tnebldc.orgtnebldc.org/docs_files/finalseptember2017… · xls file · web view ·...
TRANSCRIPT
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of September 2017 at 8th TNSOCC Meeting
Transmission Lines / Elements DetailsS. No. SLDC P_Id Name of SS
1 Erode 60396 230 KV ARASUR 230 KV
2 Erode 60397 110 KV ARASUR 230 KV
3 Erode 60413 110 KV COIMBATORE 230 KV
4 Madurai 60541 110 KV SANKANERI 230 KV
5 Erode 60682 110 KV
6 Erode 60803 230 KV KARUVALUR 230 KV
Type of SS
PONNAPURAM 230 KV
7 Erode 60818 230 KV KARUVALUR 230 KV
8 Erode 60858 110 KV ALIYAR 230 KV
9 Madurai 60934 110 KV kanarpatty 400 KV
10 Madurai 60935 110 KV kanarpattyi 400 KV
11 Madurai 60936 110 KV kanarpatty 400 KV
12 Madurai 61107 110 KV KAYATHAR 230 KV
13 Erode 61164 230 KV THINGALUR 230 KV
14 Madurai 61314 110 KV ANUPPANKULAM 230 KV
15 Madurai 61316 230 KV
16 Madurai 61590 230 KV VALUTHUR 230 KV
17 Madurai 60223 400 KV kamuthi 400 KV
18 Madurai 60224 400 KV kamuthi 400 KV
19 Madurai 60225 400 KV kamuthi 400 KV
ANUPPANKULAM 230 KV
20 Erode 60245 110 KV
21 Erode 60246 230 KV
22 Madurai 60931 110 KV KAYATHAR 230 KV
23 Madurai 61096 110 KV Thalaiyuthu 110 KV
24 Erode 60398 230 KV ARASUR 230 KV
25 Chennai 60488 110 KV
26 Chennai 60518 110 KV
27 Chennai 60530 110 KV
28 Chennai 60537 110 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
Sriperumbudur 400 KV
Sriperumbudur 400 KV
Sriperumbudur 400 KV
Sriperumbudur 400 KV
29 Chennai 60540 110 KV
30 Chennai 61295 230 KV KORATTUR 230 KV
31 Chennai 61361 110 KV Tondiarpet 230 kV SS
32 Madurai 60293 230 KV KODIKURICHY 230 KV
33 Madurai 51741 230 KV UDAYATHUR 230 KV
Sriperumbudur 400 KV
34 Chennai 60503 110 KV
35 Chennai 60512 400 KV SUNGAVARCHATRAM
36 Erode 60670 110 KV PYKARA
37 Erode 60712 KUNDAH PH1
38 Chennai 61283 230 KV KOYAMBEDU 230 KV
39 Chennai 61512 230 KV KORATTUR 230 KV
Sunguvarchatram 400 KV
GENERATING STATIONS
40 Erode 60248 110 KV THUDIALUR 230 KV
41 Madurai 60299 230 KV KODIKURICHY 230 KV
42 Erode 60365 KUNDAH PH3
43 Erode 53732 PUSHEP
44 Erode 60400 110 KV ARASUR 230 KV
45 Madurai 60415 110 KV SRPUDUR 230 KV
46 Erode 60450 230 KV MTPS
GENERATING STATIONS
GENERATING STATIONS
47 Madurai 60489 110 KV KAVANOOR 230 KV
48 Madurai 60542 110 KV
49 Madurai 60548 110 KV PERIYAR
50 Madurai 60550 230 KV SANKANERI 230 KV
51 Madurai 60570 110 KV
CHECKANURANI SW STATION 230 KV
TUTICORIN -AUTO 230 KV
52 Madurai 60571 110 KV
53 Erode 60671 110 KV PYKARA
54 Madurai 60718 110 KV KAYATHAR 230 KV
55 Madurai 60723 110 KV KAYATHAR 230 KV
SAMAYAPURAM 230 KV
56 Erode 60726 230 KV ANTHIYUR 230 KV
57 Erode 60728 230 KV ANTHIYUR 230 KV
58 Erode 60738 110 KV PALAVADI 400 KV
59 Madurai 60750 230 KV
60 Erode 60784 230 KV GOBI 230 KV
61 Madurai 60824 110 KV PASUMALAI 230 KV
62 Madurai 60872 110 KV KODIKURICHY 230 KV
EACHANGADU 230 KV
63 Erode 60876 230 KV ANTHIYUR 230 KV
64 Erode 60880 230 KV ALIYAR 230 KV
65 Erode 60997 400 KV Salem 400 KV
66 Erode 61016 110 KV
67 Chennai 61057 230 KV CUDDALORE 230 KV
METTUR AUTO 230 KV
68 Erode 61110 230 KV SALEM AUTO 230 KV
69 Madurai 61111 110 KV KAYATHAR 230 KV
70 Madurai 61161 110 KV THIRUVARUR 230 KV
71 Madurai 61224 110 KV THANJAVUR 230 KV
72 Erode 61267 110 KV DEVIAKURICHI 230 KV
73 Erode 61270 110 KV INGUR 230 KV
74 Madurai 61318 230 KV
75 Erode 61321 110 KV INGUR 230 KV
76 Erode 61327 110 KV INGUR 230 KV
ANUPPANKULAM 230 KV
77 Erode 61402 110 KV PONNAPURAM 230 KV
78 Madurai 61428 110 KV PUGALUR 230 KV
79 Erode 61456 110 KV PONNAPURAM 230 KV
80 Erode 61468 110 KV
81 Chennai 61486 110 KV VILLUPURAM 230 KV
82 Chennai 61515 230 KV KORATTUR 230 KV
83 Chennai 61531 110 KV Villapuram 110 KV
84 Erode 61563 230 KV UNJANAI 230 KV
85 Madurai 60181 110 KV KODIKURICHY 230 KV
PONNAPURAM 230 KV
86 Madurai 60196 110 KV KODIKURICHY 230 KV
87 Madurai 60229 110 KV
88 Erode 60239 110 KV PALLADAM 230 KV
89 Erode 60247 110 KV
TUTICORIN -AUTO 230 KV
OTHAKKAL MANDABAM 230 KV
90 Erode 60330 110 KV UDUMALPET 230 KV
91 Madurai 60780 110 KV KODAIYAR PH2
92 Madurai 61094 110 KV Thalaiyuthu 110 KV
93 Erode 60162 110 KV METTUR DPH
94 Erode 60402 230 KV ARASUR 230 KV
95 Chennai 60403 230 KV ECHUR 230 KV
96 Madurai 60454 230 KV KARAIKUDI 230 KV
97 Madurai 60463 110 KV KARAIKUDI 230 KV
98 Chennai 60486 230 KV NOKIA 230 KV
99 Madurai 60492 110 KV KAVANOOR 230 KV
100 Chennai 60506 230 KV
101 Madurai 60516 400 KV Kayathar 400 KV
102 Madurai 60521 400 KV Kayathar 400 KV
Sunguvarchatram 400 KV
103 Madurai 60523 230 KV PUDUKOTTAI 230 KV
104 Chennai 60528 110 KV
105 Madurai 60544 110 KV
106 Madurai 60551 230 KV
Sunguvarchatram 400 KV
CHECKANURANI SW STATION 230 KV
CHECKANURANI SW STATION 230 KV
107 Madurai 60575 230 KV
108 Erode 60657 110 KV SINGAPURAM 230 KV
109 Erode 60658 110 KV SINGAPURAM 230 KV
110 Erode 60672 110 KV PYKARA
111 Erode 60683 230 KV
112 Chennai 60699 230 KV
113 Madurai 60716 110 KV ALAGARKOIL 230 KV
SAMAYAPURAM 230 KV
PONNAPURAM 230 KV
Sriperumbudur 400 KV
114 Chennai 60724 110 KV VEERAPURAM 230 KV
115 Erode 60727 230 KV SINGARAPET 230 KV
116 Madurai 60770 230 KV then I 230 KV
117 Madurai 60781 110 KV KAYATHAR 230 KV
118 Madurai 60785 110 KV SEMBATTY 230 KV
119 Chennai 60790 230 KV S.P.KOIL 230 KV
120 Erode 60794 230 KV GOBI 230 KV
121 Chennai 60804 230 KV S.P.KOIL 230 KV
122 Erode 60811 110 KV GOBI 230 KV
123 Chennai 60821 230 KV S.P.KOIL 230 KV
124 Madurai 60826 110 KV PASUMALAI 230 KV
125 Chennai 60832 230 KV S.P.KOIL 230 KV
126 Madurai 60875 230 KV KODIKURICHY 230 KV
127 Chennai 60886 400 KV Alamathy 400 KV
128 Chennai 60924 230 KV S.P.KOIL 230 KV
129 Madurai 60938 400 KV kanarpatty 400 KV
130 Madurai 60943 110 KV KAYATHAR 230 KV
131 Erode 60944 230 KV KARUVALUR 230 KV
132 Erode 60946 230 KV KARUVALUR 230 KV
133 Erode 60948 110 KV KARUVALUR 230 KV
134 Chennai 60950 230 KV S.P.KOIL 230 KV
135 Madurai 60974 110 KV
136 Chennai 60976 110 KV CUDDALORE 230 KV
137 Erode 61006 230 KV Salem 400 KV
138 Erode 61022 110 KV
139 Madurai 61089 110 KV Thanjavur 110 KV
kinnimangalam 230 KV
SADAYAMPALAYAM 230 KV
140 Madurai 61093 110 KV Thanjavur 110 KV
141 Madurai 61106 110 KV
142 Madurai 61126 230 KV
143 Madurai 61131 110 KV
144 Erode 61169 110 KV THINGALUR 230 KV
145 Erode 61172 230 KV Salem 400 KV
146 Erode 61212 230 KV
KADALANGUDI 230 KV
KADALANGUDI 230 KV
KADALANGUDI 230 KV
PALLAKAPALAYAM 230 KV
147 Madurai 61225 230 KV THANJAVUR 230 KV
148 Madurai 61226 110 KV THANJAVUR 230 KV
149 Erode 61274 110 KV INGUR 230 KV
150 Erode 61313 110 KV
151 Madurai 61319 110 KV
152 Madurai 61322 110 KV
153 Erode 61340 110 KV Erode 110 KV
154 Chennai 61356 110 KV THIRUVALAM 230 KV
155 Madurai 61444 230 KV TRICHY 230 KV
BHAVANISAGAR 110 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
156 Madurai 61463 110 KV PUGALUR 230 KV
157 Madurai 61473 110 KV PUGALUR 230 KV
158 Madurai 61484 110 KV Kallakudi 110 KV
159 Chennai 61491 110 KV VILLUPURAM 230 KV
160 Chennai 61507 230 KV THIRUVALAM 230 KV
161 Erode 61509 230 KV SALEM AUTO 230 KV
162 Chennai 61518 230 KV KORATTUR 230 KV
163 Chennai 61533 110 KV Villapuram 110 KV
164 Erode 61549 110 KV UNJANAI 230 KV
165 Erode 61554 110 KV PUDHANCHANTHAI 230 KV
166 Erode 61566 110 KV UNJANAI 230 KV
167 Erode 61570 110 KV UNJANAI 230 KV
168 Erode 61611 110 KV DEVIAKURICHI 230 KV
169 Madurai 61620 110 KV KADALANGUDI 230 KV
170 Erode 61628 110 KV LOWER METTUR 1
171 Madurai 60182 230 KV KODIKURICHY 230 KV
172 Madurai 60226 400 KV kamuthi 400 KV
173 Madurai 60227 400 KV kamuthi 400 KV
174 Erode 60251 110 KV THUDIALUR 230 KV
175 Erode 60254 110 KV
176 Erode 60288 230 KV KUNDAH PH4
OTHAKKAL MANDABAM 230 KV
177 Erode 60306 110 KV UDUMALPET 230 KV
178 Madurai 60352 230 KV
179 Erode 60361 230 KV Udumalpet 400 KV
180 Erode 60368 230 KV KUNDAH PH3
181 Chennai 230 KV
182 Chennai 60568 110 KV ARNI 230 KV
183 Madurai 61036 230 KV PERAMBALUR 230 KV
184 Madurai 56233 230 KV SANKANERI 230 KV
AMUTHAPURAM 230 KV
230KVTharamani SS (Kadapperi Lines)
185 Erode 60385 110 KV Udumalpet 110 KV
186 Erode 60387 110 KV Udumalpet 110 KV
187 Erode 60404 230 KV ARASUR 230 KV
188 Erode 60405 110 KV ARASUR 230 KV
189 Madurai 60416 110 KV SRPUDUR 230 KV
190 Erode 60451 230 KV MTPS
191 Erode 60464 400 KV KARAMADAI 230 KV
192 Madurai 60466 230 KV KARAIKUDI 230 KV
193 Erode 60481 110 KV LOWER METTUR 2
194 Madurai 60494 110 KV KAVANOOR 230 KV
195 Madurai 60546 230 KV VEERANAM 230 KV
196 Madurai 60556 230 KV
197 Chennai 60569 230 KV ARNI 230 KV
198 Erode 60684 110 KV
199 Madurai 60717 110 KV ALAGARKOIL 230 KV
200 Erode 60730 230 KV SINGARAPET 230 KV
201 Erode 60735 230 KV ANTHIYUR 230 KV
202 Erode 60741 230 KV
203 Madurai 60746 110 KV KAYATHAR 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
KARIAMANGALAM 230 KV
204 Madurai 60782 110 KV then I 230 KV
205 Erode 60792 230 KV
206 Erode 60798 400 KV PALAVADI 400 KV
207 Chennai 60812 400 KV
Vinnamangalam 230 KV
Sriperumbudur 400 KV
208 Madurai 60828 110 KV PASUMALAI 230 KV
209 Madurai 60852 230 KV VEERANAM 230 KV
210 Madurai 60863 110 KV PASUMALAI 230 KV
211 Erode 60888 230 KV ALIYAR 230 KV
212 Erode 60891 230 KV HOSUR 230 KV
213 Chennai 60911 230 KV Thiruvalam 400 KV
214 Madurai 60970 230 KV
215 Chennai 60980 110 KV CUDDALORE 230 KV
216 Madurai 60981 230 KV
RENGANATHAPURAM 230 KV
kinnimangalam 230 KV
217 Chennai 60984 230 KV CUDDALORE 230 KV
218 Erode 61011 230 KV
219 Madurai 61014 230 KV KAYATHAR 230 KV
220 Erode 61019 110 KV Salem 400 KV
221 Erode 61021 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
222 Erode 61061 230 KV
223 Madurai 61100 110 KV Melakallur 110 KV
224 Madurai 61113 230 KV
225 Madurai 61114 110 KV KAYATHAR 230 KV
226 Madurai 61177 230 KV THIRUVARUR 230 KV
227 Madurai 61240 110 KV KOVILKALAPAL
228 Erode 61269 110 KV DEVIAKURICHI 230 KV
METTUR AUTO 230 KV
KADALANGUDI 230 KV
229 Madurai 61315 230 KV ALUNDUR 230 KV
230 Erode 61323 110 KV INGUR 230 KV
231 Madurai 61324 110 KV
232 Madurai 61331 110 KV
233 Erode 61333 110 KV Singarapet 110 KV
234 Madurai 61342 110 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
235 Erode 61343 110 KV Erode 110 KV
236 Erode 61347 110 KV Singarapet 110 KV
237 Chennai 61362 230 KV Thiruvalam 400 KV
238 Chennai 61367 230 KV TONDIARPET
239 Chennai 61391 110 KV MOSUR 230 KV
240 Chennai 61418 230 KV MOSUR 230 KV
241 Erode 61429 110 KV
242 Madurai 61446 230 KV TRICHY 230 KV
243 Madurai 61459 110 KV PUGALUR 230 KV
244 Madurai 61465 230 KV PUGALUR 230 KV
PONNAPURAM 230 KV
245 Madurai 61472 110 KV PUGALUR 230 KV
246 Chennai 61494 230 KV VILLUPURAM 230 KV
247 Chennai 61495 110 KV VILLUPURAM 230 KV
248 Erode 61552 110 KV UNJANAI 230 KV
249 Erode 61562 110 KV
250 Chennai 61564 230 KV Ulundurpet 230 KV
PUDHANCHANTHAI 230 KV
251 Erode 61574 110 KV UNJANAI 230 KV
252 Erode 61577 110 KV UNJANAI 230 KV
253 Madurai 61591 230 KV VALUTHUR 230 KV
254 Erode 60175 METTUR TPH
255 Madurai 60197 230 KV KODIKURICHY 230 KV
256 Erode 60212 110 KV KURUKATHI230KV
GENERATING STATIONS
257 Erode 60252 230 KV THUDIALUR 230 KV
258 Erode 60260 230 KV
259 Erode 60290 110 KV LOWER METTUR 1
OTHAKKAL MANDABAM 230 KV
260 Erode 60301 110 KV LOWER METTUR 1
261 Erode 60307 110 KV UDUMALPET 230 KV
262 Erode 60309 110 KV UDUMALPET 230 KV
263 Madurai 60380 230 KV
264 Chennai 110 KV 230KV Kadapperi SS
TUTICORIN -AUTO 230 KV
265 Chennai 230 KV
266 Chennai 110 KV SIRUSERI 230 KV
267 Chennai 230 KV Basin Bridge 230 KV
268 Chennai 110 KV Tharamani
269 Chennai 230 KV MYLAPORE 230 KV
230KVTharamani SS (Kadapperi Lines)
270 Erode 61573 110 KV
271 Erode 60296 110 KV LOWER METTUR 1
272 Chennai 61050 230 KV CUDDALORE 230 KV
PUDHANCHANTHAI 230 KV
273 Madurai 230 KV 230 KV THIRUVARUR 230 KV
274 Madurai 60789 110 KV SEMBATTY 230 KV
275 Erode 60167 METTUR DPH
276 Erode 60407 230 KV ARASUR 230 KV
277 Madurai 60418 230 KV SRPUDUR 230 KV
278 Erode 60427 110 KV COIMBATORE 230 KV
GENERATING STATIONS
279 Madurai 60469 230 KV KARAIKUDI 230 KV
280 Chennai 60513 230 KV Sungavarchatram
281 Chennai 60517 230 KV ORAGADAM 230 KV
282 Chennai 60520 230 KV ORAGADAM 230 KV
283 Madurai 60543 400 KV Kayathar 400 KV
284 Madurai 60559 230 KV SANKANERI 230 KV
285 Madurai 60561 230 KV CHECKANURANI SW STATION 230 KV
286 Chennai 60574 110 KV ARNI 230 KV
287 Madurai 60576 230 KV
288 Madurai 60580 230 KV
289 Erode 60607 110 KV LOWER METTUR 1
TUTICORIN -AUTO 230 KV
SAMAYAPURAM 230 KV
290 Erode 60659 110 KV SINGAPURAM 230 KV
291 Erode 60685 230 KV
292 Erode 60710 230 KV KUNDAH PH3
293 Erode 60711 230 KV KUNDAH PH3
294 Madurai 60719 110 KV ALAGARKOIL 230 KV
PONNAPURAM 230 KV
295 Erode 60733 230 KV SINGARAPET 230 KV
296 Madurai 60766 110 KV KAYATHAR 230 KV
297 Madurai 60795 230 KV then I 230 KV
298 Madurai 60797 110 KV SEMBATTY 230 KV
299 Madurai 60817 230 KV PASUMALAI 230 KV
300 Erode 60819 110 KV GOBI 230 KV
301 Madurai 60830 110 KV PASUMALAI 230 KV
302 Madurai 60955 230 KV KAYATHAR 230 KV
303 Chennai 60968 230 KV S.P.KOIL 230 KV
304 Madurai 60983 110 KV
305 Madurai 60985 110 KV
306 Chennai 60986 110 KV
307 Chennai 60987 110 KV CUDDALORE 230 KV
308 Erode 61026 230 KV Salem 400 KV
309 Madurai 61040 110 KV PERAMBALUR 230 KV
RENGANATHAPURAM 230 KV
kinnimangalam 230 KV
THIRUVANNAMALAI 230 KV
310 Madurai 61095 110 KV Thalaiyuthu 110 KV
311 Madurai 61101 110 KV
312 Erode 61116 230 KV SALEM AUTO 230 KV
313 Erode 61130 110 KV
314 Madurai 61165 230 KV THIRUVARUR 230 KV
315 Erode 61171 110 KV THINGALUR 230 KV
KADALANGUDI 230 KV
KARIAMANGALAM 230 KV
316 Erode 61174 230 KV Salem 400 KV
317 Madurai 61197 230 KV
318 Erode 61215 230 KV
319 Chennai 61243 230 KV Alamathy 400 KV
320 Erode 61279 230 KV INGUR 230 KV
321 Madurai 61320 110 KV ALUNDUR 230 KV
NEMALITHIPIYAKUDI 230 KV
PALLAKAPALAYAM 230 KV
322 Erode 61326 230 KV INGUR 230 KV
323 Madurai 61353 110 KV
324 Erode 61354 110 KV Erode 110 KV
325 Madurai 61359 230 KV
326 Chennai 61443 110 KV MOSUR 230 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
327 Madurai 61454 110 KV TRICHY 230 KV
328 Madurai 61479 110 KV PUGALUR 230 KV
329 Chennai 61496 110 KV VILLUPURAM 230 KV
330 Erode 61510 230 KV SALEM AUTO 230 KV
331 Chennai 61536 110 KV Villapuram 110 KV
332 Chennai 61556 230 KV Athipet
333 Chennai 61578 230 KV
334 Erode 61610 110 KV
335 Erode 61612 110 KV DEVIAKURICHI 230 KV
THIRUVERKADU 230 KV
PUDHANCHANTHAI 230 KV
336 Madurai 60207 230 KV VEERANAM 230 KV
337 Madurai 60214 230 KV
338 Madurai 60235 230 KV
339 Erode 60240 230 KV PALLADAM 230 KV
340 Erode 60255 230 KV THUDIALUR 230 KV
341 Erode 60264 110 KV
342 Erode 60308 230 KV KURUKATHI230KV
TUTICORIN -SIPCOT 230 KV
TUTICORIN -AUTO 230 KV
OTHAKKAL MANDABAM 230 KV
343 Erode 60310 230 KV UDUMALPET 230 KV
344 Erode 60315 230 KV KURUKATHI230KV
345 Erode 60362 230 KV Udumalpet 400 KV
346 Madurai 60381 230 KV
347 Erode 60258 230 KV THUDIALUR 230 KV
348 Madurai 61170 230 KV THIRUVARUR 230 KV
349 Madurai 60878 230 KV KODIKURICHY 230 KV
TUTICORIN -AUTO 230 KV
350 Madurai 60183 230 KV KODIKURICHY 230 KV
351 Madurai 60353 230 KV
352 Erode 60388 110 KV Udumalpet 110 KV
353 Chennai 60406 230 KV ECHUR 230 KV
354 Erode 60408 110 KV ARASUR 230 KV
AMUTHAPURAM 230 KV
355 Madurai 60419 230 KV SRPUDUR 230 KV
356 Erode 60445 230 KV COIMBATORE 230 KV
357 Erode 60452 230 KV MTPS
358 Madurai 60560 110 KV PERIYAR
359 Madurai 60564 230 KV
360 Madurai 60567 230 KV SANKANERI 230 KV
361 Chennai 60577 110 KV ARNI 230 KV
362 Madurai 60578 230 KV
363 Madurai 60579 230 KV
CHECKANURANI SW STATION 230 KV
CHECKANURANI SW STATION 230 KV
TUTICORIN -AUTO 230 KV
364 Chennai 60581 110 KV ARNI 230 KV
365 Madurai 60586 110 KV
366 Madurai 60613 230 KV TTPS
SAMAYAPURAM 230 KV
367 Erode 60686 110 KV
368 Madurai 60720 230 KV ALAGARKOIL 230 KV
369 Erode 60731 230 KV ANTHIYUR 230 KV
370 Chennai 60743 230 KV VEERAPURAM 230 KV
371 Madurai 60753 110 KV
372 Madurai 60807 110 KV SEMBATTY 230 KV
373 Madurai 60814 110 KV then I 230 KV
374 Madurai 60815 110 KV KAYATHAR 230 KV
375 Erode 60823 230 KV PALAVADI 400 KV
PONNAPURAM 230 KV
EACHANGADU 230 KV
376 Erode 60825 230 KV GOBI 230 KV
377 Madurai 60834 110 KV PASUMALAI 230 KV
378 Erode 60881 230 KV HOSUR 230 KV
379 Madurai 60883 110 KV KODIKURICHY 230 KV
380 Erode 60905 110 KV ALIYAR 230 KV
381 Chennai 60951 230 KV S.P.KOIL 230 KV
382 Madurai 60957 230 KV KAYATHAR 230 KV
383 Chennai 60960 230 KV S.P.KOIL 230 KV
384 Madurai 60988 230 KV
385 Chennai 60990 110 KV CUDDALORE 230 KV
386 Chennai 61000 230 KV
387 Erode 61024 230 KV
388 Erode 61029 230 KV
kinnimangalam 230 KV
THIRUVANNAMALAI 230 KV
METTUR AUTO 230 KV
SADAYAMPALAYAM 230 KV
389 Erode 61031 230 KV Salem 400 KV
390 Madurai 61117 110 KV KAYATHAR 230 KV
391 Erode 61135 110 KV
392 Madurai 61173 110 KV THIRUVARUR 230 KV
393 Erode 61272 110 KV DEVIAKURICHI 230 KV
KARIAMANGALAM 230 KV
394 Madurai 61325 110 KV ALUNDUR 230 KV
395 Erode 61328 110 KV INGUR 230 KV
396 Madurai 61330 230 KV ALUNDUR 230 KV
397 Madurai 61370 230 KV
398 Chennai 61371 110 KV Tondiarpet
399 Madurai 61458 230 KV TRICHY 230 KV
ANUPPANKULAM 230 KV
400 Erode 61567 230 KV
401 Erode 61580 110 KV UNJANAI 230 KV
402 Madurai 61593 110 KV VALUTHUR 230 KV
403 Madurai 60184 110 KV KODIKURICHY 230 KV
404 Madurai 60198 110 KV KODIKURICHY 230 KV
405 Madurai 60215 110 KV
406 Madurai 60256 110 KV PAPANASAM
PUDHANCHANTHAI 230 KV
TUTICORIN -SIPCOT 230 KV
407 Erode 60271 230 KV
408 Madurai 60272 230 KV UDAYATHUR 230 KV
409 Erode 60311 110 KV UDUMALPET 230 KV
410 Erode 60317 110 KV KURUKATHI230KV
411 Erode 60320 110 KV KURUKATHI230KV
412 Erode 60323 110 KV KURUKATHI230KV
413 Chennai 230 KV 230KV Kadapperi SS
414 Chennai 110 KV
OTHAKKAL MANDABAM 230 KV
230KVTharamani SS (Kadapperi Lines)
415 Chennai 230 KV KITSPARK SS
416 Madurai 60421 110 KV SRPUDUR 230 KV
417 Madurai 60590 110 KV
418 Madurai 60621 230 KV TTPS
419 Erode 60660 230 KV SINGAPURAM 230 KV
420 Chennai 60700 230 KV
421 Erode 61033 230 KV
CHECKANURANI SW STATION 230 KV
Sriperumbudur 400 KV
METTUR AUTO 230 KV
422 Erode 61037 230 KV Salem 400 KV
423 Chennai 61065 230 KV S.P.KOIL 230 KV
424 Erode 61282 110 KV INGUR 230 KV
425 Erode 61286 110 KV INGUR 230 KV
426 Chennai 61302 110 KV KILPAUK 230 KV
427 Erode 61364 110 KV Erode 110 KV
428 Chennai 61381 230 KV GUMMIDIPOONDI
429 Chennai 61497 230 KV VILLUPURAM 230 KV
430 Erode 61613 230 KV DEVIAKURICHI 230 KV
431 Chennai 60701 400 KV
432 Chennai 61285 33 KV KOYAMBEDU 230 KV
433 Chennai 61293 33 KV KOYAMBEDU 230 KV
434 Chennai 61378 230 KV TONDIARPET 230 KV
Sriperumbudur 400 KV
435 Chennai 61565 230 KV MANALI 230 KV
436 Chennai 230 KV Basin Bridge 230 KV
437 Chennai 61525 230 KV KORATTUR 230 KV
438 Erode 60389 110 KV Udumalpet 110 KV
439 Erode 60410 110 KV ARASUR 230 KV
440 Madurai 60423 110 KV SRPUDUR 230 KV
441 Erode 60455 230 KV MTPS
442 Erode 60461 230 KV COIMBATORE 230 KV
443 Madurai 60473 110 KV KARAIKUDI 230 KV
444 Madurai 60573 230 KV SANKANERI 230 KV
445 Madurai 60641 230 KV
446 Madurai 60791 230 KV PASUMALAI 230 KV
447 Erode 60827 230 KV GOBI 230 KV
448 Madurai 60864 110 KV KAYATHAR 230 KV
CHECKANURANI SW STATION 230 KV
449 Madurai 60884 110 KV KAYATHAR 230 KV
450 Erode 60918 110 KV ALIYAR 230 KV
451 Chennai 60919 400 KV Thiruvalam 400 KV
452 Madurai 60995 230 KV
453 Chennai 61001 110 KV CUDDALORE 230 KV
RENGANATHAPURAM 230 KV
454 Chennai 61004 110 KV CUDDALORE 230 KV
455 Erode 61053 230 KV Salem 400 KV
456 Madurai 61123 110 KV KAYATHAR 230 KV
457 Madurai 61178 230 KV THIRUVARUR 230 KV
458 Madurai 61227 230 KV THANJAVUR 230 KV
459 Erode 61234 110 KV SALEM AUTO 230 KV
460 Erode 61332 110 KV INGUR 230 KV
461 Madurai 61334 110 KV ALUNDUR 230 KV
462 Madurai 61365 230 KV ANUPPANKULAM 230 KV
463 Madurai 61376 230 KV
464 Chennai 61452 110 KV MOSUR 230 KV
465 Chennai 61457 230 KV MOSUR 230 KV
466 Chennai 61498 110 KV VILLUPURAM 230 KV
467 Chennai 61524 230 KV KORATTUR 230 KV
468 Erode 61553 110 KV UNJANAI 230 KV
469 Madurai 61594 110 KV VALUTHUR 230 KV
470 Erode 60172 MOYAR
471 Erode 60180 230 KV METTUR TPH
ANUPPANKULAM 230 KV
GENERATING STATIONS
472 Madurai 60199 110 KV KODIKURICHY 230 KV
473 Erode 60242 230 KV PALLADAM 230 KV
474 Erode 60243 110 KV PALLADAM 230 KV
475 Erode 60261 230 KV THUDIALUR 230 KV
476 Erode 60262 230 KV THUDIALUR 230 KV
477 Erode 60282 110 KV OTHAKKAL MANDABAM 230 KV
478 Erode 60313 110 KV UDUMALPET 230 KV
479 Madurai 60354 230 KV
480 Chennai 230 KV
481 Erode 60163 110 KV METTUR DPH
AMUTHAPURAM 230 KV
230KVTharamani SS (Kadapperi Lines)
482 Chennai 60409 110 KV ECHUR 230 KV
483 Erode 60412 110 KV ARASUR 230 KV
484 Madurai 60430 230 KV SRPUDUR 230 KV
485 Erode 60453 230 KV MTPS
486 Madurai 60477 110 KV KARAIKUDI 230 KV
487 Madurai 60495 110 KV KAVANOOR 230 KV
488 Chennai 60534 230 KV
489 Madurai 60547 400 KV Kayathar 400 KV
SPR SIPCOT(MAMBAKKAM) 230 KV
490 Erode 60553 230 KV
491 Madurai 60582 230 KV
492 Madurai 60583 110 KV SANKANERI 230 KV
GURUPARAPALLI 230 KV
TUTICORIN -AUTO 230 KV
493 Madurai 60594 110 KV
494 Madurai 60622 230 KV TTPS
495 Madurai 60642 230 KV
SAMAYAPURAM 230 KV
CHECKANURANI SW STATION 230 KV
496 Erode 60687 230 KV
497 Erode 60737 110 KV SINGARAPET 230 KV
498 Erode 60739 230 KV SINGARAPET 230 KV
499 Chennai 60745 230 KV VEERAPURAM 230 KV
500 Madurai 60835 110 KV then I 230 KV
PONNAPURAM 230 KV
501 Madurai 60838 110 KV PASUMALAI 230 KV
502 Madurai 60890 110 KV KODIKURICHY 230 KV
503 Madurai 60892 110 KV KAYATHAR 230 KV
504 Erode 60903 110 KV HOSUR 230 KV
505 Erode 60926 110 KV ALIYAR 230 KV
506 Madurai 60939 400 KV kamuthi 400 KV
507 Erode 60954 110 KV KARUVALUR 230 KV
508 Madurai 60963 110 KV KAYATHAR 230 KV
509 Chennai 61008 230 KV CUDDALORE 230 KV
510 Madurai 61012 110 KV
511 Erode 61028 110 KV
512 Erode 61043 230 KV
513 Madurai 61044 230 KV PERAMBALUR 230 KV
514 Erode 61059 230 KV Salem 400 KV
RENGANATHAPURAM 230 KV
METTUR AUTO 230 KV
SADAYAMPALAYAM 230 KV
515 Chennai 61081 110 KV
516 Madurai 61109 110 KV
517 Erode 61175 110 KV THINGALUR 230 KV
518 Erode 61176 230 KV Salem 400 KV
519 Madurai 61180 110 KV THIRUVARUR 230 KV
THIRUVANNAMALAI 230 KV
KADALANGUDI 230 KV
520 Madurai 61199 110 KV THIRUVARUR 230 KV
521 Erode 61216 110 KV
522 Madurai 61241 110 KV KOVILKALAPAL
523 Erode 61248 110 KV KUNDAH PH3
524 Chennai 61249 110 KV S.P.KOIL 230 KV
525 Chennai 61250 110 KV S.P.KOIL 230 KV
526 Erode 61275 110 KV DEVIAKURICHI 230 KV
PALLAKAPALAYAM 230 KV
527 Erode 61290 110 KV INGUR 230 KV
528 Erode 61335 110 KV INGUR 230 KV
529 Erode 61339 230 KV INGUR 230 KV
530 Erode 61374 110 KV Erode 110 KV
531 Chennai 61383 230 KV TONDIARPET 230 KV
532 Madurai 61389 110 KV
533 Madurai 61461 230 KV TRICHY 230 KV
ANUPPANKULAM 230 KV
534 Chennai 61464 110 KV MOSUR 230 KV
535 Madurai 61470 230 KV PUGALUR 230 KV
536 Chennai 61499 230 KV VILLUPURAM 230 KV
537 Erode 61614 110 KV DEVIAKURICHI 230 KV
538 Erode 61629 110 KV LOWER METTUR 1
539 Madurai 60185 110 KV KODIKURICHY 230 KV
540 Madurai 60208 230 KV VEERANAM 230 KV
541 Madurai 60228 400 KV kamuthi 400 KV
542 Madurai 60238 230 KV
543 Madurai 60275 230 KV UDAYATHUR 230 KV
544 Erode 60286 110 KV
TUTICORIN -AUTO 230 KV
OTHAKKAL MANDABAM 230 KV
545 Erode 60314 110 KV UDUMALPET 230 KV
546 Madurai 60334 110 KV
547 Madurai 60336 230 KV
548 Erode 60363 230 KV Udumalpet 400 KV
549 Chennai 230 KV
NALLAPPANAYAKANPATTY 230 KV
NALLAPPANAYAKANPATTY 230 KV
230KVTharamani SS (Kadapperi Lines)
550 Chennai 61336 110 KV CUDDALORE 230 KV
551 Erode 60391 110 KV Udumalpet 110 KV
552 Erode 60414 110 KV ARASUR 230 KV
553 Chennai 60429 230 KV ECHUR 230 KV
554 Erode 60468 400 KV KARAMADAI 230 KV
555 Madurai 60484 230 KV KARAIKUDI 230 KV
556 Madurai 60487 230 KV KARAIKUDI 230 KV
557 Chennai 60514 400 KV SUNGUVARCHATRAM SS
558 Madurai 60549 110 KV Kayathar 400 KV
559 Madurai 60554 110 KV VEERANAM 230 KV
560 Chennai 60585 230 KV ARNI 230 KV
561 Madurai 60597 230 KV
562 Madurai 60643 230 KV
563 Erode 60673 110 KV PYKARA
564 Erode 60688 110 KV
565 Chennai 60703 110 KV
566 Erode 60713 KUNDAH PH1
SAMAYAPURAM 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
Sriperumbudur 400 KV
GENERATING STATIONS
567 Madurai 60721 230 KV ALAGARKOIL 230 KV
568 Erode 60742 230 KV SINGARAPET 230 KV
569 Madurai 60799 230 KV PASUMALAI 230 KV
570 Madurai 60810 110 KV SEMBATTY 230 KV
571 Erode 60831 110 KV GOBI 230 KV
572 Madurai 60850 110 KV then I 230 KV
573 Chennai 60889 400 KV Alamathy 400 KV
574 Madurai 60906 110 KV KAYATHAR 230 KV
575 Erode 60909 110 KV HOSUR 230 KV
576 Madurai 60966 110 KV KAYATHAR 230 KV
577 Madurai 60991 230 KV
578 Chennai 61009 110 KV CUDDALORE 230 KV
579 Erode 61034 230 KV
kinnimangalam 230 KV
METTUR AUTO 230 KV
580 Erode 61078 110 KV Salem 400 KV
581 Chennai 61086 230 KV
582 Madurai 61098 110 KV Melakallur 110 KV
583 Madurai 61125 110 KV KAYATHAR 230 KV
584 Erode 61179 230 KV THINGALUR 230 KV
585 Erode 61181 110 KV THINGALUR 230 KV
THIRUVANNAMALAI 230 KV
586 Madurai 61182 230 KV THIRUVARUR 230 KV
587 Madurai 61188 110 KV THIRUVARUR 230 KV
588 Erode 61194 110 KV THINGALUR 230 KV
589 Madurai 61201 110 KV NEMALITHIPIYAKUDI 230 KV
590 Erode 61235 110 KV SALEM AUTO 230 KV
591 Chennai 61252 110 KV S.P.KOIL 230 KV
592 Erode 61257 230 KV MTPSII
593 Chennai 61366 110 KV THIRUVALAM 230 KV
594 Madurai 61393 230 KV
595 Erode 61416 110 KV Erode 110 KV
ANUPPANKULAM 230 KV
596 Madurai 61462 230 KV TRICHY 230 KV
597 Madurai 61467 230 KV PUGALUR 230 KV
598 Madurai 61476 110 KV PUGALUR 230 KV
599 Chennai 61500 230 KV VILLUPURAM 230 KV
600 Chennai 61501 110 KV VILLUPURAM 230 KV
601 Chennai 61514 110 KV THIRUVALAM 230 KV
602 Chennai 61568 230 KV Ulundurpet 230 KV
603 Chennai 61569 110 KV MANALI 230 KV
604 Madurai 61595 230 KV VALUTHUR 230 KV
605 Erode 60173 MOYAR
606 Erode 60176 METTUR TPH
607 Madurai 60200 110 KV KODIKURICHY 230 KV
608 Erode 60266 110 KV THUDIALUR 230 KV
609 Erode 60269 110 KV THUDIALUR 230 KV
610 Madurai 60276 230 KV UDAYATHUR 230 KV
611 Erode 60295 230 KV
GENERATING STATIONS
GENERATING STATIONS
OTHAKKAL MANDABAM 230 KV
612 Erode 60302 110 KV LOWER METTUR 1
613 Erode 60316 230 KV UDUMALPET 230 KV
614 Erode 60371 230 KV Udumalpet 400 KV
615 Chennai 110 KV 230KV Kadapperi SS
616 Chennai 110 KV SIRUSERI 230 KV
617 Chennai 230 KV Basin Bridge 230 KV
618 Chennai 110 KV Tharamani
619 Chennai 230 KV MYLAPORE 230 KV
620 Madurai 60783 110 KV KODAIYAR PH2
621 Madurai 61621 230 KV
622 Chennai 60702 230 KV
623 Madurai 60431 110 KV SRPUDUR 230 KV
624 Erode 60168 METTUR DPH
625 Erode 60417 230 KV ARASUR 230 KV
KADALANGUDI 230 KV
Sriperumbudur 400 KV
GENERATING STATIONS
626 Madurai 60490 230 KV KARAIKUDI 230 KV
627 Madurai 60497 230 KV KAVANOOR 230 KV
628 Chennai 60515 230 KV
629 Chennai 60536 230 KV
630 Madurai 60552 230 KV Kayathar 400 KV
631 Madurai 60584 230 KV
632 Madurai 60587 230 KV
SUNGUVARCHATRAM 400 KV
SPR SIPCOT(MAMBAKKAM) 230 KV
TUTICORIN -AUTO 230 KV
TUTICORIN -AUTO 230 KV
633 Madurai 60592 230 KV SANKANERI 230 KV
634 Madurai 60623 230 KV TTPS
635 Madurai 60644 230 KV
636 Erode 60681 230 KV THUDIALUR 230 KV
637 Erode 60689 230 KV
638 Madurai 60754 110 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
EACHANGADU 230 KV
639 Madurai 60765 KODAIYAR PH1
640 Madurai 60779 110 KV KODAIYAR PH2
641 Madurai 60816 110 KV SEMBATTY 230 KV
642 Chennai 60829 230 KV
643 Erode 60837 110 KV GOBI 230 KV
644 Erode 60844 400 KV
645 Madurai 60921 110 KV KAYATHAR 230 KV
646 Madurai 60940 400 KV KANARPATTY 400 KV
GENERATING STATIONS
Sriperumbudur 400 KV
KARIAMANGALAM 230 KV
647 Madurai 60953 230 KV KAYATHAR 230 KV
648 Madurai 60993 230 KV
649 Chennai 61010 230 KV CUDDALORE 230 KV
650 Madurai 61023 110 KV
651 Erode 61046 230 KV
652 Madurai 61054 110 KV PERAMBALUR 230 KV
653 Erode 61083 400 KV Salem 400 KV
kinnimangalam 230 KV
RENGANATHAPURAM 230 KV
METTUR AUTO 230 KV
654 Erode 61138 110 KV
655 Madurai 61147 230 KV
656 Erode 61183 230 KV THINGALUR 230 KV
657 Madurai 61184 230 KV THIRUVARUR 230 KV
658 Madurai 61228 230 KV THANJAVUR 230 KV
KARIAMANGALAM 230 KV
KADALANGUDI 230 KV
659 Madurai 61229 110 KV THANJAVUR 230 KV
660 Erode 61253 110 KV KUNDAH PH3
661 Chennai 61258 230 KV S.P.KOIL 230 KV
662 Erode 61278 230 KV DEVIAKURICHI 230 KV
663 Erode 61280 400 KV MTPSII
664 Erode 61292 230 KV INGUR 230 KV
665 Chennai 61309 230 KV CMRL 230 KV
666 Erode 61337 110 KV Singarapet 110 KV
667 Madurai 61341 230 KV ALUNDUR 230 KV
668 Erode 61346 230 KV INGUR 230 KV
669 Madurai 61406 230 KV ANUPPANKULAM 230 KV
670 Erode 61422 110 KV Erode 110 KV
671 Chennai 61474 230 KV MOSUR 230 KV
672 Chennai 61527 230 KV KORATTUR 230 KV
673 Chennai 61561 230 KV Athipet
674 Chennai 61583 230 KV
675 Erode 61615 230 KV DEVIAKURICHI 230 KV
676 Erode 61630 110 KV LOWER METTUR 1
THIRUVERKADU 230 KV
677 Madurai 60186 110 KV KODIKURICHY 230 KV
678 Madurai 60216 230 KV
679 Madurai 60230 400 KV kamuthi 400 KV
680 Madurai 60280 230 KV UDAYATHUR 230 KV
681 Erode 60289 230 KV KUNDAH PH4
682 Erode 60312 230 KV
683 Erode 60318 230 KV UDUMALPET 230 KV
STERILITE SW STATION 230 KV
OTHAKKAL MANDABAM 230 KV
684 Erode 60322 110 KV
685 Erode 60327 110 KV
686 Madurai 60337 230 KV
687 Madurai 60355 230 KV
688 Chennai 230 KV KITSPARK SS
689 Madurai 61317 230 KV KAYATHAR 230 KV
OTHAKKAL MANDABAM 230 KV
OTHAKKAL MANDABAM 230 KV
NALLAPPANAYAKANPATTY 230 KV
AMUTHAPURAM 230 KV
690 Chennai 61493 110 KV VILLUPURAM 230 KV
691 Madurai 60775 110 KV KODAIYAR PH2
692 Erode 60422 110 KV ARASUR 230 KV
693 Madurai 60432 110 KV SRPUDUR 230 KV
694 Erode 60457 230 KV MTPS
695 Madurai 60498 230 KV KAVANOOR 230 KV
696 Madurai 60545 230 KV KARAIKUDI 230 KV
697 Madurai 60645 230 KV
698 Erode 60690 230 KV
699 Chennai 60704 230 KV
700 Madurai 60722 230 KV ALAGARKOIL 230 KV
701 Erode 60747 110 KV SINGARAPET 230 KV
702 Erode 60751 110 KV ANTHIYUR 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
Sriperumbudur 400 KV
703 Chennai 60769 110 KV VEERAPURAM 230 KV
704 Erode 60778 110 KV ANTHIYUR 230 KV
705 Madurai 60805 230 KV PASUMALAI 230 KV
706 Madurai 60808 230 KV PASUMALAI 230 KV
707 Erode 60856 230 KV PALAVADI 400 KV
708 Madurai 60870 110 KV then I 230 KV
709 Erode 60882 230 KV PALAVADI 400 KV
710 Erode 60915 110 KV HOSUR 230 KV
711 Madurai 60956 230 KV KAYATHAR 230 KV
712 Erode 60958 230 KV KARUVALUR 230 KV
713 Erode 60962 230 KV KARUVALUR 230 KV
714 Erode 60964 230 KV KARUVALUR 230 KV
715 Erode 60965 110 KV KARUVALUR 230 KV
716 Madurai 60972 230 KV KAYATHAR 230 KV
717 Erode 60977 110 KV ALIYAR 230 KV
718 Chennai 61013 110 KV CUDDALORE 230 KV
719 Erode 61017 110 KV
720 Madurai 61048 110 KV
721 Erode 61052 230 KV
722 Erode 61056 230 KV
METTUR AUTO 230 KV
RENGANATHAPURAM 230 KV
METTUR AUTO 230 KV
SADAYAMPALAYAM 230 KV
723 Erode 61084 230 KV Salem 400 KV
724 Madurai 61119 230 KV
725 Madurai 61144 110 KV
726 Erode 61185 110 KV THINGALUR 230 KV
727 Madurai 61186 110 KV THIRUVARUR 230 KV
728 Erode 61217 110 KV
729 Erode 61218 230 KV
KADALANGUDI 230 KV
KADALANGUDI 230 KV
PALLAKAPALAYAM 230 KV
PALLAKAPALAYAM 230 KV
730 Madurai 61230 230 KV THANJAVUR 230 KV
731 Erode 61236 230 KV SALEM AUTO 230 KV
732 Erode 61254 230 KV
733 Erode 61308 110 KV GOBI 230 KV
METTUR AUTO 230 KV
734 Madurai 61345 230 KV ALUNDUR 230 KV
735 Erode 61352 110 KV INGUR 230 KV
736 Chennai 61388 110 KV
737 Erode 61411 110 KV Singarapet 110 KV
738 Erode 61460 110 KV
GUMMIDIPOONDI 230 KV
PONNAPURAM 230 KV
739 Madurai 61471 110 KV TRICHY 230 KV
740 Erode 61511 110 KV LOWER METTUR 4
741 Erode 61513 230 KV SALEM AUTO 230 KV
742 Chennai 61521 110 KV THIRUVALAM 230 KV
743 Chennai 61529 230 KV KORATTUR 230 KV
744 Erode 61581 230 KV PUDHANCHANTHAI 230 KV
745 Madurai 61592 110 KV KUTTALAM
746 Madurai 61596 110 KV VALUTHUR 230 KV
747 Erode 61627 110 KV Thirupathur 110 KV
748 Erode 60171 110 KV LOWER METTUR 3
749 Erode 60253 230 KV PALLADAM 230 KV
750 Erode 60319 230 KV UDUMALPET 230 KV
751 Erode 60331 230 KV OTHAKKAL MANDABAM 230 KV
752 Chennai 110 KV
753 Madurai 61399 230 KV
754 Chennai 60411 110 KV ECHUR 230 KV
755 Erode 60425 110 KV ARASUR 230 KV
756 Madurai 60448 110 KV UDAYATHUR 230 KV
757 Madurai 60456 110 KV UDAYATHUR 230 KV
400KV Sriperumbudur SS (Kadapperi lines)
ANUPPANKULAM 230 KV
758 Erode 60472 230 KV KARAMADAI 230 KV
759 Madurai 60499 110 KV KAVANOOR 230 KV
760 Madurai 60500 110 KV KAVANOOR 230 KV
761 Chennai 60526 230 KV ORAGADAM 230 KV
762 Madurai 60555 230 KV Kayathar 400 KV
763 Erode 60563 230 KV
