yeti fab lab - option b - redteam software filemep engineer mej & associates, inc. 811 barton...
TRANSCRIPT
-
MEP EngineerMEJ & Associates, Inc.811 Barton Springs Rd.Suite 700Austin, TX 78704
Contact:Walt [email protected]: 512-457-8771
Architectlauckgroup106 E 6th StreetSuite 700Austin, TX 78701
Contact:Joe [email protected]: 512-479-0337
3/1
4/2
016 9
:37:0
1 A
MA
uth
or
Yeti F
ab L
ab -
Option B
1559.0
1.0
1
Yeti Fab Lab - Option B
4635 Boston Ln, Suite 100Austin TX 78735
MEP + Structural
2016 0
1 2
7 -
Issu
e f
or
Pri
cin
g, P
erm
it &
Co
nstr
ucti
on
2016 0
3 1
4 -
Perm
it R
evis
ion
MP1.00 Mechanical and Plumbing Cover Sheet
M1.01 Mechanical Demolition Plan Level 1
M2.01 Mechanical Plan Level 1
M2.02 Mechanical Roof Plan
M3.01 Compressed Air Piping Plan Level 1
M4.01 Mechanical Schedules
M4.02 Mechanical Details
M5.01 Compressed Air Riser
P2.01 Plumbing Plan Level 1
P2.02 Gas Piping Roof Plan
P3.01 Plumbing Details and Schedules
P4.01 Plumbing Risers
P4.02 Gas Riser
E1.00 Electrical Cover Sheet
E1.01 Electrical Power Plan Level 1
E1.02 Electrical Roof Plan
E2.01 Electrical Lighting Plan Level 1
E3.01 Electrical Riser Diagram, Schedules and Details
E4.01 Electrical Panel Schedules
S0.0 General Notes
S1.0 Foundation Plan
S2.0 Framing Plan
S3.0 Typical Details
Client RepresentativeAquila Commercial1717 W. 6th StreetSuite. 700Austin, TX 78703
Contact:Todd [email protected]: 512-684-3825
Architectural 2016 0
1 2
7 -
Issu
e f
or
Pri
cin
g, P
erm
it &
Co
nstr
ucti
on
2016 0
3 1
4 -
Perm
it R
evis
ion
A000 Cover
A011 Code Analysis and Egress Plan
A021 TAS-01
A022 TAS-02
A031 Project Specifications
A032 Project Specifications
A041 Schedule of Finishes and Equipment
A111 Demolition Plan
A112 Demolition RCP
A121 Construction Plan
A122 Enlarged Plans
A131 Power-Data and Equipment Plan
A141 Reflected Ceiling Plan
A142 Enlarged Ceiling Plans
A151 Finish Plan
A201 Interior Elevations
A202 Interior Elevations
A203 Interior Elevations
A501 Cabinet and Casework Details
A502 Wall and Ceiling Details
A601 Wall Types
A701 Door and Hardware Schedule
2016 03 14 - Permit RevisionTDLR EAB# : EABPRJB6808440
Structural EngineerDunaway Associates5121 Bee Cave RdSuite 105Austin, TX 78746
Contact:Sarah [email protected]: 512-306-8252
1
1
-
WH
A A
B B
C C
D D
E E
F F
G G
1
1
2
2
3
3
4
4
5
5
128' Egress
74' E
gre
ss
76' E
gre
ss
102' Egress142' Egress
N.I.C.
Occupancy
Group B
Group F-1
Group S-1
60' - 0"
18' -
0"
10' -
0"
18' - 0"
28' - 0"
18' -
0"
20' - 0"
3' -
0"
9' -
0"
9' - 0"
27' - 0"
68' -
0"
10' - 0"
26' -
0"
80' - 0"
106' Egress
Lab
123
Storage
122
Electrical
124
Storage
121
WR2
120b
Server
114
Storage
115
Storage
117
Restroom
112
Restroom
111
Display Hall
102
OpenCollaboration
105b
Janitor
113
Break Room
110
Open Office
105
MediumConference
107
SmallConference
106
Riser
108
Phone
109
Reception
101
Storage
102b
Storage
101b
LargeConference
103
Woodshop
118
WR3
120d
WR1
120a
Print
120c
Restroom
126
Restroom
127
1' - 0"
33' -
0"
43' - 0"41' - 0"
33' -
0"
37' -
0"
16' - 0"
16' -
0"
195' E
gre
ss
111' E
gre
ss
3' - 0"
6' -
0"
10' - 0"
10' -
0"
30' -
0"
10' - 0"
8' -
0"
Multi-Tenant Corridor
106 E 6th Street, Suite 700Austin, TX 78701512.479.0337 main
Project Number:
Sheet Name:
Sheet No:
Date of Expiration:
Date of Affixation:
Project Revisions:
All drawings and written material appearingherein constitute original unpublishedwork, and may not be duplicated, used ordisclosed without the written consent oflauckgroup.
