YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
As mention in Chapter 2, Point No. 17 .0 of YEIDA building byelaws:
CANCELLATION OF PERMIT FOR BUILDING ACTIVITY –
If at any time after the issuance of permit, the Chief Executive Officer is
satisfied that such permit was sanctioned in consequence of any material
misrepresentation or fraudulent statement contained in the application given
or the information furnished, the Chief Executive Officer may, after giving an
opportunity to the applicant of being heard, cancel such permit and any work
done thereunder shall be deemed to have been done without permit. The
Technical Person found responsible for the same shall be blacklisted and
debarred for 5 years from practicing in the notified area. If the owner is found
responsible for violations, action may be taken as per lease deed.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Appendix -8(A) in YEIDA building byelaws:
Appendix – 8(A)
(See regulation Number 25.2)
Kindly () tick the relevant codes that have been followed STRUCTURAL SAFETY AND NATURAL HAZARD PROTECTION OF BUILDINGS Requirements specified in the following Indian Standards, Codes and guidelines and other documents needs to be observed for structural safety and natural hazard protection of buildings etc:-
(a) For General Structural Safety 1. IS : 1905 – 1987 “Code of practice for structural safety of buildings;
masonry walls” Indian Standards Institution, March 1981. 2. IS : 1904 – 1978 “Code of practice for structural safety of buildings;
foundation” Indian Standards Institution. 3. IS : 456 - 2000 “Code of practice for plain and Reinforced Concrete”
Indian Standards Institution, September 2000. 4. IS : 800 - 1984 “Code of practice for general construction in steel”
Indian Standards Institution, February 1985. 5. IS : 883 - 1966 “Code of practice for design of structural timbers in
buildings; ” Indian Standards Institution, March 1967 Besides any other relevant Indian Standards will need to be referred to
(b) For Earthquake protection. 1. IS : 1893 – 1984 “Criteria for Earthquake resistant Design of
Structures (Fourth Revision)” June 1986 2. IS : 13920 – 1993 “Ductile detailing of reinforced concrete
structures subjected to Seismic forces – Code of Practice” November 1993
3. IS : 4326 – 1993 “Earthquake Resistant Design and Construction of Buildings – Code of Practice (Second Revision)” October 1993
4. IS : 13828 – 1993 “Improving Earthquake Resistance of Low Strength Masonry Buildings - Guidelines” August 1993.
5. IS : 13827 – 1993 “Improving Earthquake Resistance of Earthen Building Guidelines” October 1993
6. IS : 13935 – 1993 “Repair and Seismic Strengthening of Buildings – Guidelines” November 1993.
7. “Improving Earthquake Resistance of Building – Guidelines” by expert group, Government of India, Ministry of Urban Affairs and
Employment, published by Building Materials and Technology Promotion Council 1998.
8. The National Building Code of India 1983 For location of the building in hazard prone area of earthquakes, cyclone or wind storms and floods, reference may be made to the following:
9. “Vulnerability Atlas of India”by expert group, Government of India, Ministry of Urban Affairs and Employment, published by Building Materials and Technology Promotion Council 1997.
NOTE : 1. As and when anyone of the above referred standards and documents is revised, the design
and construction of Buildings thereafter must satisfy the latest version for approval of building plans by the Authority.
The above information is factually correct. Signature of owner with date Signature of the Engineer who will
supervise the construction ( with qualification and experience as mentioned in Appendix 12)
Name (Block) …………………………. Name (Block) …………………………………………….… Address: …………………………. Legible Seal: (with address) Signature of the Technical Person who will supervise the construction Name (Block) ………………………………….
Registration number. ……………………………
Legible Seal with address : ……………………..