764 Madurai 60565 110 KV PERIYAR
765 Chennai 60588 110 KV ARNI 230 KV
GURUPARAPALLI 230 KV
766 Chennai 60596 230 KV ARNI 230 KV
767 Madurai 60599 110 KV SANKANERI 230 KV
768 Madurai 60600 230 KV
769 Chennai 60601 230 KV ARNI 230 KV
770 Madurai 60646 230 KV
771 Erode 60674 PYKARA
SAMAYAPURAM 230 KV
CHECKANURANI SW STATION 230 KV
GENERATING STATIONS
772 Erode 60691 110 KV
773 Madurai 60725 230 KV ALAGARKOIL 230 KV
774 Madurai 60729 110 KV ALAGARKOIL 230 KV
775 Madurai 60732 110 KV ALAGARKOIL 230 KV
PONNAPURAM 230 KV
776 Erode 60748 110 KV SINGARAPET 230 KV
777 Erode 60796 230 KV
778 Madurai 60806 110 KV KODAIYAR PH2
779 Madurai 60833 110 KV SEMBATTY 230 KV
Vinnamangalam 230 KV
780 Madurai 60839 110 KV PASUMALAI 230 KV
781 Erode 60840 230 KV GOBI 230 KV
782 Erode 60862 110 KV PALAVADI 400 KV
783 Madurai 60877 230 KV then I 230 KV
784 Madurai 60895 110 KV KODIKURICHY 230 KV
785 Chennai 60937 230 KV Thiruvalam 400 KV
786 Madurai 60961 230 KV KAYATHAR 230 KV
787 Madurai 60975 230 KV KAYATHAR 230 KV
788 Chennai 61015 110 KV CUDDALORE 230 KV
789 Erode 61058 110 KV
790 Erode 61088 230 KV Salem 400 KV
791 Chennai 61097 230 KV
METTUR AUTO 230 KV
THIRUVANNAMALAI 230 KV
792 Chennai 61099 110 KV
793 Madurai 61108 110 KV
794 Madurai 61120 110 KV KAYATHAR 230 KV
795 Madurai 61122 230 KV
796 Erode 61141 110 KV
797 Erode 61187 230 KV THINGALUR 230 KV
THIRUVANNAMALAI 230 KV
KADALANGUDI 230 KV
KADALANGUDI 230 KV
KARIAMANGALAM 230 KV
798 Madurai 61193 110 KV THIRUVARUR 230 KV
799 Madurai 61195 110 KV THIRUVARUR 230 KV
800 Madurai 61196 230 KV THIRUVARUR 230 KV
801 Madurai 61203 110 KV
802 Erode 61237 230 KV SALEM AUTO 230 KV
803 Madurai 61239 110 KV PERAMBALUR 230 KV
804 Erode 61244 PUSHEP
805 Erode 61255 110 KV KUNDAH PH3
NEMALITHIPIYAKUDI 230 KV
GENERATING STATIONS
806 Chennai 61266 230 KV S.P.KOIL 230 KV
807 Erode 61281 110 KV DEVIAKURICHI 230 KV
808 Erode 61296 110 KV INGUR 230 KV
809 Erode 61300 230 KV INGUR 230 KV
810 Madurai 61351 230 KV ALUNDUR 230 KV
811 Erode 61357 110 KV INGUR 230 KV
812 Madurai 61358 110 KV ALUNDUR 230 KV
813 Erode 61360 230 KV INGUR 230 KV
814 Erode 61368 230 KV INGUR 230 KV
815 Chennai 61369 110 KV THIRUVALAM 230 KV
816 Chennai 61373 110 KV THIRUVALAM 230 KV
817 Chennai 61377 230 KV Thiruvalam 400 KV
818 Chennai 61385 110 KV TONDIARPET
819 Madurai 61409 230 KV
820 Madurai 61417 110 KV
821 Erode 61419 110 KV Singarapet 110 KV
822 Madurai 61421 110 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
823 Madurai 61425 110 KV
824 Erode 61431 110 KV Erode 110 KV
825 Chennai 61481 110 KV MOSUR 230 KV
826 Chennai 61487 230 KV MOSUR 230 KV
827 Chennai 61502 110 KV VILLUPURAM 230 KV
ANUPPANKULAM 230 KV
828 Chennai 61530 230 KV THIRUVALAM 230 KV
829 Chennai 61538 110 KV Villapuram 110 KV
830 Chennai 61576 110 KV Ulundurpet 230 KV
831 Chennai 61607 110 KV KORATTUR 230 KV
832 Erode 61616 110 KV DEVIAKURICHI 230 KV
833 Madurai 61623 230 KV kumbakonam 230 KV
834 Madurai 60187 110 KV KODIKURICHY 230 KV
835 Madurai 60201 110 KV KODIKURICHY 230 KV
836 Madurai 60217 230 KV
837 Madurai 60218 230 KV
838 Erode 60257 230 KV PALLADAM 230 KV
839 Erode 60259 110 KV PALLADAM 230 KV
840 Madurai 60263 110 KV PAPANASAM
TUTICORIN -SIPCOT 230 KV
TUTICORIN -SIPCOT 230 KV
841 Erode 60277 110 KV THUDIALUR 230 KV
842 Erode 60278 110 KV THUDIALUR 230 KV
843 Erode 60321 230 KV UDUMALPET 230 KV
844 Erode 60332 110 KV
845 Madurai 60356 230 KV
846 Erode 60372 230 KV Udumalpet 400 KV
847 Chennai 110 KV
848 Chennai 230 KV 230KV Kadapperi SS
OTHAKKAL MANDABAM 230 KV
AMUTHAPURAM 230 KV
400KV Sriperumbudur SS (Kadapperi lines)
849 Chennai 110 KV SIRUSERI 230 KV
850 Chennai 110 KV KITSPARK SS
851 Chennai 230 KV Tharamani
852 Madurai 61198 230 KV THIRUVARUR 230 KV
853 Erode 61268 230 KV MTPSII
854 Chennai 61288 230 KV S.P.KOIL 230 KV
855 Chennai 60491 230 KV NOKIA 230 KV
856 Erode 60675 PYKARA
857 Chennai 60894 400 KV Alamathy 400 KV
858 Erode 60922 230 KV HOSUR 230 KV
859 Chennai 61115 230 KV
860 Chennai 61297 110 KV KOYAMBEDU 230 KV
GENERATING STATIONS
THIRUVANNAMALAI 230 KV
861 Erode 60283 230 KV PALLADAM 230 KV
862 Erode 60291 KUNDAH PH4
863 Erode 60366 KUNDAH PH3
864 Chennai 110 KV SIRUSERI 230 KV
865 Chennai 230 KV KITSPARK SS
866 Chennai 230 KV Basin Bridge 230 KV
867 Erode 60426 110 KV ARASUR 230 KV
GENERATING STATIONS
GENERATING STATIONS
868 Madurai 60436 230 KV SRPUDUR 230 KV
869 Erode 60458 230 KV MTPS
870 Erode 60474 230 KV KARAMADAI 230 KV
871 Madurai 60501 110 KV KAVANOOR 230 KV
872 Chennai 60531 230 KV ORAGADAM 230 KV
873 Madurai 60605 230 KV SANKANERI 230 KV
874 Chennai 60610 110 KV ARNI 230 KV
875 Madurai 60640 110 KV KARAIKUDI 230 KV
876 Madurai 60647 110 KV
877 Erode 60676 110 KV PYKARA
878 Erode 60749 230 KV SINGARAPET 230 KV
879 Chennai 60979 400 KV Thiruvalam 400 KV
880 Erode 61064 230 KV
881 Erode 61076 230 KV UDUMALPET 230 KV
882 Erode 61090 110 KV Salem 400 KV
883 Erode 61127 110 KV ALIYAR 230 KV
884 Madurai 61129 110 KV KAYATHAR 230 KV
CHECKANURANI SW STATION 230 KV
METTUR AUTO 230 KV
885 Erode 61256 110 KV KUNDAH PH3
886 Erode 61263 230 KV MTPSII
887 Erode 61287 230 KV DEVIAKURICHI 230 KV
888 Madurai 61289 110 KV KAYATHAR 230 KV
889 Madurai 61305 110 KV KAYATHAR 230 KV
890 Erode 61382 110 KV INGUR 230 KV
891 Chennai 61398 230 KV GUMMIDIPOONDI 230 KV
892 Erode 61435 110 KV Erode 110 KV
893 Madurai 61480 230 KV TRICHY 230 KV
894 Chennai 61492 230 KV MOSUR 230 KV
895 Chennai 61532 110 KV KORATTUR 230 KV
896 Erode 61617 110 KV DEVIAKURICHI 230 KV
897 Erode 60174 MOYARGENERATING STATIONS
898 Madurai 60202 110 KV KODIKURICHY 230 KV
899 Erode 60324 230 KV UDUMALPET 230 KV
900 Erode 60333 110 KV
901 Madurai 60357 230 KV
OTHAKKAL MANDABAM 230 KV
AMUTHAPURAM 230 KV
902 Erode 60373 230 KV Udumalpet 400 KV
903 Madurai 60434 110 KV SRPUDUR 230 KV
904 Erode 60164 110 KV METTUR DPH
905 Erode 60165 110 KV METTUR DPH
906 Erode 60428 230 KV ARASUR 230 KV
907 Erode 60475 230 KV KARAMADAI 230 KV
908 Madurai 60502 110 KV KAVANOOR 230 KV
909 Madurai 60524 110 KV PUDUKOTTAI 230 KV
910 Chennai 60538 230 KV
911 Madurai 60557 230 KV Kayathar 400 KV
912 Madurai 60589 230 KV TTPS
913 Madurai 60591 230 KV
SPR SIPCOT(MAMBAKKAM) 230 KV
TUTICORIN -AUTO 230 KV
914 Madurai 60603 110 KV
915 Madurai 60648 230 KV
916 Madurai 60665 110 KV KARAIKUDI 230 KV
917 Erode 60692 230 KV
SAMAYAPURAM 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
918 Chennai 60705 230 KV
919 Madurai 60734 110 KV ALAGARKOIL 230 KV
920 Madurai 60756 230 KV
921 Chennai 60787 230 KV VEERAPURAM 230 KV
922 Erode 60842 230 KV GOBI 230 KV
923 Madurai 60887 110 KV then I 230 KV
924 Madurai 60893 110 KV SEMBATTY 230 KV
925 Madurai 60898 230 KV KODIKURICHY 230 KV
Sriperumbudur 400 KV
EACHANGADU 230 KV
926 Madurai 60901 110 KV then I 230 KV
927 Madurai 60941 400 KV kamuthi 400 KV
928 Madurai 61007 230 KV KAYATHAR 230 KV
929 Chennai 61018 230 KV CUDDALORE 230 KV
930 Chennai 61020 110 KV CUDDALORE 230 KV
931 Madurai 61060 230 KV PERAMBALUR 230 KV
932 Erode 61092 110 KV Salem 400 KV
933 Chennai 61112 230 KV
934 Erode 61189 110 KV THINGALUR 230 KV
935 Madurai 61200 230 KV THIRUVARUR 230 KV
936 Madurai 61207 110 KV
937 Erode 61219 230 KV
938 Erode 61223 110 KV
THIRUVANNAMALAI 230 KV
NEMALITHIPIYAKUDI 230 KV
PALLAKAPALAYAM 230 KV
PALLAKAPALAYAM 230 KV
939 Erode 61238 230 KV SALEM AUTO 230 KV
940 Madurai 61242 110 KV KOVILKALAPAL
941 Erode 61245 230 KV PUSHEP
942 Erode 61259 110 KV KUNDAH PH3
943 Chennai 61273 230 KV S.P.KOIL 230 KV
944 Erode 61423 110 KV Singarapet 110 KV
945 Madurai 61432 110 KV ANUPPANKULAM 230 KV
946 Madurai 61475 230 KV PUGALUR 230 KV
947 Madurai 61482 230 KV TRICHY 230 KV
948 Chennai 61503 230 KV VILLUPURAM 230 KV
949 Chennai 61535 110 KV KORATTUR 230 KV
950 Erode 61555 110 KV UNJANAI 230 KV
951 Erode 61584 110 KV UNJANAI 230 KV
952 Madurai 61598 110 KV VALUTHUR 230 KV
953 Erode 61631 110 KV LOWER METTUR 1
954 Erode 61632 230 KV UNJANAI 230 KV
955 Madurai 60188 230 KV KODIKURICHY 230 KV
956 Madurai 60203 230 KV KODIKURICHY 230 KV
957 Madurai 60209 230 KV VEERANAM 230 KV
958 Madurai 60219 110 KV
959 Madurai 60231 400 KV kamuthi 400 KV
960 Madurai 60265 230 KV
TUTICORIN -SIPCOT 230 KV
TUTICORIN -AUTO 230 KV
961 Erode 60335 110 KV
962 Madurai 60338 230 KV
963 Erode 60339 230 KV
964 Madurai 60340 110 KV
965 Madurai 60341 110 KV
966 Madurai 61436 110 KV
OTHAKKAL MANDABAM 230 KV
NALLAPPANAYAKANPATTY 230 KV
OTHAKKAL MANDABAM 230 KV
NALLAPPANAYAKANPATTY 230 KV
NALLAPPANAYAKANPATTY 230 KV
ANUPPANKULAM 230 KV
967 Erode 60166 110 KV METTUR DPH
968 Erode 60392 110 KV Udumalpet 110 KV
969 Erode 60433 110 KV ARASUR 230 KV
970 Erode 60435 230 KV ARASUR 230 KV
971 Madurai 60438 230 KV SRPUDUR 230 KV
972 Madurai 60459 110 KV UDAYATHUR 230 KV
973 Erode 60460 230 KV MTPS
974 Erode 60467 110 KV COIMBATORE 230 KV
975 Erode 60478 400 KV KARAMADAI 230 KV
976 Erode 60480 230 KV KARAMADAI 230 KV
977 Madurai 60504 230 KV KAVANOOR 230 KV
978 Chennai 60519 400 KV Sungavarchatram
979 Chennai 60533 230 KV ORAGADAM 230 KV
980 Madurai 60558 400 KV Kayathar 400 KV
981 Madurai 60562 110 KV VEERANAM 230 KV
982 Madurai 60593 230 KV
983 Madurai 60625 230 KV TTPS
984 Erode 60627 110 KV LOWER METTUR 2
TUTICORIN -AUTO 230 KV
985 Chennai 60628 230 KV ARNI 230 KV
986 Madurai 60649 230 KV
987 Madurai 60666 230 KV KARAIKUDI 230 KV
988 Erode 60677 PYKARA
989 Erode 60693 110 KV
990 Erode 60714 KUNDAH PH1
991 Erode 60752 230 KV SINGARAPET 230 KV
CHECKANURANI SW STATION 230 KV
GENERATING STATIONS
PONNAPURAM 230 KV
GENERATING STATIONS
992 Erode 60786 230 KV ANTHIYUR 230 KV
993 Chennai 60820 400 KV
994 Madurai 60841 110 KV PASUMALAI 230 KV
995 Erode 60846 110 KV GOBI 230 KV
Sriperumbudur 400 KV
996 Madurai 60879 110 KV SEMBATTY 230 KV
997 Madurai 60899 230 KV SEMBATTY 230 KV
998 Madurai 60904 230 KV KODIKURICHY 230 KV
999 Erode 60912 110 KV THUDIALUR 230 KV
1000 Madurai 60914 110 KV SEMBATTY 230 KV
1001 Madurai 60982 230 KV KAYATHAR 230 KV
1002 Chennai 60989 230 KV Thiruvalam 400 KV
1003 Madurai 60996 230 KV
1004 Chennai 61025 230 KV CUDDALORE 230 KV
1005 Chennai 61027 110 KV CUDDALORE 230 KV
1006 Erode 61069 110 KV
1007 Madurai 61102 110 KV Melakallur 110 KV
kinnimangalam 230 KV
METTUR AUTO 230 KV
1008 Madurai 61132 110 KV KAYATHAR 230 KV
1009 Madurai 61140 110 KV
1010 Erode 61142 400 KV Salem 400 KV
1011 Erode 61150 110 KV Salem 400 KV
KADALANGUDI 230 KV
1012 Erode 61151 110 KV Salem 400 KV
1013 Madurai 61202 230 KV THIRUVARUR 230 KV
1014 Chennai 61276 110 KV S.P.KOIL 230 KV
1015 Erode 61298 110 KV DEVIAKURICHI 230 KV
1016 Erode 61310 110 KV GOBI 230 KV
1017 Erode 61329 230 KV SALEM AUTO 230 KV
1018 Chennai 61380 230 KV Kayathar 400 KV
1019 Chennai 61390 230 KV Tondiarpet 230 KV SS
1020 Erode 61396 230 KV INGUR 230 KV
1021 Erode 61427 110 KV Singarapet 110 KV
1022 Madurai 61438 110 KV
1023 Madurai 61477 230 KV PUGALUR 230 KV
1024 Madurai 61478 230 KV PUGALUR 230 KV
ANUPPANKULAM 230 KV
1025 Erode 61516 110 KV SALEM AUTO 230 KV
1026 Chennai 61537 230 KV THIRUVALAM 230 KV
1027 Erode 61557 230 KV UNJANAI 230 KV
1028 Chennai 61579 230 KV Ulundurpet 230 KV
1029 Erode 61585 230 KV
1030 Madurai 61601 110 KV KUTTALAM
1031 Madurai 61626 110 KV KUTTALAM
1032 Erode 60177 METTUR TPH
1033 Madurai 60189 230 KV KODIKURICHY 230 KV
PUDHANCHANTHAI 230 KV
GENERATING STATIONS
1034 Madurai 60220 110 KV
1035 Madurai 60274 110 KV
1036 Erode 60298 110 KV THUDIALUR 230 KV
1037 Erode 60300 110 KV LOWER METTUR 1
TUTICORIN -SIPCOT 230 KV
TUTICORIN -AUTO 230 KV
1038 Erode 60305 110 KV THUDIALUR 230 KV
1039 Erode 60342 110 KV
1040 Erode 60369 230 KV KUNDAH PH3
1041 Erode 60379 110 KV THUDIALUR 230 KV
1042 Erode 60382 230 KV THUDIALUR 230 KV
1043 Erode 60383 110 KV THUDIALUR 230 KV
1044 Chennai 110 KV 230KV Kadapperi SS
1045 Chennai 230 KV
1046 Chennai 110 KV Tharamani
OTHAKKAL MANDABAM 230 KV
230KVTharamani SS (Kadapperi Lines)
1047 Chennai 61504 230 KV VILLUPURAM 230 KV
1048 Erode 60169 METTUR DPH
1049 Madurai 60440 110 KV SRPUDUR 230 KV
1050 Madurai 60462 230 KV UDAYATHUR 230 KV
1051 Erode 60470 110 KV COIMBATORE 230 KV
1052 Madurai 60505 110 KV KAVANOOR 230 KV
GENERATING STATIONS
1053 Madurai 60525 230 KV PUDUKOTTAI 230 KV
1054 Madurai 60595 230 KV
1055 Madurai 60609 230 KV SANKANERI 230 KV
1056 Madurai 60611 110 KV
1057 Madurai 60620 110 KV PERIYAR
1058 Madurai 60626 230 KV TTPS
TUTICORIN -AUTO 230 KV
SAMAYAPURAM 230 KV
1059 Madurai 60650 110 KV
1060 Erode 60694 230 KV
1061 Chennai 60706 230 KV
1062 Erode 60849 110 KV GOBI 230 KV
1063 Madurai 60866 110 KV PASUMALAI 230 KV
1064 Madurai 60907 230 KV KODIKURICHY 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
Sriperumbudur 400 KV
1065 Madurai 60927 110 KV SEMBATTY 230 KV
1066 Madurai 60928 110 KV SEMBATTY 230 KV
1067 Madurai 60929 110 KV SEMBATTY 230 KV
1068 Madurai 60942 230 KV SEMBATTY 230 KV
1069 Madurai 60945 400 KV KANARPATTI 400 KV
1070 Madurai 60994 230 KV KAYATHAR 230 KV
1071 Chennai 61032 230 KV CUDDALORE 230 KV
1072 Erode 61042 230 KV
1073 Madurai 61063 110 KV PERAMBALUR 230 KV
1074 Erode 61080 230 KV UDUMALPET 230 KV
1075 Madurai 61103 110 KV
1076 Erode 61139 110 KV ALIYAR 230 KV
METTUR AUTO 230 KV
KADALANGUDI 230 KV
1077 Erode 61143 110 KV
1078 Erode 61153 110 KV Salem 400 KV
1079 Erode 61190 110 KV THINGALUR 230 KV
1080 Madurai 61210 110 KV THIRUVARUR 230 KV
1081 Chennai 61246 110 KV Alamathy 400 KV
KARIAMANGALAM 230 KV
1082 Erode 61260 110 KV KUNDAH PH3
1083 Chennai 61277 110 KV S.P.KOIL 230 KV
1084 Madurai 61338 110 KV KAYATHAR 230 KV
1085 Madurai 61363 230 KV ALUNDUR 230 KV
1086 Chennai 61384 110 KV Kanji 110 KV
1087 Chennai 61407 230 KV
1088 Erode 61439 110 KV Erode 110 KV
1089 Chennai 61505 110 KV VILLUPURAM 230 KV
1090 Erode 61520 230 KV
1091 Chennai 61541 110 KV THIRUVALAM 230 KV
GUMMIDIPOONDI 230 KV
SADAYAMPALAYAM 230 KV
1092 Chennai 61544 110 KV KORATTUR 230 KV
1093 Madurai 61604 110 KV KUTTALAM
1094 Madurai 60190 230 KV KODIKURICHY 230 KV
1095 Madurai 60204 110 KV KODIKURICHY 230 KV
1096 Madurai 60232 400 KV kamuthi 400 KV
1097 Madurai 60241 110 KV Uthumalai 110 KV
1098 Madurai 60267 110 KV
1099 Erode 60346 230 KV
1100 Chennai 230 KV
1101 Chennai 230 KV KITSPARK SS
1102 Erode 61586 230 KV UNJANAI 230 KV
TUTICORIN -AUTO230KV
OTHAKKAL MANDABAM 230 KV
230KVTharamani SS (Kadapperi Lines)
1103 Erode 61587 230 KV
1104 Erode 60393 110 KV Udumalpet 110 KV
1105 Erode 60399 110 KV THUDIALUR 230 KV
1106 Erode 60437 110 KV ARASUR 230 KV
1107 Madurai 60465 230 KV UDAYATHUR 230 KV
1108 Madurai 60507 230 KV KAVANOOR 230 KV
1109 Chennai 60535 230 KV ORAGADAM 230 KV
PUDHANCHANTHAI 230 KV
1110 Madurai 60598 110 KV
1111 Madurai 60651 110 KV
1112 Erode 60695 230 KV
1113 Erode 60755 230 KV SINGARAPET 230 KV
TUTICORIN -AUTO 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
1114 Erode 60793 110 KV ANTHIYUR 230 KV
1115 Madurai 60822 230 KV PASUMALAI 230 KV
1116 Madurai 60845 110 KV PASUMALAI 230 KV
1117 Erode 60853 110 KV GOBI 230 KV
1118 Erode 60867 230 KV PALAVADI 400 KV
1119 Erode 60885 400 KV PALAVADI 400 KV
1120 Chennai 60896 400 KV Alamathy 400 KV
1121 Chennai 60897 110 KV VEERAPURAM 230 KV
1122 Madurai 60908 230 KV KODIKURICHY 230 KV
1123 Madurai 60910 230 KV then I 230 KV
1124 Erode 60920 110 KV THUDIALUR 230 KV
1125 Madurai 60930 230 KV SEMBATTY 230 KV
1126 Madurai 60969 230 KV KAYATHAR 230 KV
1127 Madurai 60999 110 KV kinnimangalam 230 KV
1128 Erode 61003 230 KV
1129 Chennai 61035 110 KV CUDDALORE 230 KV
1130 Chennai 61039 230 KV CUDDALORE 230 KV
1131 Erode 61073 230 KV
1132 Madurai 61133 110 KV KAYATHAR 230 KV
1133 Erode 61145 110 KV
1134 Erode 61148 230 KV ALIYAR 230 KV
METTUR AUTO 230 KV
METTUR AUTO 230 KV
KARIAMANGALAM 230 KV
1135 Chennai 61149 230 KV Thiruvalam 400 KV
1136 Erode 61155 230 KV Salem 400 KV
1137 Erode 61301 110 KV DEVIAKURICHI 230 KV
1138 Madurai 61350 230 KV KAYATHAR 230 KV
1139 Chennai 61387 230 KV Thiruvalam 400 KV
1140 Erode 61401 110 KV INGUR 230 KV
1141 Erode 61434 110 KV Singarapet 110 KV
1142 Madurai 61483 110 KV TRICHY 230 KV
1143 Chennai 61517 230 KV MOSUR 230 KV
1144 Chennai 61545 230 KV
1145 Madurai 61599 110 KV VALUTHUR 230 KV
1146 Erode 60179 230 KV METTUR TPH
1147 Madurai 60191 230 KV KODIKURICHY 230 KV
THIRUVALAM 230 KV SS
1148 Erode 60284 230 KV PALLADAM 230 KV
1149 Erode 60285 110 KV PALLADAM 230 KV
1150 Erode 60287 110 KV PALLADAM 230 KV
1151 Erode 60325 230 KV UDUMALPET 230 KV
1152 Madurai 60343 230 KV
1153 Madurai 60344 110 KV
NALLAPPANAYAKANPATTY 230 KV
NALLAPPANAYAKANPATTY 230 KV
1154 Madurai 60345 110 KV
1155 Erode 60348 110 KV
1156 Madurai 60358 230 KV
1157 Erode 60374 230 KV Udumalpet 400 KV
1158 Chennai 60992 230 KV CUDDALORE 230 KV
NALLAPPANAYAKANPATTY 230 KV
OTHAKKAL MANDABAM 230 KV
AMUTHAPURAM 230 KV
1159 Chennai 60998 230 KV CUDDALORE 230 KV
1160 Madurai 61312 230 KV KAYATHAR 230 KV
1161 Madurai 60632 230 KV Kayathar 400 KV
1162 Erode 60401 230 KV THUDIALUR 230 KV
1163 Chennai 60420 230 KV ECHUR 230 KV
1164 Madurai 60442 110 KV SRPUDUR 230 KV
1165 Erode 60476 110 KV COIMBATORE 230 KV
1166 Madurai 60508 110 KV KAVANOOR 230 KV
1167 Madurai 60527 230 KV PUDUKOTTAI 230 KV
1168 Chennai 60532 110 KV
1169 Madurai 60602 110 KV
1170 Madurai 60612 110 KV SANKANERI 230 KV
SUNGUVARCHATRAM 400 KV
TUTICORIN -AUTO 230 KV
1171 Madurai 60614 230 KV
1172 Chennai 60629 110 KV ARNI 230 KV
1173 Chennai 60630 110 KV ARNI 230 KV
1174 Chennai 60631 230 KV ARNI 230 KV
1175 Madurai 60634 230 KV Kayathar 400 KV
1176 Madurai 60652 230 KV
SAMAYAPURAM 230 KV
CHECKANURANI SW STATION 230 KV
1177 Erode 60661 230 KV SINGAPURAM 230 KV
1178 Madurai 60667 230 KV KARAIKUDI 230 KV
1179 Erode 60678 PYKARA
1180 Madurai 60736 230 KV ALAGARKOIL 230 KV
1181 Madurai 60740 110 KV ALAGARKOIL 230 KV
GENERATING STATIONS
1182 Madurai 60757 110 KV
1183 Erode 60758 110 KV SINGARAPET 230 KV
EACHANGADU 230 KV
1184 Erode 60762 230 KV SINGARAPET 230 KV
1185 Madurai 60764 230 KV
1186 Madurai 60777 110 KV KODAIYAR PH2
EACHANGADU 230 KV
1187 Erode 60800 230 KV
1188 Madurai 60809 230 KV PASUMALAI 230 KV
1189 Erode 60843 110 KV ANTHIYUR 230 KV
1190 Erode 60847 230 KV ANTHIYUR 230 KV
1191 Erode 60857 230 KV GOBI 230 KV
Vinnamangalam 230 KV
1192 Madurai 60859 230 KV PASUMALAI 230 KV
1193 Erode 60873 230 KV
1194 Erode 60874 400 KV PALAVADI 400 KV
KARIAMANGALAM 230 KV
1195 Madurai 60913 110 KV KODIKURICHY 230 KV
1196 Madurai 60917 110 KV then I 230 KV
1197 Madurai 60947 110 KV kamuthi 400 KV
1198 Erode 60967 230 KV KARUVALUR 230 KV
1199 Erode 60971 230 KV KARUVALUR 230 KV
1200 Erode 60973 110 KV KARUVALUR 230 KV
1201 Madurai 61030 230 KV KAYATHAR 230 KV
1202 Chennai 61041 110 KV CUDDALORE 230 KV
1203 Madurai 61067 110 KV PERAMBALUR 230 KV
1204 Erode 61075 110 KV METTUR AUTO 230 KV
1205 Madurai 61104 110 KV
1206 Madurai 61105 110 KV
1207 Chennai 61118 230 KV
1208 Chennai 61121 110 KV
1209 Chennai 61124 110 KV
1210 Madurai 61134 110 KV
KADALANGUDI 230 KV
KADALANGUDI 230 KV
THIRUVANNAMALAI 230 KV
THIRUVANNAMALAI 230 KV
THIRUVANNAMALAI 230 KV
KADALANGUDI 230 KV
1211 Madurai 61136 230 KV
1212 Erode 61146 110 KV
1213 Erode 61156 400 KV Salem 400 KV
1214 Madurai 61205 110 KV THIRUVARUR 230 KV
1215 Madurai 61214 230 KV
KADALANGUDI 230 KV
KARIAMANGALAM 230 KV
NEMALITHIPIYAKUDI 230 KV
1216 Erode 61220 110 KV
1217 Erode 61261 110 KV KUNDAH PH3
1218 Erode 61311 110 KV GOBI 230 KV
1219 Erode 61344 110 KV SALEM AUTO 230 KV
1220 Madurai 61372 110 KV ALUNDUR 230 KV
1221 Madurai 61375 110 KV KAYATHAR 230 KV
1222 Chennai 61392 110 KV THIRUVALAM 230 KV
PALLAKAPALAYAM 230 KV
1223 Chennai 61394 110 KV THIRUVALAM 230 KV
1224 Chennai 61400 110 KV THIRUVALAM 230 KV
1225 Chennai 61403 110 KV THIRUVALAM 230 KV
1226 Chennai 61408 110 KV MOSUR 230 KV
1227 Chennai 61412 110 KV
1228 Chennai 61414 230 KV
1229 Chennai 61420 110 KV ARNI 230 KV
VINNAMANGALAM 230 KV
GUMMIDIPOONDI 230 KV
1230 Madurai 61441 110 KV
1231 Madurai 61445 230 KV
1232 Erode 61449 110 KV Erode 110 KV
1233 Madurai 61485 110 KV TRICHY 230 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
1234 Chennai 61508 230 KV VILLUPURAM 230 KV
1235 Chennai 61523 110 KV MOSUR 230 KV
1236 Chennai 61528 230 KV MOSUR 230 KV
1237 Chennai 61534 110 KV MOSUR 230 KV
1238 Chennai 61540 110 KV Villapuram 110 KV
1239 Chennai 61551 230 KV THIRUVALAM 230 KV
1240 Chennai 61571 230 KV MANALI 230 KV
1241 Chennai 61582 110 KV Ulundurpet 230 KV
1242 Madurai 61597 110 KV KUTTALAM
1243 Madurai 61600 230 KV VALUTHUR 230 KV
1244 Chennai 61609 230 KV KORATTUR 230 KV
1245 Erode 61618 110 KV DEVIAKURICHI 230 KV
1246 Madurai 61622 110 KV kumbakonam 230 KV
1247 Madurai 61624 110 KV THANJAVUR 230 KV
1248 Madurai 61625 110 KV kumbakonam 230 KV
1249 Madurai 60192 230 KV KODIKURICHY 230 KV
1250 Madurai 60205 110 KV KODIKURICHY 230 KV
1251 Madurai 60233 400 KV kamuthi 400 KV
1252 Madurai 60234 400 KV kamuthi 400 KV
1253 Madurai 60244 110 KV Uthumalai 110 KV
1254 Madurai 60250 110 KV SERVALAR
1255 Madurai 60268 110 KV PAPANASAM
1256 Madurai 60270 110 KV
1257 Erode 60349 110 KV
1258 Erode 60375 230 KV Udumalpet 400 KV
1259 Chennai 230 KV 230KV Kadapperi SS
TUTICORIN -AUTO 230 KV
OTHAKKAL MANDABAM 230 KV
1260 Chennai 110 KV KITSPARK SS
1261 Chennai 230 KV Tharamani
1262 Chennai 60496 230 KV NOKIA 230 KV
1263 Chennai 60707 400 KV
1264 Chennai 60836 230 KV
1265 Erode 61247 PUSHEP
1266 Chennai 61299 230 KV KOYAMBEDU 230 KV
1267 Chennai 61307 230 KV KILPAUK 230 KV
Sriperumbudur 400 KV
Sriperumbudur 400 KV
GENERATING STATIONS
1268 Erode 60294 KUNDAH PH4
1269 Erode 60367 KUNDAH PH3
1270 Erode 60384 110 KV THUDIALUR 230 KV
1271 Chennai 230 KV SIRUSERI 230 KV
1272 Chennai 230 KV Basin Bridge 230 KV
1273 Erode 61262 110 KV KUNDAH PH3
1274 Madurai 60761 230 KV
GENERATING STATIONS
GENERATING STATIONS
EACHANGADU 230 KV
1275 Madurai 61204 230 KV THIRUVARUR 230 KV
1276 Erode 60386 230 KV THUDIALUR 230 KV
1277 Erode 60439 230 KV ARASUR 230 KV
1278 Madurai 60443 110 KV SRPUDUR 230 KV
1279 Madurai 60604 230 KV
1280 Madurai 60615 230 KV SANKANERI 230 KV
1281 Madurai 60618 230 KV TTPS
TUTICORIN -AUTO 230 KV
1282 Erode 60662 230 KV SINGAPURAM 230 KV
1283 Erode 60679 PYKARA
1284 Madurai 60768 110 KV
1285 Madurai 60773 110 KV
GENERATING STATIONS
EACHANGADU 230 KV
EACHANGADU 230 KV
1286 Madurai 60813 230 KV PASUMALAI 230 KV
1287 Madurai 60848 110 KV PASUMALAI 230 KV
1288 Erode 60855 230 KV ANTHIYUR 230 KV
1289 Erode 60861 230 KV GOBI 230 KV
1290 Erode 60871 400 KV PALAVADI 400 KV
1291 Madurai 60923 230 KV then I 230 KV
1292 Madurai 61051 110 KV SEMBATTY 230 KV
1293 Madurai 61062 230 KV
1294 Erode 61079 110 KV
1295 Erode 61152 110 KV ALIYAR 230 KV
1296 Erode 61157 230 KV Salem 400 KV
1297 Erode 61159 400 KV Salem 400 KV
1298 Erode 61191 230 KV THINGALUR 230 KV
1299 Madurai 61206 110 KV THIRUVARUR 230 KV
1300 Madurai 61231 110 KV THANJAVUR 230 KV
RENGANATHAPURAM 230 KV
METTUR AUTO 230 KV
1301 Erode 61251 230 KV PUSHEP
1302 Erode 61294 400 KV MTPSII
1303 Madurai 61379 230 KV ALUNDUR 230 KV
1304 Madurai 61397 110 KV KAYATHAR 230 KV
1305 Erode 61404 110 KV INGUR 230 KV
1306 Madurai 61413 110 KV KAYATHAR 230 KV
1307 Madurai 61437 110 KV KAYATHAR 230 KV
1308 Madurai 61447 110 KV
1309 Madurai 61450 230 KV
1310 Madurai 61466 230 KV PUGALUR 230 KV
1311 Erode 61519 110 KV SALEM AUTO 230 KV
1312 Chennai 61539 230 KV MOSUR 230 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
1313 Chennai 61542 110 KV Villapuram 110 KV
1314 Erode 61589 110 KV PUDHANCHANTHAI 230 KV
1315 Madurai 61602 110 KV VALUTHUR 230 KV
1316 Madurai 60249 110 KV Uthumalai 110 KV
1317 Erode 60326 110 KV UDUMALPET 230 KV
1318 Chennai 230 KV 230KVTharamani SS (Kadapperi Lines)
1319 Madurai 59481 230 KV ALAGARKOIL 230 KV
1320 Madurai 60653 110 KV
1321 Erode 60390 110 KV THUDIALUR 230 KV
1322 Erode 60395 110 KV THUDIALUR 230 KV
1323 Chennai 60424 110 KV ECHUR 230 KV
1324 Erode 60441 110 KV ARASUR 230 KV
1325 Madurai 60444 110 KV SRPUDUR 230 KV
CHECKANURANI SW STATION 230 KV
1326 Erode 60446 230 KV ARASUR 230 KV
1327 Madurai 60471 230 KV UDAYATHUR 230 KV
1328 Madurai 60509 110 KV KAVANOOR 230 KV
1329 Madurai 60566 110 KV VEERANAM 230 KV
1330 Madurai 60606 230 KV TUTICORIN -AUTO 230 KV
1331 Madurai 60616 110 KV
1332 Madurai 60619 230 KV TTPS
1333 Chennai 60633 110 KV ARNI 230 KV
SAMAYAPURAM 230 KV
1334 Madurai 60635 400 KV Kayathar 400 KV
1335 Chennai 60636 230 KV ARNI 230 KV
1336 Madurai 60654 230 KV
1337 Madurai 60668 110 KV KARAIKUDI 230 KV
1338 Erode 60696 230 KV
1339 Madurai 60744 230 KV ALAGARKOIL 230 KV
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
1340 Erode 60763 230 KV SINGARAPET 230 KV
1341 Madurai 60788 KODAIYAR PH2
1342 Erode 60802 230 KV
1343 Madurai 60851 110 KV PASUMALAI 230 KV
1344 Madurai 60916 230 KV KODIKURICHY 230 KV
1345 Madurai 60949 110 KV kamuthi 400 KV
1346 Erode 60978 110 KV KARUVALUR 230 KV
GENERATING STATIONS
Vinnamangalam 230 KV
1347 Madurai 61002 110 KV
1348 Madurai 61038 230 KV KAYATHAR 230 KV
1349 Chennai 61045 110 KV CUDDALORE 230 KV
1350 Madurai 61055 110 KV SEMBATTY 230 KV
1351 Madurai 61068 230 KV PERAMBALUR 230 KV
1352 Madurai 61070 110 KV SEMBATTY 230 KV
1353 Erode 61082 110 KV
kinnimangalam 230 KV
METTUR AUTO 230 KV
1354 Chennai 61128 110 KV
1355 Madurai 61137 110 KV
1356 Erode 61160 230 KV Salem 400 KV
1357 Erode 61163 110 KV KARUVALUR 230 KV
1358 Erode 61168 110 KV ALIYAR 230 KV
1359 Madurai 61208 110 KV THIRUVARUR 230 KV
1360 Erode 61221 110 KV
THIRUVANNAMALAI 230 KV
KADALANGUDI 230 KV
PALLAKAPALAYAM 230 KV
1361 Madurai 61232 110 KV THANJAVUR 230 KV
1362 Chennai 61291 110 KV S.P.KOIL 230 KV
1363 Erode 61304 110 KV DEVIAKURICHI 230 KV
1364 Erode 61349 230 KV SALEM AUTO 230 KV
1365 Madurai 61386 230 KV ALUNDUR 230 KV
1366 Erode 61410 110 KV INGUR 230 KV
1367 Erode 61415 230 KV INGUR 230 KV
1368 Chennai 61424 230 KV THIRUVALAM 230 KV
1369 Chennai 61426 230 KV
1370 Chennai 61430 110 KV ARNI 230 KV
GUMMIDIPOONDI 230 KV
1371 Erode 61440 110 KV Singarapet 110 KV
1372 Madurai 61448 110 KV KAYATHAR 230 KV
1373 Madurai 61451 110 KV
1374 Madurai 61453 230 KV
1375 Madurai 61469 230 KV PUGALUR 230 KV
ANUPPANKULAM 230 KV
ANUPPANKULAM 230 KV
1376 Madurai 61488 110 KV TRICHY 230 KV
1377 Erode 61522 230 KV SALEM AUTO 230 KV
1378 Chennai 61543 110 KV MOSUR 230 KV
1379 Erode 61558 110 KV UNJANAI 230 KV
1380 Chennai 61559 230 KV THIRUVALAM 230 KV
1381 Erode 61588 110 KV UNJANAI 230 KV
1382 Erode 61606 230 KV
1383 Madurai 60193 230 KV KODIKURICHY 230 KV
1384 Madurai 60206 110 KV KODIKURICHY 230 KV
1385 Madurai 60221 230 KV
1386 Madurai 60236 400 KV kamuthi 400 KV
1387 Madurai 60279 110 KV
PUDHANCHANTHAI 230 KV
TUTICORIN -SIPCOT 230 KV
TUTICORIN -AUTO 230 KV
1388 Erode 60292 230 KV PALLADAM 230 KV
1389 Erode 60297 110 KV PALLADAM 230 KV
1390 Erode 60328 110 KV UDUMALPET 230 KV
1391 Madurai 60347 230 KV
1392 Erode 60350 110 KV
1393 Erode 60376 230 KV Udumalpet 400 KV
1394 Chennai 230 KV
NALLAPPANAYAKANPATTY 230 KV
OTHAKKAL MANDABAM 230 KV
230KVTharamani SS (Kadapperi Lines)
1395 Erode 60394 110 KV Udumalpet 110 KV
1396 Madurai 60479 230 KV UDAYATHUR 230 KV
1397 Erode 60482 230 KV KARAMADAI 230 KV
1398 Erode 60485 110 KV LOWER METTUR 2
1399 Erode 60493 110 KV LOWER METTUR 3
1400 Madurai 60510 230 KV KAVANOOR 230 KV
1401 Chennai 60522 400 KV
1402 Chennai 60539 230 KV ORAGADAM 230 KV
1403 Madurai 60572 230 KV VEERANAM 230 KV
1404 Madurai 60608 230 KV
1405 Madurai 60617 230 KV SANKANERI 230 KV
1406 Madurai 60637 230 KV Kayathar 400 KV
1407 Chennai 60638 230 KV ARNI 230 KV
SUNGUVARCHATRAM 400 SS
TUTICORIN -AUTO 230 KV
1408 Madurai 60655 230 KV
1409 Erode 60663 230 KV SINGAPURAM 230 KV
1410 Madurai 60669 110 KV KARAIKUDI 230 KV
1411 Erode 60680 PYKARA
1412 Erode 60697 110 KV
1413 Chennai 60708 230 KV
CHECKANURANI SW STATION 230 KV
GENERATING STATIONS
PONNAPURAM 230 KV
Sriperumbudur 400 KV
1414 Erode 60767 110 KV SINGARAPET 230 KV
1415 Madurai 60801 KODAIYAR PH2
1416 Erode 60860 110 KV ANTHIYUR 230 KV
1417 Erode 60865 110 KV GOBI 230 KV
1418 Chennai 60900 400 KV Alamathy 400 KV
GENERATING STATIONS
1419 Chennai 60902 110 KV VEERAPURAM 230 KV
1420 Chennai 60925 110 KV VEERAPURAM 230 KV
1421 Madurai 60932 110 KV KODIKURICHY 230 KV
1422 Chennai 61047 110 KV CUDDALORE 230 KV
1423 Erode 61049 230 KV
1424 Erode 61066 230 KV
1425 Madurai 61072 230 KV KAYATHAR 230 KV
1426 Madurai 61074 110 KV SEMBATTY 230 KV
1427 Erode 61085 110 KV
METTUR AUTO 230 KV
SADAYAMPALAYAM 230 KV
METTUR AUTO 230 KV
1428 Madurai 61087 230 KV
1429 Erode 61158 110 KV ALIYAR 230 KV
1430 Erode 61166 110 KV Salem 400 KV
1431 Madurai 61209 110 KV THIRUVARUR 230 KV
1432 Erode 61271 230 KV MTPSII
RENGANATHAPURAM 230 KV
1433 Chennai 61303 230 KV S.P.KOIL 230 KV
1434 Erode 61306 230 KV DEVIAKURICHI 230 KV
1435 Madurai 61395 110 KV ALUNDUR 230 KV
1436 Chennai 61433 110 KV
1437 Madurai 61455 110 KV KAYATHAR 230 KV
GUMMIDIPOONDI 230 KV
1438 Madurai 61489 110 KV TRICHY 230 KV
1439 Madurai 61490 110 KV TRICHY 230 KV
1440 Madurai 61506 110 KV
1441 Chennai 61548 110 KV Villapuram 110 KV
KADALANGUDI 230 KV
1442 Chennai 61572 230 KV CUDDALORE 230 KV
1443 Chennai 61575 110 KV MANALI 230 KV
1444 Madurai 61603 230 KV VALUTHUR 230 KV
1445 Erode 61608 230 KV
1446 Erode 61619 230 KV DEVIAKURICHI 230 KV
PUDHANCHANTHAI 230 KV
1447 Erode 60178 METTUR TPH
1448 Madurai 60194 110 KV KODIKURICHY 230 KV
1449 Madurai 60222 230 KV
1450 Erode 60303 230 KV PALLADAM 230 KV
1451 Erode 60329 110 KV UDUMALPET 230 KV
1452 Erode 60351 230 KV
GENERATING STATIONS
TUTICORIN -SIPCOT 230 KV
OTHAKKAL MANDABAM 230 KV
1453 Madurai 60359 230 KV
1454 Erode 60370 230 KV KUNDAH PH3
1455 Erode 60377 230 KV Udumalpet 400 KV
1456 Chennai 230 KV 230KV Kadapperi SS
1457 Chennai 110 KV Tharamani1458 Erode 61264 230 KV KUNDAH PH3
1459 Madurai 60447 110 KV SRPUDUR 230 KV
1460 Erode 60449 110 KV ARASUR 230 KV
1461 Erode 60483 110 KV KARAMADAI 230 KV
AMUTHAPURAM 230 KV
1462 Madurai 60511 230 KV KAVANOOR 230 KV
1463 Madurai 60529 230 KV PUDUKOTTAI 230 KV
1464 Madurai 60624 110 KV PERIYAR
1465 Madurai 60639 230 KV Kayathar 400 KV
1466 Madurai 60656 230 KV
1467 Erode 60698 230 KV
1468 Madurai 60760 KODAIYAR PH1
CHECKANURANI SW STATION 230 KV
PONNAPURAM 230 KV
GENERATING STATIONS
1469 Madurai 60771 110 KV
1470 Erode 60772 110 KV SINGARAPET 230 KV
1471 Madurai 60774 230 KV
1472 Madurai 60854 110 KV PASUMALAI 230 KV
SAMAYAPURAM 230 KV
EACHANGADU 230 KV
1473 Erode 60868 110 KV GOBI 230 KV
1474 Erode 60869 110 KV ANTHIYUR 230 KV
1475 Madurai 60933 110 KV KODIKURICHY 230 KV
1476 Madurai 60952 110 KV KANARPATTY 400 KV
1477 Madurai 61005 110 KV kinnimangalam 230 KV
1478 Madurai 61071 230 KV PERAMBALUR 230 KV
1479 Madurai 61077 230 KV KAYATHAR 230 KV
1480 Madurai 61091 230 KV
1481 Erode 61167 230 KV Salem 400 KV
1482 Madurai 61211 230 KV THIRUVARUR 230 KV
1483 Madurai 61213 230 KV THIRUVARUR 230 KV
1484 Erode 61222 110 KV
1485 Madurai 61233 230 KV THANJAVUR 230 KV
RENGANATHAPURAM 230 KV
PALLAKAPALAYAM 230 KV
1486 Erode 61265 230 KV KUNDAH PH3
1487 Erode 61284 400 KV MTPSII
1488 Erode 61355 230 KV SALEM AUTO 230 KV
1489 Madurai 61405 230 KV ALUNDUR 230 KV
1490 Erode 61442 110 KV Singarapet 110 KV
1491 Erode 61526 230 KV SALEM AUTO 230 KV
1492 Chennai 61546 110 KV MOSUR 230 KV
1493 Chennai 61547 110 KV KORATTUR 230 KV
1494 Erode 61560 110 KV UNJANAI 230 KV
1495 Madurai 61605 230 KV VALUTHUR 230 KV
1496 Erode 60170 METTUR DPH
1497 Madurai 60195 110 KV KODIKURICHY 230 KV
1498 Madurai 60237 400 KV kamuthi 400 KV
1499 Madurai 60273 110 KV PAPANASAM
1500 Madurai 60281 230 KV
GENERATING STATIONS
TUTICORIN -AUTO 230 KV
1501 Erode 60304 230 KV PALLADAM 230 KV
1502 Erode 60378 230 KV Udumalpet 400 KV
1503 Chennai 61550 110 KV KORATTUR 230 KV
1504 Chennai 230 KV
1505 Chennai 60709 230 KV
1506 Erode 61192 230 KV PALLADAM 230 KV
230KVTharamani SS (Kadapperi Lines)
Sriperumbudur 400 KV
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of September 2017 at 8th TNSOCC Meeting
Transmission Lines / Elements DetailsFeeder Equipment Purpose
230/110 KV Auto Transformer - I, HV I, LV I breakers, it's CTs and LAS
Monthly maintenance works and REF enabling works by P & C wing / CBE
110 KV Arasur - Somanur feeder Breaker & CTs
Monthly maintenance works.
