€¦ · xls file · web view · 2017-12-10kit installation l-3 communications corp camp...

229
NAVAIR Long Range Acquisition Forecast Data Shee 10M to 50M N Full and Open Competition 2QFY13 4QFY13 2yrs 10M to 50M N Full and Open Competition 4QFY11 2QFY12 60Mos LB&B 10M to 50M N Full and Open Competition 3QFY12 1QFY13 60Mos ESIP Wihidbey Island 50M to 100M N Full and Open Competition 3QFY12 4QFY12 60Mos ESP 10M to 50M N Full and Open Competition 4QFY12 2QFY13 60Mos ProActive 100M to 250M N Full and Open Competition 4QFY12 2QFY13 60Mos Fidelity unlimited." **DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opp succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast ( information on an annual basis. The LRAF contains NAVAIR requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal yea informational and marketing purposes only. It does not constitute a specific offer or commitment by the Navy to fund, in whole or in part, the opportunities listing is not all inclusive and is subject to change. Short Descriptive Title of Contracting Opportunity (to include RFPs) Expected Dollar Value Range for the Requirement (include "options") Small Business Set Aside Anticipated Procurement Method Requiring Organization Projected NAVAIR Contracting Office Anticipated Solicitation / RFP (Qtr/FY) Anticipated Contract Award (Qtr/FY) Anticipated Period of Performance (months or years) Incumbent Contractor (If Applicable) Projected Work Location Command Aircraft Crew Training (CACT) AIR-1.3.1.9 131900G NAWCTSD Orlando FL (N61339 and N61340) Flight Safety International Command Aircraft Crew Training (CACT) AIR-1.3.1.9 131900G NAWCTSD Orlando FL (N61339 and N61340) NAS Corpus Christi, Kingsvill, Meridian, Pensacola, Whiting Field Command Aircraft Crew Training (CACT) AIR-1.3.1.9 131900G NAWCTSD Orlando FL (N61339 and N61340) Contractor Operation & Maintenance of Simulators (COMS) AIR-1.3.1.9 131900G NAWCTSD Orlando FL (N61339 and N61340) Whidbey Island, Jacksonville, Hawaii Contractor Operation & Maintenance of Simulators (COMS) AIR-1.3.1.9 131900G NAWCTSD Orlando FL (N61339 and N61340) Lakehurst & Pensacola Contractor Instructor Services (CIS) AIR-1.3.1.9 131900G NAWCTSD Orlando FL (N61339 and N61340) NAS Corpus Christi, Kingsvill, Meridian, Pensacola, Whiting Field

Upload: hadieu

Post on 22-May-2018

230 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

NAVAIR Long Range Acquisition Forecast Data SheetNAVAIR Public Release 11-1186 Distribution Statement A - "Approved for public release; distribution is unlimited."

10M to 50M

N Full and Open Competition 2QFY13 4QFY13 2yrs N/A

10M to 50M

N Full and Open Competition 4QFY11 2QFY12 60Mos LB&B N/A

10M to 50M

N Full and Open Competition 3QFY12 1QFY13 60Mos ESIP Wihidbey Island N/A

50M to 100M

N Full and Open Competition 3QFY12 4QFY12 60Mos ESP N/A

10M to 50M

N Full and Open Competition 4QFY12 2QFY13 60Mos ProActive N/A

Contractor Instructor Services (CIS)

100M to 250M

N Full and Open Competition 4QFY12 2QFY13 60Mos Fidelity N/A

**DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opportunities for the next and succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast (LRAF) and updating the information on an annual basis. The LRAF contains NAVAIR requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal years. The forecast is for informational and marketing purposes only. It does not constitute a specific offer or commitment by the Navy to fund, in whole or in part, the opportunities referenced herein. This listing is not all inclusive and is subject to change.

Short Descriptive Title of Contracting Opportunity (to include RFPs)

Expected Dollar Value Range for the Requirement

(include "options")

Small Business Set Aside

Anticipated Procurement Method

Requiring Organization

Projected NAVAIR Contracting Office

Anticipated Solicitation / RFP

(Qtr/FY)

Anticipated Contract Award

(Qtr/FY)

Anticipated Period of Performance

(months or years)

Incumbent Contractor (If Applicable)

Projected Work Location

Procurement Quantity (if

applicable)

Command Aircraft Crew Training (CACT)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Flight Safety International

Command Aircraft Crew Training (CACT)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

NAS Corpus Christi, Kingsvill,

Meridian, Pensacola,

Whiting Field

Command Aircraft Crew Training (CACT)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Contractor Operation & Maintenance of Simulators (COMS)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Whidbey Island, Jacksonville,

Hawaii

Contractor Operation & Maintenance of Simulators (COMS)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Lakehurst & Pensacola

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

NAS Corpus Christi, Kingsvill,

Meridian, Pensacola,

Whiting Field

Page 2: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10M

N Full and Open Competition 1QFY13 3QFY13 60Mos CAE Western Pacific N/A

10M to 50M

N Full and Open Competition 2QFY13 4QFY13 60Mos LB&B N/A

50M to 100M

N Full and Open Competition 2QFY12 1QFY13 Base Plus Options N/A

650K to 5M

N Full and Open Competition 4QFY12 2QFY13 N/A

10M to 50M

N Full and Open Competition 1QFY12 4QFY13 Carley Corp Jacksonville N/A

Contractor Operation & Maintenance of Simulators (COMS)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Contractor Operation & Maintenance of Simulators (COMS)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Willow Grove, Fallon, New

Orleans

Instructional Systems Development (ISD)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Instructional Systems Development (ISD)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

A. Horold Associates

Instructional Systems Development (ISD)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Page 3: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

N Full and Open Competition 3QFY13 2QFY14 Carley Corp N/A

5M to 10M

N Full and Open Competition 4QFY13 3QFY14 Carley Corp Camp Pendelton N/A

650K to 5M

Y 8(a) Competitive AIR-10.0 2QFY12 3QFY12 Fy12-FY14 JACOBS NAWC WD CL N/A

Admin Support

150K to 649K

N Full and Open Competition AIR-10.0 1QFY12 2QFY12 2 yesrs Avvpol FRC SW N/A

ABC Tool and Training 150K to 649K TBD Full and Open Competition AIR-10.0 1QFY12 2QFY12 2 years N/A FRC SW N/A

Tech Writer 150K to 649K TBD Full and Open Competition AIR-10.0 1QFY12 2QFY12 2 years N/A FRC SW N/A

5M to 10MY Small Business Set Aside AIR-4.0 4QFY11 1QFY12 5 years AMELEX Inc. PAX n/a

50M to 100M N Full and Open Competition AIR-4.0 4J 3QFY11 2QFY12 PAX NAS IDIQ

Instructional Systems Development (ISD)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Cherry Point, Miramar

Instructional Systems Development (ISD)

AIR-1.3.1.9 131900G

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Customer Service/Commercial Accounts/Cost Accounting

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Unknown at this time

Unknown at this time

Reseach and Engineering Facilities Support

NAWCAD Patuxent River MD (N00421)

Naval Aviation Enterprise Warfare Analysis Support

NAWCAD Patuxent River MD (N00421)

3 years (Base Year + 2 options)

MANTECH Corporation

Page 4: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MTBD TBD after Market Research 1QFY12 3QFY12 various One

LWIR Camera

150K to 649K

N Full and Open Competition 1QFY13 2QFY13 8-10 Years China Lake, CA 2

UV Hyperspectral Camera

150K to 649K

N Full and Open Competition 1QFY12 3QFY12 8-10 Years China Lake, CA 1

IR Lasers

150K to 649K

N Full and Open Competition 2QFY13 3QFY13 10-15 Years China Lake, CA 1

150K to 649K

TBD Full and Open Competition 1QFY12 1QFY12 10 yrs China Lake, CA 1

150K to 649K

TBD Full and Open Competition 1QFY12 2QFY12 10-15 Years China Lake, CA 1

LWIR Camera

150K to 649K

TBD Full and Open Competition 2QFY12 3QFY12 8-10 Years China Lake, CA 1

Telescope

150K to 649K

TBD Full and Open Competition 1QFY13 2QFY13 8-10 Years China Lake, CA 1

Custom Trailer

150K to 649K

TBD Full and Open Competition 1QFY13 2QFY13 10-15 Years China Lake, CA 1

NIR/IR lasers

150K to 649K

N Sole Source 1QFY13 2QFY13 10yrs China Lake, CA unknown

Non-linear crystals

150K to 649K

N Sole Source 1QFY13 2QFY13 10yrs China Lake, CA unknown

IR optics /laser mirrors

150K to 649K

N Sole Source 3QFY12 4QFY12 10yrs China Lake, CA unknown

Technical and Analytical Support for Intel Division

AIR-4.0 4L1000A

NAWCAD Patuxent River MD (N00421)

12 months with 4 option years

Patuxent River, MD

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Custom field test trailer for the tracking mount

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Custom field test truck to support transportation of the tracking mount.

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Page 5: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

infrared (IR) Detectors

150K to 649K

N Sole Source 1QFY12 2QFY12 8-10 Years China Lake, CA 2

IR Detectors

150K to 649K

N Sole Source 1QFY12 3QFY12 8-10 Years China Lake, CA 2

Fast Steering Mirror

150K to 649K

TBD Sole Source 2QFY13 3QFY13 8 years China Lake, CA 1

Non-linear materials

150K to 649K

TBD Sole Source 2QFY12 3QFY12 10yrs China Lake, CA unknown

IR Detectors

150K to 649K

TBD Sole Source 1QFY12 2QFY12 8-10 Years China Lake, CA 2

20 Gal Pessure Reactor

150K to 649K

N Full and Open Competition 1QFY12 2QFY12 10yrs China Lake, CA 1

150K to 649K

N Full and Open Competition 1QFY12 2QFY12 8-10 Years China Lake, CA 1

NMR Spectrometer

650K to 5M

N Full and Open Competition 1QFY13 2QFY13 10 yrs China Lake, CA 1

STTR

10M to 50M

Y Small Business Set Aside 2QFY11 4QFY11 N/A Multiple

STTR

10M to 50M

Y Small Business Set Aside 2QFY12 4QFY12 N/A Multiple

STTR

10M to 50M

Y Small Business Set Aside 2QFY13 4QFY13 N/A Multiple

STTR

10M to 50M

Y Small Business Set Aside 2QFY14 4QFY14 N/A Multiple

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4100D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4200D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Physical Vapor Deposition (PVD) Reactor

AIR-4.0 4L4200D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L4200D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

Page 6: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50M

Y Small Business Set Aside 1QFY11 3QFY11 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 3QFY11 1QFY12 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 4QFY11 2QFY12 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 1QFY12 3QFY12 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 3QFY12 1QFY13 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 4QFY12 2QFY13 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 1QFY13 3QFY13 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 3QFY13 1QFY14 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 4QFY13 2QFY14 N/A Multiple

SBIR

10M to 50M

Y Small Business Set Aside 1QFY14 3QFY14 N/A Multiple

E^3 SE and T&E Engineering Support10M to 50M

Y 8(a) Competitive AIR-4.1 2QFY12 4QFY12 5 years Wyle, Inc Pax TBD

FASTRACK (AIR-4.1) 250M to 1B N Full and Open Competition AIR-4.1 4QFY12 1QFY13 5 Years BAE Systems TBD

Small Business Innovation Research (SBIR)

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

AIR-4.0 4L5000A

NAWCAD Lakehurst NJ

(N68335)

Phase I - 6 months

Phase II - 24 months

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Pax; Multiple FRCs

Page 7: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10M

Y Small Business Set Aside AIR-4.1 1QFY11 2QFY11 5 years Ridgecrest, CA TBD

NavMPS

150K to 649K

N Sole Source AIR-4.1 1QFY11 1QFY11 5 years L-3 Point Mugu, CA TBD

NavMPS

150K to 649K

N Sole Source AIR-4.1 1QFY11 1QFY11 5 years Jacobs Point Mugu, CA TBD

5M to 10M

N Sole Source AIR-4.1 1QFY11 1QFY11 5 years ITT Avionics Clifton, NJ TBD

NavMPS

5M to 10M

N Sole Source AIR-4.1 1QFY11 1QFY11 5 years Brandes Point Mugu, CA TBD

650K to 5M

N Sole Source AIR-4.1 1QFY11 1QFY11 5 years Raytheon Co TBD

E3 SE and T&E Engineering Support

5M to 10M

Y 8(a) Competitive 2QFY12 4QFY12 5 yrs Wyle, Inc. N/A

AEA Engineering Services

10M to 50M

N Sole Source AIR-4.1.2 2QFY13 4QFY13 5 years Pt. Mugu TBD

10M to 50M

N Sole Source AIR-4.1.2 1QFY12 2QFY12 5 years Wyle Pt. Mugu

Air weapons systems survivability & safety analysis, modeling and Simulation verification, Validation and accreditation support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Survice Engineering Inc.

NAWCAD Patuxent River MD (N00421)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Electronic Warfare Software Support Activity (EWSSA) Jammer Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

F/A-18/EA-18G Sensor Systems Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Goleta/El Segundo, CA

AIR-4.1 and 5.4.4

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River,

MD

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

L-3 Communications

Airborne Electronic Attack (AEA) IPT Engineering Services /N6893610D0014

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Page 8: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50M

N Sole Source AIR-4.1.2 4QFY11 1QFY12 5 years Pt. Mugu

50M to 100M N Sole Source AIR-4.1.2 1QFY11 2QFY11 5 years Pt. Mugu TBD

50M to 100M N Sole Source AIR-4.1.2 2QFY11 4QFY11 3 years Pt. Mugu

50M to 100M N Sole Source AIR-4.1.2 2QFY12 4QFY12 5 years Pt. Mugu

ALQ-218 Engineering/Avionics

5M to 10M

N Sole Source AIR-4.1.2 2QFY11 1QFY12 5 Years Pt. Mugu TBD

50M to 100M N Sole Source AIR-4.1.2.1 2QFY12 2QFY13 5 years BOEING ST LOUIS, MO N/A

NavMPS Engineering Support

150K to 649K

N Full and Open Competition AIR-4.1.2.3 2QFY13 4QFY13 4 years L-3 Point Mugu, CA

10M to 50M

Y Full and Open Competition AIR-4.1.2.3 1QFY12 2QFY12 4 years Point Mugu, CA

Joint Electronic Attack and Compatibility Office (JEACO), Electronic Attack (EA) Systems in support of the Electronic Warfare (EW) and EA communications jamming pods and laboratories/N68936-11-R-0034

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Airborne Electronic Attack (AEA) IPT Engineering Services/N68936-10-R-0018***

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Northrop Grumman

Airborne Electronic Attack (AEA) IPT Engineering Services /N68936-11-R-0003

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Northrop Grumman

Airborne Electronic Attack (AEA) IPT Engineering Services /N68936080027

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

L-3 Communications

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SCS Development for the F/A-18 & EA-18G Aircraft

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCAD Patuxent River MD (N00421)

NavMPS Engineering and Spiral Development Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Brandes Associates

Page 9: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50M

N Full and Open Competition AIR-4.1.2.4 1QFY11 3QFY11 5 years St. Louis MO TBD

10M to 50M

N Sole Source AIR-4.1.2.4 3QFY11 2QFY12 3 years Boeing St. Louis MO N/A

50M to 100M N Sole Source AIR-4.1.2.4 2QFY11 1QFY11 5 years Hurst, TX TBD

System Configuration Sets (SCS) in support of AV-8B Aircraft

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

McDonnell Douglas (Boeing)

Post Production System Engineering Support of AV-8B

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

H-1 System Configuration Sets (SCS) Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Bell Helicopter Textron Inc.

(BHTI)

Page 10: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100M N Sole Source AIR-4.1.2.4 2QFY11 4QFY11 5 years Hurst, TX

5M to 10M

N Sole Source AIR-4.1.2.4 1QFY11 1QFY12 5 years Valparaiso, FL TBD

H-1 Optimized Top Owl (OTO) Support

5M to 10M

N Sole Source AIR-4.1.2.4 1QFY11 1QFY12 5 years THALES Bordeaux, FR TBD

5M to 10M

N Sole Source AIR-4.1.2.4 1QFY11 1QFY12 5 years Valparaiso, FL

H-1 Optimized Top Owl (OTO) Support

5M to 10M

N Sole Source AIR-4.1.2.4 3QFY11 1QFY12 5 years THALES Bordeaux, FR

Flight Services

650K to 5M

N Sole Source AIR-4.1.2.4 1QFY11 1QFY11 5 years Mojave,CA TBD

Flight Services

650K to 5M

N Sole Source AIR-4.1.2.4 1QFY12 1QFY12 5 years Mojave,CA

F/A-18 (AWL) and AV-8B Lab Support

650K to 5M

N Sole Source AIR-4.1.3 4QFY11 1QFY12 3 years China Lake, CA N/A

AIR-4.1.4 SOFTWARE ENGINEERING 100M to 250M N Full and Open Competition AIR-4.1.4 4QFY12 2QFY13 5 years TBD

H-1 System Configuration Sets (SCS) Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Bell Helicopter Textron Inc.

(BHTI)

H-1 Joint Mission Planning System Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Joint Technology Engineering, Inc.

(JTE)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

H-1 Joint Mission Planning System Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Joint Technology Engineering, Inc.

(JTE)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

BAE Systems Electronics &

Integrated Solutions

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

BAE Systems Electronics &

Integrated Solutions

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Hewlett Packard (HP)

NAWCAD Patuxent River MD (N00421)

L-3 Communications

Pax; Multiple FRCs

Page 11: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50M

Y Small Business Set Aside AIR-4.1.8.3 4QFY12 4QFY13 5 years METI China Lake, CA N/A

5M to 10MTBD Full and Open Competition AIR-4.3.4 4QFY11 2QFY12 5 years NAVMAR All Sites 1

650K to 5M

TBD Full and Open Competition AIR-4.3.4 1QFY11 2QFY11 6 months China Lake, CA 1

100M to 250M

N Sole Source AIR-4.4 2QFY12 1QFY13 3 years

RF Environment Generator

5M to 10M

N Full and Open Competition 4QFY14 4QFY15 5 years NA Pt Mugu CA N/A

AMES Maintenance

650K to 5M

N Sole Source 1QFY11 1QFY11 3 years Amherst Pt Mugu CA N/A

650K to 5M

N Full and Open Competition 2QFY12 4QFY12 5 years NA Pt Mugu CA NA

650K to 5M

Y Small Business Set Aside 4QFY11 4QFY12 2 years 5 Months Tsui Consultancy Point Mugu

SBIR Phase 2 - Analog to Information

150K to 649K

Y Small Business Set Aside 4QFY11 4QFY12 1 years GIRD Systems Point Mugu

SBIR Phase 2 - Analog to Information

150K to 649K

Y Small Business Set Aside 1QFY12 1QFY13 1 year 3Months SA Photonics Point Mugu

Surviability and Vulnerability Live Fire Test and Evaluation

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

CSS to replasce the current NAVMAR contract

NAWCAD Patuxent River MD (N00421)

Field Emission Scanning Electron Microscope

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Propulsion & Power Component Improvent Program BOA

NAWCAD Patuxent River MD (N00421)

N00019-09-G-0009

GE Aviation, Lynn, MA

AIR-4.5 45P300E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.5 45P300E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Radio Frequency (RF) Environment Generator

AIR-4.5 45P300E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

STTR Phase 2 - Digital Wideband Receiver Design

AIR-4.5 45P100E

NAWCAD Lakehurst NJ

(N68335)

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Page 12: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

Y Small Business Set Aside 1QFY12 1QFY13 4 years China Lake TBD

650K to 5M

Y Small Business Set Aside 2QFY12 2QFY13 2 years Bennet Aerospace Point Mugu

650K to 5M

Y Small Business Set Aside 4QFY12 4QFY13 2 years SA Photonics Point Mugu

650K to 5M

Y Small Business Set Aside 3QFY11 3QFY12 2 years SI2 Technologies Point Mugu

650K to 5M

Y Small Business Set Aside 3QFY12 3QFY13 2 years Point Mugu

UAS Components and Parts10M to 50M

N Full and Open Competition AIR-4.5.10 2QFY12 3QFY12 3 years TBD St. Ingoes, MD TBD

Compact Antenna Range Upgrade150K to 649K

N Full and Open Competition AIR-4.5.10 1QFY12 2QFY12 TBD N/A St. Inigoes, MD N/A

Shock Isloators

150K to 649K

N Full and Open Competition AIR-4.5.10 4QFY11 1QFY12 5 years TBD St. Ingoes, MD TBD

Waveguide150K to 649K

N Full and Open Competition AIR-4.5.10 1QFY12 2QFY12 5 years TBD St. Ingoes, MD TBD

ICIS Division-Wide Cabinets650K to 5M

N Full and Open Competition AIR-4.5.10 1QFY12 2QFY12 5 years N/A 237 cabinets

NTDS I/O Cards650K to 5M

N Full and Open Competition AIR-4.5.10 4QFY11 1QFY12 5 years St. Inigoes, MD TBD

Communications Support10M to 50M

N Full and Open Competition AIR-4.5.10 4QFY12 2QFY13 5 years N/A St. Inigoes, MD N/A

10M to 50M

N Full and Open Competition AIR-4.5.10 2QFY13 4QFY13 5 years N/A

SBIR Phase 2 - Wideband Transmitter for EA Aircraft

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Mainstream Engineering Corporatoin

SBIR Phase 2 - Measurement Methods Phased Array Jammers

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SBIR Phase 2 - Measurement Methods Phased Array Jammers

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SBIR Phase 2 - Conformal Wideband Phased Array

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SBIR Phase 2 - Universal Signal Matching

AIR-4.5 45P100E

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Michigan Aerospace

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

At awarded vendor's facilities

NAWCAD Lakehurst NJ

(N68335)

L-3 Communications

NAWCAD Patuxent River MD (N00421)

Communications and Information Systems Support

NAWCAD Patuxent River MD (N00421)

Booz Allen Hamilton, Inc.

St. Inigoes, MD and Lexington

Park, MD

Page 13: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

150K to 649KN Full and Open Competition AIR-4.5.10 1QFY12 2QFY12 1 year N/A St. Inigoes, MD N/A

Mission Systems Engineering 50M to 100M N Full and Open Competition AIR-4.5.10 3QFY11 4QFY11 5 years The MIL Corp St. Inigoes, MD N/A

Modernization Engineering & Installs 50M to 100M N Full and Open Competition AIR-4.5.10 3QFY11 1QFY12 5 years N/A St. Inigoes, MD N/A

50M to 100M N Full and Open Competition AIR-4.5.10 1QFY12 3QFY12 5 years BAE Systems California, MD N/A

Lifetime Support Engineering 50M to 100M N Full and Open Competition AIR-4.5.10 2QFY13 4QFY13 5 years BAE Systems California, MD N/A

10M to 50M

Y Small Business Set Aside AIR-4.5.10 3QFY11 4QFY11 5 years Antech Systems N/A

RD674 Digital Voice Logger System650K to 5M

N Sole Source AIR-4.5.10 2QFY12 3QFY12 3 years St. Inigoes, MD TBD

FOSOV Kitting100M to 250M

N Full and Open Competition AIR-4.5.11 4QFY11 1QFY12 3 years N/A St. Inigoes, MD N/A

Land Mobile Radios MA BPAs10M to 50M

N Full and Open Competition AIR-4.5.11 1QFY12 1QFY12 5 years N/A St. Inigoes, MD N/A

Baseband MA BPAs10M to 50M

N Full and Open Competition AIR-4.5.11 3QFY12 3QFY12 5 years N/A St. Inigoes, MD N/A

Power Supply MA BPAs10M to 50M

N Full and Open Competition AIR-4.5.11 3QFY12 3QFY12 5 years N/A St. Inigoes, MD N/A

Antenna MA BPAs10M to 50M

N Full and Open Competition AIR-4.5.11 3QFY12 3QFY12 5 years N/A St. Inigoes, MD N/A

Satellite Communications 50M to 100M N Full and Open Competition AIR-4.5.11 4QFY11 1QFY12 5 years N/A St. Inigoes, MD N/A

SATCOM MA BPAs 50M to 100M N Full and Open Competition AIR-4.5.11 2QFY12 2QFY12 5 years N/A St. Inigoes, MD N/A

Compact Antenna Range Upgrade, Phase 2

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Shipboard Radio Communications Systems (N00421-10-R-1042)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Electronic Performance Solutions System Development (N00421-10-R-1025)

NAWCAD Patuxent River MD (N00421)

St. Inigoes, MD and Chesapeake,

VA

NAWCAD Lakehurst NJ

(N68335)

Digital Signal Products Inc.

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

Page 14: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50MN Full and Open Competition AIR-4.5.11 1QFY12 2QFY12 5 years N/A St. Inigoes, MD N/A

Exterior Communications Support 50M to 100M N Full and Open Competition AIR-4.5.11 4QFY11 1QFY12 5 years BAE Systems St. Inigoes, MD N/A

50M to 100M N Full and Open Competition AIR-4.5.11 4QFY11 1QFY12 5 years N/A St. Inigoes, MD N/A

C-E Platform 50M to 100M N Full and Open Competition AIR-4.5.11 1QFY14 2QFY14 5 years BAE Systems St. Inigoes, MD N/A

C4ISR System Support 50M to 100M N Full and Open Competition AIR-4.5.11 2QFY14 4QFY14 5 years St. Inigoes, MD N/A

Life Cycle Sustainment Support 50M to 100M N Full and Open Competition AIR-4.5.11 2QFY14 4QFY14 5 years St. Inigoes, MD N/A

50M to 100M N Full and Open Competition AIR-4.5.11 3QFY14 1QFY15 5 years St. Inigoes, MD N/A

Special Communications Programs 50M to 100M N Full and Open Competition AIR-4.5.11 4QFY14 1QFY15 3 years St. Inigoes, MD N/A

Hardware BPAs10M to 50M

Y Full and Open Competition AIR-4.5.11 4QFY11 1QFY12 5 years N/A St. Inigoes, MD N/A

TDIS Replacement System650K to 5M

Y Full and Open Competition AIR-4.5.11 4QFY11 4QFY11 3 years N/A St. Inigoes, MD N/A

Amplifier MA BPAs10M to 50M

Y Small Business Set Aside AIR-4.5.11 3QFY12 3QFY12 5 years N/A St. Inigoes, MD N/A

Rack Ready MA BPAs 50M to 100M Y Small Business Set Aside AIR-4.5.11 3QFY12 3QFY12 5 years N/A St. Inigoes, MD N/A

Transit Case MA BPAs5M to 10M

Y Small Business Set Aside AIR-4.5.11 3QFY12 3QFY12 5 years N/A St. Inigoes, MD N/A

10M to 50MY Small Business Set Aside AIR-4.5.11 2QFY13 3QFY13 5 years N/A St. Inigoes, MD N/A

Intelligence Operations and Communication support

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Family of Special Operation Vehicles Support

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

TBD(Current 3 Yr

contract under evaluation)

NAWCAD Patuxent River MD (N00421)

TBD(Current 3 Yr

contract under evaluation)

Telecommunication and Related Communication Electronic Support

NAWCAD Patuxent River MD (N00421)

TBD(Current 3 Yr

contract under evaluation)

NAWCAD Patuxent River MD (N00421)

Booz Allen Hamilton, Inc.

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

Small Business Set-Aside Integration Support

NAWCAD Patuxent River MD (N00421)

Page 15: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Wave Relay5M to 10M

N Sole Source AIR-4.5.11 3QFY11 3QFY11 5 years N/A St. Inigoes, MD N/A

10M to 50MY Small Business Set Aside AIR-4.5.12 2QFY12 1QFY13 5 years St. Inigoes, MD N/A

650K to 5MY Small Business Set Aside AIR-4.5.12 2QFY11 1QFY12 3 years St. Inigoes, MD N/A

Radio Frequency (RF) Subsystem

650K to 5M

TBD TBD after Market Research AIR-4.5.2 1QFY12 3QFY12 60 months China Lake IDIQ

Naval Surveillance in Adverse Weather

650K to 5M

N Full and Open Competition AIR-4.5.2.3 1QFY12 2QFY12 2 years Boeing SRS Tucson,AZ N/A

Passive Millimeter Wave Imager

650K to 5M

N Full and Open Competition AIR-4.5.2.3 2QFY12 3QFY12 2 years N/A TBD 1

10M to 50M

N Full and Open Competition AIR-4.5.2.5 1QFY13 4QFY13 4 years N/A N/A N/A

SAiTR Fusion

150K to 649K

N Full and Open Competition AIR-4.5.2.5 2QFY12 1QFY13 1 year TBD TBD N/A

IR-SAiTR-D

650K to 5M

N Full and Open Competition AIR-4.5.2.5 1QFY12 4QFY12 2 years TBD TBD N/A

150K to 649K

N Sole Source AIR-4.5.2.5 1QFY13 3QFY13 1 year N/A N/A

10M to 50MN Full and Open Competition AIR-4.5.8 4QFY11 2QFY12 3 years SAIC 4.5.8 St. Inigoes N/A

NAWCAD Lakehurst NJ

(N68335)

S&SBES Mechanical Facilities Support Services

NAWCAD Patuxent River MD (N00421)

Compliance Corporation

S&SBES Material Handling Support Services

NAWCAD Patuxent River MD (N00421)

Compliance Corporation

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Eclipse Electronic Systems Inc.

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Future ASuW Seeker Technology (FAST)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Sensor Technology Inegration & Exploitation Lab

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Air Traffic Control & Landing systems (ATC&LS) Engineering & Management Support

NAWCAD Patuxent River MD (N00421)

Page 16: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Aircraft Services10M to 50M

N Full and Open Competition AIR-4.5.8 3QFY12 1QFY13 5 years N/A N/A

50M to 100M N Full and Open Competition AIR-4.5.8 1QFY12 2QFY12 5 years L-3 4.5.8 St. Inigoes N/A

10M to 50MN Full and Open Competition AIR-4.5.8.1 3QFY11 2QFY12 5 years ARINC 4.5.8 St. Inigoes N/A

10M to 50MN Full and Open Competition AIR-4.5.8.1 2QFY11 4QFY11 5 years BAE 4.5.8 St. Inigoes N/A

10M to 50MN Sole Source AIR-4.5.8.1 3QFY13 1QFY14 3 years TBD

SPN-43 Recievers10M to 50M

N Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 TBD N/A TBD

SPN-41 Radome Windows650K to 5M

N Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 TBD N/A TBD

50M to 100M N Full and Open Competition AIR-4.5.8.2 1QFY12 4QFY12 5 years BAE 4.5.8 St. Inigoes N/A

AN/FPN-63 LCE 10M to 50M

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

SPN 41B FPGA CCA Interface150K to 649K

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

SPN 41B Displays150K to 649K

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

SPN 41 B Encoder150K to 649K

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

SPN 41 B Gumsticks150K to 649K

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

SPN 41B MEMS Boards150K to 649K

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

Azimuth and Elevation Radome Shell650K to 5M

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

NAWCAD Patuxent River MD (N00421)

4.5.8 Pax River LSTF

Joint Precision Approach and Landing System (JPALS), Navy Unmanned Combat Air System (N-UCAS), &AAR Support

NAWCAD Patuxent River MD (N00421)

Research and Development Support for JPALS & N-UCAS

NAWCAD Patuxent River MD (N00421)

ATC&LS Technical Engineering Products & Services

NAWCAD Patuxent River MD (N00421)

Repair, Fabricate, Modify PALS Hardware

NAWCAD Patuxent River MD (N00421)

Sierra Nevada Corporation

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

ATC&LS Technical Engineering Products & Services

NAWCAD Patuxent River MD (N00421)

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

Page 17: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

SPN-41 Replacement Transmitter650K to 5M

TBD Full and Open Competition AIR-4.5.8.2 2QFY12 4QFY12 5 years N/A TBD

10M to 50MN Full and Open Competition AIR-4.5.8.3 3QFY11 1QFY12 5 years Lockheed 4.5.8 St. Inigoes N/A

Field Maintenance Support FACSFAC10M to 50M

N Full and Open Competition AIR-4.5.8.3 4QFY13 1QFY14 5 years Trandees 4.5.8 St. Inigoes N/A

CEEMC Hardware10M to 50M

N Sole Source AIR-4.5.8.3 2QFY11 1QFY12 5 years N/A N/A

50M to 100M N Full and Open Competition AIR-4.5.8.4 3QFY14 4QFY14 5 years N/A N/A

ITEG IDIQ650K to 5M

N Sole Source AIR-4.5.8.4 4QFY11 4QFY11 2 years General Dynamics N/A Maximum 25

Raytheon BOA Follow-On 50M to 100M N Sole Source AIR-4.5.8.4 3QFY11 1QFY12 5 years Raytheon TBD

Program Mgmt and Eng Support10M to 50M

N Full and Open Competition AIR-4.5.9. 4QFY11 1QFY12 3 years BAH St. Inigoes N/A

Engineering and Technical Support 50M to 100M N Full and Open Competition AIR-4.5.9. 1QFY13 2QFY13 5 years BAE St. Inigoes N/A

AN/UPX-24 BOA5M to 10M

N Sole Source AIR-4.5.9.1 4QFY11 4QFY11 5 years L3 N/A TBD

Chassis and Ancillary Hardware650K to 5M

N Sole Source AIR-4.5.9.1 1QFY12 2QFY12 5 years AP Labs N/A TBD

TPI PMC Cards650K to 5M

N Sole Source AIR-4.5.9.1 3QFY14 4QFY14 5 years Brandywine N/A TBD

Backplanes & Card Cages650K to 5M

N Sole Source 1QFY12 2QFY12 5 years Dawn VME N/A TBD

VME and NTDS Cards650K to 5M

N Sole Source 3QFY13 4QFY13 5 years Sabtech N/A TBD

Rugged Panel Mt Keyboard150K to 649K

N Sole Source AIR-4.5.9.2 2QFY13 3QFY13 5 years Cortron N/A TBD

Flat Panel Displays5M to 10M

N Sole Source AIR-4.5.9.2 4QFY11 1QFY12 3 years Barco N/A TBD

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

Software Generation, Test & Eval, Computer Support Services

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Lakehurst NJ

(N68335)

Contractor Facilities

Technical & Engineering Services for USMC, ATC

NAWCAD Patuxent River MD (N00421)

4.5.8 Pax River LSTF

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Patuxent River MD (N00421)

4.5.8 Pax River LSTF

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

AIR-4.5.9.1 and 4.5.9.2

NAWCAD Lakehurst NJ

(N68335)

AIR-4.5.9.1 and 4.5.9.2

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

Page 18: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Display Card Set5M to 10M

N Sole Source AIR-4.5.9.2 2QFY12 3QFY12 5 years Primagraphics N/A TBD

Illuminated Panels650K to 5M

N Sole Source AIR-4.5.9.2 3QFY13 4QFY13 5 years Aeropanel N/A TBD

ATC Consoles650K to 5M

N Sole Source AIR-4.5.9.2 2QFY12 2QFY12 5 years Alabama Aircraft N/A TBD

InterMAPic Licenses650K to 5M

N Sole Source AIR-4.5.9.2 2QFY13 3QFY13 5 years Gallium N/A TBD

Reflective Memory Cards650K to 5M

N Sole Source AIR-4.5.9.2 1QFY12 2QFY12 5 years GE Fanuc N/A TBD

Ethernet Switches650K to 5M

N Sole Source AIR-4.5.9.2 1QFY13 2QFY13 5 years RuggedCom N/A TBD

Rehost Chassis650K to 5M

N Sole Source AIR-4.5.9.2 2QFY13 3QFY13 5 years SIE N/A TBD

UPS650K to 5M

N Sole Source AIR-4.5.9.2 2QFY13 3QFY13 5 years Energy N/A TBD

150K to 649KN Full and Open Competition AIR-4.6 1QFY11 2QFY11 1.3 years Techno-Sciences Beltsville MD TBD

4.6 Engineering Services 50M to 100M N Full and Open Competition AIR-4.6 4QFY11 3QFY12 3 years PAX N/A

Advanced Control Sensor650K to 5M

N Full and Open Competition AIR-4.6 1QFY11 1QFY11 5 years NA Contractor Site TBD

Adanced Oxygen Generation650K to 5M

N Full and Open Competition AIR-4.6 1QFY11 2QFY11 5 years NA Contractor Site TBD

Conformal Body Armor650K to 5M

N Full and Open Competition AIR-4.6 1QFY11 2QFY11 2 years NA Contractor Site TBD

650K to 5MN Full and Open Competition AIR-4.6 1QFY11 2QFY11 5 years NA Contractor Site TBD

Advanced Helmet Vision System650K to 5M

N Sole Source AIR-4.6 1QFY11 2QFY11 5 years Gentex Visionex Carbondale, PA TBD

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

Semi-Active Magnetorheological Seat Suspension (SAMMS)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Research, Engineering and

Development, Inc.

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Advanced Sensor and Display Development

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Page 19: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100M Y Small Business Set Aside 3QFY11 4QFY11 4years, 5 months N/A TBD

Small Bus. Innovation Research 11.2

650K to 5M

Y Small Business Set Aside 3QFY11 1QFY12 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 11.3/B

650K to 5M

Y Small Business Set Aside 4QFY11 2QFY12 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 12.1

650K to 5M

Y Small Business Set Aside 1QFY12 3QFY12 3 years N/A Contractor Site N/A

650K to 5M

Y Small Business Set Aside 2QFY11 4QFY11 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 12.2

650K to 5M

Y Small Business Set Aside 3QFY12 1QFY13 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 12.3/B

650K to 5M

Y Small Business Set Aside 4QFY12 2QFY13 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 13.1

650K to 5M

Y Small Business Set Aside 1QFY13 3QFY13 3 years N/A Contractor Site N/A

650K to 5M

Y Small Business Set Aside 2QFY13 4QFY13 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 13.2

650K to 5M

Y Small Business Set Aside 3QFY13 1QFY14 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 13.3/B

650K to 5M

Y Small Business Set Aside 4QFY13 2QFY14 3 years N/A Contractor Site N/A

Small Bus. Innovation Research 14.1

650K to 5M

Y Small Business Set Aside 1QFY13 3QFY13 3 years N/A Contractor Site N/A

In-Service Engineering CSS On-site trainer support

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

Various ISE sites CONUS & OCONUS

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

Small Bus. Tech. Transition Research (STTR) 11.A

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

Small Bus. Tech. Transition Research (STTR) 13.A

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

Page 20: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

Y Small Business Set Aside 2QFY13 4QFY13 3 years N/A Contractor Site N/A

SM-1 Full Service Support (FMS)

10M to 50M

N Sole Source AIR-4.7 2QFY12 4QFY12 36 months Tucson

RDT&E Support for Raytheon Systems

10M to 50M

N Sole Source AIR-4.7 3QFY12 1QFY13 36 months Tucson

RDT&E Support for Raytheon Systems

10M to 50M

N Sole Source AIR-4.7 3QFY12 1QFY13 36 months Tucson

Multi-Launcher Emulator

150K to 649K

N Sole Source 3QFY11 3QFY11 4 to 6 Months 5

650K to 5M

Y 8(a) Competitive 1QFY13 2QFY13 3 years ICI Services Ridgecrest, CA 1

PCB Design and Layout

5M to 10M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Design and Layout

5M to 10M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Design and Layout

5M to 10M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year READIX, INC China Lake

Small Bus. Tech. Transition Research (STTR) 14.A

AIR-4.6 (Various PMAs)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Raytheon Missile Systems

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Raytheon Missile Systems

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Raytheon Missile Systems

AIR-4.7 47J260D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

WINTEC INNOVATIVE

ENGINEERING

FORT WALTON BEACH, FL

Precision Attack Weapons (PAWS) Technical Project Office (TPO) Support

AIR-4.7 WD 4.7.J.

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

D V K INTEGRATED

SERVICES, INC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

MURRIETTA CIRCUITS

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Page 21: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

PCB Design and Layout

5M to 10M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

Sunman

5M to 10M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

650K to 5M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Fab and Pop

650K to 5M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Fab Only

650K to 5M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Fab and Pop

650K to 5M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Fab & Pop

650K to 5M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

PCB Fab & Pop

650K to 5M

N Full and Open Competition AIR-4.7.2.3 1QFY12 2QFY12 1 year China Lake

Nitrogen Gas

150K to 649K

N Sole Source AIR-4.7.2.5 3QFY12 1QFY13 1 year PRAXAIR INC China Lake

Machine Shop Maintenance

10M to 50M

N Full and Open Competition AIR-4.7.5 2QFY13 4QFY13 5 years China Lake

Plating, Painting and Coating

650K to 5M

N Full and Open Competition AIR-4.7.5 1QFY13 2QFY14 5 years KRYLER CORP. China Lake

Plating, Painting and Coating

650K to 5M

N Full and Open Competition AIR-4.7.5 2QFY12 2QFY13 5 years China Lake

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

STILWELL BAKER INC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SUNMAN ENGINEERING

INC

Printed Circuit Board (PCB) Fab and Pop

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

HUGHES CIRCUITS INC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

HUNTER TECHNOLOGY CORPORATION

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

KCA ELECTRONICS,

INC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

MURRIETTA CIRCUITS

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SUNMAN ENGINEERING

INC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

WHIZZ SYSTEMS INC.

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

WESCO CONSULTANTS LIMITED LIABIL

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

ELITE METAL FINISHING, LLC

Page 22: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Electronic Components IDIQ, Laguna

650K to 5M

N Full and Open Competition AIR-4.7.5 4QFY12 4QFY13 5 years China Lake

High Speed Technology

650K to 5M

Y Small Business Set Aside AIR-4.7.6 3QFY11 1QFY12 1.5 years Various China Lake, CA 1

CDI BLU -1-10

650K to 5M

N Full and Open Competition AIR-4.7.8.2 3QFY12 3QFY13 12 months China Lake N/A

150K to 649K

N Sole Source AIR-4.7.8.7 2QFY12 4QFY12 6 months China Lake N/A

Fire Optic Test Set

150K to 649K

N Sole Source AIR-4.7.8.7 1QFY12 1QFY13 12 months China Lake N/A

Liquid Nitrogen System

150K to 649K

N Sole Source AIR-4.7.8.7 1QFY13 4QFY13 8 months China Lake N/A

Liquid Nitrogen System

150K to 649K

N Sole Source AIR-4.7.8.7 1QFY13 4QFY13 8 months China Lake N/A

System Engineering Services10M to 50M

N Full and Open Competition AIR-4.8.1 3QFY11 1QFY12 3 years none NA

650K to 5MY 8(a) Competitive AIR-4.8.2 4QFY11 1QFY12 3 years NA

10M to 50MY Small Business Set Aside AIR-4.8.3 1QFY12 3QFY12 5 years SSI Lakehurst NA

H1 OTPS J-6885 FCC PRODUCTION 650K to 5M TBD TBD after Market Research AIR-4.8.4.8 4QFY12 1QFY13 1 year 21 units

10M to 50M

N Full and Open Competition AIR-4.8.6 1QFY12 3QFY12 5 years M&T Lakehurst TBD

10M to 50MY Full and Open Competition AIR-4.8.6 2QFY12 4QFY12 5 years MTG Lakehurst TBD

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

LAGUNA COMPONENTS,

INC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Ordnance Assessment Warhead Testing

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

Engineering Services - Engineering Drawings for ALRE and SE

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

Engineering services - ADMACS and ALRE Modernization

NAWCAD Lakehurst NJ

(N68335)

Unknown at this time

486 Engineering support for propulsion, A/C & armament handling, VSTOL, fighter and special mission A/C, SE instlls, TPS and FMS

NAWCAD Lakehurst NJ

(N68335)

486 Engineering CSS support for AC, Avionics, servicing and miscellaneous

NAWCAD Lakehurst NJ

(N68335)

Page 23: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MY 8(a) Non Competitive AIR-4.8.8 1QFY11 4QFY11 3 years Penda Aiken NA

CVN 72 Main Engine Cylinders150K to 649K

N Full and Open Competition AIR-4.8.8 3QFY11 1QFY12 2 years Rexroth 4 units

1 7/16" wire rope150K to 649K

N Full and Open Competition AIR-4.8.8 1QFY12 2QFY12 6 months 18 reels

1 1/4" wire rope150K to 649K

N Full and Open Competition AIR-4.8.8 1QFY12 2QFY12 6 months 25 reels

1 7/16" wire rope150K to 649K

N Full and Open Competition AIR-4.8.8 1QFY13 2QFY13 6 months 18 reels

1 1/4" wire rope150K to 649K

N Full and Open Competition AIR-4.8.8 3QFY13 4QFY13 6 months 25 reels

50M to 100M N Full and Open Competition AIR-4.8.8 3QFY13 2QFY14 3 years Sabre Systems NA

150K to 649KY Small Business Set Aside AIR-4.8.8 3QFY11 1QFY12 3 months N/A TBD

PMD Technical Services650K to 5M

Y Small Business Set Aside AIR-4.8.8 3QFY11 2QFY12 3 years NDI Engineering NA

650K to 5MY Small Business Set Aside AIR-4.8.8 3QFY12 2QFY13 3 years NDI Engineering NA

650K to 5MY Small Business Set Aside AIR-4.8.8 1QFY11 4QFY11 3 years Honeywell NA

650K to 5MY Small Business Set Aside AIR-4.8.8 3QFY11 1QFY12 3 months N/A TBD

50M and Over

N Full and Open Competition 2QFY10 4QFY11 5 Years N/A

10M to 50MTBD Full and Open Competition AIR-5.1 ISEET 3QFY12 2QFY13 5 years N/A

650K to 5MTBD Sole Source AIR-5.1 ISEET 4QFY11 2QFY12 5 years N/A

Prototype Manufacturing Division Laborer Support

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

NAWCAD Lakehurst NJ

(N68335)

Wire Rope Corporation

Lakehurst, New Jersey

NAWCAD Lakehurst NJ

(N68335)

Wire Rope Corporation

Lakehurst, New Jersey

NAWCAD Lakehurst NJ

(N68335)

Wire Rope Corporation

Lakehurst, New Jersey

NAWCAD Lakehurst NJ

(N68335)

Wire Rope Corporation

Lakehurst, New Jersey

Aircraft Launch & Recovery Equipment (ALRE) Installation Contract

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

PMD Steel Procurement for EMALS Clevis

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

Prototype Manu. Div. Information Technology Services

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

Prototype Manu. Div. Machine Tool Maintenance

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

PMD Steel Procurement for EMALS Footstools

NAWCAD Lakehurst NJ

(N68335)

Lakehurst, New Jersey

NAWC NTWL/NTWP Aircraft Maintenance Support

AIR-5.1 (NTWL/NTWP)

NAWCAD Patuxent River MD (N00421)

Dyncorp (Pax Rvr); NGTS &

VSE (Pt Mugu); AECOM (China

Lake)

PAX RIVER, MD; Pt Mugu, CA,

China Lake, CA

FTE and Programmatic Support for ISEET

NAWCAD Patuxent River MD (N00421)

NAWCAD Pax River

NATEU Test Planning and Test Reporting training

NAWCAD Patuxent River MD (N00421)

NAWCAD Pax River

Page 24: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Aircrew & Aircrew Support Services 50M to 100M N Full and Open Competition AIR-5.1 NTWL 3QFY12 1QFY13 5 years Wyle

Unmanned Vehicle Target Services

5M to 10M

N Sole Source AIR-5.1.1/5.1.8 1QFY12 4QFY12 5 years N/A

5.1.2 Contract Support Services50M and Over

N Full and Open Competition AIR-5.1.2 4QFY11 2QFY12 N/A Pax River N/A

650K to 5MTBD Full and Open Competition AIR-5.1.5 3QFY10 4QFY11 N/A

650K to 5MTBD Sole Source AIR-5.1.5 1QFY12 4QFY12 Calspan Corp N/A

10M to 50M

N Full and Open Competition AIR-5.1.6 4QFY11 1QFY12 3 Years ManTech N00421 N/A

F/A-18 - VX-23 Support Services

10M to 50M

N Full and Open Competition 4QFY11 3QFY12 3 Years Wyle Pax River N/A

Boeing DT III Maint.

50M and Over

N Sole Source 4QFY11 4QFY11 5 years Boeing Pax River N/A

BMD Eningeering Services

650K to 5M

N Full and Open competition 1QFY12 1QFY12 3 years PMRF N/A

10M to 50M

N Full and Open Competition AIR-5.2 1QFY12 1QFY12 5 years IDIQ

NAWCAD Patuxent River MD (N00421)

NAWCAD Pax River

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Canadian Commercial Corporation -

(Meggitt Defense)

various Navy Ranges

NAWCAD Patuxent River MD (N00421)

Base year + 4 option years

TPS Information Techology, Management, and Flight scheduling support

NAWCAD Lakehurst NJ

(N68335)

Base year plus 4 Option years

Integrated Systems

Solutions, Inc

NAWCAD Pax River

Recompete of Operation and Maintenance of ASTARS Support

NAWCAD Patuxent River MD (N00421)

Base year plus 2 option years

NAWCAD Pax River

Manned and Unmanned Air Vehicle Evaluation

NAWCAD Patuxent River MD (N00421)

AIR-5.1.7PMA265, VX-23, JSF, T45,

and EA-6B

NAWCAD Patuxent River MD (N00421)

AIR-5.1.7PMA265/

VX-23

NAWCAD Patuxent River MD (N00421)

AIR-5.1.8 NAWCWD

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Comglobal system Inc.

