

GDB(SQL Server/SDE)

SRICPublication

GDB(SQL Server/SDE)

Two-WayReplication

FHWAOther Third Parties

Project Authorization

Project Location

State Rail

Authority

HRFinance

Maintenance,Materials,

ROW,Engineering,

Traffic Engineering

…………….……………………………………..

PrimaveraP7

AASHTOTrns*port

Site Manager

MS4Over heightOverweight

PrimaveraApplicationInterface

ApplicationXxtender

Documents Contracts

MicroStationDGN

Esri Interoperability

Extension or FME

HRFinance

EsriHighway DataManagement

SolutionGIS/HDS

Railroad

ITSTraffic Server 5

Outdoor Advertising

SalvageCrash Reporting

ERP SUITE GIS Integration

InRoads

EsriPRODUCTION

MAPPINGCARTOGRAPHIC

Production GIS/HDS

MaintenanceDistricts

Engineering

Work OrdersAssets

PavementBridge

Asset ManagementFugro Roadway

DeightonBridge Inspect

Materials ControlSoils/Testing

ITSTraffic Monitoring

Outdoor AdvertisingSalvage Y ards

Crash

TrafficEngineering

RailConnect

GTIGISHDS

HRFinance

Applications

Parkways

ParkwaysE-ZPass

ParkwaysE-ZPass

2

3

4

5

6

17

8

910

11

12

WMS

13

Page 16: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Recommended Workflow

1. Project authorization from FHWA or other third parties. Information is entered in Primavera and notice is sent to the survey field crew to GPS project location.2. Field crew collects project location data and other pertinent data as necessary3. Data is replicated to the district office using either Web-based disconnected check-in or connected synchronization services for distributed geodatabase versions maintained in supported database platforms. Both types of replication offer two-way workflows necessary to support field crews 4. Two-way replication is setup between the District Offices and Central Office Production geodatabase to keep geodatabases in sync.5. Esri’s Interoperability Extension or Feature Management Extension (FME) is used to provide interoperability between the geodatabase and MicrosStation DGN files for data exchange. For web services, MicroStation V8i can consume WMS. Both options should be available for users.6. Project Location Data is sent to Primavera.7. All business data within the ERP is linked to the roadway network LRS. 8. Roadway Network LRS and event data in the production environment is maintained by Esri Highway Data Maintenance System.9. Data for Cartographic production (Federal, State, County and City Maps) is located in the Publication geodatabase and managed by ESRI’s Production Mapping.10. Data is replicated one-way to the publication environment for Web Portal and File downloads.11. Data is replicated to the new Web Portal Publication Database. Data is projected to Web Mercator (Auxiliary Sphere) Projection before replication.12. Data and Maps are available for download via automated ETL.

Page 17: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Recommendations for Business Architecture

Develop GIS Steering Committee

Identify GIS Champions in Business Units

Data Discovery Workshop with Business Units

Define GIS Data Standards and Field Data Collection Procedures

Define Business Units Data Roles and Responsibilities

Define ERP/GIS Integration Requirements

Define MicroStation Interoperability Requirements with Business units

Implement Standards GIS Steering Committee Oversight and Support for ERP/GIS Rollout

GIS Section and Business Champion continued work with Business Units on ERP/GIS Rollout

Phase I Phase II Phase III Phase IV

Page 18: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Recommendations for Data Architecture

Phase I Phase II Phase III Phase IVData Model Workshop

Separate Database Environments – Create Staging and Publication Environments

Develop QA/QC Procedures for Data Cleanup

Develop Common Base Maps

Develop Data Caching Strategy

Develop Data Management Strategy –Versioning-

Replication-Archiving

Define ETL Tools

Create Mosaic Datasets

Develop Conceptual and Logical Data Models

Data Cleanup

Test Data Caching Strategy in Staging Environment

Pilot Versioning-Replication-Archiving in Staging Environment

Define Data Maintenance Workflows

Automate ETL Tools

Test Mosaic Datasets in Staging Environment

Pilot Physical Geodatabase Schema

in Staging Environment

Roll Out Data Caching Strategy in Production Environment

Roll Out Versioning-

Replication-Archiving in Production Environment

Test ETL Tools in Staging

Roll Out Mosaic Datasets in Production Environment

Roll out Physical Geodatabase Schema

to Production Environment

Roll Out ETL Tools in Production Environment

Page 19: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Recommendations for Application Architecture

Phase I Phase II Phase III Phase IVDesign Templates for Official Maps in Production Mapping in Staging Environment –

Test Caching Strategies

Pilot Production Mapping in Staging Environment

Develop Mobile GIS Application Based on Data Collection Standards and Procedures

Pilot WMX in Staging Environment

Pilot GIS & MicroStation Integration using Interoperability in Staging Environment