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Appendix -8(B) in YEIDA building byelaws:
Appendix –8 (B) (See regulation number 25.2)
4.1 BUILDING INFORMATION SCHEDULE
1. Building Address Plot number Sector Town: Y.E.
2. Building function & Locations 2.1 Use Institutional Commercial Industrial * 2.2 Importance Ordinary Important Hazardous * 2.3 Seismic Zone (Design Intensity Used V(IX) IV(VIII) III(VII) II(VI) IS:1893
3. Design *EQ Factor 0=…… I=…… = h=…… IS:1893
4. Foundation 4.1 Soil type at site (Note 2) Rock/stiff Medium # Soft Liquefiable Expensive(Bearing IS:1904 Capacity.) 4.2 Type of Foundation Strip Indiv.Col. Fottings/Raft Bearing Piles Friction Piles IS:1893
5. Load Bearing Wall Buildings
5.1 Building Category A(h.05) B(h=.05 to .06) C(h.06 to.08) D(h.08 to 9.12) E(h0.12) IS:4326 5.2 Bearing Walls Brick Stone Solid Block Hollow Block Adobe 5.3 Mortar (Note 4) C : S=1:….. C:L:S=1 ….. L:S=1: … Clay Mud * 5.4 Floors Reinforce Stone slabs on joists Prefab flooring elements * concrete slabs 5.5 Roof structure Flat like floors/pitched Trussed/Raftered/A Frame/Slopping R.C. Slab 5.6 Roof covering CGI Sheeting *AC Sheeting Clay tiles/Slate Woodshingle * 5.7 Opening in walls Control used on sizes? Control used on location? Strengthening around?
IS:4326 Yes/No/NA Yes/No/NA Yes/No/NA
IS:13828
5.8 Bands Provided Plinth Band Lintel Band Roof/Eave Band Gable Band Ridge Band
Yes/No/NA Yes/No/NA Yes/No/NA Yes/No/NA
5.9 Vertical Bars At corners of rooms At jambs of openings
Yes/No/NA Yes/No/NA
5.10 Stiffening of Prefab R.C. screed & Band Peripheral band and Diagonal planks and Floors/Roofs
connectors alround band IS:4326
6. Steel/R.C. frame buildings 6.1 Building shape Both axes near symmetrical One axis near symmetrical/Unsymmetrical (torsion
considered) 6.2 Infills/partitions Out of plane stability check? Yes/No In Plane stiffness considered? Yes/No
IS:1893,IS:4326 6.3 Dectile Detailing of Beams? Columns? Beam/column Joint? Sheer Walls? IS:13920 R.C. Frames Yes/No Yes/No Yes/No Yes/No
---------------------------------------------------------------------------------------------------------------- 6.4 Ductile Detailing of Beams? Columns? Beam/column Joint? SP6(6) Steel Frames Yes/No Yes/No Yes/No
Notes 1. Encircle the applicable Data point or insert information.
2. Stiff.N30:Medium.N=10.3:Soft.N10:Liquefiable,poorly graded sands with N15 under Water Table (see Note 5 of Table 1 in IS:1893) Where N: Standard Penetration (I:2131 – 1981)
3. * Means any other. Specify. C = Cement, S=Sand, L= Lime The above information is factually correct. Signature of owner with date Signature of the Engineer who will
supervised the construction ( with qualification and experience as mentioned in Appendix 12)
Name (Block) …………………………. Name (Block) ………………… Address: Address: …………
Legible Seal: (with address) Signature of the Technical Person who will supervised the construction * R.C. stands for Reinforce Concrete * CGI stands for Corrugated Galvanised Iron * B.C. stands for Bearing Capacity * EQ stands for Earth Quake *AC stands for Asbestos Corrogated Name (Block) ……………………. Registration Number. ………….. Legible Seal : …………………….. With address
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Appendix -8(C) in YEIDA building byelaws:
Appendix - 8(C) (See regulation number 25.2)
CERTIFICATE
(The certificate to be submitted with the application for building permission along with the building drawings and Building Information Schedule)
1. Certified that the building plans submitted for approval also satisfy the safety requirements
as stipulated in the Indian Standard Codes, guidelines and documents specified in the Appendix 8A regarding earthquake safety awareness and the information given in the attached Building Information Schedule is factually correct to the best of my knowledge and understanding.