1.110KV Coimbatore - Arasur# Breaker & CTs. 2.Section Between 230KV CBE SS And 110KV Kallimadai SS on 110KV CBE-Arasur#
1. Monthly maintenance works , 2. Providing jumpers from 110KV Arasur# at CBE SS for alternate source to 110/11KV CBE SS.
110KV SANKANERI- S.R.PUTHUR# BREAKER, CTs and Line Switches
Monthiy maintenance
110 KV Ponnapuram # Breaker & CTs & Line entire
For monthly maintenance works
230 Kv Karuvalur - PGCIL feeder Breaker with Line switch
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam
230 TBC/BC BREAKER and CTs
Quarterly Mtce work
110 KV Northern side CT
For Monthly maintenance work of TBC and bus transfer switch
110KV ALR-UDT-II FEEDER CB,CT AND LINE SECTION BETWEEN ALR AND DEVANOORPUTHUR SS
110KV MANOOR FEEDER BREAKER AND CT BAY NO 102
MONTHLY MAINTENANCE WORK
110KV MANOOR FEEDER BREAKER AND CT BAY NO 102
MONTHLY MAINTENANCE WORK
110KV MANOOR FEEDER BREAKER AND CT BAY NO 102
MONTHLY MAINTENANCE WORK
On 110 KV Kayathar - Thalaiyuthu Express Feeder breaker with CT only
For monthly maintenance work
230KV MTPS II feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
Monthly maintenance work
230KV Bus entire
Auto Transformer II
For replacement of 230KV MIDDLE Strung Bus from isolator switch 1-89B to2-89B
For Attending Auto Transformer II HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
For Monthly Maintenance Work
For Monthly Maintenance Work
For Monthly Maintenance Work
110KV I.G.Kottai feeder
110KV SPR-I.G.Kottai feeder
110KV SPR-I.G.Kottai Feeder
110KV SPR-I.G.Kottai feeder
110KV OKM-Udumalpet-1 feeder section between 110KV Kinathukadavu SS to 110KV Gomangalam SS
PMI Work by Lines /Thudiyalur wing
230KV OKM-Anaikadavu Breaker ,CTs and(with 89L Line switch) entire line
Monthly Maintenance Work
110KV KAYATHAR-TALAYUTHU EXPRESS FEEDER ENTIRE LINE
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION
on 110 KV Thalaiyuthu - Kayathar Express # breaker with CT and GRT Testing
a) For monthly maintenance workb) For annual relay testing by GRT
230 KV PGCIL - Arasur Link 2 feeder Breaker, CTs and line entire
Monthly maintenance works.
Quarterly maintenance work and Lines work
For attending quarterly maintenance and lines work
For attending quarterly maintenance and line work
For attending quarterly maintenance and lines work
110 KV I.G.Kottai feeder
100MVA AUTO TR NO.1
On 230KV Bus Section II
For attending quarterly maintenance and lines works
GENERAL MAINTENANCE WORK
50 MVA Power Transformer-1 & 33 KV Tollgate feeder one by one.
For Routine Maintenance Works.
1)Monthly maintenance work 2)New 230KV bay Dropper erection &stability Testing works by AE/SS/Erection /Tirunelveli
230/33kv Power Tr1, HV and LV breaker
Monthly maintenance work
UNIT NO.1
230 KV Northern Bus
230 KV Korattur-SPR feeder
110 KV SPDR/Mosur-II Feeder entire
Monthly Maintenance work
400/ 230 KV, 315 MVA Auto-Transformer-I entire(OCC)
For Monthly maintenance works
110KV PYKARA - BHAVANI BARRIAGE 1# (ENTIRE LINE)
FOR MONTHLY MAINTENANCE WORK
87GT ABB RELAY COMMISSIONING WORK, MAIN EXCITER ARMATURE TURNING WORK & MONTHLY MAINTENANCE WORK
For attending oil leak in Bus PT - 2.
Jumper replacement work at various location
230KV Transfer Bus Section
Unit II
UNIT 2
110 KV GC Breaker with CT,110 KV Bus PT-2,110 KV Bus coupler, 110 KV Bottom Bus entire & Eastern wing of 110 KV Top Bus
For Erection of New 110 KV Breaker & CTs in the new 110 KV Bay by GCC wing Coimbatore
1)For Monthly Maintenance work2)New 230KV bay Dropper erection &stability Testing works by AE/SS/Erection /Tirunelveli
For monthly maintenance work
MONTHLY MAINTENANCE WORK
110 KV Arasur - Karamadai 1 feeder Breaker & CTs
Monthly maintenance works
110 KV SRP-KKY # Br,CT & Line switch and Line section between SRP to KNNLR
Monthly Mainteanace work,Jumper tightness checking
MTPS.I TO ANTHIYUR 230KV FEEDER
MONTHLY MAINTENANCE
110 KV KARAIKUDI-VALUTHUR # SEC. BET. R.S.MANGALAM AND THIRUVADANAI (INCLUDING ANANDUR SPUR LINE)
LINE MAINTENANCE WORKS
110 KV Alagarkoil-Sempatty I feeder section between 110KV Sholavanthan SS and 110KV Samaynallur SS
For Tower to Tower inspection and Line Maintenance Work
110 KV Periyar - Theni feeder-1 Breaker with CT
Monthly Maintenance Work
230/110KV Auto Transformer- HV and LV Breaker
Filling SF6 gasin R- Phase Limp of H.V. Breaker
On 110KV TTN-ARNI-I feeder entire.
For Tower to Tower Inspection and rectification work.
110 KV SMPM-Kallakudi -I # CT's , Breakers and entire line portion (tied feeder)
Monthly Maintenance Works and Line Patrol Work.
110 KV PYKARA - SANDYNALLAH # (ENTIRE LINE)
FOR MONTHLY MAINTENANCE WORK
110 KV KAYATHAR-KODAYAR FEEDER SEC B/W VEERVANALLUR & KODAYAR
FOR LINE INSPECTION & RECTIFICATION WORK
110KV KAYATHAR-K.G.PATTI SEC B/W KALINGAPATTI&KARIVALAMVANTHANALLUR
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
110 KV PENNAGARAM FEEDER
230 KV Bus Coupler Breaker
230KV MTPS feeder Breaker CT and Line switch
Monthly Maintenance works.
230KV GOBI Feeder Breaker, CT and line switch
Monthly Maintenance works.
Monthly maintenance work.
MONTHLY MAINTENANCE WORK
Auto Transformer-III HV, LV Breaker and CTs
FOR MONTHLY MAINTENANCE WORK
1).110 KV Sembatty - Alagarkoil -1 # Line LC in Section between Sholavandan and Samayanallur SS.
Flashed over Disc replacement works at Loc 39 Top Phase, Tree Cutting and T-T Inspection works
110 KV Kadayanallur # Breaker with CT & Isolators
For Monthly Maintenance Work
Half yearly Mtce work
400/230KV ICT-I
110KV Singarapet #I
Cancellation of p ID no 60728 applied for 230KV Gobi feeder
Cancellation of the LC already applied vide ID no 60728 for 04.09.17
230KV ALR-UDT FEEDER CB,CT AND LINE ENTIRE
Monthly Maintenance Works
Monthly Maintenance Work
230 KV Neyveli TS 1 - Eachangadu feeder( Between TSI and 230 Kv Eachangadu SS)
LC has been requested in the existing 230 KV SC line of Neyveli TS-I to Eachangadu feeder from Loc.No 16 to Loc. 134 for replacing the existing balance aged Kundha conductors by Zebra conductors.
100MVA Auto Transformer-HV-I, LV-I Breakers and their CTs
Monthly Maintenance works
on 110 KV Kayathar - Papanasam # breaker with CT only
For monthly maintenance work
110KV Thiruvarur - Narimanam I feeder
Line Premansoon Inspection and rectification work, Breaker, CTs & isolator maintenance work
110 KV Thanjavur - Alundur feeder, breaker, CT & LI(Line portion between Thanjavur 230 KV SS & Thuvakudi 110 KV SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For rectification works by the AEE/Lines/Thanjavur3) For annual relay testing works by the AEE/P&C/Thanjavur
110 KV Capacitor bank II Breaker CTs, Capacitor side Isolator, LAS
For Monthly Maintenance work
110KV Capacitor Bank I entire
110KV Palladam - Sipcot II # section between Uthukuli to Periyandi palayam SS
Work taken by TLC wing perundurai for line crossing work on new 230KV Ingur - PGCIL # in between the location of 236-237 existing 110KV Palladam Sipcot II # SC line on DC tower
100 MVA AUTO TR. II, HV-II and LV-II Breaker with CT only.
For Monthly Maintenance Work.
MONTHLY MAINTENANCE WORKS
110KV Ingur - Ponnapuram II feeder
DP pole welding work at loc no: 346/1 & 2 work taken by Ingur lines section
110KV PNPM-INGUR-II # S/B 110KV S/B 110KV RASIPALAYAM, KADAIYUR AND PALAYAKOTTAI SS.
Erection of 1 No. KCR+3m tower with square cross arm & releasing, lowering and restringing of 3 Nos. panther conductor thro the newly erected tower ie. between existing Loc 174 & 176 for making LILO of Ingur – Ponnapuram I feeder at Rasipalayam 400 KV SS. FROM 04.09.17 TO 06.09.17 DAILY FROM 09.00HRS TO 18.00HRS
110 KV TNPL feeder breaker, CT & Line switch only
Monthly Maintenance work at Pugalur 230KV SS end & Strengthening of switch yard structural, replacing of supporting/shackle insulators, CT’s, PT’s and renovation of 110KV yard flooring by M/s. TNPL at TNPL end from 04.09.17/09.00 Hrs to 09.09.17/18.00 Hrs. The LC requested letter by M/s TNPL ltd is sent through mail.
110KV PNPM-INGUR-I #(PNPM-KURUKAATHI#) S/B 110KV DHARAPURAM AND KUNDADAM SS.
Replacement of Anti fog insulatorsFROM 04.09.17 TO 14.09.17 DAILY FROM 08 TO 17 HRS.
110KV Villupuram Link Auto #
230 KV NCTPS-ETPS feeder
110KVVillupuram Link Auto #
110KV MARUTHUR # S/B 110KV MARUTHUR AND POOLAVADY SS.
Replacement of Anti fog insulatorsFROM 04.09.17 TO 25.09.17 DAILY FROM 08 TO 17 HRS.
To carry out Breaker and CT’s Monthly Maintenance Work
Jumper Tightness work
Breaker , CT’s & Line Side isolator Maintenance Works.
230KV AND 110KV BUS SECTION BREAKERS AND IT'S CT'S ONLY.
FOR MONTHLY MAINTENANCE WORK AND 110KV CONTROL PANEL REARRANGEMENT WORK FOR SANKARI 110KV FEEDER NEW C & R PANELS ERRCTION WORK
110 KV Kadayanallur # Breaker with CT & Line Isolators
For monthly maintenance work.
110KV Kodikurchi-Kannarpatty feederSection between ( Keelapavoor-Keelaveeranam-Alangulam
Defective disc replacement work at location No. 8, & 15
110KV TTN - ARNI - I Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
110 KV Palladam -Palladam # Breaker,CTs and Line entire
To carryout monthly maintenance work by AEE/Maintenance/Palladam and Premonsoon inspection on line by AEE/lines /Palladam
110KV OKM-Udumalpet 2 feeder section between 110KV Mill Kovilpalayam SS to 110KV Kongalnagaram SS Line
PMI work carry out by Lines /Thudiyalur wing
110KV Kayathar Feeder
110 KV DPH-Auto ss feeder 1
Auto Transformer I
110KV Ponnapuram – Marudur feeder
For Monthly Maintenance.
Monthly maintenance of breaker CT& LS
on 110 KV Thalaiyuthu - Melakaloor # breaker with CT only
For monthly maintenance work
1.Monthly maintenance works.2.Annual Relay Testing work.
230 KV PGCIL - Arasur Link 1 feeder Breaker, CTs and line entire
Monthly maintenance works.
Monthly Maintenance work in Auto Transformer I
230/110 KV 50 MVA Auto Transformer - 1 & its allied equipments.
For Monthly maintenance work.
230 KV SV chatram - Nokia # entire
110 KV KKDI- AL.Koil # s/b KKDI - TPR
For disc replacement work
230 KV Nokia-Sunguvarchatram feeder breaker, CTs & Line isolators
For Quarterly maintenance work
110 KV KAVANOOR-VALINOKKAM-ARKAY # SEC. BET. KAVANOOR & VALINOKKAM
LINE MAINTENANCE WORKS&Monthly maintenance work
For Quarterly maintenance works
400KV Tie Breaker (408-52) for karaikudi & kamudhi feeder
Monthly Maintenance work
400KV Kamudhi feeder main breaker (409-52), Reactor Breaker (409-52R),Reactor & CT.
Monthly Maintenance work
230 KV BUS Coupler Breaker
AUTO I, HV I, LV I , 110 KV BUS I (NORTHERN SIDE ) UPTO 110 KV BUS COUPLER BREAKER, 110 KV T.NALLUR, 110 KV ADHANAKKOTTAI AND 110 KV ALANGUDY EID PARRY FEEDER BREAKER, CT , ISOLATORS AND 110 KV ADHANAKKOTTAI FEEDER LINE PORTION BETWEEN MALAIYUR TO VADAKADU 110 KV SS .
AUTO I,HV I, LV I, 110 KV FEEDER BREAKERS,CT,ISOLATORS AND EHT LINE MAINTENANCE WORKS 110 KV BUS I STRENGTHENING WORKS BY TRANSFORMER ERECTION WING TRICHY AND GRT TESTING WORKS.
110 KV SV Chatram - Kanchi # Entire
For Monthly Mtce. work
110 KV Kinnimangalam - PSQ-III feeder section b/w KMLM &TMGLM
For Tower to Tower inspection and Line maintenance Work
For Monthly Maintenance Work
Auto trf 1
230KV SMPM-TRICHY # Breaker & CT's , Line isolators and entire line portion.
Monthly Maintenance work, line Patrol work by AE/Lines/kallakudy.
110 KV DEVIYAKURICHI-I FEEDER/ CT,BREAKER.
MONTHLY MAINTENANCE
110 KV DEVIYAKURICHI-I FEEDER/ CT,BREAKER.
MONTHLY MAINTENANCE
110KV PYKARA - MOYAR 1# (ENTIRE LINE)
FOR MONTHLY MAINTENANCE WORK
For monthly maintenance works
230 KV Sunguvarchatram - Nokia feeder
Lines LC and Jumper tightness works
110KV ALKL-Sembatty I # Bkr with C.T,& Section betweenManickampatty and Alagarkoil
Monthly Mtce work&tree clearance work
110 KV Thiruporur feeder Quarterly Maintenance
Auto transformer III & LV III Breaker
To carry monthly maintenance work by AEE/MTC/230KV SS/SPT
230 KV Auto Transformer I , HV & LV Breaker with CT
FOR Monthly Mtc WORK
110KV KAYATHAR-SURULIYAR FEEDER SEC B/W MALAYANKULAM &VEERASIGAMANI
FOR DEFECTIVE DISC REPLACMENT WORK AT VARIOUS LOCATION
110KV SBT - RNPM I # Bkr, CTs and S/B SBT and Kannivadi SS
1. Monthly maintenance work2. Tree cutting work
230 KV S.P.Koil - Omega Feeder
230 KV S.P.Koil - Omega Feeder
230 KV S.P.Koil -Omega Feeder
230 KV S.P.KOIL - OMEGA FEEDER
Monthly Maintenance works & Line Maintenance work
230 KV GOBI- Pallakapalayam Feeder Breaker, CT’s and entire line
FOR MONTHLY MAINTENANCE WORK
Monthly Maintenance works & Line Maintenance work
110 KV Bhavani Sagar Feeder breaker, CTs with Entire line
FOR MONTHLY MAINTENANCE WORK
Monthly Maintenance Work & Line Maintenance Work
1).110 KV Pasumalai - Thullukkapatty # Breaker & CT, LI only. 2) Line LC in Section between Pasumalai - Soolakarai SS.
1) Monthly Maintenance Works of BKR & CT,LI 2) Tree cutting works and T-T Inspection works 3) Flashed over Disc replacement at Loc 22 Top Phase in Aviyur Spur Line
Monthly Maintenance work & Line Maintenance work
400 KV NCTPS FEEDER
230 KV S.P.KOIL -OMEGA FEEDER
230 KV Amuthapuram I # Breaker with CT & Isolators
For Monthly Maintenance Work
For ART testing and maintenance works.
Monthly maintenance works & Line Maintenance Work
400/230 KV ICT 1 MAIN, TIE BREAKERS WITH CT AND TRANSFORMER BAY NOS 404, 405
For Monthly Maintenance Work
On 110 KV Kayathar - Eppodumvendran # breaker with CT and entire line
a) For Monthly Maintenance workb) Tower to Tower inspection work
230 KV Karuvalur -Karamadai # Breaker,CTs LAS and its lines switch
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam.
230 TBC/BC BREAKER, CTs and B Bus side switch of 230KV Karamadai # (201-89B)
For Monthly maintenance work of Bus transfer Switch
110 KV Nambiyur Breaker, CTs with Line switch
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam.
230KV S.P.KOIL-OMEGA FEEDER FOR QUARTERLY MTCE AND LINE MTCE WORK
110KV KNMLM - PASUMALAI III (THIRUMANGALAM)
Monthly maintenance works for breaker and CT
110KV Neyveli –Villupuram II feeder (section between Neyveli to Arasur )
To Check jumper tightness at various locations
230KV Unjanai - KRT # at both endsBkr & its CTs
Monthly maintenance Works
Power transformer I Breaker and Isolators.
Monthly maintenance and P&C check.
110KV TJR-LINK-I&IIFeeder and 110KV TJR-TJR Feeder its line isolators
110kv Bus maintenance work and Earth resistance measurement work
110KV TJR-LINK-I&IIFeeder and 110KV TJR-TVR Feeder its line isolators
110kv Bus maintenance work and Earth resistance measurement work
110KV Kadalangudy- Mayiladuthurai feeder entire
1)Line inspection and rectification work. 2)Maintenance work
230KV Auto transformer I; HV-I; LV-I;
1)Maintenance work 2)Relay testing work.
110KV Kadalangudy- Mayiladuthurai feeder entire
1)Line inspection and rectification work 2)maintenance work 2)Relay testing work at KGDY end.
110KV Ingur feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
230KV Unjanai# Bkr,CT& Line Switch
Monthly Maintenance work and Relay Replacement work by P&C/Salem
230KV Gobi# CT,Breaker and Switches
Monthly maintenance work
110 KV Ingur - SIPCOT 2 # entire
100 MVA Auto Transformers-1 & 2, HV- 1 & 2, LV- 1 & 2 Breakers & CTs. (one by one)
Monthly maintenance works by the AEE/Mtce/Thanjavur
110 KV Thanjavur Link - 1 & 2 feeders, breakers, CTs & LIs (one after another)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For rectification work in Thanjavur Link-1 feeder by the AEE/Lines/Thanjavur,3) For annual relay testing works by the AEE/P&C/Thanjavur.
Work taken by TLC wing perundurai for line crossing work on new 230KV Ingur - PGCIL # in between the location of 11-12 of Ingur 230KVSS – Sipcot II feeder
110 KV Bus at Bhavanisagar 110 KV SS
Annual Relay Test on Busbar protection Relay by Grd wing
110KV APKM - NSPM feeder Breaker and CT at both ends and line entire.
(a) For Monthly Maintenance Work. (b) For replacement of flash over disk in loc No. 252 ( c) For Monthly Maintenance Work at NSPM SS.
110 KV Thulukkapatti - Pasumalai feeder Section between Pasumalai - Soolakarai SS.
For replacement of flash over disk in loc No. 170
110 KV SWTP feeder breaker and CT
Monthly maintenance work.
110 KV Thiruvalam – Karnambut feeder entire.
For EHT line maintenance work
230 KV Trichy – Samayapuram feeder Breaker,CTs , Line Isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
110 KV Pugalur - Elumathur feeder Breaker, CTs ,Line switch
Monthly maintenance works .
1)110 KV Pugalur - Karur Radial feeder Breaker, CTs, 2) Line section between 230KV Pugalur and 110KV Veepampalayam SS in 110KV Karur feeder
Monthly Maintenance work. Pre monsoon and jumper tightness work.
110KV BUS A&B 110 KV BUS A&B LOOPING WORKS.110 KV GC SF6 BREAKER SWITCH PROVISION WORKS.
110KV Villupuram – Maduapakkam – II # (section between Vikravandi -Thiruchitrambalam) And110 KV Villupuram - Madurapakkam I # (between MadurapakkaM & Rajashree Cogen)
To carry out Breaker and CT’s Monthly Maintenance Work And1.)For inspection of jumper joints at various locations in the line between Madurapakkam and Vanur SS ( AEE/Lines/Vpm)2.)For stringing of 230 KV Cuddalore - Veerapuram line across the 110 KV Villupuram - Madurapakkam I & II feeders between loc. No. 54 & 55 by AEE / TLC / Cuddalore
i) On Auto Transformer –III, HV-III, LV-III Breaker and CT’s, ii)On 110KV Karnambut Feeder Breaker and CT’s
i) For Auto Transformer –III, HV-III, LV-III, Breaker and CT’s, monthly maintenance workii) For 110kv Karnambut Feeder Breaker and CT’s, monthly maintenance work
230 KV NCTPS-ETPS feeder
110KV Villupuram- Neyveli- I #
230KV KR Thoppur – Unjanai feeder
Jumper Point checking work
Jumper Tightness work
Breaker CTs & Line side isolator maintenance works.
110KV Pudhansanthai – K.N.Patty # line portion between K.N.Patty SS and Rasipuram SS
Flashed over disc insulator replacement work
110KV Namagiripet feeder CB, CTs and Line Switch.
For monthly maintenance works.
1.1. UNJANAI - SALEM 400KVSS 230KV FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK AND GRT ANNUAL RELAY TESTING WORK
1. 110KV UNJANAI - SANKARI FEEDER BREAKER & CT;S ONLY.
FOR REPLACING OF NEW ONE CONTROL AND RELAY PANELS IN SANKARI 110KV FEEDER
110 KV Puthanchandai-Namagripet Feeder
Jumper tightness work
110 KV Kadalangudi - Aduthurai - Neyveli feeder (Line portion between 110KV Srimushnan SS & 110KV Pappakudi SS)
For Disc replacement in Loc.No. 243 B-phase & tree cutting works carried out by AEE/Lines/Thanjavur.
230 KV KPH3 #
BHAVANISAGAR MICRO PH - BHAVANISAGAR 110 KV SS FEEDER, ENTIRE LINE
For replacement of defective R phase Wavetrap in 110 KV Micro - Bhavanisagar 110 KV SS Feeder, Micro end
230 KV Amuthapuram I # Breaker with CT & Line Isolators
For monthly maintenance work.
For Monthly Maintenance Work
For Monthly Maintenance Work
110 KV Capacitor bank I & II Breaker with CTs
For Monthly maintenance works
110KV OKM-Thudiyalur-2 feeder Breaker,CT's only
Monthly maintenance work
Monthly maintenance work
230 KV PH3 to PH4 Feeder
110KV SEMPATTY FEEDER BREAKER AND LINE SECTION BETWEEN UDT & ELAYAMUTHUR SS
Monthly Maintenance
230KV Amuthapuram-Kodikurichi-1 # with breakers,CT's and its isolators
Monthly Maintenance Work
230KV Myvadi-Kadamparai-I feeder Breaker,CT Line entire.
For Monthly Maintenance and PMI by lines wing
For monthly maintenance work
230KV Sriperumbudur-Tharamani #
Insulator and jumper replacement work
110KV Arani-Kanchipuram feeder,110KV Breaker,CT's & Line side Isolator.
For monthly maintenance work.
230KV Perambalur-TAQA feeder breaker CT's wave trap & Line Isolater.
For monthly maintenance maintenance work.
230/110KV AutoTransformer-I HV&LV Breaker CTS&Lineswitches.
For monthly maintenance Work
230kv MTPS.I TO INGUR # at BE
110 KV UDT –Link – I #rs breaker, CT’s and Entire line
Monthly Maintenance Work
110 KV UDT –Link –III #rs breaker, CT’s and Entire line
Monthly Maintenance Work
230/110 KV Auto Transformer - IV, HV IV, LV IV breakers, it's CTs and LAS
Monthly maintenance works and REF enabling works by P & C wing / CBE
110 KV Arasur - Thingalur feeder Breaker & CTs
Monthly maintenance works and Tan delta measuremet of CTs by P & C wing/ CBE
110 KV SRP-NGL # Breaker, CT & line switch and Line entire
Monthly Mainteanace work,Jumper tightness checking
MONTHLY MAINTENANCE
315 MVA, 400/230KV, ICT III
230 KV KKDI - VLDR #
110 KV BPH 2 - BPH1 # at BPH 2
For Monthly maintenance work of ICT 3 HV/LV Breakers, CTs & LAS
For disc replacement work
The monthly maintenance works in feeder equipment and its Line side isolator and Earth switch.
110 KV KAVANOOR-MMDU-SVGA # SEC. BET. KAVANOOR & MANAMADURAI
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
POWER TRANSFORMER-IV, HV.BREAKER-IV, LV.BREAKER-IV & 33KV MICON-VII, VESTES-I&II FEEDERS
FOR QUARTERLY & MONTHLY MAINTENANCE WORKS
230KV Tie Breaker & Isolator.
110KV ALKL-Sembatty 2# Br,CT
230 KV Checkanurani - Kayathar I feeder entire
For Monthly Maintenance Work,Line Maintenance Work and &P&C Work
For Monthly Maintenance work
110 KV Ingur I # Breaker, CTs & line upto Selampalayam SS
For monthly maintenance works & Annual testing by P&C Wing
for monthly maintenance work
230KV SNPT - Vinnamangalam # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
230KV Bus Coupler Breaker at Anthiyur 230
Monthly Maintenance works.
400 KV Paalavadi to Thiruvalam I feeder
Monthly maintenance work.
110KV MELAKALLUR-SANKANERI FEEDER SEC B/W M.KALLUR & KARISALPATTI.
FOR DEFECTIVE DISC REPLACEMENT WORK
400 KV HV-II breaker
110 KV Theni - SEMPATTY I & II # Breaker with CT One by one
MonthLY MTC, Tree cutting work
230 KV Singarapet feeder breaker, CT’s & line isolators
For attending monthly maintenance works and for jumper tightness checking works in cut point towers of 230 KV VNM – Singarapet #.
400 KV Paalavadi to Thiruvalam I feeder
Monthly maintenance work.
For Quarterly maintenance works
Tree cutting works
230KV Transfer Bus Entire
110KV Pasumalai - Sakthi Sugars # Line LC in the Section between Natarmangalam and Arasanoor
For Maintenance work in the Transfer Bus Isolator(789C) of Power Transformer-4. Already LC has been applied on Power Transformer-4 on the same day vide:ID No:60546.
Anual Mtce work
1)110 KV Pasumalai - Sembatty Feeder Line LC section between Pasumalai SS and Achampathu SS
Replacement of existing 110KV SC Line with leopard conductor by 110KV SC line on DC tower with panther conductor a) To dismantle the existing Towers and erection of New Towers at Loc 167 and 168 and stringing between Loc No 166 and 169 under improvement b) Erection of DP between Loc no 185 and 186 c) Dismantling of existing towers and erection of 2 Nos Towers in either side of proposed railways track at Loc No 186 and 187 under DCW as requested by southern railways.
230KV ALR-KDH FEEDER CB,CT AND LINE ENTIRE
Auto-I,230KV shoolagiri-Hosur#,110KV Bagalur# and breakers ,CTs,all other equipments.
monthly maintenance work and line clearance work
230KV Thiruvalam - S.P.Kovil #
AUTO TRANSFORMER I
Preventive Maintenance Work
1)230/110kv Auto Transfomer II HV,LV breaker and CT2)110kv RNPM-SBT I # breaker,CT and Relay
1)monthly maintenance2)Relay test
110 KV Neyveli – Villupuram Feeder – I (section between Oraiyur SS to Neyveli)
At Loc.129 (T) Top phase Jumper arc and Pin corrosionAt Loc 113,114 & 116 Pin CorrosionAt Loc 84 & 85Flashed over Insulator to be replaced.At Loc 61(S) Bottom phase 2 nos broken disc to be changed to healthy one.
Monthly maintenance work
230KV TSII- Ulundhurpettai
110KV Bus-A at KRT
100MVA Auto transformer II
To Check jumper tightness at various locations
230KV MTPS I – Ingur feeder entire
Jumper tightness checking at T.LOC No:524 & 525 River Crossing Towers in 230KVSS MTPS I- Ingur feeder
On 230 KV Kayathar - Checkanurani I #, breaker with CT, Lines inspection and GRT Works
a) For monthly maintenance workb) Tower to Tower inspection workc) Relay replacement, and breaker testing works by GRT
Monthly Maintenance Works
Monthly Maintenance Work
Auto Transformer I
230 KV MTPS I – Ingur feeder entire
Jumper tightness checking at T.LOC No:524 & 525 River Crossing Towers in 230KVSS MTPS I- Ingur feeder
on 110 KV Melakallur - Sanganeri # breaker with CT only
For monthly Maintenance work
230KV Kadalangudy- PPN II feeder entire
1)Line inspection and rectification work 2)Preventive maintenance work at PPN Plant end.
on 110 KV Kayathar - N.S.Puram #, breaker with CT only
For monthly Maintenance work
HV I, LV I and CTs maintenance work
110 KV NT Kudi I feeder (Line portion between T(K)GTPS and 110 KV Thirumakkottai SS)
(1)For Breaker,Isolators, CTs, and CVTs maintenance works (2) Breaker testing works by MRT
110 KV Capacitor bank I Breaker CTs, Capacitor side Isolator, LAS
For Monthly Maintenance work
230KV Alundur -Trichy I feeder breaker, CT'S, CVT'S and line isolators.
a) Preventive Monthly maintenance work. b)premonsoon inspection and tree cutting work. C) Relay Testing Work.
110KV Thingalore # Breaker, CT’s by Ingur maintenance wing
MONTHLY MAINTENANCE WORKS
110 KV APKM - RJPM - I feeder Br., CT. and Line switch only.
For Monthly Maintenance Work.
110 KV NNPT - Reddiapatty feeder section between 110 KV Reddiapatti SS and 110 Kv SIVAKASI ESI SS
Earth wire cut rectification work at LOC.No. 4 to 6
110kV ARNI #II ENTIRE LINES and Breaker , CT's only
For monthly mtc work
110 KV Thulukkapatty- MCL # Br. CT. and line switch only
For Monthly Maintenance Work.
100 MVA Auto Transformer-1.
110 KV Capacitor Bank I breaker, CT and its cells
Monthly maintenance work.
110KV Arni#II Breakers & CT's also Entire line
for monthly mtc work.
230KV Thiruvalam – S.P.Koil feeder entire
For replacement of aged disc at loc 69.
For Routine Maintenance Works.
110KV PALLUR FEEDER BREAKERS&CT'S ONLY
For monthly maintanance work
AUTO TRANSFORMER-1,HV1,LV Breakers With CT'S
For monthly maintenance work
110KV PNPM-INGUR-I #(PNPM-KURUKAATHI#) S/B 110KV KUNDADAM AND UTHYIR SS.
Releasing, lowering and restringing of 3 Nos. panther conductor between existing Loc 174 to newly erected KCR and existing Loc 175 & stringing of 110 KV DC line between Tapping Loc 1 & Loc 2 of proposed 110 KV DC line for making LILO of Ingur – Ponnapuram I feeder at Rasipalayam 400 KV SS.
230 KV TRICHY - ALUNDUR I Feeder breaker,CTs, Line isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
110KV Pugalur - Puliyur Feeder Breaker, CTs
Monthly Maintenance Work.
230 KV Pugalur - Paramathy I feeder Breaker, CT & line switch& entire line only.
Monthly Maintenance work.
230KV Bus Coupler
110KV Kabilarmalai Radial feeder Breaker,CTs
Monthly Maintenance work.
To carry out Breaker and CT’s Monthly Maintenance Work.
110 KV Ulundurpet - Thiyagadurgam #
For tightening of loose jumpers in the Ulundurpet - Thiyagadurgam line and providing of arcing horns in the 110 KV Nagalur LILO.
110KV Pudhansanthai – K.N.Patty # line portion between K.N.Patty SS and Rasipuram SS
Flashed over disc insulator replacement work
110KV Bus Coupler CB and CTs ONLY.110KV Rasipuram CB, CTs and Line Switch.110KV Namakkal feeder CTs ONLY.110KV Valayapatty feeder CTs ONLY.
For monthly maintenance works and replacement of 110KV High Tan Delta LAMCO CTs-3 Nos. in BC, 2 Nos. in Rasipuram feeder.1 No. in 110KV Namakkal feeder & 2 Nos. in 110KV Valayapatty feeder.
Ulundurpet 230/110KV Autotransformer
Total shutdown monthly maintenance work.
110KV CAPACITOR BANK NO I BREAKER, CELLS AND BANKSIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK
110KV CB-II BREAKER, CT;S AND BANKSIDE ISOLATOR ONLY.
FOR MONTHLY MAINTENANCE WORK
230KV Valuthur - Karaikudi feeder entire
MACHINE-1 GENERATOR & ALL ITS AUXILIARIES
FOR MONTHLY MAINTENANCE
230KV Veeranam -Abisekapatty feeder
Defective jumper bolt rectification work at location No.56,65,70 &73 and Tree clearance work .
110 Kv Kurukathi - Ponnaouram # Sec. Uthiyur ss to Kundadam ss
Making LILO of Ingur - Ponnapuram # at 400 Kv Rasi Palayam Ss by TLC Perundurai
230 KV TDLR - OKM # at both ends 1. For PMI works by AE Lines CBE2. For monthly maintenance works by AE/MTC/TDLR3. For Numarical Relay replacement works by GRT wing CBE
230KV OKM-Thudiyalur feeder Breaker,CT's and(With 89M1,89M2&89L Isolators) entire line
Monthly maintenance works,PMI Work & Polluted disc replacement carry out by lines/Thudiyalur wing
110 kV Common bus L.C due to commissioning of New 110 kV CVT and 110 kV CC
For carrying out the jumper connection works from 110 kV line and commissioning of New 110 kV CVT and 110 kV CC in 110 kV BPH-1 to BPH-2 feeder at LMBPH-1/ Chekkanur end by AEE/P& C/Mettur Dam
On 230KV Transfer Bus entire
16MVA Pr.Tr.I Monthly maintenane work
110 kV Common bus L.C due to commissioning of New 110 kV CVT and 110 kV CC
For carrying out the jumper connection works from 110 kV line and commissioning of New 110 kV CVT and 110 kV CC in 110 kV BPH-1 to BPH-2 feeder at LMBPH-1/ Chekkanur end by AEE/P& C/Mettur Dam
110 KV UDUMALPET LINK III FEEDER BREAKER AND LINE ENTIRE
For Monthly Maintenance
110 KV UDUMALPET LINK I FEEDER BREAKER AND LINE ENTIRE
For Monthly Maintenance
For providing Jumper from the existing Transfer Bus to New Bay for 2 Nos Kayathar 400KV SS and for stability Test.
110KV MAMBAKKAM FEEDER Maintenance work
110 KV Tidel park SS Maintenance
230KV Sriperumbudur-Tharamani #
Insulator and jumper replacement work
Auto Transformer III
Monthly Maintenance
230/110 KV 100 MVA Auto Transformer - II
For attending Monthly Maintenance Work by JE / Mtce / 230 /110 KV GIS SS Mylapore
110KV Pudhansandai feeder CB, CTs and Line Switch.110KV West Bus, its PTs and West Bus side Switches-5 Nos.
For monthly maintenance works.
110KV BPH1-BPH2 Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
Monthly maintenance work in 110KV BPH1-BPH2 Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
230 KV – TAQA – Perambalur Line
Checking of jumper Tightness at Railway crossing locations and replacement of flashover insulators at various locations.
Machine 1
230KV THIRUVARUR-KADALANGUDI #
Erection of tower at loc.92 and stringing of 230KV DC Line between Loc.91&92(LILO Portion) in 230KV LILO OF Thiruvarur-Kadalangudi 230KV SC line at Kumbakonam 230KV SS
110KV SBT - Alagarkovil II # Bkr and CTs only
Monthly maintenance work
Monthly Maintenance.
230/110 KV Auto Transformer - II, HV II, LV II breakers, it's CTs and LAS
Monthly maintenance works and REF enabling works by P & C wing / CBE
230 KV SRP-SNRI # Br ,CT & Line switch and Line entire
Monthly Mainteanace work,Tree clearance work,Annual Relay testing work
1.110Kv CBE - Peelamedu # Breaker & CTs. 2. Auto Transformer II, 3. HV II Breaker& CTs. 4. LV II Breaker & CTs and LAS
1. Monthly Maintenance Works 2.P&C wing testing works .
230 kv KKDI - PGCIL - 2 # Entire
230KV CKNI-Theni # Entire
a) For Brk and Cts mtc work.b) Tower to Tower inspection work.c) Annual relay test.
230 KV Sunguvarchatram - Oragadam feeder entire
For Quarterly maintenance works
230KV ORAGADAM - SUNGUVARCHATRAM FEEDER
For Quarterly maintenance works
230KV Oragadam - Singaperumalkovil feeder
For Monthly maintenance works
400KV karaikudi feeder main breaker (407-52), Reactor Breaker (407-52R),Reactor & CT.
Monthly Maintenance work
230 KV Sankaneri- S.R.PUTHOOR # BREAKER CT and Line siwcthes
D - switch isolator rectification work
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
110KV Arani - Singarapet-I Feeder Breaker,CT's and Line Isolator
For Monthly maintenance work.
On 230KV TTPS-Auto-I feeder entire
For Tower to Tower Inspection and Rectification work.
100 MVA Auto Transformer-I, HV-I, LV-I, Breakers , CT's, and isolators
Monthly Maintenance Work
110 kV Common bus L.C due to commissioning of New 110 kV CVT and 110 kV CC
For carrying out the jumper connection works from 110 kV line and commissioning of New 110 kV CVT and 110 kV CC in 110 kV BPH-1 to BPH-2 feeder at LMBPH-1/ Chekkanur end by AEE/P& C/Mettur Dam
230KV PH4-THUDIYALUR # For PMI Work
230KV KPH4-THUDIYALUR# For PMI Work
110KV ALKL-KKDI # Bkr with C.T
110 KV SALEM -II FEEDER/ CT,BREAKER.
MONTHLY MAINTENANCE
AUTO-II ,HV-II,LV-II Breaker and Its CTs
For monthly maintenance works
for monthly maintenance work
Tree cutting work
230 KV Salem - SNPT # at Both ends
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
110KV KAYATHAR-PAPANASAM FEEDER SEC B/W KAYATHAR&RASTHA
LINE INSPECTION & RECTIFICATION WORK
230 KV Theni-Chekkanurani # Br., C.T and line Isolator
For line mtc works & attending premonsoon remarks
110KV RNPM I # S/B Kannivadi and Reddiyarchatram SS
100 MVA AUTO - I, HVB - I, LVB - I , CT only.
Monthly Maintenance Works
110 KV Anthiyur Feeder breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
1)110KV Pasumalai - Sakthi Sugars # Section between Pasumalai and Uranganpatty 2 )Line LC
1) Maintenance Works of BKR & CT, LI only. 2) Tree Cutting and Tower to Tower Inspection works .
On 230 KV Kayathar - Veeranam # breaker with CT, Lines Inspection and GRT testing works
a) Monthly Maintenance workb) Tower to Tower Inspection workc)GRT annual relay and breaker testing works
230KV SPKOIL-ORAGADAM FEEDER BREAKER,CT AND ISOLATORS
Monthly maintenance works and line maintenance works
110KV KNMLM -THENI I
110kv RNPM-Kovilur # breaker and CT (section Between RNPM and Kovilur SS)
1)monthly maintenance2)GRT Relay testing work
Monthly maintenance works for breaker and CT
110 KV Bus Section Breaker and CT's only
Monthly maintenance work
The 110KV Cuddalore – LANCO # breaker with CT’s line side isolator
For monthly maintenance works
230KV Pallakapalayam - KRT # at both ends
Monthly Maintenance Works
110KV Siruvachur Feeder breaker CT's only
For monthly maintenance work
on 110 KV Thalaiyuthu - Gangaikondan Kytr # breaker with CT onyl
For monthly maintenance work
110KV Kadalangudy- Vaitheeswarankoil feeder entire
1)Line inspection and rectification work 2)Maintenance work 3)Annual Relay testing work at V.Koil SS end
230KV Singarapet Feeder and 110KV Capacitor Bank-I & II Breakers, CTs, Line Isolators and Capacitors.
monthly Maintenance
110 KV Kariamangalam - Ramiyanahally # entire
Maintenance wing Carryout Monthly Maintenance works by Maintenance wing and Lines wing programmed to replacement of Mid span joint at Loc No: 59-60.
230KV Thiruvarur - Nemmeli Thippiyakudy feeder
Line Premansoon Inspection and Rectification work, Breaker, CTs and Line side Isolator maintenance work
110Kv Erode - Thingalur # I at both ends
Monthly maintenance works.
230KV NCTPS feeder only
230KV Ingur - MTPS #
230KV Pallakapalayam # Bkr,CT & Line Switch
Monthly Maintenance work and Relay Replacement work by P&C/Salem
A)230KV NEMMELI THIPPIYAKUDI-THIRUVARUR FEEDER BREAKER, CT's AND LINE ISOLATOR. B)230KV NEMMELI THIPPIYAKUDI-THIRUVARUR FEEDER ENTIRE
A)FOR MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ NEMMELI THIPPIYAKUDI. B)FOR PREMONSOON RECTIFICATION WORK BY AE/LINES /PATTUKKOTTAI.
230KV K.R.Thoppur # CT , Breaker and Switches
Monthly maintenance and defective earth switch rectification work
Routine maintenance work
jumber tightness work & maintenance work taken by Ingur lines section
110KV Alundur - Trichy-I Feeder breaker,CT's, and Line Isolators.
a) Preventive Monthly maintenance work. b) Premonsoon inspection and Tree cutting work. c)Relay testing work.
230KV MTPS # Breaker, CT’s and Line side Isolator and 230 KV Auxillary Bus switch by Maintenance wing Ingur 230 KV SS
MONTHLY MAINTENANCE WORKS & RCC STRUCTURE RENOVATION WORKS FOR 5 DAYS
110 APKM - T. Kallupatti # Br., CT. and line switch only.
Monthly Maintenance Works of BKR & CT, Line switch only.
110 KV Thingalur I feeder breaker,CT and line side between Erode SS and Thingalur 230 KV SS
Conducting Annual relay test by AEE/P&C - I/Erode and attending of Hot Spots noticed in Thermo vision camera.
Auto Tr- III, HV III, LV III Br. And Strung bus from 2-89B isolator switch to southern side end
Replacement of southern side strung bus, bus bar and 2 Nos. isolators. (Bus coupler 2 - 89 B & 7 - 89) Note: Actual LC From 14 hrs on 07.09.17 to 9 hrs. on 11.09.17
The 110kv Mosur Link I,& Mosur Link II Feeder Breaker and CT'S
For monthly maintenance work
230KV Salem -Singarapet feeder
110KV TRICHY - ALUNDUR I Feeder breaker, CTs and line isolators and line entire
a) For monthly maintenance works. b) Pre monsoon inspection
110KV Pugalur-Link feeder Breaker,CTs,Line switch and line entire
For Monthly maintenance work and Earth wire restringing work.
110KV Villupuram – Acharapakkam – II #
To carry out Breaker and CT’s Monthly Maintenance Work.
Jumper point checking work
110KV Villupuram- Neyveli- II #
230/110Kv AUTO TRANSFORMER-I
Breaker CTs & Line side isolator maintenance works.
230KV MOSUR feeder Breaker, CTs and line isolator.
Routine Maintenance work
For Routine maintenance work
110KV Namakkal feeder CB, CTs and Line Switch.110KV Valayapatty feeder CB, CTs & Line Switch.
For replacement of 110KV Lamco High Tan Delta CTs and monthly maintenance works.
110 KV Deviakurichi-Singapuram-11 Feeder (Section between Attur ss - P.G.Palayam ss )
Jumper tightness work
230Kv Veeranam-Kayathar feeder CT With line switch
For Quarterly and Monthly Maintenance Work.
On 230 /110 KV Auto-II, HV-II and LV-II breakers with CTs and LAS only.
For monthly maintenance work.
230KV TTN - TTPS - I feeder breaker with CT bus & Line side switches
For Monthly Maintenance Works
230 KV Palladam - Kurukathi # at Both ends
To carryout monthly maintenance work by AEE/Maintenance/Palladam and line maintenance work by AEE/Lines/Palladam
230/110 KV Auto Transformer - III with HV 230 KV Breaker and LV 110 KV Breaker & CTs
1. For Monthly maintenance works by AE/MTC/TDLR2. For REF relay testing works by P&C wing /CBE
110KV OKM-R.S.Puram-2 feeder Breaker,CT's only
Monthly Maintenance work
230 Kv Kurukathi - Palladam # at Both ends
For monthly maintenance work of Breaker,CTs and Line side Isolator.
On 230KV Main Bus entire
Auto Transformer I
AUTO TRANSFORMER I,HV I & LV I COMPLETE
For Monthly Maintenance
Auto Transformer I with Hv, Lv Breaker,CTs and LAS
For monthly maintenance work of Auto, Breaker & CTs
230KV Myvadi-Kadamparai-II feeder Breaker,CT Line entire.
For Monthly Maintenance and PMI by lines wing
For providing Jumper from the existing Main Bus to New Bay for 2 Nos Kayathar 400KV SS and for stability Test.
230 KV PH-IV Feeder Breaker with CTs
For monthly maintenance works
HV I, LV I and CTs maintenance work
230KV Amuthapuram II # Breaker with CT & Isolators
230 KV Amuthapuram I # Breaker
Auto Transformer II
230 KV Amuthapuram II # Breaker with CT & Line Isolators
For Monthly Maintenance Work.
230KV Amuthapuram-kodikurichi-2 # with breakers,CT's and its isolators
Monthly maintenance work
110 KV UDT –Link – II #r breaker, CT’s and Entire line
Monthly Maintenance Work
Monthly Maintenace work in Auto Transformer II
110 KV Arasur - Palladam feeder Breaker & CTs and line section between 110 KV Kaniyur SS, 110 KV Ichipatty SS and 110 KV Palladam SS
Monthly maintenance works and PMI works in the line by lines wing/Palladam
230 KV BUS I
230 KV A Bus entire
230 KV isolator no 45 alignment work
230Kv CBE-OKM # CB, CT and line entire
1. Polluted disc replacement works by AE/Lines/CBE. 2. Monthly maintenance Works.
MTPS.I TO SALEM 400KV SS.II FEEDER
MONTHLY MAINTENANCE
110 KV PERIYAR - THENI -2 FEEDER Breaker with CT
Monthly Maintenance Work.
230 KV Kinnimangalam - TTPS feeder entire
For Line Maintenance Work
230 Sankaneri - Kayathar # breaker CTs and Line Swiches
Monthly maintenance
110KV Arani-Singarapet-II feeder 110KV Breaker,CT's & Line Isolator.
For Monthly Maintenance work.
For monthly maintenance works
On 230 KV TTPS- kinnemangalam - feeder entire.
For Tower to Tower Inspection and Rectification work.
110KV Arani-Thayanur #,110KV Breaker,CT's & Line Isolator.
For monthly maintenance work.
110KV Samayapuram - Trichy Grid feeder breaker, CT's and line portion between 230KV Thatchankurichy SS and 110KV Poovalur SS.
