Slide 1
ITU-T Y.1564 Test
For Ethernet Links
![Page 2: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/2.jpg)
2
PM1-1SN110014-00
Slide 2
• BERT (Bit Error Rate Test),» Not very effect at testing Ethernet,
• Commonly requested as customers are comfortable with this technology.
• Designed to test audio lines based on the human brain???
• RFC2544,» Commonly referred to as the reference point for testing
Ethernet,• Originally designed for network elements, adopted by telecom
operators.
• MultiStream,» Not a standard but customers confirm the network using it.
• Simple straight forward check of the network.
*No one method is the best, customer dependant*
Types of tests Today.
![Page 3: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/3.jpg)
3
PM1-1SN110014-00
Slide 3
• RFC2544» Designed for testing Ethernet networks using
different frame sizes.» Completes several tests (sequentially) including,
• Throughput,› Speed at which the frame size transfers through the network.
• Frame Loss,› Number of fames lost while transferring through the
network.• Latency,
› Time the frame takes to transfer through the network.• Packet Jitter, (not standard)
› The variation of the frame arrival.• Burstability (often not tested),
› Ability of the network to be able to handle burst frames.
» Also defines 2 types of switch reset’s not used by operators.
Types of tests Today.
Ethernet cloud
network
BB
AA
![Page 4: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/4.jpg)
4
PM1-1SN110014-00
Slide 4
• MultiStream,» As many end users networks consist of multiple streams of traffic (across the
WAN network) on different VLAN.• Telecom operators simulate this by generating multiple streams.
» Very good for checking CoS (Class of Service),• Confirms the network routing is correct,• Confirms throughput per VLAN,
» Set-up can be complicated depending on network configuration,• Each stream configured independently,• Depending on network configuration the tester configuration requires to be adjusted.
» Results can be complicated to analyze,• Different network configuration mean different thresholds of what is pass or fail.
» Not able to test different frame sizes (elements perform differently).
Types of tests Today.
Edge RouterCustomer Network
Customer Router
Customer LAN
LAN Network
LAN Network
VLAN 1
VLAN 2
VLAN x
LAN Network
Stacked VLAN 1
VLAN 1
VLAN x
Stacked VLAN 2
VLAN 1
VLAN x
Telecom networkAccess Network
MPLS Edge Router
![Page 5: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/5.jpg)
5
PM1-1SN110014-00
Slide 5
• Y.1564 was while in draft format within the ITU-T called Y.156sam.» All ITU-T standards are numeral only so they often use
letters at the end until it’s released.• sam at the end of Y.156sam stands for,
» Service Activation Test Methodology.• The full name is “An Ethernet Service Activation Test
Methodology”
![Page 6: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/6.jpg)
6
PM1-1SN110014-00
Slide 6
• Completed in two sections,» Service Configuration Test,
• Confirms the network is able to transfer a single streamof frames (Test Flow) at the required configuration confirming the Throughput,
› IR (Information Rate).
• At a fixed frame size or mix of frame sizes.
» Service Performance Test,• Transmits all Test Flows simultaneously at the CIR confirming
no errors over a configured duration.
» Requires Pass / Fail results based on SAC (Service
Acceptance Criteria) information.
Enter Test Parameters
Start Test
Troubleshoot Service
Configuration
Troubleshoot Ethernet Services
Test Completed
Fail
Fail
Pass
Pass
Service Configuration
Test
Service Performance
Test
![Page 7: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/7.jpg)
7
PM1-1SN110014-00
Slide 7
• Generate single frame size or an E-MIX (Ethernet MIX) of frame sizes,
» A repeating a mix of different Ethernet frame sizes, i.e; 64 – 128 – 256 – 1024 – 1518.
• Generating at CIR or stepping up to the CIR,» Measuring at each step the IR, FLR, FTD, FDV, FLRSAC,» Confirm all are within the SAC limits before continuing.
• Generate at the CIR + EIR,» Measure the IR, FLR, FTD and FDV .
• Generate at the CIR + 125% * EIR, (Traffic Policing)» Measure the IR, FLR, FTD and FDV .
• CBS and CBS + EBS test completed if required.
• Repeat above measurementsper Test Flow,
» Each Test Flow able to be independently configured,
• Representing different traffic types with different priorities.
• Test duration should be short.
