GreenGen --- Near Zero Emission Coal Based Power Generation Project in China Xu Shisen Thermal Power Research Institute Technology Development Center of CHNG 23th May 2007 TPRI

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

GreenGen --- Near Zero Emission Coal Based Power

Generation Project in China

Xu Shisen

Thermal Power Research Institute Technology Development Center of CHNG

23th May 2007

TPRI

Page 2: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

ContentsContents

Why does Why does China need need GreenGen ?

Roadmap of GreenGen Program

Demonstration Project

R&D on Key Technologies

Summary

TPRI

Page 3: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Why coal ?Why coal ?

NG Coal

80 60 100CO2 emission

85:15 75:25 95:5C : H(wt.%)

40 60 230Year

300

200

100

0

Oil

TPRI

Page 4: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Why Coal?Why Coal?

Thermal

Hydro

Renewable Nuclear

Structure of Structure of ChinaChina’’s Electric s Electric PowerPower

TPRI

77.8%

20.7%

1.1% 0.4%

2006

Page 5: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

中国历年发电装机增长情况

6913 7236 7644 8012 8705 9382 1009011550 12664 13789

1514716653

1829119989

2172223654

2542427729

2987731932

3384935657

39141

44239

51718

62200

0

10000

20000

30000

40000

50000

60000

70000

1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

(年)

(万

千瓦

China’s electric power development

Page 6: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

CHNG’s electric power development

Page 7: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

CoalCoal’’s problems problem

How to increase efficiency?How to reduce emissions?

Average Coal Consumption Ratio (by end of 2006)China:366g/kWhWorld:320 g/kWh

Page 8: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Emission of thermal power technologiesEmission of thermal power technologies

TPRI

Page 9: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

0102030405060708090

NGCC 525MW

($3.50=$3.3$/GJ NG)

NGCC 525MW

($5/MBtu=$4.7/GJ NG)

IGCC 520MW

USC PC 600MW

COE $MWh with Capture& Sequestration

COE $/MWh with CO2Capture

COE $/MWh w/outCapture

NGCC = Natural Gas Combined Cycle

IGCC = Integrated Gasification Combined Cycle

USC PC – Hi-efficiency Pulverized coal

COE with CO2 capture and sequestrationTPRI

Page 10: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

CCT in the futureCCT in the future

SC/USC + FGD + SCR (SC/USC + FGD + SCR (deep clean, COdeep clean, CO2))

-------- for near futurefor near future

CFBC (CFBC (capacity, efficiency, deep clean, COcapacity, efficiency, deep clean, CO2))

-------- to complement USCto complement USC

PFBCPFBC((deep clean, technical barrier, COdeep clean, technical barrier, CO2))

IGCC ( IGCC ( reduce cost, COreduce cost, CO2 ))

-------- for medium futurefor medium future

GreenGen (high efficiency, near zero emission and HGreenGen (high efficiency, near zero emission and H2

production )) -------- for long term futurefor long term future

TPRI

Page 11: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

R&DD on the integrated coal gasification, hydrogen R&DD on the integrated coal gasification, hydrogen production, power generation and COproduction, power generation and CO22 sequestration systemsequestration system

To achieve high coalTo achieve high coal--based generation efficiency and near based generation efficiency and near zero emission of all pollutant including COzero emission of all pollutant including CO22

To verify key technologies, sustain technologies and system To verify key technologies, sustain technologies and system integration technology and create integration technology and create ““GreenGenGreenGen”” technology with technology with full Chinese intellectual property rightfull Chinese intellectual property right

To conduct commercial demonstration at acceptable price and To conduct commercial demonstration at acceptable price and realize sustainable development of coalrealize sustainable development of coal--based generationbased generation

The Objects of GreenGen

TPRI

Page 12: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

2005 2010 2015 2020 2025

●1000-2000t/d gasifier

●system integration

●250MW IGCC

● 100~200kW MCFC and 50kWSOFC

● H2 production and CO2 separation at pilot scale

●3000t/d gasifier

●300~400MW IGCC

● MW MCFC and 200kWSOFC● H2 production and CO2 separation at 100MW class

●3000t/d gasifier

●300~400MW GreenGen demonstration

with10~50 MW MCFC and SOFC, H2 production ,

CO2 separation and near zero emission

First Step

Second Step

ThirdStep

R&DD Deployment

Roadmap of GreenGen Program

TPRI

Page 13: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Air Air Separation Nitrogen