Automate GIS & MicroStation Interoperability Workflows

Pilot Highway Data Management Solution in Staging Environment

Pilot Mobile GIS Applications

Rollout WMX in Production Environment

Rollout GIS & CAD Integration using Interoperability Extension in Production Environment

Rollout Highway Data Management Solution to Production

Rollout Mobile GIS Applications

Discovery Workshop for SOA/ERP GIS Web Services and Mapping Applications Requirements

Pilot GIS/ERP Integration Web Service/Mapping Applications in Staging Environment

Rollout GIS/ERP Integration Web Services/Mapping Applications in Production Environment

Rollout ERP/GIS Integration to Production Environment

Page 20: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Recommendations for Technical Architecture

Phase I Phase II Phase III Phase IV

Esri Enterprise Health Check

Install WMX in Staging Environment

Determine High Level ERP/GIS System Integration Requirements for Asset Management, Work Order Management, Safety Management, etc.

System Architecture Workshop to Support ERP/GIS Integration Requirements

Revisit System Architecture Requirements Integration Requirements

Install Image Server Extension in Staging Environment –

Install Production Mapping in Staging Environment

Install Interoperability extension in Staging Environment

Install WMX in Production Environment

Install Image Server Extension in Production Environment –

Install Production Mapping in Production Environment

Install Interoperability extension in Production Environment

Page 21: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Recommendations for GIS Staffing

Phase I Phase II Phase III Phase IV

Hire GIS Database Administrator Hire GIS Developer

Page 22: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Revised Tasks

Page 23: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Revised Tasks for Business Architecture

Develop GIS Steering Committee Identify GIS Champions in Business Units Conduct Data Discovery workshop with business

units to identify pockets of existing GIS data that should be maintained in the enterprise geodatabase.

Page 24: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Revised Tasks for Data Architecture

Conduct Transportation Data Model Workshop Separate Database Environments Create Staging and Publication Environment Develop QA/QC Strategy for Data Clean-up Develop Common Base Maps for Web Portal and Desktop Develop Data Caching Strategy Define Data Maintenance Workflows – RIL and LRS – WMX

Workshop Develop Data Management Strategy Define ETL/Data Extraction Processes Design and Create Mosaic Datasets

Page 25: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Revised Tasks for Application Architecture

Design Templates in Staging Environment Test Caching Strategies using Image Server Extension

in Staging EnvironmentAutomate GIS & MicroStation Interoperability

Workflows

Page 26: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Revised Tasks for Technical Architecture

Esri Enterprise Health Check – Initial System Enterprise Health Check with GIS and OT System and Network Administrators

Install WMX in Staging Environment Install Production Mapping Solution in Staging Environment Install Image Server extension in Staging Environment Install Interoperability extension in Staging Environment

Page 27: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Status Update

Page 28: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Business Architecture

Develop GIS Steering Committee – In Progress Identify GIS Champions in Business Units - In ProgressConduct Data Discovery workshop with business

units to identify pockets of existing GIS data that should be maintained in the enterprise geodatabase.

– In Progress

Page 29: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Data Architecture

Conduct Transportation Data Model Workshop – Complete Separate Database Environments – Complete Create Staging and Publication Environment – Complete Develop QA/QC Strategy for Data Clean-up – In Progress Develop Common Base Maps for Web Portal and Desktop –

Complete Develop Data Caching Strategy – In Progress Define Data Maintenance Workflows – RIL and LRS – WMX

Workshop – In Progress Develop Data Management Strategy - In Progress Define ETL/Data Extraction Processes – In Progress Design and Create Mosaic Datasets - In Progress

Page 30: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Application Architecture

Design Templates in Staging Environment– In Progress Test Caching Strategies using Image Server

Extension in Staging Environment - In ProgressAutomate GIS & MicroStation Interoperability

Workflows – In Progress

Page 31: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Technical Architecture

Esri Enterprise Health Check – Initial System Enterprise Health Check with GIS and OT System and Network Administrators

- Complete Install WMX in Staging Environment - Complete Install Production Mapping Solution in Staging

Environment - Complete Install Image Server extension in Staging Environment - Complete Install Interoperability extension in Staging Environment - Complete

Page 32: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Future Work

Page 33: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Future Work

Complete Ongoing TasksIncorporate Ideas from the Upcoming

Geospatial Strategic Plan by Cambridge Systematics/Transcend Spatial

Page 34: Yueming Wu, Ph.D., GISP GIS Manager May 9, 2012 WVDOT GIS Strategic & Business Plan and Its Implementation

Yueming WuGIS Manager

WVDOT

(304) 558-7437

[email protected]