Environmental Survey and Documentation/GIS Support Services

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Epsilon System Solutions

China Lake, Point Mugu Sea Range,

PAX

Page 25: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M and Over

N Full and Open Competition AIR-5.2 4QFY12 1QFY13 5 yrs ITT

Threat validation Support Services

650K to 5M

Y 8(a) Competitive AIR-5.3 3QFY11 4QFY12 3 years Ridgecrest, CA

50M and Over

Y Small Business Set Aside AIR-5.3 2QFY12 3QFY12 Five Years SA-TECH Point Mugu

5M to 10M

N Sole Source AIR-5.3 4QFY12 1QFY13 Three Years Orbital Sciences

Land and Surface Target Scorer (LSTS)

650K to 5M

N Sole Source AIR-5.3 3QFY12 4QFY11 3 Years N/A

Vehicle Control Interface

650K to 5M

N Sole Source AIR-5.3 3QFY12 4QFY11 3 Years N/A

10M to 50M

Y Small Business Set Aside AIR-5.3.3 4QFY11 2QFY12 5 years N/A

J Band ISRF

10M to 50M

N Full and Open Competition AIR-5.3.9.4 1QFY12 4QFY11 5 years N/A IDIQ

Mini IFM/ISRFS Recompete

10M to 50M

N Full and Open Competition AIR-5.3.9.4 3QFY12 3QFY13 5 years Teledyne Cougar Sunnyvale, CA IDIQ

10M to 50M

N Full and Open Competition AIR-5.3.9.4 2QFY12 2QFY13 5 years Camarillo, CA Seaport-e

Pacific Range Support Team Range Instrumentation Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

SAALEX Corporation

Pacific Targets and Marine Operations and Maintenance of Aerial and Seaborne targets and assets

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

GQM-163 Operational Contro Room Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Point Mugu and PMRF Hawaii

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Cambridge Consultants

Cambridge, England

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Aero Mech Engineering

San Luis Obispo, CA

Key West Facility Operational and Technical Services

NAWCAD Patuxent River MD (N00421)

Seaward Services Inc

NAWCAD, Key West

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

ATSO Engineering Services for RF airborne threat simulation systems

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Jacobs Technology Group

Page 26: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Hydra CCAs

10M to 50M

Y Small Business Set Aside AIR-5.3.9.4 2QFY12 2QFY13 5 years US Technologies Oak Lawn, NJ IDIQ

Electronic Assemblies Recompete

10M to 50M

Y Small Business Set Aside AIR-5.3.9.4 4QFY11 4QFY12 5 years CTA Ridgecrest, CA IDIQ

CCAs

10M to 50M

Y Small Business Set Aside AIR-5.3.9.4 3QFY11 3QFY12 5 years US Technologies Fair Lawn, NJ IDIQ

Decoy Related Material

5M to 10M

N Sole Source AIR-5.3.9.4 1QFY12 2QFY11 5 years Meggitt Irvine, CA IDIQ

RIMS

5M to 10M

N Sole Source AIR-5.3.9.4 2QFY12 2QFY11 5 years Teledyne Cougar Sunnyvale, CA IDIQ

Filthy Buzzard

10M to 50M

N Sole Source AIR-5.3.9.4 1QFY12 1QFY13 5 years KOR Electronics Irvine, CA IDIQ

MMPM

10M to 50M

TBD TBD after Market Research AIR-5.3.9.4 1QFY12 1QFY13 5 years Teledyne Cougar Sunnyvale, CA IDIQ

Dual Channel Amplifier

10M to 50M

TBD TBD after Market Research AIR-5.3.9.4 4QFY11 4QFY12 5 years N/A IDIQ

100M to 250M

N Full and Open Competition AIR-5.4.0 1QFY12 3QFY12 5 yrs N/A N/A

50M to 100M N Full and Open Competition AIR-5.4.1 4QFY11 1QFY12 5 yrs N/A N/A

10M to 50M

N Sole Source AIR-5.4.1 2QFY13 3QFY13 5 yrs Sabre Systems N/A

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

IBST Systems Deveopment & Enhancement

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River,

MD

RDT&E Infrastructure Engineering, Technical and Management Support

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River,

MD and NAWCWD China

Lake, CA

RDT&E Infrastructure Engineering and Management Support

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River,

MD

Page 27: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100M N Full and Open Competition AIR-5.4.3 4QFY11 2QFY12 5 yrs N/A N/A

50M to 100M Y 8(a) Competitive AIR-5.4.4.8 4QFY12 3QFY13 5 yrs Wyle, Inc. N/A

10M to 50M

TBD Full and Open Competition AIR-6.0 2QFY12 4QFY12 TBD Aranea Various

5M to 10M

N Sole Source AIR-6.0 4QFY12 2QFY13 McLean, VA

650K to 5M

N Full and Open Competition AIR-6.0 3QFY12 2QFY13 D.P. Associates N/A

10M to 50M

N Full and Open Competition AIR-6.0 4QFY12 3QFY13 Delex N/A

5M to 10M

N Full and Open Competition AIR-6.0 2QFY12 1QFY13 D.P. Associates N/A

Engineering and Technical Support Services

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River,

MD

Engineering and Technical Support Services

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River,

MD

JTDI - IT System Sustainment, IA, Software Development, Globla Software/Hardware Deployments

NAVICP Mechanicsburg

(N00104)

Huntsville, Alabama &

Patuxent River, MD.

JEDMICS (Operating System) Baseline Release Software Design, Development, Test, Integration Support.

NAVICP Mechanicsburg

(N00104)

3 Years, (1) Base Year, CY13 & (2)

Option years, CY14, CY15.

Northrop Grumman Information

Systems (NGIS)

Three (3) Annual Baseline Release

Instructional Systems Development (ISD)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Cherry Point, Yuma

Instructional Systems Development (ISD)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Whidbey Island, Cherry Point, Tinker AFB

Instructional Systems Development (ISD)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Page 28: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50M

N Full and Open Competition AIR-6.0 4Q FY 12 4QFY13 D.P. Associates N/A

5M to 10M

N Full and Open Competition AIR-6.0 2QFY13 4QFY14 D.P. Associates N/A

5M to 10M

N Full and Open Competition AIR-6.0 3QFY13 2QFY14 N/A

COPE

650K to 5M

Y HUBZone Set Aside AIR-6.6 1QFY11 2QFY11 5 Years China Lake, CA

Instructional Systems Development (ISD)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

North Island,San Diego,

Jacksonville

Instructional Systems Development (ISD)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

New River, Hawaii, Norfolk

Instructional Systems Development (ISD)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Rollout Systems LLC

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Page 29: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Paveway II Spares

650K to 5M

Y AIR-6.6 1QFY11 2QFY11 5 Years China Lake, CA

Paveway II Spares

650K to 5M

Y TBD after Market Research AIR-6.6 1QFY11 2QFY11 5 Years China Lake, CA

Maintenance Planning10M to 50M

Y 8(a) Competitive AIR-6.7 2QFY11 5 Years China Lake, CA

RESET Project Office Y AIR-6.7 2QFY08 2QFY10 5 years N/A

7.0 IRCMS Contract150K to 649K

Y AIR-6.7 1QFY11 3QFY11 60 Months Jax/Tinker N/A

6.7 National Contract

50M and Over

TBD TBD after Market Research AIR-6.7 2QFY10 4QFY10 5 years various N/A

650K to 5M

Y Small Business Set Aside AIR-6.7.2.4 1QFY12 2QFY12 5 years Lakehurst various N/A

TBD

Y 8a Competitive AIR-6.7.5 2QFY11 4QFY11 Dyn-Corp N/A

Service-Disabled Veteran-Owned Set Aside

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAWCAD Patuxent River MD (N00421)

24.5M to 22.5M per Option (Option is 6 Mo. Long) (6 more remaining

Options)Open Competition and Small

Business Set aside both

NAWCAD Patuxent River MD (N00421)

DS2 (0022) and PKL (0023)

CONUS and OCONUS US Marine Corps

MCAS and OEF

Service-Disabled Veteran-Owned Set Aside

Unknown at this time

Andromedia Systems

Incorporated

NAWCAD Patuxent River MD (N00421)

Multiple across sites

Military Packaging Engineering Support

NAWCAD Lakehurst NJ

(N68335)

Contractor Maintenance Support Services (CMSS)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Jacksonville, Beauford, Oceana

Page 30: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

100M to 250M

Y 8a Competitive AIR-6.7.5 4QFY11 2QFY12 N/A

Operational Support

10M to 50M

Y Small Business Set-Aside AIR-6.7.5 4QFY11 3QFY12 SoBran N/A

50M and Over

TBD TBD after Market Research AIR-6.7.5.3 1QFY11 1QFY12 5 years Pax River

F/A-18 E/F Squadron Transition

10M to 50M

N Sole Source AIR-6.7.6.1.3 1QFY12 3QFY12 2 years Boeing St. Louis, MO

Contractor Maintenance Support Services (CMSS)

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Tyonek Services Corp

Jacksonville, Beauford, Oceana

NAWCTSD Orlando FL

(N61339 and N61340)

Base Plus 4 1 yr Options

Jacksonville, Beaufort, Oceana

Aviation Technical Training Product Development

NAWCTSD Orlando FL

(N61339 and N61340)

L3Communicatiiions/D. P.

Associates Inc.

NAWCAD Lakehurst NJ

(N68335)

F/A-18 E/F SE required for the

transition of 4 F/A-18C squadrons

Page 31: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

EA-18G Expeditionary SE

650K to 5M

N Sole Source AIR-6.7.6.1.3 1QFY12 3QFY12 2 years Boeing St. Louis, MO

Tech data pubs

50M and Over

Y 8(a) Competitive AIR-6.8.5 2QFY12 2QFY13 3 years Alutiiq S3G Various

Geothermal Interferometric

150K to 649K

N Full and Open Competition 1QFY12 1QFY12 1 year China Lake N/A

Office Furniture

5M to 10M

N Full and Open Competition 1QFY12 1QFY12 1 Year SteelCase, Inc. China Lake N/A

Wiffleball 8

5M to 10M

N Full and Open Competition 1QFY12 1QFY12 2 years China Lake N/A

Molten Carbonate Fuel Cell

650K to 5M

N Full and Open Competition 1QFY12 1QFY12 2 years China Lake N/A

Fuel Cell

650K to 5M

N Full and Open Competition 1QFY12 1QFY12 1 year Microcell Corp. China Lake N/A

WESTRANSCO

150K to 649K

Y Small Business Set Aside 1QFY12 1QFY12 1 Year WESTTRANSCO China Lake N/A

NAWCAD Lakehurst NJ

(N68335)

EA-18G SE required to

support Expeditionary deployment

NAWCAD Patuxent River MD (N00421)

AIR-7.0 7J0000D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Regents of the University of

Colorado

AIR-7.0 7J0000D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-7.0 7J0000D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Energy/Matter Conversion Corp.

AIR-7.0 7J0000D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Logan Energy Corp.

AIR-7.0 7J0000D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

AIR-7.0 7J0000D

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Page 32: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Strategic Leadership Support

10M to 50M

Y 8(a) Competitive AIR-7.1 4QFY11 2QFY12 3 years Omnitec Solutions

NBO Support

10M to 50M

Y Small Business Set Aside AIR-7.1 2QFY12 1QFY14 3 years Spalding PAX River

Move Service

650K to 5M

y Small Business Set Aside AIR-7.1 1QFY14 1QFY15 3 years JAG Pax River

Courier Service

150K to 649K

TBD TBD after Market Research AIR-7.1 4QFY11 4QFY11 5 years Eastern GCR PAX River

VTC IDIQ10M to 50M

Y 8(a) Competitive AIR-7.2 4QFY11 2QFY12 5 years

Informatica Software maintenance150K to 649K

TBD Full and Open Competition AIR-7.2 4QFY11 1QFY12 12 months Patuxent River

NAWCAD Patuxent River MD (N00421)

PAX River,MD; Arlington, VA

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Page 33: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

150K to 649KTBD Full and Open Competition AIR-7.2 4QFY11 1QFY12 12 months Patuxent River

Adobe software Maintenance150K to 649K

TBD Full and Open Competition AIR-7.2 4QFY11 1QFY12 12 months Patuxent River

650K to 5M

TBD Full and Open Competition AIR-7.2 4QFY11 1QFY12 12 months Patuxent River

Aqualogic software Maintenance650K to 5M

TBD Full and Open Competition AIR-7.2 4QFY11 1QFY12 12 months Patuxent River

150K to 649KN Sole Source AIR-7.2 2QFY13 4QFY13 4 years Consona N/A

7.2 NHD Incident Tracker Maintenance150K to 649K

N Sole Source AIR-7.2 2QFY13 4QFY13 4 years Frontrange

150K to 649KN Sole Source AIR-7.2 2QFY13 4QFY13 4 years Syntellect

e.PowerSoftware license Maintenance650K to 5M

N Sole Source AIR-7.2 3QFY13 1QFY14 12 months Patuxent River

150K to 649KTBD TBD after Market Research AIR-7.2 3QFY13 2QFY14 One time buy

Contrator Support Services 250M to 1B

TBD TBD after Market Research AIR-7.2 1QFY12 3QFY12 5 years GDIT/PSI Sierra

HD VTC Technology650K to 5M

TBD TBD after Market Research AIR-7.2 4QFY13 2QFY14 One time buy

Data Center Information Technology650K to 5M

TBD TBD after Market Research AIR-7.2 1QFY14 3QFY14 One time buy

Data Center Information Technology650K to 5M

TBD TBD after Market Research AIR-7.2 1QFY15 3QFY15 One time buy

650K to 5M

Y AIR-7.3.3 1QFY11 4QFY11 Not applicable VA / MD

Starteam Enterprise and CaliberRM support and software Maintenance

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Business Objects Software Maintenance

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

7.2 NHD Knowledge Management Maintenance

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

7.2 NHD Automated Call Distribution Maintenance

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

CAC Enablement Software and Remote Admin Software

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAVAIR Leadership Development Program (NLDP)

HUBZone Small Business Set Aside

NAVAIR Headquarters

(N00019)

1 yr / 4 one-yr options

Three (3) sessions of each course (5 courses) per year

of contract

Page 34: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Security Support Services (Follow-On)5M to 10M

Y 8(a) Competitive AIR-7.4 1QFY12 3QFY12 36 months 0

PAO Support

5M to 10M

Y 8(a) Competitive AIR-7.5 1QFY12 3QFY12 5 years Bowhead Pax River

Administrative Support Services

10M to 50M

Y Small Business Set Aside AIR-7.8 4QFY11 4QFY12 5 years Pax River N/A

Administrative Support Services150K to 649K

Y 8(a) Competitive AIR-7.8 HQ 4QFY11 1QFY12 5 yrs NTA Pax River N/A

Workforce Skills Center Coordinator150K to 649K

Y 8(a) Competitive AIR-7.8 HQ 1QFY12 2QFY12 5 yrs NTA Pax River N/A

Workforce Skills Center Coordinator

150K to 649K

Y 8(a) Competitive AIR-7.8 WD 4QFY11 4QFY11 3 yrs NDTI Point Mugu N/A

CAM&T10M to 50M

TBD Full and Open Competition Fleet 1Q FY13 3Q FY14 5 years TBD NA

Depot Labor Maintenance (DLM) 100M to 250M Y 8(a) competitive FRCSE 4QFY11 1QFY12 5 years FRCSE JAX N/A

Production Support 10M to 50M Yes Small Business Set Aside FRCSE 1QFY12 3QFY12 5 years SoBran Inc FRCSE JAX N/A

650K to 5M

N Full and Open Competition FRCSW 7.2 1QFY12 2QFY12 3 yrs Re-Compete North Island N/A

IT Infrastructure Support Services

650K to 5M

TBD Full and Open Competition FRCSW 7.2 2QFY12 1QFY13 5 yrs N/A N/A

NAVAIR Headquarters

(N00019)

Security Assistance Corporation

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Government Contracts

Consulting, Inc. (GCC)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAVAIR Headquarters

(N00019)

Cherry Point & Yuma

NAWCTSD Orlando FL

Tyonek Native Corp.

NAWCTSD Orlando FL

FST Radar Engineering Support Services

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAVAIR Headquarters

(N00019)

FRCSW San Diego, CA

Page 35: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

TBD Full and Open Competition FRCSW 7.2 4QFY12 2QFY13 5 yrs N/A N/A

Over 1B N Sole Source PEOJSF 3QFY11 1QFY12 24 months LM Aero Ft Worth, TX 32 Air Systems

Over 1B N Sole Source PEOJSF 4QFY11 3QFY12 24 months LM Aero Ft Worth, TX

Over 1B N Sole Source PEOJSF 3QFY11 2QFY12 24 months Pratt & Whitney Hartford, CN

Over 1B N Sole Source PEOJSF 4QFY11 4QFY12 24 months Pratt & Whitney Hartford, CN

Program Support 10M to 50M Y 8(a) Competitive PMA-201 4QFY11 1QFY12 Imagine One N/A

Upgrade of Aerial Refueling System 650K to 5M N Full and Open Competition PMA-201 3QFY12 4QFY12 12 months Parker Hannifin Hauppauge, NY 76

Over 1B N Full and Open Competition PMA-201 1QFY13 3QFY14 3 years N/A TBD TBD

Harpoon Command Launch Systems 100M to 250M N Sole Source PMA-201 2QFY12 2QFY13 36 Months Boeing St Charles MO

Harpoon Command Launch Systems 10M to 50M N Sole Source PMA-201 2QFY13 2QFY14 24 Months Boeing St Charles MO TBD

Harpoon Command Launch Systems 10M to 50M N Sole Source PMA-201 2QFY14 2QFY15 24 Months Boeing St Charles MO TBD

10M to 50M N Sole Source PMA-201 2QFY13 3QFY13 36 months Boeing St Charles MO TBD

10M to 50M N Sole Source PMA-201 2QFY12 4QFY12 Boeing St Charles MO N/A

50M to 100M N Sole Source PMA-201 3QFY11 2QFY12 12 months Boeing St Charles MO 70

Corporate Automated Financial Information System (CAFIS) Support

NAVAIR Headquarters

(N00019)

FRCSW San Diego, CA

F-35 LM LRIP Lot 5 Production Definitization

NAVAIR Headquarters

(N00019)

F-35 LM LRIP Lot 6 Production & Sustainment Forward Pricing

NAVAIR Headquarters

(N00019)

32 Air Systems with Option for +3

F135 PW LRIP 5 Production and Sustainment Definitization

NAVAIR Headquarters

(N00019)

32 Propulsion Systems

F135 PW LRIP 6 Production and Sustainment Definitization

NAVAIR Headquarters

(N00019)

32 PropulsionSystems with Option for

+3

NAVAIR Headquarters

(N00019)

I year (3 option years)

Lexington Park MD

NAVAIR Headquarters

(N00019)

Offensive Anti-Surface Warfare (OASuW) Weapon

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

8 Systems plus NRE (SNEP)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Harpoon Missile and Launch Systems IDIQ

NAVAIR Headquarters

(N00019)

SLAM-ER, Harpoon Missile and Launch Systems Follow on Support Contract (Boeing) FY11-14

NAVAIR Headquarters

(N00019)

1 year (1 option year)

Harpoon/SLAM-ER Missile Acquisition (Lot 87) (Boeing)

NAVAIR Headquarters

(N00019)

Page 36: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100M N Sole Source PMA-201 2QFY12 1QFY13 12 months Boeing St Charles MO 50

50M to 100M N Sole Source PMA-201 2QFY13 4QFY13 12 months Boeing St Charles MO 50

50M to 100M N Sole Source PMA-201 2QFY14 1QFY15 12 months Boeing St Charles MO 50

5M to 10M N Sole Source PMA-201 3QFY11 2QFY12 12 months Boeing St Charles MO N/A

5M to 10M N Sole Source PMA-201 2QFY13 1QFY13 12 months Boeing St Charles MO N/A

5M to 10M N Sole Source PMA-201 2QFY13 4QFY14 12 months Boeing St Charles MO N/A

5M to 10M N Sole Source PMA-201 2QFY14 1QFY15 12 months Boeing St Charles MO N/A

Harpoon Command Launch Systems 650K to 5M N Sole Source PMA-201 2QFY14 3QFY15 BSC Systems Inc. Restin VA N/A

JSOW Follow-on Support 650K to 5M N Sole Source PMA-201 1QFY12 3QFY12 12 months Raytheon Tucson AZ N/A

JSOW Follow-on Support 650K to 5M N Sole Source PMA-201 1QFY13 3QFY13 12 months Raytheon Tucson AZ N/A

JSOW Follow-on Support 650K to 5M N Sole Source PMA-201 1QFY14 3QFY14 12 months Raytheon Tucson AZ N/A

Training Services (Harpoon/SLAM-ER) 650K to 5M N Sole Source PMA-201 4QFY12 4QFY13 Vienna VA N/A

650K to 5M N Sole Source PMA-201 4QFY11 1QFY12 12mo Raytheon Indianapolis, IN N/A

650K to 5M N Sole Source PMA-201 4QFY12 1QFY13 12mo Raytheon Indianapolis, IN N/A

650K to 5M N Sole Source PMA-201 3QFY11 1QFY12 12mo Boeing St. Charles, MO N/A

650K to 5M N Sole Source PMA-201 4QFY11 1QFY12 12mo Boeing St. Charles, MO N/A

Harpoon/SLAM-ER Missile Acquisition (Lot 88) (Boeing)

NAVAIR Headquarters

(N00019)

Harpoon/SLAM-ER Missile Acquisition (Lot 89) (Boeing)

NAVAIR Headquarters

(N00019)

Harpoon/SLAM-ER Missile Acquisition (Lot 90) (Boeing)

NAVAIR Headquarters

(N00019)

Harpoon/SLAM-ER Missile Acquisition (Lot 87 spares) (Boeing)

NAVAIR Headquarters

(N00019)

Harpoon/SLAM-ER Missile Acquisition (Lot 88 spares) (Boeing)

NAVAIR Headquarters

(N00019)

Harpoon/SLAM-ER Missile Acquisition (Lot 89 spares) (Boeing)

NAVAIR Headquarters

(N00019)

Harpoon/SLAM-ER Missile Acquisition (Lot 90 spares) (Boeing)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

I year (3 option years)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

I year (3 option years)

Delex Systems, Inc.

AWW-13 SUPPORT CONTRACT FY12 (Raytheon)

NAVAIR Headquarters

(N00019)

AWW-13 SUPPORT CONTRACT FY13 (Raytheon)

NAVAIR Headquarters

(N00019)

Recoverable Air Test Vehicle (RATV) Procurement

NAVAIR Headquarters

(N00019)

PRE Support to SLAM-ER and Harpoon FY12

NAVAIR Headquarters

(N00019)

Page 37: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M N Sole Source PMA-201 4QFY12 1QFY13 12mo Boeing St. Charles, MO N/A

Upgrade of BRU-32 Bomb Rack 650K to 5M N Sole Source PMA-201 2QFY12 3QFY12 12 months Marvin Industries Irvine, CA 130

Upgrade LAU-115 Missile Launcher 650K to 5M N Sole Source PMA-201 2QFY12 3QFY12 12 months RTSC Indy Indianapolis, IN 114

Dual Carriage Smart Bomb Rack 50M to 100M TBD TBD after Market Research PMA-201 2QFY12 2QFY13 20 months N/A TBD 231

5M to 10M N Sole Source PMA-202 3QFY11 2QFY12 5 Yrs Peckham Ind Lansing, Michigan 4,226

NACES Production Lot 27 10M to 50M N Sole Source PMA-202 1QFY12 2QFY12 1 Yr 70 Ejection Seats

F/A-18 OBOGS 650K to 5M N Sole Source PMA-202 1QFY12 2QFY12 1 Yr Cobham Davenport, IA

Engineering Support for CSEL System 150K to 649K N Sole Source PMA-202 1QFY12 1QFY12 1 Yr Raytheon Various 1

Combat Survival Radios 150K to 649K N Sole Source PMA-202 1QFY12 1QFY12 1 Yr GSA (Boeing) 50

V-22 Test Set 150K to 649K N Sole Source PMA-202 1QFY12 2QFY12 1 Yr Cobham Davenport, IA 1

E-2D OBOGS 150K to 649K N Sole Source PMA-202 1QFY12 2QFY12 1 Yr Cobham Buffalo, NY

10M to 50M N Sole Source PMA-202 1QFY11 1QFY12 1 Yr Cam Lock LTD United Kingdom 2,047

5M to 10M N Sole Source PMA-202 3QFY11 2QFY13 5 Yrs Peckham Ind Lansing, Michigan 2,285

LEP EDU8 650K to 5M N Sole SourcePMA-202

3QFY12 3QFY12 5 Yrs Gentex Milwood, NY 180

LEP EDU8 650K to 5M N Sole Source PMA-202 1QFY13 3QFY13 5 Yrs Gentex Milwood, NY 185

PRE Support to SLAM-ER and Harpoon FY 13

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Aircrew Endurance Survival Vest and Soft Armor

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Martin Baker Aircraft Co. ltd.

Denham, United Kingdom

NAVAIR Headquarters

(N00019)

40 Oxygen Monitors/ 40

Oxygen Concentrators

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Huntington Beach CA

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

12 Oxygen Regulators

A/P22P-14 Aircrew CBR Respirator Assemblies

NAVAIR Headquarters

(N00019)

Aircrew Endurance Survival Vest and Soft Armor

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 38: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Crash Worthy Troop Seats 10M to 50M NFull and Open Competition

PMA-202 1QFY13 2QFY13 5 Yrs TBD TBD

NACES Production Lot 28 10M to 50M N Sole Source PMA-202 1QFY13 2QFY13 1 Yr 69 Ejection Seats

F/A-18 OBOGS 650K to 5M N Sole Source PMA-202 1QFY13 2QFY13 1 Yr Cobham Davenport, IA

E-2D OBOGS 150K to 649K N Sole Source PMA-202 1QFY13 2QFY13 1 Yr Cobham Buffalo, NY

5M to 10M N Sole Source PMA-202 3QFY11 2QFY14 5 Yrs Peckham Ind Lansing, Michigan 807

LEP EDU8 650K to 5M N Sole Source PMA-202 2QFY14 3QFY14 5 Yrs Gentex Milwood, NY 455

150K to 649K

Y 8(a) Competitive PMA-205 2QFY13 3QFY13 24 mo Carley Corp Orlando, FL N/A

650K to 5M

Y 8(a) Competitive PMA-205 2QFY12 3QFY12 24 mo Carley Corp Orlando, FL N/A

E-6B Hydraulic PC Simulation

650K to 5M

Y 8(a) Competitive PMA-205 2QFY12 3QFY12 24 mo Carley Corp Orlando, FL N/A

Tower Simulator Devices

10M to 50M

N Full and Open Competition PMA-205 3QFY12 4QFY12 5 years N/A Various 32

E-2C Trainer Concurrency Contract

10M to 50M

N Full and Open Competition PMA-205 3QFY11 1QFY12 5 YRS N/A TBD Three

10M to 50M

N Full and Open Competition PMA-205 4QFY11 2QFY12 5 yrs TBD 4

NAVAIR Headquarters

(N00019)

544 Gunner seats/140 troop

Seats

NAVAIR Headquarters

(N00019)

Martin Baker Aircraft Co. ltd.

Denham, United Kingdom

NAVAIR Headquarters

(N00019)

40 Oxygen Monitors/ 40

Oxygen Concentrators

NAVAIR Headquarters

(N00019)

12 Oxygen Regulators

Aircrew Endurance Survival Vest and Soft Armor

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

E-6B Auxiliary Power Unit PC Simulation

NAWCTSD Orlando FL

(N61339 and N61340)

E-6B Mission Crew Courseware Restructure

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

MH60R/S Avionic Maintenance Trainer, Weapons Load Trainer/Mission Configuration Trainer updates WLT/MCT

NAWCTSD Orlando FL

(N61339 and N61340)

LMSI & Rockwell Collins

Page 39: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100M

N Full and Open Competition PMA-205 1QFY12 3QFY12 30 Months N/A 1

50M to 100M

N Full and Open Competition PMA-205 1QFY12 4QFY12 5 yrs TBD 9

50M to 100M

N Full and Open Competition PMA-205 4QFY12 3QFY13 3months/device. TBD Various 7

H-60 ISEO Support Contract

5M to 10M

N Full and Open Competition PMA-205 1QFY12 2QFY12 5yrs NAS North Island N/A

650K to 5M

N Full and Open Competition PMA-205 1QFY13 1QFY14 2 yrs TBD 2

SeaPort support services to PMA2055M to 10M

Y Small Business Set Aside PMA-205 1QFY12 4QFY12 36 months METI

650K to 5M

Y Small Business Set Aside PMA-205 1QFY12 3QFY12 18 Months N/A 8

650K to 5M

N Sole Source PMA-205 3QFY11 1QFY12 6 mo Q4 Services 4

USMC Common Enlisted Aircrew Trainers

NAWCTSD Orlando FL

(N61339 and N61340)

CONUS and OCONUS MCAS

MH60S OFT NASMP Fidelity Improvements

NAWCTSD Orlando FL

(N61339 and N61340)

MH-60R TOFT #1 - #7 Obsolecense, Aircraft Concurrency, and NASMP Implementation.

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

Future Design and Engineering

Corporation (FDE)

HH-60H Concurrency and Obsolescence

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCAD Patuxent River MD (N00421)

Patuxent River MD

Hoist/Parachute Procedures Training (Device 9F10)

NAWCTSD Orlando FL

(N61339 and N61340)

Havelock, NC; Patuxent River,

MD; Norfolk, VA; Jacksonville, FL: Pensacola, FL; Miramar, CA; Lemoore, CA;

Whideby Island, WA

P-3 2F87 Operational Flight Trainer visual system upgrade

NAWCAD Lakehurst NJ

(N68335)

Jacksonville FL, Whidbey Island

Wash and Kanehoe Bay

Hawaii

Page 40: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

250M to 1B

N Sole Source PMA-205 1QFY12 2QFY12 5 years L-3 N/A

5M to 10M

N Sole Source PMA-205 1QFY14 3QFY14 15 Months Bell Textron 1

650K to 5M

N Sole Source PMA-205 2QFY12 3QFY12 12 Months AI2 IA 7

10M to 50M

TBD TBD after Market Research PMA-205 2QFY12 2QFY13 3 YRS N/A TBD Two

10M to 50M

TBD TBD after Market Research PMA-205 2QFY12 2QFY13 5 yrs TBD 4

150K to 649K

TBD TBD after Market Research PMA-205 1QFY13 3QFY13 TBD N/A Orlando, FL 1

50M to 100M

TBD TBD after Market Research PMA-205 1QFY13 4QFY13 5 YRS Rockwell Collins TBD Two

5M to 10M

TBD TBD after Market Research PMA-205 1QFY12 3QFY12 18 Months N/A MCAS New River 2

5M to 10M

TBD TBD after Market Research PMA-205 1QFY13 3QFY13 18 Months N/A 2

5M to 10M

TBD TBD after Market Research PMA-205 1QFY14 3QFY14 18 Months N/A MCAS Miramar 4

F-18C/D Roadmap Procurement Program Basic Ordering Agreement

NAWCTSD Orlando FL

(N61339 and N61340)

Arlington, TX, NAS Ocean, Lemoore, Ft. Workth, New

Orleans,, Atsugi, MCAS miramar,

Beaufort & Iwacuni

AH-1Z Simulator Technology and Visual System Upgrade

NAWCTSD Orlando FL

(N61339 and N61340)

MCAS Camp Pendelton, CA

Reduced Oxygen Breathing Device - Spatial Disorienation Part Task Trainer (PTT)

NAWCTSD Orlando FL

(N61339 and N61340)

C-2A Aircraft Upgrades and Obsolescence

NAWCTSD Orlando FL

(N61339 and N61340)

MH60S Aircrew Virtual Environment Trainer NASMP Upgrades & Procure 4 H60S Aircrew Virtual Environment Trainer (AVET) & MH-60R Aircrewman Training System #1 - #4 (NASMP)

NAWCTSD Orlando FL

(N61339 and N61340)

Common Distributed Mission Training Station (CDMTS) ver 4.3

NAWCTSD Orlando FL

(N61339 and N61340)

E-2D Aircrew and Maintenance Follow on

NAWCTSD Orlando FL

(N61339 and N61340)

East Coast MV-22 Pilot Sim Visual System Upgrades

NAWCTSD Orlando FL

(N61339 and N61340)

CH-53 Pilot Simulator Visual System Upgrades

NAWCTSD Orlando FL

(N61339 and N61340)

MCAS New River & MCAS Miramar

West Coast MV-22 Pilot Sim Visual System Upgrades

NAWCTSD Orlando FL

(N61339 and N61340)

Page 41: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

TBD TBD after Market Research PMA-205 3QFY12 4QFY13 6 to 9 months N/A Oceana, VA N/A

Tower Operator Trainer System

650K to 5M

TBD TBD after Market Research PMA-205 3QFY12 4QFY12 1 year N/A Pensacola, FL N/A

Mixed Gas Hypoxia Chamber

650K to 5M

TBD TBD after Market Research PMA-205 3QFY12 4QFY12 12 Months CA 7

650K to 5M

TBD TBD after Market Research PMA-205 3QFY13 4QFY13 12 Months AI2 TBD 18

650K to 5M

TBD TBD after Market Research PMA-205 1QFY14 2QFY14 12 Months N/A TBD 32

650K to 5M

TBD TBD after Market Research PMA-205 2QFY14 3QFY14 12 Months N/A TBD 30

Dynamic Ejection Seat Trainer

650K to 5M

TBD TBD after Market Research PMA-205 3QFY14 4QFY14 12 Months N/A TBD 9

E-6B IAT Rehost

650K to 5M

TBD TBD after Market Research PMA-205 2QFY14 4QFY14 24 mo TBD Orlando, FL N/A

10M to 50MN Full and Open Competition PMA-207 3QFY11 2QFY12 36 Mos N/A UNK N/A

10M to 50MN Full and Open Competition PMA-207 3QFY12 2QFY13 3 Years N/A Kuwait City N/A

250M to 1BN Full and Open Competition PMA-207 4QFY13 1QFY14 3 YEARS NA NA 3 TO 5

F-5 Maintenance Follow on50M to 100M

N Full and Open Competition PMA-207 3QFY12 4QFY13 Sikorsy Multiple Sites N/A

NSAWC Maintenance Follow on50M to 100M

N Full and Open Competition PMA-207 3QFY12 4QFY13 L-3 Fallon, NV N/A

Landing Signal Officer (LSO) Trainer Upgrade

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

Colorado Altitude Training

Reduced Oxygen Breathing Device - Spatial Disorienation Part Task Trainer (PTT)

NAWCTSD Orlando FL

(N61339 and N61340)

Visual Upgrade for Reduced Oxygen Breathing Device - Spatial Disorienation Part Task Trainer (PTT)

NAWCTSD Orlando FL

(N61339 and N61340)

Upgrade Virtual Reality Parachute Descent Trainer

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

C-130T Avionics Obsolescence Uprgrade (AOU)

NAVAIR Headquarters

(N00019)

Kuwait KC-130J Contractor Maintenance Services

NAVAIR Headquarters

(N00019)

Naval Test Wing Pacific P-3 Replacement Aircraft Procurement

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Base Year + 4 Option years

NAVAIR Headquarters

(N00019)

Base Year + 4 Option years

Page 42: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10MN Full and Open Competition PMA-207 3QFY12 4QFY13 Pratt & Whitney Fallon, NV N/A

AAP for F-16 structures Modifications5M to 10M

N Full and Open Competition PMA-207 3QFY12 4QFY13 5 Years N/A TBD N/A

Kuwait Material Handling Equipment650K to 5M

N Full and Open Competition PMA-207 1QFY12 4QFY12 1 Year N/A Kuwait City N/A

CAS tanker follow-on contract100M to 250M

N Sole Source PMA-207 1QFY12 3QFY12 Multiple Sites N/A

KC-130J Harvest HAWK Kits 4 - 6

10M to 50M

N Sole Source PMA-207 3QFY11 1QFY12 Lockheed Martin Palmdale, CA 3 Kits

C-20 Sustaining Engineering Contract10M to 50M

N Sole Source PMA-207 4QFY11 1QFY12 5 mos Savannah, GA N/A

10M to 50MN Sole Source PMA-207 4QFY11 1QFY12 18 mos 16 Kts

10M to 50MN Sole Source PMA-207 2QFY12 2QFY13 Rolls Royce Indianapolis, IN N/A

C-9 EGPWS & RAAS150K to 649K

N Sole Source PMA-207 1QFY12 2QFY12 1Year L-3 TBD 6

KC-130J CLS - 12 Month Mod 50M to 100M N Sole Source PMA-207 3QFY11 1QFY12 12 months Lockheed Martin Marietta, GA N/A

KC-130J CLS - 12 Month Mod50M to 100M

N Sole Source PMA-207 1QFY12 1QFY13 Lockheed Martin Marietta, GA N/A

Kuwait KC-130J Supply Spares5M to 10M

N Sole Source PMA-207 1QFY12 2QFY12 3 Years Lockheed Martin Kuwait City N/A

C-9 TCAS 7.1650K to 5M

N Sole Source PMA-207 1QFY12 1QFY12 1Year L-3 TBD 6

C-40A Mode 5 Upgrade650K to 5M

N Sole Source PMA-207 2QFY12 4QFY12 1Year Boeing Aircraft TBD 13

F100 Engine Fleet Maintenance Program

NAVAIR Headquarters

(N00019)

Base Year + 4 Option years

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Base Year + 4 Option years

Omega Air Refueling Services

NAVAIR Headquarters

(N00019)

Delivery Dates for CLINS 1 - 3: CLIN

0001 - 11/2012; CLIN 0002 -

2/28/2013; CLIN 0003 - 2/28/2013

NAVAIR Headquarters

(N00019)

Gulfstream Aerospace Corporation

Electronic Propeller Control System (EPCS)

NAVAIR Headquarters

(N00019)

Hamilton Sundstrand

Windsor Locks, CT

KC-130J - Rolls Royce Power by the hour (PBTH)

NAVAIR Headquarters

(N00019)

Base Year + 4 Option years

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Base Year + 4 Option years

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 43: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

C-9 Data link650K to 5M

N Sole Source PMA-207 3QFY12 4QFY12 1Year L-3 TBD 6

650K to 5MN Sole Source PMA-207 3QFY12 2QFY13 3 Years Rolls Royce Kuwait City N/A

650K to 5MN Sole Source PMA-207 3QFY12 2QFY13 3 Years Lockheed Martin Kuwait City N/A

10M to 50MTBD TBD after Market Research PMA-207 1QFY12 3QFY12 3 YEARS N/A NA 8

C-12W A/C Procurement 50M to 100M TBD TBD after Market Research PMA-207 1QFY12 4QFY12 3 YEARS N/A NA 4

C-40A A/C Procurement50M to 100M

TBD TBD after Market Research PMA-207 4QFY11 1QFY12 3 YEARS Boeing Aircraft Seattle, WA 1

C-40A TCAS 7.1650K to 5M

TBD TBD after Market Research PMA-207 2QFY12 2QFY12 1Year Boeing Aircraft TBD 13

50M to 100M TBD TBD after Market Research PMA-207 4QFY11 3QFY12 5 YEARS L-3 Com Various N/A

MLT FY12 Option 2 CLS Spares

650K to 5M

Y Small Business Set Aside PMA-208 2QFY12 1 year Sandy, UT

650K to 5MY Small Business Set Aside PMA-208 2QFY13 1 year Sandy, UT 40

MLT Production Contract650K to 5M

Y Small Business Set Aside PMA-208 2QFY14 1 year Sandy, UT 40

10M to 50MN Sole Source PMA-208 1QFY12 4QFY12 3 Years Orbital Chandler, AZ 6 to 8

10M to 50MN Sole Source PMA-208 4QFY12 2QFY13 3 Years Orbital Chandler, AZ 6 to 8

10M to 50MN Sole Source PMA-208 4QFY13 2QFY14 3 Years Orbital Chandler, AZ 6 to 8

10M to 50MN Sole Source PMA-208 4QFY14 2QFY15 3 Years Orbital Chandler, AZ 6 to 8

NAVAIR Headquarters

(N00019)

Kuwait KC-130J Field Service Representatives

NAVAIR Headquarters

(N00019)

Kuwait KC-130J Field Service Representatives

NAVAIR Headquarters

(N00019)

C-12W A/C Procurement Mission Enhancements

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

C-9 Contractor Logistics Support Contract

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Kairos Autonomi, Inc

MLT FY13 Option 3 C&C Spares Support

NAVAIR Headquarters

(N00019)

Kairos Autonomi, Inc

NAVAIR Headquarters

(N00019)

Kairos Autonomi, Inc

GQM-163AProduction(FRP-6)

NAVAIR Headquarters

(N00019)

GQM-163AProduction(FRP-7)

NAVAIR Headquarters

(N00019)

GQM-163AProduction(FRP-8)

NAVAIR Headquarters

(N00019)

GQM-163AProduction(FRP-9)

NAVAIR Headquarters

(N00019)

Page 44: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50MN Sole Source PMA-208 3QFY15 1QFY16 5 Years Orbital Chandler, AZ N/A

MSST LRIP10M to 50M

N Sole Source PMA-208 2QFY12 1QFY13 1 year ATK 5

MSST Production10M to 50M

N Sole Source PMA-208 1QFY14 1 year ATK Wodland Hills, CA 10

MSST Production10M to 50M

N Sole Source PMA-208 2QFY14 1QFY15 1 year ATK Wodland Hills, CA 10

MSST Production10M to 50M

N Sole Source PMA-208 2QFY15 1QFY16 1 year ATK Wodland Hills, CA 10

Wideband Datalink150K to 649K

N Sole Source PMA-208 4QFY11 3QFY12 24 months N/A

SNTC RF Equipment ACQ/Retrofit150K to 649K

N Sole Source PMA-208 4QFY13 4QFY14 12 months

5M to 10MN Sole Source PMA-208 3QFY15 1QFY16 5 Years Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 2QFY12 4QFY12 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 2QFY12 4QFY12 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 1QFY13 3QFY13 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 1QFY13 3QFY13 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 1QFY14 3QFY14 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 1QFY14 3QFY14 18 Months Orbital Chandler, AZ N/A

GQM-163ABOA IIICY-16 .. 20

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Micro Systems, Inc

Ft Walton Beach, FL

NAVAIR Headquarters

(N00019)

Micro Systems, Inc

Ft Walton Beach, FL

GQM-163AILS

NAVAIR Headquarters

(N00019)

GQM-163AFY-12Initial Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-12Replenishment Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-12Repair Efforts

NAVAIR Headquarters

(N00019)

GQM-163AFY-13Initial Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-13Replenishment Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-13Repair Efforts

NAVAIR Headquarters

(N00019)

GQM-163AFY-14Initial Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-14Replenishment Spares

NAVAIR Headquarters

(N00019)

Page 45: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MN Sole Source PMA-208 Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 1QFY15 3QFY15 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 1QFY15 3QFY15 18 Months Orbital Chandler, AZ N/A

650K to 5MN Sole Source PMA-208 Orbital Chandler, AZ N/A

MSST Rocket Motors650K to 5M

N Sole Source PMA-208 4QFY11 2QFY12 1 year ATK 14

SNTC RF Equipment ACQ/Retrofit650K to 5M

N Sole Source PMA-208 1QFY12 3QFY12 12 months

SNTC RF Equipment ACQ/Retrofit650K to 5M

N Sole Source PMA-208 4QFY12 3QFY13 12 months

650K to 5MN Sole Source PMA-208 4QFY12 3QFY13 12 months

DSQ-50A Scalar Scoring650K to 5M

N Sole Source PMA-208 4QFY13 3QFY14 12 months Irvine, CA

DSQ-50A O-level Test Set150K to 649K

TBD TBD after Market Research PMA-208 1QFY12 3QFY12 12 months TBD

T-1438150K to 649K

TBD TBD after Market Research PMA-208 4QFY13 3QFY14 12 months

650K to 5MTBD TBD after Market Research PMA-208 4QFY11 3QFY12 12 months TBD

DSQ-50A O-level Test Set650K to 5M

TBD TBD after Market Research PMA-208 4QFY13 3QFY14 12 months

SSAT Production 10M to 50M

Y PMA-208 1QFY13 1 year CEi Sacramento, CA 45

SSAT Production 10M to 50M

Y PMA-208 1QFY14 1 year CEi Sacramento, CA 45

SSAT Production 10M to 50M

Y PMA-208 2QFY14 1QFY15 1 year CEi Sacramento, CA 45

GQM-163AFY-14Repair Efforts

NAVAIR Headquarters

(N00019)

GQM-163AFY-15Initial Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-15Replenishment Spares

NAVAIR Headquarters

(N00019)

GQM-163AFY-15Repair Efforts

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

Micro Systems, Inc

Ft Walton Beach, FL

NAVAIR Headquarters

(N00019)

Micro Systems, Inc

Ft Walton Beach, FL

DSQ-50AScalar Scoring

NAVAIR Headquarters

(N00019)

Micro Systems, Inc

Ft Walton Beach, FL

NAVAIR Headquarters

(N00019)

Meggit Defense Industries

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

AN/DPN-90O-level Test Set

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

Page 46: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

SSAT Production 10M to 50M

Y PMA-208 1QFY16 1 year CEi Sacramento, CA 45

SSAT RATOs150K to 649K

Y PMA-208 3QFY11 4QFY11 1 Year CEi Sacramento, CA 44

150K to 649KY PMA-208 3QFY11 4QFY11 1 year CEi Sacramento, CA 10

650K to 5MY PMA-208 3QFY11 4QFY11 3 Years Cei Sacramento, CA N/A

10M to 50MN Full and Open Competition PMA-209 3QFY13 3QFY14 5 years Pax River

GPWS Software Product Contract10M to 50M

TBD Full and Open Competition PMA-209 4QFY11 4QFY12 5 years Pax River

LPIA Technical and Enginering650K to 5M

TBD TBD after Market Research PMA-209 4QFY11 1QFY12 18 months BAE Wayne, NJ N/A

150K to 649KN Sole Source PMA-209 1QFY11 1QFY12 5 Yrs SCI Samina NAS PAX 36 ea.

150K to 649KN Sole Source PMA-209 4QFY10 4QFY11 5 Yrs Mason-Esterline NAS PAX 50 ea.

150K to 649KN Sole Source PMA-209 4QFY10 2QFY11 5 Yrs FEI-Zyfer NAS PAX 14 ea.

10M to 50MN Sole Source PMA-209 2QFY11 2QFY12 3 Yrs Raytheon NAS PAX 312 ea.