2. It is also certified that the structural design including safety from natural hazards including earth quake has been prepared by duly qualified civil engineer along with qualification and experience as mentioned in Appendix 12.
3. Location /Address of Building Plot number ____________________ Sector _________________________ Town: Yamuna Expressway____________________
4. Particulars of Building 1. Ground Coverage (square meter) 2. Total covered area (square meter) 3. Total Numbers of Floors above ground.
Signature of owner with date Signature of the Engineer who will supervise the construction ( with qualification and experience as mentioned in Appendix 12)
Name (Block) …………………………. Name (Block) ………………… Address:
Address …………………………. Legible Seal: (with address) …………………………. Signature of the Technical Person who will supervised the construction Name (Block) ………………………… Registration number …………………. Legible Seal : ………………………… (with address)…………………………
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Appendix -12 in YEIDA building byelaws:
APPENDIX -12
Qualification of Technical Personnel for Preparation of Schemes for Building Permit and
Supervision
(i) The qualifications of the technical personnel and their competence to carry out different
jobs for building permit and supervision by the Authority shall be as hereinafter
indicated.
(ii) ARCHITECTS
2.1 Qualification – The qualification of Architect will be the Associate Membership of the
Indian Institute of Architects or such Degree or Diploma which makes him eligible for
such membership or qualification mentioned in Schedule –XIV of Architects Act. 1972
and registered with the Council of Architecture as per provisions of the Architects Act.
1972.
2.2 An Architect shall be competent to carry out work related to building permit and shall
be entitled to submit the following:
(i) All plans and related information connected with building permit.
(ii) Structural details and calculations for building on plots upto 500 square metre and
upto four storeys height, and
(iii) Certificate of supervision for all buildings.
(iv) Layout Plan upto 2 hectares
(iii) ENGINEERS
3.1 Qualification- The qualification for Engineers will be Associate/Corporate
Membership (Civil) of the Institution of Engineers or such degree/diploma in Civil,
Municipal, or Structural Engineering which makes him eligible for such membership
or which is recognized by the Uttar Pradesh Public Service Commission for the post
of Assistant Engineer. An engineer shall be competent to carry out the work related
to building permit and shall be entitled to submit the following:
(i) Building plans for plots upto 1000 sqm.
(ii) Structural details and service detail and calculations for all buildings.
(iii) Certificate of supervision for all buildings.
(v) Structural Calculation and details for building mentioned shall be as follows:
(v) TOWN PLANNER (for layout plans)
The minimum qualification for a town planner shall be post-graduate degree or post graduate diploma in town and country planning/ urban planning which makes him eligible for Associate Membership of the Institute of Town Planners, India or recognized by the Public Service Commissions for the Post of Assistant Town Planner. A Town Planner shall be competent to carry out work related to building permit and shall be entitled to submit the layout plans.
(vi) GROUP OR AGENCY When a group or agency comprising of qualified Architect/Engineer Town Planner is
practicing then the qualification and competence of work will be the combination of the individual qualification and competence given under paras 2, 3 and 4 above.
Sr No.