Enter Test Parameters
Start Test
Troubleshoot Service
Configuration
FailService Configuration
Test
1 to 60 sec
CIR
CIR + EIR
CIR + 125% EIRRED Section
Yellow Section
Green Section
Color ModeTransmission Rate
Testing Time
Transmitted RateGuaranteed
Traffic
Non Guaranteed Traffic
Confirm Traffic Dropped
25%
![Page 8: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/8.jpg)
8
PM1-1SN110014-00
Slide 8
• CBS and EBS testing (Experimental / For Study),» Bursting at line rate above the CIR and/or the EIR
confirming the network is capable of handling a short duration of large traffic.
• Ethernet networks often bursts,» Testing the networks flexibility in this way allows for
testing closer to real life network traffic conditions.» Tx at CIR then Stop Tx for a short timeframe,» Tx the largest of to following,
• 1% of CBS,• 1.5 times largest frame,• 0.1% of CIR/8
» Stop Tx for a short timeframe, Resume CIR traffic and Repeat.
• For EBS testing substitute CIR with EIR
1 to 60 sec
CIR
CIR + EIR
CIR + 125% EIRRED Section
Yellow Section
Green Section
Color ModeTransmission Rate
Testing Time
Transmission RateGuaranteed
Traffic
Non Guaranteed Traffic
Confirm Traffic Dropped
Min IFGPre Burst Gap Post Burst Gap GapEIR with EBS
90.91%
100%
EIR
EBS
CBS
CIR
Line Rate
90.91%
100%
Enter Test Parameters
Start Test
Troubleshoot Service
Configuration
FailService Configuration
Test
EBS
![Page 9: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/9.jpg)
9
PM1-1SN110014-00
Slide 9
• Once Service Configuration has passed.• Transmit all Test Flows simultaneously
at the CIR rate,• Measure simultaneously per stream,
» IR, FTD, FDV, FLR and AVAIL,• Testing time should follow the
ITU-T M.2110 standards of,» 15 min,» 02 hour,» 24 hour.
» Test Flow’s can be configured in many different ways.
MAC Data (Payload)
IP Data (Payload)
Enter Test Parameters
Start Test
Troubleshoot Service
Configuration
Fail
Pass
Service Configuration
Test
Troubleshoot Ethernet Services
Test Completed
Fail
Pass
Service Performance
Test
![Page 10: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/10.jpg)
10
PM1-1SN110014-00
Slide 10
• New methodology to test multiple Ethernet services simultaneously in a network (optional)
• RFC 2544 is the standard commonly used today» Originally designed for checking performance of a
network device» Runs one service at a time,
• Tests in a serial manner not running all services simultaneously
Comparison of test methodology
Item ITU-T Y.1564 RFC 2544Designed for Service activation Devices performanceConcurrent services Multiple services simultaneously One service at a timeSimulates A realistic network One service in a networkTesting time Short due to simultaneous test /
serviceLong due to serial nature of test (assuming completed per full standard)
Test result Directly related to SLA requirements
Link performance limit
![Page 11: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/11.jpg)
11
PM1-1SN110014-00
Slide 11
• ITU-T Y.1564 completes the testing in two phases» Service Configuration Test
• Confirm each individual service is configured correctly checking, CIR (Committed Information Rate), EIR (Excess Information Rate), FTD (Frame Transfer Delay), FDV (Frame Delay Variation), FLR (Frame Loss Ratio), CBS (Committed Burst Size), EBS (Excess Burst Size).
» Service Performance Test• Transmits one or many Service Configuration Tests simultaneously at the CIR
confirming all traffic is able to traverse the network under the full service load over time.
RFC 2544 completes tests one after another.
Y.1564 completes a quick per service test followed by the performance test.
Configuration Test Performance Test
Note: to scale - Y.1564 spaced for graphical representation Time
![Page 12: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/12.jpg)
12
PM1-1SN110014-00
Slide 12
• Up to 32 services supported» 3GPP TS 23.203 defines 9 kinds of QoS Class.
MT9090A can simultaneously perform testing on all classes of service.
QCIResource
TypePriority
PacketDelay
Budget
PacketError Loss
RateExample Services
1
GBR
2 100 ms 10-2 Conversational Voice
4 150 ms 10-3 Conversational Video (Live Streaming)2
3 50 ms 10-3 Real Time Gaming3
4 5 300 ms 10-6 Non-Conversational Video (Buffered Streaming)
5
Non-GBR
1 100 ms 10-6 IMS Signalling
6 6 300 ms 10-6
Video (Buffered Streaming)TCP-based (e.g.,www, e-mail, chat, ftp, p2p file sharing, progressive video, etc.)