Oxygen

Coal

Water or Steam

Gasification

Marketable

Ash and Slag

Water

Gas

PurificationSulfur

Recovery

Marketable Sulfur

Syngas Shift

Air Gas Turbine

Steam

Turbine

Power

PowerFuel Cell

Clean

Gas

Industrial U

tilization

Unm

ineableCoal

Beds

Embedded in

Deep Sea

H2 &

CO

2Separation

H2

Separation

H2

CO2R

ich H

ydrogen

The final flow sheet of GreenGenThe final flow sheet of GreenGenTPRI

(Only first step)

Page 14: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

To To complete industrial demonstration project of 400MW before 2020complete industrial demonstration project of 400MW before 2020

Generation efficiency up to 55%Generation efficiency up to 55%--60%60%

SOSO2 2 and NOx emission less than 20mg/Nmand NOx emission less than 20mg/Nm33

PM2.5, Hg and VOC near zero dischargePM2.5, Hg and VOC near zero discharge

Over 80% of COOver 80% of CO22 separated and treatedseparated and treated

Byproducts effectively utilizedByproducts effectively utilized

Acceptable costAcceptable cost

Technological goals of GreenGenTechnological goals of GreenGen

TPRI

Page 15: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

The Flow Sheet of GreenGen Stage 1 TPRI

Page 16: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

TPRI

Page 17: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

First stage objectsFirst stage objects

250MW250MWEff.(net): >42%(LHV) Eff.(net): >42%(LHV) De SOx eff. : >98% De SOx eff. : >98% NOx: <80mg/NmNOx: <80mg/Nm33(16%@ O(16%@ O22))Operation in 2009Operation in 2009<2000mRMB<2000mRMB

TPRI

Page 18: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Key technologiesKey technologies

Gasifier: TPRIGasifier: TPRI--2000T/D2000T/DE E -- Gas turbine :Gas turbine :

Nanjing+ GE TurbineNanjing+ GE TurbineShanghai Electric Group+ SIMENSShanghai Electric Group+ SIMENSDong Fang Electric + MHIDong Fang Electric + MHI

ASU, HRSG, ST,etc.: Domestic ManufactureASU, HRSG, ST,etc.: Domestic ManufactureDesign: Domestic Design: Domestic

TPRI

Page 19: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

GreenGen Lab.GreenGen Lab.

•CO2 capture and sequestration:

•A 10,000 Nm3/h PSA CO2 captureexperimental setup

•A 150 Nm3/h CO2 membrane separation capture experimental setup

TPRI

Page 20: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

250MW IGCC Power Plant in Tianjin 250MW IGCC Power Plant in Tianjin TPRI

Page 21: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

CHNG approved “The Program of GreenGen ” in 2004.

The feasibility study of the first step demonstration project has

been finished in Sept. 2006, and will be started to construct in

2007 and put into operation in 2009.

CHNG prepares to set up GreenGen Industrial Alliance, and

welcome the energy companies in the world to participate in

GreenGen.

The membership agreement was singed between CHNG and the

FutureGen Industrial Alliance on 27 Oct. 2005.

Implementation of GreenGen

TPRI

Page 22: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Vice-Premiere Zeng Peiyan meeting stakeholders

TPRI

Page 23: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

GreenGen Ltd., Co. GreenGen Ltd., Co.

GreenGen Ltd., Co. founder agreement signing ceremonyGreenGen manifested the responsibility of state-owned energy giants in

addressing energy utilization and environmental issues.