Type of Building
Number of years of experience for Structural Engineer for structural design and supervision
Other Details
Graduate Civil Engineer
Post Graduate Structural Engineer
1 Multistoreyed / important facility buildings which are upto 4 storeys or 12 metre high or 2500 square metre covered area
5 years 3 years
2 Multistoreyed important
facility buildings which are upto 8 storeys or 24 metre high or 5000 square metre covered area
9 years 7 years
3 Multistoreyed / important facility buildings which are above 8 stories or above 24 metre high or above 5000 square metre covered area
10 years 8 years Copy of structural design to be signed by Professor of Structural Design of Indian Institute of Technology/N.I.T, or any other recognized technical institutes.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
TIMELINE FOR SANCTIONING OF BUILDING PLANS FOR INDUSTRIAL PLOTS:
Ease of Doing Business ds vUrxZr vkS|ksfxd bdkbZ;ksa dks
Lohd`fr;k¡ tkjh djus dh O;oLFkk
• vkS|ksfxd Hkw[k.Mksa ij izLrkfor Hkouksa ds fy, vko”;d izi=ksa lfgr Hkou fuekZ.k
vuqKk gsrq vkosnu vkWuykbZu izkIr gksus ij 40000 oxZeh0 rd ds Hkw[k.Mksa ij 15
fnu ds Hkhrj rFkk 40000 oxZeh0 ls cM+s Hkw[k.Mksa ij 30 fnu ds Hkhrj ekufp= dh
Lohd`fr ;k vkifRr@vLohd`fr vkosnd dks lwfpr ugha fd;s tkus dh n”kk esa Hkou
ekufp= Lohd`r ¼Deemed Approved½ le>k tk;sxkA
• mDr dk vuqeksnu izkf/kdj.k dh 60oha cksMZ cSBd fnukad 09-06-2017 esa izkIr fd;k
x;k gSA
• tulekU; ls vkifRr@lq>ko dh izfØ;k mijkUr fnukad& 10@07@2017 dks 'kklu
ds vuqeksnukFkZ izsf’kr fd;k x;k gSA
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
PROCEDURE OF LAND ALLOTMENT FOR INDUSTRIAL PLOT:
FOR PLOTS SIZES UPTO 4000 SQ.M.
izkf/kdj.k dh 60oha cksMZ cSBd dh en la[;k&60@05] fnukad 09-06-2017
esa lapkyd e.My }kjk Ease of Doing Business ds Øe esa vuqeksfnr izLrko esa
vkS|ksfxd bdkbZ;ksa gsrq Hkw&vkoaVu izfdz;k dk ljyhdj.k fuEu izdkj fd;k x;k
gS %&
4000 oxZ ehVj rd
1- ;g ;kstuk vksiu & ,UMsM gksaxhA
2- ;g ;kstuk izFke vkvks] izFke ikvks (First come, First serve) ds vk/kkj ij ykxw dh
tk;sxhA
3- ;g ;kstuk ykVjh vFkok lk{kkRdkj i)fr ls eqDr gksxhA
blds vfrfjDr fuEu izfdz;k@ O;oLFkk dk Hkh vuqlj.k fd;k tk;sxk%&
1- vkosnu&i= vkWuykbu izkIr fd;s tk;sxsa rFkk vkWoaVu&i= Hkh vkWuykbZu gh
tkjh fd;s tk;sxsaA
2- vkosnu&i= ds lkFk tek fd;s tkus okys “kqYd tSls%& izfdz;k “kqYd] iath;u
“kqYd] vkosnu “kqYd] vkWuykb Zu izkf/kdj.k ds [kkrs esa tek fd;s tk;sxsaA
3- vkosnd ls p;u ds mijkUr bl vk”k; dk ,d “kiFk&i= fy;k tkuk gksxk
fd vkosnu ds czks”kj esa nh x;h le; lkj.kh ¼yhtMhM fu’iknu ds 48 eghus
ds vUnj½ bdkbZ dks lapkfyr u dj ikus dh fLFkfr esa izkf/kdj.k vkWoafVr
