Page 1: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YH

SY

ST

EM

FAB

RIC

AT

OR

S P

TE

LTD

YH

SY

ST

EM

FAB

RIC

AT

OR

S P

TE

LTD

CCOMPANY OMPANY PPROFILEROFILE

4 Penjuru Place #01-14, 2-8 Penjuru Tech HubSingapore 608782Email: [email protected]: (65) 65151018 Fax: (65) 62650297

Page 2: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

IIINNNTTTRRROOODDDUUUCCCTTTIIIOOONNN

YYYHHH SSSYYYSSSTTTEEEMMM FFFAAABBBRRRIIICCCAAATTTOOORRRSSS PPPTTTEEE LLLTTTDDD YH System Fabricators Pte Ltd (YH System) was incorporated in end November 2004. Working in close partnership with the automation industry, YH System is specialized in the design, assembly and installation processes for the manufacturing of various packaged equipment used to facilitate industry automation. We aim to provide the following services efficiently and effectively to all customers:

• System Integration For Process Control System • Design And Fabrication Of Control Panels • Design And Fabrication Of Metering Panels For Custody Transfer • Design And Fabrication Of Analyzer Shelter And Cabin • Electrical And Instrumentation Installation Work For Package Equipment Such As

Metering Skid, Compressor Skid, ETC. • On-Site Assistance In Instrumentation Works

All the above services will be performed or supervised by YH System Fabricators Pte Ltd’s staff with assistance from outsourced resources if required. Client will be required to provide the basic document such as:

• System Architecture Diagram • Information On Major Hardware To Be Provided By Client • The Standard Or Code Of Practice To Follow • Preferred Vendor List

YH System Fabricators Pte Ltd can provide the engineering to generate the required documentation, examples are as below:

• Panel And/Or System Cabinet Layout Drawings • System Schematic Drawings • Functional Logic Drawings

Page 3: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

TTTHHHEEE CCCOOOMMMPPPAAANNNYYY

Name of Company : YH System Fabricators Pte Ltd Date of Incorporation : 22nd November 2004 Registered Office Address : 4 Penjuru Place, #01-14 2-8 Penjuru Tech Hub Singapore 608782 Company Registration No. : 200415055K Factory Address : 4 Penjuru Place, #01-14 2-8 Penjuru Tech Hub Singapore 608782 Telephone Number : 65151018 Fax Number : 62650297 Website : www.yhsystem.com.sg E-mail Address : [email protected] Directors : Loh Hua Jin Loh Boon Kiat Company’s Secretary : Chow Kwai Fong Advance Management Pte Ltd Apt Blk 531 Upper Cross Street, #03-53, Hong Lim Complex, Singapore 050531 Banker : DBS Bank Jurong Branch 97/99, Corporation Drive, Singapore 619767 Authorized Capital : S$1,000,000 Paid Up Capital : S$250,000 Quality System : ISO 9001: 2000 Design, assembly and installation of control panel and analyzer shelter for the automation industry.

Page 4: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

TTTHHHEEE CCCOOOMMMPPPAAANNNYYY

Employees: No. of Engineer : 4 No. of Engineering Assistant/Production Supervisor : 2 No. of Draftsman : 1 No. of Office Staff : 2 No. of Technician : 4

To maintain the most competitive pricing, YH System Fabricators Pte Ltd controls the overhead cost by keeping a minimum lower skilled work force such as fitters and electricians. Engineering and supervision staffs are permanent employees. Additional manpower requirement are outsourced and obtained from selected contractors who meet our standards. Steel work fabrication for analyzer cabins and shelters, and customized panel and equipment housing are sub-contracted out to selected steel work fabricators. Detailed design and E&I work are covered by YH System Fabricators Pte Ltd.

Page 5: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

SSSTTTEEEEEELLL WWWOOORRRKKK CCCOOONNNSSSTTTRRRUUUCCCTTTIIIOOONNN FFFAAACCCIIILLLIIITTTIIIEEESSS AAATTT CCCOOONNNTTTRRRAAACCCTTTOOORRR PPPRRREEEMMMIIISSSEEESSS

Page 6: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

TTTHHHEEE CCCAAAPPPAAABBBIIILLLIIITTTYYY

YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following types of work:

• Supply of PLC System and Panel, including programming.

Customer need to provide the following information: a. Functional Logic Diagram or System Description for the PLC b. I/O cable schedule and document for PLC hardware requirement c. Specification for panel wiring

YH System Fabricators will generate the following document:

a. Panel detailed layout drawings with Bill of Material b. Detailed wiring and I/O termination drawings c. Functional Logic Diagram for PLC Programming

• Supply, design, assemble and wiring of Metering Panel for Custody Transfer.

Customer need to cover the software and the hardware for flow computers and Man Machine Interface system and to provide the following Information: a. System Architecture Drawing b. P & ID c. Detailed information for all field devices connected to the system d. Field I/O cable schedule and Junction Box termination details e. Specification for panel wiring f. List of hardware to be free issued with dimension and wiring details g. List of hardware to be covered by YH System Fabricators

YH System Fabricators will generate the following drawings:

a. Cabinet detailed layout drawings with Bill of Material b. Electrical wiring schematic drawings and field/panel termination details

• Supply, design and E&I work for Analyzer Shelter and Cabin.

Customer need to provide the followings: a. Details of all free issued items such as analyzers and sample handling systems, etc. b. Details of Junction Boxes to be installed in the shelter or cabin, or the cable schedule for the power supply and outgoing signals from the shelter or cabin if the junction boxes are to be included in the scope of work for the shelter or cabin. c. Cable specifications and wiring spec.