TPRI

Page 24: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

China Huaneng Group, Holding Company, China Huaneng Group, Holding Company,

financial contribution 51%financial contribution 51%

China Datang Group 7%China Datang Group 7%

China Huadian Corporation 7%China Huadian Corporation 7%

China Guodian Corporation 7%China Guodian Corporation 7%

China Power Investment Corporation 7%China Power Investment Corporation 7%

Shenhua Group 7%Shenhua Group 7%

State Development & Investment Co. 7%State Development & Investment Co. 7%

China Coal Group 7%China Coal Group 7%

GreenGen Ltd., Co.TPRI

Page 25: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

CHNG participated in US “FutureGen” project on Oct 27. 2005

CHNG Participated in FutureGen AllianceTPRI

Page 26: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

GreenGenGreenGen stage Istage Isigning ceremony in 2006signing ceremony in 2006

TPRI

Page 27: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

GreenGenGreenGen stage IIstage IIsigning ceremony on April 18signing ceremony on April 18thth 20072007

CHNG singed the agreement about GreenGen Stage II with the government of Tianjin City ,and will build 2×400 MW GreenGen in Tianjin

TPRI

Page 28: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

high efficiency and large scale gasification high efficiency and large scale gasification

gas cleanupgas cleanup

hydrogen gas turbine technology hydrogen gas turbine technology

FC FC

membrane separation membrane separation

COCO22 capture and sequestrationcapture and sequestration

system integrationsystem integration

Key technologies

TPRI

Page 29: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

700kg/d,1997700kg/d,1997--2000, funded by MOST and SPC2000, funded by MOST and SPC

36t/d (10MWth )Funded by National“863” Program2001-2005

2000t/d2000t/d,, 20092009

Two Stages Two Stages Gasification Gasification

TPRI

Page 30: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Gasifier Type:• oxygen Entrained flow• 2 Stages Reaction• dry feed• No syngas recycle• with water cooling wall • with waster heat recovery• Pressure: 3.0MPa

• Temperature: 1300~1600℃

• Cold syngas efficiency: >81%

• CO+H2>90%

• Carbon conversion>98%

Two stages gasificationTwo stages gasification

TPRI

Page 31: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Pilot facility :

Coal Feed Rate: 36 t/d

Pressure: 3.0MPa

Completed: 2005

Fund: MOST, CHNG

Partners: 7

TPRI

36t/d (10MWth )Funded by National“863” Program2001-2005

TPRI

Page 32: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Syngas Cleaning Pilot Scale Facility at TPRI

Page 33: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

TPRI

Software for IGCC and FC System Design and Optimization Based on Aspen Plus

TPRI TPRI

Page 34: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

R&D on FCR&D on FC

5kW SOFC funded by MOST.5kW SOFC funded by MOST.

50kW MCFC funded by MOST. 50kW MCFC funded by MOST.

The software for design and optimization for FC The software for design and optimization for FC power system funded by MOST. power system funded by MOST.

TPRI

Page 35: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

H2/CO2 Separation

Simple and compact facilities, so need little space. It has good efficiency and flexibility, easy to operation and low cost. No additional pollution(the cost is 25% lower than absorption )

Hard to get high concentration CO2

Membrane

Simple principleHigh energy penalty and bulky facilities

Cryogenic

Low energy penalty and simple process

Limited sorbent capacity, so need more sorbent and high automatization for sorbent’s frequent desorption.

PressureSwingAdsorption(PSA)

Adsorption

Good absorption selectivity, CO2concentration can be up to 99.9%.

High energy penaltyChemical

CO2 can be separated only by decompressed and distilled, need little regeneration energy.

Bad absorption selectivity, so good absorbent performance is the key

PhysicalAbsorption

AdvantagesShortcomingSeparation methods

TPRI

Page 36: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Means of Geological Sequestration or Storage of CO2Means of Geological Sequestration or Storage of CO2

TPRI

Page 37: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

CO2 storage capacity in ChinaTPRI

Page 38: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

COCO22 storage in deep geologic formationstorage in deep geologic formation and and

enhance oil recoveryenhance oil recoveryTPRI

Page 39: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Geological map of the Bohai and Ordos Basins

GeoCapacity

COACH

TPRI,GreenGen Co. joined the COACH and will join the

cooperation with UK for CO2 capture and sequestration

TPRI

Page 40: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

SummarySummary

China needs needs GreenGen

Roadmap of GreenGen Program was ready in 2004

First stage demonstration project is based on the China’s intellective property, and will go into operation in 2009

Demonstration project is funded by MOST

TPRI

Page 41: Xu Shisen Technology Development Center of CHNG 23th May 2007 · High energy penalty and Simple principle bulky facilities Cryogenic Low energy penalty and simple process Limited

Thank you for your attention !