2017 02 12
3/1
4/2
016 9
:37:0
4 A
M
A011
Code Analysisand EgressPlan
Yeti F
ab L
ab -
Option B
1559.01.01
Auth
or
Yeti F
ab L
ab -
Option B
1559.0
1.0
1
4635 B
osto
n L
n, S
uite
100 A
ustin T
X78735
2016 03 14
Occupancy IBC 2012 Table 1004.1.1Function Of Space Occupancy
Occupant LoadFactor
OccupancyGross or Net
Accessory storage areas, mechanical equipment room Group S-1 300 SF Gross
Agricultural Building Group U 300 SF Gross
Aircraft hangars Group U 500 SF Gross
Airport terminal - Baggage claim Group A-3 20 SF Gross
Airport terminal - Baggage handling Group A-3 300 SF Gross
Airport terminal - Concourse Group A-3 100 SF Gross
Airport terminal - Waiting areas Group A-3 15 SF Gross
Assembly - Exhibit Gallery and Museum Group A-3 30 SF Net
Assembly - Gaming floors (keno, slots, etc.) Group A-3 11 SF Gross
Assembly with fixed seats
Assembly without fixed seats - Concentrated (chairs only - not fixed) Group A-2 7 SF Net
Assembly without fixed seats - Standing space Group A-3 7 SF Net
Assembly without fixed seats - Unconcentrated (tables and chairs) Group A-3 15 SF Net
Bowling centers Group A-3 7 SF Net
Business Group B 100 SF Gross
Courtrooms - other than fixed seating areas Group A-3 40 SF Net
Day care Group I-4 35 SF Net
Dormitories Group R-2 50 SF Gross
Educational - Classrom area Group E 20 SF Net
Educational - Shops and other vocational room areas Group E 50 SF Net
Excercise rooms Group E 50 SF Gross
Fabrication and manufacturing areas Group F-1 200 SF Gross
Institutional areas - Inpatient treatment areas Group I 240 SF Gross
Institutional areas - Outpatient areas Group I 100 SF Gross
Institutional areas - Sleeping areas Group I 120 SF Gross
Kitchens, commercial Group F-1 200 SF Gross
Library - Reading rooms Group A-3 50 SF Net
Library - Stack area Group A-3 100 SF Gross
Locker rooms Group B 50 SF Gross
Mercantile - Areas on other floors Group M 60 SF Gross
Mercantile - Basement and grade floor areas Group M 30 SF Gross
Mercantile - Storage, stock, shipping areas Group M 300 SF Gross
Parking garages Group S-2 200 SF Gross
Residential Group R 200 SF Gross
Skating rinks, swimming pools - Decks Group A-4 15 SF Gross
Skating rinks, swimming pools - Rink and pools Grojup A-4 50 SF Gross
Stages and platforms Group A-2 15 SF Net
Warehouses Group A-2 500 SF Gross
Occupancy Room Schedule
Number Name Area Occupancy
OccupantLoad
FactorOccupant
Load
EgressWidth
Required(Other)
Exit WidthRequired
(Stair)
101 Reception 224 SF Group B 100 SF 3 0.6 0.9
101b Storage 40 SF Group B 100 SF 1 0.2 0.3
102 Display Hall 303 SF Group B 100 SF 4 0.8 1.2
102b Storage 102 SF Group B 100 SF 2 0.4 0.6
103 Large Conference 239 SF Group B 100 SF 3 0.6 0.9
105 Open Office 2,093 SF Group B 100 SF 21 4.2 6.3
105b Open Collaboration 284 SF Group B 100 SF 3 0.6 0.9
106 Small Conference 114 SF Group B 100 SF 2 0.4 0.6
107 Medium Conference 150 SF Group B 100 SF 2 0.4 0.6
108 Riser 28 SF Group S-1 300 SF 1 0.2 0.3
109 Phone 40 SF Group B 100 SF 1 0.2 0.3
110 Break Room 326 SF Group B 100 SF 4 0.8 1.2
110b Corridor 318 SF Group B 100 SF 4 0.8 1.2
111 Restroom 211 SF Group B 100 SF 3 0.6 0.9
112 Restroom 210 SF Group B 100 SF 3 0.6 0.9
113 Janitor 56 SF Group S-1 300 SF 1 0.2 0.3
114 Server 301 SF Group B 100 SF 4 0.8 1.2
115 Storage 188 SF Group B 100 SF 2 0.4 0.6
117 Storage 1,895 SF Group S-1 300 SF 7 1.4 2.1
118 Woodshop 1,383 SF Group F-1 200 SF 7 1.4 2.1
120a WR1 2,040 SF Group F-1 200 SF 11 2.2 3.3
120b WR2 3,184 SF Group F-1 200 SF 16 3.2 4.8
120c Print 1,498 SF Group F-1 200 SF 8 1.6 2.4
120d WR3 1,544 SF Group F-1 200 SF 8 1.6 2.4
121 Storage 1,349 SF Group S-1 300 SF 5 1 1.5
122 Storage 874 SF Group S-1 300 SF 3 0.6 0.9