YH System Fabricators will generate the followings: a. Analyzer shelter or cabin detailed arrangement drawings b. Electrical wiring schematic drawings including Junction Box details c. Tubing schematic drawings

Page 7: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

• Supply of Wellhead Shutdown Panel, Fusible Plug Panel and Pneumatic Shutdown

Panel.

Customer need to provide the followings: a. Functional Specifications or System Description for the system b. Cause and Effect Chart c. Specifications for the hydraulically operated shutdown valves d. Approved Vendor List for the components

YH System Fabricators will design and generate the followings:

a. Panel detailed layout drawings with bill of material b. Schematic drawings for shutdown and interlock systems c. Sizing for the accumulators, hydraulic storage tank and hydraulic pumps

• E&I work for Package Equipment such as Metering Skid, Compressor Skid, etc.

Customer need to provide the followings: a. The General Arrangement drawing for the skid b. Electrical and pneumatic junction boxes layout c. Power Distribution Boxes layout d. Cable specifications and schedule e. Specification for installation work f. Hook-up drawings g. List of hardware to be covered by YH System Fabricators

YH System Fabricators will cover the remaining work including loop testing to complete the installation.

• Supply, assemble and wiring of DCS System Cabinets and Consoles, including the supply of system cables.

Customer need to provide the following information:

a. I/O Loading list and cable schedule b. List of I/O hardware to be free-issued with dimension and wiring details c. List of hardware to be covered by YH System Fabricators d. Specification for cabinet wiring

YH System Fabricators will generate the following drawings:

a. Cabinet detailed layout drawings with Bill of Material b. I/O termination drawings

Tools and equipments for fabricating system cable System cable pull test in progress

Page 8: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

PAST PROJECT EXPERIENCESPAST PROJECT EXPERIENCES

Page 9: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Guangdong LNG Receiving Terminal Project Client : Emerson Process Management Asia Pacific Pte Ltd

Scope of work : Design and supply of 5 units metering panel

Completion date : Mid-April 2005

Page 10: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Zhusanjiao Oil Product Pipeline Project Client : Emerson Process Management Asia Pacific Pte Ltd

Scope of work : Design and supply of 22 units metering panel

Completion date : Mid-July 2005

Page 11: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Page 12: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Guangdong LNG Trunkline Project Client : Emerson Process Management Asia Pacific Pte Ltd

Scope of work : i) Design and supply of 9 units metering panel ii) Design and supply of 9 analyzer shelters

iii) Electrical and instrumentation installation work for 9 metering skids including loop and functional testing

Completion date : End-October 2005

Page 13: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Page 14: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : BSP FAPP-1 & FAPP-3 Project Client : Emerson Process Management Asia Pacific Pte Ltd

Scope of work : Design and supply of 2 units local metering panel

Completion date : End-September 2005

Page 15: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Caojing OSBL Metering Station Project Client : Emerson Process Management Asia Pacific Pte Ltd

Scope of work : Design and supply of 2 units purge metering panel Completion date : End-September 2005

Page 16: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Suban Phase 2 Gas Project Client : Emerson Process Management Asia Pacific Pte Ltd

Scope of work : i) Design and supply of 1 unit metering panel with HMI System

ii) Design and supply of 6 analyzer shelters

Completion date : Mid-March 2006

Page 17: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Page 18: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Wellhead Control Panel Client : CSE – iAP Pte Ltd

Scope of work : Design and supply of 1 unit wellhead control panel

Completion date : End May 2006

Page 19: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Page 20: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Total E&P Myanmar Project Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : Design and supply of 1 analyzer rack and PRS

Completion date : Mid-July 2005

Page 21: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Kizomba C&D Mondo Project Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : (i) Design and supply of 2 units metering panel (ii) Electrical and instrumentation installation work for 2 metering skids including loop and functional testing

Completion date : July 2006

Page 22: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Page 23: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Xijiang FPSO Project Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : Design and supply of 2 units sample receiving cabinet

Completion date : Mid September 2006

Page 24: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Yulin Analyzer System Modification Project Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : Design and supply of 1 unit stainless steel analyzer cabin

Completion date : Mid February 2007

Page 25: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Shijiazhuang – Taiyuan Product Oil Pipeline Client : Emerson Process Management Co. Ltd. (China) Scope of work : Design and supply of 2 units prover box. Completion date : Mid March 2007

Page 26: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : SOP Naphtha Tank Facilities Project Client : Rotork Controls (Singapore) Pte Ltd Scope of work : Design and supply of 3 units Scada cabinets Completion date : Mid May 2007

Page 27: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Emergency Shutdown Valve Control Panel Client : CSE - iAP Pte Ltd Scope of work : Design and supply of 1 unit Emergency Shutdown Valve Control Panel Completion date : Mid June 2007

Page 28: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Page 29: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Fujian LNG Terminal & Trunkline Project Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : (i) Design and supply of 12 units metering panel (ii) Design and supply of 8 units stainless steel analyzer shelter with detachable door (iii) Design and supply of 8 units pressure reducing system

Completion date : Mid June 2007

Page 30: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Guangdong LNG Receiving Terminal Project Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : Design and supply of 2 units sampling panel Completion date : Mid August 2007

Page 31: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : Yangzhou Project Client : GL&V Singapore Pte Ltd Scope of work : Design and supply of 1 unit Local Control Panel Completion date : Mid October 2007

Page 32: YH SYSTEM FABRICATORS PTE LTD Profile08.pdf · YH System Fabricators Pte Ltd has a team of experienced engineers who can undertake complete responsibility to execute the following

YHSF Company Profile

Project : MLJ2 ROC-8 Client : Emerson Process Management Asia Pacific Pte Ltd Scope of work : Design and supply of 1 unit ROC 809 Completion date : Mid Jan 2008