For Monthly Maintenance work and premansoon EHT line inspection work.
230KV TTPS-KINNIMANGALAM FEEDER ENTIRE
For monthly maintenance work
110 KV Northern Bus Entire
230KV Bus coupler breaker only
230 KV S.P.KOIL FEEDER
For Monthly Mtc
For monthly maintenance works
for monthly maintenance work
230KV GOBI Feeder Breaker, CT and line switch
Monthly Maintenance works.
Monthly maintenance
110 kv MCL-1 & II Feeder BREAKER , CT'S one by one
MONTHLY MAINTENANCE WORK
1. 110KV SBT - Theni I # Bkr, CTs only2. 110KV SBT - Theni II # Bkr, CTs and relays
1. Monthly maintenance work2. Tree cutting work
230 KV Auto Transformer II , HV & LV Breaker with CT
110KV KAYATHAR-KODIKURUCHI FEEDER SEC B/W THERKUPATTI&KEELAVEERANAM.
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION.
230 KV Paalavadi -Karimangalam feeder
Monthly maintenance work
Half yearly Mtce work
230 KV Anthiyur Feeder breaker, CTs and entire line
FOR MONTHLY MAINTENANCE WORK
1)110 KV Pasumalai - Sembatty Feeder BKR & CT,LI only section between Pasumalai and Achampathu SS 2)Line LC
1)Maintenance Works of BKR & CT, LI only. 2)Tree cutting works
230KV Hosur-Mettur #,Auto-II,110KV KEMPATTY #,110KV Uddanapally #,breakers,CTs,other equipments.
monthly maintenance work and line maintenance work
110 KV Kayathar # Breaker with CT & Isolators
230KV Amuthapuram II # Breaker
110KV ALR-UDI-I FEEDER CB,CT AND LINE SECTION BETWEEN ALR AND POOLANKINAR SS
230KV KNMLM-TTPS
110 KV Uthangal LILO Line
230KV Hosur Feeder
230KV SPKOIL-VEERAPURAM FEEDER
FOR QUARTERLY MTCE WORK
On 230 KV Kayathar - Sanganeri # breaker with CT and Lines Inspection Works
a) Monthly Maintenance workb) Tower to Tower Inspection work
230 KV S.P.KOIL -VEERAPURAM FEEDER
Quarterly maintenance works
Maintenance works of Breaker and CT
Loc. 4 & 5 Painting to be done
230 KV Tiruvannamalai- Neyveli TS-I #, Breaker, CT,s and Line Isolator
Monthly maintenance work
Monthly Maintenance Work & defective Main I relay release by P&C Wing Mettur
Power transformer III breaker and Isolators.
Monthly maintenance and P&C check.
230KV MTPS1 # 2 Bkr,CTs & Line Switch
Monthly Maintenance Works
on 110 KV Kayathar - Suruliyar # breaker with CT only
For monthly Maintenance work
1.110KV Vellichandai feeder breaker, CTs,Line switch2. Auto Transformer - I with HV-I Breaker, CTs & LV-I Breaker CTs, Auto I Transfer Switch 3. Palavadi (Already Mettur #) 230KV feeder breaker ,CT`s, Line Switch and Transfer Switch and Line Between 230 KV Karimangalam SS - 400/230-110 KV Palavadi SS.4.230 KV TBC ( Bus Coupler) Breaker with isolators for Transfer Switch maintenance Purpose.
Carryout Monthly SS Maintenance works by maintenance wing, Lines wing Programed in 230 KV Palavadi (Already in Mettur #) Arching rods 8 Nos to be provided at location No: 08,13,15.
110KV Thiruvarur - Mannargudy Feeder bkr
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work & annual relay testing work by P &C.
110 KV Thirukovilur Feeder Breaker and CTs.
For Monthly Maintenance work
110KV Alundur - Trichy-I Feeder breaker,CT's, and Line Isolators.
a) Preventive Monthly maintenance work. b) Premonsoon inspection and Tree cutting work. c)Relay testing work.
110 KV Bus Coupler Breaker and CT’s by Ingur maintenance wing
MONTHLY MAINTENANCE WORKS
230KV Alundur -Trichy II feeder breaker, CT'S, CVT'S and line isolators.
a) Preventive Monthly maintenance work. b) Premonsoon inspection and Tree cutting work. c)Relay testing work.
100 MVA AUTO TR. III, HV-III and LV-III Breaker and C.T. only.
For Monthly Maintanance work.
50 MVA Power Transformer-2 & 33 KV OHP feeder one by one.
For Routine Maintenance Works.
230 KV TRICHY - ALUNDUR II Feeder breaker, CTs, Line Isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
230KV Valayapatty feeder CB, CTs, Wave TRap, CVT and 230KV isolators.
For monthly maintenance works.
Capacitor Bank NO :II BREAKER , CT'S AND CELL SIDE ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
110KV line section between Arkay - Mandapam SS in 110KV Arkay - Mandapam - Perungulam feeder.
For attending tree cutting and tower to tower inspection work
110 KV Kayathar # Breaker with CT & Line Isolators
Monthly maintenance work
110KV OT Patty - Papanasam feederSection between (VK Puram -Papanasam
Earth wire re stringing work at location No.8-10.
On 110 KV Sipcot- Eppodumvendran Feeder breaker with CT's and line isolator only
For monthly maintenance work.
110KV PPM- OT Patti feeder breaker with CT
For carrying out monthly maintenance work.
230KV Auto Tr, HV & LV BR.
100MVA Auto Tr. I Monthly maintenane work
230KV OKM-Coimbatore feeder Breaker,CT's and(With 89M1,89M2&89L Isolators)entire line
Monthly maintenance works,PMI Work & Polluted disc replacement carry out by lines/Thudiyalur wing
1.FOR REPLACING STRAND CUT ZEBRA JUMPER BETWEEN 110KV LV BR CT BREAKER PAD B PH. 2.GRT ANNUAL RELAY TEST
110 KV UDUMALPET LINK II FEEDER BREAKER AND LINE ENTIRE
For Monthly Maintenance
110 Kv Kurukathi - Ingur 2 # Breaker, Cts, and Line Isolators
For monthly maintenance work of Breaker, Line Isolator & CTs
110 Kv Kurukathi - Ingur 1 # Breaker, Cts, and Line Isolators
For monthly maintenance work of Breaker, Line Isolator & CTs
110 Kv Kurukathi - Ponnapuram # Breaker, Cts, and Line Isolators
For monthly maintenance work of Breaker, Line Isolator & CTs
110KV Tharamani - Velachery OH # & 110KV KITS-Velachery OH #
Insulator replacement work inside marshy land
100MVA Auto .I Monthly maintenance work
110 KV SRP-ARMI I # section between SRP to Perungudi and 110 KV SRP - ARMI II # section between SRP-RDPM
At ISRO complex at tower no 39 & 40 Tower members/parts to be Tightend & Earth wire to be fitted in its original position,Annual relay testing work
110 KV Kinnimangalam - Theni-I feeder section b/w CKNI & Valanthur
For Tower to Tower inspection & flashover disc replacement work
230KV TTPS-KOODANKULAM FEEDER ENTIRE
ANNUAL MAINTENANCE OF STRUNG BUS INSULATORS
230 KV K.R.THOPPUR FEEDER/CT,BREAKER,ISOLATOR.
MONTHLY MAINTENANCE
230 KV Sriperumbudur - Kadapperi -II feeder
For Quarterly maintenance works
230KV K.R.Thoppur - Singapuram feeder entire
For Jumper cone tightness checking work at Tension Towers Between TLONO:1-24
230KV MAPS-ECHUR FEEDER
110KV Eastern Bus
230KV Singapuram - KRT # at both ends Bkr,CTs & Line Switch
Monthly Maintenance Works
LINE MAINTENANCE WORK
110KV Erode- Thiruvachi feeder entire Mettukadai LILO
jumber tightness work & maintenance work taken by Ingur lines section
110KV Erode - New Suriyam palayam feeder entire
Jumber tightness work at tower loc no: 172 & line maintenance work
Routine Maintenance work
110 KV Thiruvachi feeder breaker , CT and line side between Erode SS and Mettukadai 110 KV SS
Conducting of Annual relay test by AEE/P&C-I/Erode and attending of HOT spots noticed in Thermo vision camera.
33 KV ARUMBAKKAM-2
33 KV Arumbakkam- 2 Feeder
230KV NCTPS-II Feeder.
230 KV NCTPS Feeder, Breaker,230KV CTs Line Isolator
GRT Annual Relay Test and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
230KV Villupuram – Acharapakkam #And230 KV Villupuram - Acharapakkam #
To carry out Breaker and CT’s Monthly Maintenance Work. AndFor replacement of weak insulators at location No.210
230 KV Singapuram- K.R.Thoppur feeder
Jumper tightness work
400/ 230 KV, 200 MVA,Auto-Transformer-IV
For monthly maintenance works
For Quarterly maintenance work.
For Quarterly maintenance work.
For Routine Maintenance Works.
230KV Manali - Mylapore #
230KV Mylapore Feeder
110 KV BUS II & BUS III
MTPS.I TO MTPH FEEDER
Jumper tightness & Tower to tower inspection.
Routine Maintenance Work
230 KV Alamathy-Thiruverkadu feeder
Jumper Tightness work
110 KV UDT –Aliyar – I #r breaker, CT’s and section between UDT – Poolanginar SS.
Monthly Maintenance Work
110 KV Capacitor Bank - I, Breaker, CTs & Cell units
Monthly maintenance works
110 KV isolator 29 alignment work
MONTHLY MAINTENANCE
1.230KV CBE-TDLR # Entire . 2. 230KV CBE-TDLR # Breaker, CTs & 89L Isolator
1. PMI works by AE/Lines /CBE. 2. Monthly maintenance works 3. P&C wing Testing.
110 KV KKDI - TVNI - VLDR # S/B KKDI- TVNI
For Disc replacement work.
230/33 k.v POWER TRANSFORMERM - III H.V and L.V BREAKER
L.V. CT bushing clamp replacement work
230 KV Checkanurani - Renganathapuram feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
1) 230 KV Pasumalai - Anupankulam # BKR, CT and LI only. 2).Line Entire.
a) Maintenance Works of BKR & CT,LI b)Tree Cutting and T-T inspection works
Auto Transformer-II HV, LV Breaker and CTs
FOR MONTHLY MAINTENANCE WORK
110KV KAYATHAR-SURULIYAR FEEDER SEC B/W KAYATHAR&SANKARANKOVIL.
For at location no:1 takeoff (tension point at kayathar 110 KV SS). Jumper B- phase slipped from PILOT INSULATOR. IT will leads to frequent tripping during high wind season, when the jumper comes into arcing distance. Hence it has to be repositioned to its normal position.
Monthly Mtce work
315MVA,400KV/230KV ICT-I
110KV KAYATHAR-ANUPPANKULAM FEEDER SEC B/W DURAISAMYPURAM & KOVILPATTI
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
110KV ALR LINK-I FEEDER CB,CT AND LINE ENTIRE
Preventive Maintenance Work
230kv RNPM-CKNI # breaker,CT and line switch
1)monthly maintenance2)GRT Relay Testing work
110 KV CUD-Chitharasur # breaker, CT’s & Line side isolator.
For monthly maintenance works
230KV Bus- A at KRT
110 KV – Chitharasur – Sornavoor Feeder
At Loc 29 (T) Long rod 1 No flashed Over.At Loc 33 (S) 3 nos Insulators flashed over to be replaced.At Loc 37(T) Top phase Jumper Arc to be rectified.
Monthly Maintenance Works
on 110 KV Kayathar - Kodayar #, breaker with CT only
For monthly Maintenance work
230KV Thiruvarur - Thanajvur feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isoaltor maintenance work and Annual Realy Test by GRT wing.
230 KV Thanjavur - Thiruvarur feeder, Breaker, CT, CVT & Line Isolator.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For jumper checking works by the AEE/Lines/Thanjavur,3) For annual relay testing works by the AEE/P&C/Thanjavur.
110KV Sipcot II Breaker & CT’s
110KV Singapuram-II feeders Breaker & CT’s
Monthly maintenance work.
MONTHLY MAINTENANCE WORKS
110KV Alundur - Vadugapatty Feeder and Breaker,CT's and Line isolators.
a)Preventive Monthly Maintenance work b) Premonsoon inspection work and tree cutting work. c) Relay Testing work.
230KV Southern Bus entire (from 1 - 89 B switch to south side end)
For provinding of over hang loop jumper to 2 - 89 B. ( Augmentation of 100MVA to 160MVA )
230 KV KTR-SPR feeder
UNIT 3 OF MOYAR POWER HOUSE
230 KV Anuppankulam - Madurai feeder Br., CT., and Line switch only.
(a) For monthly maintenance work. (b) For replacement of flash over disk in loc No. 255
110KV SALAI FEEDER BREAKER&CT'S
For monthly maintenance work
The 230kv Auto transformer III,HV III,LV III Breakers & CT'S
For monthly maintenance work
110 KV Thirukoilur - Deviyakuruchi # ( Pudhupattu Spur line)
For tightening of loose jumpers in the 110 KV Sankarapuram - Pudhupattu line
Jumper Tightness work
110KV Pallakapalayam-Sankagiri # II line entire
Flashed over disc replacement work
110KV line section between Arkay - Keelakarai SS in 110KV Arkay - Keelakai - Kavanoor feeder .
For attending tree cutting and tower to tower inspection work
FOR MONTHLY MAINTENANCE WORK
230kv MTPH - MTPS I # at Both ends
FOR MONTHLY MAINTENANCE
110KV Bus section Breaker
110KV Kodikurchi-Veerasigamani # I feederSection between (Kodikuruchi- Echantha SS)
For special line Patrol work at Tree clearance work
Auto Transformer I and its HV,LV breaker,CTs and LAS
To carryout monthly maintenance work by AEE/Maintenance/Palladam
110 KV Palladam-Sipcot II # Breaker,CTs and line section between 230 KV Palladam SS and 110 KV Alagumalai SS
To carryout monthly maintenance work by AEE/Maintenance/Palladam and Line maintenance by AEE/Lines/Palladam
230 KV TDLR - CBE # at Both ends and line entire
For monthly maintenance works & PMI works
230/110 KV Auto Tr.-I with HV 230 KV Breaker & LV 110 KV Breaker with CTs
For monthly maintenance works
Monthly maintenance work
110 KV RANGANATHAPURAM FEEDER BREAKER AND LINE SEC BETWEEN UDT AND MELKARAI PATTY
For Monthly Maintenance
230/33KV Power transformer-1 HV,LV Breakers with CT's and its 33KV feeder
Monthly Maintenance Work
230KV Kalivanthapattu-Tharamani #
Insulator and jumper replacement work
110 Kv Mettur Town SS Feeder entire.
1.Monthly Maintenance.2.Annual rely testing
110 Kv Echur - Mazhaiyur # Monthly Maintenance work carried in all Cts and isolators in 110 KV Echur - Mazhaiyur #.
110 KV Arasur - Karamadai 2 feeder Breaker & CTs
Monthly maintenance works
110 KV SRP - KDR I # Br,CT & Line switch, 110 KV SRP - KDR I # section between SRP-TKY
Monthly Mainteanace work,Tree clearance work
230kv MTPS.I - KRT # 1 at both ends
MONTHLY MAINTENANCE
on 110 kv KKDI - SVGA # S/B KKDI - KALLAL
a) For BRK & Cts mtc work.b) for Tower to Tower inspection work.c) Annual relay test.
110 KV KAVANOOR-VALINOKKAM-ARKAY SEC.BET.VALLINOKKAM &KEELAKARAI
LINE MAINTENANCE WORKS
230KV SIPCOT Mambakkam - Sriperumbudur feeder - Breaker, Current Transformers & Line side isolator only.
For monthly maintenance works.
400 KV Main Breaker for ICT1(406-52), Tie Breaker 405-52 and 110 KV LV Breaker 101-52, 110 KV Ayyanarithu Line 1,Line 2 and Keelaveeranam Breaker, 400/110KV ICT1 & 110KV Bus -1 & 2 - PT
Monthly Maintenance work
G.R.T. Testing
230KV Shoolagiri & Singarapet # breakers, HV-I, HV-II breakers , Auto-I & Auto-II, LV-I & LV-II breakers, GC-I, GC-II breakers, Pr.Tr 110/33KV & Pr.Tr 110/11KV, 11KV LV, 33KV LV breakers, 33KV & 11KV feeder breakers
Monthly maintenance works in 230KV Shoolagiri & Singarapet feeders,230KV HV-I & HV-II, Auto-I & Auto-II, 110KV LV-I & LV-II, 110KV Hosur feeder, 110KV Karimangalam feeder breakers and GC-I, GC-II breakers, Pr.Tr 110/11KV, Pr.Tr 110/33KV, 11KV LV, 33KV LV breaker, 33KV & 11KV feeder breakers
On 230KV TTPS-Auto-II feeder entire
For Tower to Tower Inspection and Rectification work.
110K.V Sankaneri Melakallur # Breaker, CTs and Line Switches
110KV NORTHEN BUS ENTIRE For Monthly Maintenance Works.
230KV TTPS-AUTO SS - II FEEDER ENTIRE
ANNUAL MAINTENANCE OF STRUNG BUS INSULATORS
230 KV Checkanurani - Ind Bharath feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
100 MVA AUTO TRANSFORMER - I
AUTO-III,HV-III,LV-III Breaker and Its CTs
For monthly maintenance works
110 KV Ramiyanahalli # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
230 KV SNPT - Gurubarapally # at both ends
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
Monthly maintenance
110 KV Theni-Periyar I & II # Breaker with CT (One by one)
For Monthly Mtc work.
1)110 KV Pasumalai - Alagarkoil-II # BKR & CT, LI only. 2)Line LC
1) Maintenance Works of BKR & CT, LI only. 2) Tree cutting works.
110 KV Veerasigamani-I # bREAKER WITH ct & Isolators
For Monthly Maintenance work
110KV KAYATHAR-K.G.PATTI FEEDER SEC B/W KALINGAPATTI&KALUGUMALAI
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
110KV Gurubarapally feeder entire
Quarterly Mtce work
Monthly maintenance work and line maintenance work
110KV ALR LINK-II FEEDER CB,CT AND LINE ENTIRE
400/230KV ICT 2 MAIN BREAKER, TIE BREAKER WITH CT AND TRANSFORMER (BAY NOS 406, 405)
MONTHLY MAINTENANCE WORK
110 KV Karuvalur-Arasur II feeder breaker , CT's
Monthly Maintenance of 110 KV Karuvalur-Arasur II feede
On 110 KV Kayathar - Gangaikondan # breaker with CT and Lines work Section between kayathar to gangaikondan
a) Monthly Maintenance workb) Lines Inspection section between Kayathar to gangaikondan
110KV MDPH - II
Auto transformer III HV & LV breakers with CTs
For monthly maintenance works
110kv RNPM-SBT III # breaker ,CT and relay
1)monthly maintenance2)GRT Relay testing work
Monthly Maintenance Work
Power transformer IV breaker and Isolators.
Monthly maintenance and P&C check.
230KV Perambalur-Trichy feeder breaker CT's wave trap & Line Isolater.
For monthly maintenance maintenance work.
230KV MTPS-I # Bkr,CTs & Line Switch
Monthly Maintenance Works
110 KV Tiruvannamalai-Villupuram # Breaker,CT's and Line Isolator
Monthly maitenance work
110KV Mayiladuthurai- Thiruvarur feeder (up to Peralam SS)
Line inspection and rectification work.
110KV Thingalore - Erode # II at both ends and line entire
Monthly maintenance works.
230KV MTPS-I# Bkr,CT&Line Switch
Monthly Maintenance work and Relay Replacement work by P&C/Salem
110KV Thiruvarur - Narimanam - II feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work & Annual relay testing by P & C.
110KV Bus Coupler CT, Breaker
110KV KPH2-THUDIYALUR 1 # For PMI Work
110 KV S.P.Koil - Siruseri Feeder
110KV T(K)GTPS - THIRUVARUR FEEDER (VIA: 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS & 110KV MANNARGUDI SS), LINE PORTION BETWEEN T(K)GTPS TO 110KV ULLIKKOTTAI SS.
FOR PREMONSOON INSPECTION BY AE/LINES/ PATTUKKOTTAI.
Monthly maintenance
110 KV Thiruvarur feeder (Line portion between T(K)GTPS and 110 KV Ullikkottai SS)
(1) Breaker, CTs and Line Isolators maintenance works.(2) Breaker testing works.
Quarterly Maintenance Work
110 KV S.P.Koil - Acharapakkam -I Feeder
Quarterly Maintenance Work
110 KV Deviakurichy-Singipuram feeder- II Breaker, CTs
For Monthly Maintenance work
100 MVA Auto Transformer-II
110KV Thingalur – Erode II feeder entire Gandhi nagar LILO
jumber tightness work & maintenance work taken by Ingur lines section
110KV Thiruvachi # Breaker, CTs and Line side Isolator
MONTHLY MAINTENANCE WORKS
Auto Transformer III and its HV & LV Breakers with CT’s and Isolators
MONTHLY MAINTENANCE WORKS
110 KV Thingalur II feeder breaker , CT and line side between Erode 110 KV SS and Gandhinagar 110 KV SS
Attending hot spot and Monthly maintenance work.
For Routine Maintenance Works.
110 KV APKM-Thulukkapatti-II feeder Br., CT., and Line entire at both ends.
(a) For Monthly Maintenance Work. (b ) For Monthly Maintenance Work at Thulukkapatti SS.
1. 230KV Trichy - Perambalur feeder Breaker , CTs, Line Isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
THE 110KV ITCHIPUTHUR FEEDER BREAKER&CT'S
For monthly maintenance work
Auto transformer II, HV II and LVII Breaker,CT's and LAS only.
For Monthly Maintenance Work.
Auto Transformer – I ,Southern Bus and 110KV T.V.Nallur #
1.Auto Tfr – I Monthly maintenance work.2.To carry out HV I & LV I Breaker and CT’s Monthly Maintenance Work.
110 KV Deviakurichi-Thammampatty Feeder(Section between Godamalai ss –Thammampatty SS)
Jumper tightness work
110kv BHAVANISAGAR Micro PH - BHAVANISAGAR 110 KV SS# entire
For GRT Annual Relay Tests and maintenance of line equipments in 110 KV Micro - Bhavanisagar 110 KV SS Feeder, Micro end at MHPH / Bhavanisagar
110 KV Veerasigamani I # Breaker with CT & Line Isolators
For Monthly Maintenance Work.
230kV Veeranam-Abishekapatti Feeder CT with line switch.
For Quarterly and Monthly Maintenance work.
For Monthly Maintenance Work
230KV TTN - TTPS - II feeder breaker with CT bus & Line side switches
For erection of CVT & Wave Trap, combined with SS erection and Monthly Maintenance Works
230/33kv Power TR 2 HV & LV Breaker& 33KV SRSPL,SRL ,SAPTAGIRI & REDPONIX FDRS
33 KV bUS 2 DROPPER Y PH REPLCEMENT & MAINTENANCE WORK
110KV OKM-Udumalpet-1 feeder Breaker,CT's & Line switch
Monthly maintenance work
230KV Transfer bus section-I&II
110 KV PONNAPURAM FEEDER BREAKER UPTO PATSPIN EHT
For Monthly Maintenance
110KV Viswanathaperi #breaker with C.T
For Monthly maintenance work
For maintenance and tightness checking work
230KV Myvadi-Anikadavu # at both ends Breaker,CT Line entire.
For Monthly Maintenance and PMI by lines wing
230KV Kalivanthapattu-Tharamani #
Insulator and jumper replacement work
110 KV LV 1,2,3 and feeders one by one 110 KV all feeders
1. Erection of 110 KV bus bar protection C & R panel 2.Erection of Control Cable up to 8 Core and above 8 core related to above panel
110 KV UDT –Aliyar – II #r breaker, CT’s and line. between Udt and Devanoorputhur S
Monthly Maintenance Work
110 KV Arasur - Karuvalur 1 feeder Breaker & CTs
Monthly maintenance works
230 KV Echur -Arani #
400KV Karamadai - MTPS II # 2
ON 230 KV VLDR - A.Koil # entire
Monthly Maintenance work carried in all Cts and isolators in 230 KV Echur - Arani #.
For Monthly maintenance work of Main & Tie Breaker, CTs, line side CVT, Isolators & for LAS base rearrangement work by L & T
230/110 kv 50 MVA Auto Transformer - 2 & its allied equipment.
for monthly mtc work.
a) for tree cutting work.b) for Annual relay test.
400/ 230 KV, 315 MVA Auto-Transformer-II entire with Tie-4 Breaker (OCC)
For Monthly maintenance work
UNIT NO.2 at Kundah ph I
110KV Bus Coupler Breaker (104-52) only
Monthly Maintenance work
POWER TRANSFORMER-I, HV.BREAKER-I, LV.BREAKER-I & 33KV MICON-III,IV& V FEEDERS
FOR QUARTERLY & MONTHLY MAINTENANCE WORKS
230KV Arni-Echur feeder(Both End),230KV Breaker, CT's & Line Isolator
For monthly Maintenance work.
230KV Bus Coupler Breaker & isolotors (idle)
Monthly Maintenance Work
230 KV Checkanurani - Pasumalai II feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
110KV PYKARA - MOYAR2# (ENTIRE LINE)
FOR MONTHLY MAINTENANCE WORK
110 KV Ingur II # Breaker, CTs & line upto Kulathupalayam SS
For monthly maintenance works & Annual testing by P&C Wing
110 KV Sriperumbudur - Thiruvallore feeder
For Quarterly maintenance works
FOR MONTHLY MAINTENANCE WORK
Auto transformer II & LV II Breaker
400/230 KV ICT#4 (315 MVA)
230KV ALKL-Valuthur # Bkr,CT,&Line entire
Monthly Mtce work & line patrol
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
1)230 KV Pasumalai - Checkanurani # - II BKR & CT,LI only
a) Maintenance Works of BKR & CT,LI
110KV SBT - DGL # Bkr, CTs and line entire
1. Monthly maintenance work 2. Tree cutting work
110 KV Periyakodivery Feeder Breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
110 KV Theni -Periyar # III Breaker with CT only
For Monthly Mtc work
For maintenance works.
AUTO TRANSFORMER II
110KV MELAKALLUR-KODAYAR FEEDER ENTIRE LINE
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
110KV Zuzuvadi feeder and Auto III
Monthly maintenance work and line maintenance work
On 110 KV Kayathar - Arumuganeri # breaker with CT and Lines work section between kayathar to palayamkottai SS
a) Monthly Maintenance workb) Lines Inspection between Kayathar to palayamkottai SS
Monthly maintenance work
110 KV Cuddalore – Kulanchavadi # breaker with CT’s and line side isolator
For monthly maintenance works
230KV MTPS II - MTR # at both ends
Monthly Maintenance work
110KV Bus-B at KRT Monthly Maintenance Works
230 KV Tiruvannamalai-Villupuram #, Breaker, cT's and Line Isolator
Monthly maintenance work
on 110 KV Melakaloor - Kodayar # breaker with CT only
For monthly maintenance work
on 110 KV Kayathar - Anupankulam #, breaker wit CT and GRT Testing
a)For monthly maintenance work and b)For annual relay and breaker testing
Autotransformer II and its HV/LV Breaker with CTs only.
Monthly maintenance works.
110KV Arasur feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
Auto Transformer II, HV, LV and CTs
Monthly Maintenance work
110Kv Narimanam - Nagapattinam Feeder
Line premansoon inspection and rectification work and annual relay testing by AEE/P & C.
110KV Thingalore - Arasur # Line section between Thingalur 230KV SS and 110KV Velampalayam SS.
Stringing of 230KV SC Line from Arasur PGCIL 400KV SS to Ingur 230KV SS for crossing the existing tower location 18 & 19 of Perumanallur 110KV SS DC Line.
110KV NEMMELI THIPPIYAKUDI-MADUKKUR FEEDER BREAKER, CT's AND LINE ISOLATOR.
FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/N T KUDI.
230KV Mettur Feeder
110 KV Railway II feeder
110KV Salem - K.R.Thoppur feeder # 1 at Salem 230
Monthly maintenance work.
110 KV S.P.Koil -Oragadam-I Feeder
Quarterly Maintenance Work
Monthly maintenance work
For EHT Line Maintenance Works.
100 MVA AUTO TR. I, HV-I and LV-I Breaker with CT only.
For Monthly Maintenance Work.
110 KV Elumahtur feeder breaker, CT and line side
Conducting Annual relay test by AEE/P&C-I/Erode, attending Hot spot and monthly maintenance work.
100MVA Auto Transformer I, LV I BR, HV & LV LAS, LV CTs and Isolators.
a) For monthly maintenance works.
Auto transformer I, HV I and LV I Breaker,CT's and LAS only.
For Monthly Maintenance Work
110KV Pugalur - Ranganathapuram feeder Breaker, CTs
Monthly maintenance work.
110 KV Villupuram - Thirukoilur #
230KV Villupuram – Thiruvannamalai #And110 KV Villupuram - Thirukoilur #
To carry out Breaker and CT’s Monthly Maintenance Work.
For replacement of weak insulators at location No. 2 off Karanaiperichanur LILO
230KV Villupuram feeder
110KV Manali - Metro Water #
i)On 110KV Railway- II Feeder Breakers and CT’s
i)For Monthly Maintenance Works
Total shutdown monthly maintenance work.
Jumper tightness & Tower to tower inspection.
230KV Valuthur - Alagarkovil feeder entire
UNIT 1 OF MOYAR POWER HOUSE FOR MONTHLY MAINTENANCE WORK
MACHINE-2 GENERATOR & ALL ITS AUXILIARIES
FOR MONTHLY MAINTENANCE
110KV OT Patty - Kayathar feederSection between (OTPatty-Seethaparpanallur )
Defective jumper replacement work at location No.95 and replacement of disc at location No.102.
110 KV KMDI-II feeder Breaker with CTs
For monthly maintenance works
110 KV Sandinallah feeder Breaker with CTs & 110 KV Sandinallah feeder entire line
For monthly maintenance works & PMI works
230/33kv Power Tr1, HV and LV breaker ONLY
Monthly maintenance work
230KV OKM-MYVADI # at both ends and line entire
Monthly maintenance work
16MVA Pr.Tr.II Monthly maintenane work
110KV SIRUSERI-II FEEDER Maintenance work
Auto Transformer II
110 KV Perungudi SS Maintenance
110KV BPH1-BPH2 Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
Monthly maintenance work in 110KV BPH1-BPH2 Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
230 KV UDPT - IDUKKI # LINE ENTIRE
For Monthly Maintenance
230KV Myvadi-Othkalmandabam feeder Breaker,CT line entire
For Monthly Maintenance work and PMI by lines wing.
Monthly Maintenance Work
230/110 KV 100 MVA Power Transformer - II
For attending Monthly Maintenance Work by JE / Mtce / 230 /33 KV GIS SS Mylapore
110KV Melakallur Feeder
Tree clearance work
Machine 2
Monthly maintenance of breaker CT& LS and GRT annual relay testing
230 KV Thiruvarur - Kadalangudi feeder
For tree cutting works carried out by AEE/Lines/Thanjavur.
230 KV Sunguvarchatram - Mambakkam Sipcot feeder
Lines LC and jumper tightness works
110 KV SRP - KDR I # section between TKY to PPI
Monthly Maintenance.
230/110 KV Auto Transformer - III, HV III, LV III breakers, it's CTs and LAS
Monthly maintenance works and Tan delta measuremet of CTs and REF enabling works by P & C wing/ CBE
On 230 KKDI - Kavanur - 1 # entire
230KAVANOOR-KARAIKUDI # I
230KV Bus-I
a) for Brk and Cts mtc work.b) for tree cutting works.c) Annual relay test.
LINE MAINTENANCE WORKS
230 KV Sunguvarchatram - Mambakkam feeder entire
For Quarterly maintenance works
230KV SIPCOT Mambakkam - SV.Chatram feeder - Breaker, Current Transformers & Line side isolator only.
For monthly maintenance works.
Monthly Maintenance work
On 230KV TTPS-sterlite feeder entire
For Tower to Tower Inspection and Rectification work.
On 230KV TTPS-sterlite feeder entire
For Tower to Tower Inspection and Rectification work.
230 KV Northern Bus Entire
230 k.v Sankaneri - Abishekapatti # Breaker, CTs and Line Switches
Removing crow nest with G.I.wire over 230 k.v Isolator stucture
230KV TTPS-STERLITE FEEDER ENTIRE
ANNUAL MAINTENANCE OF UNDER HUNG BUS INSULATORS
230 KV Checkanurani - Kinnimangalam feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
230 KV PH-IV feeder breaker with CTs
For Monthly maintenance works
For monthly maintenance works
110KV ICL-I & ICL-II feeder Breaker and CT's only One by one.
For Monthly Maintenance work
PH-1 Machine
110KV Link Feeder
Monthly maintenance of generator transformer, SF6 breaker, 110KV LAS, CT & PT and 110KV Line switch
Monthly maintenance of breaker CT& LS
110KV SBT - Alagarkovil I # Bkr and CTs only
Monthly maintenance work
230 KV Mambakkam - Sunguvarchatram feeder
Lines LC and jumper tightness works
Capacitor Bank I Breaker and CTs only
FOR MONTHLY MAINTENANCE WORK
400 KV Paalavadi -MTPS II # I at both ends
Monthly maintenance work
110KV KAYATHAR-O.T.PATTI FEEDER SEC B/W KAYTHAR & SEETHAPARPANALLUR.
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION.
400/110 KV ICT 3 MAIN BREAKER, TIE BREAKER AND LV BREAKER WITH CT AND TRANSFORMER BAY NOS 410, 411,101
MONTHLY MAINTENANCE WORK
230KV KNMLM – CKNI I # Entire
230KV Bus coupler Breaker
On 230/110 KV Autotransformer II, HV II an LV II breaker with CT and GRT Works
a) For Monthly maintenance workb) Relay replacement, and breaker testing works by GRT
Maintenance works of Breaker and CT
230 KV Bus Coupler Breaker with CT’s
For monthly maintenance works
110kv RNPM -UDPT # Breaker and CT
1)monthly maintenance2)GRT Relay testing work
Monthly Maintenance work
110KV Kallakudy-II(Thuraiyur) feeder Breaker CT's only
For monthly maintenance work
400/230KV ICT-II,Tie-I Bkr,HV & LV Side Bkr,CTs
Monthly Maintenance Works
Maintenance work
1.110 KV SSREL feeder breaker,CTs, Line switch.2.Auto Transformer - II with HV- II Breaker and CTs & LV- II Breaker CTs and Auto II Transfer Switch3.230 KV TBC ( Bus Coupler) Breaker with isolators for Transfer Switch Maintenance Purpose.
Carryout Monthly SS Maintenance works by maintenance wing, Lines wing Programed in 110 KV SSREL # Tree Clearance Work Line between 230 KV Karimangalam SS to 110 KV Pochampalli SS at Loc No: 110 - 125.
230KV Kadalangudy- Thiruvarur feeder entire
230KV Ingur - Thingalur # at both ends feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
230KV Thiruvarur - Kadalangudy feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work
230 KV Thanjavur - Alundur-1 feeder, breaker, CT & LI.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For jumper checking works by the AEE/Lines/Thanjavur
110KV KPH2-THUDIYALUR 1 # For PMI Work
400KV Palavadi -I
230KV Ingur - Thingalur feeder
110 KV Thanjavur - NTKudi feeder(Line portion between Thanjavur 230 KV SS and Eachankottai 110 KV SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For jumper checking works by the AEE/Lines/Thanjavur,3) For annual relay testing works by the AEE/P&C/Thanjavur.
230 KV S.P.Koil -Kalpakkam-II Feeder
Line Maintenance Work
230 KV Deviyakurichy – Valayapatty # at both ends
For Monthly Maintenance work
Monthly Maintenance work as approval by OCC
jumber tightness work & maintenance work taken by Ingur lines section
Auto Transformer I
for monthly mtc work
Monthly Maintenance
110KV SNPT - Vinnavanur # at both ends
230KV Alundur - Thanjavur-I Feeder Breaker, CT's, CVT's and Line Isolators.
a)Monthly Preventive Maintenance work. b)Premonsoon Inspection and tree cutting work. c)Relay Testing Work.
230KV Ingur - Thingalur # at both ends and and 230 KV Auxillary Bus switch at Ingur 230 end
MONTHLY MAINTENANCE WORKS & RCC STRUCTURE RENOVATION WORKS FOR 5 DAYS
230 KV NNPTY - AMPRM feeder entire.
Jumper bolt rectification work at Loc. No.5
230 KV Korattur-Manali feeder
230/110kV Auto transformer - II
110 KV Capacitor Bank II breaker , CT and its cells
Conducting annual relay test by AEE/P&C-I/Erode and Monthly maintenance work.
230KV ATHIPATTU FEEDER BREAKERS &CT'S ONLY
For monthly maintenance work
Jumper Tightness work at various location
230V Bus-I entire, 230KV BusCoupler Breaker & CTs.
Routine Maintenance work.
For Routine maintenance work,
230 KV Deviakurichi-Valaiyapatty Feeder
Jumper tightness work
BHAVANISAGAR MHPH 110 KV MICRO - MOYAR FEEDER, MICRO END ONLY
For GRT Annual Relay Tests in 110 KV Micro - Moyar Feeder, Micro End at MHPH / Bhavanisagar
110 KV Veerasigamani II # Breaker with CT & Line Isolators
For Monthly Maintenance Work.
On 230 KV Sterlite - TTPS feeder breaker with CTs and line isolators only.
For monthly maintenance work.
For Monthly Maintenance Work
230/33KV POWER TR3,HV & LV BREAKER AND 33KV SRF 1 TO 4
1.REPLACE ZEBRA VERTICAL DROPPER OF POWER TR 3 TO LV BR 3 CT R PH 2. 33KV BUS 3 STRUNG BUS CLAMP REPLACEMENT & POWER TR 3 MTCE WORK
230kv Thudiyalur - KPH 4 # at both ends
Monthly maintenance work
230/110KV Auto Transformer -1 Hv and LV breakers with CTs and LAS
Monthly Maintenance Work
230KV UDT-ALIYAR FEEDER BREAKER AND LINE ENTIRE
For Monthly Maintenance
80MVA Auto .II
110KV OKM -TDLR 1 feeder section between 110KV MDK SS to 230 KV TDLR SS Line
PMI work carry out by Lines /Thudiyalur wing
110KV OKM-Sulur feeder breaker and CTs only
For Monthly maintenance work
230 KV NNPT - AMUTHAPURAM feeder Breaker with CT and Line isolators.
For monthly maintenance work
230KV Amuthapuram-N.M.Patty Feeder with Breakers,CTs and its isolators
Monthly Maintenance Work and M2 relay replacement
Monthly maintenance work
230KV KAYATHAR(400KV)-ANUPPANKULAM FEEDER ENTIRE LINE
FOR DEFECTIVE DISC REPLACEMENT WORK
110KV SR PUDUR Feeder No.1
MTPS.I TO SALEM 230KV FEEDER
230KAVANOOR-KARAIKUDI # II
230 KV KKDI- KVNR II # ENTIRE
1)110KV Villupuram – Maduapakkam – I # (9-12 HRS)2)110KV Villupuram – Maduapakkam – II # (13 - 16 HRS) (one by one)
To carry out Breaker and CT’s Monthly Maintenance Work.
i)GRT - LBB wiring and Testingii) monthly maintenance of breaker CT,LS
110 KV Arasur - Thudialur feeder Breaker & CTs
Monthly maintenance works and Tan Delta measurement of CTs by P & C wing/CBE
110 KV SRP-ARMI I # Br, CT & Line switch
Monthly Mainteanace work, Annual Relay testing work
MONTHLY MAINTENANCE
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
a)for brk & ct's mtc workb)Disc replacement workc)Annual relay test
110 KV Southern Bus Entire
230 KV Checkanurani - Pasumalai I feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
For monthly maintenance works
230 KV Sriperumbudur - Korratur feeder
For quarterly maintenance works
230 KV ALKL-Checkanurani # Bkr,CT,&Line entire
Monthly Mtce work & line patrol work
110 KV Link I # Breaker and CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
110KV Bus Coupler Breaker and CT.
Monthly Maintenance works.
110 KV S.P.KOIL FEEDER -I Monthly maintenance
110KV Mettur, 110KV Barrage III, 110KV Anthiyur,110KV Thalavaipet, 110KV Gobi feeders Breakers and CTs and 110KV Bus Coupler Breaker and CT one by one
TAN DELTA Values checking up with assistance of P&C wing Gobi.
1)230 KV Pasumalai - Checkanurani # - I BKR & CT,LI only 2).Line Entire.
a) Maintenance Works of BKR & CT,LI b)Tree Cutting C) Release of Loop jumpers already provided in between Checkanurani and Alagarkoil Feeder in between Loc 3 and 4 towards Ckni and Alagarkoil D) Providing of jumpers already kept opened at Loc 3 towards Pasumalai
230 KV Paalavadi -Mettur feeder
400 KV BUS - II
1) 230 KV Pasumalai - Alagarkoil # Line entire , BKR & CT,LI only 2).Line Entire.
a) Commissioning of newly erected breaker with new munerical Distance relay in M2 b)Tree Cutting c) Release of Loop jumpers already provided in between Checkanurani and Alagarkoil Feeder in between Loc 3 and 4 towards Ckni and Alagarkoil d) Providing of jumpers already kept opened at Loc 3 towards Pasumalai
Monthly maintenance work
110 KV Theni - Sempatty II # line section between Theni & Eluvanam patty ss
110 KV Kodai kanal spur line mtc work
Commissioning Activities - Bus bar protection checking stability in-view of commissioning of Rasipalayam III and IV
Hosur 110/33KV GC and 110/11KV GC
Monthly maintenance work.
110KV KANARPATTI(400KV)-UTHUMALAI FEEDER ENTIRE LINE
FOR JUMPER TIGHTNESS CHECKING WORK
Auto transformer I ,HV,LV BKR,CTs and LAS
For Monthly maintenance work
230 TBC/BC BREAKER CTs and 230 KV Bus B side switch of 230KV AUTO-1 # (205-89A)
For Monthly maintenance work of Bus transfer Switch (205-89A)
230KV Bus Bar protection will be switched off
Bus bar protection relays testing by GRT/Thudiyalur
Half yearly Mtce work
230KV Palavadi feeder
110KV Annur # breaker, CT with line switch and CVT
Monthly maintenance work and Line maintenance by AEE/Lines/Palladam
On 230 KV Kayathar - Abishegapatty # breaker with CT and entire line
a) For Monthly maintenance work b) Tower to Tower Inspection works
110KV ALR-SKPY FEEDER CB,CT AND LINE ENTIRE
110 KV Bus Coupler Breaker with CT
For monthly maintenance works
110KV Barrage Power House 3 – Barrage Powerhouse - 4 entire
Tree cutting work at 110KV Barrage Power House 3 to Barrage Power House - 4 entire
110kv RNPM-SBT II # breaker,CT and Relay
1)monthly maintenance2)GRT relay testing work
Monthly Maintenance work
230 KV Bus coupler breaker and Isolators.
Annual relay testing work by P&C Palladam and Monthly maintenance.
110KV Thevur # CT, Breaker
230KV Salem Steel Plant-I# Bkr,CTs & Line Switch
Monthly Maintenance works and Relay replacement work by P&C/Salem
230KV Kadalangudy- PPN II feeder entire
Preventive maintenance of Isolator No.04 at PPN Plant.
110KV KGTPS- Thiruvarur feeder entire
Relay testing work at KGTPS end.
110KV Thingalur Link feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
110KV Thiruvarur - KGTPS Express feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work & Annual relay testing by AEE / P&C
Monthly maintenance
Auto-I HV &LV side - Entire transformer,LAS, CT, Breaker and Switches
Monthly maintenance work
230 KV Thanjavur - Alundur-2 feeder, breaker, CT & LI.
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For jumper checking works by the AEE/Lines/Thanjavur
230KV MTPS feeder Breaker, CT’s & Line Isolator
Monthly maintenance work.
110KV Barrage Power House 3 – Barrage PowerHouse - 4 entire
Tree cutting work at 110KV Barrage Power House 3 to Barrage Power House - 4 entire
110 KV PERIYA KODIVERY-GOBI FEEDER,110KV PERIYA KODIVERY-MAYAR PH FEEDER AND110 KV PERIYA KODIVERY-BAS FEEDER ONE BY ONE
TO CARRTOUT TANDELTA TEST & Maintenance work by AEE/ P&C/GOBI & AEE/o/P.Kodivery
230KV Alundur - Thanjavur-II Feeder Breaker, CT's, CVT's and Line Isolators.
a)Monthly Preventive Maintenance work. b)Premonsoon Inspection and tree cutting work. c)Relay Testing Work.
110KV Railway traction – I # Breaker, CTs, and Line side Isolator
MONTHLY MAINTENANCE WORKS
110 KV Periyapalayam Feeder, Breaker,110KV CTs Line Isolator
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
110KV LINK # I BREAKERS, CT'S AND ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK.
110KV PNPM-INGUR-I #(PNPM-KURUKAATHI#) S/B 110KV KUNDADAM AND UTHIYUR SS.
Replacement of Anti fog insulatorsFROM 15.09.17 TO 25.09.17 DAILY FROM 08 TO 17 HRS.
230KV Salem – MTPS feeder
110KV Trichy – Srirangam feeder Breaker, CTs, line isolator and line portion between 230KV Trichy SS and 110KV Kambarasampettai SS only.
For a) Monthly Maintenance works b) Premonsoon inspection.
110KV BPH4-BPH3# EQUIPMENTS ENTIRE
FOR MONTHLY MAINTENANCE WORKS
Jumper checking work
230 KV Korattur-Manali feeder
i)On 110KV Capacitor Bank-I and 110KV Capacitor Bank -II Breaker and CT’s one by one
i)For Monthly Maintenance Works
Jumper Tightness work
Auto-I, HV & LV-I CBs, CTs, LASs and 230KV HV-I side Switches.
For monthly maintenance works.
110KV Railway Feeder I&II
110KV KGTPS- THIRUVARUR EXPRESS FEEDER WITH ENTIRE LINE AT BOTH END
REGULAR AND ROUTINE BREAKER MAINTENANCE AND TESTING WORKS.GRT WING RELAY TESTING
110KV line section between Perungulam - Mandapam SS in 110KV Arkay - Mandapam - Perungulam feeder.
For attending tree cutting and tower to tower inspection work
Monthly Maintenance work(One by one)
110KV BPH3-BPH4 # BKR, CT, Line isolator, entire line
110KV BPH3-BPH4 # Monthly maintenance work.
230 KV Palladam - Othakalmandapam # Breaker,CTs and line side isolator
To carryout monthly maintenance work by AEE/Maintenance/Palladam
AUTO TRANSFORMER II ,HV II & LV II COMPLETE
For Monthly Maintenance
230KV OKM-Palladam feeder breaker ,CTs with line Switches (89L),entire line
For monthly maintenance work
110KV Sriperumbudur -Porur # IIJumper tightness checking work.
110 Kv Echur - Vandavsi #
110kv SANKANERI fdr. Br. Ct only.
230 KV Anuppankulam - Kayathar feeder Br., CT. only
For monthly maintenance work.
Monthly Maintenance work carried in all Cts and isolators in 110 KV Echur - Vandavasi #.
110 KV Arasur - Coimbatore feeder Breaker & CTs
Monthly maintenance works and Tan Delta measurement of CTs by P & C wing/CBE
110kv Radhapuram fdr,Br, CT& LINE SW.,
MONTHLY MAINTENANCE WORK
MONTHLY MAINTENANCE WORK
230KV Ingur Feeder PMI Works by AE/ Lines/ Thudialur
110 KV KAVANOOR-KAMUTHI # SEC. BET. KAVANOOR & KAMUTHI (INCLUDING KADALADI SPUR LINE)
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
110 KV KAVANOOR-KAMUTHI # SEC. BET. KAMUTHI 110 KV SS TO TAMILPADI 110 KV SS
LINE MAINTENANCE WORKS
100 MVA AUTO TRANSFORMER I ,II & III 110/33KV Pr.Tr.-I&II,110/11KV Pr.Tr-I,II&III, 110KV GC & 11KV FEEDERS
FOR Monthly maintenance works
230KV Anuppankulam Feeder,Breaker (201-52) & CT,CVT,LAS.
Monthly Maintenance work
230KV HV-I breaker, Auto-I, 110KV LV-I breaker , 110KV Karimangalam feeder breaker, 230KV HV-II breaker, Auto-II, 110KV LV-II breaker
Monthly maintenance works in Auto -I & II, 230KV HV-I & II and 110KV LV-I & II and 110KV Karimangalam feeder.
110 KV PERIYAR - THENI -3 Feeder Breaker with CT
Monthly Maintenance Work.