Hkw[k.M dks fujLr fd;s tkus gsrq LorU= gksxkA
4- fu/kkZfjr le; lkj.kh ¼yhtMhM fu’iknu ds 48 eghus ds vUnj½ ds vuqlkj
bdkbZ lapkfyr u gksus dh fLFkfr esa 06 ekg dk le;&foLrj.k gsrq ldkj.k
vkosnu djuk gksxk tks xzsl ihfj;M ekudj eq[; dk;Zikyd vf/kdkjh dh
vuqefr ls fu%”kqYd ns; gksxkA
5 xzsl ihfj;M lekIr gksus ds ckn Hkh bdkbZ lapkfyr u fd;s tkus dh fLFkfr esa
izkf/kdj.k dh ,d vUrfoZHkkxh; lfefr }kjk LFkyh; fujh{k.k dj ifj;kstuk
dh izxfr vk/kkfjr viuh fjiksVZ eq[; dk;Zikyd vf/kdkjh dks lkSaisxh rRi”pkr~
eq[; dk;Zikyd vf/kdkjh }kjk xq.k&nks’k ds vk/kkj ij vfxze le;&foLrj.k
ij fu.kZ; fy;k tk ldsxkA
6 Hkw[k.M vkWoaVu ds mijkUr vkWoaVh }kjk vkWoafVr Hkw[k.M ij fu/kkZfjr le;&lhek
ds vUnj bdkbZ LFkkiuk dh fn”kk esa dksbZ lUrks’ktud iz;kl u djus dh fLFkfr
esa leiZ.k fd;k tkrk gS rks leiZ.k Lohdkj djus dh dk;Zokgh czks”kj ds fu;e
o “krksZa ds vuqlkj dh tk;sxhA
7 iznq’k.k eqDr vkS|ksfxd bZdkbZ;ksa ds lEcU/k esa iwoZ esa izkf/kdj.k }kjk tkjh ;kstuk
ykxw gksxh rFkk mijksDr ds vfrfjDr czks”kj dh vU; fu;e@”krZsa ;Fkkor jgsaxhA
mDr vkns”k eq[; dk;Zikyd vf/kdkjh egksn; ds vuqeksnu fnukad 07-07-
2017 ds Øe esa tkjh fd;k tk jgk gSA tks rRdky izHkko ls ykxw gksxkA
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
PROCEDURE OF LAND ALLOTMENT FOR INDUSTRIAL PLOT:
FOR PLOTS SIZES ABOVE 4000 SQ.M.
izkf/kdj.k dh 60oha cksMZ cSBd dh en la[;k&60@05] fnukad 09-06-2017
esa lapkyd e.My }kjk Ease of Doing Business ds Øe esa vuqeksfnr izLrko esa
vkS|ksfxd bdkbZ;ksa gsrq Hkw&vkoaVu izfdz;k dk ljyhdj.k fuEu izdkj fd;k x;k
gS %&
4000 oxZ ehVj ls vf/kd
1- ;g ;kstuk vksiu & ,UMsM gksaxhA
2- ;g ;kstuk ykVjh vFkok lk{kkRdkj i)fr ls eqDr gksxhA
3- ;g ;kstuk Objective criteria o Project presentation i)fr ij vk/kkfjr gksxhA ftlds
laca/k esa ‘kklu dh uhfr izkIr gksus ds mijkUr cksMZ ls vuqeksfnr djk;k tk;sxkA
4- bl ;kstuk esa vij eq[; dk;Zikyd vf/kdkjh@mi eq[; dk;Zikyd vf/kdkjh
Lrj ds vf/kdkjh uksMy vf/kdkjh ds :i esa dk;Z djsaxsA
blds vfrfjDr fuEu izfdz;k@ O;oLFkk dk Hkh vuqlj.k fd;k tk;sxk%&
5- vkosnu&i= vkWuykbu izkIr fd;s tk;sxsa rFkk vkWoaVu&i= Hkh vkWuykbZu gh
tkjh fd;s tk;sxsaA
6- vkosnu&i= ds lkFk tek fd;s tkus okys “kqYd tSls%& izfdz;k “kqYd] iath;u
“kqYd] vkosnu “kqYd] vkWuykbZu izkf/kdj.k ds [kkrs esa tek fd;s tk;sxsaA
7- vkosnd ls p;u ds mijkUr bl vk”k; dk ,d “kiFk&i= fy;k tkuk gksxk
fd vkosnu ds czks”kj esa nh x;h le; lkj.kh ¼yhtMhM fu’iknu ds 48 eghus
ds vUnj½ bdkbZ dks lapkfyr u dj ikus dh fLFkfr esa izkf/kdj.k vkWoafVr
Hkw[k.M dks fujLr fd;s tkus gsrq LorU= gksxkA
8- fu/kkZfjr le; lkj.kh ¼yhtMhM fu’iknu ds 48 eghus ds vUnj½ ds vuqlkj
bdkbZ lapkfyr u gksus dh fLFkfr esa 06 ekg dk le;&foLrj.k gsrq ldkj.k