123 Lab 1,657 SF Group F-1 200 SF 9 1.8 2.7
124 Electrical 46 SF Group S-1 300 SF 1 0.2 0.3
125 Vestibule Not Placed Group B 100 SF
126 Restroom 121 SF Group B 100 SF 2 0.4 0.6
127 Restroom 128 SF Group B 100 SF 2 0.4 0.6
20,950 SF 143 28.6 42.9
1/8" = 1'-0"1Level 1 Egress Plan
Plan NorthTrue North
Applicable Codes:
*2012 International Building Code*2012 International Fire Code*2012 Uniform Plumbing Code*2012 Uniform Mechanical Code*2015 National Electric Code*2012 International Energy Conservation Code
*Amended by the City of Austin
Accessibility: Elimination of Architectural Barriers, Government Code, Chapter 469.Administered by the Texas Department of Licensing and Regulation (TAS 2012 Edition, Effective March 15, 2012)
Building Use: Mixed Use
Gross Floor Area IBC
Total = 21,437 SF
Occupancy Classification (Sec. 303.1): Non-separated Uses
Group BGroup F1 (Fab. and Mfg. areas)Group S1 (Aux. storage & mech. rooms)
Construction Type (Table 503): Type II-B; Fire sprinklered
PROJECT INFORMATION
1
1 2016-03-14 Permit Revision
-
48"
Min
(a)Front Approach
(c)Pocket or Hinge Approach
(d)Stop or Latch Approach
60"
Min
18" Min
(a)Front Approach, Pull Side
Figure 404.2.4.2Maneuvering Clearances at Doorways Without Doors,
Sliding Doors, Gates, and Folding Doors
42"
Min
(b)Side Approach
22" Min 42"
Min
24" Min42"
Min
Figure 404.2.4.1Maneuvering Clearances at Manual Swinging Doors and Gates
48"
Min
(b)Front Approach, Swing Side
48"
Min
(c)Front Approach, Push Side, Door
Provided with both Closer and Latch
12" Min
60"
Min
36" Min
(d)Hinge Approach, Pull Side
54"
Min
42" Min
(e)Hinge Approach, Pull Side
42"
Min
(f)Hinge Approach, Push Side
22" Min
48"
Min
(g)Hinge Approach, Push Side, Door
Provided With Both Closer and Latch
22" Min 48"
Min
24" Min
(h)Latch Approach, Pull Side
54"
Min
24" Min
(i)Latch Approach, Pull Side,Door Provided With Closer
42"
Min
(j)Latch Approach, Push Side
24" Min
48"
Min
(k)Latch Approach, Push Side,Door Provided With Closer
24" Min
Figure 404.2.3Clear Width of Doorways
32" Min
90
32" Min 32" Min
(a)Hinged Door
(b)Sliding Door
(b)Folding Door
48" Min
30"
Min
Figure 305.3Clear Floor or Ground Space
48" Min
30"
Min
48"
Min
Figure 305.5Position of Clear Floor or Ground Space
(a)Forward
(b)Parallel
X >
24"
36"
X >
15"
60"
Figure 305.7.1Maneuvering Clearance in an
Alcove, Forward Approach
Figure 305.7.2Maneuvering Clearance in an
Alcove, Parallel Approach
9"
6" Max
(a)Elevation
(b)Plan
Figure 306.2Toe Clearance
30"
Min
(a)Elevation
(b)Plan
Figure 306.3Knee Clearance
9"
11" Min
27"
Min
8" Min
25" Max
4" Max
X >
27"
X >
/= 80"
Figure 307.2Limits of Protruding Objects
X
8"
X >
8"
48"
Min
48"
Min
X >
8"
12" Min
1/2
" M
ax
Figure 302.2Carpet Pile Height
1/2" Max
.
Dominant Directionof Travel
Long Dimension PerpendicularTo Dominant Direction of Travel
Figure 302.3Elongated Openings in Floor or Ground Surfaces
Figure 303.2Vertical Change in Level
1/4
" M
ax
Figure 303.3Vertical Change in Level
1/4
" M
ax
1/4
" M
ax
.1/2
"
12
Advisory 303.3 Beveled. A change in level of 1/2inch (13 mm) is permitted to be 1/4 inch (6.4mm) vertical plus 1/4 inch (6.4 mm) beveled.However, in no case may the combined changein level exceed 1/2 inch (13 mm). Changes inlevel exceeding 1/2 inch (13 mm) must complywith 405 (Ramps) or 406 (Curb Ramps).
60" Min
24"
Min
36"
Min
60"
Min
12" Min 36" Min 12" Min
Figure 304.3.2T-Shaped Turning Space
48" Min 48" Min
48" Min
Figure 404.2.6Doors in Series and Gates in Series
(a) (b) (c)
60" Min
Landing
Ramp Run
Ram
p R
un
Ramp Run LandingLanding
60" Min 60" Min
Ram
p R
un (
Min
)
As W
ide a
s
(a)Straight
(b)Change In Direction
Figure 405.7Ramp Landings
12" Min 12" Min X