110KV Arani Link feeder,110KV Breaker,CT's & Line Isolator.
For Monthly Maintenance work.
UNIT 3
230/110KV Auto Transformer III,230KV Bus selection Isolators, Breaker, CT's & incoming ,out going isolators.
For Monthly Maintenance work.
110 k.v Sankaneri - Koodankulam # Breaker, CTs and Line Switches
Monthly maintence work
230KV SMPM-POYYUR # Breaker,CT's , Line Isolators and entire line portion.
Monthly Maintenance work, line Patrol work by AE/Lines/Kallakudy.
230KV Arani-Bhavini-II feeder Breaker,CT's and Line isolators.
For monthly maintenance work.
230 KV Checkanurani - Meelavittan feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
FOR MONTHLY MAINTENANCE WORK
110 KV Maruthur # Breaker, CTs & Line up to Maruthur SS
For monthly maintenance works
100MVA AUTO TR II HV II&LV II Bkr,CT&LAS
Monthly Mtce work.& Tan delta test
110KV ALKL-PASUMALAI I # Bkr&CT
Monthly Mtce work& GRT Annual relay testing
110KV ALKL-PASUMALAI I # sec between othakadai&IT Park SS
FOR tree clearence work
110KV BUS
110 KV Link II # Breaker and CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
Auto Transformers No.II & 110KV Western Side Bus, 110KV V.patty #, Tirupattur # breakers, CT’s
For replacing the defective surge monitors in 230/110 KV LAS, for carrying out routine monthly maintenance works.
110KV Station battery commissioning works
1. 110KV SBT - RNPM II # S/B Gandhigramam and RNPM 230KV SS2. 110KV SBT-Alundur # Bkr, CTs, relays and S/B SBT and Sengurichi SS
1. Monthly maintenance work 2. Tree cutting work and 'R' ph tapping switch problem rectification work at Angunagar SS.3. Relay testing work
230kv Thiruvalam Link-I #
1)110 KV Pasumalai - Anupankulam # BKR & CT, LI only. 2) Line entire
1)Maintenance Works of BKr & CT,LI 2) Flashed over disc replacement works. Tree cutting works and T-T Inspection works
230 KV GOBI - MTPS II Feede Breaker, CT’s and entire line
FOR MONTHLY MAINTENANCE WORK
110 KV Paalavadi -Dharmapuri feeder
Monthly maintenance work
230 KV Auto Transformer III , HV & LV Breaker with CT only.
For Monthly Mtc work
110 KV Kodikurichi WF # Breaker with CT & Isolators
For Monthly Maintenance Work
Preventive Maintenance Work
230KV TTPS-KOODANKULAM FEEDER ENTIRE LINE
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION
110KV Malco II Feeder
230KV Bus B
On 230/110 KV Auto Transformer III, HV III and LV III, breaker with CT and GRT testing
a) For Monthly Maintenance workb) GRT Annual relay and breaker testing
110 KV Cuddalore - Nathapattu # breaker with CT’s and Line side isolator.
For monthly maintenance works
Monthly Maintenance work
Monthly Maintenance Works
Autotransformer-I, Breaker, CT's and LAS
Monthly maitenance work
on 110 KV GC breaker with CT only
110 KV Tiruvannamalai-Kanji #, Breaker, CT's and Line Isolator
Monthly maintenance work
110KV Kadalangudy- Aduthurai- Neyveli TS I feeder portion between Kadalangudy-Aduthurai and Thirupanandal SS.
1)Line inspection and rectification work 2)Maintenance work
For Monthly Maintenance work
230KV Kadalangudy- Neively TS II feeder entire
1)Maintenance work 2)Annual relay testing work at KGDY end.
1.110 KV Gurubarapally feeder breaker,CTs, Line switch
Carryout Monthly Maintenance works by Maintenance wing
Autotransformer I with HV I/LV I Breaker and CTs only.
Monthly maintenance works.
110KV BUS LC entire 110KV Bus Sensationalizing isolator erection work & commission of 110Kv Bus coupler - II Breaker work.
110KV Thiruvarur - Thanjavur feeder sec bw Thiruvarur and Poondi
Line premansoon inspection and rectification work, Breaker, CTs and Line side isoaltor maintenance work
230KV Thiruvarur - PPN feeder & 230KV Thiruvarur - Thanajvur feeder
Errection of 230 KV Single circuit line on DC Tower for Power evacuation from Thermal Power Plant of by M/s. Nagai Power Pvt. Ltd. –Stringing of conductor over the Existing (Above) feeders
UNIT-1
110KV KPH2-THUDIYALUR 1 # For PMI Work
110 KV NEMMELI THIPPIYAKUDI-THANJAVUR FEEDER BREAKER,CT's & LINE ISOLATOR.
FOR MONTHLY MAINTENANCE WORK BY AEE/MTC/NEMMELI THIPPIYAKUDI.
100MVA Auto Transformer-II, HV-II, LV-II Breakers and their CTs and 110KV K.R.Thoppur-II feeder Breaker, CT’s & Line Isolator
Monthly Maintenance
Line portion between Thirupananthal 110KV SS and Pappakudy 110KV SS in 110KV Neyveli TS1 - Aduthurai feeder.
1) The Dismantling of Existing PA tower & Erection of GCR tower at location No. 9& 11 in 110KV Jayankondam spur line by TLC viruthachalam. 2) Restringing of old conductor in the newly erected towers.
Need Base Maintenance
110KV Erode- Elumathur # entire
230KV Ingur - Karamadai feeder
i. 230/110 KV, 100 MVA Auto Tr.I ii.230 KV Kalpakkam - Acharapakkam Feeder
i.Monthly Maintenance Work.ii.Line Maintenance Work.
110 KV Krishnapuram Feeder Breaker ,CTs
For Monthly Maintenance work
Jumber tightness work at tower loc no: 9& 24 line maintenance work
jumber tightness work & maintenance work taken by Ingur lines section
100 MVA Auto Transformer - I ,HV-I,LV-I Breaker's, CT's and Isolators.
a)Monthly maintenance work. b)Relay Testing work.
110KV Kurukathi # I Breaker, CTs, and Line side Isolator
MONTHLY MAINTENANCE WORKS
110KV Alundur - Thanjavur Feeder breaker,CT's, and Isolators. ( Alundur end only)
a) Preventive Monthly maintenance work. b) Premonsoon inspection and Tree cutting work. c)Relay testing work.
Autotransformer II and its HV II & LV Ii Breakers with CT’s and Isolators
MONTHLY MAINTENANCE WORKS
230KV Karamadai # Breaker, CT’s and Line side Isolator and 230 KV Auxillary Bus switch
MONTHLY MAINTENANCE WORKS & RCC STRUCTURE RENOVATION WORKS FOR 5 DAYS
110 KV Thiruvalam – Vellore II feeder (In between 230KV SS Thiruvalam and 110KV Katpadi SS).
For providing repair sleeves of strands cut Line in between Loc 27 &28.
230KV Thiruvalam - Link I feeder.
110KV Vyasarpadi Feeder.
110 KV Thiruvalam – Gudiyatham feeder entire.
For EHT line maintenance work.
For EHT Line Maintenance Works.
For Routine Maintenance Works.
230KV Bus entire For replacement of 230KV Northern Strung Bus from North side end to isolator switch No. 1-89B
110 KV APKM - MADURAI # Br., CT., and line switch only.
For Monthly Maintenance Works.
110KV LINK # II BREAKERS , CT'S AND ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK
110 KV APKM - PPTY # Br., CT., and line only
For monthly maintenance work.
110KV Villupuram – Thayanur #
110 KV Anuppankulam - Kayathar feeder Br., CT. and Line Switch only.
For monthly maintenance work.
110 KV Erode SS entire Top and Bottom bus.
Monthly maintenance work and Attending of HotSpot.
110kv Thiruttani feeder Breaker& ct's
For monthly maintenance work
230kv Auto transformer II,HV II,&LV II Breakers and &CT'S
For monthly maintenance work
To carry out Breaker and CT’s Monthly Maintenance Work.
110KV GC Breaker
110KV Ulundurpet feeder
110 KV MANALI FEEDER
i) On Auto Tr. –II, HV-II, LV-II Breaker and CT’s.ii)On 110KV Vellore-II Feeder, 110KVGudiyattam Feeder, Breaker and CT’s,(110kv Western Bus) for monthly maintenance work iii)On 230KV Link-I Feeder Breaker and CT’S
i) For monthly maintenance work in Auto Transformer –II, HV-II, LV-II Breaker and CT’s, ii) 110KV Vellore-II Feeder,110KVGudiyattam Feeder, Breaker and CT’s, (Western Bus) for monthly maintenance work. 110KV Vellore SS Loads will fed from 230KV Arani SS.iii) 230KV Link-I Feeder Breaker and CT’S for monthly maintenance work.
Breaker CTs & Line side isolator maintenance works.
Total shutdown maintenance work
General Maintenance Work
110 KV Deviakurichi-Krishnapuram Feeder(Section between Deviakurichy ss – Dhanalashmi Srinivasan Sugar Pvt Ltd)110 KV Deviakurichi-Thammampatty Feeder(Section between Mettla ss –Namagripet SS)
Jumper tightness work
Auto transformer-I and Auto transformer-II one by one
Monthly maintenance of auto tranformer-I & II
110 KV Kodikurichi WF # Breaker with CT & Line Isolators
For Monthly Maintenance Work.
110KV Servalar - Papanasam feeder- I
Tree clearance work at various location feeder -I
a) On 230/110 KV Auto-I, HV-I and LV-I breakers with CTs and LAS only.b) On 110KV Sipcot-TTN-III feeder breaker with CTs and line isolators only.
a) For monthly maintenance work.b) For monthly maintenance work.
On 230 KV Sipcot- CKNRI feeder breaker with CTs and line isolators only. (Th’ Bus Transfer Breaker)
a) For monthly maintenance work.b) For Annual relay test.
230 KV Palladam-PGCIL # Breaker,CTs and line entire
To carryout monthly maintenance work by AEE/Maintenance/Palladam and Line maintenance work by AEE/Lines/Palladam
110 KV Palladam - Santhaipet # Breaker,CTs and line side isolator
To carryout monthly maintenance work by AEE/Maintenance/Palladam
110KV PPM- KKI feeder breaker with CT
For carrying out monthly maintenance work.
110KV Sriperumbudur -Porur # IJumper tightness checking work.
100MVA Auto Tr. II Monthly maintenane work
110 KV Bus Coupler breaker with CTs
For monthly maintenance works
110 KV Arasur feeder breaker with CTs
For monthly maintenance works
230KV MYVADI LINK I FEEDER BREAKER &LINE ENTIRE
For Monthly Maintenance
110KV OKM -Thudiyalur #1 breaker and CTs only
For monthly maintenance work
230/33KV Power transformer-2 HV,LV Breakers with CT's and its 33KV feeder
Monthly Maintenance Work
230KV Myvadi-Link-I feeder Breaker,CT line entire
For Monthly Maintenance work and PMI by lines wing.
110KV TCS FEEDER Maintenance work
110KV HCL & WIPRO
230 KV Sriperumpudhur SS
230KV Thiruvarur - PPN feeder
230KV Gobi Feeder
Qtrly maintenance works
Maintenance & GRT relay changing work
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work
Monthly Maintenance work
i.230 KV Kalpakkam -Acharapakkam Feeder ii.230/110 KV,100 MVA Auto Tr.-II
i.Insulator replacement work.ii.Monthly maintenance work.
Unit 5
400/110 KV ICT#2 200 MVA
110 KV KODAMBAKAM #
230/ 110 KV, 100 MVA Auto-Transformer-1, Power transformer-I & II, all 11 KV feeders & 110 KV Nokia feeder
for Monthly maintenance works
FOR MONTHLY MAINTENANCE WORK
For maintenance works.
230KV Hosur - Yerandahally feeder entaire
Monthly maintenance work and line maintenance work
230 KV Bus Coupler Breaker and Transfer Bus CVT
Monthly maintenance work
For Quarterly maintenance work.
Unit 1
Unit I
110KV SHOLINGANALLUR FEEDER Maintenance work
Auto transformer II and its HV,LV breaker and CTs,LAS
To carryout monthly maintenance work by AEE/Maintenance/Palladam
Monthly maintenance work
For monthly maintenance work
230KV Siruseri # & 110KV Velachery # one after another
Annual relay test and Maintenance works
Auto Transformer III & 110 KV Bus Section II Isolator
Half yearly Maintenance Work
110 KV Arasur Local SS GCCB and 110 KV Capacitor Bank - III
Total shutdown works and monthly maintenance works.
230 KV TIE BREAKER & CT'S
230 KV SRP-KDM # Breaker,CT,Line switch & Line entire
Monthly Maintenance work, Tree clearance work,Annual Relay testing work
MTPS.I TO SINGARAPET 230KV FEEDER
MONTHLY MAINTENANCE
1. 230KV Bus B & Bus A, one after another 2. Auto II 3. 230KV Karuvalur feeder & ICT II one after another 4. 110KV BB PH II feeder
1. Rectification of Bus Isolators of 230 KV Karuvalur feeder (89B), ICT II (89B) & Auto II (89A) 2. OLTC oil changing work in Auto II 3. P & C TANDELTA testing work in Auto II
110 KV KARAIKUDI-VALUTHUR # SEC. BET. THIRUVADANAI TO THONDI
LINE MAINTENANCE WORKS
FOR Quarterly maintenance works
230/110 K.V. AUTO TRANSFORMER -II H.V and L.V Breaker
Oil leak rectification work in L.V. bushing and G.R.T Testing
110KV Santhavasal feeder 110KV Breaker, CT's & Line Isolator.
For monthly Maintenance work.
110KV KKDI-SVGA# S/b M.PATTY-SVGA
Tree clearance & Disc replacement work
400KV/230KV ICT-II
100MVA Auto transformer I
Auto Transformer III
110 KV Anuppankulam-T.kallupatti feeder sec b/w Erichanatham and T.Kallaupatti
For Line Maintenance Works
110 KV GC BREAKER & 66KV ENTIRE BUS
FOR MONTHLY MAINTENANCE WORK
230 KV MTPS # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
Preventive Maintenance Work
Monthly Maintenance work
For Monthly Maintenance
110KV Nangavally # Bkr,CTs & Line Switch
Monthly Maintenance Works
110KV ALR-SLR FEEDER NO-I CB,CT LINE ENTIRE
Quarterly Mtce work and patrol work by JE/Lines/pollachi
ON 110 kv kayathar - OT.Patty # breaker with CT only
For monthly Maintenance work
110KV KPH2-THUDIYALUR 1 # For PMI Work
230KV MTPS Feeder
110KV Capacitor Bank II entire
Monthly Maintenance Work
100 MVA Auto Transformer – I ,HV & LV Breakers and CTs
For Monthly Maintenance work
110KV MELAKALLUR-SANKANERI FEEDER SEC B/W KARISALPATTI & MELAPALAYAM
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
110KV KAYATHAR-K.G.PATTI FEEDER SEC B/W KAYATHAR&KALUGUMALAI.
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATION.
MONTHLY MAINTENANCE WORKS
230 KV Sulurpet Feeder, Breaker,230KV CTs Line Isolator
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
110 KV Korattur-Kadaperi I feeder
UNIT 2 OF MOYAR POWER HOUSE
110 KV Ingur II feeder breaker , CT and line side.
Monthly maintenance work and attending of Hot spot
100MVA Auto Transformer II, HV II & LV II BRs, HV II & LV II and their LAS,CTs and isolators.
For a) Monthly Maintenance works
230KV THIRUVALAM FEEDER Breaker&CT'S only
For monthly maintenance work
Jumper Tightness work
110 KV Deviakurichi-Thammampatty Feeder(Section between Mettla ss –Namagripet SS)
Jumper tightness work
FOR MONTHLY MAINTENANCE WORK
110KV Kannarpatty - Uthumalai feederSection between (Uthumalai-Veerasigamani)
Defective jumper replacement work at location No.16 &23 and replacement of disc at location No.3,14,24 .
230KV MYVADI LINK II FEEDER BREAKER &LINE ENTIRE
For Monthly Maintenance and Panel replacement work by P & C Wing..
110KV R.S.Puram -1 feeder breaker and CTs only
For monthly maintenance work
230/33KV Power transformer-3 HV,LV Breakers with CT's and its 33KV feeder
Monthly Maintenance Work
Tree clearance work
110 KV DPH-Auto SS feeder 2
230KV Pushep feeder
230KV Myvadi-Link-II feeder Breaker,CT line entire
For Monthly Maintenance work, PMI by lines wing and Panel replacement work by P&C Udumalpet.
110 KV SRP - KDR I # section between TKY & VNR
1.Monthly Maintenance.2.Annual rely testing
110 KV DPH-Barrage 1 feeder entire
1.Monthly Maintenance.
230 KV Arasur - Gobi feeder Breaker & CTs
Monthly maintenance works and Tan delta measuremet of CTs by P & C wing/ CBE
For Monthly maintenance work of Breaker, CTs, line side CVT, Isolators
110 KV KAVANOOR-PIONEER (PENNA)
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
110 KV T.NALLUR FEEDER LINE (ENTIRE RADIAL FEEDER )
FOR MONTHLY MAINTENANCE WORK OF 110 KV EHT LINE FROM 230KV SS TO T. NALLUR SS
100MVA, 230/110 KV Auto Transformer-II - HV & LV Breakers and Current Transformers only.
For monthly maintenance works.
230KV Sangaraperi-2 feeder Main breaker (212-52)& CT,CVT
Monthly Maintenance work
230KV TTPS-CHECKANURANI FEEDER ENTIRE
For monthly maintenance work
On 230KV TTN-Kayathar feeder entire
For Tower to Tower Inspection and Rectification work.
110KV Samayapuram - Trichy Grid feeder line portion between 110KV Poovalur SS and 110KV Thiruvanaikoil SS.
For premansoon EHT line inspection work.
230 KV Checkanurani - TTPS feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
On 110 KV KKDI - DVKT # S/B KKDI - DVKT
For disc replacement work.
230 KV Othakkalmandapam # Breaker, CT& Line entire
For monthly maintenance works
Tree clearance work
100 MVA AUTO TRANSFORMER - II
110KV Bus section III
230 KV Sunguvarchatram - Nokia feeder
Lines LC and jumper tightness works
110KV ALKL-KKDI # Sec bet thaniyamangalamss and Thirupathur SS
230 KV Eachangadu-Neyvely TS I # Breaker & CT's
For monthly maintenance works
Quarterly maintenance
230 KV GOBI-Arasur Feeder Breaker, CT’s and entire line
FOR MONTHLY MAINTENANCE WORK
110 KV Theni- Kinnimangalam I &II # Breaker with CT only ( One by one )
For Monthly Mtc work
1. Replacement of existing strung bus (Zebra) by Moose conductor2. Monthly maintenance work
230 KV Veeranam # Breaker with CT & Isolators
For Monthly Maintenance work
110 KV Panruti Spur Line
110 KV Theni -Rasingapuram # Breaker with CT & line
For mtc works & attending premonsoon remarks
400/110KV ICT 4 MAIN BREAKER, TIE BREAKER AND LV BREAKERS WITH CT AND TRANSFORMER BAY NOS 412,411 AND 106
MONTHLY MAINTENANCE WORK
On 230 KV Kayathar - TTN AUTO #, breaker with CT and entire line
a) For monthly maintenance workb) Tower to Tower inspection work
Auto transformer II HV & LV breakers with CTs
For monthly maintenance works
At Loc. 25 & 26 Railway crossing Jumper arc and Tightness checking.
1)230/110KV Auto Transformer I (100MVA), HV I Breaker & LV I breaker, CT's, Isolators.
1)For monthly maintenance work .
110KV Salem-I # Bkr,CTs & Line Switch
Monthly Maintenance Works
230KV BUS - I
110 KV Barriage-IV # CT , Breaker
230 KV Tiruvannamalai-Singarapet #, Breaker, CT's and Line Isolator
Monthly maintenance work
110KV Kavindapadi feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
230KV BUS - I maintenance work.
A) 110KV NEMMELI THIPPIYAKUDI-KOVILKALAPPAL (VIA:VADASERI) FEEDER BREAKER, CT's, AND LINE ISOLATOR. B) 110KV NEMMELI THIPPIYAKUDI-KOVILKALAPPAL (VIA:VADASERI) FEEDER ENTIRE.
A) FOR MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ N.T.KUDI. B) FOR PREMONSOON INSPECTION & RECTIFICATION WORK BY AE/LINES/ PATTUKKOTTAI.
Auto-II HV &LV side - Entire transformer,LAS, CT, Breaker and Switches
Monthly maintenance work
Monthly maintenance work
230KV KARAMADAI #
110KV KPH2-THUDIYALUR 2 # For PMI Work
Sankari feeder Breaker, CT’s & Line Isolator.
Monthly Maintenance
110 KV NT Kudi I feeder (Line Portion between T(K)GTPS and 110 KV Vadasery SS)
(1) Breaker, CTs and Line Isolators maintenance works.(2) Breaker testing works.
Monthly Maintenance
230 KV S.P.Koil -Kalpakkam-I Feeder
Line Maintenance Work.
110KV POCHAMPALLI SIPCOT # SF6 BREAKERS, CT'S AND ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK
110 KV APKM- Rajapalayam - II feeder Br., CT.
For monthly maintenance work.
110 KV Korattur-Kadaperi I feeder
Auto transformer III, HV III and LV III Breaker,CT's and LAS only.
For Monthly maintenance Work .
100MVA Auto Transformer III, LV III BREAKER, LAS, CTs and ,LV III I/C Isolator.
For a) Monthly Maintenance works
110 KV Thirukoilur - Deviyakuruchi # ( between Thirukoilur and Ariyalur SS)
For inspection of jumper joints at various locations in the Devaradiarkuppam LILO
Jumper Tightness work
110KV Unjanai - Elanager # line portion between Elanager SS and Rasipuram SS.
Jumper tightness checking
1.110KV UNJANAI - BKB-II FEEDER BREAKER , CT'S AND LINESIDE ISOLATOR ONLY .2.AUTO TR NO : I BREAKERS AND CT'S ONLY
FOR MONTHLY MAINTENANCE WORK
110KV Valuthur - Karaikudi feeder Breaker ,CT's only
BHAVANISAGAR MHPH 110 KV GC & 11 KV LV
For GRT Annual Relay & Breaker Tests on 110 KV GC & 11 KV LV Breakers at MHPH / Bhavanisagar
1.110KV UNJANAI - SANKARI FEEDER BREAKER AND IT'S CT'S ONLY.
FOR REPLACING OF CONTROL AND RELAY PANELS IN SANKARI 110KV FEEDER WITH NEW PANEL
230 KV Veeranam # Breaker with CT & Line Isolators
For Monthly Maintenance Work.
110KV Kannarpatty - Keelaveeranam feederSection between (Keelaveeranam-Surandai)
Defective jumper replacement work at location No.4 ,9and defective disc replacement work at location No.7,9&21 .
230kV Veeranam-Kodikuruchi Feeder CT with line switch.
For Quarterly and Monthly Maintenance work.
On 110KV Sipcot-TTN-I feeder breaker with CTs and line isolator only.
For monthly maintenance work.
For Monthly Maintenance Work
230KV TTN - Kayathar Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
110KV OKM -Thudiyalur -2 feeder section between 110KV Seeranaickenpalayam SS to 110KV Somayampalayam SS
PMI work carry out by Lines Thudiyalur wing
230/110 KV Auto Transformer I , 230KV HV Breaker I with CT, 110KV LV Breaker I with CT.
For monthly maintenance work
230 KV OKM-Ponnapuram feeder breaker with Cts and line Isolators (89L) and line entire
For monthly maintenance work
110KV Rajapalayam feeder breaker with C.T and Bus & Line Isolators and 110KV Reddiapatti feeder breaker with C.T and Bus & Line Isolators
For monthly maintenance work
110 KV Alangulam feeder breaker with C.T and Bus Isolator, 110KV Bus section I and 110 KV PT-I
For monthly maintenance work
110 KV NNPT - Reddiapatty feeder section between 110 KV Reddiapatti SS and 110 Kv SIVAKASI ESI SS
Earth wire cut rectification work at LOC.No. 6 to 8
100 MVA AUTO TR I HV I & LV I Br
MTPS.I TO MTPS.II LINK FEEDER
110 KV DPH-Barrage 1 feeder entire
1.Monthly Maintenance.
110 KV UDT –O.K.M -I # breaker, CT’s and line. Between UDT and Anthiyur
Monthly Maintenance Work
110 KV Capacitor Bank - II, Breaker, CTs & Cell units
Monthly maintenance works
230 KV Arasur - Karamadai feeder Breaker & CTs.
Monthly maintenance works of Breaker & CTs, Main I relay changing works by P & C wing / CBE and jumpering works for new 230 Kv Shenbagapudur LILO by TLC/MTP of GCC/CBE.
Monthly Mainteanace work, Annual Relay testing work
110KV SAMUGARENGAPURAM FEEDER BREAKER, CT & LINE sW
MONTHLY MAINTENANCE WORK
MONTHLY MAINTENANCE
1. 110KV CBE-TDLR I # Breaker & CTs. 2. 110KV CBE-TDLR II # Breaker & CTs ( One by One)
1.Monthly maintenance works .
400 KV PGCIL (ARASUR) Feeder II
230KV Arasur
230KV/110KV Auto tr I
230 KV Bus 'A'
For Monthly maintenance work of Main & Tie Breaker, CTs, line side CVT, Isolators & for LAS base rearrangement work by L & T
For providing jumper at loc 2 nearby Bellepalayam village by TLC Mettupalayam wing.
MONTHLY MAINTENANCE WORKS
400/110 KV, 200 MVA Auto-Transformer-III with Tie-3 Bkr(OCC)
For Monthly maintenance work
FOR Monthly maintenance work
400KV Main Breaker for ICT-2 (410-52) 400KV Tie Breaker for ICT-2 & ICT-3 (411-52) & 230KV LV Breaker for ICT-2 (206-52), 400/230KV ICT-2
Monthly Maintenance work
POWER TRANSFORMER-II, HV.BREAKER-II, LV.BREAKER-II & 33KV RAMCO, WINDFARM, ENERCON FEEDERS
FOR QUARTERLY & MONTHLY MAINTENANCE WORKS
On 230KV TTPS-Kayathar-I feeder entire
For Tower to Tower Inspection and Rectification work.
230KV TTPS-KAYATHAR - I FEEDER ENTIRE
ANNUAL MAINTENANCE OF STRUNG BUS INSULATORS & RELAY TESTING, TRANSDUCER (MW) REPLACEMENT BY MRT - 1
LMBPH 2/NPT Switch yard 110kV Common Bus & equipments.
To carryout testing and Commissioning works of 110KV Bus PTs (set-1)
For Annual relay test.
UNIT 6
UNIT NO 3
230KV Arani-Singarapet feeder Breaker,CT's and Line isolator.
For Monthly maintenance work.
230 KV Checkanurani -Sembatty feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
On 230/110 KV 50 MVA Auto Transformer - 3 & its allied equipment.
FOR MONTHLY MAINTENANCE WORK
110 KV Thungavi # Breaker & CTs & line upto Thungavi SS
For monthly maintenance works
FOR MONTHLY MAINTENANCE WORK
230KV Arani # Breaker and CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
400 KV Tie-III breaker
230/110KV Auto Transformer II HV & LV breakers and CTS
Monthly Maintenance works and Annual relay tests by P&C wing Gobi.
For Quarterly maintenance works
110 KV Pasumalai - (Tirumangalam) -Kinnimangalam 3 # BKR & CT,LI only. and section between Pasumalai SS and Tirumangalam SS - Line LC.
1)Maintenance Works of BKR & CT,LI 2)Tree cutting works in the section between Pasumalai SS and Tirumanglam SS .
Capacitor Bank II Breaker and CTs only
FOR MONTHLY MAINTENANCE WORK
110KV Bus section II 1. Replacement of existing strung bus (Zebra) by Moose conductor. 2. Monthly maintenance work
230KV SBT-CKNI-Myvadi DC feeder Bkr, CTs, relays and line entire
1. Erection of square cross arm on existing DC towers on CKNI - Myvadi # at Sembatti SS end. (take off tower)2. Monthly maintenance work, relay testing work, tree cutting work and at loc. 7 & 15 earth bond rectification work on 230KV CKNI #.
Auto Transformer - I
110KV Bus section I
For Monthly Maintenance Work
110 KV Thudialur - Sandinallah feeder section between Thudialur and Maruthur
For new line stringing work at 230/110 KV Thudialur SS new 110 KV bay
1. Releasing and stringing of strung bus for replacement of Zebra by Moose conductor in 110KV Bus section II and replacement of exg. bus coupler switch by new switch.2. Monthly maintenance work
On 230 KV Kayathar - TTPS I #, breaker with CT and entire line
a) For Monthly Maintenance workb) Tower to Tower inspection work
230KV Thiruvalam Link-II #
AUTO TRANSFORMER III
110KV Rc Plant Feeder
Preventive Maintenance Work
Monthly maintenance work
230KV Cuddalore- TAQA # breaker, CT’s line side isolator
For monthly maintenance works
110 KV neyveli Deviakurichi feeder I & II (In Feeder I section between 110KV Adari SS and 110KV Bethasamuthram, In feeder II 110KV Veppur SS and Deviakurichi
110KV Nainarpalayam ABS Feeder I & II complete maintenance works.
Monthly Maintenance work
on 110 KV Melakallur - Thalaiyuthu # breaker with CT only
For monthly Maintenance work
on 110 KV Kayathar - Periyar # breaker with CT and GRT testing
a) For monthly Maintenance workb) For annual relay and breaker testing
110KV Kadalangudy- KGTPS feeder entire
1)Line inspection and rectification work 2)Maintenance work
400/110KV ICT-III,Tie-II Bkr,HV&LV Side Bkr,CTs
Monthly Maintenance Works
110KV Barrage II feeder Bkr,CT & Line switch
Monthly Maintenance Works
230KV Bus Coupler Breaker
230KV Thiruvalam - Link II feeder.
110KV Vembadithalam # Bkr,CT & Line Switch
Monthly Maintenance works
230KV Bus coupler Breaker maintenance work.
110 KV S.P.Koil- M.M.Nagar-I Feeder
Quarterly Maintenance Work.
110 KV TASPL Feeder( Neyveli Feeder- II) Breaker and CTs.
For Monthly Maintenance work
1.110 KV PERIYA KODIVERY -GOBI FEEDER
Annual Relay test and Maintenance work
100MVA Auto Transformer-III HV-III, LV-III Breakers and their CTs and 110KV Rasipuram feeders Breaker & CT’s
Monthly Maintenance
For EHT Line Maintenance Works.
100 MVA Auto Transformer -III. For Routine Maintenance Works.
230 KV Bus Coupler Breaker, CT’s,Isolator and main bus
MONTHLY MAINTENANCE WORKS & RCC STRUCTURE RENOVATION WORKS FOR 5 DAYS
110KV METTUR # I SF6 BREAKERS, CT'S AND ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK AND FOREST AREA VARIOUS LOCATION TREE CUTTING WORK
110 KV Capacitor Bank - II Br., CT. and line switch only.
For monthly maintenance work.
230 KV Pugalur - Pudansanthai feeder Breaker, CT, Line switch
For Monthly maintenance work.
230 KV Pugalur - Paramathy II feeder Breaker, CT & line switch and line entire only
For Monthly maintenance work
110 KV Salem – Rasipuram feeder Jumper checking work
i)On 230KV Link-II feeder Breakers and its CT’s and Line Isolators
i)For Monthly Maintenance Works
230KV Puthansanthai-Pugalur # line entire
Jumper tightness checking
230KV Neyveli TS-II Feeder
Auto Transformer - I
It is proposed to avail line clear TS II - 230 KV Ulundurpet feeder for carrying out the relay test by GRT / Villupuram .
230KV Pugalur feeder CB, CTs, CVTs, Wave Traps and 230KV Switches.
For monthly maintenance works.
110KV KGTPS KADALANGUDI FEEDER BREAKER
REGULAR AND ROUTINE BREAKER MAINTENANCE AND TESTING WORKS
110KV KGTPS KADALANGUDI FEEDER BREAKER
REGULAR AND ROUTINE BREAKER MAINTENANCE AND TESTING WORKS
MACHINE-3 GENERATOR & ALL ITS AUXILIARIES
FOR MONTHLY MAINTENANCE
For Monthly Maintenance Work.
On 110KV Sipcot-TTN-II feeder breaker with CTs and line isolators only.
For monthly maintenance work.
110KV TTN - Sipcot- II Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
110 KV GC Breaker with CTs, Bus PT-II, 110 KV KMDI-I feeder bay with CTs & Line, 110 KV Pykara feeder breaker with CTs & Line
For monthly maintenance works & New line stringing works by GCC wing / CBE for new 110 KV bay by GCC / wing CBE
110KV BPH1-MDPH Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
Monthly maintenance work in 110KV BPH1-MDPH Feeder - SF6 Breaker, CT, Line side Isolator and Earth Switch
230 KV PH3 to PH2 Feeder
16MVA Pr.Tr.III Monthly maintenane work
230KV KITS -Tharamani #
50 MVA Power Transformer I Maintenance
110 KV GC Breaker with CTs, Bus PT-II, 110 KV KMDI-I feeder bay with CTs & Line, 110 KV Pykara feeder breaker with CTs & Line
For monthly maintenance works & New line stringing works by GCC wing / CBE for new 110 KV bay by GCC / wing CBE
110Kv OKM-Irugur feeder breaker ,CTs and Line switches
For monthly maintenance work
For monthly maintenance work
110 KV COIMBATORE I & II FEEDER BREAKER WITH CTS
For Monthly maintenance works
230/ 110 KV AUTO TR-II WITH HV BREAKER & LV BREAKER AND CTs
For Monthly maintenance works & OLTC DIAPHRAM REPLACEMENT WORK BY Tr.ERECTION WING COIMBATORE
110 KV Geddai-I & II feeder BREAKER AND CTs
For Monthly maintenance works
Insulator and jumper replacement work
Machine 3
230KV Villupuram – Ulundurpettai #
To carry Breaker and CT’s Monthly Maintenance Work.
Monthly Maintenance.
110 KV SRP-MPL # Br ,CT & Line switch and Line section between SRP to ARAL
Monthly Maintenance work, Tree clearance work,Annual Relay testing work
230KV POWER TR4,HV & LV BREAKER.&33KV BUS 4, 33KV SIMRAN 1 TO4
1.TO REPLACE STRAND CUT VERTICAL DROPPER IN R PH .IN 33KV BUS 4. 2) MONTHLY MAINTENANCE WORK
1. 110KV CBE-Arasur # section between CBE SS and Kallimadai SS .
1. PMI works by AE/Lines /CBE.
110 KV KARAIKUDI-VALUTHUR # SEC. BET. VALUTHUR & R.S.MANGALAM (INCLUDING SALAIGRAMAM SPUR LINE)
LINE MAINTENANCE WORKS
230 KV PUDUKKOTTAI-ALUNDHUR FEEDER BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE
FOR MONTHLY MAINTENANCE OF BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE AND GRT TESTING WORKS
On 230KV TTPS-Kayathar-II feeder entire
For Tower to Tower Inspection and Rectification work.
230/33 k.v. Power Transformer-I H.V and L.V breaker
Monthly Maintenance work
110 KV SMPM- Srirangam # Breaker and CT's only (Tied feeder)
Monthly Maintenance Work.
110 KV Periyar - Suruliyar feeder Breaker with CT and Line side AB Switch
Monthly Maintenance Work.
230KV TTPS-KAYATHAR - II FEEDER ENTIRE
ANNUAL MAINTENANCE OF STRUNG BUS INSULATORS
Auto Transformer -II
110KV Pasumalai - Sembatty# Vadipatti spurline
For Tower to Tower inspection & flashover disc replacement work
230 KV S.D.PALAYAM # Breaker, CTs & line Entire
For monthly maintenance works & Annual testing by P&C Wing
230 KV Sriperumbudur - NCTPS feeder
Lines LC and jumper tightness works
110 KV Kavundapadi Feeder Breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
1)110 KV Pasumalai - Arasaradi SC Feeder Line LC section between Pasumalai SS and Arasaradi SS
Provision of 1 DP structure with isolator near Arasasadi SS Premises for easy isoaltion of 110/33-11KV KV Arasaradi SS from Pasumalai - Arasaradi Feeder SC line
For Monthly Maintenance work
110KV Bus section I 1. Replacement of existing strung bus (Zebra) by Moose conductor.2. Monthly maintenance work
110KV Bus section II 1. Releasing and stringing of strung bus for replacement of existing strung bus (Zebra) by Moose conductor in 110KV Bus section I.2. Monthly maintenance work
110KV SBT - RNPM III # Bkr, CTs, relays and S/B SBT and V.N.Patti
1. Monthly maintenance work2. Tree cutting work3. Relay testing work
230KV SBT - CKNI-Myvadi DC feeder Bkr, CTs and line entire
1. Dismantling of 230KV line from exg. CKNI-Myvadi DC take off tower to CKNI and Myvadi # lattice structure. (Loc. C-D & F-G)2. Erection of 230KV SC line from exg. CKNI - Myvadi DC take off tower to newly erected SC take off tower for new Karaikudi bay. (KKDI bay to be renamed as CKNI bay. Loc B-D)3.Erection of new line from exg. CKNI - Myvadi DC take off tower to CKNI # lattice structure. (CKNI bay to be renamed as Myvadi bay. Loc C-E)4.Erection of new line from exg. Theni - Karaikudi DC take off tower to Myvadi # lattice structure. (Myvadi bay to be
400/110KV ICT 5 MAIN,LV BREAKERS WITH CT AND TRANSFORMER BAY NO 413 AND 109
MONTHLY MAINTENANCE WORK
On 230 KV Kayathar - TTPS II #, breaker with CT, Lines Inspection and GRT Works
a) For monthly maintenance work,b) Tower to Tower inspection workc) Relay replacement, and breaker testing works by GRT
Auto transformer I HV & LV breakers with CTs
For monthly maintenance works
230KVSS K.R.Thoppur - Thingalur feeder entire
For Jumper cone tightness checking work at Tension Towers Between T LOC NO:77-97
110KV Perambalur-Koothur feeder(Ariyalur) Breaker CT's only
For monthly maintenance work
230KV MYVADI LINK I FEEDER BREAKER &LINE ENTIRE
For Monthly Maintenance and Panel replacement work By P&C wing.
110KV Palaiyur- KGTPS feeder entire
Line inspection and rectification work.
110KV ALR-NGM FEEDER CB,CT LINE ENTIRE
Quarterly Mtce work and Line patrol work by JE/Lines/pollachi
110 kv Alamathy-HVF#
1.110KV Karimangalam feeder breaker, CTs,Line switch 2.Auto Transformer -III with HV- III Breaker and CTs & LV- III Breaker CTs and Auto III Transfer Switch 3.Shoolagiri 230KV feeder breaker CT`s, Line switch, and Transfer Switch and Line Between 230 KV Karimangalam SS to 230 KV Shoolagiri SS.4.230 KV TBC ( Bus Coupler) Breaker with isolators for Transfer Switch maintenance Purpose.
Carryout Monthly SS Maintenance works by maintenance wing and Lines wing Programed in 230 KV Shoolagiri feeder Arching rods 8 Nos to be provided at location No: 40,56,57.
110KV Thumbipady # Bkr,CT&Line Switch
Monthly Maintenance Works
110Kv Gobi feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
110KV T(K)GTPS-MANNARGUDI-THIRUVARUR FEEDER (LP:110KV ULLIKKOTTAI SS TO 110KV MANNARGUDI SS)
PREMONSOON INSPECTION & RECTIFICATION WORK BY AE/L/PATTUKKOTTAI
MONTHLY MAINTENANCE WORK.
110KV KPH2-THUDIYALUR 2 # For PMI Work
110 KV S.P.Koil -Oragadam -II Feeder
Quarterly Maintenance Work
110KV KAYATHAR-N.SUBBIAHPURAM FEEDER SEC B/W KAYATHAR & VIJAYAPURI
FOR DEFECTIVE DISC REPLACEMENT WORK AT VARIOUS LOCATIONS
LC on 230KV Alundur - Pudukkottai Feeder breaker, CT'S, CVT'S and Line Isolators.
a)Monthly preventive maintenance work. b)Premonsoon inspection and tree cutting work. c)Relay Testing Work.
110 KV Kanchipuram – Kaveripakkam feeder (In between 110 KV Pallur SS and 110 KV Damal SS).
For EHT Line maintenance work
Auto Transformr I 100 MVA GRT Annual Relay Test and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
110 KV Ingur III feeder breaker , CT and line side.
Conducting annual relay test by AEE/P&C-I/Erode, attending HOt spot and Monthly maintenance work.
110 KV Echur- Mazhaiyur - Thayanur # ( between Chetpet and Gingee SS )
For inspection of jumper joints at various locations in the line between loc. No. 1 and 28 off Thayanur LILO
230 KV Sadayapalayam-Ponnapuram feeder breaker and Isolators
Monthly maintenance and P&C check.
i)On 110KV Vellore-I Feeder Breaker and CT’s
i) For 110KV Vellore-I Feeder Breaker and CT’s,for monthly maintenance work and to attend 110KV Isolator defect
110 KV Korattur-Kadaperi II feeder
Auto Transformer - II
Jumper Tightness work
110KV KGTPS - PALAIYUR FEEDER BREAKER
REGULAR AND ROUTINE BREAKER MAINTENANCE AND TESTING WORKS.
For Monthly Maintenance Work.
110KV Kodikurchi-Kannarpatty feederSection between ( Alangulam-Kannarpatty)
Defective disc replacement work at location No. 12, 24 .
For Monthly Maintenance Work
230KV KITS -Tharamani #
100MVA Auto .III
a)110KV Uthumalai -Surrandai Feeder Breaker with CTb)110 KV Uthumalai -Auro mira FeederBreaker with CT
For monthily maintanance work
110KV TTN - Sipcot- III Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
230/110KV Auto Transformer -3,HV3 and LV3 breakers and CTs with LAS
For monthly maintenance work
Insulator and jumper replacement work
Monthly maintenance work
1. 230KV UNJANAI - P.CHANTHAI FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY
FOR MONTHLY MAINTENANCE WORK
230KV/110KV Auto Tr II
230 KV Bus 'B'
230KV Unjanai feeder CB, CTs, CVTs, Wave Traps and 230KV Switches.
For monthly maintenance works.
110 KV UDT –Okm – II #r breaker, CT’s and Section between UDT and Kongalnagaram.
Monthly Maintenance Work
110 KV Coimbatore I & II feeder breaker with CTs
For monthly maintenance works
110 KV Arasur - Kaniyur feeder Breaker & CTs
Tan delta measuremet of CTs by P & C wing/ CBE
230KV UDAYATHOOR-ABISEKAPATTI FDR(PGCIL)BREKER, CT CVT &LINE SW
1.ANNUAL RELAY TEST BY GRT/SR.PUDUR. 2) MONTHLY MAINTENANCE WORK
MONTHLY MAINTENANCE WORKS
FOR Monthly maintenance work
230 KV Southern Bus Entire
On 110KV ARNI-SRPudur-II feeder (Section between 110KV KKLM SS and 110KV Radhapuram SS )
For Tower to Tower Inspection and Rectification work.
110KV Kinnimangalam - Theni II feeder section between Kinnimangalam and K.Vilakku
For Tower to Tower inspection and Line maintenance Work
For monthly maintenance works
230 KV Thiruvalam # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
ICT-1 (400-230 KV)-315 MVA
400 KV BUS - I
400/230 KV ICT#3 315 MVA
110KV Thalavaipet feeder Breaker and CT only
Monthly Maintenance works .
100 MVA AUTO - II, HVB - II, LVB - II, CT only.
Monthly Maintenance Works
1)110KV Pasumalai - Alagarkoil -1 # BKR & CT,LI . 2) Line LC Section between Pasumalai -Vandiyur SS.
1)Maintenance Works of BKR & CT, LI 2) Tree cutting works and T-T Inspection works
110 KV Thingalur Feeder Breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
Monthly maintenance work
Commissioning Activities - Bus bar protection checking stability in-view of commissioning of Rasipalayam III and IV
For maintenance works.
110KV S.P KOIL #-II
Auto Transformer -III
110KV KNMLM THENI II
Quarterly Maintenance
For Monthly Maintenance work
230 KV Theni-Sempatty # Br., C.T and line isolator
For line mtc works & attending premonsoon remarks
110 KV Karamadai-I feeder section between 110 KV PNP SS and 230 KV Karamadai SS
For loop jumper removal and new loop provision work in 110 KV Karamadai-I feeder
230KV SBT - Theni # Bkr, CTs, and line switch
Monthly maintenance work
On 230/110 KV Auto transformer I, HV I and LV I, breaker with CT and GRT works
a) For Monthly maintenance work b) Relay replacement, and breaker testing works by GRT
Monthly maintenance works for breaker and CT
230KV MTPH Feeder
Monthly Mtce work
230KVSS Mettur – Tunnel Power House feeder entire
Jumper cone Tightness checking at LOC TNO: 5 & 6 River Crossing TNO: 7 & 8 Railway crossing TNO:27 & 28 Railway crossing Towers at 230KVSS Mettur- Tunnel Power feeder
110 KV Cuddalore - Spic Pharma # breaker, CT’s & Line side isolator
For monthly maintenance works
230 KV Ulundhurpettai- Villupuram
To Check jumper tightness at various locations
Monthly Maintenance work
on 110 KV Kayathar - Kodikurichi #, breaker with CT only
For monthly Maintenance work
1.110 KV Bargur feeder breaker, CTs & Line switch
Carryout Monthly SS Maintenance works by maintenance wing
230/110KV AUTO TRANSFORMER-I WITH HV&LV CB,CTs
230KV Thiruvalam-Singarapet # Preventive Maintenance Work
230KV Salem Steel Plant -II # Bkr,CT & Line Switch
Monthly Maintenance Works
110 KV Neyveli # I Breaker and CT’s
For Monthly Maintenance work
230KV ABISEKPATTI-UDAYATHUR FEEDER ENTIRE LINE
FOR JUMBER TIGHTNESS CHECKING AT VARIOUS LOCATION
230KV Thiruvalam – Singarapet feeder entire.
For replacement of damaged disc at Loc 334 & 335
110KV Ponnapuram # II Breaker, CTs,
MONTHLY MAINTENANCE WORKS
Tie Breaker and CTs
110KV METTUR II # SF6 BREAKERS, CT'S AND ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK AND FOREST AREA VARIOUS LOCATION TREE CUTTING WORK
110 KV Trichy – Punalkulam feeder Breaker , CTs , line isolator and line portion between 230 KV, Trichy SS and 110 KV Mathur SS.
a) For monthly maintenance works. b) Pre monsoon inspection
For Monthly Maintenance work
Auto Transformer - III
i)On 230KV Chittoor interstate feeder Breakers and its CT’s and Line Isolators
i)For Monthly Maintenance Works
110 KV VGTPS - RSmadai -Kavanur feeder section between VGTPS and R.S. Madai
For attending tower to tower Inspection and Tree cutting work
230KV MTPH - AUTO SS FEEDER AND ITS BREAKER, CT'S & LINE ISOLATORS
FOR MONTHLY MAINTENANCE
Monthly maintenance work
Auto transformer III and its HV,LV breaker,CTs and LAS
To carryout monthly maintenance work by AEE/Maintenance/Palladam
110 KV Palladam-Veerapandy # Breaker,CTs and line section between Palladam-Veerapandy
To carryout monthly maintenance work by AEE/maintenance/Palladam and Line Maintenance work by AEE/Lines/Palladam
110 KV Palladam - Elavanthy # breaker,CTs and line entire
To carryout monthly maintenance work by AEE/Maintenance/Palladam and Line Maintenance work by AEE/Lines/Palladam
AUTO TRANSFORMER III HV III & LV III COMPLETE
For Monthly Maintenance.
230/110 KV Auto II, 230KV HV Breaker II with CT, 110KV LV Breaker II with CT
For monthly maintenance work
110 KV Thottiapatti # breaker with C.T and Bus & line isolators,
For monthly maintenance work
110KV Bus Section II with 110 KV PT-II and 110KV Kodikuruchi # Breaker and bus isolator 110KV Bus Section II with 110 KV PT-II and 110KV Kodikuruchi # Breaker and bus isolator
For monthly maintenance work
110KV OKM -Negamam -1 feeder breaker and Cts with line switchs
For monthly maintenance work
230/33KV Power transformer-4 HV,LV Breakers with CT's and its 33KV feeder
Monthly Maintenance Work
230KV Myvadi-Sempatty feeder Breaker,CT line entire
For Monthly Maintenance work & PMI by lines wing.
230KV Cuddalore- Neyveli TS-1# , breaker,Ct’s with line side isolator.