150K to 649K

N Sole Source PMA-209 4QFY11 1QFY12 12 months Bloomington, MN Services

CNS/ATM F/A-18A+ EGI RETROFIT150K to 649K

N Sole Source PMA-209 1QFY12 3QFY12 18 months N/A

CH-53K EGI Technical Support150K to 649K

N Sole Source PMA-209 3QFY11 1QFY12 6 months N/A

CH-53K EGI ROR Support150K to 649K

N Sole Source PMA-209 2QFY12 4QFY12 18 months N/A

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

SSAT SNTC Transponder Incorporation

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

SSAT Schdule and Program Adjustment

Women-Owned Small Business Set Aside

NAVAIR Headquarters

(N00019)

MFOQA SW and Prime Integration Contract

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

CNS/ATM Hardware: AIUs & DCUs (NRE and Production)

NAVAIR Headquarters

(N00019)

CNS/ATM Hardware: Hand Controllers (NRE and Production)

NAVAIR Headquarters

(N00019)

CNS/ATM Hardware: Zyfer Modules (NRE and Production)

NAVAIR Headquarters

(N00019)

CNS/ATM Hardware: MAGR-24s (NRE and Production)

NAVAIR Headquarters

(N00019)

General Dynamics -Advanced Information Systems / PMA209 BOA Task Order for Mission Computer Repairs

NAVAIR Headquarters

(N00019)

General Dynamics-Advanced Information

Systems

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

Page 47: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

RAAF F/A-18 EGI Link 21 retrofit150K to 649K

N Sole Source PMA-209 1QFY12 3QFY12 9 months N/A

SAF F/A-18 EGI field loading capability150K to 649K

N Sole Source PMA-209 1QFY12 3QFY12 9 months N/A

Ecuador SH-2G EGI procurement150K to 649K

N Sole Source PMA-209 2QFY12 4QFY12 15 months Honeywell Clearwater, FL N/A

E-2D EGI JPALS Trade Study, Phase II150K to 649K

N Sole Source PMA-209 1QFY13 3QFY13 12 months N/A

E-2D EGI JPALS Trade Study, Phase III150K to 649K

N Sole Source PMA-209 1QFY14 3QFY14 12 months N/A

CF-18 EGI LBI correction150K to 649K

N Sole Source PMA-209 4QFY11 2QFY12 12 months N/A

Oracle Production Licenses150K to 649K

N Sole Source PMA-209 1QFY12 3QFY12 Unknown 500 licenses

MFOQA Flight Data Translator for T-45150K to 649K

N Sole Source PMA-209 3QFY14 1QFY15 3 years Boeing

150K to 649KN Sole Source PMA-209 3QFY12 1QFY13 5 yrs NAS Pax 27

CNS/ATM Hardware: GDL-90150K to 649K

N Sole Source PMA-209 3QFY11 1QFY12 5 yrs Garmin NAS Pax 29

50M to 100M

N Sole Source PMA-209 4QFY11 1QFY12 36 months Rockwell Collins Cedar Rapids, Ia

MSMA Basic Ordering Agreement 50M to 100M N Sole Source PMA-209 3QFY11 4QFY11 5 yrs Rockwell Collins N/A

FCNS Production

5M to 10M

N Sole Source PMA-209 4QFY11 3QFY12 36 months Harris Corporation Melbourne, FL 28

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

CNS/ATM Hardware: Temperature Probe

NAVAIR Headquarters

(N00019)

Rosemont Aerospace

NAVAIR Headquarters

(N00019)

ARC-210 Basic Ordering Agreement (BOA)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Ceadr Rapids, Iowa

NAVAIR Headquarters

(N00019)

Page 48: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10M

N Sole Source PMA-209 1QFY12 4QFY12 24 months Albuquerque, NM 158

5M to 10M

N Sole Source PMA-209 4QFY11 2QFY12 24 Months Bloomington, MN Services

Common Electronic Standby Indicator 5M to 10M N Sole Source PMA-209 4QFY11 2QFY12 5 yrs General Electric 100

650K to 5M

N Sole Source PMA-209 3QFY11 1QFY12 12 months St Louis, MO Services

650K to 5M

N Sole Source PMA-209 1QFY13 4QFY13 36 months Albuquerque, NM Services

Advanced Multi-Purpose Display (AMPD) Production

NAVAIR Headquarters

(N00019)

Honeywell International

General Dynamics -Advanced Information Systems / PMA209 BOA Task Order for Mission Systems Computer / Warfare Management Computer Integration Effort

NAVAIR Headquarters

(N00019)

General Dynamics-Advanced Information

Systems

NAVAIR Headquarters

(N00019)

Cheltenham, England

Advanced Mission Computer (AMC) Engineering Services BOA Task Order (Prime Integrator)

NAVAIR Headquarters

(N00019)

Boeing Corporation (McDonnell Douglas)

AMPD Engineering Services BOA (Manufacturer)

NAVAIR Headquarters

(N00019)

Honeywell International

Page 49: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

N Sole Source PMA-209 1QFY13 4QFY13 36 months Harris Corporation Melbourne, FL Services

650K to 5MN Sole Source PMA-209 3QFY11 4QFY11 9 months N/A

H-1 EGI Procurement650K to 5M

N Sole Source PMA-209 3QFY11 1QFY12 24 months Honeywell Clearwater, FL 46

650K to 5MN Sole Source PMA-209 3QFY11 1QFY12 18 months N/A

650K to 5MN Sole Source PMA-209 1QFY14 3QFY14 18 months N/A

MFOQA FVDA Product Contract650K to 5M

N Sole Source PMA-209 1QFY13 2 years BGI, LLC

CNS/ATM EGI650K to 5M

N Sole Source PMA-209 3QFY11 1QFY12 5 Yrs Honeywell NAS PAX

CNS/ATM Hardware: Fuel Flow Sensor650K to 5M

N Sole Source PMA-209 3QFY12 1QFY13 5 yrs Ametek NAS Pax 27

650K to 5MN Sole Source PMA-209 3QFY12 1QFY13 5 yrs NAS Pax 27

650K to 5MN Sole Source PMA-209 3QFY11 1QFY12 5 yrs Ballard NAS Pax 29

C-2A EGI JPALS Trade Study, Phase II150K to 649K

N Sole Source PMA-209 1QFY13 3QFY13 12 months Honeywell Clearwater, FL N/A

C-2A EGI JPALS Trade Study, Phase III150K to 649K

N Sole Source PMA-209 1QFY14 3QFY14 12 months Honeywell Clearwater, FL N/A

FCNS Engineering Services BOA (Manufacturer)

NAVAIR Headquarters

(N00019)

CNS/ATM F/A-18A+ EGI RAIM OFP NRE

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

CH-53K EGI Phase II OFP missionization

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

CH-53K EGI Phase III OFP missionization

NAVAIR Headquarters

(N00019)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

CNS/ATM Hardware: Improved Data Modem

NAVAIR Headquarters

(N00019)

Radionic Industries

CNS/ATM Hardware: TACAN Converter Box

NAVAIR Headquarters

(N00019)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

Page 50: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

VH-60N EGI SAASM GEM Link Update150K to 649K

N Sole Source PMA-209 1QFY12 3QFY12 12 months Honeywell Clearwater, FL N/A

EA-6B MIDS Compatible TACAN 650K to 5M

N Sole Source PMA-209 1QFY12 2QFY12 24 months Rockwell Collins Cedar Rapids, IA N/A

SSC EGI Missionization650K to 5M

N Sole Source PMA-209 1QFY12 3QFY12 24 months Honeywell Clearwater, FL N/A

650K to 5MN Sole Source PMA-209 3QFY12 4QFY12 12 months Honeywell Clearwater, FL 100

650K to 5MN Sole Source PMA-209 3QFY12 4QFY12 12 months 100

H-53 RAHRS Sustainment Mod650K to 5M

N Sole Source PMA-209 1QFY13 3QFY13 24 months BAE Johnson City, NY N/A

N-UCAS Phase F Technical Support650K to 5M

N Sole Source PMA-209 3QFY11 1QFY12 15 months Honeywell Clearwater, FL 100

N-UCAS Phase F Integration Units650K to 5M

N Sole Source PMA-209 3QFY11 1QFY12 6 months Honeywell Clearwater, FL 100

N-UCAS Phase G650K to 5M

N Sole Source PMA-209 1QFY13 3QFY13 24 months Honeywell Clearwater, FL 100

650K to 5MN Sole Source PMA-209 1QFY13 2QFY13 12 months Honeywell Clearwater, FL 100

650K to 5MN Sole Source PMA-209 1QFY13 2QFY13 12 months 100

650K to 5MN Sole Source PMA-209 3QFY13 4QFY13 12 months Honeywell Clearwater, FL 100

650K to 5MN Sole Source PMA-209 3QFY13 4QFY13 12 months 100

H-1 EGI RAIM/SAASM Update650K to 5M

N Sole Source PMA-209 1QFY14 3QFY14 24 months Honeywell Clearwater, FL N/A

650K to 5MN Sole Source PMA-209 1QFY14 2QFY14 12 months Honeywell Clearwater, FL 100

650K to 5MN Sole Source PMA-209 1QFY14 2QFY14 12 months 100

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

H-764G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

LN-100G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

Northrop Grumman

Woodland Hills, CA

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

H-764G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

LN-100G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

Northrop Grumman

Woodland Hills, CA

H-764G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

LN-100G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

Northrop Grumman

Woodland Hills, CA

NAWCAD Lakehurst NJ

(N68335)

H-764G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

LN-100G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

Northrop Grumman

Woodland Hills, CA

Page 51: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MN Sole Source PMA-209 3QFY14 4QFY14 12 months Honeywell Clearwater, FL 100

650K to 5MN Sole Source PMA-209 3QFY14 4QFY14 12 months 100

Advanced Digital Data Set (ADDS) 100M to 250M TBD TBD after Market Research PMA-209 4QFY11 3QFY12 n/a n/a

10M to 50MTBD TBD after Market Research PMA-209 3QFY11 1QFY12 5 Yrs DCS Corp. NAS PAX CSS

Reduced Form Factor (RFF) N Full and Open Competition PMA-213 TBD N/A TBD TBD

CXP Units/Kits

100M to 250M

N Sole Source PMA-213 2QFY11 1QFY12 3 yrs BAE Greenlawn, NY 6554

DI Units/Kits

10M to 50M

N Sole Source PMA-213 3QFY11 3QFY12 2 yrs BAE Greenlawn, NY 97

OE-120/UPX Antenna10M to 50M

N Sole Source PMA-213 1QFY11 4QFY11 2 yrs BAE Nashua, NH 7

OE-120/UPX Antenna10M to 50M

N Sole Source PMA-213 1QFY13 4QFY13 2 yrs BAE Nashua, NH 5

AN/UPX-24 (C )

10M to 50M

N Sole Source PMA-213 2QFY11 2QFY12 2 yrs NG 7

H-764G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

LN-100G EGI procurements & depot repairs

NAWCAD Lakehurst NJ

(N68335)

Northrop Grumman

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

5 yr contract (EMD- LRIP)

Patuxent River, MD

CNS/ATM Common Systems Integration Lab

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Woodland Hills, CA

Page 52: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50M

Y Small Business Set Aside PMA-226 3QFY11 1QFY12 3-years Precise N/A

Trainer Upgrade

650K to 5M

Y 8(a) Competitive PMA-226 3QFY11 1QFY12 12 mo TBD NAWTSD Orlando 1 each

Dual Torque Indicator Test Set150K to 649K

N Full and Open Competition PMA-226 4QFY11 1QFY12 12 mo TBD Cherry Point 25 each

650K to 5MTBD TBD after Market Research PMA-226 3QFY13 4QFY13 1 yr TBD TBD N/A

AIMS Enhancement software update150K to 649K

N Sole Source PMA-226 1QFY12 3QFY12 12 mo Honeywell Carlsbad, CA 1 Software release

Kit Installation650K to 5M

N Sole Source PMA-226 1QFY12 3QFY12 12 mo Kit Installations

Boeing Aerospace Operations650K to 5M

N Sole Source PMA-226 1QFY12 1QFY12 12 mo N/A

Boeing Aerospace Operations650K to 5M

N Sole Source PMA-226 1QFY13 1QFY13 12 mo N/A

Syn Shaft Tunnel Fairing150K to 649K

N Sole Source PMA-226 1QFY12 3QFY12 6 mo VX Aerospace Morganton, NC 7 kits

650K to 5MTBD TBD after Market Research PMA-226 1QFY12 3QFY12 1 yr ZENETEX Havelock, NC N/A

650K to 5MTBD TBD after Market Research PMA-226 2QFY12 4QFY12 1 yr ALUTIIQ Havelock, NC N/A

650K to 5MTBD TBD after Market Research PMA-226 1QFY13 3QFY13 1 yr ZENETEX Havelock, NC N/A

650K to 5MTBD TBD after Market Research PMA-226 1QFY14 3QFY14 1 yr ZENETEX Havelock, NC N/A

650K to 5M

TBD TBD after Market Research PMA-226 2QFY14 4QFY14 1 yr TBD TBD N/A

Program Mgt/Engineering Support Services

NAVAIR Headquarters

(N00019)

Cherry Point, NC 95%,

Miramar/Pendleton, CA 5%

NAWCTSD Orlando FL

(N61339 and N61340)

NAVAIR Headquarters

(N00019)

AIR 6.8.5 Logistics Product Data Support Services

NAWCAD Patuxent River MD (N00421)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

L-3 COMMUNICATIO

NS CORP

Camp Pendleton, CA

NAVAIR Headquarters

(N00019)

BOEING AEROSPACE OPERATIONS

Cherry Point, North Carolina

NAVAIR Headquarters

(N00019)

BOEING AEROSPACE OPERATIONS

Cherry Point, North Carolina

NAVAIR Headquarters

(N00019)

National 6.7 Logistics Contract / Zenetex

NAWCAD Patuxent River MD (N00421)

AIR 6.8.5 Logistics Product Data Support Services

NAWCAD Patuxent River MD (N00421)

National 6.7 Logistics Contract / Zenetex

NAWCAD Patuxent River MD (N00421)

National 6.7 Logistics Contract / Zenetex

NAWCAD Patuxent River MD (N00421)

AIR 6.8.5 Logistics Product Data Support Services AIR 6.8.5 Logistics Product Data Support Services / AlutiiqAIR 6.8.5 Logistics Product Data Support Services / Alutiiq

NAWCAD Patuxent River MD (N00421)

Page 53: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Drafting Services 150K to 649K TBD TBD after Market Research PMA-226 1QFY12 1QFY12 12 mo LTM Inc N/A

Drafting Services 150K to 649K TBD TBD after Market Research PMA-226 1QFY13 1QFY13 12 mo LTM Inc N/A

100M to 250MN Sole Source PMA-231 4QFY11 1QFY13 5 Years Rolls Royce Oakland, CA N/A

E-2D Unit Under Test (UUT)10M to 50M

N Sole Source PMA-231 2QFY11 1QFY12 30 Months Bethpage, NY N/A

10M to 50MN Sole Source PMA-231 3QFY11 1QFY12 30 Months Bethpage, NY N/A

10M to 50MN Sole Source PMA-231 1QFY12 4QFY12 3 Years Bethpage, NY N/A

E-2D LRIP Lot 4 Spares10M to 50M

N Sole Source PMA-231 3QFY12 1QFY13 30 Months Bethpage, NY N/A

E-2D FRP Spares10M to 50M

N Sole Source PMA-231 3QFY13 3QFY14 30 Months Bethpage, NY N/A

E-2C Intelligent (I)-Files150K to 649K

N Sole Source PMA-231 4QFY11 1QFY12 1 Year Owego, NY N/A

250M to 1BN Sole Source PMA-231 3QFY11 2QFY13 3 Years Bethpage, NY N/A

5M to 10MN Sole Source PMA-231 2QFY13 4QFY13 3 Years Bethpage, NY 30

E-2D Guard Radios5M to 10M

N Sole Source PMA-231 4QFY11 3QFY12 1 Year Bethpage, NY N/A

5M to 10MN Sole Source PMA-231 1QFY12 4QFY12 5 Years Bethpage, NY N/A

650K to 5MN Sole Source PMA-231 4QFY11 1QFY12 1 Year Bethpage, NY 31

E-2C WRA-9 Kits/Installs for the Fleet650K to 5M

N Sole Source PMA-231 4QFY11 3QFY12 3 Years Syracuse, NY 30

E-2C High Frequency Antenna Installs650K to 5M

N Sole Source PMA-231 1QFY12 3QFY12 3 Years Bethpage, NY N/A

Unknown at this time

Cherry Point, North Carolina

Unknown at this time

Cherry Point, North Carolina

E-2C and E-2DT56A-427 Series 4 Engine Repairs

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

E-2D Low Rate Initial Production (LRIP) Lot 3 Spares

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

E-2D Integrated Logistic Support for Non-Recurring Engineering (NRE)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Lockheed Martin Corporation

E-2D Full Rate Production (FRP) Lot 1 Contract

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

E-2C Cooperative Engagement Capability (CEC) Backfit

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

E-2D In-flight Refueling (IFR) EMD Effort

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

E-2C CORE Open Architecture (OA) Production & Install

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Lockheed Martin Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

Page 54: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MN Sole Source PMA-231 1QFY13 3QFY13 1 Year BAE Systems Phoenix, AZ 35

E-2D Multi-Year Procurement (MYP)Over 1B

N Sole Source PMA-231 3QFY12 2QFY14 5 Years Bethpage, NY N/A

5M to 10M

Y PMA-234 4QFY13 4QFY14 60 Months N/A TBD N/A

ALE-43(v)5

10M to 50M

N Sole Source PMA-234 4QFY12 2QFY13 12 Months Raytheon Raytheon TBD

APKWS FRP Basic with 4 Options100M to 250M

N Sole Source PMA-242 3QFY11 2QFY12 5 years BAE Systems Nashua, NH 8321

AARGM Full Rate Production (FRP) 50M to 100M

N Sole Source PMA-242 1QFY12 3QFY12 28 months 72

AARGM FRP 250M to 100M

N Sole Source PMA-242 1QFY13 3QFY13 28 months 100

650K to 5M

N Sole Source PMA-242 4QFY11 1QFY12 4 yrs Boeing St Louis, MO N/A

CDWS GAU-21650K to 5M

N Sole Source PMA-242 3QFY13 4QFY13 24 months FN/Herstal 40

FMS II - HARM650K to 5M

N Sole Source PMA-242 2QFY13 4QFY13 18 Months Tuscon, AZ N/A

FMS II - HARM650K to 5M

N Sole Source PMA-242 2QFY12 4QFY12 12 Months Tuscon, AZ N/A

650K to 5MY 8(A) Non Competitive PMA-251 1QFY12 3QFY12 24 months None TBD 1 Shipset

150K to 649KTBD Full and Open Competition PMA-251 1QFY12 3QFY12 12 months None TBD CVN 78

E-2D Parachute Survival Ensemble (PSE)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

PM Support Services for EA-6B and AEA Program Office (Seaport)

Service-Disabled Veteran-Owned Set Aside

NAWCAD Patuxent River MD (N00421)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ATK Mission Systems Group

Woodland Hills, CA

NAVAIR Headquarters

(N00019)

ATK Mission Systems Group

Woodland Hills, CA

JAGM Platform Integration Engineering Support

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Leige/Herstal Belgium

NAVAIR Headquarters

(N00019)

Raytheon Company

NAWCAD Patuxent River MD (N00421)

Raytheon Company

Aviation Data and Management Control System (ADMACS) BLK 3

NAWCAD Lakehurst NJ

(N68335)

Integrated Launch and Recovery Television Surveillance System (ILARTS)

NAWCAD Lakehurst NJ

(N68335)

Page 55: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

150K to 649KTBD Full and Open Competition PMA-251 1QFY12 3QFY12 1 None TBD LSD 49

150K to 649KTBD Full and Open Competition PMA-251 2QFY13 3QFY13 1 None N/A TBD

150K to 649KTBD Full and Open Competition PMA-251 1QFY12 3QFY12 12 months None TBD CVN 68 Class

150K to 649KTBD Full and Open Competition PMA-251 2QFY12 4QFY12 Four Years None N/A TBD

150K to 649KTBD Full and Open Competition PMA-251 2QFY13 3QFY13 One Year None N/A TBD

150K to 649KTBD Full and Open Competition PMA-251 2QFY13 4QFY13 Two Years None N/A TBD

650K to 5MTBD Full and Open Competition PMA-251 2QFY14 4QFY14 Four Years None N/A TBD

10M to 50MN Sole Source PMA-251 3QFY11 1QFY12 5 yrs Calzoni Italy 50

10M to 50M

N Sole Source PMA-251 3QFY11 2QFY12 54 months General Atomics San Diego, CA N/A

10M to 50M

N Sole Source PMA-251 3QFY12 1QFY13 4 years General Atomics San Diego, CA 1 Land Based Unit

150K to 649KN Sole Source PMA-251 4QFY11 1QFY12 12 months TBD CVN 78

50M and OverN Sole Source PMA-251 4QFY12 2QFY13 48 months General Atomics San Diego, CA N/A

50M and OverN Sole Source PMA-251 4QFY12 2Qtr/FY13 48 months General Atomics San Diego, CA N/A

50M to 100MN Sole Source PMA-251 1QFY12 4QFY13 4 years General Atomics San Diego, CA 1 Land Based Unit

50M to 100MN Sole Source PMA-251 4QFY12 1QFY13 4 years General Atomics San Diego, CA N/A

Helicopter Operation Surveillance System (HOSS)

NAWCAD Lakehurst NJ

(N68335)

Catapult ReContoured Spear Prototypes

NAWCAD Lakehurst NJ

(N68335)

Integrated Launch and Recovery Television Surveillance System (ILARTS)

NAWCAD Lakehurst NJ

(N68335)

Waterbrake PMS without water - hardware

NAWCAD Lakehurst NJ

(N68335)

Catapult ReContoured Spear Prototypes

NAWCAD Lakehurst NJ

(N68335)

Integrated Catapult Control Station (ICCS) Limit Switches Corrosion Control Production

NAWCAD Lakehurst NJ

(N68335)

Advanced Prognostics for Steam Catapults

NAWCAD Lakehurst NJ

(N68335)

Advanced Stabilized Glide Slope Indicator (ASGSI)

NAWCAD Lakehurst NJ

(N68335)

Electromagnetic Aircraft Launch System (EMALS) Engineering/Life Cycle Support Development (ELCSD)

NAWCAD Lakehurst NJ

(N68335)

Advanced Arresting Gear (AAG) single wire unit for Lakehurst Jet Car Track Site (JCTS) Track #3

NAWCAD Lakehurst NJ

(N68335)

Integrated Launch and Recovery Television Surveillance System (ILARTS)

NAWCAD Lakehurst NJ

(N68335)

Cobham Sensor Systems

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) for CVN 79

NAWCAD Lakehurst NJ

(N68335)

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) for CVN 79

NAWCAD Lakehurst NJ

(N68335)

Advanced Arresting Gear (AAG) shipset for FMS ISO British CVF

NAWCAD Lakehurst NJ

(N68335)

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) for CVN 79

NAWCAD Lakehurst NJ

(N68335)

Page 56: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100MN Sole Source PMA-251 4QFY12 1QFY13 4 years General Atomics San Diego, CA N/A

5M to 10MN Sole Source PMA-251 1QFY12 4QFY12 24 months General Atomics San Diego, CA 1 Shipset

Compact Swaging Machine5M to 10M

N Sole Source PMA-251 2QFY15 4QFY15 48 months Creare US

ARC RCV Re-Design650K to 5M

N Sole Source PMA-251 2QFY13 3QFY13 24 months Northup Grumman US

ARC CROV Actuator Re-Design650K to 5M

N Sole Source PMA-251 2QFY13 3QFY13 24 months Northup Grumman US

150K to 649KN Sole Source PMA-251 2QFY12 2QFY12 12 months Epsilon TBD CVN 78

150K to 649KN Sole Source PMA-251 2QFY13 3QFY13 One Year CA Three

650K to 5M

TBD TBD after Market Research PMA-251 4QFY11 2QFY12 24 months N/A TBD 1 Shipset

Hydraulic Packing150K to 649K

TBD TBD after Market Research PMA-251 1QFY14 3QFY14 12 months None TBD

Hydraulic Filtration150K to 649K

TBD TBD after Market Research PMA-251 4QFY11 1QFY12 24 months None TBD

150K to 649KTBD TBD after Market Research PMA-251 1QFY12 2QFY12 24 months None TBD 4 Shipsets

Wire Supports150K to 649K

TBD TBD after Market Research PMA-251 4QFY11 1QFY12 12 months N/A TBD

650K to 5MTBD TBD after Market Research PMA-251 3QFY11 1QFY12 5 yrs None TBD 50

650K to 5M

TBD TBD after Market Research PMA-251 4QFY11 2QFY12 24 months None TBD 1 Shipset

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) for CVN 79

NAWCAD Lakehurst NJ

(N68335)

Electromagnetic Aircraft Launch System (EMALS) CVN-79 Long Lead Time Material (LLTM)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

10 Shipsets, 3 land sites

NAWCAD Lakehurst NJ

(N68335)

10 Shipsets, 3 land sites

NAWCAD Lakehurst NJ

(N68335)

10 Shipsets, 3 land sites

Integrated Launch and Recovery Television Surveillance System (ILARTS)

NAWCAD Lakehurst NJ

(N68335)

Low Launch Valve Semi-Auto Lube Systems

NAWCAD Lakehurst NJ

(N68335)

Hydraulics International

Incoporated (HII)

Electromagnetic Aircraft Launch System (EMALS) Launch Motor Subsystem (LMS) Government Furnished Equipment (GFE) Shipbuilding and Conversion, Navy (SCN)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

10 Shipsets, 3 land sites

NAWCAD Lakehurst NJ

(N68335)

10 Shipsets, 3 land sites

Landing Signal Officer Display System (LSODS) MK 31 Mod 0

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

10 Shipsets, 3 land sites

Aviation Lighting System Control Panel Set (ALS-CPS)

NAWCAD Lakehurst NJ

(N68335)

Electromagnetic Aircraft Launch System (EMALS) Launch Motor Subsystem (LMS) Government Furnished Equipment (GFE) Shipbuilding and Conversion, Navy (SCN)

NAWCAD Lakehurst NJ

(N68335)

Page 57: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Moriah Wind Systems Production650K to 5M

TBD TBD after Market Research PMA-251 4QFY12 1QFY13 TBD QPI TBD TBD

Moriah Wind Systems Production650K to 5M

TBD TBD after Market Research PMA-251 4QFY12 1QFY13 TBD QPI TBD TBD

Display Computer Production10M to 50M

N Sole Source PMA-257 4QFY11 3QFY12 3 Years General Electric Various 99

ECP 282 - Fuel Couplings150K to 649K

N Sole Source PMA-257 2QFY11 1QFY12 1 Year Boeing St Louis, MO 74

Thermal Battery Removal150K to 649K

N Sole Source PMA-257 4QFY11 4QFY12 2 years Boeing Various 141

EVIC Cat 3 EI's (2012)150K to 649K

N Sole Source PMA-257 1QFY12 3QFY12 1 Year Hartford, CT 8 Units

EVIC Cat 3 EI's (2013)150K to 649K

N Sole Source PMA-257 1QFY13 3QFY13 1 Year Hartford, CT 8 Units

F402 Logistics Support (2013)150K to 649K

N Sole Source PMA-257 2QFY13 3QFY13 12 Months PAL Cherry Point, NC N/A

F402 Logistics Support (2014)150K to 649K

N Sole Source PMA-257 2QFY14 3QFY14 12 Months PAL Cherry Point, NC N/A

ECP-310 TAMMAC Last Lot buy150K to 649K

N Sole Source PMA-257 3QFY11 1QFY12 1 year Boeing St Louis, MO 14

Litening Pod Repair and Procurement250M to 1B

N Sole Source PMA-257 1QFY12 1QFY13 4 years IDIQ

Post-Production Support Follow-on50M to 100M

N Sole Source PMA-257 1QFY13 1QFY14 4 years Boeing St Louis, MO N/A

Advanced Memory Unit relocation650K to 5M

N Sole Source PMA-257 4QFY11 3QFY12 2 years Boeing Various 138

WMC Upgrade650K to 5M

N Sole Source PMA-257 4QFY11 3QFY12 2 years General Electric TBD 146

LTM Support (2012)650K to 5M

N Sole Source PMA-257 2QFY12 3QFY12 12 Months LTM Cherry Point, NC N/A

LTM Support (2013)650K to 5M

N Sole Source PMA-257 2QFY13 3QFY13 12 Months LTM Cherry Point, NC N/A

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Hamilton Sundstrand

NAVAIR Headquarters

(N00019)

Hamilton Sundstrand

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Rolling Meadows, IL

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 58: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

LTM Support (2014)650K to 5M

N Sole Source PMA-257 2QFY14 3QFY14 12 Months LTM Cherry Point, NC N/A

F402 CIP (2012)650K to 5M

N Sole Source PMA-257 3QFY11 1QFY12 12 months Rolls Royce Bristol, UK N/A

F402 CIP (2013)650K to 5M

N Sole Source PMA-257 3QFY12 1QFY13 12 months Rolls Royce Bristol, UK N/A

F402 CIP (2014)650K to 5M

N Sole Source PMA-257 3QFY13 1QFY14 12 months Rolls Royce Bristol, UK N/A

F402 ILS (2012)650K to 5M

N Sole Source PMA-257 3QFY11 1QFY12 12 months Rolls Royce Bristol, UK N/A

F402 ILS (2013)650K to 5M

N Sole Source PMA-257 3QFY12 1QFY13 12 months Rolls Royce Bristol, UK N/A

F402 ILS (2014)650K to 5M

N Sole Source PMA-257 3QFY13 1QFY14 12 months Rolls Royce Bristol, UK N/A

F402 Support Equipment (2012)650K to 5M

N Sole Source PMA-257 1QFY12 3QFY12 Various Various Various

F402 Support Equipment (2013)650K to 5M

N Sole Source PMA-257 2QFY13 3QFY13 Various Various Various

F402 Support Equipment (2014)650K to 5M

N Sole Source PMA-257 2QFY14 3QFY14 Various Various Various

Engine Accessory CIP (2012)650K to 5M

N Sole Source PMA-257 1QFY12 3QFY12 12 Months Goodrich UK N/A

Engine Accessory CIP (2013)650K to 5M

N Sole Source PMA-257 2QFY13 3QFY13 12 Months Goodrich UK N/A

Engine Accessory CIP (2014)650K to 5M

N Sole Source PMA-257 2QFY14 3QFY14 12 Months Goodrich UK N/A

150K to 649K

N Sole Source PMA-257 4QFY11 3QFY12 5 years Boeing St Louis, MO N/A

650K to 5M

TBD TBD after Market Research PMA-257 3QFY12 2QFY13 24 Months N/A 1

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

12 months from first delivery

NAVAIR Headquarters

(N00019)

12 months from first delivery

NAVAIR Headquarters

(N00019)

12 months from first delivery

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

JSSA Operational Flight Program Support

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

H6.1 OFP Upgrades: Weapon Systems Trainers (WST)

NAWCTSD Orlando FL

(N61339 and N61340)

MCAS Cherry Point, NC/Yuma,

AZ

Page 59: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5M

TBD TBD after Market Research PMA-257 4QFY12 4QFY13 24 Months N/A 1

650K to 5M

TBD TBD after Market Research PMA-257 2QFY14 2QFY15 24 Months N/A 1

Lot 12100M to 250M

N Sole Source PMA-259 2QFY11 2QFY12 1.5yrs Raytheon Tucson, AZ 200-300

Lot 13100M to 250M

N Sole Source PMA-259 2QFY12 2QFY13 1.5yrs Raytheon Tucson, AZ ~300

Lot 14100M to 250M

N Sole Source PMA-259 2QFY13 2QFY14 1.5yrs Raytheon Tucson, AZ ~300

Sustainment FY1410M to 50M

N Sole Source PMA-259 3QFY13 1QFY14 1yr Raytheon Tucson, AZ N/A

System Improvement Program50M to 100M

N Sole Source PMA-259 1QFY13 2QFY13 2yrs Raytheon Tucson, AZ N/A

System Improvement Program5M to 10M

N Sole Source PMA-259 3QFY11 4QFY11 1.5yrs Raytheon Tucson, AZ N/A

Sustainment FY125M to 10M

N Sole Source PMA-259 3QFY11 1QFY12 1yr Raytheon Tucson, AZ N/A

Sustainment FY135M to 10M

N Sole Source PMA-259 3QFY12 1QFY13 1yr Raytheon Tucson, AZ N/A

10M to 50M

Y 8(a) Competitive PMA-260 3QFY13 1QFY14 5 Yrs N/A TBD 74

RTCASS Performance Based Logistics50M and Over

N Full and Open Competition PMA-260 2QFY12 1QFY13 5 Yrs Boeing TBD N/A

PEMA Production5M to 10M

N Full and Open Competition PMA-260 1QFY12 1 Year N/A U NK IDIQ

10M to 50MY Small Business Set Aside PMA-260 4QFY11 3QFY12 5 Yrs N/A TBD 75

H6.1 OFP Upgrades: MOS-specific MAINT trainers

NAWCTSD Orlando FL

(N61339 and N61340)

MCAS Cherry Point, NC

H6.2 OFP Upgrades: MOS-specific MAINT trainers

NAWCTSD Orlando FL

(N61339 and N61340)

MCAS Cherry Point, NC/Yuma,

AZ

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

SHIPBOARD MOBILE ELECTRIC POWER PLANT

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

TEST STAND, HYDRAULIC COMPONENT (REPLACEMENT)

NAWCAD Lakehurst NJ

(N68335)

Page 60: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

FIBER OPTIC REPAIR SET 150K to 649K

Y Small Business Set Aside PMA-260 3QFY12 1QFY13 2 Yrs N/A TBD 17

650K to 5M

Y Small Business Set Aside PMA-260 3QFY11 2QFY12 3 Yrs N/A TBD 11

650K to 5MY Small Business Set Aside PMA-260 3QFY12 4QFY12 6 mo N/A UNK 14

Test Program Set Offload Production650K to 5M

Y Small Business Set Aside PMA-260 3QFY13 4QFY13 1 Yr N/A UNK 58

CASS Test Program Set Production650K to 5M

Y Small Business Set Aside PMA-260 3QFY13 4QFY13 1 Yr N/A UNK 20

PARTICLE COUNTER

10M to 50M

TBD TBD after Market Research PMA-260 3QFY13 1QFY14 5 Yrs N/A TBD 834

FIBER OPTIC CLEANING SYSTEM150K to 649K

TBD TBD after Market Research PMA-260 3QFY12 1QFY13 2 Yrs N/A TBD 24

150K to 649K

TBD TBD after Market Research PMA-260 3QFY12 1QFY13 2 Yrs N/A TBD 23

COMMON EDDY PROBE SET

150K to 649K

TBD TBD after Market Research PMA-260 3QFY13 1QFY14 1 Yr N/A TBD 87

MPI QUALITY CONTROL SET

150K to 649K

TBD TBD after Market Research PMA-260 3QFY13 1QFY14 1 Yr N/A TBD 82

5M to 10MTBD TBD after Market Research PMA-260 3QFY12 1QFY13 5 Yrs N/A TBD 117

NAWCAD Lakehurst NJ

(N68335)

A/F48T-6A ARMAMENT HANDLING EQUIPMENT TEST SET

NAWCAD Lakehurst NJ

(N68335)

CASS Test Program Set Simulator Production

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

MOBILE MAGNETIC PARTICLE UNIT PWR SPLY

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

TEST SET, RADAR ALTIMETER (REPLACEMENT)

NAWCAD Lakehurst NJ

(N68335)

Page 61: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

MID RANGE TOW TRACTOR

5M to 10M

TBD TBD after Market Research PMA-260 1QFY12 3QFY12 3 Yrs N/A TBD 125

5M to 10M

TBD TBD after Market Research PMA-260 3QFY13 1QFY14 4 Yrs N/A TBD 60

650K to 5M

TBD TBD after Market Research PMA-260 3QFY13 1QFY14 4 Yrs N/A TBD 49

650K to 5M

TBD TBD after Market Research PMA-260 3QFY13 1QFY14 4 Yrs N/A TBD 14

Administrative and Financial Support 650K to 5M

Y 8(a) Non Competitive PMA-261 4QFY11 2QFY12 3 years

50M to 100MN Full and Open Competition PMA-261 1QFY14 3QFY14 5 years

CH-53K GE38 Engine Contract10M to 50M

N Sole Source PMA-261 4QFY11 3QFY12 5 Years GE Aviation MA 102

10M to 50MN Sole Source PMA-261 1QFY12 3QFY13 2year Lynn, MA

10M to 50MN Sole Source PMA-261 1QFY13 3QFY14 2year Lynn, MA 11 Engines

T64 ERIP10M to 50M

N Sole Source PMA-261 3QFY11 2QFY12 Lynn, MA 55

10M to 50MN Sole Source PMA-261 1QFY12 3QFY13 2year Lynn, MA

NAWCAD Lakehurst NJ

(N68335)

COMMON CABIN PRESSURE TEST SET

NAWCAD Lakehurst NJ

(N68335)

STATIONARY PENETRANT INSPECTION SYSTEM

NAWCAD Lakehurst NJ

(N68335)

TEST STAND, COMPRESSOR POWER UNIT

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

Programmatic, Engineering & Technical Support Services

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAVAIR Headquarters

(N00019)

GE38 Engines including Cans, PM, Tooling

NAVAIR Headquarters

(N00019)

General Electric Aviation

3 Cans 4 Engines

GE38 Engines including PM and Tooling

NAVAIR Headquarters

(N00019)

General Electric Aviation

NAVAIR Headquarters

(N00019)

1year + 95wks ARO

General Electric Aviation

GE38 Engines including Cans, PM, Tooling

NAVAIR Headquarters

(N00019)

General Electric Aviation

3 Cans 4 Engines

Page 62: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50MN Sole Source PMA-261 1QFY13 3QFY14 2year Lynn, MA 11 Engines

10M to 50MN Sole Source PMA-261 2QFY12 3QFY12 DMEA N/A

EAPS Bypass Doors Kits, H-53E5M to 10M

N Sole Source PMA-261 1QFY11 1QFY12 3 years SIKORSKY Stratford, CT 600

T64 ERIP650K to 5M

N Sole Source PMA-261 2QFY12 1QFY13 Lynn, MA 9

T64 ERIP650K to 5M

N Sole Source PMA-261 2QFY13 1QFY14 Lynn, MA 15

CBM NRE Sustainment Cost650K to 5M

N Sole Source PMA-261 1QFY13 1QFY14 1 year Goodrich Vergennes, VT N/A

FTI Bulkhead Bushings, H-53E650K to 5M

N Sole Source PMA-261 1QFY11 1QFY12 2 years SIKORSKY Stratford, CT

650K to 5MN Sole Source PMA-261 3QFY11 3QFY12 3 years SIKORSKY Stratford, CT N/A

MGB Housing Casting Tooling, H-53E650K to 5M

N Sole Source PMA-261 4QFY11 3QFY12 2 years SIKORSKY Stratford, CT

H-53 SAC OEM NRE650K to 5M

N Sole Source PMA-261 4QFY11 1QFY12 2 years SIKORSKY Stratford, CT N/A

H-53 SAC OEM NRE650K to 5M

N Sole Source PMA-261 1QFY13 1QFY14 Base plus 3 years SIKORSKY Stratford, CT N/A

CH--53 LRIP 1 Procurement

Over 1B

N Sole Source PMA-261 4QFY11 3QFY12 5 Years CT 19

PMA-262 Support5M to 10M

N Full and Open Competition PMA-262 4QFY12 4QFY12 12 months SAIC NAVAIR

PMA-262 Support5M to 10M

N Full and Open Competition PMA-262 4QFY13 4QFY13 12 months SAIC NAVAIR

PMA-262 Support5M to 10M

N Full and Open Competition PMA-262 4QFY14 4QFY14 12 months SAIC NAVAIR

GE38 Engines including PM and Tooling

NAVAIR Headquarters

(N00019)

General Electric Aviation

SMFCD Production / Installation Procurement

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

2 months + 95wks ARO

General Electric Aviation

NAVAIR Headquarters

(N00019)

3 months + 95wks ARO

General Electric Aviation

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

VARIABLE NUMBER

AFCS Computer Obsolescence NRE, H-53E

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

VARIABLE NUMBER

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Sikorsky Aircraft Corporation

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Page 63: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

MQ-4C BAMS UAS LRIP Lot 2250M to 1B

N Sole Source PMA-262 2QFY12 1QFY13 3 years NGC-Bethpage 4 UAS

MQ-4C BAMS UAS LRIP Lot 3250M to 1B

N Sole Source PMA-262 2QFY13 1QFY14 3 years NGC-Bethpage 4 UAS

MQ-4C BAMS UAS FRP Lot 1250M to 1B

N Sole Source PMA-262 2QFY14 1QFY15 3 years NGC-Bethpage 4 UAS

PMA-262 Support5M to 10M

Y TBD after Market Research PMA-262 1QFY12 1QFY12 12 months Ausley NAVAIR

PMA-262 Support650K to 5M

Y TBD after Market Research PMA-262 1QFY13 1QFY13 12 months TBD NAVAIR

PMA-262 Support650K to 5M

Y TBD after Market Research PMA-262 1QFY14 1QFY14 12 months TBD NAVAIR

1206 TBD10M to 50M

N TBD after Market Research PMA-263 4QFY12 1 Years TBD 10 AV

10M to 50MN Full and Open Competition PMA-263 3QFY11 2 Years TBD Iraq/Afghanistan N/A

10M to 50MN Full and Open Competition PMA-263 3QFY11 2Yea TBD Iraq N/A

10M to 50MN Full and Open Competition PMA-263 3QFY13 2 Years TBD Iraq/Afghanistan N/A

10M to 50MN Full and Open Competition PMA-263 3QFY13 2 Years TBD Norfolk/Afloat N/A

10M to 50MN Full and Open Competition PMA-263 3QFY13 2 Years TBD Iraq N/A

250M to 1BN Full and Open Competition PMA-263 2QFY11 Up to 5 Years TBD N/A

50M to 100MN Full and Open Competition PMA-263 2QFY11 1 Year TBD Afghanistan N/A

50M to 100MN Full and Open Competition PMA-263 3QFY11 2 Years TBD N/A

50M to 100MN Full and Open Competition PMA-263 3QFY13 2 Years TBD Afghanistan N/A

NAVAIR Headquarters

(N00019)

Rancho Bernardo, CA

NAVAIR Headquarters

(N00019)

Rancho Bernardo, CA

NAVAIR Headquarters

(N00019)

Rancho Bernardo, CA

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAVAIR Headquarters

(N00019)

ISR Services For Air Force Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services For Army Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services For Air Force Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services For Ship Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services For Army Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services Recompete Multiple Contract Award

NAVAIR Headquarters

(N00019)

Iraq, Afghanistan and Afloat

ISR Services for Marine Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services For TECOM/Marine OEF Effort Under New Contract

NAVAIR Headquarters

(N00019)

29 Palsm/Afghanistan

ISR Services For TECOM/Marine OEF Effort Under New Contract

NAVAIR Headquarters

(N00019)

Page 64: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10MN Full and Open Competition PMA-263 1QFY11 1 Year TBD Iraq N/A

SIR Services For Ship5M to 10M

N Full and Open Competition PMA-263 2QFY11 1 Year TBD Norfolk N/A

5M to 10MN Full and Open Competition PMA-263 3QFY11 2 Years TBD Iraq N/A

5M to 10MN Full and Open Competition PMA-263 3QFY11 2 Years TBD Norfolk/Afloat N/A

5M to 10MN Full and Open Competition PMA-263 3QFY13 2 Years TBD Iraq N/A

650K to 5MN Full and Open Competition PMA-263 1QFY11 1 Year TBD 29 Palms, CA N/A

10M to 50MN Sole Source PMA-263 2QFY11 3 Years TBD World Wide N/A

Iraq ScanEagle10M to 50M

N Sole Source PMA-263 1QFY12 3 Years Iraq 10 AV

Poland ScanEagle (FOS 1206)10M to 50M

N Sole Source PMA-263 4QFY11 2 Years Afghanistan

Poland Navy ScanEagle10M to 50M

N Sole Source PMA-263 4QFY12 2 Years Poland 15-20 AV

Poland Navy ScanEagle (FOS)10M to 50M

N Sole Source PMA-263 1QFY13 2 Years Poland

Pakistan ScanEagle10M to 50M

N Sole Source PMA-263 2QFY12 5 Years Pakistan 20 AV

Colombia Night Eagle10M to 50M

N Sole Source PMA-263 2QFY12 3 Years Colombia UNKNOWN

Tunisia Shelter Case150K to 649K

N Sole Source PMA-263 1QFY12 2 Years Tunisia Shelters Only

Dutch STUAS50M to 100M

N Sole Source PMA-263 4QFY13 3 Years Netherlands 20 AV

Iraq Training Case5M to 10M

N Sole Source PMA-263 2QFY12 3 Years Iraq N/A

ISR Services for Army Under New Contract

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ISR Services for GOPLAT Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services For Ship Under New Contract

NAVAIR Headquarters

(N00019)

Isr Services For GOPLAT Under New Contract

NAVAIR Headquarters

(N00019)

ISR Services for TECOM Under New Contract

NAVAIR Headquarters

(N00019)

CLS Contract to Support Naval Special Warfare

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ATTRITION UNKNOWN

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ATTRITION UNKNOWN

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 65: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Iraq ScanEagle (FOS)5M to 10M

N Sole Source PMA-263 4QFY12 2 Years Iraq

Colombia (FOS)5M to 10M

N Sole Source PMA-263 1QFY12 2 Years Colombia

Tunisia FOS650K to 5M

N Sole Source PMA-263 3QFY12 2 Years Tunisia

1206 TBD10M to 50M

N PMA-263 4QFY12 1 Year TBD 10 AV

250M to 1BN Full and Open Competition PMA-264 3QFY12 2QFY14 ERAPSCO 471200

AN/SSQ-101 Sonobuoy for FY1210M to 50M

N Sole Source PMA-264 2QFY11 1QFY12 ERAPSCO 2000

AN/SSQ-125 Sonobuoy for FY1210M to 50M

N Sole Source PMA-264 2QFY11 1QFY12 ERAPSCO 2500

AN/SSQ-101 Sonobuoy FY1310M to 50M

N Sole Source PMA-264 2QFY12 1QFY13 ERAPSCO 1800

AN/SSQ-110 Seawater Batteries150K to 649K

N Sole Source PMA-264 1QFY12 2QFY12 USSI Columbia City, IN 4000

50M to 100MN Sole Source PMA-264 2QFY11 1QFY12 ERAPSCO 61170

50M to 100MN Sole Source PMA-264 2QFY12 1QFY13 ERAPSCO 59280

AN/SSQ-125 Sonobuoy for FY135M to 10M

N Sole Source PMA-264 2QFY12 1QFY13 ERAPSCO 1100

5M to 10MN Sole Source PMA-264 3QFY12 1QFY13 30-36 months ERAPSCO N/A

NAVAIR Headquarters

(N00019)

ATTRITION UNKNOWN

NAVAIR Headquarters

(N00019)

ATTRITION UNKNOWN

NAVAIR Headquarters

(N00019)

ATTRITION UNKNOWN

NAVAIR Headquarters

(N00019)

All AN/SSQ Series Sonobuoys for FY14-18

NAWCAD Patuxent River MD (N00421)

FY14 Base with 4 option years

DeLeon, FL & Columbia City, IN

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

DeLeon, FL & Columbia City, IN

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

DeLeon, FL & Columbia City, IN

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

DeLeon, FL & Columbia City, IN

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

AN/SSQ-36, 53 and 62 Sonobuoys for FY2012

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

DeLeon, FL & Columbia City, IN

AN/SSQ-36, 53 and 62 Sonobuoys for FY13

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

DeLeon, FL & Columbia City, IN

NAWCAD Patuxent River MD (N00421)

12 months/ Annual Procurement

DeLeon, FL & Columbia City, IN

AN/SSQ-125 ECP to Increase Source Level

NAWCAD Patuxent River MD (N00421)

DeLeon, FL & Columbia City, IN

Page 66: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

HAASW Sonobuoy EMD Contract

5M to 10M

N Sole Source PMA-264 3QFY12 1QFY13 24 months ERAPSCO N/A

HAASW LRIP Contract 5M to 10M

N Sole Source PMA-264 2QFY14 3QFY14 12 months ERAPSCO 1440

APG-73 System 0 level wiring tester650K to 5M

TBD Full and Open Competition PMA-265 4QFY12 2QFY13 1 Year Eclypse TBD TBD

650K to 5MTBD Full and Open Competition PMA-265 4QFY12 2QFY13 1 Year Eclypse TBD TBD

Legacy Obsolescence - A650K to 5M

TBD Full and Open Competition PMA-265 4QFY11 3QFY12 1 Year N/A TBD TBD

Legacy Obsolescence - B650K to 5M

TBD Full and Open Competition PMA-265 4QFY11 3QFY12 1 Year N/A TBD TBD

Legacy Obsolescence - C650K to 5M

TBD Full and Open Competition PMA-265 4QFY11 3QFY12 1 Year N/A TBD TBD

Legacy Obsolescence - A650K to 5M

TBD Full and Open Competition PMA-265 4QFY12 3QFY13 1 Year N/A TBD TBD

Legacy Obsolescence - B650K to 5M

TBD Full and Open Competition PMA-265 4QFY12 3QFY13 1 Year N/A TBD TBD

Legacy Obsolescence - C650K to 5M

TBD Full and Open Competition PMA-265 4QFY12 3QFY13 1 Year N/A TBD TBD

Legacy Obsolescence - A650K to 5M

TBD Full and Open Competition PMA-265 4QFY13 3QFY14 1 Year N/A TBD TBD

Legacy Obsolescence - B650K to 5M

TBD Full and Open Competition PMA-265 4QFY13 3QFY14 1 Year N/A TBD TBD

Legacy Obsolescence - C650K to 5M

TBD Full and Open Competition PMA-265 4QFY13 3QFY14 1 Year N/A TBD TBD

NAWCAD Patuxent River MD (N00421)

DeLeon, FL & Columbia City, IN

NAWCAD Patuxent River MD (N00421)

DeLeon, FL & Columbia City, IN

NAVAIR Headquarters

(N00019)

APG-73 Radar Receiver chassis test set

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 67: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Mobile Crew Station

650K to 5M

TBD Full and Open Competition PMA-265 1QFY12 4QFY11 24 Months N/A Kuwait TBD

JPALS Capable Navigation Solution 10M to 50M TBD Full and Open Competition PMA-265 2QFY12 2QFY13 3.5 Years Boeing TBD N/A

10M to 50MN Sole Source PMA-265 TBD 1QFY12 TBD Boeing Australia N/A

ECP 6368 Part 2 for Mode 5 CIT kits10M to 50M

N Sole Source PMA-265 4QFY11 1QFY13 TBD BAE BAE Greenlawn ~687

JHMCS Integration10M to 50M

N Sole Source PMA-265 2QFY12 1QFY13 36 Months Boeing Kuwait TBD

ECP TBD for Mode 5 CIT kits10M to 50M

N Sole Source PMA-265 4QFY12 1QFY14 TBD BAE BAE Greenlawn TBD

10M to 50MN Sole Source PMA-265 3QFY11 2QFY12 TBD Boeing Boeing, St Louis TBD

DTS ECP 6253R1 (LRIP 2)

10M to 50M

N Sole Source PMA-265 1QFY11 2QFY12 36 Months Boeing / Harris 64

ALR-67(V)3 FRP1410M to 50M

N Sole Source PMA-265 1QFY12 2QFY12 12 Months Raytheon Forest, MS 21

IMPLC 10M to 50M

N Sole Source PMA-265 3QFY11 2QFY12 Raytheon Goleta, CA TBD

RTOC/ECP-1010M to 50M

N Sole Source PMA-265 4QFY11 2QFY12 5 Raytheon McKinney, TX TBD

10M to 50MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

10M to 50MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

GPP310M to 50M

N Sole Source PMA-265 3QFY12 2QFY13 1 Year Boeing Boeing, St Louis N/A

ALR-67(V)3 FRP16 (Option to FRP15)10M to 50M

N Sole Source PMA-265 1QFY15 2QFY15 12 Months Raytheon Forest, MS 45

NAWCTSD Orlando FL

(N61339 and N61340)

Unknown at this time

In-Country repair/incorp of RFD/W's in Australia

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP 6213R2 Step 2 TEF Honeycomb Follow-on Kits

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

St. Louis, Mesa, AZ, Melbourne,

FL, and field sites.