vkosnu djuk gksxk tks xzsl ihfj;M ekudj eq[; dk;Zikyd vf/kdkjh dh
vuqefr ls fu%”kqYd ns; gksxkA
5 xzsl ihfj;M lekIr gksus ds ckn Hkh bdkbZ lapkfyr u fd;s tkus dh fLFkfr esa
izkf/kdj.k dh ,d vUrfoZHkkxh; lfefr }kjk LFkyh; fujh{k.k dj ifj;kstuk
dh izxfr vk/kkfjr viuh fjiksVZ eq[; dk;Zikyd vf/kdkjh dks lkSaisxh rRi”pkr~
eq[; dk;Zikyd vf/kdkjh }kjk xq.+k&nks’k ds vk/kkj ij vfxze le;&foLrj.k
ij fu.kZ; fy;k tk ldsxkA
6 Hkw[k.M vkWoaVu ds mijkUr vkWoaVh }kjk vkWoafVr Hkw[k.M ij fu/kkZfjr le;&lhek
ds vUnj bdkbZ LFkkiuk dh fn”kk esa dksbZ lUrks’ktud iz;kl u djus dh fLFkfr
esa leiZ.k fd;k tkrk gS rks leiZ.k Lohdkj djus dh dk;Zokgh czks”kj ds fu;e
o “krksZa ds vuqlkj dh tk;sxhA
7 iznq’k.k eqDr vkS|ksfxd bZdkbZ;ksa ds lEcU/k esa iwoZ esa izkf/kdj.k }kjk tkjh ;kstuk
ykxw gksxh rFkk mijksDr ds vfrfjDr czks”kj dh vU; fu;e@”krZsa ;Fkkor jgsaxhA
mDr vkns”k eq[; dk;Zikyd vf/kdkjh egksn; ds vuqeksnu fnukad 07-07-
2017 ds Øe esa tkjh fd;k tk jgk gSA tks rRdky izHkko ls ykxw gksxkA
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
LIST OF DOCUMENTS REQUIRED FOR LAND ALLOTMENT FOR INDUSTRIAL
PLOTS (CHECKLIST):
1. Documentary proof in support of details of the Proposed Unit with Project
report.
2. Documentary evidence in support of promoter's contribution for means of
finance.
3. Flow Chart showing manufacturing process.
4. Copies of Balance Sheet and Profit and Loss Account of last 03 financial years
duly certified by Chartered Accountant, as applicable.
5. Income Tax returns of all the Promoters / Directors for the last 3 years as
applicable.
6. Details about arrangement for marketability of the finished product.
7. Self-certified photo copies of the testimonials pertaining to
educational/technical qualification & work experience
8. Giving the duly filled and signed details about the Promoter / Director/
Partner/ Proprietor/ Shareholder
9. Affidavit containing the points below:
I. That the Unit product does not fall under polluting categories.
II. That the Company /Firm will get NOC/Consent from U.P. Pollution
Control Board, Udyog Aadhar Memorandum and other clearances from
concerned department of U.P. Govt.
III. That the deponent is aware of the condition of the Authority that it is
mandatory to submit the above documents to the Authority before the
execution of the Lease Deed and if the Deponent fails to submit the
above documents, he alone would be responsible for the
consequences resulting there from.
IV. That the Deponent is also aware of the consequences that non-
submission of the above documents may also lead to cancellation of his
candidature/ allotment of the land for which he has applied.