For monthly maintenance works
230 Kv Echur - Kalpakkam #
230KV Cuddalore- Neyveli TS-1# , breaker,Ct’s with line side isolator
For monthly maintenance works
230KV KAYATHAR(400KV)-MADURAI FEEDER ENTIRE LINE
FOR LINE INSPECTION & RECTIFICATION WORK.
230KV Madurai feeder Main Breaker (202-52) & CT,CVT
Monthly Maintenace work
230 KV/110 KV Auto Tr. - II with HV breaker and LV breaker with CTs
For monthly maintenance works & OLTC Diaphram replacement work by Transformer Erection wing CBE
Monthly Maintenance work carried in all Cts and isolators in 230 KV Echur - Kalpakkam #
Tree clearance work110 KV SRP-KDR II # section between TKY to KDR including MTM,MCI,NDKV and KZI spur line
1. 110KV CBE- Arasur # section between Kallimadai SS and 230KV Arasur SS. 2. 110KV CBE # Breaker & CTs . 3. Auto Transformer I . 4. HV I Breaker & CTs. 5. LV I Breaker, CTs & LAS .
1. PMI Works by AE/Lines /CBE. 2. Monthly Maintenance Works .
110 KV KAVANOOR-PARAMAKUDI # SEC. BET. KAVANOOR AND PARAMAKUDI
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
G.R.T. Testing work.
AUTO II, HVII, LVII , 110 KV LV II BUS (SOUTHERN SIDE ), 110 KV SIPCOT FEEDER BREAKER, 110 KV BUS COUPLER BREAKER AND 110KV ALANGUDY-EID PARRY FEEDER LINE PORTION BETWEEN 110 KV NAGUDY SS AND KODIKKULAM SS
AUTO II, HVII, LVII, BREAKER, ISOLATORS AND EHT LINES MAINTENANCE, 110 KV BUS II STRENGTHENING WORKS BY TRANSFORMER ERECTION TRICHY WING AND GRT TESTING WORKS.
110 KV SVC chatram - Palayaseevaram feeder entire
For Monthly Mtce. work
On 110KV TTN-Sipcot-I feeder (Section between 230KV Auto SS and 110KV Vagaikulam SS))
For Tower to Tower Inspection and Rectification work.
110 K.V. Sankaneri- Udayathur # breaker, CTs, line switches.
230KV Bus Coupler
100 MVA Auto Transformer-II, HV-II, LV-II, Breakers , CT's, and isolators
Monthly Maintenance Work
110KV Arani-Sirungattur feeder,110KV Breaker,CT's & Line Isolator.
For Monthly Maintenance work.
110KV Kaveripakkam feeder,110KV Breakers, CT's & Line Isolator.
For Monthly maintenance work.
230/110KV Auto Transformer I,230KV Bus selection isolators, Breaker, CT's & incoming ,out going isolators.
For Monthly Maintenance work.
Monthly Maintenace work
230 KV Checkanurani - Kayathar II feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
On 230 KV KKDI - N.T KUDI # entire
UNIT 2
Monthly Mtce work
230 KV MAIN BUS FEEDER AND 110 KV DEVIYAKURICHI-II FEEDER / CT,BREAKER. 230 KV BUS,BUS PT-I
MONTHLY MAINTENANCE
A) For tree cutting workB) For Annual relay testc) For Brk & CTs mtc work
FOR MONTHLY MAINTENANCE WORK
100MVA AUTO TR I HV I & LVI Bkr,CT&LAS
Monthly Mtce work& GRT Tan delta test
110KV ALKL-PASUMALAI II # Bkr&CT
110 KV VIRUTHACHALAM FEEDER BREAKER,CT's
For MONTHLY MAINTENANCE WORK
110 KV Tirupattur # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
110KV SR Pudur Feeder No.II
Auto transformer I, LV I Breaker & CTs
To carry monthly maintenance work by AEE/MTC/230 KV SS / SPT
80 MVA ,Auto Transformer I &HV I, LV I Breaker,CT's & their related Equipments
For Monthly maintenance works.
GRT Annual relay testing and monthly maintenance of breaker CT & LS
Auto Transformers No. I & 110KV Eastern Side Bus, 110KV Ambur # breaker & its CT’s
For replacing the defective surge monitors in 230 /110 KV LAS and for carrying out routine monthly maintenance works
1)230 KV Pasumalai - Kayathar #, BKR & CT,LI only. 2).Line Entire.
a)Maintenance Works of BKR & CT,LI b)Tree Cutting works and T-T inspection works
110KV Anthiyur feeder Breaker,CT and line switch.
Monthly Maintenance works .
230/110KV Auto Transformer I HV & LV breakers and CTS
Monthly Maintenance works .
Auto Transformer-I HV, LV Breaker and CTs
FOR MONTHLY MAINTENANCE WORK
230 KV Pasumalai - Kayathar # BKR & CT only.
Replacement of the existing age old and defective 230KV , 110V DC Operated HBB make SF6 Breaker by the newly drawn CGL Make breaker in 230 KV Pasumalai - Kayathar feeder at Pasumalai 230KV SS, due to persisting gas leak problem in B Phase limb under breaker Open condition.LC could be Entered only for 3 days . whereas the actual LC Required is from 23.09.2017 to 12.10.2017
400 KV Paalavadi-Thiruvalam II feeder
Monthly maintenance work
400 KV Paalavadi-MTPS-II -II feeder
Monthly maintenance work
110 KV Tenaksi -Papanasam # breaker with CT & isolators
For Monthly Maintenance Work
110 KV TNI-Periyar I #(Uthama palaym SS Spurline only)
mtc of Line Isolotors at UPM ss
110KV UTHUMALAI FEEDER BREAKER AND CT BAY NO 108
MONTHLY MAINTENANCE WORK
230/110 KV Autotransformer - II, HV, LV, Breaker, CT’s and LAS only.
For Monthly maintenance work
110KV Malco III feeder
230 TBC/BC BREAKER CTs and B Bus side switch of 230KV AUTO-1 # (203-89A)
For Monthly maintenance work of Bus transfer Switch (203-89A)
110 KVKaruvalur- Arasur I feeder Breaker, CTs. only
For Monthly maintenance work
On 230 KV Kayathar - Checkanurani II #, breaker with CT, Lines inspection and GRT Works
a) For monthly maintenance workb) Tower to Tower inspection workc) Relay replacement, and breaker testing works by GRT
110 KV Cuddalore - J.K. Pharma # breaker, CT’s., Line side isolator
For monthly maintenance works
110KV DSSL Feeder (Krishnapuram) breaker CT's only
For monthly maintenance work.
Monthly Maintenance work
110KV Kadalangudy- KGTPS feeder entire
Line inspection and rectification work
110KV KGTPS- Kumbakonam feeder entire
Line inspection and rectification work.
Autotransformer-II, Breaker, Ct's and LAS
Monthly maintenance work
110 KV tiruvannamalai Link #, Breaker, CT's and Line Isolator
Monthly maintenance work
110 KV Tiruvannamalai-Vinnavanur #, Breaker, CT's and Line Isolator
Monthly maintenance work
110KV KGTPS- Kumbakonam feeder entire
Relay testing work at KGTPS end.
400KV Bus Section-I
230/110KV Auto transformer II; HV-II; LV-II
1)Maintenance work 2)Relay testing work
1.110 KV Dharmapuri feeder breaker, CTs and Line Switch
Carryout Monthly SS Maintenance works by Maintenance
Monthly Maintenance Works
110KV Kodavasal - Kovilvenni feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work and Annual Relay Test by GRT wing.
A)230KV NEMMELI THIPPIYAKUDI-KARAIKUDI FEEDER BREAKER, CT's AND LINE ISOLATOR. B)230KV NEMMELI THIPPIYAKUDI-KARAIKUDI FEEDER.C)230KV NEMMELI THIPPIYAKUDI-KARAIKUDI FEEDER BREAKER, CT's.
A) MONTHLY PREVENTIVE MAINTENANCE WORK BY AEE/MTC/ NEMMELI THIPPIYAKUDI. B) PREMONSOON INSPECTION & RECTIFICATION WORK BY AE/LINES/PATTUKKOTTAI.C) ANNUAL RELAY TESTING BY AEE/P&C/THANJAVUR.
110 KV BKB-I # CT, Breaker
110KV KPH2-THUDIYALUR 2 # For PMI Work
110 KV Railway I feeder.
Monthly maintenance work
110 KV PERIYA KODIVERY -MOYAR FEEDER
Annual Relay test and Maintenance work
110KV Singapuram-I feeders Breaker & CT’s
Monthly Maintenance
110KV Alundur - Sempatty feeder Breaker's,CT'S and Line section between 230 KV SS Alundur up to vaiyamppatty 110 KV SS.
a) Monthly maintenance work. b)premonsoon inspection and tree cutting work. c)Relay testing work.
110KV THALAIYUTHU-ICL-1 FEEDER ENTIRE LINE
FOR JUMPER TIGHTNESS CHECKING WORK
For EHT Line Maintenance Works
110 KV Sugar Mill feeder entire. For EHT Line Maintenance Works.
110 KV Thiruvalam – Kaveripakkam feeder (In between 230 KV Thiruvalam SS and 110 KV Sipcot SS).
For EHT Line Maintenance work.
110 KV Thiruvalam – M.V.Puram feeder entire.
For EHT line maintenance works and Jumper tightness works.
110KV Mosur – Sholinghur feeder in between 230KV Mosur SS and 110 KV Sholinghur SS.
For EHT line maintenance works and jumper replacement work at loc 129.
110 KV Anaicut – V.Patty feeder entire.
For EHT Line Maintenance Works.
230 KV kamatchi Feeder, Breaker,230KV CTs Line Isolator
GRT Testing and Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
110 KV Arani - Kaveripakkam feeder(LC in between 110 KV Timiri SS and 110 KV Kaveripakam SS).
For attending arcing horn tightness checking work.
230 KV PSQ - KYTR # entire.
110 KV APKM - Thulukkapatti I feeder Br., CT at both ends and Line entire.
(a) For Monthly Maintenance Works (b ) For Monthly Maintenance Works at Thulukkapatti SS.
For replacement of flash over disc at Loc. No. 214
110 KV BKB - I feeder,CT and line side
Attending hot spot and monthly maintenance work.
110 KV Trichy Link I & II feeder breaker , CTs & Line Isolator and line entire one by one.
a) For monthly maintenance works. b) Pre monsoon inspection
Thiruvallur feeder Breaker and Cts
Sholinghur feeder breaker and CTs
Auto Transformer–II ,Northern BusAnd110 KV Villupuram - Thirukoilur # ( between Karanaiperichanur and Thirukoilur substations)
1.Auto Tfr –II Monthly maintenance work.2.To carry out Breaker and CT’s Monthly Maintenance WorkAndFor replacement of weak insulators at location No. 2 off Karanaiperichanur LILO
For monthly maintenance work
Auto Transformer IV,HV-IV,LV-IV,breaker and CTs
For Monthly Maintenance work.
For monthly Maintenance work
230KV NCTPS - Tondiarpet 2 #
110 KV Ko-Poovanur feeder
110KVVillupuram – Acharapakkam #
Breaker CTs & Line side isolator maintenance works.
i) On Auto Transformer –I, HV-I, LV-I , Auto Transformer –IV, HV-IV, LV-IV Breakers and its Cts ii)On 110KV Sugar Mill feeder and 110KV Railway –I Feeder Breaker and CT’s, for monthly maintenance workiii)On 110KV Kaveripakkam feeder Breaker and its CT’s, iv)On 110kv M.V.Puram Breaker and its CT’s for monthly mtce. work
i)For Auto Tr -IV,HV -IV,LV-IV, and Auto Tr -I,HV -I,LV-I for monthly maintenance work,ii)On 110KV Kaveripakkam feeder Breaker and its CT’s,110KV Sugar Mill feeder,110Railway-I Feeder and110kv M.V.Puram Breaker and its CT’s for monthly mtce. Work(110KV Eastern Bus). The 110KV SIPCOT SS Loads will fed from 230KVSS Arani SS.
Jumper tightness & Tower to tower inspection.
Total shutdown maintenance work.
Auto Transformer III
100MVA AUTO TR-2
110KV KGTPS-KUMBAKONAM RADIAL FEEDER WITH ENTIRE LINE AT BOTH END
REGULAR AND ROUTINE BREAKER MAINTENANCE AND TESTING WORKSRELAY TESTING BY GRT WING
For Attending Auto Transformer III HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
FOR GENERAL MTC WORK
110 KV Singapuram- Deviakurichi -11 Feeder (Section between P.G.Palayam ss -Singapuram ss)
Jumper tightness work
110KV K.Venni-K.Vasal feeder(bay108) and 110KV Sakottai feeder(bay 104) one by one
feeder breaker and isolator monthly maintenanace
110 KV KGTPS - Saakkottai feeder
110KV Punnalkulam - Trichy feeder (Line portion between 110KV Grid SS Punnalkulam & 110KV Veeramarasenpettai SS)
For GRT relay test carried out by AEE/ Maintenance / 110KV Grid SS/ Punnalkulam
For jumper checking & tree cutting works carrying out by the AEE/Lines/ Thanjavur.
110 KV Tenkasi - Papanasam # Breaker with CT & Line Isolators
For Monthly Maintenance Works.
110KV Kodikurchi- Tenkasi-Papanasam feederSection between ( Kadayam-Rastha -Papanasam)
Defective disc replacement work at location No. 32&33 .
For Monthly Maintenance Work
110KV Switch yard entire
For Monthly Maintenance Work
110 KV Veerasigamani feeder breaker with CT
For monthily maintanance work
110KV Switch yard monthly maintenance works.
110KV PPM- SVLR feeder-1 breaker with CT.
For carrying out monthly maintenance work.
110KV TTN - Sipcot- I Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
110KV OKM-Udumalpet 2 feeder breaker and CTs only
For monthly maintenance work
230KV Myvadi-Pugalur feeder Breaker,CT line entire
For Monthly Maintenance work & PMI by lines wing.
230KV Sriperumbudur - Kadapperi # I
Quarterly maintenance work.
100 MVA Auto Transformer II Maintenance
UNIT-2
100 MVA AUTO TRNSFORMER-2
230KV Korattur feeder
25MVA Power transformer II &10MVA Power transformer –IV
Monthly maintenance work
230 KV Nokia-Sriperumbudur feeder breaker, CTs & Line isolators
For Quarterly maintenance work
400/ 230 KV,315 MVA, Auto-Transformer-II
For monthly maintenance works
230 KV Sriperumbudur - Nokia feeder
Lines LC and jumper tightness works
Monthly Maintenence
For Quarterly maintenance work.
Routine Mainteance work
Unit 2
Unit III
100MVA AUTO TRANSFORMER-II Maintenance work
230KV Manali Feeder
110KV KPH2-THUDIYALUR 2 # For PMI Work
Monthly maintenance work
For monthly maintenance work
110 KV Geddai-I & II feeder BREAKER AND CTs
For Monthly maintenance works
Routine Maintenance Work
230 KV Eachangadu- # poyyur BREAKER, CT's, &LINE CVT
FOR MONTHLY MAINTENANCE WORK
Auto Transformer III HV III, LV III and CTs maintenance work.
230 KV KV Karamadai feeder BREAKER AND CTs
For Monthly maintenance works
230 KV Arasur - PUSHEP feeder Breaker & CTs and line entire.
Monthly maintenance works of Breaker & CTs and PMI works in the line and Relay testing and Auto reclosure enabling works by P & C wing/CBE
110 KV SRP-PZR # Br,CT and Line switch and Line entire
Mainteanace work,Jumper tightness checking
On 230KV TTPS - MADURAI feeder entire
For Tower to Tower Inspection and Rectification work.
230/33K.V. Powertransformer-II H.V and L.V Breaker.
Monthly Maintenace work.
230KV TTPS-MADURAI FEEDER ENTIRE
For monthly maintenance work
UNIT 7
AUTO TRANSFORMER-II AND 110 KV SALEM-I FEEDER/Auto transformer-II and HV ,Breaker,CT LAS and LV Breaker CT ,LAS
MONTHLY MAINTENANCE
FOR MONTHLY MAINTENANCE WORK
110 kv Pennadam (Radial) Feeder BREAKER , CT'S.
FOR MONTHLY MAINTENANCE WORK.
50 MVA ,Auto Transformer II &HV II, LV II Breaker,CT's & their related Equipments
For Monthly maintenance works & Annual Relay test by GRT/VPM.
ICT-2 (400/110 KV)-200 MVA
Tree cutting work
1)230 KV Pasumalai - TTPS #, BKR & CT,LI only. 2).Line Entire.
a)Maintenance Works of BKR & CT,LI b)Tree Cutting works and T-T inspection works
1).110 KV Pasumalai - Arasaradi SC Feeder # Breaker & CTonly. 2)Line entire
1)Monthly Maintenance Works of BKR & CT 2) Tree cutting works and T-T Inspection works
110 KV Barrage III PH Feeder Breaker & CT only.
Monthly Maintenance works .
230 KV BUS COUPLER Breaker with CT’s
FOR MONTHLY MAINTENANCE WORK
Monthly maintenance work
230 KV Theni - Moozhiyar # Breaker with CT.& Line
Line Monthly Mtc and premonsoon inspection
110 KV SBT-UDPT # S/B Pappampatty and M.N Patty
110KV MDPH I Feeder
400KV Bus Section-II
230kv RNPM-PGLR # Breaker and CT
1)monthly maintenance2)GRT Relay testing work
Monthly Maintenance work
110KV ALR-SLR FEEDER NO-II CB,CT LINE SECTION BETW ALR SS AND IYARPADI SS
Monthly Mtce work AND LINE PATROL WORKS
230KV Thingalur # Bkr,CT & Line Switch
Monthly Maintenance Work and Relay replacement work by P&C/Salem
Monthly Maintenance Works
230KV KR Thoppur feeder Breaker, CTs and Line Isolator only.
Monthly maintenance works.
110KV Thiruvarur - T.R.Pattinam feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work.
110 KV & 230 KV Bus-Coupler breakers (one by one)
For monthly maintenance works by the AEE/Mtce/Thanjavur
230kv ARASUR#
400KV/230KV ICT-II
Monthly Maintenance
Monthly Maintenance work as approval by OCC
230KV Alundur - Paramathy Feeder Breaker, CT's, CVT's and Line Isolators.(Alundur End Only)
a)Monthly Preventive Maintenance work. b)Relay Testing Work.
110KV KAYATHAR-O.T.PATTI FEEDER SEC B/W SEETHA PARPANALLUR & O.T.PATTI
FOR JUMPER TIGHTNESS CHECKING WORK
110KV Erode II # Breaker, CTS, Line side Isolator
MONTHLY MAINTENANCE WORKS
110KV KAYATHAR-O.T.PATTI FEEDER SEC B/W SEETHA PARPANALLUR & O.T.PATTI
FOR JUMPER TIGHTNESS CHECKING WORK
110KV KAYATHAR-VANCHIMANIYACHI TRACTION FEEDER ENTIRE LINE
FOR JUMPER TIGHTNESS CHECKING WORK
230 KV TTPS - PSQ # entire.
110 KV Thulukkapatty-Aruppukottai # section between 110 KV MRPM SS & 110 KV Thulukkapatty SS
(a) For providing GI Metal spike on tower cross arm . (b) For monthly maintenance work
For premonsoon inspection work.
230KV Pugalur - Ranganathapuram feeder Breaker, CTs & line switch and entire line only
Monthly Maintenance work.
110 KV Singapuram – I feeder between Udayapatty 110KV SS to Kitchipalayam 110KV SS
Jumper checking work
230 KV Alamathy feeder breaker and CTs,
For monthly maintenance work
110 KV Villupuram- Kandamangalam #And110 KV Villupuram - Kandamangalam #
Breaker CTs & Line side isolator maintenance works. And1.)For replacement of the existing PG clamps at loc. No. 103 and for inspection of insulators at loc. No.89 & 90.( AEE/Lines/Vpm)2.) For stringing of 230 KV Cuddalore - Veerapuram line across the 110 KV Villupuram - Kandamangalam between loc. No.60 & 61 by AEE / TLC / Cuddalore
110KV KN Patty feeder CB, CTs and Line Switch. 110KV East Bus, its PTs and 5 Nos.East Bus side Switches.
For monthly maintenance works.
110KV VGTPS - Perungulam For attending breaker and it's CT's and isolators Monthly Maintenance work.
110KV Uthumalai-Vannikonanthal feeder breaker with CT
For monthily maintanance work
110 KV POOLAVADY FEEDER BREAKER AND LINE ENTIRE SEC BETWEEN UDUMALPET & THUNGAVI
For Monthly Maintenance.
230KV Kalivanthapattu-Tharamani #
Insulator and jumper replacement work
For PMI works
110 KV Echur - Kaliyampoondi #
230KV ALKL-ALUNDUR feeder breaker ,CT&Line entire
monthly maintenance work& Annual relay testing work by GRT wing/ pasumalai.
110 KV Kinnimangalam-PSQ-I feeder Entire
For Line Maintenance works
110 KV OKM-I & II feeder BREAKER AND CTs
For Monthly maintenance works
110 KV Karamadai-II feeder section between keeranatham ss and koilpalayam ss
Monthly Masintenance work in all CTs and Isolators in 110 KV Echur - Kaliyampoondi #
110 KV Arasur - Karuvalur 2 feeder Breaker & CTs
Monthly maintenance works
110 KV SRP-SNRI # Breaker CT and Line switch. 110 KV SRP-SNRI # section between SRP - Perungudi
Monthly Mainteanace work,Line Mainteanace work,Annual relay testing work
230 KV Arasur - Kundah PH 2 feeder Breaker & CTs
For compressor overhauling works and line side isolator gear box defect rectification works.
230KV UDAYATHOOR-KAYATHAR FDR.BREAKER, CT,CVT& LINE SW
1.ANNUAL RELAY TEST BY GRT/SR.PUDUR. 2) MONTHLY MAINTENANCE WORK
110 KV KAVANOOR-R.S.MADAI-VGTPS # SEC. BET. KAVANOOR AND R.S.MADAI
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
POWER TRANSFORMER-III, HV.BREAKER-III, LV.BREAKER-III & 33KV MICON-I,MICONII & MICON VI FEEDERS
FOR QUARTERLY & MONTHLY MAINTENANCE WORKS
On 230KV TTPS-Sipcot feeder entire
For Tower to Tower Inspection and Rectification work.
110 KV SMPM-Kallakudi -II # CT's , Breakers and entire line portion (tied feeder) .
Monthly Maintenance Works and Line Patrol Work.
230KV TTPS-SIPCOT FEEDER ENTIRE
For monthly maintenance work
110KV Kannamangalam #,110KV Breaker, CT's & Line Isolators.
For Monthly maintenance work.
On 110 KV KKDI - TCP # Brk & Ct's
400 KV Main Breaker for ICT3 (412-52), 400 KV Tie Breaker for ICT2 & ICT3 (411-52), 230KV LV Breaker for ICT3 (203-52). 400/230KV ICT3
Monthly Maintenace work
230/110KV Auto Transformer II,230KV Bus selection isolators, Breaker, CT's & incoming ,out going isolators.
For Monthly Maintenance work.
230 KV Checkanurani - Nallamanaikanpatty feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
For Brk & Ct's mtc work
230 KV Myvadi I # Breaker, CTs & Line entire
For monthly maintenance works & Annual testing by P&C Wing
230 KV ALKL-Alandhur # Bkr,CT,&Line entire
Monthly Mtce work& TREE CLEARENCE WORK.
PH-2 Machine
230 KV Tie Breaker
230 KV Tiruvannamalai # Breaker & CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
monthly maintenance of Generator and alied equipments, Back washing of UGB & LGB oil coolers and Butterfly valve water filter cleaning & overhauling
230 KV Shoolagiri feeder breaker, CT’s & line isolators
For attending monthly maintenance works and for jumper tightness checking works in cut point towers of 230 KV VNM – Shoolagiri #.
110 KV Pasumalai - Kinnimangalam # - I BKR & CT,LI only.
Maintenance Works of BKR & CT,LI
For Monthly Maintenance Work
110KV ALANKULAM FEEDER BREAKER AND CT BAY NO 111
MONTHLY MAINTENANCE WORK
110 KV Karuvalur-Thekkalur feeder Breaker ,line switch and Its CTs.
For Monthly maintenance work .
Tree cutting work
110KV Malco feeder I
110KV KNMLM – PASUMALAI I # Entire
Monthly maintenance works for breaker and CT
On 230 KV Kayathar - Udayathur #, breaker with CT and entire line
a) For monthly maintenance workb) Tower to Tower inspection work
110 KV Capacitor Bank II with Breaker & CT’s
For monthly maintenance works
110KV SBT - PSQ # Bkr and CTs only
Monthly maintenance work
1)230/110KV Auto-III,HV-III,LV-III Breakers CT'S & Isolaters only.
For monthly maintenance works.
110KV SBT - Udumalpet # S/B S.V.Patti and Pappampatti
Monthly Maintenance work
230KV Link-I# Bkr,CT&Line Switch
110KV BUS COUPLER CB AND CT
110 KV Sankari-I # CT , Breaker
110 KV Tiruvannamalai-Thandrampet #, Breaker, CT's and Line Isolator
Monthly maintenance work
110KV Vaitheeswaran Koil- Manalmedu- LTPCL feeder entire
Line inspection and rectification work
Monthly Maintenance works
110 KV KVLR-Nambiyur # Breaker, CTs along with Line switch
For Monthly maintenance work and Line maintenance by AEE/Lines/Palladam and AEE/Lines/Gobi.
MONTHLY MTCE WORKS
110KV Thiruvarur - T(K)GTPS Express feeder
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work and Annual Relay Testing work by GRT wing.
Monthly maintenance work
110 KV Thanjavur - Punalkulam feeder, Breaker, CT & LI(Line portion between Thanjavur 230 KV SS & Punalkulam 110 KV Grid SS)
1) For monthly maintenance works by the AEE/Mtce/Thanjavur,2) For jumper checking works by the AEE/Lines/Thanjavur3) For annual relay testing works by the AEE/P&C/Thanjavur
110 KV S.P.Koil- Acharapakkam -II Feeder
Quarterly Maintenance Work.
110 KV Deviakurichy-Singipuram feeder- I Breaker, CTs
For Monthly Maintenance work
230KV Link-I feeder Breaker, CT’s & Line Isolator.
Monthly Maintenance
L.C. on 230KV Alundur - Alagarkoil Feeder Breaker CT'S,CVT'S and Line Isolators.
a) Preventive Monthly Maintenance Work. b) Relay testing Work c) Premonsoon Inspection Work.
AUTO TANSFORMER II
110KV Erode III # Breaker, CTs, Line side Isolator
MONTHLY MAINTENANCE WORKS
Auto Transformer I and its HV & LV Breakers with CT’s and Isolators
MONTHLY MAINTENANCE WORKS
230KV Thiruvalam – Mosur feeder entire.
For EHT Line maintenance work.
GRT TESTING AND MONTHLY MAINTENANCE WORK- CT Clamp, and Bolt Nuts replacement work.
110 KV Arani - Kanamangalam feeder in between 110 KV Kilpalipet and 110 KV Thorapadi SS.
For EHT Line Maintenance work
110KV SAMALPATTI RAILWAY # I SF6 BREAKER, CT'S AND ENTIRE LINE
FOR MONTHLY MAINTENANCE WORK.
110KV KAYATHAR-PAPANASAM FEEDER SEC RASTHA&PAPANASAM
FOR JUMPER TIGHTNESS CHECKING WORK
(a) 110 KV K.G. Patti - Kayathar feeder section between 110 KV Perumal patti SS and 110 KV Mudangiar SS. (b) 110 KV Suruliyar - Kayathar feeder section between 110 KV Sangarankoil SS and Suruliyar PH
(a) For replacement of flash over disc at Loc. No. 6, 7 & 21. (b) Tree cutting works.
230 KV NNPTY - CKNII feeder entire.
Jumper bolt rectification work at Loc. No.5
230 KV Paruthiyur feeder breaker, CT & Line switch only
Monthly Maintenance work
1. 110KV Trichy - Kovilur feeder breaker, CTs, line isolator and Line portion between 230KV SS Trichy and 110KV Kavalkaranpatti SS.
a) For monthly maintenance works. b) Pre monsoon inspection
230KV Salem KR Thoppur Link-I feeder
Jumper checking work
110 KV Bus Cop feeder breaker and CTs
For Monthly maintenance work.
110KV Unjanai-T.Gode # and Unjanai – Sankagiri # and BKB-II – T.Gode line entire
Dropper jumper tightness checking at T.Gode SS.
i)On 230KV Mosur feeder Breakers and its CT’s and Line Isolators
i)For Monthly Maintenance Works
1. 110KV UNJANAI - NALLUR FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.2.110KV UNJANAI - T.GODE FEEDER BREAKER, CT'S AND LINESIDE ISOLATOR ONLY.3. AUTO TR NO :II BREAKERS AND IT'S CT'S ONLY.
FOR MONTHLY MAINTENANCE WORK
230 KV Tie Breaker
Auto-II, HV & LV-II CBs, CTs, LASs and 230KV Switches.
For monthly maintenance works.
For Monthly Maintenance Works.
110KV Servalar - Papanasam feeder- II
Tree clearance work at various location in feeder II .
On 230 KV SIPCOT-TTPS Feeder breaker with CTs and line isolators only.
For monthly maintenance work.
For Monthly Maintenance Work
110KV TTN - ARNI - II Feeder breaker with CT bus & line side switches
For Monthly Maintenance Works
110KV CAPACITOR BANK I ENTIRE
Auto Transformer IV and its HV,LV side breaker and CTs
To carryout monthly maintenance work by AEE/Maintenance/Palladam
110 KV Palladam-Tirupur # Breaker, CT's and Line side isolator
To carryout monthly maintenance work by AEE/Maintenance/Palladam
For Monthly Maintenance.
230 KV NNPT - CHEKKANURANI feeder Breaker with CT&Line isolator
For monthly maintenance work
110KV OKM-Negamam -2 feeder breaker and CTs
For monthly maintenance work
230KV Myvadi- Ponnapuram-I feeder Breaker,CT line entire
For Monthly Maintenance work & PMI by lines wing.
230KV Kalivanthapattu-Tharamani #
Insulator and jumper replacement work
230KV Kundha PH 3 feeder
110 KV UDT –Gudimangalam – #r breaker, CT’s and line between UDT and Gudimangalam
Monthly Maintenance Work
230KV UDAYATHOOR-SANKANERI FDR,BR., CT., CVT., L.SW
MONTHLY MAINTENANCE WORK
For Monthly maintenance work of Breaker, CTs, line side CVT, Isolators
110 kV LMBPH 2 to LMBPH 3 feeder equipments, Line side isolator and Earth Switch at LMBPH-2.
For monthly maintenance works in breaker,CTs, Line side isolator and Earth Switch
110KV BPH3-BPH2 # BKR, CT, Line isolator, entire line
To carry out the Monthly maintenance work
230 KV KAVANOOR-SIPCOT #
230KV BUS COUPLER BREAKER
G.R.T. Testing work.
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
400/110 KV, 200 MVA Auto-Transformer-IV with Tie-3 Bkr(OCC)
For Monthly maintenance work
230 KV Oragadam - Sriperumbudur feeder
FOR Quarterly maintenance works
FOR QUARTERLY & MONTHLY MAINTENANCE WORKS
On 230KV Sipcot - Kavanoor feeder entire
For Tower to Tower Inspection and Rectification work.
230K.V Sankaneri- Udayathur # breaker CTs and Line Switches.
230KV Kayathar-1 feeder main breaker (204-52) & CT,CVT,LAS
Monthly Maintenace work
230KV Arni-Sriperumpudhur feeder(Both End),230KV Breaker, CT's & Line Isolator
For monthly Maintenance work.
UNIT 1
230 KV Checkanurani - Amuthapuram feeder entire
For Monthly Maintenance Work, Line Maintenance Work and P&C Work
230 KV DEVIYAKURICHI FEEDER/ CT,BREAKER,WAVE DRAP.
MONTHLY MAINTENANCE
On 110 KV KKDI - DVKT # S/B s.vayal - TVNI entire line
For disc replacement work.
FOR MONTHLY MAINTENANCE WORK
110KV Pethapampatty # breaker & CTs & line upto Kottamangalam SS
For monthly maintenance works
230 KV Sriperumbudur - Arni feeder
Lines LC and jumper tightness works
PH-2 Machine
110 KV SSREL # Breaker, CTs & line isolators
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
i) GRT-LBB wiring and testingii) Exciter cleaningiii) 55Mva Gen.TR Maintenanceiv) 110KV SF6 Unit breaker maintenance v) Quarterly Runner Inspection
110KV Mettur Feeder Breaker CT and Line switch.
Monthly Maintenance works .
110 KV GOBI Feeder breaker, CTs with line switch
FOR MONTHLY MAINTENANCE WORK
400/230 KV ICT#5 HV Main breaker 9(1)52 only
For maintenance works.
110 KV Kits park Feeder
110 KV Kits park Feeder
Quarterly Maintenance
Quarterly Maintenance
110KV section I Breaker with CT & Isolators
For Monthly Maintenance Work
110 KV Capacitor Bank I with Breaker & CT’s
For monthly maintenance works
230KV MTPS II – Thingalur feeder entire
i) For Jumper cone tightness checking work at Tension Towers Between 87-143 andii) To Rectified the Bolt Nut at Arking Rod at B phase Towers LOC NO:143
230 KV Sadayapalayam-Palladam feeder breaker and Isolators.
Monthly maintenance and P&C check.
On 230 KV Kayathar - 400 KV Kayathar I LINK #, breaker with CT, Lines inspection and GRT Works
a) For monthly maintenance workb) Tower to tower inspection workC) Relay replacement and breaker testing works
110kv sbt - UDUMALPET # bKR, ctS AND s/b SBT and S.V.Patti
1. Monthly maintenance work2. Tree cutting work
110KV Anthiyur Feeder with 110KV Auxiliary bus Entire
Monthly Maintenance work & Auxiliary bus conductor replacement work Portion between ABS1 to ABS2
230KV Thingalur Feeder
1)230/110kv Auto Transformer I HV, LV breaker,CT and relay.2)110kv RNPM - PGLR # breaker and CT
1)monthly maintenance2)GRT relay testing work
110KV ALR-AKY FEEDER CB, CT AND LINE SEC BETW ALR SS AND AKY SS
HALF YEARLY MTCE AND LINE PATROL
110Kv Salem-II# Bkr,CT & Line Switch
Monthly Maintenance works
110KV Thiruvarur - Mayiladuthurai feeder (Line portion between 110KV Neelagudy SS to 110KV SS Peralam)
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work.
Monthly Maintenance work
110 KV SANMAR FEEDER
i.230/110 KV, 100 MVA Auto Tr.IVii.230 KV Oragadam -Sriperumbudur Feeder.
i.Monthly maintenance work.ii.Line maintenance work.
230 KV Deviyakurichy – Singipuram # Breaker, CTs and Line side isolator both end.
For Monthly Maintenance work
110KV Alundur - Trichy-II Feeder breaker,CT's, and Line Isolators.
a)Monthly maintenance work. B)Relay testing work.
Monthly Maintenance work, CT Clamp, and Bolt Nuts replacement work.
110KV KAYATHAR-K.G.PATTI FEEDER SEC B/W KARIVALEMVANTHANALLUR & PERUMALPATTI
FOR DEFECTIVE DISC REPLACEMENT AT VARIOUS LOCATIONS
110KV TRICHY - ALUNDUR II breaker,CTs & Line Isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
110KV TRICHY - ALUNDUR II breaker,CTs & Line Isolator and line entire.
a) For monthly maintenance works. b) Pre monsoon inspection
110KV Kadalangudy- LTPCL feeder entire
1)Line inspection and rectification work 2)Maintenance work
110KV Villupuram – Thiruvananamalai #
Breaker CTs & Line side isolator maintenance works.
110KV Athipet - L & T #
Auto Transformer I
230 KV buscoupler breaker with CT
230 KV Current transformer replacement works in 230 KV Buscoupler bay for Kfw Augumentation works
To re-fix the jumper @ 110KV Mellur SS towards Panjetty SS, Which was already opened for 400KV line crossing work. After completion, the 110KV supply extended to panjetty SS.
For Attending Auto Transformer I HV and LV breakers and it's CT's and isolators Monthly Maintenance work.
230KV idle Bus, its PTs, Bus Coupler CB, CTs and idle Bus Switch.
For monthly maintenance works.
230 KV Deviyakurichy – Singapuram Feeder
Jumper tightness work
110KV CAPACITOR BANK II ENTIRE
MACHINE-4 GENERATOR & ALL ITS AUXILIARIES
FOR MONTHLY MAINTENANCE
110 KV Bus section I Breaker with CT & Isolators
For Monthly Maintenance Works.
On 230 KV Sipcot-KVNR feeder breaker with CTs and line isolators only.
For monthly maintenance work.
230 KV Palladam-Sadayapalayam# Breaker,CTs and Line entire
To carryout monthly maintenance work by AEE/maintenance/Palladam and Line Maintenance work by AEE/Lines/Palladam
For Monthly Maintenance.
230/110KV Auto Transformer 2,HV/LV 2 breakers and CTs with LAS
For monthly maintenance work
230 KV PH3 to Karamadai Feeder
230KV Bus Coupler Breaker only.
100MVA Auto Tr. III Monthly maintenane work
110 KV velachery SS Maintenance230KV KPH4-THUDIYALUR # For PMI Work
Tree clearance work
110KV Thudialur II Feeder
230KV Amuthapuram-checkanoorani Feeder with Breakers,CTs and its isolators
Monthly Maintenance Work
For monthly maintenance work
For Monthly Maintenance work
110 KV SRP - KDR I # section between PPI and KDR
110 KV Capacitor Bank - III, Breaker, CTs & Cell units
Monthly maintenance works
For Monthly maintenance work of Breaker and CTs
230 KV KAVANOOR-VALUTHUR #
230KV B-BUS Entire
PH-1 Machine
MONTHLY MAINTENANCE WORKS AND LINE MAINTENANCE WORKS
230 KV PUDUKKOTTAI-KARAIKKUDY PG FEEDER BREAKER, CT, CVT, ISOLATORS AND 230 KV EHT LINE.
FOR MONTHLY MAINTENANCE WORK OF BREAKER, CT, CVT, ISOLATORS 230 KV EHT LINE AND GRT TESTING WORKS
110 KV PERIYAR-KG PATTY Feeder Breaker with CT
Monthly Maintenance Work.
230KV kayathar-2 feeder Main breaker (205-52) & CT,CVT
Monthly Maintenace work
For Monthly maintenance woorks
230 KV Myvadi II # Breaker, CTs & Line entire
For monthly maintenance works & Annual testing by P&C Wing
Back washing of UGB, LGB and cooling water filter cleaning
230 KV Bus B Entire For BUS maintenance
110 KV MUSIRI # Breaker & CTs and line portion between 230kV Samayapuram SS and 110KV Vengaimandalam SS.
Monthly Maintenance Work and Premansoon line patrol work.
110 KV Capacitor bank II Breaker, CTs and Capacitor units
To carry monthly maintenance work by AEE/Maintenance/230KV SS / Singarapet
110 KV Pasumalai - Kinnimangalam - 2 # BKR & CT,LI only.
Maintenance Works of BKR & CT,LI
110 KV BUS COUPLER Breaker with CT’s
FOR MONTHLY MAINTENANCE WORK
110KV Gobi Feeder Breaker CT and Line switch.
Monthly Maintenance works .
110 KV Bus Section II Breaker with CT & Isolators
For Monthly Maintenance Work
110KV KEELAVEERANAM FEEDER BREAKER AND CT BAY NO 105
MONTHLY MAINTENANCE WORK
110KV KNMLM-PASUMALAI II # Entire
Monthly maintenance works for breaker and CT
230KV Bus coupler Breaker only
230kv TBC Breaker monthly maintenance
230KV BUS II
230KV PPN - Thanjavur feeder
110 KV Sankari-II # CT, Breaker
For monthly maintenance work
On 230 KV Kayathar - 400 KV Kayathar II LINK #, breaker with CT and Lines inspection
a) For monthly maintenance workb) Tower to tower inspection work
230KV Link-II # Bkr,CT & Line Switch
Monthly Maintenance work
230KV BUS II maintenance work
Line premansoon inspection and rectification work, Breaker, CTs and Line side isolator maintenance work
Monthly maintenance work
230 KV Thanjavur - PPN feeder, Breaker, CT, CVT & LI.
1) For monthly maintenance works by AEE/Mtce/Thanjavur,2) For line jumper checking works by AEE/Lines/Thanjavur
230KV KPH4-THUDIYALUR # For PMI Work
400KV Palavadi-II Monthly Maintenance work as approval by OCC
230KV Link-II feeder Breaker, CT’s & Line Isolator.
Monthly Maintenance
100 MVA Auto Transformer - II ,HV-II,LV-II Breaker's, CT's and Isolators.
a)Monthly maintenance work. b)Relay Testing work.
110KV SAMALPATTI RAILWAY # II SF6 BREAKER, CT'S AND LINE SIDE ISOLATORS
FOR MONTHLY MAINTENANCE WORK
Sriperumpathur 110 KV feeder
110 KV Korattur-Sembium I feeder
Machine 4
100 MVA Auto Transformer-- II
230KV Salem KR Thoppur Link-II feeder
Jumper checking work
For monthly maintenance work.
Jumper Tightness work
110KV Pallakapalayam-Sankagiri # II line entire
Flashed over disc replacement work
230KV Valuthur - Kavanoor feeder entire
Monthly Maintenance.
110 KV Bus section II Breaker with CT & Isolators
For monthly maintenance work.
For Monthly Maintenance Work
110KV PPM- SVLR feeder-2 breaker with CT.
For carrying out monthly maintenance work.
For Monthly Maintenance Works
110 KV Korattur-Sembium II feeder
230 KV TBC Breaker and Transfer Bus
To carryout monthly maintenance work by AEE/Maintenance/Palladam
230KV Myvadi-Ponnapuram-II feeder Breaker ,CT line entire.
For Monthly Maintenance work and PMI by lines wing.
Jumper Tightness work
230KV Sriperumbudur -Tharamani #
Insulator and jumper replacement work
230 KV Sriperumbudur - Koyambedu feeder
For quarterly maintenance works
230 KV Northern Main bus ( Auto Transformer II,IV and 230 KV Sadayapalayam Feeder)
To carryout Half yearly maintenance on Northern Main bus By AEE/Maintenance/Palladam
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of September 2017 at 8th TNSOCC Meeting
Transmission Lines / Elements DetailsCondition From date
Possible Fri, Sep 1, 2017 9:00
Possible Fri, Sep 1, 2017 9:00
Possible Fri, Sep 1, 2017 9:00
Fri, Sep 1, 2017 9:00
Possible Fri, Sep 1, 2017 10:00
Possible Fri, Sep 1, 2017 9:00
Recomendation
From time
During the LC periiod, the remaining 3 X 100 MVA Auto TRs will be in service. 110 KV Somanur SS under total shutdown.
110 KV Somanur SS under total shutdown.
Total Shutdown at 110KV Kallimadai SS. KPR Mill EHT service , Sulur TRaction EHT Service will be fed from 230KV Arasur SS.
FEEDER TO BE KEPT RADIAL FROM 230 K.V S.R.PUTHUR S.S
Subject to the wind generation, 1.110KV PNPM SS GC-II will be feed from 110KV Ingur - II # Hence No SS will be affected.
(OCC Approved) 230kV KVLR-Karamadai # will be in service
Bus - A will be in service Possible Fri, Sep 1, 2017 9:00
Possible Fri, Sep 1, 2017 9:00
POSSIBLE Fri, Sep 1, 2017 10:00
Fri, Sep 1, 2017 10:00
Fri, Sep 1, 2017 10:00
POSSIBLE Fri, Sep 1, 2017 9:00
Possible Fri, Sep 1, 2017 9:00
POSSIBLE Fri, Sep 1, 2017 9:00
1)During the LC period 110kv UDT-I Feeder will caters the load2)DEVANOORPUTHUR SS under shutdown
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
During the LC period, the Feeder will be radial from other end. Hence no ss affected
The feeder is already in radial condition.No SS will be affected.
During the LC Period the 110 KV Anuppankulam SS will be availing total shut down. Hence no SS will be affected.
POSSIBLE Fri, Sep 1, 2017 8:00
POSSIBLE Fri, Sep 1, 2017 9:00
Fri, Sep 1, 2017 10:00
Fri, Sep 1, 2017 10:00
Fri, Sep 1, 2017 10:00
During the LC period, Auto Transformer-I& III, HV-I & III, LV-I, & III will be under hand tripped condition andAuto Transformer-II , 230KV Anuppankulam - Sterlite feeder bay already under line clear condition. 230KV APKM-MDU, 230kv APKM-KYTR feeder will be radial from other end only.110KV Aruppukottai SS loads will be transferred to 110KV Kavanoor - Kamuthi feeder for which concurrence obtained fromEE/O/Kavanoor and 110KV APKM - PSQ # Radial fed from other end, if necessary. Hence no SS affected.
During the LC period Auto Transformer I & III will be in service. Hence there is 'no' interruption in power evacuation
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
110KV Manoor SS availing monthly shutdown work on the same day, no SS affected.
Possible Fri, Sep 1, 2017 9:00
Possible Fri, Sep 1, 2017 9:00
Fri, Sep 1, 2017 8:00
Fri, Sep 1, 2017 10:00
Possible Sat, Sep 2, 2017 9:00
Sat, Sep 2, 2017 9:00
Possible Sat, Sep 2, 2017 9:00
Sat, Sep 2, 2017 9:00
Sat, Sep 2, 2017 9:00
During LC period1.110KV Kinathukadavu SS radially fed from 230KV OKM SS.2.110KV Anthiyur and 110KV Gomangalam SS radially fed from 110KV Udumalpet ss3.No other SS will be affected .
During LC Period 1.Other 230 KV feeders catter the SS loads.2.No other SS Will be affected
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
During the LC period, the feeder will be radial from other end. Hence no ss affected.
During the LC period, the reamaining 5 Nos. 230 KV feeders will be in service.
All other 110KV Feeders will be in service
Repeated entry
All other 110KV Feeders will be in service
All other 110KV Feeders will be in service
Repeated entry
All other 110KV Feeders will be in service
Repeated entry
Sat, Sep 2, 2017 9:00
Possible Sat, Sep 2, 2017 9:00
Possible Sat, Sep 2, 2017 9:00
POSSIBLE Sat, Sep 2, 2017 8:00
POSSIBLE Sun, Sep 3, 2017 9:00
All other 110 KV feeders will be in service
Repeated entry
DURING THE PERIOD OF SHUT DOWN OTHER 2NO'S 100MVA AUTO TR. WILL BE IN SERVICE
During the period of shutdown,Except 50 MVA Power Transformer-1 & 33 KV Tollgate feeder one by one.all other feeders and equipment will be in service.
During the lc period: 1)Auto III Will be Out of Service Auto I &II Will Cater the Present SS Load, 389 mB will be kept at open condition.2)230kvAmuthapuram I & II # Will be radial fed from Other End. Auto II load TRANSFERRED to the tie breaker.3)Concurrence obtained from SE/NCES/TIRUNELVELI,SE/O/TIRUNELVELI, SE/GCC/MADURAI
During the LC period the Power Tr1 loads will be transferred to other Power Trs.
Possible Sun, Sep 3, 2017 9:00
Sun, Sep 3, 2017 9:00
NIL Possible Sun, Sep 3, 2017 8:00
Possible Sun, Sep 3, 2017 8:00
Sun, Sep 3, 2017 10:00
Possible Sun, Sep 3, 2017 9:00
During period of LC, the 110 KV SPDR/MSR # entire will be in OFF condition, there will be no supply to EHT Consumers M/s. FOxconn, M/s. Hinduja, M/s. Flextronics, M/s. Samsung and concurrence to be obtained from thier.
During the period of LC, 400/ 230 KV, 315 MVA Auto-Transformer-I will be in OFF condition. 400/ 230 KV, 315 MVA Auto-Transformer-II will cater the loads of 230 KV Feeders with out interruption.
OCC Approved 134th/ 106
DURING THE LC PERIOD UNIT NO.1 UNDER NOT STANDBY CONDITION
For attending oil leak in Bus PT - 2.
To be discuss
All other feeder will be in service
Possible Sun, Sep 3, 2017 9:00
POSSIBLE Sun, Sep 3, 2017 9:00
Possible Sun, Sep 3, 2017 8:00
Postponed Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
PROGRAMMED LC Possible Mon, Sep 4, 2017 9:00
1. 110 KV Thudialur SS will be fed from 110 KV Kmdi-I feeder by closing By pass switch at Thudialur SS.2. 110 KV KMDI-II & 110 KV Arasur feeders radially fed from other end.