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP-6407: FT50 LEX Closure Lower Flange Y318 Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6408: FT50 Y233 Bulkhead Z90 Floor Attachment Retrofit Redesign

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 68: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Mode S, LJDAM, ACMI, POD, LAU7D10M to 50M

N Sole Source PMA-265 1QFY11 3QFY11 24 Months Boeing Malaysia TBD

10M to 50MN Sole Source PMA-265 1QFY12 3QFY11 24 Months Kuwait TBD

CEA #110M to 50M

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Boeing Boeing, St Louis TBD

Retrofit IV 10M to 50M

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Raytheon TBD

Retrofit VI10M to 50M

N Sole Source PMA-265 4QFY13 3QFY14 1 Year Raytheon TBD

AME Phase II & III10M to 50M

N Sole Source PMA-265 1QFY12 4QFY12 36 Months Boeing Kuwait TBD

CEA #210M to 50M

N Sole Source PMA-265 4QFY12 4QFY13 1 Year Boeing Boeing, St Louis TBD

IRST Production Contract10M to 50M

N Sole Source PMA-265 TBD TBD TBD Boeing Boeing, St. Louis

ATFLIR Hardware10M to 50M

N Sole Source PMA-265 TBD TBD 18-24 Months Raytheon 10 pods

GCU Analysis of Alternatives

150K to 649K

N Sole Source PMA-265 3QFY11 1QFY12 12 Months Boeing Boeing, St. Louis N/A

150K to 649KN Sole Source PMA-265 3QFY11 1QFY12 24 Months Boeing Kuwait TBD

Data at Rest FIRST Contract150K to 649K

N Sole Source PMA-265 4QFY11 1QFY12 12 Months Boeing TBD N/A

FIRST Contract / ISS Common150K to 649K

N Sole Source PMA-265 1QFY12 1QFY12 1 Year Boeing Boeing, St Louis N/A

ISS Common150K to 649K

N Sole Source PMA-265 TBD 1QFY12 12 Months Boeing Boeing, St Louis TBD

Legacy BOM150K to 649K

N Sole Source PMA-265 3QFY11 1QFY12 1 Year Raytheon TBD

NAVAIR Headquarters

(N00019)

PRC-112G Survival Radios, URT-140 Txmitr

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Vendor production line

NAVAIR Headquarters

(N00019)

Vendor production line

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Vendor production line

NAVAIR Headquarters

(N00019)

Contractor Field Services Team CY11 & 12 A/C Repairs (Depot Level)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Vendor production line

Page 69: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

V3 IMIC Conversion w/ Raytheon150K to 649K

N Sole Source PMA-265 TBD 1QFY12 TBD Raytheon 8

ISS Common150K to 649K

N Sole Source PMA-265 TBD 1QFY13 12 Months Boeing Boeing, St Louis TBD

150K to 649KN Sole Source PMA-265 4QFY11 2QFY12 18 Months Uxbridge, UK 59

SSR Installation Kits150K to 649K

N Sole Source PMA-265 3QFY12 2QFY13 22 Months Boeing 25

150K to 649KN Sole Source PMA-265 3QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

AESA FRACAS150K to 649K

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Boeing Boeing, St Louis N/A

150K to 649KN Sole Source PMA-265 1QFY12 3QFY12 TBD Boeing Boeing, St Louis TBD

AESA FRACAS150K to 649K

N Sole Source PMA-265 4QFY12 3QFY13 1 Year Boeing Boeing, St Louis N/A

AESA FRACAS150K to 649K

N Sole Source PMA-265 4QFY13 3QFY14 1 Year Boeing Boeing, St Louis N/A

150K to 649KN Sole Source PMA-265 2QFY11 4QFY11 TBD Boeing Boeing, St Louis TBD

ALR-67(V)2 Hot Quad Upgrade150K to 649K

N Sole Source PMA-265 TBD TBD NGC Malaysia

250M to 1B

N Sole Source PMA-265 2QFY11 3QFY12 GE Lynn, MA 88 engines

FOT&E Period XIII and XV50M to 100M

N Sole Source PMA-265 3QFY11 1QFY12 TBD Boeing Boeing, St Louis N/A

ECP 6344 5th & 6th Channel50M to 100M

N Sole Source PMA-265 2QFY13 1QFY14 1 Year Boeing Boeing, St Louis N/A

ALR-67(V)3 FRP1550M to 100M

N Sole Source PMA-265 4QFY12 1QFY14 12 Months Raytheon Forest, MS 50

NAVAIR Headquarters

(N00019)

Vendor production line

NAVAIR Headquarters

(N00019)

JHMCS ACC-695 NACES Seat Position Sensor Modification Kits

NAVAIR Headquarters

(N00019)

Martin-Baker Aircraft Co. Ltd.

NAVAIR Headquarters

(N00019)

Monterey Park, CA

ECP 6413 Enhanced NACES Seat Base and Back Cushions

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP-6372: Y233 Bulkhead Rudder/Brake Pulley Bracket Attachment Redesign - AFC-576

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP 6385 External Fuel Tank Test System (EFTTS) Support Equipment Obsolescence

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

8 systems plus spares

FY12/13 Engine Production and Support Contract

NAVAIR Headquarters

(N00019)

4 years (2012-2015)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 70: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

ALR-67(V)3 FRP1750M to 100M

N Sole Source PMA-265 1QFY16 1QFY16 12 Months Raytheon Forest, MS 21

GPP350M to 100M

N Sole Source PMA-265 3QFY13 2QFY14 1 Year Boeing Boeing, St Louis N/A

Retrofit V50M to 100M

N Sole Source PMA-265 4QFY12 3QFY13 1 Year Raytheon TBD

50M to 100MN Sole Source PMA-265 1QFY11 4QFY11 TBD Boeing Boeing, St Louis N/A

MIDS, Link 16, and ARC-21050M to 100M

N Sole Source PMA-265 1QFY13 4QFY13 36 Months Boeing Kuwait TBD

IRST Incremental Funding50M to 100M

N Sole Source PMA-265 TBD TBD TBD Boeing Boeing, St. Louis N/A

5M to 10MN Sole Source PMA-265 2QFY11 1QFY12 1 Year Boeing Boeing, St Louis 46

ECP 621 Mode 5/S Class A kits

5M to 10M

N Sole Source PMA-265 2QFY11 1QFY12 4 yrs Boeing Boeing, St Louis

5M to 10MN Sole Source PMA-265 1QFY11 1QFY12 12 Months Boeing Melbourne, FL N/A

T4 AMC NRE Delta Phase5M to 10M

N Sole Source PMA-265 2QFY11 1QFY12 TBD Boeing Minneapolis, MN TBD

AME FIRST CONTRACT5M to 10M

N Sole Source PMA-265 4QFY11 1QFY12 12 Months Boeing TBD N/A

ECP 6038 Follow-On Kits and Installs5M to 10M

N Sole Source PMA-265 1QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

ECP 6279 Modules Kits (WRA)5M to 10M

N Sole Source PMA-265 1QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

Additional Depot Requirements5M to 10M

N Sole Source PMA-265 1QFY11 1QFY12 TBD Raytheon TBD

EA-18G CILS Kit Procurements5M to 10M

N Sole Source PMA-265 2QFY12 1QFY13 1 Year Boeing Boeing, St Louis 66

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Vendor production line

ECP-6213R2 F/A-18E/F Trailing Edge Flap Redesign

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Lot 26-29 ANAV Retrofit Kit Procurements

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

FY12 - 75 kits FY13 - 70 kits FY14 - 70 kits FY15 - 33 kits

ECP-6393 DMD Retrofits LoTB for Lots 26-29

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Vendor production line

NAVAIR Headquarters

(N00019)

Page 71: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10MN Sole Source PMA-265 2QFY12 1QFY13 1 Year Boeing Boeing, St Louis 36

ECP 6038 Follow-On Kits and Installs5M to 10M

N Sole Source PMA-265 1QFY12 1QFY13 TBD Boeing Boeing, St Louis TBD

ECP 6279 Modules Kits (WRA)5M to 10M

N Sole Source PMA-265 1QFY12 1QFY13 TBD Boeing Boeing, St Louis TBD

ECP 6344 5th & 6th Channel5M to 10M

N Sole Source PMA-265 2QFY12 1QFY13 1 Year Boeing Boeing, St Louis TBD

5M to 10MN Sole Source PMA-265 2QFY13 1QFY14 1 Year Boeing Boeing, St Louis 42

ECP 6038 Follow-On Kits and Installs5M to 10M

N Sole Source PMA-265 1QFY13 1QFY14 TBD Boeing Boeing, St Louis TBD

ECP 6279 Modules Kits (WRA)5M to 10M

N Sole Source PMA-265 1QFY13 1QFY14 TBD Boeing Boeing, St Louis TBD

5M to 10MN Sole Source PMA-265 2QFY14 1QFY15 1 Year Boeing Boeing, St Louis 43

5M to 10MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis N/A

5M to 10MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis N/A

5M to 10MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis N/A

5M to 10MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis N/A

5M to 10MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis N/A

5M to 10MN Sole Source PMA-265 4QFY12 2QFY13 18 Months Uxbridge, UK 25

COSSAR (CIT)5M to 10M

N Sole Source PMA-265 1QFY11 3QFY11 24 Months Boeing Malaysia

Spares for Color Displays5M to 10M

N Sole Source PMA-265 1QFY12 3QFY12 2 Years Boeing Boeing, St Louis TBD

Lot 26-29 ANAV Retrofit Kit Procurements

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Lot 26-29 ANAV Retrofit Kit Procurements

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Lot 26-29 ANAV Retrofit Kit Procurements

NAVAIR Headquarters

(N00019)

ECP-6402: FT50 Y204 Bulkhead Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6403: FT50 X13 Keel @ Z108 Floor Attach Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6404: FT50 Z90 Longeron @ Y233 Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6405: FT50 Z111 Longeron @ Y326 Bulkhead Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6406: FT50 X0 Keel Lower Flange Retrofit Redesign

NAVAIR Headquarters

(N00019)

NACES Ejection Seat GFE Procurement for JHMCS

NAVAIR Headquarters

(N00019)

Martin-Baker Aircraft Co. Ltd.

NAVAIR Headquarters

(N00019)

8 systems plus spares

NAVAIR Headquarters

(N00019)

Page 72: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

T4 AMC NRE Delta Phase5M to 10M

N Sole Source PMA-265 2QFY11 4QFY11 TBD Boeing Boeing, St Louis N/A

5M to 10MN Sole Source PMA-265 1QFY11 4QFY11 TBD Boeing Boeing, St Louis TBD

Instrumentation5M to 10M

N Sole Source PMA-265 4QFY11 4QFY12 1 Year Boeing Boeing, St Louis TBD

IETMS ALUTIIQ CONTRACT650K to 5M

N Sole Source PMA-265 4QFY11 1QFY12 12 Months ALUTIIQ TBD N/A

ECP-6393 DMD Retrofit NRE650K to 5M

N Sole Source PMA-265 3QFY11 1QFY12 TBD Boeing Melbourne, FL N/A

650K to 5M

N Sole Source PMA-265 3QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 3QFY11 1QFY12 TBD Boeing Melbourne, FL 35

650K to 5MN Sole Source PMA-265 2QFY11 1QFY12 12-18 Months Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 4QFY11 1QFY12 12 Months Boeing TBD N/A

IETMS FIRST CONTRACT650K to 5M

N Sole Source PMA-265 4QFY11 1QFY12 12 Months Boeing TBD N/A

650K to 5MN Sole Source PMA-265 2QFY11 1QFY12 TBD Boeing Boeing, St Louis 7

650K to 5MN Sole Source PMA-265 2QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 3QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 1QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

ISS UNIQUE Contract (RAAF)650K to 5M

N Sole Source PMA-265 TBD 1QFY12 TBD Boeing Boeing, St Louis TBD

NAVAIR Headquarters

(N00019)

ECP-6282: FT50 / FT77 Post-CRI Inner Wing Retrofit, AYC-1439

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP 6368SOW Mode 5 CIT Obsolescence Contract Mod

NAVAIR Headquarters

(N00019)

ECP-6393 DMD Retrofit for Lots 26-29 for KITS & PRAT Option

NAVAIR Headquarters

(N00019)

Incorporation of AN/ALQ-214 (V)4 and AN/ALQ(V)5

NAVAIR Headquarters

(N00019)

Information Assurance for FIRST Contract

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Mode 5 CIT (7 add'l assets) Contract Mod

NAVAIR Headquarters

(N00019)

ECP 6394 Horizontal Stab Gang Channel Corrosion

NAVAIR Headquarters

(N00019)

ECP 6397 Wheel Transducer Drive Coupling Redesign

NAVAIR Headquarters

(N00019)

ECP-6227C2 INLET NACELLE BLEED PLATE CRACK, AFC-582

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 73: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

ISS Discretionary650K to 5M

N Sole Source PMA-265 TBD 1QFY12 12 Months Boeing Boeing, St Louis TBD

ISS Discretionary650K to 5M

N Sole Source PMA-265 1QFY12 1QFY12 2 Years Boeing Boeing, St Louis TBD

ADAS Upgrade Hush House System650K to 5M

N Sole Source PMA-265 4QFY11 1QFY12 24 Months IAC Kuwait TBD

ALR-67(V)3 ESI Phase 3650K to 5M

N Sole Source PMA-265 1QFY12 1QFY12 3 Months Raytheon Goleta, CA N/A

ECP-064 Retrofit AESA Compatibility650K to 5M

N Sole Source PMA-265 3QFY11 1QFY12 Raytheon Goleta, CA N/A

650K to 5MN Sole Source PMA-265 4QFY11 1QFY12 12 Months Raytheon TBD N/A

650K to 5MN Sole Source PMA-265 4QFY11 1QFY13 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 2QFY12 1QFY13 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 2QFY12 1QFY13 TBD Boeing Boeing, St Louis TBD

ISS Discretionary650K to 5M

N Sole Source PMA-265 TBD 1QFY13 12 Months Boeing Boeing, St Louis TBD

EA-18G CILS Kit Procurements650K to 5M

N Sole Source PMA-265 2QFY13 1QFY14 1 Year Boeing Boeing, St Louis 12

650K to 5MN Sole Source PMA-265 4QFY12 1QFY14 TBD Boeing Boeing, St Louis TBD

EA-18G CILS Kit Procurements650K to 5M

N Sole Source PMA-265 2QFY14 1QFY15 1 Year Boeing Boeing, St Louis 12

Lot 36 AEA Kits650K to 5M

N Sole Source PMA-265 1QFY11 2QFY12 1 Year Boeing Boeing, St Louis 12 Kits

650K to 5MN Sole Source PMA-265 4QFY11 2QFY12 TBD Boeing Boeing, St Louis TBD

USSR Operational RMMs and A kits650K to 5M

N Sole Source PMA-265 3QFY11 2QFY12 22 Months Boeing Johnstown, PA 58 RMM, 40 Kits

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Operating System Upgrade from Windows XP to Windows 7

NAVAIR Headquarters

(N00019)

ECP 6368 Part 2 for TD, trainers, kits (shelf labels), logistics

NAVAIR Headquarters

(N00019)

ECP-6326: FT50 Fuel Barrier Web at Y510, AFC-539

NAVAIR Headquarters

(N00019)

ECP-6386: Inner Wing - TEF Shroud Hinges Bushing Migration

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP TBD for TD, trainers, kits (shelf labels), logistics

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP 6368SOW Mode 5 CIT A+/C/C+/D aircraft integration Contract Mod

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 74: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

SSR Installation Kits650K to 5M

N Sole Source PMA-265 3QFY11 2QFY12 22 Months Boeing 48

650K to 5MN Sole Source PMA-265 3QFY11 2QFY12 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 1QFY12 2QFY12 TBD Boeing Boeing, St Louis TBD

USSR Operational RMMs and A kits650K to 5M

N Sole Source PMA-265 TBD 2QFY12 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 4QFY11 2QFY12 18 Months Uxbridge, UK 18

LBIA FRP 14650K to 5M

N Sole Source PMA-265 TBD 2QFY12 Raytheon TBD

Lot 37 AEA Kits650K to 5M

N Sole Source PMA-265 1QFY12 2QFY13 1 Year Boeing Boeing, St Louis 12 Kits

650K to 5MN Sole Source PMA-265 2QFY11 2QFY13 TBD Boeing Boeing, St. Louis TBD

USSR Operational RMMs and A kits650K to 5M

N Sole Source PMA-265 3QFY12 2QFY13 22 Months Boeing Johnstown, PA 52 RMM, 35 Kits

ECP 6360 Retrofit (recurring) FY13650K to 5M

N Sole Source PMA-265 1QFY12 2QFY13 1 Year Boeing 25 Kits

650K to 5MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

650K to 5M

N Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 2QFY12 2QFY13 TBD Boeing Boeing, St Louis TBD

USSR Operational RMMs and A kits650K to 5M

N Sole Source PMA-265 3QFY13 2QFY14 22 Months Boeing Johnstown, PA 22 RMM, 17 Kits

NAVAIR Headquarters

(N00019)

Monterey Park, CA

ECP 6339 Incorporation of GFE Improved Solid State Oxygen Monitoring System

NAVAIR Headquarters

(N00019)

ECP-6343: External Fuel Tank Air Pressure Regulator (EFTPR) -- AYC-1513

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NACES Ejection Seat GFE Procurement for JHMCS

NAVAIR Headquarters

(N00019)

Martin-Baker Aircraft Co. Ltd.

NAVAIR Headquarters

(N00019)

Vendor production line

NAVAIR Headquarters

(N00019)

ECP-6400 AMC T4 Production Incorporation

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAS Whidbey Island

ECP-6401: Canopy Sill Longeron @ Y270 Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6409: FT50 Inner Wing Panel Skin Off Retrofit Redesigns

NAVAIR Headquarters

(N00019)

ECP-6410: FT50 Inner Wing Spar 6 Lower Web Lug @ Inboard Closure Rib Skin On Retrofit Redesign

NAVAIR Headquarters

(N00019)

ECP-6411: FT50 Inner Wing Upper Splice Fitting @ Aft Fastener Skin On Retrofit Redesign

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 75: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

ECP 6360 Retrofit (recurring) FY14650K to 5M

N Sole Source PMA-265 1QFY12 2QFY14 1 Year Boeing 25 Kits

AESA Obsolescence - A650K to 5M

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - B650K to 5M

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - C650K to 5M

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Boeing Boeing, St Louis TBD

Monopulse650K to 5M

N Sole Source PMA-265 4QFY11 3QFY12 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - A650K to 5M

N Sole Source PMA-265 4QFY12 3QFY13 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - B650K to 5M

N Sole Source PMA-265 4QFY12 3QFY13 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - C650K to 5M

N Sole Source PMA-265 4QFY12 3QFY13 1 Year Boeing Boeing, St Louis TBD

650K to 5MN Sole Source PMA-265 4QFY12 3QFY13 TBD Boeing Boeing, St Louis TBD

AESA Obsolescence - A650K to 5M

N Sole Source PMA-265 4QFY13 3QFY14 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - B650K to 5M

N Sole Source PMA-265 4QFY13 3QFY14 1 Year Boeing Boeing, St Louis TBD

AESA Obsolescence - C650K to 5M

N Sole Source PMA-265 4QFY13 3QFY14 1 Year Boeing Boeing, St Louis TBD

JTT-R B-kits650K to 5M

N Sole Source PMA-265 4QFY12 4QFY13 1 Year Boeing Dayton, OH 25 Kits

SLAP Structures Phase B (75% effort)TBD

N Sole Source PMA-265 3QFY11 1QFY12 TBD Boeing Boeing, St Louis TBD

MAD CRITBD

N Sole Source PMA-265 3QFY11 2QFY12 1 Year Boeing Boeing, St Louis N/A

TBDN Sole Source PMA-265 3QFY11 2QFY12 1 Year Boeing Boeing/NGC 77

NAVAIR Headquarters

(N00019)

NAS Whidbey Island

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP-6240R1 FT50 18K MLG Side brace Fitting Failure -- AFC-565

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ECP6315R1 NAVWAR Production Panel Installation

NAVAIR Headquarters

(N00019)

Page 76: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

SLAP Structures Phase B (25% effort)TBD

N Sole Source PMA-265 4QFY11 2QFY12 TBD Boeing Boeing, St Louis TBD

10M to 50MN Sole Source PMA-265 4QFY12 TBD Boeing Various TBD

CASS PBL150K to 649K

N Sole Source PMA-265 1QFY12 TBD Boeing Boeing, St Louis N/A

150K to 649KN Sole Source PMA-265 3QFY11 1QFY12 24 Months Haifa, Israel 4

150K to 649KN Sole Source PMA-265 3QFY11 1QFY12 18 Months San Jose, CA 52

150K to 649KN Sole Source PMA-265 1QFY12 3QFY12 24 Months Haifa, Israel 2

TOFT

10M to 50M

N Sole Source PMA-265 4QFY11 1QFY12 24 Months L3 Comm Malaysia 1 system

JTT-R NRE: IDIQ

10M to 50M

N Sole Source PMA-265 TBD 4QFY11 3 Years Not Applicable Dayton, OH N/A

JPALS EMD 10M to 50M N Sole Source PMA-265 1QFY13 4QFY13 5 Years Boeing Boeing, St Louis N/A

Swiss Fleet Retrofit for U25 Program10M to 50M

TBD Sole Source PMA-265 2QFY12 4QFY12 18 Months Boeing Switzerland N/A

650K to 5MTBD Sole Source PMA-265 2QFY12 1QFY13 12-18 Months Boeing Boeing, St Louis TBD

10M to 50M

TBD Sole Source PMA-265 TBD TBD TBD BAE BAE Greenlawn TBD

650K to 5MTBD Sole Source PMA-265 TBD TBD TBD BAE BAE Greenlawn 45

DTS ECP 6253R1 (FRP)100M to 250M

TBD TBD after Market Research PMA-265 2QFY12 2QFY13 5 Years N/A TBD 280

5M to 10MTBD TBD after Market Research PMA-265 4QFY12 1QFY12 12 Months N/A TBD N/A

NAVAIR Headquarters

(N00019)

Squadron Support Equipment Standup NAWCAD

Lakehurst NJ (N68335)

NAWCAD Lakehurst NJ

(N68335)

JHMCS Support Equipment Upgrade/Modification

NAWCAD Lakehurst NJ

(N68335)

Vision Systems International (VSI)

JHMCS Fast Characterization Tool (FACT) Warranty

NAWCAD Lakehurst NJ

(N68335)

Vision Systems International (VSI)

JHMCS Support Equipment Upgrade/Modification

NAWCAD Lakehurst NJ

(N68335)

Vision Systems International (VSI)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

Unknown at this time

NAVAIR Headquarters

(N00019)

Incorporation of AN/ALQ-214 (V)4 and AN/ALQ(V)5

NAVAIR Headquarters

(N00019)

Procure -20 APX-111s for A+/C/D aircraft

Unknown at this time

Procure remaining 45-20 APX-111 for E/F/G retrofit

Unknown at this time

NAVAIR Headquarters

(N00019)

OPERATING SYSTEM UPGRADES FOR PMA265

NAVAIR Headquarters

(N00019)

Page 77: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Cargo50M and Over

N Full and Open Competition PMA-266 4QFY11 1QFY13 12 months TBD NAVAIR TBD

MRMUAS50M and Over

N Full and Open Competition PMA-266 4QFY11 4QFY12 12 months TBD NAVAIR TBD

Fire Scout production procurment10M to 50M

N Sole Source PMA-266 3QFY11 2QFY12 12 months NAVAIR 12

Fire Scout support10M to 50M

N Sole Source PMA-266 3QFY11 2QFY12 12 months NAVAIR NA

TCS10M to 50M

N Sole Source PMA-266 3QFY11 1QFY12 12 months Raytheon NAVAIR NA

Weaponization10M to 50M

N Sole Source PMA-266 3QFY11 4QFY11 12 months NAVAIR NA

Software Sustainment10M to 50M

N Sole Source PMA-266 3QFY11 1QFY12 12 months TBD NA

VTUAV10M to 50M

N Sole Source PMA-266 1QFY11 1QFY12 12 months TBD NA

Weaponization650K to 5M

N Sole Source PMA-266 3QFY11 4QFY11 12 months Raytheon NAVAIR NA

Fire Scout support 5M to 10M N Sole Source PMA-266 1QFY11 1QFY11 12 months Ausley NAVAIR NA

Fire Scout support 650K to 5M TBD Sole Source PMA-266 1QFY11 1QFY11 12 months RIAC NAVAIR NA

Fire Scout support 650K to 5M TBD Sole Source PMA-266 1QFY11 1QFY11 12 months TSI NAVAIR NA

Fire Scout support 650K to 5M N Sole Source PMA-266 1QFY11 1QFY11 12 months Bowhead NAVAIR NA

Fire Scout support10M to 50M

N Sole Source PMA-266 3QFY11 4QFY11 12 months NAVAIR NA

Guidance & Control Support150K to 649K

N Sole Source PMA-268 3QFY11 3QFY11 1 Year Salt Lake City, UT N/A

EGI purchase150K to 649K

N Sole Source PMA-268 4QFY11 4QFY11 1 Year Honeywell Clearwater, FL 4

650K to 5MN Sole Source PMA-268 3QFY11 3QFY11 2 Years Honeywell Clearwater, FL N/A

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAVAIR Headquarters

(N00019)

Unknown at this time

Unknown at this time

Unknown at this time

Unknown at this time

NAVAIR Headquarters

(N00019)

Northrop Grumman

Corporation

NAWCAD Patuxent River MD (N00421)

Sierra Nevada Corp

NAWCAD Patuxent River MD (N00421)

Phase F - PGPS STR support for H-764 NAWCAD Patuxent River MD (N00421)

Page 78: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Brakes Training

650K to 5M

Y 8(a) Competitive PMA-271 2QFY12 2 years Orlando, FL

A/C Acoustic Thermal Blankets

650K to 5M

Y 8(a) Non Competitive PMA-271 4QFY09 5 Years 4 kits

E-6B Block II MR-TCDL

50M and Over

N Full and Open Competition PMA-271 3QFY10 1QFY12 6 Years TBD TBD 20 Kits

E-6B Block II AEHF/FAB-T and PNVC

50M and Over

N Full and Open Competition PMA-271 TBD TBD TBD TBD TBD 20 Kits

10M to 50MN Full and Open Competition PMA-271 1QFY15 1QFY16 5 years Boeing Tinker AFB, OK

Carbon Brakes

10M to 50M

N Full and Open Competition PMA-271 1QFY10 3QFY11 4 years TBD

HF ALE10M to 50M

N Full and Open Competition PMA-271 1QFY15 3QFY15 3 years N/A TBD

CLS50M and Over

N Full and Open Competition PMA-271 2QFY10 1QFY11 5 Years DRS Tinker AFB, OK

E-6B CSS Support 150K to 649K

N Full and Open Competition PMA-271 4QFY10 1QFY11 5 Year Sonalyst

E-6B CSS Support (BPA Contract)10M to 50M

N Full and Open Competition PMA-271 4QFY11 1QFY12 5 Years TBD

E-6B Block IA NRE and LRIP 10M to 50M

N Sole Source PMA-271 2QFY10 4 Years

10M to 50MN Sole Source PMA-271 4QFY11 1QFY12 Boeing Prime Oklahoma City 12 Kits

NAWCTSD Orlando FL

(N61339 and N61340)

NAVAIR Headquarters

(N00019)

First State Manufacturing

Blankets to be installed by ALC

Tinker and ARINC on the Block I mod

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Crash Survivable Flight Incident Recording System (CSFIRS) II

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NRE to be performed by

winning bidder. Production installs will be done at the

squadron level

1 Kit with production option

of 15 Kits

NAVAIR Headquarters

(N00019)

1 NRE Kit with production option

of 15 Kits

NAVAIR Headquarters

(N00019)

NAWCAD Patuxent River MD (N00421)

NAVAIR Patuxent River,

MD

NAWCAD Patuxent River MD (N00421)

NAVAIR Patuxent River,

MD

NAVAIR Headquarters

(N00019)

Rockwell Collins Prime, L-3 Sub-

Contractor

Richardson Texas and Waco Texas

E-6B Internet Protocol Bandwidth Expansion (IPBE) Phase 1 FRP

NAVAIR Headquarters

(N00019)

5 yrs (tied to Block I)

Page 79: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50MN Sole Source PMA-271 4QFY11 1QFY12 Rockwell Prime Oklahoma City 12 Kits

10M to 50M

N Sole Source PMA-271 1QFY10 2 years Rockwell Collins 15 Kits

HPTS Obsolescence10M to 50M

N Sole Source PMA-271 1QFY16 2QFY15 4 years Rockwell Collins

E-6B Block I LRIP

50M and Over

N Sole Source PMA-271 1QFY10 4QFY10 3 years

E-6B Block I FRP

50M and Over

N Sole Source PMA-271 4QFY11 4QFY12 7 years 11 AC

E-6B Block IA Production50M and Over

N Sole Source PMA-271 2QFY13 1QFY14 5 Years

650K to 5M

N Sole Source PMA-271 2QFY10 2 years Oklahoma City 3 Kits

650K to 5M

N Sole Source PMA-271 2QFY10 2 years Oklahoma City 3 Kits

5M to 10M

N Sole Source PMA-271 1QFY10 2QFY10 2 years Rockwell Collins 6 kits

Compact VLF Reciever Replacement650K to 5M

TBD TBD after Market Research PMA-271 1QFY15 3QFY15 3 years N/A TBD

RIAC Contractor Support150K to 649K

Y 8(a) Competitive PMA-272 4Q FY07 2Q FY12 1 year Wyle Labs N/A

RIAC Contractor Support150K to 649K

Y 8(a) Competitive PMA-272 4Q FY07 2Q FY13 1 year Wyle Labs N/A

PMA272 Contract Support650K to 5M

Y 8(a) Competitive PMA-272 4Q FY12 1Q FY13 3 year N/A

E-6B Internet Protocol Bandwidth Expansion (IPBE) Phase 3 FRP

NAVAIR Headquarters

(N00019)

5 yrs (tied to Block I)

E-6B Internet Protocol Bandwidth Expansion (IPBE) Phase 4 Option

NAVAIR Headquarters

(N00019)

Richardson Texas and Oklahoma

City OK

NAVAIR Headquarters

(N00019)

NRE Richardson TX, production

TBD

1 NRE Kit with production option

of 15 Kits

NAVAIR Headquarters

(N00019)

Rockwell Collins Prime, ARINC Sub-Contractor

Richardson Texas and Oklahoma

City OK

4 LRIP installations

NAVAIR Headquarters

(N00019)

Rockwell Collins Prime, ARINC Sub-Contractor

Richardson Texas and Oklahoma

City OK

NAVAIR Headquarters

(N00019)

Rockwell Collins Prime, XX Sub-

Contractor

Richardson Texas and TBD

16 Aircraft kits plus 4 Trainer kits

E-6B Internet Protocol Bandwidth Expansion (IPBE) Phase 1 (NRE with Block I A/C)

NAVAIR Headquarters

(N00019)

ARINC for the installation,

Boeing for the Phase 1 kit

E-6B Internet Protocol Bandwidth Expansion (IPBE) Phase 3 (NRE with Block I A/C)

NAVAIR Headquarters

(N00019)

ARINC for the installation,

Rockwell for NRE and Kit

E-6B Internet Protocol Bandwidth Expansion (IPBE) Phase 1 & 3 Training

NAWCTSD Orlando FL

(N61339 and N61340)

Binghamton, NY and Oklahoma

City, OK

NAVAIR Headquarters

(N00019)

1 NRE Kit with production option

of 15 Kits

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

American Electronics

Patuxent River, MD

Page 80: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

150K to 649KN Full and Open Competition PMA-272 4Q FY11 1Q FY12 2 years Fair Lawn, NJ 65

150K to 649KN Full and Open Competition PMA-272 4Q FY11 1Q FY12 2 years Syosset, NY 30

150K to 649KN Full and Open Competition PMA-272 4Q FY11 1Q FY12 1 year Andromeda Jacksonville, FL N/A

L3 Engineering Contractor Support650K to 5M

N Full and Open Competition PMA-272 4Q FY07 2Q FY12 1 year L3 N/A

650K to 5MN Full and Open Competition PMA-272 4Q FY11 1Q FY12 2 years KOR Electronics Cypress, CA 15

650K to 5MN Full and Open Competition PMA-272 4Q FY11 1Q FY12 2 years Sunnyvale, CA 15

150K to 649KY Small Business Set Aside PMA-272 4Q FY11 1Q FY12 2 years Ridgecrest, CA 30

150K to 649KY Small Business Set Aside PMA-272 4Q FY11 1Q FY12 2 years Ridgecrest, CA 15

150K to 649KY Small Business Set Aside PMA-272 4Q FY11 1Q FY12 2 years Ridgecrest, CA 15

150K to 649KY Small Business Set Aside PMA-272 4Q FY11 1Q FY12 2 years Breinigsville, PA 15

150K to 649KN Sole Source PMA-272 4Q FY11 1Q FY12 18 months Northrup Gruman Rolling Medows 34

ALE-55 Repair of Test Assets150K to 649K

N Sole Source PMA-272 3QFY11 2QFY12 1 year BAE Systems Nashua, NH Lot

ALQ-214 Repair of Test Assets150K to 649K

N Sole Source PMA-272 3QFY11 2QFY12 1 year Clifton, NJ Lot

Mod to PowerPC Contract150K to 649K

N Sole Source PMA-272 1QFY12 1QFY12 12 months BAE Systems Austin, TX N/A

ALE-55 Repair of Test Assets150K to 649K

N Sole Source PMA-272 3Q FY12 2Q FY13 1 year BAE Systems Nashua, NH Lot

ALQ-214 Repair of Test Assets150K to 649K

N Sole Source PMA-272 3Q FY12 2Q FY13 1 year Clifton, NJ Lot

ALQ-167 DRFM EA: Hydra Circuit Card Assemblies Delivery Order

NAWCAD Patuxent River MD (N00421)

United States Technologies, Inc.

ALQ-167 DRFM EA: Hydra RF Units 1 & 2 Delivery Order

NAWCAD Patuxent River MD (N00421)

General Microwave

PMA272J2 Contract Support Delivery Order

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Patuxent River, MD

ALQ-167 DRFM EA: mini-I/J Band DRFMs Delivery Order

NAWCAD Patuxent River MD (N00421)

ALQ-167 DRFM EA: mini-Intermediate Frequency Modulator Delivery Order

NAWCAD Patuxent River MD (N00421)

Teledyne Cougar Inc.

ALQ-167 DRFM EA: Hydra Chassis/Kit Delivery Order

NAWCAD Patuxent River MD (N00421)

Computer Technology

Associates, Inc.

ALQ-167 DRFM EA: RF Interface Box Delivery Order

NAWCAD Patuxent River MD (N00421)

Computer Technology

Associates, Inc.

ALQ-167 DRFM EA: Dual Control Box Delivery Order

NAWCAD Patuxent River MD (N00421)

Computer Technology

Associates, Inc.

ALQ-167 DRFM EA: Microwave Power Module Delivery Order

NAWCAD Patuxent River MD (N00421)

Triton Systems, Inc.

ALR-67(V)2 RF Amplifiers (Hot Quads for Malaysia)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

Page 81: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

ALQ-214 Software/Firmware10M to 50M

N Sole Source PMA-272 3Q FY11 1Q FY12 24 months Clifton, NJ N/A

ALE-50 IMPLC Prodcution Contract10M to 50M

N Sole Source PMA-272 4Q FY11 3Q FY12 20 months Raytheon Corp Forrest, MS Lot

APR-39 Correction of Deficiencies10M to 50M

N Sole Source PMA-272 3QFY11 2QFY12 3 years NGC N/A

JATAS Support BOA10M to 50M

N Sole Source PMA-272 TBD 2Q FY12 5 years TBD TBD N/A

ALE-55 FRP 210M to 50M

N Sole Source PMA-272 2QFY11 3QFY12 1 year BAE Systems Nashua, NH

ATW Retrofit Kit Procurement10M to 50M

N Sole Source PMA-272 2Q FY12 1Q FY13 2 years NGC 121

ALQ-214 FRP 950M and Over

N Sole Source PMA-272 3Q FY11 2Q FY12 2 years Clifton, NJ 23

50M and OverN Sole Source PMA-272 4Q FY11 2Q FY12 54 months ATK Clearwater, FL Lot

Smart Dispense Phase 250M and Over

N Sole Source PMA-272 3QFY12 15 mo ATK Clearwater, FL N/A

Sustainment Phase 250M and Over

N Sole Source PMA-272 3QFY12 15 mo ATK Clearwater, FL N/A

ALQ-214 FRP 1050M and Over

N Sole Source PMA-272 3Q FY11 2Q FY13 2 years Clifton, NJ 51

ALQ-214 FRP 1150M and Over

N Sole Source PMA-272 3Q FY11 2Q FY14 2 years Clifton, NJ 41

ASPJ Swiss Material Lay-In

650K to 5M

N Sole Source PMA-272 4Q FY10 1Q FY12 18 months Clifton, NJ N/A

ALE-55 Field Support650K to 5M

N Sole Source PMA-272 3Q FY11 2Q FY12 1 year BAE Systems Nashua, NH N/A

ALQ-214 Field Support650K to 5M

N Sole Source PMA-272 3QFY11 2QFY12 1 year Clifton, NJ N/A

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Rolling Meadows, IL

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

FOTDs: 343 EFCs: 46

NAVAIR Headquarters

(N00019)

Rolling Meadows, IL

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

FY 12-13 AAR-47 Prodcution Contract with mid-year options

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

NAVAIR Headquarters

(N00019)

Joint Venture - ITT Electronic

Systems/Northrop Grumman

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

Page 82: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MN Sole Source PMA-272 3Q FY12 4Q FY12 1 year NGC N/A

ALE-47 HW and Software Support650K to 5M

N Sole Source PMA-272 1QFY12 2Q FY12 5 years BAE Systems Austin, TX N/A

ALE-55 Field Support650K to 5M

N Sole Source PMA-272 3QFY12 2QFY13 1 year BAE Systems Nashua, NH N/A

ALQ-214 Field Support650K to 5M

N Sole Source PMA-272 3Q FY12 2Q FY13 1 year Clifton, NJ N/A

ALE-55 FRP 310M to 50M

TBD TBD after Market Research PMA-272 2QFY11 3QFY13 1 year TBD TBD

ALE-55 FRP 410M to 50M

TBD TBD after Market Research PMA-272 2QFY11 3QFY14 1 year TBD TBD

150K to 649KN Full and Open Competition PMA-273 4QFY12 3QFY13 2 yrs TBD TBD Lot

250M to 1BN Full and Open Competition PMA-273 1QFY13 4QFY12 Milton, FL N/A

250M to 1BN Full and Open Competition PMA-273 4QFY12 4QFY13 5 yrs TBD TBD Lot

T-45 Tail Hook Development650K to 5M

N Full and Open Competition PMA-273 1QFY12 1QFY13 3 yrs TBD TBD Lot

650K to 5MN Full and Open Competition PMA-273 4QFY12 4QFY13 2 yrs TBD TBD Lot

T-45 Canopy Redesign650K to 5M

N Full and Open Competition PMA-273 4QFY12 4QFY13 2 yrs TBD TBD Lot

650K to 5MN Full and Open Competition PMA-273 4QFY12 3QFY12 2 yrs TBD TBD Lot

T-39 Recompete

Over 50M

N Full and Open Competition PMA-273 1QFY12 1QFY13 NASP, FL N/A

DoN LAIRCM CV-22 Integration Support for PMA-275

NAVAIR Headquarters

(N00019)

Rolling Meadows, IL

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ITT Electronic Systems

NAVAIR Headquarters

(N00019)

FOTDs: 344 EFCs: 74

NAVAIR Headquarters

(N00019)

FOTDs: 370 EFCs: 63

T-45 Heads Up Display (HUD) Camera Modification

NAVAIR Headquarters

(N00019)

TH-57 Contractor Maintenance, Modification and Logistics Support

NAVAIR Headquarters

(N00019)

5 yrs (1 qtr base, 19 option qtrs)

L-3 Communications

Vertex

T-45 Aircraft Contractor Logistics Support (CLS)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

T-45 Main Land Gear Overhaul Equipment Qual

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

T-45 Head's Up Display (HUD) Modification

NAVAIR Headquarters

(N00019)

NAWCAD Patuxent River MD (N00421)

2 yrs (1yr base 6 Mo - OPT 1, 3 Mo - OPT 2, 3 Mo -

OPT 3)

Page 83: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

AIMD Recompete

Over 50M

N Full and Open Competition PMA-273 1QFY12 4QFY12 N/A

T-44C Operational Flight Trainer SIMS

10M to 50M

TBD Full and Open Competition PMA-273 2QFY14 4QFY14 3 yrs TBD Corpus Christi, TX 2

T-44C E-motion SIMs

650K to 5M

TBD Full and Open Competition PMA-273 2QFY14 4QFY14 1 yr TBD Corpus Christi, TX 2

T-45 Digiital Display Set (DDS)10M to 50M

N Sole Source PMA-273 3QFY11 3QFY12 5yrs Torrence, CA 183

10M to 50MN Sole Source PMA-273 4QFY11 3QFY12 3 yrs Boeing St. Louis, MO Lot

250M to 1BN Sole Source PMA-273 4QFY12 4QFY13 5 yrs Rolls-Royce United Kingdom Lot

5M to 10MN Sole Source PMA-273 1QFY12 1QFY13 1 yr Boeing Lot

T-45 VMTS Retrofit Kits5M to 10M

N Sole Source PMA-273 2QFY12 1QFY13 2 yrs 6 mths Boeing St. Louis, MO 15

5M to 10M

N Sole Source PMA-273 4QFY11 2QFY12 5 yrs Atlanta, GA 150

5M to 10MN Sole Source PMA-273 1QFY12 1QFY13 3 yrs Boeing St. Louis, MO Lot

T-45 Retrofit Sustainment650K to 5M

N Sole Source PMA-273 1QFY12 1QFY13 1 yr Boeing St. Louis, MO Lot

T-45 VMTS Time Critical Components650K to 5M

N Sole Source PMA-273 3QFY11 3QFY12 1yr Boeing St. Louis, MO Lot

NAWCAD Patuxent River MD (N00421)

5 yrs - 1 Yr - base 1 Yr -

OPT 1 1 Yr - OPT 2 1 YR - OPT 3 1

YR - OPT 4

NASP, FL; NASCC, TX

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAVAIR Headquarters

(N00019)

Physical Optics Corporation

(POC)

T-45 Service Life Extension Program (SLEP)

NAVAIR Headquarters

(N00019)

T-45 Engine Contractor Logistics Support (CLS)

NAVAIR Headquarters

(N00019)

T-45 Flight Test Asset Maintenance Support (airframe)

NAVAIR Headquarters

(N00019)

Patuxent River, MD

NAVAIR Headquarters

(N00019)

T-45 Multi-Function Color Displays (MFCDs)

NAVAIR Headquarters

(N00019)

Scientific Research

Corporation (SRC)

T-45 Service Life Assessment Program (SLAP)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 84: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

T-45 Mission Data Processors (MDPs)650K to 5M

N Sole Source PMA-273 1QFY12 4QFY12 2yrs Boeing St. Louis, MO 10

T-45 Engine Studies650K to 5M

N Sole Source PMA-273 4QFY11 2QFY13 2 yrs Rolls-Royce United Kingdom Lot

650K to 5MN Sole Source PMA-273 4QFY11 2QFY13 L-3 VERTEX Kingsville, TX Lot

T-39/AIMD Bridge

10M to 50M

N Sole Source PMA-273 4QFY11 4QFY11 N/A

5M to 10MN Sole Source PMA-273 4QFY11 1QFY12 5 yrs HBC Wichita, KS N/A

VH-60N APT Upgrade

650K to 5M

Y 8(a) Competitive PMA-274 4QFY12 2QFY13 12 months N/A Quantico, VA N/A

VH-3D APT Upgrade

650K to 5M

Y 8(a) Competitive PMA-274 4QFY13 2QFY14 12 months N/A Quantico, VA N/A

PMA 274 Logistics Support Services10M to 50M

Y 8(a) Competitive PMA-274 4QFY11 2QFY12 3 years N/A Patuxent River N/A

10M to 50MY 8(a) Competitive PMA-274 1QFY12 1QFY12 5 years N/A Patuxent River N/A

10M to 50MY PMA-274 2QFY11 1QFY12 3 years N/A Patuxent River N/A

TH-3D/TH-60N Conversions10M to 50M

N Sole Source PMA-274 3QFY11 1QFY12 10 months N/A Stratford, CT 2

VH-3D Cockpit Upgrade Program10M to 50M

N Sole Source PMA-274 1QFY12 4QFY12 12 months Sikorsky Stratford, CT N/A

SLEP10M to 50M

N Sole Source PMA-274 3QFY11 2QFY12 6 years Sikorsky Stratford, CT N/A

401(C) Upgrade150K to 649K

N Sole Source PMA-274 4QFY11 2QFY12 1 year General Electric Lynn, MA N/A

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

T-45 Aircraft Contractor Logistics Support (CLS)

NAVAIR Headquarters

(N00019)

1 yr 6 mths

NAWCAD Patuxent River MD (N00421)

1 yr (6 mth base, 3 mth

OPT 1, 3 mth OPT 2)

L-3 Communications Vertex Aerospace

LLC

NASP, FL; NASCC, TX

Engineering Support T-34/T-44/T-6/TC-12/C-12W

NAWCAD Patuxent River MD (N00421)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCAD Patuxent River MD (N00421)

In-Service Presidential Helicopter Support Services

NAWCAD Patuxent River MD (N00421)

PMA 274 Program Management Support Services

Service-Disabled Veteran-Owned Small Business Set

Aside

NAWCAD Patuxent River MD (N00421)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 85: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

150K to 649KN Sole Source PMA-274 4QFY11 2QFY12 4 years Sikorsky Stratford, CT N/A

Crypto A Kit procurement (Phase II)150K to 649K

N Sole Source PMA-274 1QFY12 4QFY12 10 months Sikorsky Stratford, CT N/A

Crypto Pub Updates (Phase III) VACM150K to 649K

N Sole Source PMA-274 1QFY12 4QFY12 10 months Sikorsky Stratford, CT N/A

VH-3D Cockpit Upgrade Program650K to 5M

N Sole Source PMA-274 1QFY12 3QFY12 12 months Rockwell Collins Cedar Rapids, IA N/A