7 7 100 ms 10-3
Voice,Video (Live Streaming)Interactive Gaming
8 8300 ms 10-6
Video (Buffered Streaming)TCP-based (e.g.,www, e-mail, chat, ftp, p2p file sharing, progressive video, etc.)9 9
![Page 13: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/13.jpg)
13
PM1-1SN110014-00
Slide 13
• MX909060A ITU-T Y.1564 parameters setup tool» Create or modify the configuration for the Y.1564
testing on a PC• Overview all
of parameters in a PC display screen.
• Copy and paste the services
» Provided with MU909060Ax-007 Y.1564 test option
![Page 14: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/14.jpg)
14
PM1-1SN110014-00
Slide 14
CMA3000 Y.1564 configuration
![Page 15: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/15.jpg)
15
PM1-1SN110014-00
Slide 15
CMA3000 Y.1564 configuration
![Page 16: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/16.jpg)
16
PM1-1SN110014-00
Slide 16
CMA3000 Y.1564 configuration
![Page 17: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/17.jpg)
17
PM1-1SN110014-00
Slide 17
• Y.1564 can be completed using two testers or a single tester with a reflector at the far end.» When testing FTD the standard recognizes one way
measurements “SHOULD use synchronization to align their measurement clocks”.
• Clock accuracy and drift over time becomes very important,• As syncing equipment clocks is critical, it’s not normally
practical test in the field.
• It will be possible for testing to be completed via a Master Slave situation or a reflector.» It could also be possible to complete testing with a hard
loopback in appropriate networks.• In this configuration Y.1564 testing becomes less relative.
![Page 18: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/18.jpg)
Slide 18
Thank You,Any Questions.
![Page 19: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/19.jpg)
19
PM1-1SN110014-00
Slide 19
![Page 20: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/20.jpg)
20
PM1-1SN110014-00
Slide 20
• Question 1• What is test function be release in CMA3000 and
MT9090A GE recently ?
• A. RFC2544• B. Y.1563• C. Y.1564• D. Y.156SAM
![Page 21: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/21.jpg)
21
PM1-1SN110014-00
Slide 21
• Question 2• Which test parameter is not standard test
parameter in RFC2544?
• A. Throughput• B. Packet Loss• C. Packet Jitter• D. Packet Delay
![Page 22: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/22.jpg)
22
PM1-1SN110014-00
Slide 22
• Question 3• How many multi-stream test traffic can be setting
In CMA3000 and MT9090 GE ?
• A. 10,10• B. 8, 32• C. 32, 8• D. 8, 8
![Page 23: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/23.jpg)
23
PM1-1SN110014-00
Slide 23
• Question 4• How many Y.1564 multi-stream test traffic can be
set in CMA3000 and MT9090 GE ?
• A. 32, 32• B. 8, 8• C. 8, 32• D. 32, 8
![Page 24: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/24.jpg)
24
PM1-1SN110014-00
Slide 24
• Question 5• What is transmission rate when setting Y.1564
traffic policing test in CMA3000?
• A. CIR• B. CIR+EIR• C. CIR+125%EIR• D. CIR+EIR+CBS+EBS
![Page 25: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/25.jpg)
25
PM1-1SN110014-00
Slide 25
• Question 6• What is two test steps in Y.1564 Ethernet test ?
• A. Throughput , Packet Loss• B. Service Configuration test , Service
Performance test• C. CIR , EIR• D. CBS, EBS
![Page 26: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/26.jpg)
26
PM1-1SN110014-00
Slide 26
• Question 7• What is additional test function in Y.1564 compare
Anritsu and EXFO ?
• A. CIR,EIR test• B. CBS, EBS test• C. Traffic policing test• D. Service Configuration test , Service
Performance test
![Page 27: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/27.jpg)
27
PM1-1SN110014-00
Slide 27
• Question 8• What are test setup can be using Y.1564?
• A. End to End • B. Reflector Mode• C. Point to Multi point • D. Multi point to Multi point
![Page 28: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/28.jpg)
28
PM1-1SN110014-00
Slide 28
• Question 9• What is advantages of Y.1564 compare
RFC2544?
• A. Test throughput , packet delay ,packet jitter ,packet loss simultaneously.
• B. Test E-MIX stream• C. Multiple services simultaneously• D. Short test time
![Page 29: Y1564 Webinar Material Edit](https://reader030.vdocuments.us/reader030/viewer/2022032512/55cf9a9d550346d033a296dc/html5/thumbnails/29.jpg)
29
PM1-1SN110014-00
Slide 29
• Question 10• Please match below test name and company ?
• A. Y.156SAM A. ANRITSU• B. Y.1564 B. JDSU• C. IntelliSAM C. EXFO• D. SAMComplete D. SUNRISE