During the lc period: 1)The Transfer bus already kept in Stand by condition.2)Concurrence obtained from SE/NCES/TIRUNELVELI,SE/O/TIRUNELVELI, SE/GCC/MADURAI
Unit under shutdown condition, SF6 Breaker open condition
UNIT 2 IN SHUT DOWN CONDITION
During the LC period, the feeder will be radial from 230 KV Karamadai SS. Also 110 KV MGC Palayam SS and 110 KV Ellapalayam SS under total shutdown.
During the LC period 110/11 KV Karungulam SS will avail back feeding supply from 110 KV Palavoor # and Kannanallur SS will avail back feeding supply from 110 KV Muppandal #. Hence no SS will be affected.
NOT POSSIBLE
POSSIBLE Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
No ss will be affected. POSSIBLE Mon, Sep 4, 2017 9:00
FEEDER TO BE KEPT RADIAL FROM VALUTHUR UPTO R.S.MANGALAM AND TO KEPT RADIAL FROM KARAIKUDI UPTO THIRUVADANAI. ANANDUR SS TO BE UNDER SHUTDOWN
During LC period the feeder will be radial from Semaptty upto Solavanthan and Radial from Alagarkoil upto Samayanallur SS .
During the LC period the feeder Radial from Theni SS UP TO LINE SIDE AB SWITCH PERIYAR END. NO SS WILL BE AFFECTED
Auto Transformer-I Will not be in service loads to be cattered by the Auto Transformer- II
POSSIBLE Mon, Sep 4, 2017 10:00
NIL Possible Mon, Sep 4, 2017 8:00
POSSIBLE Mon, Sep 4, 2017 8:00
POSSIBLE Mon, Sep 4, 2017 8:00
1. During the above LC Period, 110Kv Kallakudy I # Breaker is in H/T condition at 230KV Tahtchankurichy SS . 2.110Kv Thatchankurichy I# Breaker is in H/T condition at 110KV kallakudy Grid SS. 3.Bus and Line Isolator towards 110KV Kallakudy Grid SS will be kept in open condition at 230KV Thatchankurichy SS. 4.Line Isolator towards 230KV Thatchankurichy SS will be kept in open condition at 110KV Kallakudy Grid SS. 5. Earth switch will be kept in closed condition at 110Kv Kallakudy grid ss and 230KV Thatchankurichy SS. 6.110 KV Kallakudi-II # will be in tied condition. 7.There will be no interruption to any other SS.
DURING THE LC PERIOD,VEERVANALLUR SS WILL BE RADIALLY FED FROM KAYATHAR HENCE NO SS AFFECTED
DURING THE LC PERIOD,1.KALINGAPATTI WILL BE RADIALLY FED FROM KAYATHAR 2. KARIVALAMVANTHANALLUR WILL BE RADIALLY FED FROM K.G.PATTIHENCE NO SS AFFECTED.
Possible Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 10:00
Possible Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
During the LC period 230KV Gobi feeder will be in service. 230KV MTPS feeder's other end also programmed to avail LC . No SS will be affected.
During the LC period 230KV MTPS feeder will be in service. 230KV Gobi end also programmed to avail LC . No SS will be affected
Not reqiured
Load will fed through 230 KV Karimangalam Sub station.
230 KV Bus Coupler in stand by equipment since load flow does not affected.
AUTO TRANSFORMER I AND III ARE IN SERVICE,IT MAY CATER THE LOAD
1) Feeder will be kept radial from Sembatty SS upto Sholavandan SS 2) Feeder will be kept radial from Alagarkoil SS upto Samayanallur SS 3) Hence there will be No interruption of Supply to any SS 4) EE/O/Checkanurani has also applied for LC
During the LC Period 110 KV Achanpudur SS,kADAYANALLUR SS, will be radially fed from 230 KV Nalamanaicanpatti SS
Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
LC applied for 230KV MTPS feeder on 04.09.17 vide ID no 60726. ID no 60728 entered by mistake may please be cancelled
Not required
1)During the LC period 230kv KDH Feeder will caters the load
During 400/230 KV Auto Transformer I LC Period, 400/230 KV Auto Transformer II will be in Service Condition. Hence there will be no interruption of supply.
During the LC Period Singarapet feeder I radially fed from Singarapet SS End up to 110KV Thoppur SS.
230 KV Eachangadu SS will be fed from 230 KV Samyapuram feeder from Trichy end. During the period of LC the loads of 110 KV Vridhachalam SS and Pennadam SS are to be transferred to the 110 KV Neyveli -Deviakurichi II feeder. Concurrence from EE/O/Eachangadu to be obtained .(It may be Extended up to 14.09.2017)
To be discuss
Possible Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
Approved Mon, Sep 4, 2017 9:00
2Nos. 100MVA Auto Transformer-II and III will be in service. Mallur 110KV SS will be fed from Pudansandai 230KV SS . There will be no interruption to any SS or feeder.
During the LC period the Feeder will be radial from other end. Hence no ss affected
NOT POSSIBLE
During the LC period the 110KV Thiruvarur - Narimanam II feeder will be in service. Hence there will be no interruption of supply to any other SS.
During the LC period,1) this feeder will be radial from Alundur 230 KV SS upto Thuvakudi 110 KV SS,2) 110 KV Ambikapuram SS will avail shutdown on the same day (Relief : 16 MW),3) all other 110 KV feeders will be in tied condition,4) no supply interruption to any SS.
Capacitor Bank I will be in service
possible Mon, Sep 4, 2017 9:00
POSSIBLE Mon, Sep 4, 2017 9:00
Approved Mon, Sep 4, 2017 9:00
postponed Mon, Sep 4, 2017 9:00
1. No SS affected during the LC period
Auto II Tr. already proposed to be in tripped condition for 230 KV Sterlite feeder LC from 28.08.17 to 07.09.17. Hence No SS affected.
DEPENDING UPON LOAD CONDITION
1.110KV Palaya kottai SS total shutdown on 04.09.2017
postponed Mon, Sep 4, 2017 9:00SUBJECT TO WIND GENERATION,1.110KV PNPM-INGUR-II # WILL BE KEPT RADIAL UP TO RASIPALAYAM SS,2.110KV KADAIYUR SS WILL BE FEED FROM 230KV PALLADAM SS /110KV ELAVANDHI #,3.230KV INGUR SS / 11O KV INUGR - PNPM II # WILL BE KEPT RADIAL UP TO PALAYAKOTTAI SS. HENCE NO SS WILL BE AFFECTED.NO WBD CONCURRENCE ISSUED BY SE/NCES/UDT.
POSSIBLE Mon, Sep 4, 2017 9:00
postponed Mon, Sep 4, 2017 8:00
During the LC period, there will be no supply on the above feeder. This LC applied as per request of EHT consumer M/s TNPL Ltd from 04.09.17/09.00 Hrs to 09.09.17/18.00 Hrs
SUBJECT TO WIND GENERATION,1.110KV PNPM-INGUR-I #( PNPM-KURUKKATHI#)/ 230KV PNPM SS WILL BE KEPT RADIAL UP TO DHARAPURAM SS,2.110KV PNPM # / 230KV KURUKKATHI SS WILL BE KEPT RADIAL UP TO 110KV KUNDADAM SS,Hence No SS will be affected.NO WBD CONCURRENCE ISSUED BY SE/NCES/UDT.
postponed Mon, Sep 4, 2017 8:00
Possible Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
possible Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
SUBJECT TO WIND GENERATION,1.110KV MARUTHUR # / 230KV PNPM SS WILL BE KEPT RADIAL UP TO MARUTHUR SS,2.110KV PALLADAM # / 230KV ARASUR SS WILL BE KEPT RADIAL UP TO L/S OF 110KV POOLVADY SS,Hence No SS will be affected.NO WBD CONCURRENCE ISSUED BY SE/NCES/UDT.
1. Both ends Breaker H/T and bus & Line side Kept opened.2.Hence No interruption of supply to any SS.
All other feeder will be in service
1. The feeder will be kept radial from 230KV Auto SS end.2. Hence no interruption of supply in any SS.
DURING THE L.C PERIOD, 1 AUTO TR NO : I LOADS WILL BE FED BY SALEM 230KV FEEDER AND AUTO TR NO :II LOADS WILL BE FED BY P.CHANTHAI 230KV FEEDER
Mon, Sep 4, 2017 9:00
No SS will be affected. POSSIBLE Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
Possible Mon, Sep 4, 2017 9:00
1.110 KV Keelapavoor will be fed from Kodikuruchi SS and Keelaveeranam SS will be fed from Kayathar SS by closing the isolator at Keelaveeranam SS end ,and Alangulam SS will be radialy fed from Kanarpatty SS.2.110 KV isolator towards Keelapavoor will be kept opened in Alangulam SS , and Keelaveeranam SS and towards Alangulam and Keelaveeranam will be kept opened in Keelapavoor SS .Hence no SS will be affected
NOT POSSIBLE
During LC period 1)110 KV Palladam SS will fed from Arasur 230 KV SS2) No other SS will be affected
During LC Period 1.110 KV Mill Kovilpalayam SS radially fed from 230KV OKM SS.2.110 Kongalnagaram SS radially fed from 110KV Udumalpet SS.
Postponed Mon, Sep 4, 2017 9:00
Mon, Sep 4, 2017 9:00
Tue, Sep 5, 2017 10:00
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Replacement of Anti fog insulators
110KV Kayathar Feeder radial from kayathar to veeravanallur SS
During the LC period, the feeder will be radial from other end. Hence no ss affected.
the feeder will be in service from other end.
During the LC period, the reamaining 5 Nos. 230 KV feeders will be in service.
At the Time of LC1.Auto Tr I HV and LV Breakers are in H/T condition (Off) and both HV and LV isolators are Kept Open and Auto II in service condition after completion of work Auto Tr I, HV and LV Breakers will be charged and isolators are in closed condition. Hence no interruption of supply to any of the Substation.
During the LC period the Auto TR - 1 load will be contained with other Auto Tr 2 & 3. Hence there will be no interruption of supply.
POSSIBLE Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
110 KV KKDI - AL.KOIL # Loads will be transferred to 110 kv kottampatty # (fed from 230 kv Alakar koil ss) & 110 KV singampunari & 110 KV Thirupathur ss under TSD.
during the LC Period the 230KV supply Will be fed from 230 KV Nokia -SPR Feeder Without interruption of power supply.
FEEDER TO BE KEPT RADIAL FROM ARKAY UPTO VALINOKKAM.S/D availed valinookam ss
During the period of LC, the 230 KV SVC - Nokia # entire will be in OFF condition, hence there is no supply in the Feeder, 230 KV NOKIA SS will avail supply from 400 KV SPDR SS via 230 KV SPR-NOKIA #.
During the LC pewriod there will be no supply in 400KV Tie Breaker (408-52) for karaikudi & kamudhi feeder. Hence no substation affected.
During the LC period there will be no supply in 400KV Kamudhi feeder main breaker (409-52), Reactor Breaker (409-52R),Reactor & CT. Hence no substation affected.
POSSIBLE Tue, Sep 5, 2017 8:00
Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
110 KV ALANGUDY SS IN 110 KV ALANGUDY EID PARRY FEEDER AVAILING TOTAL SHUT DOWN AND 110 KV SUPPLY FOR ALIYANILAI SS NAGUDY SS AND KODIKKULAM SS AND EID PARRY CO GENERATION IS TO BE BACK FED THROUGH 110 KV SIPCOT FEEDER. 110 KV PUDUKKOTTAI SS IN 110 KV SIPCOT FEEDER AND 110 KV VADAKADU SS , 110 KV MALAIYUR SS, 110 KV ADHANAKKOTTAI SS AND 110 KV GANDARVAKOTTAI SS IN 110 KV ADHANAKKOTTAI FEEDER ALSO AVAILING TOTAL SHUT DOWN AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS.
During period of LC, the 110 KV SVC- Kanchi # entire will be in OFF Condition.
To be discuss
During LC Period There will be no supply in the entire feeder and will be radial from Pasumalai upto Tirumangalam S
During LC period 230 KV BUS Coupler in stand By condition.
POSSIBLE Tue, Sep 5, 2017 10:00
Possible Tue, Sep 5, 2017 9:00
Repeat Tue, Sep 5, 2017 9:00
NIL Postpned Tue, Sep 5, 2017 8:00
Possible Tue, Sep 5, 2017 10:00
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
1. During the shutdown period 230 KV SMPM SS will be radially fed from 230 KV SS Poyyur. 2.The other end 230 KV SS Trichy also availing LC on the same date & time.3.No interruption to any other 110 KV SS.
MONTHLY MAINTENANCE, 110 KV DEVIYAKURICHI-I Feeder will be fed radially from Devviyakurichi.
MONTHLY MAINTENANCE, 110 KV DEVIYAKURICHI-I Feeder will be fed radially from Devviyakurichi.
Subject to the wind generation, 1. Thungavi SS G.C-II will be transferred to 230KV Udt SS / 110KV Poolavadi #,2. 110KV Ingur-I & II #s willbe kept radial from other end,3. Hence Load will be with limits of other two Auto Trs.& No SS will be affected.
Other 230 KV SS will be in service
Monthly Mtce work&tree clearance work
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 8:00
POSSIBLE Tue, Sep 5, 2017 9:00
110KV-Thirukazhukundram ss and Anjur SS- proposed total shutdown and other ss loads will have to be transferred to 230 KV Omega ss
During the LC period, 1) Auto transformer III and LV III breaker will be in off condition 2) The Auto transformer I and II will be in service,3) All the 110KV feeders will be in service4) 110KV Pappireddipatty SS total shutdown approved5) 110KV Ramiyanahalli SS and 110KV Harur SS loads will be fed from 230KV SS Karimangalam if necessary and hence no interruption of supply.
During the Lc period the station load will be managed by other two Auto transormers
DURING THE LC PERIOD,1.MALAYANKULAM WILL BE RADIALLY FED FROM 110KV KAYATHAR-SURULIYAR FEEDER 2.VEERASIGAMANI WILL BE RADIALLY FED FROM UTHUMALAI.HAENCE NO SS AFFECTED.
NOT POSSIBLE
During the LC period, the feeder will be radial from other end upto Kannivadi SS. Hence no interruption to any SS.
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Repeat Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Repeat Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Repeat Tue, Sep 5, 2017 9:00
During the period of Shut down, All other 230 KV Feeders will be in service
1.ALL OTHER 3 NOS 230 KV FEEDERS ARE IN SERVICE,IT MAY CATER THE LOAD.2.OTHER END MAY ALSO AVAIL LC
During the period of Shut down, All other 230 KV Feeders will be in service.
1.110 KV BHAVANISAGAR SS AND 110 KV KARATTUPALAYAM SS MAY AVAIL TOTAL SHUTDOWN2.SUPPLY TO THE OTHER INTER SS MAY FED FROM BHAVANISAGAR MPH AND MOYAR END.
During the period of Shut down, All other 230 KV Feeders will be in service
1) Feeder will be kept radial from Thullukapatty SS upto Soolakarai SS. 2) Hence there will be No interruption of Supply to any SS
During period of Shut down,All other 230 KV feeders will be in service
POSSIBLE Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 10:00
Repeat Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 10:00
POSSIBLE Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 9:00
Postponed Tue, Sep 5, 2017 9:00
DurinG the LC Period EE/O/Amuthapuram has also applied LC on 230 KV Amuthapuram I # Breakeron the same day 05.09.2017
400 KV NCTPS feeder will not be in service.
Approved OCC 134th/100
During the period of shut down, All other 230 KV Feeders will be in service.
230KV LV NOT IN SERVICE, NO FEEDERS AT 230KV SIDE
During the LC period other end also avails LC and there will be no supply in the entire line Hence no SS affected.
230kV KVLR-PGCIL # will be in service
Not required
230kV KVLR-PGCIL # will be in service
Not required
110KV KVLR-Nambiyur loads transfered to 230KV Gobi(SS)
Repeat Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Postponed Tue, Sep 5, 2017 10:00
POSSIBLE Tue, Sep 5, 2017 9:00
DURING THE PERIOD OF SHUT DOWN, ALL OTHER 230KV FEEDERS WILL BE IN SERVICE
EE/O/CKNI has also programmed Line LC section between KNMLM – TMGLM. During the LC period the feeder will be radial from PSQ SS upto Thirumangalam SS.
110 KV Arasur SS Will Avail Total Shut down
Both end Monthly Maintenance Work
Power transformer III & Power transformer IV in service.Power transformer I loads will be fed from Power transformer III & IV.
During the LC period 1)110kv TJR-TVR Feeder will be radial upto Thanjavur urban SS.There will be no interruption of supply to any ss, 110KV TJR-LINK I&II Feeder LC also applied by EE/O/TJR on the same day,110kv M KOVIL,110KV AYYPT,110KV URBAN TJR SS S/D Programed on the same day
Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 10:00
POSSIBLE Tue, Sep 5, 2017 10:00
Possible Tue, Sep 5, 2017 9:00
Repeat Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
During the LC period 1)110kv TJR-TVR Feeder will be radial upto Thanjavur urban SS.There will be no interruption of supply to any ss, 110KV TJR-LINK I&II Feeder LC also applied by EE/O/TJR on the same day,110kv M KOVIL,110KV AYYPT,110KV URBAN TJR SS S/D Programed on the same day
No interruption to any SS. The 110KV Mayiladuthurai SS proposed to shutdown.
No interruption to any SS. Auto transformer I load will be managed by Auto Trfr -II.
No interruption to any SS. The 110KV Mayiladuthurai SS proposed to shutdown.
The feeder will be back charged.Inter SS load will be fed from Ingur 230KV SS.
Both end Monthly Maintenance work
Other end also availing LC on that day
POSSIBLE Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Postponed Tue, Sep 5, 2017 9:00
During the LC period,1) Thanjavur 110 KV Grid SS entire, Thanjavur 110 KV Urban SS, Ayyempettai 110 KV SS, Mariammankoil 110 KV SS will avail shutdown on the same day (Total load relief : 73 MW),2) all 230 KV feeders and 110 KV feeders will be in tied condition,3) no supply interruption to any SS.
During the LC period,1) the other end (i.e. Thanjavur 110 KV Grid SS) will avail LC on the same day, 2) Thanjavur 110 KV Grid SS entire, Thanjavur 110 KV Urban SS, Ayyempettai 110 KV SS, Mariammankoil 110 KV SS will avail shutdown on the same day (Total load relief : 73 MW),3) all other 110 KV feeders will be in tied condition, 4) no supply interruption to any SS.
1. No SS will be affected during LC period
Possible Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Bhavanisagar 110KV SS Availed total Shut Down on that day
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
NOT POSSIBLE
During the LC period, the Pasumali end also availing LC on the same date. Hence no ss will be affected.
During LC period no SS will be affected. Necessary concurrence obtained from SE/EEDC/Erode.
During the period of LC i The 110KV Karnambut Feeder breaker will be in ‘OFF’ Condition. ii The 110KV Arcot, 110 KV Sathuvachari, 110KV Karnambut SS are availing total Shutdown. Hence there will be no interruption of supply please.
During the LC period, a) other end also availing LC on the same feeder. b) all other 230KV feeders will be in tied condition. c) there will be no interruption of supply to any of the feeders and SS.
POSSIBLE Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
During the L.C Period, 1) 110KV Kodumudi SS,are proposed total shutdown and the remaining 110KV Elumathur SS,110KV New nadupalayam,110KV Sivagiri load fed from 110KV Erode SS. 2)The 110KV switch towards Pugalur under opened condition at 110KV Kodumudi SS.
During the LC Period, 1.110KV Manmangalam SS is proposed total shutdown. The remaining 110KV Veppampalayam SS,110KV KarurSS load will be fed through 110KV Pugalur-Renganathapuram feeder via 110KV Malaikovilur SS. 2)The 110KV Switch towards pugalur side under opened condition at 110KV Veeppampalayam SS. 3.The 110KV Switch towards 110 KV Karur SS at 110KV Malaikovilur SS under close condition . 4.110KV Renganathapuram feeder # tie opened at 110KV Renganathapuram SS.Hence there is no supply interruption to any SS.
POSSIBLE Tue, Sep 5, 2017 10:001.110KV THATCHANKURI I,110KV THATCHANKURICHI II, 110KV PERAMBALUR I, 110KV PERAMBALUR II, 110KV CHETTINAD CEMENTS and 110 KV DALMIA CEMENTS FEEDER BREAKERS TO BE HAND TRIPPED.2.ALL 110 KV BUS & LINE SWITCHES WERE TO BE OPENEDand LOCKED.3.110 KV PUTHANAMPATTY SS WILL FED FROM 230KV PERAMBALUR SS THROUGH 110KV KALLAKUDI II FEEDER.4.110KV KALLAKUDI GRIDSS TOTAL SHUTDOWN TO BE APPROVED BY SE/TEDC/METRO/TRICHY.5.CONCURRENCE OBTAINED FROM M/s.DALMIA CEMENTS(BHARATH)LTD. KALLAKUDI.6.NO INTERRUPTION TO ANY OTHER SS.7.BUS SWITCH 8 AND 9 TO BE OPENED AND LOCKED.8.110KV TK I, 110KV TK II, 110KV PBLR I, 110KV CCL FEEDERS RADIAL FROM OTHER END.
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
1) Vanur SS and Thiruchitrambalam SS availing total shut down 2) The line will be kept off between Madurapakkam and Rajasree Cogen. No interruption of supply.
During the period of LCi) The 110KV Arcot SS and 110 KV Sathuvachari SS and 110KV Karnambut SS are availing Total shutdown on 05.09.2017.The Total shutdown approved and concurrence obtained by Chief Engineer/Distribution / Velloreii) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II, Auto –Tr-IV,HV-IV,LV-IV , will be in service and cater the SS Loads.iii) Auto-Tr-III ,HV-III,LV-III will be in ‘OFF’ Condition.iv) The 110KV Karnambut Feeder, will be in ‘OFF’ condition. v)
Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Idle Line portion possible Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 9:00
1. 230KV KR Thoppur Unjanai feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. K.R.Thoppur 400KV SS is availing breaker and line switch LC.4. There will be no interruption to any SS.
repeat of 61006
All other feeder will be in service
1. The 110KV Neyveli I feeder at Thirupachanur SS towards Villupuram side will be kept open condition.2. The feeder will be kept radial from Neyveli TS-I end.3. Arasur SS in Neyveli-II # is availing total shut down.4. Neyveli-II #, T.V.Malai and Acharapakkam # are in tied condition5. Hence no interruption of supply in any SS.
During LC period110KV Namagiripet SS will be bacj fed through 110KV DVK-Thammamapatty feeder.No supply interruption.
repeat of 60611
Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 9:00
possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 10:00
DURING THE L.C PERIOD, OTHER END ALSO PROGRAMMED TO AVAIL L.C ON THE SAME DAY ON THAT FEEDEDR AND STATION LOADS WILL BE FED BY p.CHANTHAI 230KV FEEDER.
repeat of 61006
DURING THE PERIOD SANKARI 110KV FEEDER RADIALY CHARGED FROM OTHER END
Not required
1) Puthanchandai to Namagripet line ideal load condition 2) Deviakurichi 230KV SS radial fed from upto Namagripet 110KV SS End 3) There will be no interruption of supply any other SS.
During the LC period,1) 110KV Pappakudi SS will be programme total shutdown,2) 110KV Srimushnan SS supply fed radially from Neyveli TS 1,3) 110KV jayakondam SS supply fed radially from 230KV Kadalangudi SS,4) no supply interruption to any SS.
possible Tue, Sep 5, 2017 9:00
Repeat Tue, Sep 5, 2017 9:00
Tue, Sep 5, 2017 10:00
Tue, Sep 5, 2017 10:00
Approved Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 9:00
Standby Possible Tue, Sep 5, 2017 8:00
1. R phase Wavetrap in 110 KV Micro - Bhavanisagar 110 KV SS Feeder, Micro end was failed due to snake fault on 10.08.2017 at 19.09 hrs. Same was isolated and the feeder was normalized without R phase Wavetrap on 11.08.2017 at 00.20 hrs. Hence, LS is applied for replacement failed wavetrap and commissioning of new wavetrap.2. On 05.09.2017, total shutdown LC has been applied at Bhavanisagar 110 KV SS.3. There is no SS between MHPH / Bhavanisagar and Bhavanisagar 110 KV SS.4. During LC period, power evacuation will be done through 110 KV Micro - Moyar Feeder. Hence generation loss will not arise.
Capacitor bank LC will be taken one by one
During LC Period1. Radially fed from 230KV TDLR SS End
Possible Tue, Sep 5, 2017 9:00
POSSIBLE Tue, Sep 5, 2017 9:00
Both end LC applied. Possible Tue, Sep 5, 2017 9:00
Possible Tue, Sep 5, 2017 8:00
Possible Tue, Sep 5, 2017 4:00
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 10:00
Wed, 6 Sep, 2017 9:00
DURING LC PERIOD SEC BETWEEN SEMPATTY & ELAYAMUTHUR FED FROM 230KVSS SEMPATTY
1) During the LC period there will be NO supply in this feeder. 2) Other End also avail LC on same day. 3) Concurrence obtained from SE/NCES/TIN.
SF6 breaker open condition, MODS are open condition
230KV Kalivanthapattu -Tharaman # &230KV KITS -
Tharamani # will be in service.
During the period of LC,1)The 110KV Vembakkam SS availing Total shut down,2)The 110KV Mangal SS loads will be transferred to 110KV Kanchipuram SS,Hence no interruption of supply.
To be discuss
During the above period of shut down 230KV Perambalur SS will be radially fed from 230KV Trichy SS
During the LC Period AutoTransformer-I willnot be inservice.AutoTransformer-II willbe Carriedout the Entire Load.
NOT POSSIBLE
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
PROGRAMMED LC possible Wed, Sep 6, 2017 9:00
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
repeat of 60309
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
repeat of 60307
During the LC periiod, the remaining 3 X 100 MVA Auto TRs will be in service. 110 KV Sulur SS and Neelambur SS under total shutdown.
110 KV Sulur SS under total shutdown. 110 KV Poomalur SS and Thirunagar SS will be transferred to 110 Kv Arasur - Karuvalur 1 feeder.
During the LC period,110/11 KV TGPR, MPM and KKY SS will avail total shut down as approved by SE/KKEDC/NGL. Nagercoil SS will avail supply from 110 KV SRP - Kodayar I #. Maharajapuram SS will avail supply from 110 KV SRP-KKY #. Hence no SS will be affected.
possible Wed, Sep 6, 2017 10:00
POSSIBLE Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 10:00
ICT No. I & ICT No. II will be in service.
During the LC Period the all other 230 kv # tied with grid. Hence there will be no interruption of supply.
(a) During the above L.C period Unit I & 2 unit will be in service or stand by condition, depending up on the PWD demand. (b)The other end LMBPH –1 applied L.C on that day (06.09.2017) (c)110 KV BPH – 2 to LMBPH – 3 # & 110 KV LMBPH – 2 to K.R.Thoppur feeder ( now radialy fed from LMBPH – 2, up to KR Thoppur ss line side isolator.) will be in service.
FEEDER TO BE KEPT RADIAL FROM SIVAGANGA TO MANAMADURAI
During the LC period there will be no supply in entire power transformer -IV and 33KV feeders concurrence obtained from SE/NCES/TIN.
POSSIBLE Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
postponed Wed, Sep 6, 2017 10:00
POSSIBLE Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 8:00
During LC period there will be no supply in the entire feeder
During the period of LC,230KV Tie Breaker is in OFF condition.Hence no interruption of supply.
Subject to the load condition, 1.110KV Ingur-I will be kept radial from 230KV Kurukathi SS / 110KV PNPM # up to 110KV Selampalayam SS,Hence No SS will be affected.
Feeder will be radial from other end..
During the LC period both ends breaker will be in Handtrip condition and all other 230KV feeders will be in service
During the LC period 230KV MTPS feeder will feed Auto Transformer II and 230 KV Gobi feeders will feed Auto Transformer I. No SS will be affected.
1. No interruption of supply2. Load will fed through 400 KV Thiruvalam II.
DURING LC PERIOD,1.KARISALPATTI WILL BE RADIALLY FED FROM SANKANERI.
POSSIBLE Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
During the LC , Sempaty end supply radially charged up to 110 KV M.Puri SS
1. No interruption of supply2. Load will fed through 400 KV Thiruvalam II.
repeat of 60741
Auto-Transformer-II will be fed by 400 KV Tie-I breaker
OCC Approved 134th/ 121
POSSIBLE Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 10:00
1) The sakthisugars feeder is kept fed from Alkl end through 110KV Alagarkoil - Karaikudi Feeder feeding Nattarmangalam SS 2) At Nattarmangalam SS the switch towards Nelmudikarai SS is to be kept opened.3) At Arasanoor SS the switch towards and Nelmudikarai SS is to be kept opened. 4) 110KV Sakthisugar -Sivaganga Feeder will be in grid .5) The Sakthisugars - Pasumalai (Presently Alaagrkoil Feeder will be radial from Sakthisugars upto Arasanoor SS., 6)110KV Alagarkoil - Karaikudi Feeder is also radial from Alagarkoil upto Tirupathur SS Line links feeding Narasingampatti , Melur SS and Thaniyamangalam SS. 7) At Tirupathur SS the switch towards Alagarkoil is kept open. 8) 110KV Kavanoor - Manamadurai Feeder LC has been applied by EE/O/Kaavanoor 9)110/22KV Manamadurai 110/22KV Sivagangai SS,110/33-11KV The 230KV Transfer Bus is now kept idle and maintenance on Transfer Bus Isolator (789C) will be done if LC on Power Transformer-4 apllied vide ID.No:60546 is approved. Concurrence obtained from SE/NCES/Tirunelveli.
Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
1) The Feeder will be kept radial from Sembatty end upto Achampathu SS. 2)110KV AB Switch towards Pasumalai at Achampathu SS will be kept opened . 3) 110KV Pasumalai - sembatty feeder breaker will be hand tripped , Bus and Line isolator at Pasumalai SS will be kept opened.LC could be Entered only for 3 days . whereas the actual LC Required is from 06.09.2017 to 16.09.2017
1)During the LC period 230kv UDT Feeder will caters the load
During the above LC period there will be no supply to the 110KV Bagalur SS,110KV Minnager SS,110KV Nariganapuram SS.The above ss also availing the Shutdown on the same day.The 230kv ss load will be maintained 230KV Mettur#. The concurrence of SE/KEDC/Kgiri and SE/O/Tvlm had obtained.
1) possible 2) Possible
Possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
1)230kv Thiruvalam - S.P.Kovil feeder will not be in service.2)All other 400KV feeders,230KV feeders and ICTs will be in service.
1)During LC period 230/110kv Auto Transformer I will be in service and cater station load.2)110/22-11kv RNPM SS availing total shutdown L/R 18mw.3)110kv RNPM-SBT I # will be radially fed from SBT end .Hence no supply interruption to any SS
110 KV Oraiyur SS Total Shut Down
During the LC period other two Auto transformers will be in service and scatter the load
Possible Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
TSD to be availed in 230 KV Auto transformer in UPLT SS .110 Ko –Poovanur loads to be transferred to 110 KV Deviakurichi end.110 KV Ulundhurpettai loads to be transferred to Villupuram end.110 KV Thiyagadurgam,Nagalur,Pillaiyarkuppam to avail
Tentative LC applied by MTPS I,programmed for Maintenance work on 06.09.2017
repeat of 60451
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
During 110 KV Bus A LC Period, 110 KV Bus B will be in service condition. Hence there will be no interruption of supply.
During the Lc period 100MVA Auto transformer – I will be serviced.
Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 10:00
POSSIBLE Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 10:00
possible Wed, Sep 6, 2017 9:00
Tentative LC applied by MTPS I,programmed for Maintenance work on 06.09.2017
repeat of 60741
During the LC Period, the Sankaneri # will be radial up to Karisalpatti SS. Hence No SS affected. AE/Lines also availing LC on the same date.
No interruption to any SS. All other feeders will be in tied condition.
During the LC period, the feeder will be radial from other end. Hence no ss affected
NOT POSSIBLE
During the Auto transformer-I LC period, the Auto Transformer - II & III will be in service and Load will be shared by Auto Transformer II & III. Hence there will be no interruption of supply. Auto Load 40 MW for each.
During the LC period there will be no interruption to any SS.Supply will be fed from 230 KV NT Kudi SS upto 110 KV Thirumakkottai SS radially.
Capacitor Bank II will be in service
Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
During the LC period, a) Other end also avail shutdown. b) All other 230 KV feeders will be in service. c) There will be no interruption of supply to any other feeders.
NOT POSSIBLE
DEPENDING UPON LOAD CONDTIION
During the LC period the 110 KV Vembakkottai SS load will be fed from 230/110 KV Nallamanaickenpatti SS. (AB switch at 110 KV Vembakottai SS towards APKM SS WILL BE KEPT OPEN ) Hence no SS will be affected.
No SS affected, since no SS connected in between the Reddiapatti and ESI SS.
During the LC period:1) the 110KV Arani # H/T at SPT end 2) 110KV chengam SS also availing Total Shutdown Hence, there is no interruption of power supply.
Concurrence obtained from M/s. RAMCO cements Ltd., (Erstwhile MCL). Presently, there is no export of power from M/s. RAMCO to TNEB grid and hence no loss of genenration.
Approved Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
During LC period no SS will be affected. Necessary concurrence obtained from SE/EEDC/Erode.
During the LC period:1) the 110KV Arani # H/T at SPT end radial from other endHence, there is no interruption of power supply.
repeat of 61333
During the period of LC i. 230KV Thiruvalam – S.P.Koil feeder Breakers both end will be in “ OFF†condition at 400KV �Thiruvalam & 230KV S.P.Koil SS. ii. All other 230 KV feeders 230KV Link I, Link II, Singarapet feeders are in service.Hence there will be no interruption of supply please.
During the period of shutdown,Except 100 MVA Auto Transformer-1.all other feeders and equipment will be in service.
1)The 110kv Pallur ss,110kv Takkolam ss,110kv Punnai ss availing Total shutdown2)There is no interruption of supply please
1)The 110kv Pallur ss,110kv Takkolam ss,and 110kv Punnai ss availing Total shutdown
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
SUBJECT TO WIND GENERATION,1.110KV PNPM-INGUR-I # / 230KV PNPM SS WILL BE KEPT RADIAL UP TO KUNDADAM SS,2.110KV PNPM # / 230KV KURUKKATHI SS WILL BE KEPT RADIAL UP TO 110KV UTHIYUR SS,Hence No SS will be affected.NO WBD CONCURRENCE ISSUED BY SE/NCES/UDT.
repeat of 60212
During the LC period, a) other end also availing LC on the same feeder. b) all other 230KV feeders will be in tied condition. c) there will be no interruption of supply to any of the feeders and SS.
NOT POSSIBLE
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy I feeder. Hence There is no interruption to any SS,LC approved in 134 th OCC meeting
POSSIBLE Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
Idle Line portion possible Wed, Sep 6, 2017 9:00
During the LC period 1) 110KV Kabilurmalai SS is proposed total shutdown,remaining 110KV Velllur SS,110KV Villipalayam SS and 110KV Valavanthi SS, load fed from 230KV Unjanai SS via 110KV Nallur SS . Concurrence obtained from EE/SLDC/Erode. there is no interruption to any SS.
1. Bus coupler Breaker H/T .2. 230Kv Bus II is in service.3. Hence No interruption of supply to any SS.
1.) The feeder will be kept off between Ulundurpet 230 KV SS and 110 KV Thiyagadurgam SS.2.) Dharani Sugars Co-gen. will be put on home load.3.) 110 KV Nagalur and Thiyagadurgam Sub-stations availing total shut down. No interruption of supply to any SS.
Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
During LC period110KV Bus Coupler is kept out of Service.110KV Rasipuram feeder CTs are kept out of service.110KV Namakkal SS will be back fed through 110KV VPY-Namakkal feeder ORbeing tied with 110KV UNJANAI-Nallur-BJB III feeder will be back fed through 110KV Nallur feeder.110KV Sendamangalam SS will be back fed through 110KV VPY-Pudhansandai feeder.No supply interruption.
1,2,3&4) possible
It is proposed to avail total shutdown maintenance on 230/ 110 KV Auto Transformer , HV,LV,Breakers , Isolators,110KV Feeder Breakers, Isolators maintenance work, on that day Ulundurpet 110/33-11 KV SS load will be fed by Villupuram Auto SS roughly about 24 MW & Ko-Poovanur SS load will be fed Deviyakuruchi Auto SS -by Neyveli TS I - Deviyakurichi feeder. 110 KV Thiyagadurugam SS,110 KV Nagalur SS and 110 KV Pillayarkuppam SS are proposed to be carried out total shutdown maintenance work.M/s Dharani sugars co-generation plant will be instruction to go home load.
Approved Wed, Sep 6, 2017 9:00
Approved Wed, Sep 6, 2017 9:00
POSSIBLE Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
Possible Wed, Sep 6, 2017 9:00
DURING THE L.C PERIOD CAPACITOR BANK NO :II WILL CATER THE STATION WAR LOADS
DURING THE L.C PERIOD, CB NO :I WILL CATER THE STATION WAR LOADS
During the LC period 230KV Valuthur - Kavanoor and Alagarkovil feeders will be in service. Hence, there is
DURING THE LC CONDITION THE OTHER MACHINES ARE IN STANDBY CONDITION AND 230KV FEEDERS ARE IN SERVICE. PWD DEMAND 700C/S MEET OUT THROUGH DAM POWER HOUSE MACHINES.
EE/Operation /Veeranam also applied for monthly maintenance work230 KV Isolator towards Veeranam will be kept opened in Abisekapatty and 230 KV isolator towards Abisekapatty will be kept opened in Veeranam. Hence no SS will be affected
NOT POSSIBLE
110 Kv Loads upto Uthiyur Ss will be fed from 230 Kv Kurukathi Ss and 110 Kv Loads upto Kundadam Ss will be fed from 230 Kv Ponnapuram Ss.
Possible Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
Wed, Sep 6, 2017 9:00
1. Other 230 KV feeders will share the loads.2. 230 KV bus bar protection will be kept off.
During LC Period1.Other 230KV feeders catter the SS Loads.2.Hence No other SS Will be affected.
repeat of 60252
(a) During the above L.C period Unit 1 & 2 will be in standby condition at present PWD demand 700 c/s let out through barrage gate.(b) At time of L.C line isolator to be opened and earth switch to be closed in both 110 kV BPH-1 to MDPH feeder and 110 kV BPH-1 to BPH-2 feeder at both ends.(c) The 110 KV BPH – 1 to MDPH feeder and 110 kV BPH-1 to BPH-2 feeder will be in service.
possible Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 13:00
POSSIBLE Wed, Sep 6, 2017 9:00
Approvl by Wed, Sep 6, 2017 9:00
(a) During the above L.C period Unit 1 & 2 will be in standby condition at present PWD demand 700 c/s let out through barrage gate.(b) At time of L.C line isolator to be opened and earth switch to be closed in both 110 kV BPH-1 to MDPH feeder and 110 kV BPH-1 to BPH-2 feeder at both ends.(c) The 110 KV BPH – 1 to MDPH feeder and 110 kV BPH-1 to BPH-2 feeder will be in service.
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 110KV UDT I & II FEEDERS(110 KV Udt Link III, I on same day one after the another)
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 110KV UDT III & II FEEDERS(110 KV Udt Link III, I on same day one after the another)
No SS will be affected. During this LC period all 230KV feeders will be fed from Main Bus. Now Transfer Bus in ideal condition.
16MVA Pr.Tr.II & III will be in service cater the entire 11KV
loads.
Possible Wed, Sep 6, 2017 4:00
Possible Wed, Sep 6, 2017 10:00
Approved Wed, Sep 6, 2017 9:00
possible Wed, Sep 6, 2017 10:00
Possible Wed, Sep 6, 2017 9:00
230KV Kalivanthapattu -Tharamani # & 230KV KITS -
Tharamani # will be in service.
During the period of shutdown 1) The Idely charged 110KV Mambakkam# will not be inservice
1. Auto III only will not be in service. 2. All other 110KV Feeders, 230KV Feeders, Auto I & II will be in service.
110 KV Tidel park II feeder will be in service
During the above shutdown period Auto Transformer II will not be in service , the load may be restricted within the capacity of 100 MVA Auto Transformer -I
postponed Wed, Sep 6, 2017 9:00
postponed Wed, Sep 6, 2017 9:00
Inter SLDC Wed, Sep 6, 2017 9:00
During LC period110KV Pudhansandai SS along with 110KV Rasipuram SS will be back fed through 110KV PSI-KN Patty feeder.110KV Namakkal feeder now tied with 110KV Unjanai-Nallur feeder will be opened.110KV Namakkal SS will be back fed through 110KV Valayapatty-Namakkal feeder.110KV Bus Coupler CB will be hand trippped and its Switches will be kept open.Auto-II will cater to other 110KV Substations fed by this station.No supply interruption.
(a)During the above L.C period Unit 1 & 2 will be in standby condition at present PWD demand 700 c/s let out through barrage gate(b)The other end BPH-2 applied L.C on that day on 13.09.2017.(c)110 KV BPH – 1 to MDPH feeder will be in service.
Entire Feeder. Alternate supply from Trichy end
Possible Wed, Sep 6, 2017 9:00
Thu, Sep 7, 2017 10:00
Possible Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
There will be no supply in the feeder
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
The pwd demand will be met out by other standby machines at Dam Power House.
During the LC periiod, the remaining 3 X 100 MVA Auto TRs will be in service. 110 KV Saravanampatty SS under total shutdown.
During the LC period 230 KV SR Puthur - Koodankulam feeder will be in service.Other end will also apply shut down.Hence No SS will be affected.
NOT POSSIBLE
1. Scheduled shutdown at 110KV Peelamedu SS
POSSIBLE Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 9:00
Both ends L.C. to be availed Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
During the LC Period all other 230 KV # tied with grid. Hence there will be no interruption of supply.
During the period of LC, the 230 KV SVC - Oragadam # entire will be in OFF condition, hence there is no supply in the Feeder, 230 KV Oragadam SS will avail supply from 400 KV SPDR SS via 230 KV SPR-Oragadam #.
1.During the LC period there will be NO supply on the entire feeder2.All other feeders are in service
i) During LC period No supply on the entire feeder ii)All other feeders are in service
During the LC period there will be no supply in 400KV karaikudi feeder main breaker (407-52), Reactor Breaker (407-52R),Reactor & CT.Hence no substation affected.
NOT POSSIBLE
During LC period there will be no supply in the entire feeder
Possible Thu, Sep 7, 2017 9:00
No ss will be affected. POSSIBLE Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 10:00
possible Thu, Sep 7, 2017 9:00
During the period of LC,1)At present 110KV Singarapet-I # is in H/T condition,2)The 110KV Polur SS availing total Shut down.Hence no interruption of supply.
During the above Shutdown Period 100 MVA Auto Transformer II will be in service. No interruption to any other SS
(a) During the above L.C period Unit 1 & 2 will be in standby condition. At present PWD demand 700 c/s let out through barrage gate. (b) At the time of L.C bus and line isolator to be opened and earth switch to be closed in both 110 kV BPH-1 to MDPH feeder and 110 kV BPH-1 to BPH-2 feeder at both ends. (c) The 110 KV BPH 1 to MDPH feeder and 110 kV BPH-1 to BPH-2 feeder will not be in service.Remarks : The LC already applied on 06-09-2017 is not required due to GRT requested and same may be cancelled please. (ID No. 60290 / 18-08-2017 and ID No.60301/18-08-2017)
postponed Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 10:00
possible Thu, Sep 7, 2017 8:00
Thu, Sep 7, 2017 8:00
POSSIBLE Thu, Sep 7, 2017 9:00
MONTHLY MAINTENANCE, 110 KV SALEM -II FEEDER WILL BE RADIALLY FED FROM OTHER END.
Subject to the wind generation, 1.Thungavi SS G.C-II will be transferred to 230KV Udt SS / 110KV Poolavadi # 2. 110KV Ingur-I & II will be kept radial from other end,3. Hence Load will be with limits of other two Auto Trs.& No SS will be affected.
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
repeat of 60710
Feeder will be radial from kkdiend.upto Narasingampatti SS. Feeder will be radial from Sakthi sugars end.upto urptyss..A.Thekkur,S.Pudur SS Duvaragurichy SS loads will be transferred to Kottampatty feeder.
possible Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 8:00
POSSIBLE Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
During the LC period both ends breaker will be in Handtrip condition, other 6 no’s 230KV feeders will be in service and hence no interruption of supply
DURING THE LC PERIOD,RASTHA WILL BE RADIALLY FED FROM PAPANASAM PH HENCE NO SS AFFECTED.
NOT POSSIBLE
Total shut down to be proposed in the following 110 KV subststions for load relief of 62 MW (110/22 kv , ,CUMBUM ss, Ayyampalayam, Batla gundu SS, V.pandi SS,)
During the LC period, the feeder will be radial from other end Sembatti upto Kannivadi SS and radial from other end upto Reddiyarchatram SS. Hence no interruption to any SS.
1)Auto Transformer - 2 will be in Service. 2) 110/11KV Villapuram SS will be under Shutdown.
SUPPLY TO THE INTER SS MAY FED FROM 230 KV ANTHIYUR SS,NO OTHER SS WILL AFFECTED
POSSIBLE Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 9:00
1) The sakthisugars feeder is kept fed from Alkl end through 110KV Alagarkoil - Karaikudi Feeder feeding Uranganpatty SS, Nattarmanaglam , Nelmudikarai and Arasanoor SS upto Sakthisugars. 2) At Uranganpatty SS the switch towards Pasumalai SS is already kept opened 3)110KV Sakthisugar -Sivaganga Feeder will be in grid . 4)110KV Alagarkoil - Karaikudi Feeder is also radial from Alagarkoil upto Tirupathur SS Line links feeding Narasingampatti , Melur SS and Thaniyamangalam SS. 5) At Tirupathur SS the switch towards Alagarkoil is kept open. 6) 110/33-11KV Villapuram SS will be under Shutdown.
During the LC period, other end also avails LC and there will be no supply in the entire line, Hence no ss affected
All other 230 KV feeders will be in service at Spkoil 230 KV SS.
POSSIBLE Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 9:00
Inter SLDC Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 10:00
During LC 110kv Kovilur SS,33kv chatharapatty SS,33kv Vallipatty SS availing total shutdown L/R (12+4+4=20mw)Hence no supply interruption to any SS.
During the LC period the feeder will be radial from Theni SS. Upto LS of KNMLM SS.
During the period of L/C time, Autotransformer -I & II will be independently fed the station loads. There is no interruption of supply please.
The 110 KV Semmankuppam SS, 110 KV Kurunjipadi, will be availing total shutdown.110 KV Cuddalore – LANCO # tie will be opened at LANCO IPP end .the 110 KV Chidambaram SS,110 KV B.Mutlur SS,& 110 KV Chemplast load will be fed from 110 KV Cuddalore-Kullanchavadi #. Hence no interruption of supply
Both end Monthly Maintenance Work
During the above period of shut down 1)110KV Siruvachur SS, 110KV Pudukurichy SS and MRF load will be fed from 110KV Kalakudy Grid SS.
POSSIBLE Thu, Sep 7, 2017 10:00
POSSIBLE Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
During the LC period, the feeder will be radial from other end. Hence no ss affected.
No interruption to any SS. The 110KV Nidur SS proposed to shutdown.
230KV Singarapet feeder LC will be availed at both end. 3Nos. 230KV feeders will be in service. 110KV Capacitor Bank – I & II will be in hand trip condition. There will be no interruption to any SS or feeder
repeat of 60733
It is Tie feeder hence there is no interruption of power supply.
During the LC period all other 230KV feeders are in tied condition. Hence there will be no interruption of supply to any other SS.
Other end also availing LC.No SS will be affected.
possible Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 10:00
possible Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 10:00
possible Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
Both End Monthly Maintenance work.
1)DURING THE LC PERIOD 230/110KV NEMMELI THIPPIYAKUDI SS RADIALLY FED FROM 230KV KARAIKUDI SS. 2) NO INTERRUPTION TO ANY SS AND ALL OTHER FEEDERS ARE TIED CONDITION.
Other end also availing LC on that day
During the period of shutdown 230kv Alamathy-NCTPS feeder will not be in service.
1. No SS will be affected during LC period.
During the LC period, a) Intermediate 110KV Ammapettai SS also avail total shut down. b) All other 110 KV feeders will be in service. c)There will be no interruption of supply to any other feeder's and ss.
possible Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 14:00
Thu, Sep 7, 2017 9:00
OTHER END IS ALSO AVAILING LC ON THAT DAY
During the LC period,110 KV Valayapatti SS, Watrap SS, Erichnatham SS will be availing Total Shut down and 110 KV TTL SS & T. Kallupatti SS load will be transferred to 110KV PPTY feeder, along with solar genenration. Hence no SS will be affected.