401(C) Upgrade650K to 5M

N Sole Source PMA-274 4QFY11 2QFY12 2 years Sikorsky Stratford, CT N/A

Crypto Pub Updates (Phase IV)650K to 5M

N Sole Source PMA-274 1QFY12 4QFY12 10 months Sikorsky Stratford, CT N/A

PM Support Services 10M to 50M

Y 8(a) Competitive PMA-275 1QFY13 4QFY13 3 Years TBD TBD Lot

JATAS and APR-39D(V)X Forward Fit100M to 250M

N Full and Open Competition PMA-275 3QFY13 3QFY14 3 years 67

JATAS and APR-39D(V)X Retrofit250M to 1B

N Full and Open Competition PMA-275 3QFY13 3QFY14 5 years 201

MV CFTD 9 - 16

50M to 100M

N Full and Open Competition PMA-275 1QFY12 4QFY12 68 months 8

Logistics Support650K to 5M

Y Small Business Set Aside PMA-275 1QFY11 1QFY12 12 Months Lot

Logistics Support650K to 5M

Y Small Business Set Aside PMA-275 1QFY12 1QFY13 12 Months Lot

Logistics Support650K to 5M

Y Small Business Set Aside PMA-275 1QFY13 1QFY14 12 Months Lot

Engine Inlet Scroll Kits and Installs100M to 250M

N Sole Source PMA-275 2QFY13 4QFY13 4 Years Bell Boeing 500

MV TCAS Installs 10M to 50M

N Sole Source PMA-275 1QFY13 2QFY13 12 Months Bell Boeing 125

VH-3D Fixed Landing Gear (Recurring Piece)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAWCAD Patuxent River MD (N00421)

NAVAIR Headquarters

(N00019)

TBD pending source selection

TBD pending source selection

NAVAIR Headquarters

(N00019)

TBD pending source selection

TBD pending source selection

NAWCTSD Orlando FL

(N61339 and N61340)

TBD pending source selection

TBD pending source selection

NAWCAD Patuxent River MD (N00421)

TBD pending source selection

TBD pending source selection

NAWCAD Patuxent River MD (N00421)

TBD pending source selection

TBD pending source selection

NAWCAD Patuxent River MD (N00421)

TBD pending source selection

TBD pending source selection

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Page 86: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Mid Wing Avionics Obsolescence10M to 50M

N Sole Source PMA-275 3QFY11 2QFY12 54 Months Bell Boeing Lot

V-22 Intercom upgrade10M to 50M

N Sole Source PMA-275 1QFY14 3QFY14 5 Years Bell Boeing Lot

MV-22 BFT Next Gen10M to 50M

N Sole Source PMA-275 4QFY12 2QFY13 5 Years 323

MV-22 ABIU/PSIU Retrofit10M to 50M

N Sole Source PMA-275 4QFY11 3QFY12 5 Years Bell Boeing 320

10M to 50MN Sole Source PMA-275 1QFY11 4QFY12 5 Years Bell Boeing Lot

IAP Retrofit Procurement (CV-22)10M to 50M

N Sole Source PMA-275 3QFY13 4QFY13 12 Months ESA 43

Nacelle Heat Exchanger Redesign10M to 50M

N Sole Source PMA-275 3QFY12 1QFY13 5 years Honeywell Torrance, CA 475

VFG Redesign10M to 50M

N Sole Source PMA-275 2QFY12 1QFY13 5 Years Honeywell Tucson, AZ Lot

10M to 50MN Sole Source PMA-275 4QFY13 2QFY14 4 Years Bell Boeing San Diego, CA 925

Engine Inlet Scroll NRE10M to 50M

N Sole Source PMA-275 1QFY12 3QFY12 1 Year Bell Boeing Lot

Excluded Engine Repair10M to 50M

N Sole Source PMA-275 2QFY12 4QFY12 5 Years Rolls Royce Indianapolis, IN 25

VFG Design NRE10M to 50M

N Sole Source PMA-275 4QFY12 2QFY13 5 Years Bell Boeing Lot

Electrical EAPS & ESG NRE10M to 50M

N Sole Source PMA-275 1QFY13 3QFY13 4 Years Bell Boeing Lot

Clam Shell Door10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 12 Months Bell Boeing 31

Block B to C10M to 50M

N Sole Source PMA-275 3QFY11 4QFY12 3 Years Bell Boeing 6

Drive Tube Redesign10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 5 Years Bell Boeing TBD

NAVAIR Headquarters

(N00019)

Fort Worth, TX; Vergennes VT

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Bell Boeing and Raytheon

Ridley Park, PA; Indianapolis

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

2013 FRD (2013 Fleet Release Sustainment Order)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Non-Contacting Magnetic Torquemeter Kits/Installs

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Amarillo, TX; Tucson, AZ

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Page 87: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

EAPS Door Hinge Redesign10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 225

Conversion Actuator Retrofit10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 12 Months Bell Boeing 250

MLG Door Hinge Redesign Retrofit10M to 50M

N Sole Source PMA-275 1QFY11 1QFY12 2 Years Bell Boeing 250

Nacelle Wiring Improvements10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 300

Aerial Refueling System10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 50

RGR Upgrades10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 150

Enhanced Cargo Handling10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 12 Months Bell Boeing 300

Nacelle Inboard Panel10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 275

Structural Mods10M to 50M

N Sole Source PMA-275 1QFY11 1QFY12 2 Years Bell Boeing Lot

10M to 50MN Sole Source PMA-275 3QFY11 4QFY12 3 Years Bell Boeing Lot

Windscreen Durability10M to 50M

N Sole Source PMA-275 3QFY11 3QFY12 2 Years Bell Boeing Lot

LH/RH Conversion Actuator Assembly10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 125

Swashplate Actuator Retrofit10M to 50M

N Sole Source PMA-275 2QFY11 1QFY12 4 Years Bell Boeing 250

Flaperon Forced Retrofit10M to 50M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 225

JATAS Integration10M to 50M

N Sole Source PMA-275 1QFY11 1QFY12 5 years Bell Boeing Lot

SIRFC LRU-2B10M to 50M

N Sole Source PMA-275 1QFY12 4QFY12 3 years Bell Boeing 18

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Dynamic Components Structural Repair

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Hurlburt Field, FL & Canon AFB, NM

Page 88: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50MN Sole Source PMA-275 1QFY11 1QFY12 5 years Bell Boeing Scottsdale, AZ 265

AETCS S/W Mod150K to 649K

N Sole Source PMA-275 3QFY11 1QFY12 12 Months TBD Lot

APU Start w/RCU150K to 649K

N Sole Source PMA-275 1QFY12 3QFY12 2 Years Boeing Lot

FADEC Trouble Shooting Follow-On150K to 649K

N Sole Source PMA-275 1QFY12 3QFY12 12 Months Rolls Royce Indianapolis, IN Lot

EAPs Door Actuator NRE150K to 649K

N Sole Source PMA-275 3QFY11 1QFY12 1 Year Bell Boeing Lot

CFG Adapter Flange Kits150K to 649K

N Sole Source PMA-275 1QFY13 3QFY13 2 Years Bell Boeing 238

Engine Oil System Redesign NRE150K to 649K

N Sole Source PMA-275 1QFY12 3QFY12 1 Year Bell Boeing Lot

EAPS Start Valve Block A/B/10 NRE150K to 649K

N Sole Source PMA-275 3QFY11 1QFY12 1 Year Bell Boeing Lot

SIRFC RF Switch150K to 649K

N Sole Source PMA-275 1QFY11 1QFY12 3 years Bell Boeing 12

150K to 649KN Sole Source PMA-275 3QFY11 1QFY12 1 year Bell Boeing Lot

Follow-On Engine Contract250M to 1B

N Sole Source PMA-275 3QFY11 2QFY12 5 Years Rolls Royce Indianapolis, IN 311

250M to 1BN Sole Source PMA-275 2QFY11 3QFY12 5 Years Bell Boeing Lot

IAP Retrofit Procurement (MV-22)50M to 100M

N Sole Source PMA-275 3QFY13 4QFY13 4 Years ESA 208

IRS Redesign NRE50M to 100M

N Sole Source PMA-275 1QFY13 3QFY13 4 Years Bell Boeing Lot

Block A to B Upgrade50M to 100M

N Sole Source PMA-275 3QFY11 4QFY12 3 Years Bell Boeing 13

Strategic Nacelle Initiative50M to 100M

N Sole Source PMA-275 3QFY11 4QFY12 TBD Bell Boeing TBD

MLGB Fire Suppression System NRE, Retrofit and Spares

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Amarillo Tx, Rockford, IL

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX, Clifton, NJ

APR-39 AAR-47 and ALE-47 Programmer Update

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Joint Performance Based Logistics Phase II

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Page 89: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M to 100M

N Sole Source PMA-275 1QFY11 1QFY12 2 years Bell Boeing Lot

New V22 Instrumented Aircraft50M to 100M

N Sole Source PMA-275 4QFY11 2QFY12 2.5 years Bell Boeing 1

MV-22 Block C BFT5M to 10M

N Sole Source PMA-275 1QFY12 3QFY12 3 Years 60

ESFI Retrofit for CV-22 Procurement5M to 10M

N Sole Source PMA-275 4QFY12 2QFY13 12 Months Bell Boeing N/A

5M to 10MN Sole Source PMA-275 1QFY11 1QFY12 30 months Bell Boeing Lot

Inlet Barrier Filter NRE5M to 10M

N Sole Source PMA-275 2QFY12 2QFY13 1 Year Bell Boeing Lot

5M to 10MN Sole Source PMA-275 3QFY13 1QFY14 3 Years Bell Boeing 50

5M to 10MN Sole Source PMA-275 3QFY11 1QFY13 4 Years Bell Boeing 600

Side Panels Readiness Buy - Kits5M to 10M

N Sole Source PMA-275 2QFY12 4QFY12 4 Years Bell Boeing 275

5M to 10MN Sole Source PMA-275 4QFY12 2QFY14 4 Years Bell Boeing 300

SDC Redesign - Kits/Installs5M to 10M

N Sole Source PMA-275 3QFY14 4QFY14 4 Years Bell Boeing 500

Flaperon Actuator5M to 10M

N Sole Source PMA-275 3QFY11 3QFY12 2 Years Bell Boeing 309

Cargo Winch Redesign5M to 10M

N Sole Source PMA-275 2QFY11 1QFY12 4 Years Bell Boeing 120

Nacelle Vertical Pin5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 2 Years Bell Boeing 120

NLG Door Mechanism Improvement5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 300

CY2012/CY2013 Flight Test Sustainment

NAVAIR Headquarters

(N00019)

Patuxent River, MD; Philadelphia, PA; Forth Worth,

TX

NAVAIR Headquarters

(N00019)

Amarillo, TX; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Bell Boeing and Raytheon

Ridley Park, PA; Indianapolis

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

Block 20 Inc 3 Mod to include HMD Derived Reqt

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Alternate CV Holdup Circuit Kits/Installs

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

IRS Transition Ducts Readiness Buy - Kits

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Midwing Hx Readiness Buy - Kits/Installs

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Page 90: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10MN Sole Source PMA-275 2QFY11 1QFY12 4 Years Bell Boeing 150

O2 Regulator Egress Hazard5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 175

Nacelle Hinge Pin Retention5M to 10M

N Sole Source PMA-275 3QFY11 3QFY12 2 Years Bell Boeing 600

109 Maintainer Struts5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 2 Years Bell Boeing 300

Nacelle Belly Door Hinges5M to 10M

N Sole Source PMA-275 2QFY11 1QFY12 4 Years Bell Boeing 450

Nacelle Diagonal Braces5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 275

Nacelle Door Compression Latches5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 600

IDWS Engineering Updates5M to 10M

N Sole Source PMA-275 2QFY11 2QFY12 3 years BAE Johnson City, NY 32

IDWS Sustainment 5M to 10M

N Sole Source PMA-275 3QFY11 1QFY12 2 years BAE Johnson City, NY Lot

SIRFC Retrofit Kits5M to 10M

N Sole Source PMA-275 2QFY11 1QFY12 3 years Bell Boeing 18

5M to 10MN Sole Source PMA-275 4QFY11 2QFY12 2 years Lot

5M to 10MN Sole Source PMA-275 3QFY11 1QFY12 15-18 months Bell Boeing 13

5M to 10M

N Sole Source PMA-275 2QFY11 1QFY12 24 months Bell Boeing 17

5M to 10M

N Sole Source PMA-275 2QFY13 1QFY14 24 months Bell Boeing 17

5M to 10MN Sole Source PMA-275 1QFY12 4QFY12 24 months Bell Boeing 1

Rapid Ground Refueling Electrical Connection

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX, Clifton, NJ

DIRCM Operation and Integration Support

NAVAIR Headquarters

(N00019)

Northrop Grumman

Rolling Meadows, IL

B4.01/C1.01 MV SIM Concurrency Upgrade

NAVAIR Headquarters

(N00019)

New River, NC; Miramar, CA

B5.01/C2.01 MV SIM Concurrency Upgrade

NAVAIR Headquarters

(N00019)

New River, NC; Miramar, CA;

Capital Region Futenma

B6.01/C3.01 MV SIM Concurrency Upgrade

NAVAIR Headquarters

(N00019)

New River, NC; Miramar, CA;

Capital Region Futenma

CV SIM 10.4.01/20.2.01 Concurrency Upgrade

NAVAIR Headquarters

(N00019)

Kirtland, NM; Cannon, Hurlburt

Page 91: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

MV/CV Cockpit Voice Recording NRE650K to 5M

N Sole Source PMA-275 4QFY11 2QFY12 2 Years Bell Boeing Lot

650K to 5MN Sole Source PMA-275 2QFY12 1QFY13 5 Years Bell Boeing 54

Comm Co-Site for MV-22 NRE650K to 5M

N Sole Source PMA-275 1QFY12 4QFY12 2 Years Bell Boeing Lot

Aft Cabin Lighting Control Kits

650K to 5M

N Sole Source PMA-275 4QFY11 2QFY12 48 Months Bell Boeing 49

650K to 5MN Sole Source PMA-275 1QFY11 1QFY12 2 Years Bell Boeing 50

CV Iridium Antenna650K to 5M

N Sole Source PMA-275 4QFY11 2QFY12 2 Years Bell Boeing 50

LWINs Smart IE Obsolescence650K to 5M

N Sole Source PMA-275 1QFY11 1QFY12 2 Years Bell Boeing Lot

MTSS and FCC Sample/Hold650K to 5M

N Sole Source PMA-275 3QFY11 1QFY12 12 Months Bell Boeing Lot

ARC Fault Circuit Breaker NRE650K to 5M

N Sole Source PMA-275 4QFY12 2QFY13 5 Years Bell Boeing Lot

VSLED Enhancements NRE650K to 5M

N Sole Source PMA-275 4QFY11 2QFY12 12 Months Rolls-Royce Indianapolis, IN LOT

650K to 5MN Sole Source PMA-275 2QFY12 4QFY12 2 Years Bell Boeing 925

VFG Reliability Improvements NRE650K to 5M

N Sole Source PMA-275 2QFY11 1QFY12 1 Year Bell Boeing Tucson, AZ Lot

650K to 5MN Sole Source PMA-275 3QFY11 1QFY12 1 Year Bell Boeing Lot

EAPs Door Actuator Kits/Installs650K to 5M

N Sole Source PMA-275 4QFY12 2QFY13 4 Years Bell Boeing 500

CFG Adapter Flange NRE650K to 5M

N Sole Source PMA-275 3QFY11 1QFY12 1 Year Bell Boeing Lot

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

MV/CV Cockpit Voice Recorder Recurring

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Hulbert AFB, FL;

Cannon AFB, NM; Kirtland AFB, NM

APX-119 Mode 5 & ADSBB Upgrade fro CV-22

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridley Park, PA; Fort Worth, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Non-Contacting Magnetic Torquemeter NRE

NAVAIR Headquarters

(N00019)

Amarillo, TX; San Diego, CA

NAVAIR Headquarters

(N00019)

Drive System Improvement Input Quill Wavespring/Bump Face Spacer NRE

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Amarillo, TX; Rockford Il

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Page 92: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

650K to 5MN Sole Source PMA-275 3QFY11 1QFY12 1 Year Bell Boeing Lot

650K to 5MN Sole Source PMA-275 4QFY12 2QFY13 3 Years Bell Boeing 300

Upper Nacelle Improvement NRE650K to 5M

N Sole Source PMA-275 3QFY12 2QFY13 1 Year Bell Boeing Lot

650K to 5MN Sole Source PMA-275 4QFY12 2QFY13 4 Years Bell Boeing 450

SDC Class 2 Force Delta Kits650K to 5M

N Sole Source PMA-275 1QFY12 3QFY12 2 Years Bell Boeing 300

CFG Redesign NRE650K to 5M

N Sole Source PMA-275 4QFY12 2QFY13 4 Years Bell Boeing Lot

Midwing Hx Readiness Buy - NRE650K to 5M

N Sole Source PMA-275 4QFY12 2QFY13 1 Year Bell Boeing Lot

SDC Redesign - NRE650K to 5M

N Sole Source PMA-275 3QFY13 1QFY14 1 Year Bell Boeing Lot

Pressure Shut Off Valve (2 per AC)650K to 5M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 210

Sponson refuel-defuel Valve (2 per AC)650K to 5M

N Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 210

650K to 5MN Sole Source PMA-275 2QFY11 2QFY12 4 Years Bell Boeing 210

Clam Shell Door Hinge650K to 5M

N Sole Source PMA-275 1QFY11 1QFY12 2 Years Bell Boeing 108

Pylon Conversion Actuator650K to 5M

N Sole Source PMA-275 3QFY11 3QFY12 2 Years Bell Boeing 400

Fuel tank Outer Barrier650K to 5M

N Sole Source PMA-275 2QFY11 2QFY12 2 Years Bell Boeing 600

CRES Clamp650K to 5M

N Sole Source PMA-275 3QFY11 4QFY12 3 Years Bell Boeing 1000

Tie Strap Removal650K to 5M

N Sole Source PMA-275 2QFY11 1QFY12 4 Years Bell Boeing 250

AC Bus Tie Reliability Improvement NRE

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

AC Bus Tie Reliability Improvement Kits and Installs

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

EAPS Start Valve Block A/B/10 Kits and Installs

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Amarillo, TX; Tucson, AZ

NAVAIR Headquarters

(N00019)

Amarillo, TX; Rockford, IL

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Wing Auxiliary Tank Refuel-defuel Valve (2 per AC)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Page 93: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Aft Belly Door Hinge650K to 5M

N Sole Source PMA-275 1QFY11 1QFY12 2 Years Bell Boeing 250

650K to 5MN Sole Source PMA-275 3QFY11 4QFY12 3 Years Bell Boeing 250

Nacelle Door Hook Latches650K to 5M

N Sole Source PMA-275 3QFY11 3QFY12 2 Years Bell Boeing 600

Fire Door Actuators650K to 5M

N Sole Source PMA-275 2QFY11 2QFY12 12 Months Bell Boeing 175

LRSV Pressure Switch650K to 5M

N Sole Source PMA-275 2QFY11 2QFY12 2 Years Bell Boeing 325

SIRFC Improved Transmit Antenna650K to 5M

N Sole Source PMA-275 1QFY11 1QFY12 3 years Bell Boeing 12

Enhanced RVL Increment 1 Day-HUD650K to 5M

N Sole Source PMA-275 1QFY14 3QFY14 2 years ELBIT Fort Worth, TX 600

650K to 5MN Sole Source PMA-275 4QFY11 2QFY12 2 years Bell Boeing Lot

AMT 1 Block B Installation650K to 5M

N Sole Source PMA-275 1QFY12 4QFY12 26 months Bell Boeing New River, NC 1

Multi-Year Procurement of V-22 AircraftOver 1B

N Sole Source PMA-275 2QFY11 1QFY13 5 Years Bell Boeing 122

Cameo Follow On BOA Order

10M to 50M

N Sole Source PMA-275 4QFY11 1QFY12 3 Years Bell Boeing Lot

Mission Auxillary Fuel Tanks50M to 100M

N Sole Source PMA-275 1QFY12 3QFY12 5 Years Tempe, AZ 134

MV CFTD 7&8

10M to 50M

N Sole Source PMA-275 2QFY11 1QFY12 24 months Bell Boeing 2

Option 2 Execution Courseware

650K to 5M

N Sole Source PMA-275 4QFY11 1QFY12 12 months L-3 Lot

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

Standby Attitude Indicator Forced Retrofit

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX, Clifton, NJ

NAVAIR Headquarters

(N00019)

SIRFC Operation and Integration Support

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

NAWCAD Patuxent River MD (N00421)

Pax River, MD, New River, NC;

Mirmar, CA; Hulburt, FL; Cannon, NM

NAWCAD Patuxent River MD (N00421)

Robertson Fuel Systems L.L.C.

NAWCTSD Orlando FL

(N61339 and N61340)

Chantilly, VA; Futenma

NAWCTSD Orlando FL

(N61339 and N61340)

New River, NC; Kirtland, NM

Page 94: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

R&M Kits/ Installs50M to 100M

TBD Sole Source PMA-275 1QFY11 2QFY12 4 Years Bell Boeing 150

Rescue Hoist Hook650K to 5M

TBD TBD after Market Research PMA-275 1QFY11 1QFY12 2 Years N/A Contractor Facility 200

Prop Rotor Coating10M to 50M

TBD TBD after Market Research PMA-275 2QFY11 1QFY12 4 Years N/A Contractor Facility 660

FLIR Improvements5M to 10M

TBD TBD after Market Research PMA-275 1QFY13 3QFY13 3 Years Bell Boeing 50

10M to 50MN Full and Open Competition PMA-276 3QFY13 4QFY14 3 Years NA

Digital Systems upgrade10M to 50M

Full and Open Competition PMA-276 2QFY12 2QFY13 4 years TBD TBD 252

10M to 50MN Sole Source PMA-276 2QFY12 3QFY12 3 years Thales Valence, FRANCE TBD

10M to 50MN Sole Source PMA-276 2QFY13 3QFY13 3 years Thales Valence, FRANCE TBD

10M to 50MN Sole Source PMA-276 2QFY14 3QFY14 3 years Thales Valence, FRANCE TBD

10M to 50MN Sole Source PMA-276 3QFY11 3QFY12 5 years Fort Worth, TX 82

Linkless Feed System (LFS)10M to 50M

N Sole Source PMA-276 4QFY11 3QFY12 5 years Irvine, CA 174

AH-1 Weapon Systems BOA

10M to 50M

N Sole Source PMA-276 1QFY12 3QFY12 5 years Williston, VT N/A

10M to 50MN Sole Source PMA-276 3QFY11 1QFY12 3 years Salt Lake City, UT 60

10M to 50MN Sole Source PMA-276 2QFY12 1QFY13 3 years Salt Lake City, UT 60

10M to 50MN Sole Source PMA-276 1QFY13 1QFY14 3 years Salt Lake City, UT 60

NAVAIR Headquarters

(N00019)

Hurlburt Field, FL & Canon AFB, NM

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Ridely Park, PA; Amarillo, TX

PMA 276 Program Management Support Service

NAWCAD Patuxent River MD (N00421)

Precise System Inc.

Patuxent River, MD & Amarillo, TX

NAVAIR Headquarters

(N00019)

Helmet Mounted Sight Display/Optimized Top Owl (Lot 9)

NAVAIR Headquarters

(N00019)

Helmet Mounted Sight Display/Optimized Top Owl (Lot 10)

NAVAIR Headquarters

(N00019)

Helmet Mounted Sight Display/Optimized Top Owl (Lot 11)

NAVAIR Headquarters

(N00019)

Helmet Display and Tracking System (HDTS)

NAVAIR Headquarters

(N00019)

Elbit Systems of America (ESA)

NAVAIR Headquarters

(N00019)

Meggitt Defense Systems, Inc.

(MDSI)

NAVAIR Headquarters

(N00019)

General Dynamics Armament and

Technical Products (GDATP)

Mission Computers for UH-1Y and AH-1Z (Lot 9)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Mission Computers for UH-1Y and AH-1Z (Lot 10)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Mission Computers for UH-1Y and AH-1Z (Lot 11)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Page 95: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

PAC 578 Long Tube Adjust (LDV)150K to 649K

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

150K to 649KN Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

150K to 649KN Sole Source PMA-276 3QFY11 1QFY12 1 year BHTI Fort Worth, TX NA

PCA 631 Fuel System Bonding Straps150K to 649K

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

PCA 649 Chip Detectors150K to 649K

N Sole Source PMA-276 1QFY12 3QFY12 1 year BHTI Fort Worth, TX NA

Cargo Door Track NRE150K to 649K

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

150K to 649KN Sole Source PMA-276 4QFY11 2QFY12 6 months BHTI Fort Worth, TX NA

UH-1Y/AH-1Z Production - Lot 9

250M to 1B

N Sole Source PMA-276 2QFY11 2QFY12 3 years BHTI 30

UH-1Y/AH-1Z Production - Lot 10

250M to 1B

N Sole Source PMA-276 2QFY12 2QFY13 3 years BHTI 30

UH-1Y/AH-1Z Production - Lot 11

250M to 1B

N Sole Source PMA-276 2QFY13 2QFY14 3 years BHTI 30

Lot 10 AAC50M to 100M

N Sole Source PMA-276 2QFY11 2QFY12 1 year BHTI N/A

Lot 11 AAC50M to 100M

N Sole Source PMA-276 2QFY12 2QFY13 1 year BHTI N/A

Lot 12 AAC50M to 100M

N Sole Source PMA-276 2QFY13 2QFY14 1 year BHTI N/A

5M to 10MN Sole Source PMA-276 3QFY12 1QFY13 1 year BHTI N/A

NAVAIR Headquarters

(N00019)

PCA 593 Main Beam Clearance for Fuel Hose

NAVAIR Headquarters

(N00019)

PCA 600 Jackshaft Hole Pattern Alignment

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

PCA 550A UH-1Y Nose ballast (NRE & Retrofit kits for Lot 1 and first aircraft of Lot 2 Y9)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

UH-1Y/AH-1Z Production - System Engineering & Program Management CY12

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

Page 96: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10MN Sole Source PMA-276 3QFY13 4QFY13 1 year BHTI N/A

5M to 10MN Sole Source PMA-276 3QFY14 4QFY14 1 year BHTI N/A

5M to 10M

N Sole Source PMA-276 2QFY12 4QFY12 2 years Goodrich Vergennes, VT TBD

5M to 10M

N Sole Source PMA-276 2QFY13 4QFY13 2 years Goodrich Vergennes, VT TBD

5M to 10M

N Sole Source PMA-276 2QFY14 4QFY14 2 years Goodrich Vergennes, VT TBD

5M to 10MN Sole Source PMA-276 3QFY11 2QFY12 3 years BHTI Fort Worth, TX NA

Tactical Video Data Link (TVDL) 5M to 10M

N Sole Source PMA-276 4QFY11 2QFY12 1.5 years Fort Worth, TX 18

5M to 10MN Sole Source PMA-276 1QFY13 1QFY14 3 years Torrance, CA 30

5M to 10M

N Sole Source PMA-276 2QFY13 1QFY14 1 year Thales TBD N/A

Crew Seats for UH-1Y & AH-1Z (Lot 9)650K to 5M

N Sole Source PMA-276 1QFY12 3QFY12 2 years BAE Jacksonville, FL TBD

Crew Seats for UH-1Y & AH-1Z (Lot 10)650K to 5M

N Sole Source PMA-276 1QFY13 3QFY13 2 years BAE Jacksonville, FL TBD

Crew Seats for UH-1Y & AH-1Z (Lot 11)650K to 5M

N Sole Source PMA-276 1QFY14 3QFY14 2 years BAE Jacksonville, FL TBD

Troop Seats for UH-1Y (Lot 9)650K to 5M

N Sole Source PMA-276 1QFY12 3QFY12 2 years Skyline Industries Fort Worth , TX TBD

Troop Seats for UH-1Y (Lot 10)650K to 5M

N Sole Source PMA-276 1QFY13 3QFY13 2 years Skyline Industries Fort Worth, TX TBD

UH-1Y/AH-1Z Production - System Engineering & Program Management CY13

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

UH-1Y/AH-1Z Production - System Engineering & Program Management CY14

NAVAIR Headquarters

(N00019)

Fort Worth & Amarillo TX

Integrated Maintenance Diagostic/Health and Usage Monitoring System (IMD/HUMS) (Lot 9)

NAVAIR Headquarters

(N00019)

Integrated Maintenance Diagostic/Health and Usage Monitoring System (IMD/HUMS) (Lot 9)

NAVAIR Headquarters

(N00019)

Integrated Maintenance Diagostic/Health and Usage Monitoring System (IMD/HUMS) (Lot 9)

NAVAIR Headquarters

(N00019)

Damage Limits & Tolerances (DL&T) Repair Limits Program

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Elbit Systems of America (ESA)

Data Transfer System (DTS) for UH-1Y and AH-1Z (Lot 11)

NAVAIR Headquarters

(N00019)

Physical Optics Corporation

(POC)

Helmet Mounted Sight Display/Optimized TopOwl System Engineering/Program Management CY14

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 97: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Troop Seats for UH-1Y (Lot 11)650K to 5M

N Sole Source PMA-276 1QFY14 3QFY14 2 years Skyline Industries Fort Worth, TX TBD

Tail boom Fatigue Restart Program650K to 5M

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

650K to 5MN Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

Fast Rope Gantry NRE/RE650K to 5M

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

Cargo Door Dual Latch NRE/RE650K to 5M

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

UH-1Y Step NRE/RE650K to 5M

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

Cargo Hook RE650K to 5M

N Sole Source PMA-276 4QFY11 2QFY12 1 year BHTI Fort Worth, TX NA

650K to 5MN Sole Source PMA-276 4QFY11 1QFY12 1 year TBD N/A

650K to 5MN Sole Source PMA-276 3QFY12 1QFY13 1 year TBD N/A

650K to 5MN Sole Source PMA-276 2QFY13 1QFY14 1 year TBD N/A

650K to 5MN Sole Source PMA-276 3QFY11 1QFY12 1 year Thales N/A

650K to 5MN Sole Source PMA-276 2QFY12 1QFY13 1 year Thales N/A

650K to 5MN Sole Source PMA-276 2QFY13 1QFY14 1 year Thales N/A

650K to 5M

N Sole Source PMA-276 3QFY11 1QFY12 1 year Thales TBD N/A

650K to 5M

N Sole Source PMA-276 3QFY12 1QFY13 1 year Thales TBD N/A

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Common Mobile Aircrew Restaint System (CMARS) Aircraft Integration NRE

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Mission Computer System Engineering/Program Management FY12

NAVAIR Headquarters

(N00019)

Northrop Grumman

Mission Computer System Engineering/Program Management FY13

NAVAIR Headquarters

(N00019)

Northrop Grumman

Mission Computer System Engineering/Program Management FY14

NAVAIR Headquarters

(N00019)

Northrop Grumman

Helmet Mounted Sight Display/Optimized TopOwl Technical Support CY12

NAVAIR Headquarters

(N00019)

Camp Pen, CA / MCAS New River,

NC

Helmet Mounted Sight Display/Optimized TopOwl Technical Support CY13

NAVAIR Headquarters

(N00019)

Camp Pen, CA / MCAS New River,

NC

Helmet Mounted Sight Display/Optimized TopOwl Technical Support CY14

NAVAIR Headquarters

(N00019)

Camp Pen, CA / MCAS New River,

NC

Helmet Mounted Sight Display/Optimized TopOwl System Engineering/Program Management CY12

NAVAIR Headquarters

(N00019)

Helmet Mounted Sight Display/Optimized TopOwl System Engineering/Program Management CY13

NAVAIR Headquarters

(N00019)

Page 98: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

UH-1Y Flight Training Device (FTD)

10M to 50M

N Sole Source PMA-276 3QFY11 2QFY12 30 mos BHTI Tulsa, OK 2

AH-1Z Flight Training Device (FTD)

10M to 50M

N Sole Source PMA-276 3QFY11 2QFY14 21 mos BHTI Tulsa, OK 1

650K to 5M

N Sole Source PMA-276 1QFY12 2QFY12 15 mos Carley Orlando, FL

SCS-6.0/ OTO / BRITESTAR BLK II

5M to 10M

N Sole Source PMA-276 4QFY11 1QFY12 12 mos BHTI Camp Pen, CA 8

Full Motion Video R&D prototyping650K to 5M

TBD Sole Source PMA-276 3QFY11 1QFY12 1 year 4

AH-1W/Z canopy improvement650K to 5M

N Sole Source PMA-276 1QFY13 2QFY13 1 year Bell Fort Worth, TX 180

10M to 50MTBD TBD after Market Research PMA-276 4QFY12 2QFY13 1 year N/A

Full Motion Video R&D Integration650K to 5M

TBD TBD after Market Research PMA-276 1QFY12 3QFY12 1 year 6

FY12 Tomahawk Depot BLKII /III

10M to 50M

N Sole Source PMA-280 1QFY11 1QFY12 18 Months Tucson AZ 200

Virgina SSN integration support10M to 50M

N Sole Source PMA-280 1QFY11 3QFY11 Tucson AZ N/A

TTWCS Sustainment Support

50M and Over

N Sole Source PMA-280 2QFY10 3QFY10 5 yrs Valley Forge , PA N/A

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

UH-1Y/AH-1Z Multi-Function Display (MFD)/Dual Function Display (DFD) Emulator

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCWD China Lake CA or Pt

Mugu CA (N68936)

NAVAIR Headquarters

(N00019)

Northrop Grumman

Patuxent River, MD & China Lake,

CA

NAVAIR Headquarters

(N00019)

Full Motion Video R&D Integration & Test

NAVAIR Headquarters

(N00019)

Northrop Grumman

Patuxent River, MD & China Lake,

CA

NAVAIR Headquarters

(N00019)

Northrop Grumman

Patuxent River, MD & China Lake,

CA

NAVAIR Headquarters

(N00019)

Raytheon Missile Systems

NAVAIR Headquarters

(N00019)

5 Months followed by 4 possible

options

Raytheon Missile Systems

NAVAIR Headquarters

(N00019)

Lockheed Martin Corporation, Information

Systems & Global Services

Page 99: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

50M and Over

N Sole Source PMA-280 1QFY11 2QFY12 42 Months Tucson AZ 196

50M and Over

N Sole Source PMA-280 1QFY12 2QFY14 42 Months Tucson AZ 196

5M to 10M

N Sole Source PMA-280 3QFY11 1QFY13 12 Months Tucson AZ N/A

SSGN integration support650K to 5M

N Sole Source PMA-280 1QFY11 3QFY11 12 Months Tucson AZ N/A

PMA-281 Contract Logistics Support10M to 50M

N Full and Open Competition PMA-281 3QFY12 2QFY13 5 yrs Lockheed Martin various N/A

PMA-281 Common Control System10M to 50M

N Full and Open Competition PMA-281 2QFY12 1QFY13 2-5 yrs N/A unknown N/A

10M to 50M

N Full and Open Competition PMA-281 4QFY11 3QFY12 5 years DCS unknown N/A

Ready Room Chair650K to 5M

N Full and Open Competition PMA-281 3QFY11 4QFY11 1 yr N/A unknown 235

10M to 50MN Full and Open Competition PMA-281 2QFY12 2QFY13 5 yrs N/A

NSWPC Support650K to 5M

N Full and Open Competition PMA-281 1QFY13 4QFY13 5 yrs Arlington, VA N/A

P-8A Increment II RCI5M to 10M

Y 8(a) Competitive PMA-290 1QFY12 1QFY13 24 months Boeing/LM/L-3 TBD N/A

T56 Series III Depot Repair Contract

100M to 250M

N Full and Open Competition PMA-290 2QFY13 4QFY13 TBD TBD

FY12 Production Tactical Tomahawk (TT) BLK-IV R/UGM-109-E

NAVAIR Headquarters

(N00019)

Raytheon Missile Systems

FY14 Production & Depot Tactical Tomahawk (TT) BLK-IV R/UGM-109-E

NAVAIR Headquarters

(N00019)

Raytheon Missile Systems

FY13 Tomahawk Block II/III Depot Certification Shut Down / Block IV Depot

NAVAIR Headquarters

(N00019)

Raytheon Missile Systems

NAVAIR Headquarters

(N00019)

Raytheon Missile Systems

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Weaponeering and Stores Planner (WASP) Version 3.x Software for USN and WASP Versions for Royal Australian Air Force

NAVAIR Headquarters

(N00019)

NAWCAD Lakehurst NJ

(N68335)

PMA 281 Engineering & Administrative Support

NAWCAD Patuxent River MD (N00421)

SEAPORT / Brandes Assoc.

Patuxent River, MD

NAWCAD Patuxent River MD (N00421)

CSCI / Mantech Inc.

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Base and 4 Option Years

Wood Group Turbopower,

RRESO, Standard Aero

Page 100: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

5M to 10MN Full and Open Competition PMA-290 1QFY12 2QFY12 6 months TBD TBD N/A

5M to 10MN Full and Open Competition PMA-290 1QFY12 2QFY12 6 months TBD TBD N/A

Norway FMS Replace AIC-225M to 10M

N Full and Open Competition PMA-290 4QFY11 1QFY12 18 mo TBD 2 A/C plus spares

Aircrew Comms FY12

5M to 10M

N Full and Open Competition PMA-290 3QFY11 3QFY12 1 year TBD Jacksonville FL ITC Support

Aircrew Comms FY13

650K to 5M

N Full and Open Competition PMA-290 4QFY12 3QFY13 1 year TBD Jacksonville FL ITC Support

Aircrew Comms FY14

650K to 5M

N Full and Open Competition PMA-290 4QFY13 3QFY14 1 year TBD Jacksonville FL ITC Support

Production ETS contract5M to 10M

Y Full and Open Competition PMA-290 4QFY11 2QFY13 36 Months N/A Pax River, MD N/A

150K to 649KN Sole Source PMA-290 3QFY11 1QFY12 12 mo Eagle Sys PAX N/A

100M to 250M

N Sole Source PMA-290 4QFY13 3QFY14 3 years Boeing St Louis MO

10M to 50M

N Sole Source PMA-290 4QFY11 2QFY12 1.5 years Boeing St Louis MO

P-8A Increment III Focused engineering Studies (Architecture)

NAVAIR Headquarters

(N00019)

P-8A Increment III Focused engineering Studies (ASW Improvements)

NAVAIR Headquarters

(N00019)

NAWCAD Lakehurst NJ

(N68335)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCTSD Orlando FL

(N61339 and N61340)

NAWCAD Patuxent River MD (N00421)

Norway FMS Tech pubs/ maintenance CETS

NAVAIR Headquarters

(N00019)

Australian Full Rate Production (FRP II) under MOU

NAVAIR Headquarters

(N00019)

1 Operational Flight Trainer

(OFT), 1 Weapons Tactics Trainer (WTT), 1 Part Task Trainer

(PTT), 1 Ordnance Load Trainer

(OLT), 1 Integrated

Maintenance Trainer (IMT), 1

TSSC

P-8A Maintenance Training Device Design

NAVAIR Headquarters

(N00019)

1 Lot (for device design)

Page 101: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

10M to 50MN Sole Source PMA-290 4QFY12 3QFY13 1 year Boeing St Louis MO 1 Lot

10M to 50MN Sole Source PMA-290 4QFY12 4QFY13 1 year Boeing St Louis MO 1 Lot

MPRA P-3 AIP Lockheed Martin BOA 10M to 50M N Sole Source PMA-290 1QFY12 3QFY12 3 years Lockheed Martin Eagan, MN N/A

5M to 10MN Sole Source PMA-290 3QFY11 2QFY12 3 years Boeing Jacksonville FL N/A

P-8A Increment II APTR HA Delta Mod5M to 10M

N Sole Source PMA-290 3QFY11 3QFY12 3 months Boeing TBD N/A

5M to 10MN Sole Source PMA-290 1QFY12 3QFY12 6 months Boeing Seattle WA N/A

650K to 5MN Sole Source PMA-290 4QFY11 1QFY12 36 months Boeing Seattle WA N/A

P-8A Increment II APTR Retrofits650K to 5M

N Sole Source PMA-290 4QFY12 4QFY13 36 months Boeing Annaheim 6

650K to 5M N Sole Source PMA-290 3QFY11 1QFY12 3 years Raytheon McKinney, TX N/A

P-8A FRP I Over 1B

N Sole Source PMA-290 1QFY12 3QFY12 31 months Boeing Seattle WA 13

P-8A FRP II Over 1B

N Sole Source PMA-290 1QFY13 3QFY13 31 months Boeing Seattle WA 17

50M to 100MN Sole Source PMA-290 1QFY12 3QFY12 36 mo Lockheed MS2 4 A/C plus spares

Norway FMS CNS/ATM650K to 5M

N Sole Source PMA-290 1QFY13 4QFY13 18 mo Rockwell-Collins Cedar Rapids, IA

TN-P3 Link 11650K to 5M

N Sole Source PMA-290 4QFY11 2QFY12 3 years Lockheed Martin Greenville, SC

Norway FMS ARC-243 HF650K to 5M

N Sole Source PMA-290 4QFY12 1QFY13 12 mo Rockwell-Collins Cedar Rapids, IA

APTR/SDSR Retrofit 650K to 5M N Sole Source PMA-290 3QFY12 4QFY12 1 year Lockheed Martin TBD TBD

P-8A Maintenance Training Device Procurement (AT, AO ratings)

NAVAIR Headquarters

(N00019)

P-8A Maintenance Training Device Procurement (AD, AE, AME, AM ratings)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

P-8A Interim Maintenance Teaches (BOA/IDIQ TBD)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

P-8A Increment III Focused engineering Studies (Boeing Specific)

NAVAIR Headquarters

(N00019)

Sustainment - Engine Depot, Engine RR, Airframe Depot, AOG Teams (IDIQ)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

MPRA P-3 AIP Raytheon BOA for APS-137 Support

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Norway FMS ASQ-227/USQ-78B APTR Upgrade

NAWCAD Lakehurst NJ

(N68335)

Owego NY/ Greenville SC

NAWCAD Lakehurst NJ

(N68335)

4 shipsets plus spares

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Patuxent River MD (N00421)

3 shipsets plus spares

NAWCAD Patuxent River MD (N00421)

Page 102: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Lot 5 Spares

10M to 50M

N Sole Source PMA-290 4QFY13 3QFY14 2 years Boeing St Louis MO Lot 5 Spares

100M to 250MTBD TBD after Market Research PMA-290 3QFY11 4QFY12 36 months TBD TBD N/A

650K to 5M TBD TBD after Market Research PMA-290 4QFY11 3QFY12 3 years TBD TBD

Norway FMS ESM System Replacement10M to 50M

TBD TBD after Market Research PMA-290 4QFY12 4QFY12 18 mo

Domestic TN-P3 AAE 650K to 5M TBD TBD after Market Research PMA-290 1QFY12 3QFY12 4 years TBD TBD

MH-60R Common Data L ink100M to 250M

N Full and Open Competition PMA-299 3QFY11 2QFY12 5 years TBD TBD 250

MH-60R Depot Level ALFS5M to 10M

N Full and Open Competition PMA-299 3QFY12 3QFY12 12 months N/A FRCSE N/A

MH-60S Retrofit Installs5M to 10M

TBD Full and Open Competition PMA-299 3QFY13 1QFY14 3 years N/A N/A

ARPDD Retrofit10M to 50M

N Sole Source PMA-299 4QFY11 2QFY12 3 years LM MS2 Owego N/A

MH-60R ARPDD Retrofit Kits10M to 50M

N Sole Source PMA-299 1QFY12 2QFY13 24 months LM MS2 Owego, NY 16

MH-60R ARPDD Retrofit Kits10M to 50M

N Sole Source PMA-299 1QFY14 2QFY14 24 months LM MS2 Owego, NY 20

MH-60R/S JATAS10M to 50M

N Sole Source PMA-299 1QFY14 3QFY14 3 years LM MS2 Owego, NY N/A

MH-60R/S JATAS10M to 50M

N Sole Source PMA-299 1QFY14 4QFY14 2 years SAC Stratford, CT N/A

JPALS PRE-MS B 10M to 50M

N Sole Source PMA-299 4QFY11 4QFY12 1 year LM MS2 Owego, NY N/A

ALFS Fleet Service Representative

150K to 649K

N Sole Source PMA-299 1QFY12 3QFY12 1 year N/A

NAWCTSD Orlando FL

(N61339 and N61340)

P-8A Increment III Technology Development

NAVAIR Headquarters

(N00019)

C4 for ASWA & B Kits

NAVAIR Headquarters

(N00019)

FY12: 18 FY13: 8

NAWCAD Lakehurst NJ

(N68335)

4 shipsets plus spares

NAWCAD Lakehurst NJ

(N68335)

34 pylons for basic order

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAWCAD Patuxent River MD (N00421)

Norfolk, VA and NB Coronado, CA

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

San Diego, CA and

Jacksonville/Mayport, FL

Page 103: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

ALFS Fleet Service Representative

150K to 649K

N Sole Source PMA-299 1QFY13 3QFY13 1 year N/A

ALFS Fleet Service Representative

150K to 649K

N Sole Source PMA-299 1QFY14 3QFY14 1 year N/A

150K to 649K

N Sole Source PMA-299 2QFY12 4QFY12 1 year Portsmouth, RI N/A

150K to 649K

N Sole Source PMA-299 2QFY13 4QFY13 1 year Portsmouth, RI N/A

150K to 649K

N Sole Source PMA-299 2QFY14 4QFY14 1 year Portsmouth, RI N/A

150K to 649K

N Sole Source PMA-299 1QFY12 2QFY12 1 year Portsmouth, RI N/A

150K to 649K

N Sole Source PMA-299 1QFY13 2QFY13 1 year Portsmouth, RI N/A

150K to 649K

N Sole Source PMA-299 1QFY14 2QFY14 1 year Portsmouth, RI N/A

MH-60R ATI Retrofit Kits 150K to 649K

N Sole Source PMA-299 1QFY12 2QFY12 18 months SAC Stratford, CT 11

150K to 649KN Sole Source PMA-299 4QFY11 2QFY12 2 year LM MS2 Owego, NY N/A

FMS THAILAND CETS OPTION 1150K to 649K

N Sole Source PMA-299 1QFY12 2QFY12 12 months SAC Thailand N/A

FMS THAILAND CETS OPTION 2150K to 649K

N Sole Source PMA-299 1QFY13 2QFY13 12 months SAC Thailand N/A

FMS THAILAND CETS OPTION 3150K to 649K

N Sole Source PMA-299 1QFY14 2QFY14 12 months SAC Thailand N/A

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

San Diego, CA and

Jacksonville/Mayport, FL

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

San Diego, CA and

Jacksonville/Mayport, FL

ALFS Grooming & Refurbishments for retrofit

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

ALFS Grooming & Refurbishments for retrofit

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

ALFS Grooming & Refurbishments for retrofit

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

ALFS Grooming & Refurbishment for production and NRE

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

ALFS Grooming & Refurbishment for production and NRE

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

ALFS Grooming & Refurbishment for production and NRE

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

JMPS Window XP Obsolescence/Windows 7 Migration

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Page 104: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

FMS THAILAND IETMS UPDATE150K to 649K

N Sole Source PMA-299 3QFY12 2QFY14 12 months SAC Stratford, CT 2

FMS THAILAND AUX FUEL TANK 150K to 649K

N Sole Source PMA-299 1QFY12 4QFY12 12 months NAVICP Unknown 2

ALFS Lot 10 - 14

250M to 1B

N Sole Source PMA-299 3QFY11 2QFY12 5 years Portsmouth, RI 93

ALFS Lot 10

50M to 100M

N Sole Source PMA-299 3QFY11 1QFY12 5 years Portsmouth, RI 18

ALFS Lot 11

50M to 100M

N Sole Source PMA-299 3QFY12 1QFY13 5 years Portsmouth, RI 18

50M to 100MN Sole Source PMA-299 3QFY12 4QFY13 24 months SAC Stratford, CT 2

50M to 100MN Sole Source PMA-299 3QFY13 4QFY14 24 months SAC Stratford, CT 2

FMS Brazil S-7050M to 100M

N Sole Source PMA-299 3QFY11 4QFY12 24 months SAC Stratford, CT 2

5M to 10M

N Sole Source PMA-299 2QFY11 1QFY12 18 months Portsmouth, RI N/A

MH-60R/S OSI Kits5M to 10M

N Sole Source PMA-299 1QFY12 2QFY12 18 months LM MS2 Owego, NY 89

MH-60S LOGIR5M to 10M

N Sole Source PMA-299 2QFY13 1QFY14 3 years LM MS2 Owego, NY N/A

MH-60S LOGIR5M to 10M

N Sole Source PMA-299 2QFY13 1QFY14 3 years SAC Stratford, CT N/A

MH-60S UGR5M to 10M

N Sole Source PMA-299 1QFY13 4QFY13 3 years SAC Stratford, CT N/A

650K to 5MN Sole Source PMA-299 4QFY12 3QFY14 5 years SAC Stratford, CT N/A

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

FMS THAILAND (2) MH-60S HELICOPTERS

NAVAIR Headquarters

(N00019)

FMS THAILAND (2) MH-60S HELICOPTERS

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

ALFS Digital Transducer Assembly (TA)

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

MH-60R I & D Level Manual Updates/Cost

NAVAIR Headquarters

(N00019)

Page 105: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

ALFS Reliability ECPs NRE

650K to 5M

N Sole Source PMA-299 2QFY12 4QFY12 1 year Portsmouth, RI N/A

ALFS Reliability ECPs NRE

650K to 5M

N Sole Source PMA-299 2QFY13 4QFY13 1 year Portsmouth, RI N/A

ALFS Reliability ECPs NRE

650K to 5M

N Sole Source PMA-299 2QFY14 4QFY14 1 year Portsmouth, RI N/A

ALFS Aux Electric Motor Retrofit

650K to 5M

N Sole Source PMA-299 2QFY11 1QFY12 1 year Portsmouth, RI N/A

ALFS Engineering Support

650K to 5M

N Sole Source PMA-299 1QFY12 2QFY12 1 year Portsmouth, RI N/A

ALFS Engineering Support

650K to 5M

N Sole Source PMA-299 1QFY13 2QFY13 1 year Portsmouth, RI N/A

ALFS Engineering Support

650K to 5M

N Sole Source PMA-299 1QFY14 2QFY14 1 year Portsmouth, RI N/A

ESM OFP Improvements650K to 5M

N Sole Source PMA-299 1QFY13 2QFY13 1-2 years LM MS2 Owego, NY N/A

MH-60R ATI Retrofit Kits 650K to 5M

N Sole Source PMA-299 1QFY12 2QFY12 18 months LM MS2 Owego, NY 11

MH-60R IMDS Retrofit Kits650K to 5M

N Sole Source PMA-299 1QFY12 2QFY12 12 months Goodrich Vergennes, VT 12

MH-60R DVR Kits650K to 5M

N Sole Source PMA-299 1QFY12 2QFY12 12 months 24

MH-60R IMDS Retrofit Installs650K to 5M

N Sole Source PMA-299 1QFY12 2QFY12 12 months 12

MH-60R/S OSI Kits650K to 5M

N Sole Source PMA-299 1QFY13 2QFY13 18 months LM MS2 Owego, NY 18

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

Raytheon Integrated

Defense Systems

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Goodrich/TEAC Aerospace

Holdings, Inc.