V. That the Deponent fails to make unit functional within 48 months from
the due date of lease deed execution the Authority will be free to
cancel the allotted plot/lease deed and may resume possession of the
plot.
VI. That the Deponent assures and declare that in case of violation of any
terms and conditions or any directions issued by the Authority , the CEO
will be free to take any decision as it deem fit and appropriate.
VII. That the information given in the application is true and correct and if
any part of it is found to be false or concealed, the Authority will have
right to cancel the plot irrespective to the deposit of money till that
stage when the malafide is revealed.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
TIMELINE FOR LAND ALLOTMENT FOR INDUSTRIAL PLOTS:
Application form filled up in all respect will be submitted online.
After submission it will be scrutinized by a committee constituted
by the CEO and the allotment will be made on the basis of first come,
first serve without draw & without interview. The applicant
qualifying will be issued allotment letter with the approval of the
Chief Executive Officer (CEO) of the Authority. Unsuccessful
applicants will be refunded the registration amount deposited
without interest within three months from the date of approval of
allotments, through e-banking.
Allotment letters will be issued online within 21 days from the
following month, the application should be submitted with all
required documents online.
Allotment will be made in increasing order of serial numbers
enumerated in the list of vacant plots available on website.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
ONLINE PAYMENT PROCEDURE FOR LAND ALLOTMENT FOR
INDUSTRIAL PLOTS:
I. The duly filled in application form must be submitted online
along with proposal / project report and other statutory
documents.
II. The applicant must be submitted with a non-refundable & non-
adjustable Processing Fees of Rs. 15000/- + GST as applicable .
III. Registration money equivalent to 10% of total premium of the
plot area which is either adjustable or refundable for which
application is being submitted should be deposited.
IV. The present rate of allotment of industrial plot is available on
website.
V. The rate prevailing on the date of issue of allotment letter would
be applicable.
VI. The registration amount and processing fee as stated above
would be deposited through e-banking/RTGS/NEFT in favor of
Yamuna Expressway Industrial Development Authority.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
WELL DEFINED INSPECTION PROCEDURE: (BERORE GRANTING
CONSTRUCTION PERMITS)
1. Once the application for construction permit and building plan approval is
received online and documents & drawings through mail.
2. Inspector will scrutinize all documents and drawings
3. Then through “Computerized Allocation of Inspectors” , Allocated
Inspector will get the date of Inspection (mostly 7th day after receiving the
application) of the Site.
4. Inspector will have to co-ordinate with other department for a joint
inspection.
5. A single joint inspection shall be conducted so as to overlook all the points
before granting construction permit.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
MANDATORY PROVISION FOR SITE VISIT: CHECKLIST
(BERORE GRANTING CONSTRUCTION PERMITS)
Before applying for Construction permit & Building Plan approval, the allottee
is not allowed to construction anything on the site. So, during the inspection,
the Inspector has to make sure that no construction done on the Site.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
WELL DEFINED INSPECTION PROCEDURE: (BERORE GRANTING
OCCUPANCY / COMPLETION CERTIFICATE)
1. Once the application for occupancy / completion is received online and
documents & drawings through mail.
2. Inspector will scrutinize all documents and drawings
3. Then through “Computerized Allocation of Inspectors”, Allocated
Inspector will get the date of Inspection (mostly 7th day after receiving the
application) of the Site.
4. Inspector will have to co-ordinate with other department for a joint
inspection.
5. A single joint inspection shall be conducted so as to overlook all the points
before granting occupancy / completion certificate.
6. There are Provisions of list of item in building shall be mandatory for issue
of completion certificate which are mentioned in the Building byelaws of
YEIDA which need to verified and scrutinized.
7. The list is mentioned in the point “Mandatory provision for site visit-
Checklist”.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
RATE LIST OF INDUSTRIAL ALLOTMENT
YEAR (2017-2018)
SIZE OF PLOT RATE (in per sq.m.)