Monterey Park, CA

NAVAIR Headquarters

(N00019)

Aircraft Modification Team

NAS North Island, CA

NAVAIR Headquarters

(N00019)

Page 106: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

JPALS PRE-MS B 650K to 5M

N Sole Source PMA-299 4QFY11 4QFY12 1 year SAC Strafford, CT N/A

650K to 5MN Sole Source PMA-299 1QFY12 4QFY12 12 months LMS MS2 Owego, NY N/A

SIKORSKY Army Multi-Year VIIIOver 1B

N Sole Source PMA-299 1QFY11 1QFY12 5 years SAC Stratford, CT 140

Over 1B

N Sole Source PMA-299 1QFY11 1QFY12 5 years LM MS2 Owego, NY 140

FMS AUSTRALIAOver 1B

N Sole Source PMA-299 1QFY12 4QFY12 12 months LMS MS2 Owego, NY 24

FMS AUSTRALIAOver 1B

N Sole Source PMA-299 1QFY12 4QFY12 12 months SAC Stratford, CT 24

150K to 649KN Sole Source PMA-299 1QFY12 3QFY12 12 months SAC Stratford, CT 61

Stabilator Repair Kit150K to 649K

N Sole Source PMA-299 1QFY12 3QFY12 12 months SAC Stratford, CT 6

Controllable Search Light150K to 649K

N Sole Source PMA-299 1QFY12 2QFY12 12 months SAC Stratford, CT 10

Rescue Hoist Control Panel150K to 649K

N Sole Source PMA-299 1QFY12 3QFY12 12 months SAC Stratford, CT 10

Stabilator Repair Kit150K to 649K

N Sole Source PMA-299 1QFY13 3QFY13 12 months SAC Stratford, CT 10

Rescue Hoist Control Panel150K to 649K

N Sole Source PMA-299 1QFY13 3QFY13 12 months SAC Stratford, CT 5

SAC AFCS (CY12, 13, 14) Extension10M to 50M

N Sole Source PMA-299 3QFY11 1QFY12 3 years SAC Stratford, CT N/A

5M to 10MN Sole Source PMA-299 3QFY11 1QFY12 2 years LM MS2 Owego, NY N/A

Flight Test Support 650K to 5M

N Sole Source PMA-299 4QFY11 2QFY12 1 year LM MS2 Pax River N/A

NAVAIR Headquarters

(N00019)

FMS THAILAND SOFTWARE UPGRADE

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Mission Avionics/Common Cockpit MY2

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

Automatic Vibration Control (AVC) Test Box

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Lakehurst NJ

(N68335)

NAWCAD Patuxent River MD (N00421)

LM Extension (CY12 & 13) Integration (RDT&E)

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

Page 107: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Flight Test Support 650K to 5M

N Sole Source PMA-299 4QFY12 2QFY13 1 year LM MS2 Pax River N/A

Flight Test Support 650K to 5M

N Sole Source PMA-299 4QFY13 2QFY14 1 year LM MS2 Pax River N/A

JATAS Integration10M to 50M

N Sole Source PMA-299 1QFY14 3QFY14 3 years LM MS2 Owego N/A

JAGM10M to 50M

N Sole Source PMA-299 1QFY12 4QFY12 5 years LM MS2 Owego N/A

JATAS Integration5M to 10M

N Sole Source PMA-299 1QFY14 4QFY14 2 years SAC Stratford, CT N/A

JAGM5M to 10M

N Sole Source PMA-299 3QFY12 2QFY13 5 years SAC Stratford, CT N/A

JATAS Engineering Support650K to 5M

N Sole Source PMA-299 1QFY12 4QFY12 2 years LM MS2 Owego N/A

* NOTE: All information contained in this Long Range Acquisition Forecast is based on upcoming fiscal year and the two succeeding fiscal years.

NAWCAD Patuxent River MD (N00421)

NAWCAD Patuxent River MD (N00421)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

NAVAIR Headquarters

(N00019)

**DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opportunities for the next and succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast (LRAF) and updating the information on an annual basis. The LRAF contains NAVAIR requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal years. The forecast is for informational and marketing purposes only. It does not constitute a specific offer or commitment by the Navy to fund, in whole or in part, the opportunities referenced herein. This listing is not all inclusive and is subject to change.

** NOTE: Use the drop down menus for the selection of the following data sets: Expected Dollar Value, Small Business Set Aside, Procurement Method, Projected NAVAIR Contracting Office, Anticipated Solicitation and Anticipated Contract Award.

Page 108: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

NAVAIR Long Range Acquisition Forecast Data SheetNAVAIR Public Release 11-1186 Distribution Statement A - "Approved for public release; distribution is unlimited."

Requirement Description

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

**DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opportunities for the next and succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast (LRAF) and updating the information on an annual basis. The LRAF contains NAVAIR requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal years. The forecast is for informational and marketing purposes only. It does not constitute a specific offer or

Point of Contact (phone or email)

The contractor shall provide all labor, equipment, training facilities, supervision and other services necessary for training of aircrew personnel of the Navy’s C-20G aircraft pilot training. This contract supports training for CNRFC and MCAF.

COMS for the Chief of Naval Air Training (CNATRA) to support the following CNATRA trainers; T-6B, T-34C, T-44A/C, T-45A/C, and TH-57B/C training devices located at NAS Corpus Christi and NAS Kingsville, TX, NAS Meridian, MS, and NAS Whiting Field and NAS Pensacola, FL.

COMS/CIS for the Commander, Naval Air Pacific (AIRPAC) to support EA-6B and EA-18G training devices and instructional requirements at NAS Whidbey Island, WA. Possibility that requirement will be incorporated into either the current F/A-18 COMS/CIS task order or the upcoming P-3C/P-8A/BAMS task order re-compete.

FTSS III Task Order for COMS for Commanders, Naval Air Atlantic (AIRLANT) and AIRPAC to support P-3C, P-8A, and BAMS training devices located at NAS Jacksonville, FL, NAS Whidbey Island, WA, and/or MCBH Kaneohe Bay, HI.

FTSS III Task Order for COMS for the Naval Aviation Technical Training Center (NATTC) to support training devices located at NAS Pensacola, FL, and Lakehurst, NJ.

FTSS III Task Order for CIS for CNATRA to support Undergraduate Flight Training instructional requirements for multi-service Aviator and Flight Officer students at NAS Corpus Christi and NAS Kingsville, TX, NAS Whiting Field and NAS Pensacola, FL, and NAS Meridian, MS.

Page 109: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

FTSS III Task Order for COMS for AIRPAC to support training devices located in the Western Pacific (WESTPAC) Area of Responsibility (MCAS Futenma, Okinawa, NAS Iwakuni and NAF Atsugi, Japan).

FTSS III Task Order for COMS for Commander, Naval Reserve Forces (RESFOR) to support training devices located at NASJRB Willow Grove and MCRC Johnstown, PA, NAS Fallon, NV, NASJRB Fort Worth, TX, NASJRB New Orleans, LA, and NAS Key West, FL .

TDPC Task Order for Procurement of USMC Enlisted Aircrew Training Products to include the MCAT. The Enlisted Aircrew Trainer Procurement Program is intended to procure products to address Enlisted Aircrew (EAC) training requirements for UH-1Y, MV-22, KC-130, and CH-53 communities.

TDPC Task Order for Procurement for revision and maintenance of instructional training programs developed and implemented at the NSAWC Departments: N6 – C4I/C2W (Carrier Airborne Early Warning Weapons School (CAEWWS) and Electronic Reconnaissance Weapons School (ERWS); N7, Training and Standardization Department, Navy Fighter Weapons School (NFWS – TOPGUN); and N8 – Range Rotary Wing Weapons School (RWWS). The NSAWC N6, N7, and N8 Departments provide graduate level fleet training for individuals and units. The curricula revision is dictated by weapon system changes which impact training, evolving fighter tactics, command, control, communications, computers, weapons, maritime air superiority, fleet/staff training, and Seahawk helicopter tactics.

TDPC Task Order for Procurement of P‑3/P-8 Aircraft Fleet Readiness Squadron (P‑3/P-8 FRS), Weapons Tactics Unit, Reserve Squadron Augmentee Unit, Foreign Military Sales, Naval Air Training and Operating Procedures Standardization Test Support, and existing Maritime Patrol and Reconnaissance Weapons School (MPRWS) VP Air Combat Training System (ACTS) located at Naval Station (NS) Jacksonville, Florida. The courseware R&M effort is designed to reflect current equipment, tactics, threats, and operations.

Page 110: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] Admin Support

[email protected] Develop a tool for zero base budgeting.

[email protected]

[email protected]

[email protected]

TDPC Task Order for Procurement of revision and maintenance to the new J model curriculum developed and implemented for the KC-130J. Instructional Aviation Training Unit (ATU) Training Programs for the United States Marine Corps at MCAS Cherry Point, NC with long distance technical support for MCAS Miramar, CA KC-130-J ATU. The curricula revision is mandated by the analysis of quality control data and all weapon system changes that impact training such as aircraft Engineering Change Proposals (ECPs), tactics, local course rules, and Naval Aviation Training and Operating Procedures (NATOPS) documentation.

TDPC Task Order for Procurement of revision and maintenance for instructional training programs developed and implemented for the USMC Helos (AH-1W, UH-1N, HH-1N and CH-46E) at Camp Pendleton, CA. The curricula revision is mandated by the analysis of quality control data and all weapon system changes that impact training such as aircraft Engineering Change Proposals (ECPs), tactics, local course rules, and Naval Aviation Training and Operating Procedures (NATOPS) documentation.

Perform data management, data processing, data analysis, business and administrative support, and other related tasks to support the accounting department

Tech writer support include documenting processess and stp by step standard operating procedures.

Facility maintenance coordinators, Shipping Dept., Visitor Control, and analysis/administration support.

Broad spectrum of analysis support for Naval and Joint warfighting capability assessments, modeling and simulation, required to supplement and enhance government and military warfighting analytic efforts conducted in support of AIR-4.10, PEOs & PMAs, NAE and OPNAV. The scope of the PBSOW is multi-faceted and includes, warfare analysis, M&S, software development and analytic program support. Additionally, analytic efforts may be assessed relative to Joint capability requirements to provide time-phased capabilities within Joint Capability Areas.

Page 111: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Mid wave infrared camera that will be used for laser diagnostics.

[email protected] Camera to acquire data for image enhancement/processing

[email protected] System to be a research asset.

[email protected]

[email protected]

[email protected] For laboratory and field data collection.

[email protected] to provide laser pointing and feedback in the field tests.

[email protected]

[email protected] Lasers for testing material sensing and signatures.

[email protected] Infrared laser materials

[email protected] Various infrared laser optics

The Intelligence Division provides technical and analytical support for intelligence and warfare analysis products

Environmentally controlled container to assist with field tests and the travel to the tests. The container will be populated with supporting test equipment.

To provide transportation of beam steering and diagnostic hardware to and from test sites.

To provide transportation of beam steering and diagnostic hardware to and from test sites.

Page 112: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] To provide data analyasis

[email protected] To provide data analyasis

[email protected] To provide laser beam steering

[email protected] Infrared laser materials

[email protected] To provide data analyasis

[email protected] 20 Gal reactor capable of handling pressures up to 150 psi.

[email protected]

[email protected] Multinuclear NMR soectrometer with solids and solution capabilites.

[email protected]

[email protected]

[email protected]

[email protected]

Physical Vapor Deposition Reactor for manufacture of thin film semiconductor devices.

The STTR Program provides up to $850,000 in early-stage R&D funding directly to small companies working cooperatively with researchers at universities and other research institutions.

The STTR Program provides up to $850,000 in early-stage R&D funding directly to small companies working cooperatively with researchers at universities and other research institutions.

The STTR Program provides up to $850,000 in early-stage R&D funding directly to small companies working cooperatively with researchers at universities and other research institutions.

The STTR Program provides up to $850,000 in early-stage R&D funding directly to small companies working cooperatively with researchers at universities and other research institutions.

Page 113: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

The SBIR Program provides up to $1,000,000 in early-stage R&D funding directly to small technology companies (or individual entrepreneurs who form a company).

Provide Electromagnetic Environemntal Effects engineering support to 4.1 for systems engineering and 5.4.4 for T&E

To provide integrated sustainment engineering, reverse engineering and support solutions for the Aging Aircraft Fleet

Page 114: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Airborne Electronic Attack (AEA) IPT Engineering Services

[email protected] Airborne Electronic Attack (AEA) IPT Engineering Services

Analysis, modeling and simulation verification, validation and accreditation support to the Live Fire Test Program.

The NavMPS SEIT of NAWCWD, as the technical arm of PMA 281for Mission Planning, requires L-3 engineering support to accomplish systems engineering functions that are aligned to its Mission Planning Environment (MPE) Lead Guide Book; the guide defines and organizes the effort into repeatable development phases with specific artifacts required of the supporting disciplines that establish the integrated mission planning system.

Provide engineering support services to the Naval Mission Planning Systems (NavMPS).

The objective of this contract is to provide engineering support services and products required by the NAVAIR TACAIR EW IPT for the AN/ALQ-214 and AN/ALQ-165. Services required are investigations of anomalies, software engineering, systems engineering, support tools and facilities maintenance, documentation, and hardware maintenance and upgrade.

Support continuity of spiral development efforts in the design, development, integration and testing tasks for the delivery of products, as it represents the next step in the long-term evolution of the mission planning product and services development.

Avionics and weapons integration including development, T&E, in-service engineering, and operations support of all current and future models of F/A-18/EA-18 aircraft.

Provide Electromagnetic Environmental Effects engineering support to 4.1 for systems engineering and 5.4.4 for T&E. Current support is under Seaport Contract N0017805D4663 M801.

Page 115: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Airborne Electronic Attack (AEA) IPT Engineering Services

[email protected] Airborne Electronic Attack (AEA) IPT Engineering Services

[email protected] Airborne Electronic Attack (AEA) IPT Engineering Services

[email protected] ALQ-218 Engineering/Avoinics

[email protected]

[email protected]

[email protected]

Joint Electronic Attack and Compatibility Office (JEACO), Electronic Attack (EA) Systems in support of the Electronic Warfare (EW) and EA communications jamming pods and laboratories .

Continually upgrade the F/A-18 and EA-18G Aircraft Weapons Systems with a series of System Configuration Sets (SCS). An SCS is a combination of hardware and software configurations items that are integrated into a previously deployed baseline configuration.

'The NavMPS SEIT of NAWCWD, as the technical arm of PMA 281for Mission Planning, requires L-3 engineering support to accomplish systems engineering functions that are aligned to its Mission Planning Environment (MPE) Lead Guide Book; the guide defines and organizes the effort into repeatable development phases with specific artifacts required of the supporting disciplines that establish the integrated mission planning system.

Provide engineering and product spiral development support to create MPE systems across all Naval platforms for ship and shore sites. Mission Planning products provide Naval avaitors an automated means to plan, execute, analyze and debrief mission routes against targets in an opperational environment for strike, helo and support aircrafts as well as stand-off weapon systems.

Page 116: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

The AV-8B is a Vertical Short-Take-Off and Landing (VSTOL) jet aircraft used by the United States Marine Corps (USMC) primarily for Close Air Support (CAS) of ground troops. A System Configuration Set (SCS) is a Fleet-release set of components of software and hardware configuration items (CIs) that are integrated into a previously deployed AV-8B baseline configuration. When a change in the SCS is required, either new CIs are added or modifications to existing CIs are made. The SCS is delivered to the Fleets as a highly integrated hardware and software package. Boeing, as the prime contractor that developed the AV-8B, is a necessary system engineering contractor to support the PMA-257 and the AV-8B JSSA to develop the aforementioned SCSs.

The AV-8B is a Vertical Short-Take-Off and Landing (VSTOL) jet aircraft used by the United States Marine Corps (USMC) primarily for Close Air Support (CAS) of ground troops. A System Configuration Set (SCS) is a Fleet-release set of components of software and hardware configuration items (CIs) that are integrated into a previously deployed AV-8B baseline configuration. When a change in the SCS is required, either new CIs are added or modifications to existing CIs are made. The SCS is delivered to the Fleets as a highly integrated hardware and software package. Boeing, as the prime contractor that developed the AV-8B, is a necessary system engineering contractor to support the PMA-257 and the AV-8B JSSA to develop the aforementioned SCSs.

The H-1 is a helicopter produced by Bell Helicopter Textron Inc. (BHTI) used by the United States Marine Corps (USMC) primarily for Close Air Support (CAS) of ground troops. A System Configuration Set (SCS) is a Fleet-release set of components of software and hardware configuration items (CIs) that are integrated into a previously deployed H-1 baseline configuration. When a change in the SCS is required, either new CIs are added or modifications to existing CIs are made. The SCS is delivered to the Fleet as a highly integrated hardware and software package. BHTI, as the prime contractor that developed the H-1, is a necessary system engineering contractor to support the PMA-276 and the H-1 WSSA to develop the aforementioned SCSs.

Page 117: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Flight Test Services

[email protected] Flight Test Services

[email protected]

[email protected]

The H-1 is a helicopter produced by Bell Helicopter Textron Inc. (BHTI) used by the United States Marine Corps (USMC) primarily for Close Air Support (CAS) of ground troops. A System Configuration Set (SCS) is a Fleet-release set of components of software and hardware configuration items (CIs) that are integrated into a previously deployed H-1 baseline configuration. When a change in the SCS is required, either new CIs are added or modifications to existing CIs are made. The SCS is delivered to the Fleet as a highly integrated hardware and software package. BHTI, as the prime contractor that developed the H-1, is a necessary system engineering contractor to support the PMA-276 and the H-1 WSSA to develop the aforementioned SCSs.

Support for the Joint Mission Planning System (JMPS) H-1 Unique Planning Component (UPC) for Cobra 4 functionality.

Upgrade of H-1 Optimized Top Owl (OTO) Helmet Mounted Sight and Display (HMSD) to support integration of updates known as System Configuration Sets (SCS) to be used in the UH-1Y (Huey) and AH-1Z (Cobra) Weapons Systems.

Support for the Joint Mission Planning System (JMPS) H-1 Unique Planning Component (UPC) for Cobra 4 functionality.

Upgrade of H-1 Optimized Top Owl (OTO) Helmet Mounted Sight and Display (HMSD) to support integration of updates known as System Configuration Sets (SCS) to be used in the UH-1Y (Huey) and AH-1Z (Cobra) Weapons Systems.

Provides systems analysis and engineering services to F/A-18 (AWL) and AV-8B Labs. Includes local improvements to lab environments to meet fleet demands and other customer needs.

Software Engineering Support to AIR-4.1, NAVAIR PMAs and Competencies

Page 118: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] This will be a CSS contract to support Air vehicle engineering.

[email protected]

[email protected]

[email protected] Procure new RF radar environment generator

[email protected] remedial maintenance for simulator

[email protected] RF radar environment generator

[email protected]

[email protected]

[email protected]

Performance of Live Fire Test and Evaluation of DoD aircraft which includes, planning, design, fabrication, assembly, set up, instrumenting, test data acquisition, test operations and execution, clean up, maintenance, storage and test articla inventory management, etc.

The field emission scanning electron microscope is used for the microscopic examination of materials in support of research, development, testing and evaluations of Navy weapons.

Engineering services and support to perform a Component Improvement Program (CIP) for aircraft propulsion and power systems. The CIP shall be directed towards developing and qualifying improvements to in-service hardware to maintain, restore, and improve operational systems effectiveness and reduce the Operation and Support (O&S) costs.

Develop algorithms that lead to a windows-based software tool set for Electronic Attack (EA) Receiver Design and Analysis. This software tool set will allow rapid design/re-design, analysis and evaluation of proposed digital receivers against constantly changing threat scenarios. Will enable analysis of receiver design prior to fabrication, ensuring product reliability.

Develop high speed wideband digital sensing capability for digital RF receivers.

Develop high speed wideband digital sensing capability for digital RF receivers.

Page 119: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Provide various ScanEagle UAS components and parts

[email protected] Compact Antenna Range Upgrade

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Development of an integrated cooling scheme for military airborne tactical jamming systems. The proposal is to devise a universal and modular approach to provide efficient cooling for a 30W GaAs MMIC RF device.

Develop innovative methods to measure high power, wide band, dynamic beams from phased-array transmitters for jamming.

Develop innovative methods to measure high power, wide band, dynamic beams from phased-array transmitters for jamming.

Develop a wideband conformal high power jamming array system capable of operating from UHF to Ka band.

Develop robust and dynamic methods that can be applied universally to classify threats from received RF signals.

To provide new MIL SPEC 901-D certified shock isolator assemblies for future installations on OR-209/SRQ-4 systems on US Navy ships in support of the Ku-Band upgrade

Provide Ku-Band Waveguide components in support of Ship Change Document 9719 CDL Hawklink Upgrade

Procurement of 237 Communication Equipment Cabinets for use on DDG 113 and follow and other future platforms.

Next generation upgrade to NTDS interface between external computers and the MK-162 Gridlock Computer

Technical & engineering support for the design, integration, testing, installation, & life cycle support for shipboard and airborne communications systems.

Technical Services to Support Communications and Information Systems (IT, C4I, GIS, IETM, IDMS, AIT, Multimedia and Sensor Systems).

Page 120: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Compact Antenna Range Upgrade, Phase 2

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Procurement of RD-674 Digital Voice Logging Recorder System

[email protected] Kitting of equipment, metalwork fabrication, cable assembly

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Engineering & Technical services including integration, testing, installation, & verification of communications systems for platform mission systems. Also required is procurement, receipt, inspection, & post-installation assistance.

Technical, engineering, & logistics services to support the production, integration and installation of C4I and Combat systems supporting surface combatant modernizations.

Engineering & Technical services including integration, testing, installation, & verification of radio communications systems for US Navy ships. Also required is procurement, receipt, inspection, & post-installation assistance.

Technical Services in Support of Integration, Production, LSE and ISE for RCS/C5ISR systems on board Navy surface combatants.

Management, technical, & engineering support services of IETMs, Computer-based training (CBT) systems, Web technology based publishing applications, technical information markup, technical data conversion, & content management solutions.

BPA will be resolicitated each year for new potential vendors of Land Mobile Radios.

BPA will be resolicitated each year for new potential vendors of Baseband.

BPA will be resolicitated each year for new potential vendors of Power Supplies.

BPA will be resolicitated each year for new potential vendors of Antennas.

Support services essential to meet the sponsors’ quick reaction mission functions in the field of SATCOM, RF, Video, and Networking Technologies

BPA will be resolicitated each year for new potential vendors of SATCOM.

N119
518654: Not sure if these have been posted yet?
Page 121: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Small business set-aside to provide integration support services

Services in support of a wide variety of intelligence/intelligence related technical support assignments and responsibilities

Services primarily for research and development of the C4I systems including shipboard interior and exterior communications, shipboard radios, transportable, airborne and fixed shore termination communications systems

Services to support the development and sustainment of the Family of Special Operations Vehicles

Services for cradle to grave support systems fully integrated with all equipment to development of specific empty platforms or containers primarily vehicular in nature

Support services primarily focused on fabrication and integration of C4ISR systems and C-E components including requirements refinement, design, testing, integration, prototyping, training, fielding, and programmatic support

Support services primarily for fielded C-E equipment/systems and subsystems including maintenance, logistic, and life cycle sustainment

Services for implementation (from concept through deployment) of telecommunication and related C-E system to enable efficient information exchange of voice/video/data

Engineering, technical, programmatic, financial, acquisition management and professional support across all SCR Division programs

Provide parts, supplies and equipment in support of project requirements.

Tactical Digital Intercom Systems (TDIS) to replace the existing TDIS with an IP-based solution.

BPA will be resolicitated each year for new potential vendors of amplifiers.

BPA will be resolicitated each year for new potential vendors of Rack Ready Platforms.

BPA will be resolicitated each year for new potential vendors of transit cases.

Page 122: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Wave Relay Systems and Components

[email protected]

[email protected]

[email protected] VHF/UHF Receiver denmodulators and RF distribution units.

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] ATC&LS Engineering & Management Support Services

Mechanical Facilities Services in support of the Ship & Shore Based Electronic Systems (S&SBES)

Material Handling Services in support of the Ship & Shore Based Electronic Systems (S&SBES)

The contract includes data collections in representative environments (Pacific Northwest) and development of sensor fusion for optimum performance

A passive Millimeter wave imager is sought as a potential source for adverse weather imaging

ONR FNC - Develop prototype Missile Seeker for High-Speed ASuW Weapon.

Development of algorithm to fuse target discrimination outputs against surface targets. This will be integrated into a Surface AiTR system for both RF and IR target discrimination. PMA265 is the intended transition/Develop, test, and document a Linux-based software algorithm.

Develop an IR-based Assisted Target Recognition (AiTR) system against surface targets. This will be integrated into an IR Ships-in-Port and IR Ships-at-Sea baseline system, matured, and transitioned to PMA265/ Develop, test, and document a Linux-based software system. Data sets will be supplied by government.

CIP (likely multiple small procurements totaling $300K). STIEL Modernization of Equipment

Page 123: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Aircraft Services

[email protected] JPALS, N-UCAS, &AAR Support Services

[email protected] Research and Development Support for JPALS & N-UCAS Services

[email protected] ATC&LS Technical Engineering Products & Services

[email protected] Hardware

[email protected] Hardware

[email protected] Hardware

[email protected] ATC&LS Technical Engineering Products & Services

[email protected] Hardware

[email protected] Hardware

[email protected] Hardware

[email protected] Hardware

[email protected] Hardware

[email protected] Hardware

[email protected] Hardware

Page 124: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Hardware

[email protected]

[email protected] Field Maintenance Support FASFAX Services

[email protected] Hardware

[email protected] Technical & Engineering Services for USMC, ATC

[email protected] Hardware

[email protected] Hardware

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Hardware for AN/UPX-24 Interrogator Set

[email protected]

[email protected]

[email protected]

[email protected]

Software Generation, Test & Evaluation, Computer Support Services

Program Management and Eng support services to accomplish the mission and objectives of IDS

System engineering and technical support to accomplish the mission objectives of IDS.

Repairs & replacement & eng services for the AN/UPX-24(A) Interrogator Set

Hardware IDIQ for Chassis and Ancillary Equipment for AN/UPX-24 Interrogator Set

Backplane and Card Cage Hardware IDIQ for AN/UPX-24 Interrogator Set and AN/TPX-42A(V) Ship ATC

VME and NTDS Card Hardware IDIQ for AN/UPX-24 Interrogator Set and AN/TPX-42A(V) Ship ATC

Rugged Panel Mt Keyboard IDIQ for AN/TPX-42A(V) Ship and Shore ATC

Flat Panel Displays IDIQ for AN/TPX-42A(V) Ship and Shore ATC and STARS

Page 125: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] InterMAPic Licenses IDIQ for AN/TPX-42A(V) Ship and Shore ATC

[email protected]

[email protected]

[email protected]

[email protected] UPS IDIQ for AN/TPX-42A(V) Ship and Shore ATC

[email protected]

[email protected] Engineering Services

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Display Card Set Hardware IDIQ for AN/TPX-42A(V) Ship and Shore ATC

Hardware IDIQ for Illuminated Panels for AN/TPX-42A(V) Ship and Shore ATC

Hardware IDIQ for ATC Consoles for AN/TPX-42A(V) Ship and Shore ATC

Reflective Memory Cards and Misc. Hardware IDIQ for AN/TPX-42A(V) Ship and Shore ATC

Ethernet Switches Hardware IDIQ for AN/TPX-42A(V) Ship and Shore ATC

Rehost Chassis Hardware IDIQ for AN/TPX-42A(V) Ship and Shore ATC

Develop a seat suspension system that reduces energy transmitted to seat occupants onboard small water-borne vessels.

Design a predictive sensor and associated controller that can determine an impact is imminent and initiating occupant safety equipment and other emergency devices

Develop a solid state oxygen generating systems using ceramic membrane electrolyte technology.

Develop conformal ceramics for enhanced aviation armor systems for varying threat levels and applications.

Develop next generation digital technologies with high performance near infrared sensors and microdisplays.

Develop an integrated Helmet Mounted Display with day/night capability with multi spectral image fusion, smybology and cueing capbility.

Page 126: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] In-Service Engineering Technical Support for Training Systems

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

Page 127: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Printed Circuit Board Design & Layout

[email protected] Printed Circuit Board Design & Layout

[email protected] Printed Circuit Board Design & Layout

3-Phase Program to stimulate naval training technological innovation and strengten the role of small bus. In meeting DoD R&D needs

Repair, maintenance, technical support services for Standard Missile-1.

Advanced technology insertion and integration support for weapon systems developed by Raytheon.

Advanced technology insertion and integration support for weapon systems developed by Raytheon.

To procure laucher and Missile Emulater (to procure Launcher and Missile Emulator (LME) systems in support of the Navy Joint Air-to-Ground Missile (JAGM) development program. The LMEs are existing Special Test Equipment used to support the integration, test, and verification of M299/310 Launchers and Hellfire/Longbow series missiles at the MIL-STD-1760 interface to host platforms. Under an existing associate contract, the Contractor is developing, integrating, and testing additional software to be integrated in the LMEs to support: JAGM missile functionality for both Raytheon/Boeing and Lockheed Martin JAGM candidate missile designs, additional Type I platform launchers (S299, M299A1/M310A1, UAV, Navy Rotary Wing, and M801), and additional Type II platform launcher (Navy Fixed Wing Launcher).

Provide administrative, information management, and subject matter expert support

Page 128: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Printed Circuit Board Design & Layout

[email protected] Printed Circuit Board Design & Layout

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Liquid Nitrogen System

[email protected] Maintain Machine Shop machinery & equipment

[email protected]

[email protected]

Printed Circuit Board Fabrication & Assembly (Population)Bid & awarded together on a multiple vendor contract

Printed Circuit Board Fabrication & Assembly (Population)Bid & awarded together on a multiple vendor contract

Printed Circuit Board Fabrication & Assembly (Population)Bid & awarded together on a multiple vendor contract

Printed Circuit Board Fabrication & Assembly (Population)Bid & awarded together on a multiple vendor contract

Printed Circuit Board Fabrication & Assembly (Population)Bid & awarded together on a multiple vendor contract

Printed Circuit Board Fabrication & Assembly (Population)Bid & awarded together on a multiple vendor contract

IDIQ Delivery order contract for painting and plating services provided to Machine Shop customers.

IDIQ Delivery order contract for Machining overflow contract for peak customer support

Page 129: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Manufacturing Contract

[email protected] CDI BLU 1-10

[email protected] Warhead Testing

[email protected] Fire Optic Test Set

[email protected] Liquid Nitrogen System

[email protected] Liquid Nitrogen System

[email protected]

[email protected]

[email protected] Engineering Support

[email protected]

[email protected] Engineering Support

[email protected] Engineering Support

Procurement of electronic omponents IDIQ for support of WPD customers

System Engniering,Gold Disk Services, Informatino Assurance Services,

Aircraft Launch and Recovery Engineering (ALRE) and Support Equipment (SE) Drawing Efforts

Fielding I-level operational test program set (OTPS) test & repair capability for the H-1 FCC.

Page 130: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] This contract is to procure wire rope for cross deck pendants

[email protected]

[email protected] This contract is to procure wire rope for cross deck pendants

[email protected] This contract is to procure wire rope for cross deck pendants

[email protected] Contract to install ALRE systems aboard ships

[email protected] Contract to procure steel to manufacture parts.

[email protected]

[email protected]

[email protected]

[email protected] Contract to procure steel to manufacture parts.

[email protected]

[email protected]

[email protected]

This is a service act contract for laborer who support manufacturing operations (machinists, mechanics helpers, fabric workers, etc.)

This contract is to procure material for CVN 72 Arresting Gear Overhaul

This contract is to procure wire rope for cross deck pendants (Landbased)

Seaport contract for technical services to support prototype engineering, QA, and manufacturing operations planning and execution.

Seaport contract for IT services to support manufacturing operations planning and execution (JobBOSS program)

Support services to maintain and repair CNC machine tools used for manufacturing by the Prototype Manufacturing Division

O, I, and D Level maintenance support for NTWL and NTWP aircraft and associated equipment. Contractor shall provide qualified personnel to execute required maintenance (direct and in-direct) support. Must have qualified ground operations manual.

Provide flight test engineering support to the Program office and additional support to the Department as a whole.

Provide training to the ISEET department in Test Planning and Test Reporting

Page 131: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] Provide Mission Systems T&E contractor support services

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Environmental Services

provide aircrew and aircrew support services for fixed wing rotary wind and unmanned aircraft.

Provide targets and operational support associated with Aegis and other NAVSEA combat system testing and operations

Seaport Contract - Contractor to provide information technology, management analyst, and flight operations schduling support service for Test Pilot School.

Possible recompete of current contract (POP ends Aug 2012). Contract to provide 400 hours of flgiht operational support with installed ASTARS systems.

Engineering, technical, and programmatic support for ground and flight test and evaluation of aircraft weapon systems involving all land and sea based Navy/Marine Corps fixed, rotary, and unmanned aircraft. The efforts supported include test and evaluation of aircraft flying qualities, engine performance, mechanical systems, catapult launches, arrested landings, weapons separation, ballistics determination, weapons delivery accuracy, safe escape, weapons delivery planning, bomb rack interface, and missile launcher performance.

Provide engineering and technical services to support the F/A-18 and EA-18G, F-35 (JSF), T-45, and EA-6B Project Teams, along with other VX-23 squadron tasking. Included are test planning and operations services, functional engineering support, documentation support, T&E logistics support, flight operations and coordination support, and corporate operations/systems support.

F/A-18 Project Team support that includes, maintenance, manufacturing of parts, instrumentation and engineering for all models of the F/A-18, EA-18G aircraft and future variancts (domestic and FMS) for ground and flight test programs conducted and NAWC Pax River.

Provide test planning, test monitoring and real-time mission support during Aefis BMD Flight Test missile Intercept tests. In support of NAVSE and MDA programs under the cognizance of NAWCWD Point Mugu

N68936-07-D-0005

Page 132: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Threat Validation Support Services

[email protected]

[email protected]

[email protected] Beta Demonstration unit of the LSTS

[email protected] Development of an autopilot with new TCS standard interface N/A

[email protected]

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

Provide Range instrumentation systems engineering, Operations and Maintenance, configuration and data management, analysis, and logistics support for range instrumentation systems in support of the Pacific Range Support Team supported MDA missions in the Pacific/Atlantic broad area test beds and other fixed and/or mobile locations worldwide.

N00178-05-D-4395-GM01

N68936-07-D-0014

Contractor maintains and operates a variety of aerial and seaborne targets, support systems and vessels. Operations are supported predominately at Pt Mugu, China Lake, WSMR and open ocean

N0017804D4118

Conduct control room functions for the GQM-163 target that includes preparation, check, launch control, data collection and analysis

N6893609R0054

DAAB07-03-D-B010/187

Provide Operational Support; Project Support; Technical and Engineering/Systems Support; Physical Security Support; Logistics Support; Communication Support; Facility/Vessel Coordination and Planning Support; Vessel Operation and Maintenance Support; Ordnance Certification Program; Hazardous Material Program; and Quality Assurance.

Seaport

N00178-04-D-4072 GM03

Page 133: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected] Airborne Threat Simulation support

[email protected]

[email protected]

[email protected]

N68936-09-D-0025

Development, creation, and enhancement of simulation/stimulation tools and capabilities in support of research, development, testing, training, systems evaluation and experimentation of C41SR systems.

N6893601D0005

Full spectrum information technology (IT) engineering, technical and management support services for the RDT&E Infrastructure Division. Current support is under bridge contract N00421-11-C-0070. Planned RFP may slip into FY12.

Full spectrum information technology (IT) engineering and management support services for the RDT&E Infrastructure Division. Current support is under Sabre Systems Contract N0042108C0022.

Page 134: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Engineering and Technical support services in support of the Aircraft Simulation Division. Current support is under Seaport Contract N0017805D4397, M801. Planned RFP could slip into FY12.

Engineering, Technical Operational, Test and Logistics support for the Surface Aviation Interoperability Laboratory (SAIL). Current support is under Seaport Contract N0017805D4663 M804.

Sustainment, Deployment, System Engineering, Design, Development, and Testing efforts to support the Evolutionary Acquisition & Development processes to address system performance changes, to manage Commercial-Off-The-Shelf obsolescence, and to mitigate Information Assurance (IA) vulnerabilities while assuring interoperability, availability, and performance associated with operational systems within the Joint Service communitites.

N0010409DQ451

System Engineering, Design, Development, and Testing efforts to support the Evolutionary Acquisition & Development processes to address system performance changes, to manage Commercial-Off-The-Shelf obsolescence, and to mitigate Information Assurance (IA) vulnerabilities while assuring interoperability, availability, and performance associated with operational systems within the Joint Service communitites.

N0010410DQ085

TDPC Task Order for Procurement for AV-8B Revision and Maintenance (R&M) of the Fleet Readiness Squadron (FRS). Instructional programs have been developed and implemented for the Day Attack AV-8B, Night Attack AV-8B, Radar Attack AV-8B, and TAV-8B training programs. Curricula revision is mandated by the analysis s of quality control data and all weapon system changes that affect training such as aircraft engineering change proposals (ECPs), tactics, local course rules, and Naval Aviation Training and Operating Procedures (NATOPS) documentation mandates the curricula revision.

TDPC Task Order for Curricula revisions in support of FRS, CNATTU, CPRW-10, and MAG-14.

TDPC Task Order for Procurement of curriculum update, revision and enhancement management, administration and support of existing Atlantic training curriculum and presentation media at four (4) sites (FRS:VFA-125, VFA- 122, VAFAT-101).

Page 135: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] Conventional Ordnance Performance Evaluation

TDPC Task Order for Procurement for Navy Helo R&M of four Fleet Readiness Squadron (FRS) Training Programs. Instructional programs have been developed and implemented for the MH-60S, MH-60R, SH-60B and SH-60F helicopter training programs. The curricula revision is mandated by the analysis of quality control data and all weapon system changes that impact training such as aircraft engineering change proposals (ECPs), tactics, local course rules, and Naval Aviation Training and Operating Procedures (NATOPS) documentation.

TDPC Task Order for Procurement of MH/CH-53D/E R&M of three Fleet Readiness Squadron (FRS) Training Programs located at HMT-302 (CH-53E), Marine Corps Air Station (MCAS) New River, North Carolina, MAG-24 (CH-53D), Marine Corps Base Hawaii (MCBH), Kaneohe Bay, Hawaii, and Airborne Weapons Systems Training School, (AWSTS) (MH-53E), Naval Station (NS) Norfolk, Virginia. Instructional programs have been developed and implemented for the CH-53E, CH-53D and MH-53E training programs. The curricula revision is mandated by the analysis of quality control data and all weapon system changes that impact training such as aircraft engineering change proposals (ECPs), tactics, local course rules, and Naval Aviation Training and Operating Procedures (NATOPS) documentation

TDPC Task Order for Procurement of curriculum update, revision and enhancement management, administration and support for the Tidewater Naval Aviation Training Systems located at the E‑2C/C‑2A Fleet Readiness Squadron Training System (E‑2C/C‑2A FRSTS), Landing Signal Officer (LSO) School, Composite Fighter Squadron Twelve (VFC‑12) and E-2C Air Combat Training System (ACTS). Curriculum R&M is driven by changes in the weapon systems, engagement tactics, local course rules and directives, Flight Information Publications (FLIP), Naval Air Training and Operating Procedures Standardization (NATOPS) manuals, software, maintenance manuals, internal and external quality control, and instructor and student inputs. Other sources that necessitate change are improvement of technical content of the courses and changing training environments fostered by hardware and software advances.

Page 136: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Non-Proprietary Spares Parts for Paveway II Bombs

[email protected]

[email protected]

[email protected] Software Development and RCM CSS Support for 7.0 IRCMS

[email protected]

[email protected]

[email protected]

Spare Parts for Paveway II Bombs Proprietary to Archer Technologies

Logistics and technical support services in the areas of planning, analysis, development, training, support equipment management, facilities and execution.

N6893601D0005

The HQMC DC (A) Support Contract for RESET for USMC Aircraft, and a service support contract focused on providing RESET Event Support for US Marine Corps Aviation both in CONUS and OCONUS as part of OCO (Overseas Contingent Operations) Supporting Pre-Deployment, Post Deployment Inspections in CONUS and In-theatre Sustainment Inspections of Aircraft Deployed to OEF (OCONUS). We still have (6) remaining Options in support of the Contract to continue support for the RESET Contract. (Contract option is 6 months long)

The 6.7 National Contract is a service contract focused on providing manpower for various taskings across the National 6.7 Department. Three RFPs will be released by NAWC AD Pax. One RFP will be released by TSD ORL. The number of RFPs to be released by NAWC AD LKE is TBD.

The Military Packaging Services contract will provide comprehensive engineering, analytical, investigative, research and other technical military packaging support services in the following areas: documentation, testing; data systems, desiccant materials, dehumidification systems, humidity indicators, and volatile corrosion inhibitors.

Provide Contractor Maintenance Support Services (CMSS) for the Fleet Readiness Center Mid-Atlantic located at Patuxent River (FRCMA-PAX), Maryland

75 contractor personnel integrate with Military/Civil Service work force

The Contractor is required to provide maintenance support expertise and subject-matter-experts to ensure uninterrupted support in specified Level II, and limited Level III aircraft maintenance and administrative support on aircraft components, engines, and Support Equipment (SE)

Page 137: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

Fleet Readiness Center Southeast (FRCSE) provides Depot Level Maintenance (DLM) services for aircraft, aircraft engines and associated components/materials, involving the rework of existing aviation end items, systems and components and the manufacture of items and component parts that are otherwise not available

Mechanic and artisan labor to perform maintenance actions on aircraft, aircraft engines and associated components/materials undergoing Depot Level Maintenance (DLM)

Across multiple aircraft platforms in multiple sites including NAS Jacksonville, NS Mayport, Cecil Commerce Center, MCAS Beaufort and NAS Oceana

Provides support to the Fleet Readiness Center Southeast Depot Level Maintenance (DLM) effort by providing operational management of warehouses, inventory and storage of aircraft parts, production of tool kits for maintenance, and transportation of materials and components from one point in the maintenance process to the next.

Across multiple aircraft platforms in multiple sites including NAS Jacksonville, NS Mayport, Cecil Commerce Center, MCAS Beaufort and NAS Oceana

Aviation technical training documenation and source data production and delivery to include weapon system maintenance and operations training manuals, Airworthiness/Flight Clearance Products (Interim Flight Clearance, Naval Air Training and Operating Procedures (NATOPS), and Naval Aviation Technical Information Products (NATIP)). Also includes production and delivery of aviation technical training products to include Web-based Training (WBT), Computer Aided Instruction (CAI), Interactive Courseware (ICW), Interactive Multimedia Instruction (IMI), Instructor Led Training (ILT), Desktop Simulations, Part Task Trainers, Electronic Classrooms and Learning Centers to include Courseware Delivery Stations (CDS), file servers, and network systems and the implementation of these training products.

As per MAP 09-01, up to 4 squadrons will transition from F/A-18C a/c to F/A-18 E/F Super Hornet squadrons

Page 138: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] Conduct Geothermal Tests

[email protected] Provide Furniture

[email protected] Research Nuclear Fusion Systems

[email protected] Test and Evaluation Operation of the Molten fuel Carbonate Cell

[email protected] Test and Evaluation Operation of the Molten fuel Carbonate Cell

[email protected] Provide Relocation Services

Contract will used to procure pre-position and limited I level SE for EA-18G Expeditionary deployment

support to the AIR 6.8.5 national team in the following general areas: (1) technical data management support, (2) technical publishing support, (3) technical library / repository / Data Control Center (DCC) support, (4) logistics information technology support, (5) independent quality assurance support and (6) reporting.

N68936-08-C-0061

N68936-09-D-0034

N68936-09-C-0125

N68936-07-C-0077

N68936-09-C-0142

N68936-11-P-0181

Page 139: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] VTC Polycom materials, maintneance and support services

[email protected]

The Naval Air Systems Command (NAVAIR), in particular, the Command Staff Office (CSO), and the NAVAIR Command Strategic Leadership Support team (AIR 7.1.1), the NAVAIR SIGMA Program Office, and the NAVAIR Washington Liasion Office (WLO) has a requirement for the Command Strategic Leadership Services to include research and anaslysis, support on internal and external issues to NAVAIR leadership, its resource sponseors, and fleet partners, planning and implementation of various NAVAIR, Naval Aviaotion Enterprise (NAE), DOD, and DON mandated actions; planning, documentation and action identiofvcation required for implementing strateci initiative such as aligning NAVAIR support to Sea Shield, Sea Strick, Sea Basing and Force Net; management staff support to NAVAIR executive leadership; administrative and operational support staff to facilitate daily operations of the WLO to include on-site administrative support, coordination and scheduling of meetings, workshops and conferences, scheduling, and allocation of workspaces and parking passes, equipment maintenance coordination, office security, technology support and transportation.

This contract will serve as the primary contractual agreement to provide services and products to support the NAVAIR Navy ERP Business Office COE. Services and/or products include NAVAIR Process Owner coordination, Business and functional ERP process management, deficiency identification, data management and reporting, user and role management corrdination, NAVAIR unique system training coordination, representation to Navy ERP of NAVAIR concerns and requirements, liaison support to the Navy ERP program office, and strategic recommendations to NAVAIR leadership concerning use of the Navy ERP tool.

The contractor shall provide facilities support services for NAVAIR HQ. These efforts shall include providing all necessary vehicles, permits, appropriate clearances, equipment, labor scheduling, estimating and supervision of contractor personnel providing the facilities support services.

Courier service involves the transport of materials, and documents to NAVAIRs Washington Liaison Office located in Crystal City, Pentagon, adjacent buildings, and other government facilities in the Washington DC metropolitan area.

Maintenance for PowerCenter, dev/test/prod licenses, Metadata, Xconnect, and Exchange products

Page 140: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] Aqualogic Support Maintenance

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] CAC Enablement Software and Remote Admin Software

[email protected] Information Technology Contractor Support Services

[email protected] Technical refresh of VTC Endpoints

[email protected]

[email protected] Data Center Blade Technology

[email protected]

Software maintenance for Starteam Enterprise Advantage and CaliberRM Analyst

Software renewal, Adobe Connect, Coldfusion Enterprise, Web Premium

Software maintenance for Business Objects Enterprise licenses QTY 2,622, Business Objects Performance Manager QTY 2000, Business Objects Desktop Intelligence, Business Objects Predictive Analysis, Business Objects Set Analysis, Business Objects Web Intelligence

Maintenance for Knowledge Management Software utilized by the National Help Desk (NHD). Software has multiple patents.

Maintenance for Incident Tracker Software utilized by the National Help Desk.

Maintenance for Automated Call Distribution Software utilized by the National Help Desk.

Annual software maintenance for 10K e.Power Workflow user licenses which includes 10K integrated Document Management software components.

Data Center management software, de-duplication and converged networks

Leadership training - senior level leadership training: five (5) core leadership courseContract award is behind schedule due to legal/contractual issues (out of 7.3's control)

Page 141: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] O-level training for the fleet

[email protected] Skilled aircraft mechanic augmentation services

[email protected]

[email protected]

[email protected]

Buy approximately 45 w-y over contract POP (base + 2 option years) to provide security services to be provided across NAVAIR.

This PBWS describes the Corporate Communication Department products and services to be provided to the Naval Air Systems Command located at Patuxent River, MD and other sites across the United States. Products and services will support media relations, internal and strategic communication, visual information and protocol activities

Administrative services to include travel, training, visitor control, personnel, and correspondence preparation support.

The contractor shall support the BFMC Leadership Groups with program management, strategy development, and tactical operations support

Performs curriculum development and delivery of analytical and transactional course material for training of BFMs.

Performs curriculum development and delivery of analytical and transactional course material for training of BFMs

Production support services including production control, transportation,warehouse, tools and parts, etc.

Engineering support requirements include the AN/APG-65, AN/APG-65(V), AN/APG-73, AN/APG-79 Radar Systems and related Support Equipment (SE).

The effort will include support, maintenance, and conversion of existing applications such as Manufacturing Resource Planning (MRPII), Compass Contract software and a variety of commercial off-the--shelf (COTS) & custom developed software and applications. Maintenance of reports, reporting and web forms, data warehouse, application maintenance and integration are required tasks to name a few.

Page 142: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Annual Buy for ACAT ID Program

[email protected] Annual Buy for ACAT ID Program

[email protected] Annual Buy for ACAT ID Program

[email protected] Annual Buy for ACAT ID Program

[email protected] Contractor Support Services

[email protected] Product Upgrade

[email protected] Technology Development Contracts for the OASuW

[email protected] Harpoon Command Launch Systems Acquisition

[email protected] Harpoon Command Launch Systems Acquisition

[email protected] Harpoon Command Launch Systems Acquisition

[email protected]

[email protected]

[email protected] Harpoon Missile Acquisition

CAFIS support is required to maintain day-to-day operations and to provide responsive single financial reporting and accountability by area command. CAFIS is a single joint financial planning, management, and reporting system that allows seamless integration of financial and production information for FRCSW to manage and account for operational activities within the command.

Harpoon Missile and Launch Systems IDIQ for Engineering, Training and Technical Services

Sustainment support for SLAM-ER, Harpoon Missile and Launch Systems (Base Year + 1 Option Year)

Page 143: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Harpoon Missile Acquisition

[email protected] Harpoon Missile Acquisition

[email protected] Harpoon Missile Acquisition

[email protected] Harpoon Missile Spares Acquisition

[email protected] Harpoon Missile Spares Acquisition

[email protected] Harpoon Missile Spares Acquisition

[email protected] Harpoon Missile Spares Acquisition

[email protected]

[email protected] Sustainment support for JSOW

[email protected] Sustainment support for JSOW

[email protected] Sustainment support for JSOW

[email protected] Training Support for Weapon Systems

[email protected]

[email protected]

[email protected]

[email protected]

Harpoon Surface and Subsurface Launch Control System Software, System Engineering and IV&V

RTSC Indianapolis, IN shall manage AN/AWW-13 Advanced Data Link system (ADL) Functional/Sustaining Logistics support.

RTSC Indianapolis, IN shall manage AN/AWW-13 Advanced Data Link system (ADL) Functional/Sustaining Logistics support.

Boeing shall provide a quantity of between 3 - 8 RATVs in support of P-8A integration testing.

Boeing shall provide engineering support to the SLAM-ER and Harpoon programs for Aircrft Integration and Mission Planning

Page 144: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Product Upgrade

[email protected] Product Upgrade

[email protected] Product Upgrade

[email protected]

[email protected] F/A-18E/F, EA-18G and F/A-18A/C production/retrofit procurement

[email protected] F/A-18E/F, EA-18G aircraft production

[email protected] Engineering Support for all survival radios

[email protected] CSEL survival radios

[email protected] One V-22 Test set for Engineering support at NAWCAD

[email protected] E-2D aircraft production

[email protected]

[email protected]

[email protected]

[email protected]

Boeing shall provide engineering support to the SLAM-ER and Harpoon programs for Aircrft Integration and Mission Planning

Manufacturing of survival vests and soft armor. This item is being requested to be put onto the Javits-Wagner-O'Day (JWOD) Set aside list for manufacturing by a (NISH) organization.

Option 1, Procurement of AR-5 (V)1, (V)3, (V)4 and (V)5 Aircrew Chemical Biological Radiological (CBR) Respirator Assemblies

Option award. Manufacturing of survival vests and soft armor. This item is being requested to be put onto the Javits-Wagner-O'Day (JWOD) Set aside list for manufacturing by a (NISH) organization.

Manufacturing/production of Multiwavelength Laser Eye Protection & Neodymium Spectacles.

Manufacturing/production of Multiwavelength Laser Eye Protection & Neodymium Spectacles.

Page 145: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] F/A-18E/F, EA-18G and F/A-18A/C production/retrofit procurement

[email protected] F/A-18E/F, EA-18G aircraft production

[email protected] E-2D aircraft production

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Improve crashworthy performance of troop and gunner seats by upgrading current energy attenuator design which is susceptible to metal fatigue failure.

Option award. Manufacturing of survival vests and soft armor. This item is being requested to be put onto the Javits-Wagner-O'Day (JWOD) Set aside list for manufacturing by a (NISH) organization.

Option award. Manufacturing/ production of Multiwavelength Laser Eye Protection & Neodymium Spectacles.

The purpose of this task is to produce and deliver a PC Simulation to replace the E-6A Auxiliary Power Unit maintenance panel trainer. The simulation shall be supporting IMI to the existing approved curriculum materials.

To produce and deliver interactive courseware (ICW) and computer assisted instruction (CAI) materials. This effort will result in the restructure of the Mission Crew curriculum for the Replacement Aircrew Communications Operator Category I course (E-050-0406).

The purpose of this task is to produce and deliver a PC Simulation to replace the E-6A Hydraulic Systems maintenance panel trainer. The simulation shall be supporting IMI to the existing approved curriculum materials.

TSD include various controller stations in order to simulate the tower environment in order to practice team coordination and maintain proficiency.

Upgrades to resolve obsolecence, capabilities, and concurrrency issues with the E-2C training devices.

The Contractor update existing AMTs to include P3I and latest AOP, (PMA299 has not identified funding for this effort ), WLT/MCT's to meet MH60R/S aircraft concurrency requirements to include AMCM and Armed Helo. Requirements definition ongoing due to AMCM schedule slip. No funding for this effort has been requested.

Page 146: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Networked Rear Cabin Visual Simulators for CH-53, MV-22 and UH-1 Flight Training

The Contractor shall develop test and retrofit high fidelity NASMP improvements to all existing S trainers to include Chin Windows, Wider FOV and Threat improvements

Tech Refresh for addressing obsolecense for windows xp rearchitecture to Windows 7, ASTI T3 to T4, IG/Projector upgrades, and NASMP upgrades for ESM, Aero model, ISAR, enitiy management, Link 16, as well as aircraft concurrency updates.

The Contractor shall provide support to the ISEO teams, for Trainer Engineering Change Requests (TECRs), to include, monitoring and tracking of TECRs, software maintenance, engineering, technical support, training system device modification and upgrades, Information Assurance (IA) and technical data verification tasks, as well as general support as needed.

The Contractor shall develop, test and retrofit HH-60H trainers to maintain aircraft concurrency and address obsolscence issues.

Program/project mgt support, including but not limited to acq, financial, technical, production, and admin support to PMA205.

Procure 8 hoist/parachute descent procedures trainers to meet OPNAV 3710.7 Naval Aviation Survival Training Program training requirements.

Replacement of obsolete equipment that has caused excessive maintenance actions. New state of the art equipment will perform better and will be easier and less costly to maintain.

Page 147: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Produce CDMTS v4.3 in support of the MH-60S Simulator

[email protected]

[email protected]

[email protected]

[email protected]

Procure F/A-18C/D aircrew training systems and modifications & upgrades to currently fielded systems.

Replace Simulator Computer and Visual Systems on AH-1Z Full Flight Simulator

Phase III of SBIR effort. Procure 7 ROBD-SD PTTs to meet OPNAV 3710.7 Naval Aviation Survival Training Program (fixed wing ejection seat) hypoxia and (all aircraft) spatial disorientation training requirements.

Upgrades to resolve obsolecence, capabilities, and concurrrency issues with the C-2A training devices.

The Contractor shall develop test and retrofit high fidelity NASMP improvements to all existing S AVET trainers to include Full Gun Mock Up, Full Cabin Configuration, Rescue zHoist/Cargo Hook, ability to see hands and NSW insert capabilityChin Windows, Wider FOV and Threat improvements . The Contractor shall develop, produce and deliver 4 AVET devices.

E-2D Aircraft concurrency and aircraft upgrades. Training enhancements and additional required devices.

Replace Simulator Visual Systems on Containerized Flight Training Devices at MCAS New River

Replace Simulator Visual Systems on CH-53 Weapons System Trainers

Replace Simualtor Visual Systems on Containerized Flight Training Devices at MCAS Miramar

Page 148: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] LSO trainer needs an upgrade due to degradation of training.

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

TOTS is a simulated tower environment used for initial training of prospective Naval controllers, and the TOTS needs an upgrade due to degradation of training.

Procure 3 mixed gas hypoxia chambers to meet OPNAV 3710.7 Naval Aviation Survival Training Program (fixed wing non-ejection seat) hypoxia training requirements.

Procure 18 ROBD-SD PTTs to meet OPNAV 3710.7 Naval Aviation Survival Training Program (fixed wing ejection seat) hypoxia and (all aircraft) spatial disorientation training requirements.

Procure 32 ROBD-SD upgraded visual systems to meet OPNAV 3710.7 Naval Aviation Survival Training Program spatial disorientation training requirements.

Procure 30 upgraded parachute procedure trainers to meet OPNAV 3710.7 Naval Aviation Survival Training Program training requirements.

Procure 9 dynamic ejection seat trainers to meet OPNAV 3710.7 Naval Aviation Survival Training Program ejection training requirements.

The purpose of this task is to rehost the CNATT IAT Trainer for maintenance training to the existing approved curriculum materials.

Provide software integration for USN C-130T avionics upgrade to include CNS/ATM, Safety and Obssolecence

CFT to provide organizational and limited intermediate maintenance for three (3) Kuwait KC-130J aircraft

Procures 3 to 5 commercial derivative aircraft modified to support NTW-P missions. Will replace current P-3 aircraft.

Award of a Firm Fixed Price (FFP) Contract with nominal cost reimbursable provisions.

Award of a Firm Fixed Price (FFP) Contract with nominal cost reimbursable provisions.

Page 149: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] Firm Fixed Price contract for air-to-air tanker re-fueling services.

[email protected]

[email protected]

[email protected] IDIQ contract. Next Delivery anticipated 1QFY12

[email protected] Rolls Royce support of KC-130 Engines.

[email protected] Develop Service Bulletin and install EGPWS&RAAS

[email protected] Contractor Logistic Support

[email protected] Contractor Logistic Support

[email protected]

[email protected] Develop Service Bulletin and install TCAS 7.1

[email protected] Develop Service Bulletin and installMode-5 Upgrade

Award of a Firm Fixed Price (FFP) Contract with nominal cost reimbursable provisions.

Award of a Firm Fixed Price (FFP) Contract with nominal cost reimbursable provisions.

Material Handling Equipment to support maintenance and operations of newly acquired Kuwait KC-130J aircraft

The Harvest HAWK UUNS dated 9/19/08 requires nine systems to be fielded. Three harvest HAWKS systems have been procured to date. The purpose of this acquisition is to procure threee (3) additional Harvest HAWK Systems.

System Engineering and Technical Publications Support for Gulfstream G-III / G-IV aircraft

Lockheed Martin peculiar supply spares to support three (3) Kuwait KC-130J aircraft for a period of three (3) years

Page 150: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Develop Service Bulletin and install Data Link

[email protected]

[email protected]

[email protected]

[email protected] Procures four C-12F/M Repalcement Aircraft for USAM

[email protected] Procures one C-9B Replacement Aircraft Program for Navy

[email protected] Develop Service Bulletin and install TCAS 7.1

[email protected] CLS logistics for Navy, Marine and NASA C-9B aircraft

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

FSRs to provide on-site technical and operational advice, and function as the technical liaison to OEM for engineering and problem resolution

FSRs to provide on-site technical and operational advice, and function as the technical liaison to OEM for engineering and problem resolution

Modify the C12W with extended range tanks, improved ASE, and other mission enhancements

CNAF N8 endorses the need for a relatively low cost, recoverable MLT to test the effectiveness of air to ground weapons and to provide a threat representative target for Strike and Close Air Support aircrew and for Crew Served Gun training.

Planning to buy 6 - 8 targets and associated hardware/data depending on the cost

Planning to buy 6 - 8 targets and associated hardware/data depending on the cost

Planning to buy 6 - 8 targets and associated hardware/data depending on the cost

Planning to buy 6 - 8 targets and associated hardware/data depending on the cost

Page 151: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Initial production of 5 MSST Targets

[email protected] 1st Full Rate Production of MSST Target

[email protected] 2nd Full Rate Production of MSST Target

[email protected] 3rd Full Rate Production of MSST Target

[email protected] Upgrade Datalink

[email protected]

[email protected] Contracted Logistics Support, Base Year with 4 Option Years

[email protected] Procuring initial spares as part of FRP-6 contract

[email protected] Procuring additional replenishment spares

[email protected]

[email protected] Procuring additional replenishment spares as part of FRP-7 contract

[email protected] Procuring additional replenishment spares

[email protected]

[email protected] Procuring additional replenishment spares as part of FRP-8 contract

[email protected] Procuring additional replenishment spares

Basic Ordering Agreement to support Pop-UP, Repair Efforts, and Special needs. No direct Cost .

Procuring Vehicle and Component Repairs as needed. RFP and Award as Needed

Procuring Vehicle and Component Repairs as needed. RFP and Award as Needed

Page 152: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Procuring additional replenishment spares as part of FRP-9 contract

[email protected] Procuring additional replenishment spares

[email protected]

[email protected] Rocket Motor buy for Qual Testing

[email protected] Radio Frequency

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] 1st Production of SSAT - Option Exercise

[email protected] 2nd Production of SSAT - Option Exercise

[email protected] 3rd Production of SSAT

Procuring Vehicle and Component Repairs as needed.RFP and Award as Needed

Procuring Vehicle and Component Repairs as needed.RFP and Award as Needed

Page 153: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] 4th Production of SSAT - Option Exercise

[email protected] Buy of RATOs that were previously going to be GFE

[email protected] Incorporate new SNTC Transponder into SSAT Target

[email protected] Contract adjustment for inadequate Navy funding profile

[email protected]

[email protected]

[email protected] Technical and Engineering Support

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Bridge effort to extend existing order.

[email protected] Award after Phase II award is complete

MFOQA Software NRE/Prime Integration and Fielding for MFOQA Phases 3 (T-45) and 4 (MV-22)

Software Development & Delivery for Auto-TAWS, CAT III Increment 1 (TAWS II w/obstacles) and CH-53K TAWS completion

Purchase hardware to implement CNS/ATM functionality. Estimate 14 Auxillary Interface Units (MH-53E) and 22 Data Concentrator Units (MH-53E & C-130T), FY12, 13

Purchase hardware to implement CNS/ATM functionality on E-2C, C-130T & MH-53E. Estimate 50 Integrated Hand Controllers, FY11, 12 13.

Purchase Zyfer Time and Frequency Standards to implement CNS/ATM functionality on E-2C aircraft. Estimate purchase of 14 FY11, 12, 13.

Purchase Miniaturized Airborne GPS Receivers to implement CNS/ATM functionality on F/A-18 C/D aircraft. Estimate purchase of 312 each FY12, 13

This is a Task Order under the planned GD-AIS/PMA209 BOA for the repair of Type 3 Advanced Mission Computer (AMC) EMD units procured during In-Production Obsolescence Upgrades in order to support the availablity of assets for further obsolescence upgrade efforts.

EGI OFP update required to meet F/A-18 Block 25X RNP/RNAV update

Page 154: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] FMS GFE procurement

[email protected] Risk Reduction efforts

[email protected] Risk Reduction efforts

[email protected] Modify EGI OFP to correct deficiencies prior to flight test

[email protected] Oracle Licenses for MFOQA Phase 1 Fielding

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

In country support required to update GPS OFP for JASSM weapon integration.

In country training & capability desired to field load EGI & GPS OFPs.

MFOQA Flight Data Translator Tool for T-45 Development/Test/Sustainment

Purchase hardware to implement CNS/ATM functionality. Estimate 27 temperature probes (MH-53E)

Purchase hardware to implement CNS/ATM functionality. Estimate 29 GDL-90s (MH-53E)

BOA is required to satisfy ARC-210 customer requirements not available through Production Contract vehicle. These include integration support, special wiring/cabling, platform unique hardware/software etc

Establishes the basic requirements for non-recurring engineering, sustaining engineering, field service technical support, hardware procurement and software modifications in support of Communication, Navigation, Surveillance (CNS)/ Air Traffic Management requirements. Includes EFDS software and EFDS interfaces, Integrated Processing Cabinet, data loaders and Data Transfer Units, CDU 7000 software, navigation and communications systems data base support, and related avionics systems.

This contract will be for the procurement of F/A-18 Lots 36-38 production Fibre Channel Network Switch (FCNS). The FCNS will be forward fit and retrofit into the E-2D, F/A-18E/F and EA-18G aircraft. FCNS is part of a family of AMC&D products.

Page 155: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

This contract will be for the procurement of F/A-18E/F and EA-18G Lots 37-38 production Advanced Multi-Purpose Displays (AMPD). The AMPD will be forward fit and retrofit into the F/A-18E/F and EA-18G aircraft. FCNS is part of a family of AMC&D products.

This is a Task Order under the planned GD-AIS/PMA209 BOA for the intregration of Type 1 Advanced Mission Computer (AMC) Retrograde modules into the MSC in order to support the extension of service life of AV-8B Aircraft.

Unit is use as a backup SafetY of Flight item required for aircraft safety. Platforms include CH/MH-53E, C-2A and E-2C.

This is a Task Order under the existing NAVAIR/Boeing Corporate BOA and will be awarded for engineering services in support of the Advanced Mission Computer and Displays (AMC&D) program. This Task Order is oriented towards the design or re-design, development, evaluation, and logistics support of AMC&D products, specifically focused on platform integration of the AMC&D products into the F/A-18E/F and EA-18G aircraft. The contractor shall provide supplies and services required to plan, manage, and execute engineering, industrial, and logistics tasks when specified under individual delivery orders for existing fielded systems and newly designed systems and equipment. The contractor must be capable of transforming operational requirements into effective and affordable operational systems or components that comply with the AMC&D performance specification through an iterative process of technical definition, synthesis, analysis, system/component design or standards development, evaluation, and testing.

This contract will be awarded for engineering services in support of the F/A-18 Advanced Multi-Purpose Displays (AMPD). This contract is oriented towards the design or re-design, development, evaluation, and logistics support of AMPD products. The contractor shall provide supplies and services required to plan, manage, and execute engineering, industrial, and logistics tasks when specified under individual delivery orders for existing fielded systems and newly designed systems and equipment. The contractor must be capable of transforming operational requirements into effective and affordable operational systems or components that comply with the AMPD performance specification through an iterative process of technical definition, synthesis, analysis, system/component design or standards development, evaluation, and testing.

Page 156: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] EGI OFP update required to correct DT/OT deficiencies.

[email protected]

[email protected] CNS/ATM F/A-18CD EGI RAIM OFP GEM IV NRE

[email protected]

[email protected]

[email protected]

[email protected] Risk Reduction efforts

[email protected] Risk Reduction efforts

This contract will be awarded for engineering services in support of the Fibre Channel Network Switch (FCNS). This contract is oriented towards the design or re-design, development, evaluation, and logistics support of FCNS products. The contractor shall provide supplies and services required to plan, manage, and execute engineering, industrial, and logistics tasks when specified under individual delivery orders for existing fielded systems and newly designed systems and equipment. The contractor must be capable of transforming operational requirements into effective and affordable operational systems or components that comply with the FCNS performance specification through an iterative process of technical definition, synthesis, analysis, system/component design or standards development, evaluation, and testing.

EGI OFP update required to meet F/A-18 Block 25X RNP/RNAV update

EGI procurements required to meet platform forward fit delivery schedule.

EGI OFP update required to correct a/c interface deficiencies prior to entering DT/OT.

Complete development of the Flight Visualization Data Analysis Product for MFOQA Phase 2 Helo (CH-53E, MH-60R/S)

Purchase hardware to implement CNS/ATM functionality. Estimate 27 Fuel Flow Sensors (MH-53E)

Purchase hardware to implement CNS/ATM functionality. Estimate 27 improved data modems (MH-53E)

Purchase hardware to implement CNS/ATM functionality. Estimate 29 TACAN Converter Boxes (MH-53E)

Page 157: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Qualification & retrofit effort

[email protected]

[email protected]

[email protected] GFE procurements, spares & depot repairs

[email protected] GFE procurements, spares & depot repairs

[email protected]

[email protected] Demo program technical support

[email protected] Demo program test articles

[email protected] Demo program technical support

[email protected] GFE procurements, spares & depot repairs

[email protected] GFE procurements, spares & depot repairs

[email protected] GFE procurements, spares & depot repairs

[email protected] GFE procurements, spares & depot repairs

[email protected]

[email protected] GFE procurements, spares & depot repairs

[email protected] GFE procurements, spares & depot repairs

Modifications required to ARN-153 RT-1627 TACAN to make it MIDS compatible.

New EGI Missionization for a Marine Landing Craft Aircusion (SSC is the LCAC replacement)

H/W modification to prevent excessive current return damage, and updated s/w to prevent A-799s.

EGI missionization update required to meet RNP/RNAV block upgrade

Page 158: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] GFE procurements, spares & depot repairs

[email protected] GFE procurements, spares & depot repairs

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Program is Pre- MS B. ADDS is a Family of Systems comprising of configurable sets of modular hardware and software which provides scalable digital memory for tactical and sensor data files utilizing an Modular Open System Approach. ADDS will serve as a memory and processor resource for the overall aircraft mission system. The system will consist of a Data Tranfer Unit, Ground transfer Unit and a Data Transfer Device. Data Stored will be NSA Type 1. Quanity is unknown until various platforms requirments are established.

CNS/ATM Avionics Integration Facility for Systems & Software Analysis & Training Products

Development of the Reduced Form Factor of the AN/APX-123 for the Army.

Procurement of AN-APX-117/118(V) and AN-APX-123(V) Common Identification Friend or Foe (IFF) Digital Transponder (CXP) Systems, Mode 5 retrofit kits, associated equipment, technical data and engineering and logistics services. These CXP systems are being procured for US Armed Forces, and potential Foreign Military Sales (FMS), maritime and airborne weapon system platforms.

Procurment of AN/UPX-37 and AN/UPX-41(C) Identification Friend or Foe (IFF) Digital Interrogator (DI) Systems, Installation & Checkout (INCO) kits, Mode 5 and/or Mode S retrofit kits, related technical documentation, training, logistical support, system and integration engineering, and provisioned item engineering services.

Procurement of the Antenna Group OE-120/UPX which is an Electronically Steerable Antenna (ESA) that radiates interrogation pulses and receives transponder replies.

Procurement of the Antenna Group OE-120/UPX which is an Electronically Steerable Antenna (ESA) that radiates interrogation pulses and receives transponder replies.

Procurement of the Interrogator Set AN/UPX-24(V) which provides Mark XII IFF functionality through the use of a single interrogator set which can display synthetic video (symbology), synchronized with up to four radars, at up to 22 display consoles.

Page 159: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] CSS

[email protected] Block upgrade of trainer WST 2F173-1 .

[email protected] Procurement of 25 each Dual Torque Indicator Test Sets.

[email protected] Publication updates (NEW)

[email protected] AIMS software release

[email protected] Installation of various safety modification

[email protected] Technical Services (FY12)

[email protected] Technical Services (FY13)

[email protected] Procurement of (7) Sync Shaft/Tunnel Fairing

[email protected] Logistics ILS Support (T.O.)

[email protected] Publication updates (T.O.)

[email protected] Logistics ILS Support (T.O.)

[email protected] Logistics ILS Support (T.O.)

[email protected] Publication updates (NEW TO FROM ABOVE)

Page 160: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Drafting Services (FY12)

[email protected] Drafting Services (FY13)

[email protected] E-2C and E-2D Engine Repair and Maintenance

[email protected] E-2D Avionics Support

[email protected] E-2D spare parts for Lot 3 aircraft

[email protected] E-2D Depot Development for NRE

[email protected] E-2D spare parts for Lot 4 aircraft

[email protected] E-2D FRP spares in support of Lot 1 aircraft

[email protected] E-2C I-Files Electronic Support

[email protected] E-2D Full Rate Production Lot 1 aircraft

[email protected] E-2C Retrofit CEC into HE2K aircraft

[email protected] E-2D Maintenance and repair

[email protected]

[email protected] E-2C Retrofit HE2K Mission Computer

[email protected] E-2C WRA-9 Fleet Installations

[email protected]

E-2D Engineering & Manufacturing Development for integration of in-flight refueling

E-2C Hawkeye 2000 and U.S. Naval Supply Systems Command (NAVSUP)

Page 161: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] E-2D Full Rate Production (FRP) aircraft parachutes

[email protected] E-2D FRP Lot 2 through Lot 7 aircraft

[email protected]

[email protected]

[email protected] Procure APKWS II Guidance Sections.

[email protected] Procure AARGM missiles, CATM, spares and Production Support.

[email protected] Procure AARGM missiles, CATM, spares and Production Support.

[email protected]

[email protected] Procure CDWS systems for Naval Helicopters

[email protected] HARM FMS - IDIQ

[email protected] HARM FMS - Corp BOA

[email protected] Aviation Data and Management Control System (ADMACS) BLK 3

[email protected]

Program Management support services to support the missions of the EA-6B and Air Electronic Attack (AEA) program office, PMA-234. Services to include program office suport, acquisition management support, configuration management, data management and information technology support.

The production and delivery of an estimated quantity of 50 AN/ALE-43(V)5 COUNTERMEASURES CHAFF DISPENSING SET (CCDS) Systems including spares, associated technical data and computer software, and ancillary support, including integrated logistics and reliability/maintainability, quality assurance, and configuration management programs to the Raytheon Technical Services Company, Indianapolis, IN.

JAGM Engineering, Test Support & Analysis for Platform Integration. Flight & Wind Tunnel test planning and execution support, data reduction and analysis specific to integration with the F/A-18E/F.

Miscellaneous small purchases for Integrated Launch and Recovery Television Surveillance System (ILARTS) hardware such as cameras, switchers, recorders, etc.

Page 162: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Panoramic Camera

[email protected]

[email protected] Waterbrake PMS without water - hardware

[email protected]

[email protected]

[email protected] Advanced Prognostics for Steam Catapults

[email protected]

[email protected]

[email protected]

[email protected] HIGH Speed Pan/Tilit

[email protected]

[email protected]

[email protected]

[email protected]

Light weight matting surface used to build 96ft X 96ft landing zones for rotary wing aircraft

Miscellaneous small purchases for Integrated Launch and Recovery Television Surveillance System (ILARTS) hardware such as cameras, switchers, recorders, etc.

Prototypes to be put through a series of shorebased and shipboard tests. After downselect, production contract will follow in later years.

Integrated Catapult Control Station (ICCS) Limit Switches Corrosion Control Production

Advanced Stabilized Globe Indicator (ASGSI). Follow-on contract for forward and backfit Navy ships.

Electromagnetic Aircraft Launch System (EMALS) Engineering / Life Cycle Support Development

Advanced Arresting Gear (AAG) - Single Wire Land Based Unit for In-Service Support and Training to be installed at JCTS Track #3

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) - 1 Shipset for CVN 79

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) - 1 Shipset for CVN 79

Advanced Arresting Gear (AAG) - Ship Set for FMS for British CVF Program

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) - 1 Shipset for CVN 79.

Page 163: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Long lead forgings for CVN 79 Motor/Generators

[email protected] Hardware for CVN Arresting Gear cables to attach connectors.

[email protected]

[email protected] Re-Design internal piston from a two-piece to one piece design.

[email protected] Rack Procurement

[email protected] Low Launch Valve Semi-Auto Lube Systems

[email protected]

[email protected] Hydraulic packing materials for CVN Arresting Gear engines

[email protected]

[email protected] FY12 procurements for 4 Shipsets

[email protected] Hardware to support CVN Arresting Gear cables on deck

[email protected]

[email protected]

Electromagnetic Aircraft Launch System (EMALS) & Advanced Arresting Gear (AAG) - 1 Shipset for CVN 79.

Re-Design retract lever; modify actuator to re-locate relief valves; modify lockout design to preclude loosening sensor target.

Electromagnetic Aircraft Launch System (EMALS) Launch Motor Subsystem Footstool Bases and Clevises for CVN 78

Hydraulic pump and filtering hardware for CVN Arresting Gear engines.

Aviation Lighting System Control Panel Set (ALS-CPS). New contract to add ALS-CPS to VLA suite as the operator interface to ASGSI.

Electromagnetic Aircraft Launch System (EMALS) Launch Motor Subsystem Footstool Bases and Clevises for CVN 78

Page 164: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] System production / IDIQ contract

[email protected] System production / IDIQ contract

[email protected] Procurement of production qualification and end items

[email protected] Improved wing to fuselage fuel interconnect coupling. Final buy.

[email protected] Removal of thermal battery due to obsolescence.

[email protected] Engineering investigation of IDEC and HMU; component of EVICS.

[email protected] Engineering investigation of IDEC and HMU; component of EVICS.

[email protected]

[email protected]

[email protected] Last lot of ECP-310 TAMMAC kits

[email protected] Litening Pod Procurement/Upgrade Kits and Repair

[email protected] Engineering, logistics, and CM support

[email protected] Installation A-kits compatible with cockpit integration requirements

[email protected] Kit installations and acceptance test

[email protected] Logistics support for the F402-RR-408 production line at FRC-E.

[email protected] Logistics support for the F402-RR-408 production line at FRC-E.

Management support for the F402-RR-408 production line at FRC-E.

Management support for the F402-RR-408 production line at FRC-E.

Page 165: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Logistics support for the F402-RR-408 production line at FRC-E.

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Software Support of OFP upgrades

[email protected]

Annual Component Improvement Program effort in support of the F402-RR-408 propulsion system.

Annual Component Improvement Program effort in support of the F402-RR-408 propulsion system.

Annual Component Improvement Program effort in support of the F402-RR-408 propulsion system.

Annual Integrated Logistics Support contract to assist in management and improvement of engine components.

Annual Integrated Logistics Support contract to assist in management and improvement of engine components.

Annual Integrated Logistics Support contract to assist in management and improvement of engine components.

Procurement of various pieces of support equipment for the F402-RR-408 engine

Procurement of various pieces of support equipment for the F402-RR-408 engine

Procurement of various pieces of support equipment for the F402-RR-408 engine

Annual Component Improvement Program effort in support of engine accessories.

Annual Component Improvement Program effort in support of engine accessories.

Annual Component Improvement Program effort in support of engine accessories.

H6.1 Operational Flight Program (OFP) Upgrades to all (5) Weapon System Trainers (WST)

Page 166: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] LRIP procurement

[email protected] LRIP procurement

[email protected] FRP procurement

[email protected] Sustainment/Logistic and repair services

[email protected] FOT&E for BLK II

[email protected] Obsolesence Development

[email protected] Sustainment/Logistic and repair services

[email protected] Sustainment/Logistic and repair services

[email protected]

[email protected]

[email protected] PEMA Production Contact

[email protected]

H6.1 Operational Flight Program (OFP) Ugprades to MOS-specific Maintenance Training devices

H6.2 Operational Flight Program (OFP) Ugprades to MOS-specific Maintenance Training devices

The Shipboard MEPP will be a self –propelled, diesel/generator unit. It will have multiple power outputs to support aircraft maintenance : 120KVA, 115VAC, three phase, 400hz, 28VDC( 28KW) and 270VDC (72KW). It will replace the current A/S37A-3 Shipboard MEPP.

Repair, obsolescence, reliability and spare part support for the Marine RTCASS Test Stations to include fleet, GFE and depot stations as well as FMS support.

A/F27T-12 HCTS will provide general purpose hydraulic component test capability at intermediate level of maintenance.

Page 167: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] Procure Test Program Set Production Hardware

[email protected] Procure Test Program Set Production Hardware

[email protected] Procure Test Program Set Production Hardware

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Repair set containing the items required to perform mechanical splice repairs to aircraft fiber optic cables. Required for splicing in-line and pre-terminated pigtails.

Upgrade of the A/F48T-6 AHE Test Stand to replace obsolete parts. Test Stand gives the USN/USMC shore sites the capability to weight test all assigned Armament Handling Equipment.

Units provide mechanism for measuring particle contamination in fluids in support of the Navy Hydraulic Fluid Contamination Program. Buy required to replace aging equipment in Fleet.

A self-contained device to automticaly remove contamination fromn the end face of a terminated optical fiber.

Item required to power the Bench Top Magnetic Particle Units currently aboard CVNs and to replace the stand alone units aboard LHD/LHAs. The 2,000 amp AC or HWDC (half wave-DC) item provides for moderate powered MPI. Used for detection of surface and near surface flaws. Also performs AC demagnetization.

The set includes manual bolt hole probes, surface probes, adapters, cables, and a transit case to support the Eddy Current Flaw Detector. The probes have a range of frequencies, lengths and diameters to meet various inspection scenarios. This set will expedite inspection procedures due to delays in procuring PSE probes and decreased time for technique preparation.

Item is a standard set of quality control tools that will validate Magnetic Particle Inspection (MPI) techniques. The set includes a digital shunt meter, gauss meter, quick break tester, Ketos ring, and various accessories. This set will ensure SE process control requirements of NAVAIR TM 01-1A-16 are met for all Navy/USMC activities using MPI.

I level test set to test, troubleshoot & fault isolate APN-194 and -171 Radar Altimeter Receiver/ Transmitters. Replaces legacy W-0104488-1 and APM-403 units which are obsolete.

Page 168: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Administrative and Financial support for PMA-261

[email protected]

[email protected]

[email protected]

[email protected] GE38 Engines; Tooling required for Production; PM required.

[email protected]

[email protected]

Deficit fill of Mid-Range Tow Tractors used for towing aircraft and SE up to 80,000 lbs at USN & USMC shore sites. Replaces legacy USN/USMC Mid Range and SE Tow Tractors that have reliability and parts obsolescence issues. Competetive buy to a government owned drawing package is planned.

Replacement program for common The Cabin Pressure Test Set used at the O-Level to provide the capability for pressure testing of aircraft cabin and cabin seal on multiple aircraft. Existing test set is aging and becoming more difficult and costly for Fleet to maintain.

Penetrant inspection is used to locate surface defects. The system will be comprised of various stations, including an inspection station using a black light, developer tank, dryer and drain stations. The electrical requirements are 220 to 440V, 60Hz, single phase.

A/E37T-26/26A engine test systems were procured and delivered to the fleet in the 1980’s. The system has exceeded it’s 20 year service life but the requirements to support APU testing for the F/A-18 APU will be in place until 2028. This will be an upgrade to system to replace obsolete and unreliable components.

Programmatic, Engineering & Technical Services Support for PMA-261

CH-53K Low Rate Initial Production (LRIP) Lot 1 (FY12), Lot 2 (FY16) and Lot 3 (FY17) engines and associated non-recurring, equip. and services

GE38 Engines; Containers required to transport engines from manufacturer to installation facility; Tooling required for Production; PM required.

PPC 109 Rev A kits are required to convert T64 Engines under the T64 ERIP.

GE38 Engines; Containers required to transport engines from manufacturer to installation facility; Tooling required for Production; PM required.

Page 169: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] GE38 Engines; Tooling required for Production; PM required.

[email protected] SMFCD Production and Installation

[email protected] Bypass door kits for the MH/CH 53E's

[email protected]

[email protected]

[email protected]

[email protected] Improved structural bulkhead bushings for the MH/CH 53E's

[email protected] H-53E AFCS Computer obsolescence mitigation

[email protected] H-53E MGB replacement tooling

[email protected] SAC Non-recurring Engineering to support In-Service H-53 aircraft

[email protected] SAC Non-recurring Engineering to support In-Service H-53 aircraft

[email protected]

[email protected]

[email protected]

[email protected]

PPC 109 Rev A kits are required to convert T64 Engines under the T64 ERIP.

PPC 109 Rev A kits are required to convert T64 Engines under the T64 ERIP.

Continued Refinement and Maintenance of Condition Based Maintenance (CBM) Software for Integrated Mechanical Diagnosics System (IMDS)

CH-53K Low Rate Initial Production (LRIP) Lot 1 (FY12), Lot 2 (FY16) and Lot 3 (FY17) aircraft and associated non-recurring, equipment and non-recurring engineering and equipment

Seaport Contract - support includes Logistics, Engineering and Financial Support

Seaport Contract - support includes Logistics, Engineering and Financial Support

Seaport Contract - support includes Logistics, Engineering and Financial Support

Page 170: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] AFCENT Urgent Operational Needs (UONS)

[email protected] NAVCENt RFF

[email protected] AFCENT Urgent Operational Needs (UONS)

[email protected] NAVCENT RFF

[email protected] NAVCENT RFF

[email protected] NAVCENT RFF, Multi-Service UONS

[email protected] MARCENt Statement of Operational Needs (SONS)

[email protected] MARCENt Statement of Operational Needs (SONS)

[email protected] MARCENt Statement of Operational Needs (SONS)

Advanced Acquision Contract (AAC) for LRIP Lot 2. Definitization in FY14

Advanced Acquision Contract (AAC) for LRIP Lot 3. Definitization in FY15

Advanced Acquision Contract (AAC) for FRP Lot 1. Definitization in FY16

Seaport Contract - support includes Logistics, Engineering and Financial Support

Seaport Contract - support includes Logistics, Engineering and Financial Support

Seaport Contract - support includes Logistics, Engineering and Financial Support

Page 172: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

FY14-18 procurement of Anit-Submarine Warfare (ASW) AN/SSQ-36, 53, 62, 101, and 125 Sonobuoys for Fleet Use

FY12 procurement of Anit-Submarine Warfare (ASW) AN/SSQ-101 Sonobuoys for Fleet Use

FY12 procurement of Anit-Submarine Warfare (ASW) AN/SSQ-125 Sonobuoys for Fleet Use

FY 13 procurement of Low Rate Initial Producton (LRIP) Anit-Submarine Warfare (ASW) AN/SSQ-101 Sonobuoys for Fleet Use

FY12 procurement of AN/SSQ-110 Sonobuoy Silver Chloride-Magnesium Seawater Batteries, P/N 54006A-801

FY 12 procurement of Anit-Submarine Warfare (ASW) AN/SSQ-36, 53, AND 62 Sonobuoys for Fleet Use **Limited Competition

FY13 procurement of Anit-Submarine Warfare (ASW) AN/SSQ-36, 53, AND 62 Sonobuoys for Fleet Use **Limited Competition

FY 13 procurement of Full Rate Production Anit-Submarine Warfare (ASW) AN/SSQ-125 Sonobuoys for Fleet Use

Increased source level of AN/SSQ-125 is required to fully meet performance objectives.

Page 173: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] APG-73 System 0 level wiring tester

[email protected] APG-73 Radar Receiver chassis test set

[email protected] Radar Legacy Obsolescence - A

[email protected] Radar Legacy Obsolescence - B

[email protected] Radar Legacy Obsolescence - C

[email protected] Radar Legacy Obsolescence - A

[email protected] Radar Legacy Obsolescence - B

[email protected] Radar Legacy Obsolescence - C

[email protected] Radar Legacy Obsolescence - A

[email protected] Radar Legacy Obsolescence - B

[email protected] Radar Legacy Obsolescence - C

The High Altitude Air Anti-Submarine Warfare (HAASW) program requires Engineering, Manufacturing and Development (EMD) services for modification of AN/SSQ-36, AN/SSQ-53, AN/SSQ-62, AN/SSQ-101A and AN/SSQ-125 Navy sonobuoys with a precision location system and a digital telemetry link to provide the ability to perform ASW from high altitude. This effort includes integration of design modifications to include testing, certification, and qualifications to meet the technical, safety and flight clearance operational requirements.

Procurement of Low Rate Initial Production (LRIP) High Altitude Air Anti-Submarine Warfare (HAASW) sonobuoys to support Initial Operational Test and Evaluation (IOT&E)

Page 174: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Deliver of Low Cost Trainer to support Kuwait F/A-18 crew training.

[email protected] JPALS Capable Navigation Solution

[email protected] In-Country repair/incorp of RFD/W's in Australia

[email protected]

[email protected] Integration of JHMCS into Kuwait F/A-18 aircraft.

[email protected]

[email protected] ECP 6213R2 Step 2 TEF Honeycomb Follow-on Kits

[email protected] ECP 6253R1 (LRIP 2) has been approved by the CCB.

[email protected]

[email protected]

[email protected]

[email protected] ECP-6407: FT50 LEX Closure Lower Flange Y318 Retrofit Redesign

[email protected]

[email protected] GPP3

[email protected]

ECP6368 Part 2 for Mode 5 CIT kits (to upgrade a -20 to a Mode 5 CIT for E/F and G aircraft)

ECP TBD for Mode 5 CIT kits (to upgrade a -20 to a Mode 5 CIT for A+/C/D aircraft)

Electronic Warfare component required to support IDECM Block 3 system

Electronic Warfare component required to support IDECM Block 3 system

ATFLIR EOSU WRA ECP10 Flex Print incorporation via attrition retrofit (during RoR). FY12 NRE for upgraded Staring detective Array (Sub SRA within the ATFLIR's EOSU WRA)

ECP-6408: FT50 Y233 Bulkhead Z90 Floor Attachment Retrofit Redesign

Electronic Warfare component required to support IDECM Block 3 system

Page 175: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] part of ECP 618

[email protected] Upgrade/replacement of Kuwait F/A-18 Survival Radios.

[email protected] CEA #1

[email protected] AESA Radar Retrofit IV

[email protected] AESA Radar Retrofit VI

[email protected]

[email protected] CEA #2

[email protected] IRST Production Contract

[email protected]

[email protected]

[email protected] Depot Level Repair Team for undefined aircraft repairs.

[email protected]

[email protected] FIRST Contract / ISS Common

[email protected] Boeing ISS Common funding

[email protected] Legacy BOM

Delivery and integration of Automated Maintenance Environment for Kuwait F/A-18 Program.

Release issue in work. All contract actions are TBD until case is signed and release determinations completed

Improve the reliability of existing F/A-18E/F and EA-18G Generator Converter Unit (GCU) and identify power growth strategies beyond the current 65 KVA aircraft electrical loads.

DAR for PEMA products follow on Options for FY12 (FY13 NEW CONTRACT?)

Page 176: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] V3 IMIC Conversion w/ Raytheon

[email protected] Boeing ISS Common funding

[email protected]

[email protected] FY 13 Solid State Recorder retrofit installation kits (APN-5)

[email protected] ECP 6413 Enhanced NACES Seat Base and Back Cushions

[email protected] AESA FRACAS

[email protected]

[email protected] AESA FRACAS

[email protected] AESA FRACAS

[email protected]

[email protected] All contract actions are TBD until case is signed by FMS customer

[email protected]

[email protected] FOT&E Period XIII and XV

[email protected] ECP 6344 5th & 6th Channel

[email protected]

Kits to modify ejection seat for JHMCS (ECP-570R1 F/A-18C) and ECP-570R4 F/A-18D/F (Lot 23))

ECP 6385 External Fuel Tank Test System (EFTTS) Support Equipment Obsolescence

Approves the issuance of contract actions to General Electric Aircraft Engines (GEAE) for the production of Lot 16 & 17 F414-GE-400 engine production and support services for Lot 36 & 37 F/A-18E/F and EA-18G aircraft.

Electronic Warfare component required to support IDECM Block 3 system

Page 177: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] GPP3

[email protected] AESA RADAR Retrofit

[email protected] ECP-6213R2 F/A-18E/F Trailing Edge Flap Redesign

[email protected]

[email protected] IRST Incremental Funding

[email protected] ANAV Retrofit Kit Procurements

[email protected] (Delivery orders under Retrofit BOA)

[email protected] Perform non-recurring engineering

[email protected] Aircraft Integration

[email protected] AME follow on contract either FIRST follow on Option for FY12/13

[email protected] ECP 6038 Follow-On Kits and Installs

[email protected] ECP 6279 Modules Kits (WRA)

[email protected] Additional Depot Requirements

[email protected] Kit Procurements

Electronic Warfare component required to support IDECM Block 3 system

Integration of MIDS, Link-16 and ARC-210 radios into Kuwait F/A-18 aircraft.

Page 178: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] ANAV Retrofit Kit Procurements

[email protected] ECP 6038 Follow-On Kits and Installs

[email protected] ECP 6279 Modules Kits (WRA)

[email protected] ECP 6344 5th & 6th Channel

[email protected] ANAV Retrofit Kit Procurements

[email protected] ECP 6038 Follow-On Kits and Installs

[email protected] ECP 6279 Modules Kits (WRA)

[email protected] ANAV Retrofit Kit Procurements

[email protected] FT50 Y204 Bulkhead Retrofit Redesign

[email protected] FT50 X13 Keel @ Z108 Floor Attach Retrofit Redesign

[email protected] FT50 Z90 Longeron @ Y233 Retrofit Redesign

[email protected] FT50 Z111 Longeron @ Y326 Bulkhead Retrofit Redesign

[email protected] FT50 X0 Keel Lower Flange Retrofit Redesign

[email protected]

[email protected] part of ECP 618

[email protected] Additional Color Displays Spares

NACES ejections seat to enable JHMCS retrofit (ECP-570R4) for Lot 12 F/A-18C

Page 179: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] T4 AMC NRE Delta Phase

[email protected] FT50 / FT77 Post-CRI Inner Wing Retrofit, AYC-1439

[email protected] Instrumentation

[email protected]

[email protected] Perform non-recurring engineering

[email protected]

[email protected] Procure DMD Install Kits

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] ECP 6394 Horizontal Stab Gang Channel Corrosion

[email protected] ECP 6397 Wheel Transducer Drive Coupling Redesign

[email protected] ECP-6227C2 INLET NACELLE BLEED PLATE CRACK, AFC-582

[email protected] ISS UNIQUE Contract (RAAF)

IETMS moved to AIS IPT and this will be a new contract action with follow on efforts in FY12/13

Transponder (XP) and Interrogator (IR) SRAs were leveraged from APX-113 development; however, have obsolescence. Update parts selection and board layout to remove known obsolescence.

Electronic Warfare component required to support IDECM Block 3 system

IA for AME products/services follow on Options for FY12 (FY13 New Contract?)

IETMS moved to AIS IPT and has a FIRST contract action with follow on Options for FY12/FY13

Seven additional test assets to support hardware integration on A+/C/C+/D (requires contract mod to add hardware integration for A+/C/C+/D aircraft)

Page 180: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Boeing ISS Discretionary Taskers

[email protected]

[email protected] Upgrade of Kuwait Hush House operating system.

[email protected]

[email protected]

[email protected] OS Upgrade for EO/IR ATFLIR Requirements

[email protected]

[email protected] ECP-6326: FT50 Fuel Barrier Web at Y510, AFC-539

[email protected] ECP-6386: Inner Wing - TEF Shroud Hinges Bushing Migration

[email protected] Boeing ISS Discretionary Taskers

[email protected] EA-18G CILS Kit Procurements

[email protected]

[email protected] EA-18G CILS Kit Procurements

[email protected] Airborne Electronic Attack Kits for the EA-18G Aircraft

[email protected]

[email protected]

Engineering / Logistical Technical Assistance for MLU 2 Upgrades and Country specific items .

Electronic Warfare component upgrade to the IDECM Block 3 system

Electronic Warfare component upgrade to the IDECM Block 3 system

ECP6368 Part 2 for TD, ROM for trainers, kits (shelf label) and minor logistics cleanup.

ECP TBD for TD, ROM for trainers, kits (shelf label) and minor logistics cleanup.

Contract mod to add hardware integration for A+/C/C+/D aircraft using Mode 5 CIT developed under this contract.

FY 12 Upgraded Solid State Recorder Operational Removable Memory Modules and retrofit A kits (APN-1 and APN-5).

Page 181: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] FY 12 Solid State Recorder retrofit installation kits (APN-5)

[email protected]

[email protected]

[email protected] USSR Operational RMMs and A kits

[email protected]

[email protected] LBIA FRP 14

[email protected] Airborne Electronic Attack Kits for the EA-18G Aircraft

[email protected] Integrate AMC into F18 production line

[email protected]

[email protected]

[email protected] ECP-6401: Canopy Sill Longeron @ Y270 Retrofit Redesign

[email protected] ECP-6409: FT50 Inner Wing Panel Skin Off Retrofit Redesigns

[email protected]

[email protected]

[email protected]

ECP 6339 Incorporation of GFE Improved Solid State Oxygen Monitoring System

ECP-6343: External Fuel Tank Air Pressure Regulator (EFTPR) -- AYC-1513

NACES ejections seat to enable JHMCS retrofit (ECP-570R4) for Lot 12 F/A-18C

FY 13 Upgraded Solid State Recorder Operational Removable Memory Modules and retrofit A kits ( APN-1 and APN-5).