Upto 4000 sq.m. 6405 / -
Addition to 4000 to 8000 sq.m. 5460 / -
Addition to 8000 to 20000 sq.m. 4620 / -
Addition to 20000 to 40000 sq.m. 4200 / -
Addition to 40000 to 80000 sq.m. 4045 / -
Above 80000 sq.m. 3885 / -
NOTE:
THE RATE OFFERED IS SUBJECT TO AMENDMENT AND THE ALLOTMENT SHALL
BE MADE AT RATE APPLICABLE ON THE DATE OF THE ALLOTMENT.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Architects are not authorized to issue the completion certificate
for Industrial Plots. Authority scrutinize the documents, Drawings
etc. Before issuing completion certificate.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Third Party certification of structural design should be either
by Indian Institute of Technology/N.I.T, or any other recognized
technical institutes.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
vkS|ksfxd Hkwfe vkWoaVu gsrq vkCtsfDVo dzkbVsfj;k
dqy vad = 100
Ø0 la0 Ekn vad
01 vkS|ksfxd ifj;kstuk
dk lapkyu
(Industrial Project
Implementation)
dCtk izkfIr ds 02 o’kZ rdA vf/kdre 20
dCtk izkfIr ds 03 o’kZ rdA 15
dCtk izkfIr ds 04 o’kZ rdA 10
dCtk izkfIr ds 04 o’kZ ds ckn
rdA
00
02 foRrh; lqn<+hdj.k
(Financial Strength)
Lo;a ds lzksrksa }kjkA ¼100%½ vf/kdre 20
Lo;a ds lzksr ,oa cSad _.kA
¼50+50%½
15
Lo;a ds lzksr ,oa cSad _.kA
¼40+60%½
10
Lo;a ds lzksr ,oa cSad _.kA
¼30+70%½
07
03 jkstxkj Lktu
(Employment
Generation)
izfr 5 O;fDr ftlesa ,d LFkkuh;
O;fDr “kkfey gSA
01] vf/kdre 10
04 vkosnd@izkseksVlZ dh
i`’BHkwfe ,oa dk;Z
vuqHko
(Applicants
Background and
Experience)
vkS|ksfxd ifj;kstuk lapkyu dk
10 o’kZ ;k 10 o’kZ ls vf/kd dk
vuqHkoA
vf/kdre 10
vkS|ksfxd ifj;kstuk dk 05 o’kZ ls
10 o’kZ rd dk vuqHkoA
08
vkS|ksfxd ifj;kstuk lapkyu dk
05 o’kZ ls de vuqHkoA
06
05 Ekfgyk m|eh@vuqlwfpr
tkfr@tutkfr@fodykax m|ehA
¼vkosnd dEiuh@lk>snkjh QeZ esa
bl Js.kh ds m|eh dh va”k/kkfjrk
de ls de 26% gks½
vf/kdre 05
06
foxr 03 o’kksZa dh
vkfMVsM cSysUl “khV
,oa dS”k¶yks
(last 3 years audited
balance sheet)
m/oZxkeh] ykHkA
vf/kdre 10
v/kksxkeh] ykHkA 08
czsd bosu IokbUV ds vkl&iklA 06
07 foLrkjhdj.k LFkkfir {kerk dk U;wure 25%
rd of) djuk vfuok;Z gSA
vf/kdre 05
08 LVkVZ&vi vf/kdre 05
09 ifj;kstuk
izLrqrhdj.k
(Project
Presentation)
P R O J E C T vFkkZRk~ vf/kdre 15 vad
Planning
Resources
Organisation
Jealous/Competetivness
Efficiency
Capacity
Technical know- how
mijkssDr ds vk/kkj ij vkosnd dk
ewY;kadu fd;k tkukA
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
For scrutinizing the online submitted building plan, the Plans to
be submitted in AutoCAD format. So, the Building Plan can be
scrutinized properly.
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Architects are not authorized to issue the completion certificate
for Industrial Plots. Authority scrutinize the documents, Drawings
etc. Before issuing completion certificate.