Wiring kits to replace the Multi-Mission Advanced Tactical Terminal (MATT)

ECP-6410: FT50 Inner Wing Spar 6 Lower Web Lug @ Inboard Closure Rib Skin On Retrofit Redesign

ECP-6411: FT50 Inner Wing Upper Splice Fitting @ Aft Fastener Skin On Retrofit Redesign

FY 14 Upgraded Solid State Recorder Operational Removable Memory Modules and retrofit A kits ( APN-1 and APN-5).

Page 182: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] AESA Obsolescence - A

[email protected] AESA Obsolescence - B

[email protected] AESA Obsolescence - C

[email protected] Monopulse

[email protected] AESA Obsolescence - A

[email protected] AESA Obsolescence - B

[email protected] AESA Obsolescence - C

[email protected] ECP-6240R1 FT50 18K MLG Side brace Fitting Failure -- AFC-565

[email protected] AESA Obsolescence - A

[email protected] AESA Obsolescence - B

[email protected] AESA Obsolescence - C

[email protected]

[email protected] SLAP Structures Phase B (75% effort)

[email protected] MAD CRI

[email protected] ECP6315R1 NAVWAR Production Panel Installation

Wiring kits to replace the Multi-Mission Advanced Tactical Terminal (MATT)

Joint Tactical Terminal replacement for the Mission Advanced Tactical Terminal (MATT)

Page 183: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] SLAP Structures Phase B (25% effort)

[email protected] Support equipment to fielded VAQ squadrons

[email protected] CASS PBL

[email protected]

[email protected]

[email protected] Legacy Mapper upgrades to Production Configuration

[email protected] TOFT

[email protected] Engineering changes to the Joint Tactical Terminal (JTT)-IBX-M

[email protected] JPALS EMD

[email protected] Swiss Fleet Retrofit for U25 Program

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Legacy Mapper and HMDTS EMD upgrades to Production Configuration

Support Equipment Interim Support bridge to Material Support Date (MSD) Repair Contract

Electronic Warfare component required to support IDECM Block 3 system

This is a PMA209 contract action that PMA213 & PMA265 are monitoring due to impacts to the Mode 5 CIT retrofit plan. Procure 20 APX-111s for A+/C/D aircraft prior to Mode 5 CIT kit upgrade.

This is a PMA209 contract action that PMA213 & PMA265 are monitoring due to impacts to the Mode 5 CIT retrofit plan. Procure remaining 45 -20 APX-111 for E/F/G retrofit

NAVAIR contracts is reviewing AIR 4.2 BCA and has not determined contracting strategy to date.

AIS IPT is responsible for all OS upgrades through the office - This being said we do not have a complete list of how many systems will require this contract at this time.

Page 184: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] OCONUS Services contract

[email protected] New Start Program

[email protected] Endurance Upgrade (9 AV's)

[email protected] Logistics, Engineering, Operations & Maintenance Support

[email protected] Software Development

[email protected] Integration of payload for A/V

[email protected] Software Sustaining Activity

[email protected] Support includes Engineering services

[email protected] Integration of new payload requirements in the Ground Station

[email protected]

[email protected] Seaport Contract - support includes Engineering Support

[email protected]

[email protected]

[email protected] OCONUS Services contract

[email protected] Support of Surrogate Testing for UCAS-D Demo on CVN-69

[email protected] Support of Surrogate Testing for UCAS-D Demo on CVN-69

[email protected] Support of Surrogate Testing for UCAS-D Demo on CVN-69

Seaport Contract - support includes Logistics, Engineering and Financial Support

Seaport Contract - support includes Logistics, Engineering and Financial Support

Seaport Contract - support includes Logistics, Engineering and Financial Support

Page 185: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] Develop the 2nd phase of CSFIRS.

[email protected]

[email protected]

[email protected] E-6B Fleet Supply and Support Equipment Support t

[email protected] CSS Support

[email protected] CSS Support

[email protected]

[email protected] Installation of an INMARSAT System onboard the E-6B A/C

Develop the courseware for the newly installed Brake System for operators and maintenance personnel.

Thermal blankets in approx. 40% of the aircraft need to be replaced as they are not as fire retardant as the remainder of the other assets.

Integration effort associated with installing MR-TCDL a US Army communications system involving antenna installations and structural and flight analysis on the aircraft along with equipment installation inside the aircraft and a full test program.

Integration effort associated with installing AEHF/FAB-T a US Air Force MILSTAR communications replacement system involving equipment installation inside the aircraft and a full test program. Install PNVC

As a weight savings initiative, purchase 1 kit of Carbon brakes and conduct NRE with option to procur 15 addditional kits plus spares.

Update the HF communications systems with Automatic Link Establishment

Contract awarded in Sep 09. Develop a new VLF Transmit terminal and procur a new APU

Page 186: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Option on Phase 4 DNS contract to install production systems.

[email protected] Address obsolete parts with primary mission system of the E-6B.

[email protected]

[email protected]

[email protected] Block IA Production contract

[email protected]

[email protected]

[email protected]

[email protected] Replace DoD common VLR reciever with new common design.

[email protected] IT Support

[email protected] IT Support

[email protected] Program Management Support

Removal of the Utility Trailing wire antenna system from the E-6B and integration of the equipment racks and cooling for installation of the IPBE Phase 1 system.

Contract awarded 23 July 2010. Procurement and integration of the Block I upgrade system into the E-6B aircraft. Program includes Multi-Level Security, New Battestaff area, Message Processing System into 4 LRIP Aircraft.

Procurement and integration of the Block I upgrade system into the E-6B aircraft. Program includes Multi-Level Security, New Battestaff area, Message Processing System into 11 Fleet Aircraft.

Installation of an INMARSAT System onboard the E-6B Block I A/C to prototype the systems integration of Phase 1 on the Block I configured A/C

Removal of the Utility Trailing wire antenna system from the E-6B and integration of the equipment racks and cooling for installation of the IPBE Phase 1 system.

Courseware development for training aircrew personnel in the maintenance and operation of the IPBE systems, Modify operational and maintenance trainers.

Page 187: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] Program Management Support

[email protected] Engineering Support Contract

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] ALQ-167 DRFM EA: Control Box for F-5 Internal and Pod systems.

[email protected]

[email protected] Purchase of ALR-67(V)2 Hot Quads for Malaysian Legacy Hornets

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

ALQ-167 DRFM EA: Hydra Chassis CCAs (5 types) for F-5 Internal and Pod systems.

ALQ-167 DRFM EA: Hydra RF Units 1 & 2 Units for F-5 Internal and Pod systems.

ALQ-167 DRFM EA: mini I/J-Band Digital RF Memory Units for F-5 Internal and Pod systems.

ALQ-167 DRFM EA: mini-Intermediate Frequency Modulator units for F-5 Internal and Pod systems.

ALQ-167 DRFM EA: Hydra Chassis w/ Kits 1 & 4 for F-5 Internal and Pod systems.

ALQ-167 DRFM EA: RF Interface Box for F-5 Internal and Pod systems.

ALQ-167 DRFM EA: G/J-Band Microwave Power Module for F-5 Internal and Pod systems.

ROR service tasks required to support the ALE-55 FOTD program including hardware failure data collection, data reduction, problem analysis, and repair or refurbishment.

ROR service tasks required to support the ALQ-214 program including hardware failure data collection, data reduction, problem analysis, and repair or refurbishment.

Additional EMI testing to MIL STD 461F and Programmer level ATP during production.

Repair service tasks required to support the ALE-55 FOTD program including hardware failure data collection, data reduction, problem analysis, and repair or refurbishment.

Repair service tasks required to support the ALQ-214 program including hardware failure data collection, data reduction, problem analysis, and repair or refurbishment.

Page 188: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] ALE-50 IMPLC

[email protected] Correct Deficienceies against the APR-39 system

[email protected] JATAS support BOA

[email protected]

[email protected] Procurement of ATW Retrofit Kits

[email protected] ALQ-214(V)4 production units for use in F/A-18C/D/E/F aircraft

[email protected] Production and retrofit of AAR-47 hardware and support equipment

[email protected]

[email protected]

[email protected] ALQ-214(V)4 production units for use in F/A-18C/D/E/F aircraft

[email protected] ALQ-214(V)4 production units for use in F/A-18C/D/E/F aircraft

[email protected]

[email protected]

[email protected]

Design, development, integration, test and delivery of software/firmware

ALE-55 Fiber Optic Towed Decoys (FOTDs) and Electronic Frequency Converters (EFCs) for use in F/A-18E/F aircraft as part of the IDECM System.

Procure tested Operational Flight Program test support SMART dispense of countermeasures for increased survivability of assault aircraft

Hardware and software upgrade to increase the probability of detection and decrease the false alarm rate while correcting knon obsolescene issues in the AAR-47 MWS.

Government of Switerland has asked PMA-272 for a recommended lay in list to support repairs of there ALQ-165 (ASPJ) systems.

Supplies and services required for field/technical support of the ALE-55 system.

Supplies and services required for field/technical support of the ALQ-214 system.

Page 189: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] DoN LAIRCM CV-22 Integration Support for PMA-275

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

BOA for ALE-47 Navy Unique, BAE proprietary components, DSS/DCDU and technical support/services.

Supplies and services required for field/technical support of the ALE-55 system.

Supplies and services required for field/technical support of the ALQ-214 system.

ALE-55 Fiber Optic Towed Decoys (FOTDs) and Electronic Frequency Converters (EFCs) for use in F/A-18E/F aircraft as part of the IDECM System.

ALE-55 Fiber Optic Towed Decoys (FOTDs) and Electronic Frequency Converters (EFCs) for use in F/A-18E/F aircraft as part of the IDECM System.

Procurement of an Engineering Change Proposal (ECP) to redesign the T-45 HUD camera to address obsolescence issues.

Provide on-site and depot level maintenance for aircraft and engines, aircraft modifications, technical support and emergency (off-site) support services.

Procure aircraft maintenance services for 203 T-45 aircraft located at NAS Kingsville, Pensacola, Meridian, & Pax MD.

Design, prototype & test a new tail hook design capable of taking program through 2035.

Overhaul facility equipment that will be necessary to retrofit T-45 main landing gear.

Procurement of an Engineering Change Proposal (ECP) to redesign the T-45 canopy to correct fleet issues.

Procurement of an Engineering Change Proposal (ECP) to redesign the T-45 HUD to address obsolescence issues.

The T-39 Contractor Logistics Support (CLS) contract will include organizational and depot level maintenance, overhaul, repair and engine repair for the T-39 aircraft.

Page 190: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] T-44C Operational Flight Trainer Simulator

[email protected] T-44C In-flight Trainer Simulator

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

The Aircraft Intermediate Maintenance Depots (AIMDs) support and conduct generalized maintenance on all Naval Type/Model/Series (T/M/S) aircraft, non-naval aircraft located at or near Naval Air Station Pensacola (NASP), Naval Air Station Corpus Christi (NASCC), and transient aircraft. Services provided by AIMD include related repairs of aircraft, engines, avionics, electrical equipment, support and Aviation Life Support Systems (ALSS), and components to return them to Ready for Issue (RFI) status. AIMD intermediate level inductiion repair maintenance requirements are specified in the Individual Component Repair Listing (ICRL).

Procure kits to support the analog to digtal conversion of the T-45A aircraft.

Evaluate potential solutions and approaches to resolving life limited structural components of the T-45.

Procure engine maintenance services for 203 T-45 aircraft located at NAS Kingsville, Pensacola, Meridian, & Pax MD.

Procure Original Equipment Manufacturer (OEM) support for Pax River Test aircraft.

Procure retrofit kits to convert T-45C aircraft to the Virtual Mission Training System (VMTS) configuration.

Procure multi-functional color displays to relplace obsolete monochrome displays in the T-45A/C aircraft.

Conduct an assessment to determine the fatigue life limited components for the T-45 aircraft subsystems to determine what actions are needed to extend their life to 2035.

Contract to obtain engineering reachback to Boeing to enable timely response to fleet issues.

Procure time critical components to preserve the delivery schedule in support of test and evaluation.

Page 191: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Engineering Services for C-12/C-12W/TC-12/T-34/T-44

[email protected] P3I (RNP/RNAV/IFF/TAWS/Crypto) 401C Upgrade

[email protected] Cockpit Upgrade Program (CUP)

[email protected]

[email protected] Flight test management, technical and administrative support.

[email protected]

[email protected]

[email protected] VH-3D CUP

[email protected] Service Life Extension on VH-3D and VH-60N

[email protected] Development of 401(C) ECP & TD

Procure new mission computers to replace obsolete computers in the T-45A/C aircraft.

Conduct engineering studies to areas for component improvement to the 401 engine.

Procure Diminishing Manufacturing Sources (DMS) support activities for T-45 systems.

All T-39 maintenance, logistics support, and pilot services will be provided at Naval Air Station Pensacola (NASP) and/or a contractor designated licensed Federal Aviation Administration (FAA) commercial depot facility. This acquisition will also provide organizational and intermediate level maintenance for T-39 aircraft and Aircraft Intermediate Maintenance Depot (AIMD) services.

Provide acquisition, logistics, and maintenance engineering services to PMA 274.

Provide program management, acquisition management, technical, security and administrative services.

Conversion of a UH-3H aircraft to a TH-3D and conversion of a SH-60F aircraft to a TH-60N

Page 192: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Execute Weight Reduction on Landing Gear

[email protected] Crypto A Kit Procurement (Phase II)

[email protected] Crypto Pub Updates (Phase III)

[email protected] VH-3D CUP

[email protected] 401(C) Non Recurring Engineering for Aircraft Intergration

[email protected] Crypto Pub Updates (Phase IV)

[email protected] New CSS Contract for Acq Support

[email protected]

[email protected]

[email protected] Procure simulators to complete the program of record

[email protected] Logistics Support to PMA-275

[email protected] Logistics Support to PMA-275

[email protected] Logistics Support to PMA-275

[email protected] Incorporation of reliability and maintainability initiatives

[email protected] Incorporate COTS TCAS system on 38 MV22.

Production incorporation of JATAS and APR-39D(V)X on MV-22 to provide 2 color IR sensor, integrated display and correct OT deficiencies

Kits and installation of JATAS and APR-39D(V)X on MV-22 to provide 2 color IR sensor, integrated display and correct OT deficiencies

Page 193: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Incorporate wirless intercom system into all V22 A/C

[email protected] Blue Force Tracker next generation

[email protected] Retrofit of approved ECP into MV-22 aircraft

[email protected] Provide ongoing software support

[email protected]

[email protected] Combination of NRE and Kits/Installs.

[email protected]

[email protected] Subcontract to Magcanica.

[email protected]

[email protected] Repair of delivered engines

[email protected] AZ = Subcontract to Honeywell.

[email protected]

[email protected] Redesign and incorporate new clam shell door

[email protected] Retrofit previos model A/C to conform to specs of newer model A/C

[email protected] Improve reliability and maintainability of drive tube

Maintain current Drive System Interface , Fuel Mgmt and VSLED capability in face of unavailable components

Retrofit will replace existing Avioinics computer to eliviate processing speed and memory constrains-enabler to other capabilities

Non-Recurring Engineering in support of reliability and maintainability initiatives

Non-Recurring Engineering in support of reliability and maintainability initiatives

Non-Recurring Engineering in support of reliability and maintainability initiatives

Page 194: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Intallation of CV-22 SIRFC retro-fit kits to correct OT deficiencies

Provide necessary engineering for design and incorporation of EAPS Door Hinge Redesign

Provide necessary engineering for design and incorporation of Conversion Actuator Retrofit kits

Provide necessary engineering for design and incorporation of MLG Door Hinge Redesign & Retrofit

Provide necessary engineering for design and incorporation of Nacelle Wiring Improvements

Provide necessary engineering for design and incorporation of Aerial Refueling System kit

Provide necessary engineering for design and incorporation of RGR Upgrades

Provide necessary engineering for design and incorporation of Enhanced Cargo Handling Rails

Provide necessary engineering for design and incorporation of Nacelle Inboard Panels

Provide necessary engineering for design and incorporation of Structural Mods

Provide necessary engineering for techniques and kits to allow for Dynamic Components Structural Repair

Provide necessary engineering for design and incorporation of Windscreen Durability efforts

Provide necessary engineering for design and incorporation of LH/RH Conversion Actuator Assemblies

Provide necessary engineering for design and incorporation of Swashplate Actuators via Retrofit

Provide necessary engineering for design and incorporation of Flaperon Actuators via Forced Retrofit

NRE to integrate JATAS & APR-39D(V)X to provide integrated display, 2 color IR MWS, and correct OT deficiencies

Page 195: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] I-Level Generator Test Software Modification

[email protected] Aux Power Unit Modification with Regulated Converter Unit

[email protected]

[email protected]

[email protected] Incorporation of reliability and maintainability initiatives

[email protected]

[email protected]

[email protected]

[email protected] Production document updates for a class 1 ECP

[email protected]

[email protected] Ongoing PBL support

[email protected] Retrofit of approx 200 Blk B and remainig Blk C aircraft

[email protected]

[email protected]

[email protected]

NRE and hardware to provide fire suppression capability in the landing gear bay to meet vulnerable area spec compliance.

Full authority digital electronic control unit follow-on analysis/assessment following engine in-flight shutdown.

Non-Recurring Engineering in support of reliability and maintainability initiatives (IL = subcontract to GE)

Non-Recurring Engineering in support of reliability and maintainability initiatives

Non-Recurring Engineering in support of reliability and maintainability initiatives

Hardware for CV-22 SIRFC correction of OT deficiencies. NJ= subcontract to ITT

Engine procurement to align with aircraft procurement + associated spares

Non-Recurring Engineering in support of reliability and maintainability initiatives

Provide necessary engineering for design and execution of Block A to B Upgrade

Provide necessary engineering for design and execution of the Strategic Nacelle Initiative

Page 196: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Ongoing flight test support

[email protected] New instrumented test aircraft

[email protected] Incorporate Blue Force Tracker on MV-22 Block C aircraft

[email protected]

[email protected] Integration of console display to Heads Up Display System

[email protected]

[email protected]

[email protected] Incorporation of reliability and maintainability initiatives

[email protected] Incorporation of reliability and maintainability initiatives

[email protected] Incorporation of reliability and maintainability initiatives

[email protected] Incorporation of reliability and maintainability initiatives

[email protected] Upgrade actuator

[email protected] Resdesign and install

[email protected] Increase structural stability of nacelle door

[email protected]

Redesign of the Standby Flight Instrument to Enhance its cababilities

Non-Recurring Engineering in support of reliability and maintainability initiatives

Provide necessary engineering for design and incorporation of NLG Door Mechanism Improvement

Page 197: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Sustainment and Training PBL to support MV-22 IDWS

[email protected]

[email protected]

[email protected] Upgrade 13 simulators to maintain concurrency with the aircraft

[email protected] Upgrade 17 simulators to maintain concurrency with the aircraft

[email protected] Upgrade 17 simulators to maintain concurrency with the aircraft

[email protected] Upgrade for CV simulators to maintain concurrency with A/C

Provide necessary engineering for design and incorporation of Rapid Ground Refueling Electrical Connection

Provide necessary engineering to address O2 Regulator Egress Hazard

Provide necessary engineering for design and incorporation of Nacelle Hinge retention pin

Provide necessary engineering for design and incorporation of 109 Maintainer Struts

Provide necessary engineering for design and incorporation of Nacelle Belly Door Hinges

Provide necessary engineering for design and incorporation of Nacelle Diagonal Braces

Provide necessary engineering for design and incorporation of Nacelle Door Compression Latches

Correction of deficiecies for MV-22 Interim Defensive Weapon System (IDWS)

Retrofit kits for CV-22 SIRFC correction of OT deficiencies. NJ= subcontract to ITT

Contractor support to address integration issues discovered in the field and software sustainment

Page 198: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] Incoproate AFT Cabin Lighting into CV-22 aircraft

[email protected]

[email protected] Provide acces to an Iridium Network tuned antenna

[email protected]

[email protected]

[email protected] Circuit breaker redesign

[email protected] Vibration, structural life, engine diagnostic software improvement

[email protected] Combo of NRE and recurring. CA =Subcontract to Magcanica.

[email protected] Subcontract to Honeywell.

[email protected]

[email protected]

[email protected]

Develop Crash Survivable Cockpit Voice and Ambiant Noise Recording capability for V-22

Incorporate Crash Survivable Cockpit Voice and Ambiant Noise Recording

Improve VHF/UHF radio communication quality and range using CV-22 enpanage antennas

Upgrade CV-22 IFF capability to include Mode 5 capability and ADSB out compliant transmission

Maintain current Navigation capability infoadce of obsolete component

Replacement of obsolete parts in the Mass Torque Sensor System and the Flight Control Component.

Non-Recurring Engineering in support of reliability and maintainability initiatives

Incorporation of reliability and maintainability initiatives (IL = subcontrct to GE)

Non-Recurring Engineering in support of reliability and maintainability initiatives

Page 199: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Incorporation of reliability and maintainability initiatives

[email protected]

[email protected] Incorporation of reliability and maintainability initiatives

[email protected] AZ = Subcontract to Honeywell.

[email protected] IL=Subcontract to Hamilton-Sunstrand.

[email protected]

[email protected]

[email protected] Redesign and install valves

[email protected] Redesign and install valves

[email protected] Redesign and install valves

[email protected] Increase structural stability of door via hinge

[email protected]

[email protected]

[email protected]

[email protected] Tie Strap Removal

Non-Recurring Engineering in support of reliability and maintainability initiatives

Non-Recurring Engineering in support of reliability and maintainability initiatives

Non-Recurring Engineering in support of reliability and maintainability initiatives

Non-Recurring Engineering in support of reliability and maintainability initiatives

Provide necessary engineering for design and incorporation of Pylon Conversion Actuator

Provide necessary engineering for design and incorporation of Fuel tank Outer Barrier

Provide necessary engineering for design and incorporation of CRES Clamps

Page 200: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Complete Block B upgrade for A/C Maintenance Trainer I

[email protected] Continued production of V-22 LOTs 17-21

[email protected] Continued CAMEO support

[email protected] Buy-out of Fleet requirements

[email protected] Procure two Block B Simulators for Futenma

[email protected] Execution of Option for courseware concurrency with A/C

Provide necessary engineering for design and incorporation of Aft Belly Door Hinge

Provide necessary engineering for design and incorporation of Standby Attitude Indicator via Forced Retrofit

Provide necessary engineering for design and incorporation of Nacelle Door Hook Latches

Provide necessary engineering for design and incorporation of Fire Door Actuators

Provide necessary engineering for design and incorporation of Local Remote Switching Valve Pressure Switches

Hardware for CV-22 SIRFC correction of OT deficiencies NJ= subcontract to ITT

Provide day HUD currently used by CH-53E pilots for the MV-22Utilizes Army Air Warrior Contract

Contractor support to address integration issues discovered in the field

Page 201: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] Obtain improved rescue hoist hooks

[email protected] Increase abrasion resistance of prop rotor

[email protected] Improve FLIR video quality via hardward and software upgrades

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Helmet Mounted Sight and Display (HMSD) system for the AH-1W

[email protected] Linkless Feed System (LFS) for the AH-1W/Z.

[email protected]

[email protected] Procurement of Mission Computers for UH-1Y/AH-1Z aircraft

[email protected] Procurement of Mission Computers for UH-1Y/AH-1Z aircraft

[email protected] Procurement of Mission Computers for UH-1Y/AH-1Z aircraft

Kits and installation in support of various reliability and maintainability initiatives

PM Support Services across all IPTs including FMS and all functions related to the acquisition and life cycle management.

Digital System Upgrade Joint Variable Messaging, Paperless Cockpit, Moving Map (W)

Manufacture and installation of production Helmet Mounted Sight Display/Optimized Top Owl Systems to support UH-1Y/AH-1Z aircraft.

Manufacture and installation of production Helmet Mounted Sight Display/Optimized Top Owl Systems to support UH-1Y/AH-1Z aircraft.

Manufacture and installation of production Helmet Mounted Sight Display/Optimized Top Owl Systems to support UH-1Y/AH-1Z aircraft.

Procurement and/or repair of hardware and/or parts for the AH-1 Weapon Systems.

Page 202: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected] PCA - Product Change Authorization

[email protected] PCA - Product Change Authorization

[email protected] PCA - Product Change Authorization

[email protected] PCA - Product Change Authorization

[email protected] NRE - Non-Recurring Engineering

[email protected] NRE - Non-Recurring Engineering

[email protected]

[email protected]

[email protected]

[email protected] Advanced parts procurement for Long Lead Parts

[email protected] Advanced parts procurement for Long Lead Parts

[email protected] Advanced parts procurement for Long Lead Parts

[email protected]

LDV - Limited Design Variation, PCA - Product Change Authorization

Procurement of production Lot 9, UH-1Y & AH-1Z aircraft, which is a combination UH-1Y, AH-1Z Remanufacture, and AH-1Z Build New aircraft, and related supplies and services necessary for the remanufacture and initial deployment of the aircraft. Potentially first year of a 5 year multi year.

Procurement of production Lot 10, UH-1Y & AH-1Z aircraft, which is a combination UH-1Y, AH-1Z Remanufacture, and AH-1Z Build New aircraft, and related supplies and services necessary for the remanufacture and initial deployment of the aircraft. Potentially second year of a 5 year multi year.

Procurement of production Lot 11, UH-1Y & AH-1Z aircraft, which is a combination UH-1Y, AH-1Z Remanufacture, and AH-1Z Build New aircraft, and related supplies and services necessary for the remanufacture and initial deployment of the aircraft. Potentially third year of a 5 year multi year.

System Engineering and Program Management for Production activities. 12 month PoP.

Page 203: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Procurement of DTS for UH-1Y/AH-1Z aircraft

[email protected]

[email protected] Procurement of crew seats for UH-1Y/AH-1Z aircraft

[email protected] Procurement of crew seats for UH-1Y/AH-1Z aircraft

[email protected] Procurement of crew seats for UH-1Y/AH-1Z aircraft

[email protected] Procurement of troop seats for UH-1Y aircraft

[email protected] Procurement of troop seats for UH-1Y aircraft.

System Engineering and Program Management for Production activities. 12 month PoP.

System Engineering and Program Management for Production activities. 12 month PoP.

Procurement of Integrated Maintenance Diagnostic/Health and Usage Monitoring System (IMD/HUMS) for UH-1Y & AH-1Z aircraft.

Procurement of Integrated Maintenance Diagnostic/Health and Usage Monitoring System (IMD/HUMS) for UH-1Y & AH-1Z aircraft.

Procurement of Integrated Maintenance Diagnostic/Health and Usage Monitoring System (IMD/HUMS) for UH-1Y & AH-1Z aircraft.

Procurement of analysis to expand DL&T limits to decrease total life cycle costs.

Procure a digitalization / encryption / decryption capability for the AH-1W Tactical Video Data Link (TVDL) system.

System Engineering and Program Management for Production activities. 12 month PoP. Higher value due to anticipated Obs redesign.

Page 204: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Procurement of troop seats for UH-1Y aircraft.

[email protected]

[email protected]

[email protected] NRE - Non-Recurring Engineering, RE-Recurring engineering

[email protected] NRE - Non-Recurring Engineering, RE-Recurring engineering

[email protected] NRE - Non-Recurring Engineering, RE-Recurring engineering

[email protected] RE - Recurring Engineering

[email protected]

[email protected]

[email protected]

[email protected] Field Service Support for OTO System

[email protected] Field Service Support for OTO System

[email protected] Field Service Support for OTO System

[email protected]

[email protected]

Procurement of analysis to determine fatigue life of the tailboom to decrease total life cycle costs

NRE - Non-Recurring Engineering, procurement of engineering for the integration of CMARS into the aircraft

System Engineering and Program Management for Production activities. 12 month PoP.

System Engineering and Program Management for Production activities. 12 month PoP.

System Engineering and Program Management for Production activities. 12 month PoP.

System Engineering and Program Management for Production activities. 12 month PoP.

System Engineering and Program Management for Production activities. 12 month PoP.

Page 205: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Interoperable video send & receive capability for AH-1Z and UH-1Y

[email protected] Improved canopy door hinge design

[email protected] Interoperable video send & receive capability for AH-1Z and UH-1Y

[email protected] Interoperable video send & receive capability for AH-1Z and UH-1Y

[email protected]

[email protected]

[email protected]

Procurement of (2) UH-1Y FTDs for delivery to MCAS New River, NC and Kaneohe Bay, HI. Class Justification & Approval (CJ&A) approved 11 Feb 2011.

Procurement of (1) AH-1Z FTD for delivery to MCAS New River, NC Class Justification & Approval (CJ&A) approved 11 Feb 2011.

Provide Computer Based Training for pilots to practice MFD/DFD menu manipulation.

Provide latest concurrency updates to (2) ea UH-1Y and AH-1Z Composite Maintenance Trainers; and (2ea) UH-1Y and AH-1Z Simulators

Prime Contractor and System Integrator, Recertification and maintenance and Delivery of Tomahawk Block III Missiles in the All Up Round configuration. Provide Operational test missile configuration and test support. This is the last year of Depot operations, flight tests, and the ability to conduct unscheduled maintenance for the Block II / III missiles. FY12 Recerts

TWCS System integration support into the Virginia Class SSN platform.

This contract effort is to fix hardware, software, and interoperability obsolescence issues of the Tomahawk weapons systems. This acquisition is for software and system engineering support required to sustain and upgrade the TTWCS version 5 baseline to version 5.4.1 by the need date of 2015.

Page 206: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected] TWCS System integration support into the SSGN platform.

[email protected] Operational & Acquisition Contractor Logistics Support

[email protected]

[email protected] software - USN WASP Version 3.x and RAAF WASP Versions

[email protected] Ready Room Chairs for use aboard Aircraft Carriers

[email protected] PM, SE, and Logistics CSS support for PMA-281

[email protected] NSWPC ISP&E IVV re-compete

[email protected]

[email protected]

Prime Contractor and System Integrator, Manufacture and Delivery of Tomahawk Block IV Missiles in the All Up Round configuration. Provide Production Verification Test Missiles and test support. Provide Operational test missile configuration and test support. FY12/13 Production

Prime Contractor and System Integrator, Manufacture and Delivery of Tomahawk Block IV Missiles in the All Up Round configuration. Provide Production Verification Test Missiles and test support. Provide Operational test missile configuration and test support. FY14/15 Production

Prime Contractor and System Integrator,conduct non-Warranty work of Tomahawk Block IV Missiles in the All Up Round configuration. Shutdown the Blk II&III Recertification/Depot line at Prime Contractor&Subvendors; support cannibalizaton & demil prep of inactive Blk II&III missiles; continue to support Blk IV & III SLAP

S/W Development for a Common Control System for UAS platforms, starting with MRMUAS and UCLASS

To incorporate the first of RCI for Acourstic algorithms into Increment II

Multi Award Depot Level Repair Contract for T56 Series III Engine Modules

Page 207: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Engineering / market research for Increment 3

[email protected] Engineering / market research for Increment 3

[email protected] Replace AIC-22 with all digital ICS

[email protected] ITC Support

[email protected] ITC Support

[email protected] ITC Support

[email protected]

[email protected] TLOG contract

[email protected]

[email protected]

Provide technical program and production management of the P-8A in support of the aicraft production program.

Procure 1 Operational Flight Trainer (OFT), 1 Weapons Tactics Trainer (WTT), 1 Part Task Trainer (PTT), 1 Ordnance Load Trainer (OLT), 1 Integrated Maintenance Trainer (IMT), 1 TSSC

Design of Training Devices for P-8A maintenance ratings --- Aviation Electrician’s Mate (AE), Aviation Machinist’s Mate (AD), Aviation Ordnanceman (AO), Aviation Structural Mechanic Safety Equipment (AME), Aviation Structural Mechanic Hydraulics and Structures (AM), Aviation Electronics Technicians (AT)

Page 208: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Engineering / market research for Increment 3

[email protected] Inservice Support Engineering and Logistics Services

[email protected] Retrofit of APTR on LRIP 1 aircrafts

[email protected]

[email protected]

[email protected]

[email protected] Replace ASQ-222/UYS-1

[email protected] Develop CDU-7000 software/acquire hardware

[email protected] Software requirement for 12 aircraft

[email protected] Complete ARC-243 Acquisition

[email protected] Upgrade of acoustic systems for Anti-Submarine warefare missions

Integrate and deliver P-8A Maintenance Training Device for AT & AO maintenance ratings

Integrate and deliver P-8A Maintenance Training Device for AD, AM, AME, AE maintenance ratings

P-3C Mission Systems Sustainment, Interoperability Upgrades, and Obsolescence Replacement

Instruction and curriculem for quarterly training sessions of P-8A maintainers; lease of necessary supporting training labs to include commercial B-737 desktop maintenance trainers

Unclassified Maintenance Build (UMB) to support APTR-configured P-8A

P-3 Radar Systems Obsolescence Replacement, Upgrades, and Engineering

Adv procurement for 13 P-8A Long Lead, FRP Acft, Product Support and Trainers

Adv procurement for 17 P-8A FRP Long Lead, Acft, Product Support, and Trainers

Page 209: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Lot 5 Spares

[email protected] Increment III Technology Development contract award

[email protected]

[email protected] Replace current CP-500 ESM system

[email protected]

[email protected]

[email protected] Depot Level ALFS Support

[email protected]

[email protected] ARPDD Retrofit NRE, TDs, and FY12 Kits for Romeo aircraft.

[email protected] Base Year for ARPDD Retrofit Kits

[email protected] Option Exercise for ARPDD Retrofit Kits

[email protected] Integration of JATAS on MH-60R/S

[email protected] Integration of JATAS on MH-60R/S

[email protected] JPALS Integration

[email protected]

A and B Kit procurement for Command, Control, Communications, and Computers for Anti-Submarine Warfare (C4 for ASW) and High Frequency Internet Protocol (HFIP)

Aviation Armament Equipment (domestic requirements added to FMS contract)

Procure CDL Hawilink sytems for MH-60R and LAMPS capable ships.

This competition is planned for the retrofit installations of approx 40 FY14 installs, up to 75 FY15 installs, and 60 FY16 installs

Onsite support to MH60R squadrons with ALFS operational capability and organic repair and maintenance of ALFS WRAs

Page 210: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected]

[email protected]

[email protected] Provide asset grooming and refurbishing of retrofit assets.

[email protected] Provide asset grooming and refurbishing of retrofit assets.

[email protected] Provide asset grooming and refurbishing of retrofit assets.

[email protected]

[email protected]

[email protected]

[email protected] Option Exercise for ATI "A" Retrofit Kits

[email protected] JMPS Window XP Obsolescence/Windows 7 Migration

[email protected]

[email protected]

[email protected]

Onsite support to MH60R squadrons with ALFS operational capability and organic repair and maintenance of ALFS WRAs

Onsite support to MH60R squadrons with ALFS operational capability and organic repair and maintenance of ALFS WRAs

Provide asset grooming and refurbishing of program supportand test equipment.

Provide asset grooming and refurbishing of program supportand test equipment.

Provide asset grooming and refurbishing of program supportand test equipment.

Contractor Engineering Technical Services in Thailand to support MH-60S

Contractor Engineering Technical Services in Thailand to support MH-60S

Contractor Engineering Technical Services in Thailand to support MH-60S

Page 211: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] FMS Thailand Interactive Electronic Technical Manual for MH-60S

[email protected] FMS Thailand Aux Fuel Tanks for MH-60S

[email protected] Full Rate Production Lots

[email protected] Full Rate Production Lot

[email protected] Full Rate Production Lot

[email protected] FMS Thailand Procurement of 2 MH-60S Helicopters

[email protected] FMS Thailand Procurement of 2 MH-60S Helicopters

[email protected] FMS aircraft

[email protected] Update and qualify the Digital Transducer Assembly (TA)

[email protected] Option Exercise for OSI Retrofit Kits

[email protected] Integration of LOGIR on MH-60S

[email protected] Integration of LOGIR on MH-60S

[email protected] Integration of UGR on MH-60S

[email protected] I & D Level Updates to MH-60R Production Program

Page 212: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Deliver Part 1 and Part 2 Engineering Change Proposals (ECPs)

[email protected] Deliver Part 1 and Part 2 Engineering Change Proposals (ECPs)

[email protected] Deliver Part 1 and Part 2 Engineering Change Proposals (ECPs)

[email protected] Retrofit of ALFS Aux Electric Motors

[email protected]

[email protected]

[email protected]

[email protected]

[email protected] Option Exercise for ATI "A" and "B" Retrofit Kits

[email protected] Option Exercise for IMDS Retrofit Kits

[email protected] Option Exercise for DVR Kits off of the GSA catalog

[email protected] Installation of 12 IMDS Retrofit Kits

[email protected] Option Exercise for OSI Retrofit Kits

Technical engineering services in support of the AN/AQS-22 Airborne Low Frequency Sonar (ALFS)

Technical engineering services in support of the AN/AQS-22 Airborne Low Frequency Sonar (ALFS)

Technical engineering services in support of the AN/AQS-22 Airborne Low Frequency Sonar (ALFS)

Electronic Support measures (ESM) Operational Flight Program (OFP) Improvements to ESM OFP 15.04 by implementing solutions to correct STR 551 and STR 493

Page 213: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] JPALS Integration

[email protected] FMS Thailand AMP150 Software Upgrade MH-60S

[email protected] MH-60R/S Airframes; joint contract with the Army

[email protected]

[email protected] Aircraft for MH-60R FMS case

[email protected] Aircraft for MH-60R FMS case

[email protected] Automatic Vibration Control replaces VIDS line Test Set

[email protected] To remove/replace & reem the stabilator assy bushing & bearing

[email protected]

[email protected]

[email protected] To remove/replace & reem the stabilator assy bushing & bearing

[email protected]

[email protected]

[email protected]

[email protected] Support integration and test of/with LM MS2

MH-60R and MH60S Common Cockpit Kits that are provided as Government Furnished Equipment to SAC the air vehicle manufacture.

Set allow extension/retraction of the landing light & simulation of aerodynamic loads on the light during departure and approach to landings

Test set checks and troubleshoots rescue hoist control panel in the AC

Test set checks and troubleshoots rescue hoist control panel in the AC

AMCM AFCS/Tow Coupler Improvements. Training Development & Conduct.

AMCM Software Integration of CC, AOP, MPS. Training Development & Conduct

Page 214: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

[email protected] Support integration and test of/with LM MS2

[email protected] Support integration and test of/with LM MS2

[email protected] Integration of JATAS on the MH-60R

[email protected] Integration of JAGM on the MH-60R

[email protected] Integration of JATAS on the MH-60R

[email protected] Integration of JAGM on the MH-60R

[email protected] Engineering support for JATAS on MH-60R

* NOTE: All information contained in this Long Range Acquisition Forecast is based on upcoming fiscal year and the two succeeding fiscal years.

**DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opportunities for the next and succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast (LRAF) and updating the information on an annual basis. The LRAF contains NAVAIR requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal years. The forecast is for informational and marketing purposes only. It does not constitute a specific offer or

** NOTE: Use the drop down menus for the selection of the following data sets: Expected Dollar Value, Small Business Set Aside, Procurement Method, Projected NAVAIR Contracting Office,

Page 215: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

INSTRUCTIONS/GROUND RULES

Please collect the 14 data elements in this spreadsheet for each new contract/order required by your Competency, PEO or FRC.

Any blank entries need to be explained in the "Requirement Description" column.You are encouraged to spell out acronyms so someone unfamiliar with your systems can understand the abbreviations.Only include new contracts/orders for a NAVAIR requirement, that will be awarded by a NAVAIR Contracting Officer. Include all new actions expected to be awarded in FY12, FY13, and FY14.Include all new actions over $150,000 - even if you are planning to award to a large business as the prime contractor.Include all new Seaport-e task orders.

Please contact the NAVAIR OSBP if you have suggestions for improvement of this spreadsheet.

This LRAF Template contains a "Sample Data Elements" tab as well as a "Field Definitions" tab and separate tabs for each Competency and PEO.

Utilize the drop-down menus. Do NOT put any other information in the drop-down columns. Tailored inputs prevents accurate sorting & filtering of the spreadsheet.

Contracts using funding transferred by a PMA to a field activity should be reported by the Competency/Command responsible for the acquisition.

Note: The following disclaimer will be published as part of the Long Range Acquisition Forecast: "United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opportunities for the next and succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast (LRAF), and updating the information on an annual basis. The LRAF contains NAVAIR requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal years. The forecast is for informational and marketing purposes only. It does not constitute a specific offer or commitment by the Navy to fund, in whole or in part, the opportunities referenced herein. This listing is not all inclusive and is subject to change."

Page 216: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Long Range Acquisition Forecast Data SheetProjected NAVAIR Contracting Office

10M to 50M No PMA 205

NAWCTSD Orlando FL (N61339 and N61340)

1QFY12 2QFY12 5 yrs

650K to 5M Y 8(a) Competitive PMA 299 NAWCAD Patuxent River MD (N00421) 3QFY12 4QFY12 5 yrs

F/A-18 Lot 33

100M to 250M N Sole Source PMA 265 NAVAIR HEADQUARTERS (N00019) 2QFY11 4QFY12 2 yrs

100K to 649K Y AD 4.5 NAWCWD China Lake CA or Pt Mugu CA (N68936) 1QFY12 4QFY12 2 mo

Short Descriptive Title of Contracting Opportunity (to include RFPs)

Expected Dollar Value Range for the Requirement (include "options")

Small Business Set Aside

Anticipated Procurement Method

Requiring Organization

Anticipated Solicitation / RFP (Qtr/FY)

Anticipated Contract Award (Qtr/FY)

Anticipated Period of Performance (months or years)

Command Aircraft Crew Training (CACT) C-37A/C-37B

8(a) Non Competitive

Program Management Support Services

Communication Equipment

Small Business Set Aside

Page 217: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

**DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN)

* NOTE: All information contained in this Long

Page 218: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

** NOTE: Use the drop down menus for the

Page 219: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Long Range Acquisition Forecast Data SheetRequirement Description

Contractor A Orlando, FL N/A Mark Smith, 407-xxx-xxx

Contractor B N/A

Contractor C St Louis, MO 35 Harry Nimmo, 301-xxx-xxxx

N/A 2 Joan Kennedy, 760-xxx-xxxx

Incumbent Contractor (If Applicable)

Projected Work Location

Procurement Quantity (if applicable)

Point of Contact (phone or email)

Pilot Training for the C-37B Aircraft. The contractor shall provide all labor, equipment, training facilities, tools, training materials, training devices, administration, supervision and other services necessary for training for aircrew personnel of the Navy's C-37B (Navy configured Gulfstream 550). Courses are stand-along in that no ctonractor, pre-arrival training requirements of the trainee will be allowed.

Patuxent River, MD [email protected]

Program Management Support Services to include preparing Milestone Documentation.

Procurement of 35 full-rate production F/A-18E/F aircraft and associated support.

San Diego, CA

Communications Equipment used to assist in tracking, plotting and communicating critical information across multiple media channels.

Page 220: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)
Page 221: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Short Descriptive Title

Expected Dollar Value Range for the Requirement -- USE DROP-DOWN MENU ENTRIES ONLY!

Small Business Set Aside? -- USE DROP-DOWN MENU ENTRIES ONLY!

Page 222: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Requiring Organization

Anticipated Solicitation / RFP (Qtr/FY)Anticipated Contract Award (Qtr/FY)

Incumbent Contractor (if applicable)

Anticipated Procurement Method -- USE DROP-DOWN MENU ENTRIES ONLY!

Projected NAVAIR Contracting Office -- USE DROP-DOWN MENU ENTRIES ONLY!!

Anticipated Period of Performance (months or years)

Page 223: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Projected Work Location

Procurement Quantity (if applicable)

Point of Contact (phone or email)

Requirement Description

Page 224: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Enter a short, one-line description of what the requirement is. Recommend noting the existing contract number if it is a follow-on effort. Include any new contracts/orders anticipated to be awarded in the upcoming fiscal year and for two fiscal years beyond that. All new contracts/orders should include Seaport-e task orders, Basic Ordering Agreement orders, MAC orders, BPA contracts, contracts for recurring requirements, etc. All new contracts/orders, regardless of geographic site, should be included. Exceptions: Modifications and the exercise of options to existing contracts/orders should NOT be included. Examples: F/A-18 WSSA Support, V-22 thermal blanket upgrade, JDAM LRIP 3 production, E-2D CLS. ONLY include NAVAIR requirements to be issued under a NAVAIR UIC (N00019, N00421, N68335, N61339, Select a range for the total anticipated dollar value for the contract (including options): . $150K - $649K; $650K - $5M; over $5M but less than $10M; over $10M but less than $50M; over $50M but less than $100M; over $100M but less than $250M; over $250M but less than $1B; over $1B .ONLY enter requirements at or above the Simplified Acquisition Threshold ($150K, including options).Select whether or not the procurement method will be via a small business Set Aside or not, or whether the method is not yet known. Set Asides are competitive, and there are only certain types of Set Asides (listed under Procurement Method): . Y; N; TBD

Page 225: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Select the anticipated acquisition process: . Service-Disabled Veteran-Owned Small Business (SDVOSB) Set Aside; Historically Underutilized Business Zone (HUBZone) Set Aside; Women-Owned Small Business Set-Aside; SDVOSB Sole Source; HUBZone Sole Source;8(a) Non Competitive; 8(a) Competitive;Small Business Set Aside;Sole Source; Full and Open Competition; TBD after Market Research

Enter Competency Code, PMA, FRC or Business Unit that will be the primary customer for the requirement. This should be the office at NAVAIR responsible for the requirement, not the ultimate customer, Requirements Officer or PCO. . Examples: AIR-4.6.6.1, PMA207

Select The NAVAIR Contracting Office that will award the contract: . NAVAIR Headquarters (N00019); NAWCAD Patuxent River, MD (N00421); NAWCAD Lakehurst, NJ (N68335); NAWCTSD Orlando, FL (N61339 - old UIC and N61340 - new UIC after 10/1/10); NAWCWD China Lake, CA or Pt. Mugu, CA (N68936); Unknown at this timeSelect Quarter and FY of anticipated Solicitation or RFP release

Select Quarter and FY of anticipated contract award

Enter number of months or years the work is expected to take: Examples: 6 mo, 5 yrs

Enter the name of the current prime contractor if the contract will be a follow-on effort; it would also be the name of the contractor if the procurement method is "Sole Source".

Page 226: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Enter the location (city, state) where the majority of the work is to be performed

If this is a production contract (e.g., spares components, weapon systems), enter the number of units expected to be procured. If a lot of individual parts, summarize.

Enter a Government technical or IPT point of contact (POC) at NAVAIR for internal queries. This should be name and office phone number or email address for NAVAIR personnel to contact, if they have further questions. Note that individual point of contact information will NOT be published.

Enter a detailed (one paragraph or so) description of what will be procured under this contract. Information which will help a contractor to understand the scope of effort involved. This should include explanation of any blank entries. This column can also be used to identify FMS cases or provide other general information. Actual statements of work or performance work statements should not be included.

Page 227: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Anticipated Procurement Method

150K to 649K Y Service-Disabled Veteran-Owned Small Business Set Aside650K to 5M N HUBZone Small Business Set Aside5M to 10M TBD Women-Owned Small Business Set Aside10M to 50M 8(a) Competitive50M to 100M Service-Disabled Veteran-Owned Sole Source100M to 250M HUBZone Sole Source250M to 1B 8(a) Non CompetitiveOver 1B Small Business Set Aside

Sole SourceFull and Open CompetitionTBD after Market Research

Expected Dollar Value Range for the

Requirement (include "options")

Small Business Set Aside

Page 228: €¦ · XLS file · Web view · 2017-12-10Kit Installation L-3 COMMUNICATIONS CORP Camp Pendleton, CA Kit Installations Installation of various safety modification ... (ILARTS)

Projected NAVAIR Contracting Office RFP Anticipated Contract Award

NAVAIR Headquarters (N00019) 1QFY11 1QFY11NAWCAD Patuxent River MD (N00421) 2QFY11 2QFY11NAWCAD Lakehurst NJ (N68335) 3QFY11 3QFY11NAWCTSD Orlando FL (N61339 and N61340) 4QFY11 4QFY11NAWCWD China Lake CA or Pt Mugu CA (N68936) 1QFY12 1QFY12Unknown at this time 2QFY12 2QFY12

3QFY12 3QFY124QFY12 4QFY121QFY13 1QFY132QFY13 2QFY133QFY13 3QFY134QFY13 4QFY131QFY14 1QFY142QFY14 2QFY143QFY14 3QFY144QFY14 4QFY141QFY15 1QFY152QFY15 2QFY153QFY15 3QFY154QFY15 4QFY151QFY16 1QFY16