During LC period no SS will be affected. Necessary concurrence obtained from SE/EEDC/Erode.
repeat of 61171
During the LC Period the Auto Tr. III, HV III & LV III in handtripped condition. Auto TR. I & II will cater the loads of Auto Tr. III. 110 KV Aruppukottai SS load will be transfer to 110 KV Kavanoor - Kamuthi feeder, concurrence obtained from EE/O/Kavanoor.
1)The 110kv Mosur ss availing Total shut down
Possible ( One by One)
POSSIBLE Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 9:00
During the LC period, a) The other end also availing LC on the same feeder. b) The Intermediate 110 KV Ammapettai SS availing total shutdown for monthly maintenance works. c) All other 110 kv feeders will be in tied condition. d) There will be no interruption of supply to any of the SS.
During the L.C period, 110 KV Pugalur SS proposing total shut down and concurrence obtained from EHT consumer M/s. EID Parry/Pugalur.
1. Chendur SS availing Total shutdown.2. The feeder will be radial from Other end.3. Hence No interruption of supply to any SS.
1. 230KV Salem – Singarapet feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches LC.4. There will be no interruption to any SS.
repeat of 60733
Possible Thu, Sep 7, 2017 9:00
Possible Thu, Sep 7, 2017 11:00
Possible Thu, Sep 7, 2017 10:00
possible Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
1. The 110KV Neyveli II # at Arasur SS towards Villupuram side will be kept open.2. The feeder will be kept radial from Neyveli TS I end.3. Thirupachanur SS in Neyveli I feeder is availing total shutdown.4. Neyveli I #,T.V.Malai and Acharapakkam # are in tied condition.5. Hence nointerruption of supply in any SS.
During the period of Shutdown 230KV Athipattu-NCTPS Feeder alone will be in service.
During the period shutdown 230/110kV Auto transformer -II will be in service,Hence NO interruption.
During LC period110KV Namakkal SS will be back fed through 110KV Valayapatty-Namakkal feeder.110KV Sendamangalam SS will be back fed through 110KV Valayapatty-Pudhansandai feeder.No supply interruption.
1)Deviakurichi 230KV SS radial fed from upto Attur 110KV SS End.2)Singapuram 230KV SS radial fed from upto P.G.Palayam 110KV SS End 3)There will be no interruption of supply any other SS.
POSSIBLE Thu, Sep 7, 2017 10:00
POSSIBLE Thu, Sep 7, 2017 9:00
No SS will be affected. POSSIBLE Thu, Sep 7, 2017 9:00
Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
During the LC Period there will be no supply in the entire 230Kv Veeranam-Kayathar feeder.Concurrence obtained from SE/NCES/TIRUNELVELI
During the L.C period, Auto Transformer I will be in service and no SS will be affected please.
1). Other end also availing LC2). Other 3 Nos 230 KV feeders will be in service
repeat of 60308
1. Other two Auto Trs. will share the loads.2. 110 KV bus bar protection will be kept off during the LC work
During LC Period1.110KV R.S.Puram-2 feeder Load will be transfered R.S.Puram-1 feeder
LC Programmed at Other End also.110 Kv Loads Managed by 230 Kv Ingur ss and Ponnapuram Ss.
possible Thu, Sep 7, 2017 9:00
possible Thu, Sep 7, 2017 9:00
Both end LC applied. possible Thu, Sep 7, 2017 9:00
POSSIBLE Thu, Sep 7, 2017 9:00
Postponed Thu, Sep 7, 2017 9:00
Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
110 Kv Loads Managed by 230 Kv Ingur and Ponnapuram Ss.
No SS will be affected. Bus coupler breaker will be closed, charged the Transfer Bus. Then all the feeders loads are Transfered to Transfer Bus by opening the Main Bus switch.
Other 230 KV feeder will share the loads
During the Auto transformer-I LC period, the Auto Transformer - II & III will be in service and Load will be shared by Auto Transformer II & III. Hence there will be no interruption of supply. Auto Load 40 MW for each.
EE/O/Amuthapuram has also applied LC on 230KV Amuthapuram II # Breaker on the same day 07.09.2017
Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
"During the LC period EE/O/Amuthapuram has also applied LC on 230KV Amuthapuram # II breaker on the same day 07.09.2017"
1) During the LC period there will be NO supply in this feeder. 2) Other End also avail LC on same day. 3) Concurrence obtained from SE/NCES/TIN.
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
At the Time of LC1.Auto Tr II HV and LV Breakers are in H/T condition (Off) and both HV and LV isolators are Kept Open and Auto I in service condition after completion of work Auto Tr II, HV and LV Breakers will be charged and isolators are in closed condition. Hence no interruption of supply to any of the Substation.
During the LC period, 110 KV Ichipatty SS under total shut down. KPR EHT SC will be fed via 110 KV Arasur - Kaniyur feeder and 110 KV Kalivelampatty SS will be fed from 230 KV Palladam SS.
Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
PROGRAMMED LC Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Both ends LC to be availed Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
No ss will be affected. POSSIBLE Fri, Sep 8, 2017 9:00
During the LC period The 230 KV SRP KDM # radial from KDM upto SRP (excl). 100 MVA AUTO Tr I will ben service in Transfer Bus through Tie breaker.100 MVA AUTO Tr IIIwill not be service.
NOT POSSIBLE
1. 230KV CBE SS will be fed from 230KV TDLR -CBE feeder of 230Kv TDLR SS.
During the LC period the feeder Radial from Theni SS up to Line side AB Switch at Periyar end. NO SS will be affected
During LC period there will be no supply in the entire feeder
During the period of LC,the 110KV Arani- Singarapet-II # is Idly charged condition. Hence no interruption of supply.
During LC period All the 230 KV Feeders fed through B BUS
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 10:00
POSSIBLE Fri, Sep 8, 2017 9:00
During the period of LC,the 110KV Arani-Thayanur # is Idly charged condition. Hence no interruption of supply.
During the above period of shut down a)110KV Poovalur SS avail Total shutdown on the same day. b)110KV Thennur SS,110KV T.V.Koil SS, 110KV Valady SS,M/s.Kothari EHT sc. will be fed radially from 110KV Trichy Grid SS. C). The line Isolator towards 230KV Thatchankurichy SS at 110KV Poovalur ss will be Kept opened and earth switch closed. d)The line Isolator towards 110KV Poovalur ss at 230KV Thatchankurichy SS will be Kept opened and earth switch closed. e)Necessary concurrence has been obtained from M/s.Kothari EHT Service for the interuptions during the switching operations. f)There will be no interuption to any other SS/EHT consumers.
1. Both end breakers to be tripped2.Both end bus and line isolators to be opened3.Both end earth switches to be closed condition
Possible Fri, Sep 8, 2017 10:00
POSSIBLE Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
230 KV KVPT # will be in service. Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 10:00
POSSIBLE Fri, Sep 8, 2017 10:00
POSSIBLE Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 8:00
Possible Fri, Sep 8, 2017 9:00
1.110KV PNPM SS GC-II will be feed from 110KV Ingur - II #,2.110KV Maruthur # will be kept radial from 230KV Arasur SS/110KV PDM #,3. Auto Tr. II will be cut 0ff,Hence No SS will be affected.
The bus coupler breaker is stand by one hence there will be no interruption to any of the SS please.
During the LC period 230KV MTPS feeder will be in service. 230KV Gobi end also programmed to avail LC . No SS will be affected
At present there is no import/export from MCL
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
During the Lc period the station load will be managed by other two Auto transormers
DURING THE LC PERIOD,THERKUPATTI SS WILL BE RADIALLY FED FROM KAYATHAR HENCE NO SS AFFECTED
No interruption of supply Load fed through 230 KVSS Mettur
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
1.ALL OTHER 3 NOS. 230 KV FEEDERS ARE IN SERVICE,IT MAY CATER THE LOAD2.OTHER END MAY ALSO AVAIL LC
1) The Feeder will be kept radial from Sembatty end upto Achampathu SS. 2)110KV AB Switch towards Pasumalai at Achampathu SS will be kept opened. 3) Lc has been applied for TLC works in the section between Pasumalai and Achampathu from 06.09.2017 to 16.09.2017 4) No interruption to any SS
During the above LC period there will be no supply to the 110KV Uddanapally SS,110KV Kempatty SS.The above ss also availing the Shutdown on the same day.the 230kv ss load will be maintained 230KV Shoolagiri#. The concurrence of SE/KEDC/Kgiri and SE/O/Tvlm had obtained.
110 KV Keelapavoor SS, aLANGULAM ss,& Keelaveeranam SS will be radially fed from 400 KV Kanarpatty SS Hence No SS will be affected
NOT POSSIBLE
1)During the LC period 110kv UDT-II Feeder will caters the load2)POOLANKINAR SS Under shutdown
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Inter SLDC Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Postponed Fri, Sep 8, 2017 10:00
DURING THE PERIOF OF SHUT DOWN,ALL OTHER 230KV FEEDERS WILL BE IN SERVICE
During the LC period, other end also avails LC and there will be no supply in the entire line, Hence no ss affected
During the period of shutdown, All other 230 KV Feeders will be in service
During the LC period there will be no supply in the entire feeder
110 KV Uthangal and 110 KV Srimushanam will be availing TSD. 110KV Pappakudi to be transferred to Kadalangudy
During the period of L/C time,1. 230 KV T.V.Malai- Neyveli TS-I # will be OFF condition at both ends.2. Other 2 Nos 230 KV T.V.Malai-Singarapet & Villupuram # will be in service Hence there is no interruption of supply please.
During the LC Period other 230KV feeders will be service.
Power transformer I and Power transformer IV in service. Power transformer III loads will be fed from Power Transformer I & IV.
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Both end Monthly Maintenance Work
During the LC period, the feeder will be radial from other end. Hence no ss affected
110 KV Vellichandai SS,110 KV Pennagaram SS availing Total Shutdown Total Relief : 25 MW, the Station load will Managed by keeping Auto Transformer II & III, 230 KV Shoolagiri and also 1 No Grid feeder in service.
During the LC period the 110KV Mannargudy SS, 110KV Okkanadu kelaiyur SS, 110KV Ullikottai SS supply will be fed from T(K)GTPS Generating station (Radial). Hence there will be no interruption of supply to any other SS.
110 KV Thirukovilur feeder will be kept radial from Villupuram 230KV SS end.
Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
During the LC period, a) Intermediate 110KV Ammapettai SS also avail total shut down. b) All other 110 KV feeders will be in service c)There will be no interruption of supply to any other feeder's and ss.
DEPENDING UPON LOAD CONDITION
a) Other end also avail shutdown. b) All other 230 KV feeders will be in service. c) There will be no interruption of supply to any other feeders.
NOT POSSIBLE
Auto Tr. III already proposed to be in tripped condition for Southern Bus Lc from 07.09.2017 to 11.09.2017. Hence No SS affected.
During the period of shutdown,Except 50 MVA Power Transformer-1 & 33 KV Tollgate feeder one by one.all other feeders and equipment will be in service.
During the LC period, a) other end also availing LC on the same feeder. b) All other 230KV feeders will be in tied condition. c) Hence there will be no interruption of supply to any of the feeder and SS.
NOT POSSIBLE
Possible Fri, Sep 8, 2017 9:00
Approved Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 9:00
POSSIBLE Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 10:00
During LC period230KV Unjanai and Pugalur feeders will be kept tied with grid.230KV Valayapatty SS being newly commissioned not availing at opposite side.No supply interruption.
DURING THE L.C PERIOD, CB NO :I WILL CATER THE STATION WAR LOADS
During the LC period 110KV Mandapam SS will be radial from Perungulam SS.
110 KV isolator towards Papanasam will be kept opened in VK Puram and 110 KV isolator towards VKPuram will be kept opened in Papanasam.Hence no SS will be affected .
NOT POSSIBLE
During the L.C period 110 KV Aypm SS will be in shut down condition and 110KV OPTM SS will be radially fed from other end and at 110KV Aypm SS the AB switch towards 230KV Sipcot SS kept opened condition. No SS will be affected please.
Present PWD demand is 250C/s. During the LC period, the respective feeder will be radial from other end. Hence No SS will be affected.
NOT POSSIBLE
Possible Fri, Sep 8, 2017 9:00
Fri, Sep 8, 2017 10:00
Possible Fri, Sep 8, 2017 9:00
Fed From Ingur 230 Kv SS Possible Fri, Sep 8, 2017 9:00
Loads Fed From Ingur 230 Kv SS Possible Fri, Sep 8, 2017 11:00
Loads Fed From Ingur 230 Kv SS Possible Fri, Sep 8, 2017 14:00
Possible Fri, Sep 8, 2017 9:00
Possible Fri, Sep 8, 2017 9:00
During LC Period1.Other 230KV feeders catter the SS Loads.2.Hence No other SS Will be affected
1. During thE LC period the 110kv Radhapuram SS ,110kv Navaladi SS & 110kv Samugarengapuram 10 (1) SS suzlon SS.willbe fed from 110kv Sankaneri -Udayathoor feeder of Sankaneri ss.
NOT POSSIBLE
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 110KV UDT I&III FEEDERS
110KV Kadapperi - S.Pkoil # and 110KV Korttur-Kadapperi I #
radial from other end.
loads transfer to 110KV Tharamani - Velachery UG #
Possible Fri, Sep 8, 2017 9:00
POSSIBLE Sat, Sep 9, 2017 9:00
POSSIBLE Sat, Sep 9, 2017 9:00
POSSIBLE Sat, Sep 9, 2017 9:00
Possible Sat, Sep 9, 2017 9:00
Possible Sat, Sep 9, 2017 9:00
Possible Sat, Sep 9, 2017 9:00
Auto Tr.II& III will be in service. No load transfer required
During the LC period The 110 KV SRP - ARMI I # radial from ARMI upto Perungudi (incl). 110 KV SRP-ARMI II # radial from ARMI upto RDPM.Concurrence obtained from ISRO authority to shut down at ISRO 110 KV SS.Hence no SS will be affected.
During LC period ,110 KV Ckni SS radial from 230KV Kinnimangalam and 110 KV Valanthur SS radial from 230 KV Theni SS.
1.230KV TTPS-KOODANKULAM FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS.2.29A & 29B ISOLATORS KEPT OPEN CONDITION.3.EARTH SWITCH SHOULD BE CLOSED CONDITION AT BOTH ENDS.
MONTHLY MAINTENANCE AT BOTH ENDS.
Other 230 KV feeders will be in service
Both K.R.Thoppur SS & Singapuram SS have Programmed for maintenance work on that day
Possible Sat, Sep 9, 2017 9:00
Possible Sat, Sep 9, 2017 9:00
Repeat Sat, Sep 9, 2017 9:00
Possible Sat, Sep 9, 2017 9:00
Possible Sat, Sep 9, 2017 7:00
Possible Sat, Sep 9, 2017 9:00
Both end Monthly Maintenance Work
During the LC period, Kalpakkam -Spkoil 1 and 2, and 230 KV Kalpakkam -Acharapakkam feeders will be in service
1. No SS will be affected during LC period.
1. No SS will be affected during LC period. 2. 110KV Suriyam palayam SS has programmed total shut down on 09.09.2017 3. 110KV New Suriyam palayam SS supply will be fed from Barrage IV PH
During the shutdown period1)110KV KWW II feeder loads to be transferred to 110KV KWW I feeder2)110KV Cooks Road SS will be radiaaly fed from 110KV BBGTPS3) 100MVA Auto Transformer I will be inservice to cater the remaining loads
During LC period 110 KV Mettukadai SS will be under Total shutdown condition. Necessary concurrence obtained from SE/EEDC/Erode.
Possible Sat, Sep 9, 2017 10:00
Possible Sat, Sep 9, 2017 9:00
Sat, Sep 9, 2017 9:00
Sun, Sep 10, 2017 9:00
Sun, Sep 10, 2017 10:00
Sun, Sep 10, 2017 10:00
Possible Sun, Sep 10, 2017 8:00
During the Period of Shut down the 230KV Sulurpet feeder Tie open at 230KV Gummidipoondi SS end , Concurance to be obtained from OD/230KV SS Sulurpet
1)Both ends will be H/T and kept opened2) 230 KV Ulundurpettai and T.V.Malai feeders will be in service.3)Hence No interruption of supply to any SS. And1.) The feeder will be kept off from both ends.2.) 230 KV Ulundurpet and T.V.Malai feeders will be in service.
1) The singapuram & K.R.Thoppur both 230KV SS availing Breaker, CT’s maintenances work .2) There will be no interruption any other SS.
repeat of 61037
All other Auto-Transformers will be in service
OCC approved,item No.134th/135
For Quarterly maintenance work.
Wrong Entry
For Quarterly maintenance work.
Wrong Entry
During the period of shutdown,Except 230KV NCTPS-II Feeder.all other feeders and equipment will be in service.
All other feeder in service. Possible Sun, Sep 10, 2017 6:00
Approved Sun, Sep 10, 2017 9:00
Sun, Sep 10, 2017 8:00
possible Mon, Sep 11, 2017 9:00
Approved Mon, Sep 11, 2017 9:00
Mon, Sep 11, 2017 9:00
PROGRAMMED LC Mon, Sep 11, 2017 9:00
Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
1. 230KV Mylapore Feeder only will not be in service. 2. All other 110KV Feeders, 230KV Feeders, Auto I, II & III will be in service.
All other feeder will be in service
To be discuss
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
During the LC period, the remaining 2X24 MVAR Capacitor Banks will be in service.
NOT POSSIBLE
repeat of 60180
1. 230KV CBE SS will be fed from 230KV OKM-CBE feeder of 230KV OKM SS
repeat of 60261
During the LC period the 110 KV poosalakudi & A.Pudur ss under TSD. THE 110 kv kkdi - vldr # will be tied with grid thro 110 KV DVKT #Hence there will be no interruption of supply.
Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 8:00
POWER TRANSFORMER -III will not be in service, loads to be cattered by other two Power transformers
During LC period there will be no supply in the entire feeder
EE / O / ANPKM has also programmed
AUTO TRANSFORMER I AND III ARE IN SERVICE,IT MAY CATER THE LOAD
DURING THE LC PERIOD,SANKARANKOVIL SS WILL BE RADIALLY FED FROM SURULIYAR 2.MALAYANKULAM SS WILL BE CHANGED FROM 110KV KAYATHAR-SURULIYAR FEEDER to 110KV KAYATHAR- K.G.PATTI FEEDER BY CHANGE OVER SWITCH AT MALAYANKULAM SS HENCE NO SS AFFECTED.
Mon, Sep 11, 2017 8:00
possible Mon, Sep 11, 2017 9:00
Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
Possible Mon, Sep 11, 2017 9:00
DURING THE LC PERIOD,1.DURAISAMYPURAM SS WILL BE RADIALLY FED FROM KAYTHAR 2. KOVILPATTI SS WILL BE RADIALLY FED FROM ANUPANKULAM HENCE NO SS AFFECTED
NOT POSSIBLE
1)During the LC period 110kv ALR Link-II Feeder will caters the load
1).315MVA,400KV/230KV ICT-II will be in off condition.2).All other 400KV Feeders,230KV Feeders and ICT-I will be in service.
OCC approved 134th/136
During LC period other end also programmed for availing LC
The 110 KV Chitharasur SS,110 KV Keelkavarapattu SS will be availing total shutdown. And EID Co – Generation, 110 KV Sornavoor SS & 110KV Nallathur SS, loads will be transferred to the 110 KV Cuddalore – Nathapattu feeder. Hence, no interruption of supply.
Possible Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
Mon, Sep 11, 2017 9:00
Mon, Sep 11, 2017 9:00
110 KV Kelkavarapattu, Chitarasur, TSD
During 230 KV Bus A LC Period, 230 KV Bus B will be in service condition. Hence there will be no interruption of supply.
During the LC period, the # will be radial from other end. Hence no ss affected
During the LC period all other 230KV feeders are in tied condition. Hence there will be no interruption of supply to any other SS.
NOT POSSIBLE
During the LC period, 1) other end also will avail LC on the same day,2) all other 230 KV feeders will be in tied condition,3) no supply interruption to any SS.
NOT POSSIBLE
possible Mon, Sep 11, 2017 9:00
Postponed Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
1.110KV Singapuram-II will be radically fed from other end. 2.There will be no interruption to any SS or feeder.
DEPENDING UPON LOAD CONDITION
a) 110KV Vadugapatty is radial feeder. b) 110KV Vadugapatty,Pakkudy and Ammachatram SS avail Total shutdown. c) All other 110KV feeders will be in service. d) There will be no interruption of supply to any other feeders and SS.
During the LC period Auto II & III, HV II & III, LV II & III under hand tripped condition. 230 KV APKM - Sterlite feeder under hand tripped condition. Auto Transformer-I will be fed from 230KV Anuppankulam- Madurai and 230KV Anuppankulam - Kayathar feeder sources . 110 KV Aruppukottai SS load will be tramsferred to 110 KV Kavanoor - Kamuthi feeder, concurrence obtained fromEE/O/Kavanoor. 110 KV Anuppankulam - PSQ will be radially fed from PSQ end.
POSSIBLE Mon, Sep 11, 2017 9:00
Possible Mon, Sep 11, 2017 9:00
Possible Mon, Sep 11, 2017 9:00
Possible Mon, Sep 11, 2017 9:00
Possible Mon, Sep 11, 2017 8:00
Other feeder will cater the load possible Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
During the LC period, the other end also availing LC on the same date.
1)The 110kv salai ss & 110kv AJ Pet ss availing Total shutdown work
The 110kv Salai ss & 110kv K G KANDIGAI SS availing Total shutdown
1.) 110 KV switch towards pudhupattu spur line at sankarapuram SS will be kept opened . 2.) 110 KV Pudhupattu SS availing total shutdown. No interruption of supply to any SS
All other feeder will be in service
During the LC period 110KV Keelakarai SS will be radial from Kaavanoor SS.
OTHER TWO UNITS AND ALL FEEDERS WILL BE IN SERVICE
DURING THE LC PERIOD ALL THE MACHINES ARE IN STANDBY CONDITION AND OTHER 230KV FEEDER ARE IN SERVICE. PWD DEMAND 700C/S MEET OUT THROUGH DAM PH MACHINES.
Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
possible Mon, Sep 11, 2017 9:00
1.110 KV Echantha SS will be fed from 110 KV Kodikuruchi-Veerasigamani feeder # II by closing the Isolator towards Veerasigamani at Echantha SS end.2.110 KV isolator towards Kodikuruchi will be kept opened in Echantha SS and 110 KV Isolator towards Echantha will be kept opened in Kodikurichi SS .Hence no SS will be affected .
NOT POSSIBLE
During LC period 1) Other 3 No Auto Transformers will be in service2). 110 KV Alagumalai SS will be availing Total shut down3). 110 KV Mudalipalayam SS will be fed from 230 KV Ingur SS
During LC period 1).110 KV Alagumalai SS will be availing total shutdown and Mudalipalayam SS will fed from 230 KV Ingur SS2). No other SS will be affected
Other 230 KV feeder will share the loads
Other Two Auto Tr II & III will share the loads
During LC Period1.Auto-1 catter the 110KV western bus feeder loads.2.If necessary 110KV Thudiyalur-2 feeder load transfer to 230KV Thudiyalur SS
possible Mon, Sep 11, 2017 9:00
POSSIBLE Mon, Sep 11, 2017 9:00
Possible Mon, Sep 11, 2017 4:00
Possible Tue, Sep 12, 2017 9:00
SEC BETWEEN RANGANATHAPURAM AND MELKARAI PATTY WILL BE Fed FROM 230KVSS RANGANATHAPURAM
1) During the LC period there will be NO supply in P.Tr-1 and its 33KV feeders. 2) If there is wind generation its 33KV feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
230KV Sriperumbudur -Tharamani # & 230KV KITS -
Tharamani # will be in service.
The Feeder will be change over to 110 KV Mettur Auto SS-Anthiyur feeder during the LC period.
Possible Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
PROGRAMMED LC Possible Tue, Sep 12, 2017 9:00
At the time of LC1.110 KV Echur - Mazhayur # the 110 KV Echur - Mazhayur # Bkr will be HT and isolators are kept open, and the 110 KV Chetpet and 110 KV Thayanur SS Load transferred to 230 KV Villupuram SS. After completion of Work, 110 KV Echur - Mazhaiyur # Bkr will be charged and isolators are kept closed. Depend upon load condition the transferred Load will be bring back to 230 KV Echur Substation. Hence no interruption to the substation
During the LC period, the feeder will be radial from 230 KV Karamadai SS.
During the LC period the 110 KV SR Puthur - KDR I feeder will be radial from KDR PH II upto Thuckalay SS (incl).The 110/11 KV Chembonvilai, Cheramangalam and Karungal SS will avail total Shutdown to be approved by SE/KKEDC/NGL and SE/O/TIN. Concurreance to be obtained from Railway athoritise.Hence no SS will be affected.
POSSIBLE Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 10:00
Tue, Sep 12, 2017 9:00
During the LC period the 110 KV Kallal SS under Total shutdown. The 110 KV KKDI - SVGA # will be radial up to 110 KV Madhagupatty ss. Hence there will be no interruption of supply.
FEEDER TO BE KEPT RADIAL FROM ARKAYUP TO KEELAKARAI&FROMKAVANOOR UPTO VALINOKKAM
During the period of shutdown the entire load of 230KV SIPCOT Mambakkam SS [Approximately: 45MW] will be fed from 400KV SV.Chatram SS through 230KV SIPCOT Mambakkam - SV.Chatram feeder without interruption.
During the LC period there will be no supply in 400 KV Main Breaker for ICT1(406-52), Tie Breaker 405-52 and 110 KV LV Breaker 101-52, 110 KV Ayyanarithu Line 1,Line 2 and Keelaveeranam Breaker, 400/110KV ICT1 & 110KV Bus -1 & 2 - PT. Hence no substation affected.
NOT POSSIBLE
possible Tue, Sep 12, 2017 9:00
No ss will be affected. POSSIBLE Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
1. 230KV Shoolagiri & Singarapet feeder breakers,HV-I & HV-II breakers to be hand tripped, BS / LS isolators of Shoolagiri and Singarapet breakers, HV-I & HV-II to be opened.2. LV-I & LV-II, 110KV Hosur & 110KV Karimangalam # breakers to be hand tripped ( Krishnagiri 110KV SS will be transferred and Fed by 230KV Karimangalam SS), BS / LS isolators to be opened.3. GC-I & GC-II breakers to be hand tripped, BS / LS isolators to be opened. 33KV,11KV LV breakers and all 33KV & 11KV feeder breakers to be hand tripped, BS / LS isolators to be opened. 11KV LV will be hand tripped after availing station supply from the feeder fed from Krishnagiri 110KV SS. Concurrence obtained from SE/O/Thiruvalam, SE/KEDC/Krishnagiri, total shut down proposed at 230/110/33-11KV SS as per approval received from
Feeder to be kept radial from Melakallur S.S. Hence no S.S will be affected.
POSSIBLE Tue, Sep 12, 2017 10:00
POSSIBLE Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
DURING LC PERIOD 110 kv Siruganur SS also availing total shut down on that same date. (1) 110Kv Samayapuram-Kallaudy I # tie opened at 230KV Samayapuram SS. (2) 110KV Samayapuram-Siruganur # Breaker is in H/T condition at 230KV Samayapuram SS and line Isolator towards 230KV Thatchankurichy SS at 110KV Siruganur SS and Line Isolator at 230KV Samayapuram SS towards 110KV Siruganur SS is kept in open condition. . (3) AUTO TR II(100 MVA) , HV-II & LV-II BREAKER'S kept H/T Condition . 4) 110KV Kallakudy Grid SS fed through 110KV Samayapuram- Kallakudy II feeder. (5) 110 KV BUS SWITCH NO. 29 BS will be in opened condition . (6) AUTO TR.I (100 MVA) WILL BE IN SERVICE AND CATER THE ENTIRE SS LOAD. (7)There will be no intruption to any other 110KV SS, EHT Consumers.
1.230KV TTPS-AUTO SS - II FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS.2.29A & 29B ISOLATORS KEPT OPEN CONDITION.3.EARTH SWITCH SHOULD BE CLOSED CONDITION AT BOTH ENDS.
During LC period there will be no supply in the entire feeder
possible Tue, Sep 12, 2017 10:00
possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
1.110KV PNPM SS GC-II will be feed from 110KV Ingur - II #,2.110KV Maruthur # will be kept radial from 230KV Arasur SS/110KV PDM #,3. Auto Tr. II will be cut 0ff,Hence No SS will be affected.
During the shutdown period,1) 110KV Ramiyanahally feeder breaker will be in handtrip condition at Singarapet end and radially charged condition from 110KV Ramiyanahally SS upto 110KV Harur SS.2) 110 KV Ramiyanahalli SS total shutdown approved.3) 110KV Harur SS & 110KV Pappireddipatti SS loads will fed from 230 KV SS Karimangalam through 110 KV Karimangalam - Ramiyanahalli #hence no interruption of supply.
During the LC period both ends breaker will be in Handtrip condition, other 6 no’s 230KV feeders will be in service and hence no interruption of supply
110 KV S.P.Koil - # I & II - Tied condition.
During the LC period supply radial from periyar.
POSSIBLE Tue, Sep 12, 2017 9:00
Tue, Sep 12, 2017 9:00
Tue, Sep 12, 2017 8:00
1) 110 KV Arasaradi SS loads are fed by 110KV Pasumalai - Arasaradi - SC Feeder at 110KV Pasumalai SS 2) Switch No 1 at 110KV Pasumalai Grid SS is under Open Condition. 3) The feeder will be kept radial from Alagarkoil SS upto Anaiyur SS feeding Tirupalai SS 4) The 110KV isolator towards Pasumalai at Anaiyur SS and the 110KV Line isolator at 230KV Pasumalai SS will be under open condition. 5)110KV Anaiyur SS and Ellis Nagar SS will be under Shutdown.
110 KV Veerasigamani I (Ehantha ) SS will be fed from 110 KV Kodikurichi - Veerasigamani II # by closing of AB Switch towards Veerasigamani at Ehantha ss.
NOT POSSIBLE
DURING THE LC PERIOD,1.KALINGAPATTI SS WILL BE RADIALLY FED FROM K.G.PATTI 2.KALUGUMALAI SS WILL BE RADIALLY FED FROM KAYATHAR HENCE NO SS AFFECTED.
NOT POSSIBLE
possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 10:00
possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
During the above LC period there will be no interruption,since the line has been kept in ideal charged condition. The concurrence of SE/KEDC/Kgiri and SE/O/Tvlm had obtained.
1)During the LC period 110kv ALR Link-I Feeder will caters the load
230KV LV NOT IN SERVICE, NO FEEDERS AT 230KV SIDE
110KV Karuvalur SS total shutdown.110KV paduvampalli SS and Selapapalayam SS kept radial from 230KV Arasur SS through 110KV Arasur - Karuvalur 2 #
During the LC period,Gangaikondan SS will be fed from Thalaiyuthu SS, Hence no ss affected
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 10:00
POSSIBLE Tue, Sep 12, 2017 10:00
Tue, Sep 12, 2017 9:00
110 KV Vadakuthu,110 KV Sethiyathoppu SS will be availing total shutdown.The 110 Kulanchavadi SS,110 KV Thoppukollai SS ,110 KV Koranapattu SS and 110 KV Kurunjipadi SS loads will be transferred to 110 KV Neyveli TS - I – Vadakuttu # .. Hence no interruption of supply.
During LC period 110kv vedasandur SS availing total shutdown (L/R 27mw)feeder will be radially fed from SBT end .Hence no supply interruption to any other SS
During the Lc Period 110KV MDPH # I will be in service
Power transformer I and Power transformer III in service.Power transformer IV loads will be fed from Power transformer I & III
During the above period of shut down 1) 230KV Trichy SS also avaling LC. 2)230KV Perambalur SS will be radially fed from 230KV TAQA end
Both end Monthly Maintenance Work
repeat of 60453
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
During the period of L/C time,1.110 KV Mangalam SS aviling total S/D,2. 110 KV Kilpennethur, Rajanthangal, Vettavalam substations and 110 KV Thandarai Traction Feeder will be fed from 110 KV Villupuram Grid SS (Radial upto 110 KV Kilpennathur SS) Hence there is no interruption of supply please.
No interruption to any SS. The 110KV Perambur and Peralam SS proposed to shutdown.
110KV Gandhi Nagar SS availing total shutdown.Other end also availing LC. No SS will be affected.
Both End Monthly Maintenance work.
repeat of 60453
During the LC period the 110KV Thiruvarur - Narimanam I feeder will be in service. Hence there will be no interruption os supply to any other SS.
POSSIBLE Tue, Sep 12, 2017 10:00
possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 10:00
possible Tue, Sep 12, 2017 8:00
Possible Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
1) DURING THE LC PERIOD, 110KV ULLIKKOTTAI SS, 110KV OKKANADU KEELAIYUR SS AND 110KV MANNARGUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS. 2) NO INTERRUPTION TO ANY SUBSTATIONS.
Auto - I will manage the BKB-I & Sankari-I # load.Auto -II will manage the Thevur, Barriage-IV & Sankari-II # load.
During the LC period there will be no interruption to any SS. Supply will be fed from 230 KV Thiruvarur SS upto 110 KV Ullikkottai SS radially.
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
During the period of Shutdown, The above feeder loads will be transformed to 230 KV Omega SS.
During the period of Shutdown, The above feeder will be radially fed from the other end.
110KV Deviakurichy - Singipuram feeder- II will be kept radial from Singipuram 230KV SS end.
Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
1. No SS will be affected during LC period.
repeat of 61175
DEPENDING UPON LOAD CONDITION
DEPENDING UPON LOAD CONDITION
During LC period Gandhinagar 110 KV SS will be under Total Shutdown condition. Necessary concurrence obtained from SE/EEDC/Erode.
repeat of 61175
During the period of shutdown,Except 100 MVA Auto Transformer-II.all other feeders and equipment will be in service.
During the LC period the 110 KV Thulukkapatti I feeder will cater the load of 110 KV Thulukkapatti II feeder. Hence no SS will be affected.
During the L.C period, 1) other end also availing L.C on the same Feeder. 2) All other 230KV feeders will be in tied condition. 3) There will be no interruption of supply to any of the feeder and SS.
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
possible Tue, Sep 12, 2017 9:00
1)THE 110KV ITCHIPUTHUR SS AVAILING TOTAL SHUTDOWN
During the L.C Period HV II and LV II are tripped condition. 110KV Karur SS are proposed total shutdown. Load contain with in two auto transformer (I & III).There is no interruption to any SS.
1. T.V.Nallur # H/T at 230 Kv Auto Ss. The feeder will be radial from Ulundurpettai 110KV SS. 2. T.V.Nallur SS availing Total shutdown. 3. Auto Tfr II will be in service. 4. Hence No interruption of supply to any SS.
1)Pudhanchandai 230KV SS radial fed from upto Thammampatty 110KV SS End 3)Deviakurichi 230KV SS radial fed from upto Godamalai 110KV SS End 4)There will be no interruption of supply any other SS.
1. There is no SS between MHPH / Bhavanisagar and Bhavanisagar 110 KV SS.2. During LC period, power evacuation will be done through 110 KV Micro - Moyar Feeder. Hence generation loss will not arise.
Tue, Sep 12, 2017 9:00
Tue, Sep 12, 2017 10:00
Tue, Sep 12, 2017 10:00
No SS will be affected. POSSIBLE Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 10:00
Possible Tue, Sep 12, 2017 9:00
During the LC Period there will be no supply in the entire 230kV Veeranam-Abishekapatti Feeder.Concurrence obtained from SE/NCES/TIRUNELVELI.
NOT POSSIBLE
DURING THE LC PERIOD THERE WILL BE NO SUPPLY TO 33KV SRSPL,SRL ,SAPTAGIRI & REDPONIX FDRS IF WIND GEN . AVAILABLE ON THE DAY POWER TR.2 LOADS WILL BE FED FROM OTHER POWER TRS & POWER TR.2 ONLY TAKEN FOR MTCE WORK
During LC Period1.110KV OKM-Udumalpet-1 feeder will be kept radial from 110KV Udumalpet SS.2.Hence No SS will be affected
Possible Tue, Sep 12, 2017 9:00
POSSIBLE Tue, Sep 12, 2017 10:00
POSSIBLE Tue, Sep 12, 2017 12:00
Both end LC applied. Possible Tue, Sep 12, 2017 9:00
Possible Tue, Sep 12, 2017 4:00
DURING LC PERIOD SEC BETWEEN PATSPIN EHT SERVICE AND PONNAPURAM SUPPLY WILL BE FED FROM 230 KV PONNAPURAM SS
110KV NALLAMANAICKENPATTI SS,110KV VISWANATHAPERI SS,110KV NARANAPURAM SS&110KV PULIANGUDI SS WILL BE radial from 110KV VEERASIGAMANI-ii FEEDER OF 230KV Kodikuruchi SS. Hence no SS affected.
230KV TRANSFER BUS already idle condition. Hence no supply interruption.
230KV Sriperumbudur -Tharamani # & 230KV KITS -
Tharamani # will be in service.
Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
During the period of LC Auto Transformer -I and III 1)110 Kv Kullanchavadi feeder load will be transfered to 110 Kv Neyveli- Vadakuthu Feeder2)110 KV Cuddalore -lanco feeeder tie will be opened at Cuddalore End.3)110 KV Bus Coupler Breaker will be Hand Tripped and Bus coupler Isolators will be Opened Condition During the period of LC Auto Transformer-II 1)110 KV Nathapattu Feeder and 110 KV Chitharasur feeder load will be Transferred to 110 kv Neyveli Panruti Rural Feeder2)110 KV Bus Coupler Breaker will be Hand Tripped and Bus coupler Isolators will be Opened ConditionHence No Interruption of Supply.
To be discuss
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
During the LC period, the feeder will be radial from 230 KV Karuvalur SS.
Possible Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 10:00
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
Wed, Sep 13, 2017 9:00
At the time of LC1.230 KV Echur -Arani # breaker will be HT condition and isolotors are kept open, After completion of Maintenance work 230 KV Echur -Arani # breaker will be charged and isolators are kept closed. At the same time 230 KV Arani - Echur # LC already approved by LDC Chennai.There is no interruption of supply to the Substation.
400 KV MTPS Feeder I will be in service.
During the LC Period the Auto TR - 2 Load will contained with other two Auto Tr 1 & 3. Hence there will be no interruption of supply.
During the lc period all other 230 kv # are tied with grid. Hence there will be no interruption of supply.
During the period of LC, 400/ 230 KV, 315 MVA Auto-Transformer-II will be in OFF condition. 400/ 230 KV, 315 MVA Auto-Transformer-I will cater the loads of 230 KV Feeders with out interruption.
Approved in OCC134 th / 146
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 10:00
Possible Wed, Sep 13, 2017 9:00
No Interruption POSSIBLE Wed, Sep 13, 2017 10:00
POSSIBLE Wed, Sep 13, 2017 9:00
NIL possible Wed, Sep 13, 2017 8:00
possible Wed, Sep 13, 2017 10:00
Possible Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 8:00
During the LC period there will be no supply in 110KV Bus Coupler Breaker (104-52) only. Hence no substation affected.
During the LC period there will be no supply in entire power transformer -I and 33KV feeders concurrence obtained from SE/NCES/TIN.
During the period of LC,All other 4 Nos. 230KV feeders will be in service.Hence no interruption of supply
During LC Period There will be no supply in the entire feeder
Subject to the load condition, 1.110KV Ingur-II # will be kept radial from other end up to 110KV Kulathupalayam SS ,2.110KV PNPM SS GC-I will be transferred to 230KV PNPM SS / 110KV PNPM # Hence No SS will be affected.
Other 100 KV feeders will be in service
DURING THE LC PERIOD UNIT NO.2 UNDER NOT STANDBY CONDITION
Other end is also availingL C. POSSIBLE Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
Wed, Sep 13, 2017 10:00
During the period of LC, 1) Auto transformer II and LV II breaker will be in off condition 2) The Auto transformer I and III will be in service,3) All the 110KV feeders will be in service4) 110KV Singarapet Grid SS total shutdown approved and hence no interruption of supply.
EE / O / CKNI has also programmed
During the LC period, DGL SS and railway traction SS will be transferred to 110KV AKL II #. Hence no interruption to any SS.
1. 110 KV KAVILIPALAYAM SS AND 110 KV PUNGAMPALLY SS MAY AVAIL TOTAL SHUTDOWN2.SUPPLY TO OTHER INTER SS MAY FED FROM MOYAR PH END
During the L C Period supply radial from periyar .
400/230 KV ICT#4 will not be in service.
Approved in OCC 134 th / 144
POSSIBLE Wed, Sep 13, 2017 8:00
possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
Possible Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
During the above LC period there will be no supply to 110KV Zuzuvadi SS and 110KV TVS EHT service and the above ss availing shutdown on the same day. The concurrence of SE/KEDC/Kgiri and SE/O/Tvlm had obtained.
During the LC period Palayamkottai SS will be fed from 110 KV ARMI SS. Hence no ss affected
During the LC period other two Auto transformers will be in service and scatter the load
110 KV Kullanchavadi SS will be availing total shutdown..The 110 KV Thoppukollai SS ,110 KV Koranapattu SS and 110 KV Kurunjipadi SS loads will be transferred to 110 KV Neyveli TS - I – Vadakuttu # .. Hence no interruption of supply
During the LC Period 230KV other 230KV feeder will be service.
possible Wed, Sep 13, 2017 9:00
Possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 10:00
Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
Wed, Sep 13, 2017 9:00
During 110 KV Bus B LC Period, 110 KV Bus A will be in service condition. Hence there will be no interruption of supply.
During the period of L/C time,1. 230 KV T.V.Malai-Villupuram # will be OFF condition at both ends,2. Other 2 Nos T.V.Mali-Neyveli TS-I and Singarapet feeders will be in service. Hence there is no interruttion of supply please.
During the LC Period, other end also availing LC There is no intermediate SS. Hence no ss affected. AE/Lines also availing LC on the same date
During the LC period, the # will be radial from other end. Hence no ss affected
NOT POSSIBLE
110KV PerumanallurSS, Nethaji Appreal park SS and Velampalayam SS are availing total shut down.
110KV Perumanallur, Vealmpalayam and Nethaji Apprael Park SS availing total shutdown.
repeat of 61194
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 10:00
During the Auto transformer-II LC period, the Auto Transformer - I & III will be in service and Load will be shared by Auto Transformer I & III. Hence there will be no interruption of supply.
During the LC period the 110Kv Narimanam - CPCL - Nagapattinam feeder will be in service. Hence there will be no interruption of supply to any other substation.
110KV Perumanallur, Velampalayam and Nethaji Apprael Park SS availing total shutdown.
1) DURING THE LC PERIOD, 110/33-11KV MADUKKUR SS AND 110KV THIRUMAKKOTTAI SS RADIALLY FED FROM T(K)GTPS. 2) If necessary, 110KV Kovilkalappal-Madukkur-Pattukkottai tie will be created (by closing the 110KV Pattukkottai Line isolator no.2 at 110KV Madukkur SS). 3) In 110/33-11KV MADUKKUR SS 11KV only shutdown availed. 4) No interruption to any Substation.
possible Wed, Sep 13, 2017 9:00
Possible Wed, Sep 13, 2017 9:00
Wed, Sep 13, 2017 9:00
Possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
postponed Wed, Sep 13, 2017 9:00
1. 110KV K.R.Thoppur-I feeder will be radially fed from other end or Railway traction SS will be fed from 110KV K.R.Thoppur-II feeder. 2. There will be no interruption to any SS or feeder.
During the period of shutdown, The above feeder will be radially fed from other end.
Unit in service all 400KV and 230KV are in service except 230KV Thingalur feeder
repeat of 61034
During the period of LCi. 110 KV Railway II feeder breaker will be in “ OFF†condition at both �end.ii. 110 KV Railway I feeder will be in service.Hence there will be no interruption of supply please.
Durin the LC period the Auto Tr. II & III will cater the load of Auto Tr. I. Hence No SS affected.
During LC period 110 KV Nadupalayam SS will be under Total shutdown condition and 110 KV Kaspapettai SS to be fed from Pugalur 230 KV SS. Necessary concurrence obtained from SE/EEDC/Erode.
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 9:00
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
During the L.C Period HV I and LV I are tripped condition. The 110KV Malaikovilur SS,110KV Pallapatty SS & 110KV Nadupalayam SS are proposed total shutdown.There is no interruption to any SS. Load contain with in two auto transformer (II & III)
During the LC period,the 110KV Malaikovilur and 110KV Pallapatty SS are proposed total shutdown,The remaining 110KV AC Palayam SS,110KV Thalapatty ss load fed from 230KV Rengnathapuram SS. there will be no supply interruption in any 110KV SS. Concurrence obtained from EE/O/Renganathapuram.
Possible Wed, Sep 13, 2017 9:00
Inter sldc Wed, Sep 13, 2017 9:00
1. Both ends will be H/T and kept opened 2. Other 230KV Ulundurpettai feeder & T.V.Malai feeder will be in service. 3. Hence No interruption of supply to any SS. 4.)110 KV Karanaiperichanur SS availing total shutdown. No interruption of supply to any SS.
1.) The 110 KV line between 230 KV Villupuram SS and Thirukoilur SS will be kept off. 2.) The feeder will be radial from Deviyakuruchi end up to Thirukoilur SS. 3.) 110 KV Karanaiperichanur SS availing total shutdown. No interruption of supply to any SS.
Possible Wed, Sep 13, 2017 9:00
Possible Wed, Sep 13, 2017 9:00
All other feeder in service. Possible Wed, Sep 13, 2017 8:00
POSSIBLE Wed, Sep 13, 2017 9:00
During the period of LCi) Auto-Tr-I ,HV-I,LV-I , Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS Loads.ii) The 110KV Railway-II Feeder will be in ‘OFF’ conditioniii) iv) The 110KV Railway-I Feeder will be in ‘ON’ Conditionv) vi) The Railway Traction SS Loads will fed from 110KV Railway-I Feeder iv) The 230KV Link-II, 230KV Chittoor interstate feeders,230KV Link-I # and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
It is proposed to avail line clear and 230 KV Ulundurpet – Villupuram feeder for carrying out the relay test by GRT / Villupuram . So, on this day Ulundurpet Auto SS Breaker,Isolators and CT’SMaintance work Carried out.
During the LC period 230KV Valuthur - Karaikudi and Kavanoor feeders will be in service. Hence, there is
Possible Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
POSSIBLE Wed, Sep 13, 2017 10:00
possible Wed, Sep 13, 2017 9:00
OTHER TWO UNITS AND ALL FEEDERS WILL BE IN SERVICE
DURING THE LC PERIOD THE OTHER MACHINE-1, 3 & 4 ARE IN STANDBY CONDITION AND BOTH 230KV FEEDERS ARE IN SERVICE. PWD DEMAND 700C/S IS MEET THROUGH DAM PH MACHINES.
110 KV isolator towards OT Patty SS will be kept opened in Seethaparpanallur SS and 110 KV isolator towards Seethaparpanallur will be kept opened in OTPatty SS .Hence no SS will be affected.
NOT POSSIBLE
The 110 KV KMDI-II feeder loads will be fed radially from other end.
1. The 110 KV Sandinallah feeder loads will be fed radially from other SS (Pykara & Metttupalayam SS )2. 110 KV maruthur SS under total shut down.
During the LC period the Power Tr1 loads will be transferred to other Power Trs.
During LC Work1.Other 230KV feeders catter the SS loads.2.Hence No ss will be affected.
Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 9:00
Both end LC applied. Wed, Sep 13, 2017 9:00
Approval fro Wed, Sep 13, 2017 9:00
Possible Wed, Sep 13, 2017 10:00
Approved Wed, Sep 13, 2017 9:00
possible Wed, Sep 13, 2017 10:00
Possible Wed, Sep 13, 2017 9:00
(a)During the above L.C period Unit 1 & 2 will be in standby condition at present PWD demand 700 c/s let out through barrage gate(b) The other end BPH-2 applied L.C on that day on 13.09.2017.(c) 110 KV BPH – 1 to MDPH feeder will be in service.
repeat of 60296
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL BE CATER IN 230KV Myvadi I&II FEEDERS
repeat of 60295
16MVA Pr.Tr.I & III will be in service cater the entire 11KV
loads.
During the period of shutdown 1) The Idely charged 110KV Siruseri-II # will not be inservice
1. Auto II only will not be in service. 2. All other 110KV Feeders, 230KV Feeders, Auto I & III will be in service.
110 KV Perungudi II feeder will be in service
During the above shutdown period Power Transformer II will not be in service , the load may be restricted within the capacity of 100 MVA Power Transformer -I
Wed, Sep 13, 2017 9:00
Thu, Sep 14, 2017 10:00
Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
110KV Melakallur feeder may be tripped at both end
During the LC period,1) All other 230 KV feeders will be in tied condition at 230KV Kadalangudi SS & 230KV Thiruvarur SS,2) no supply interruption to any SS.
Other 230 KV feeders will be in service
Postponed to 14.9.2017
During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto TKY SS (incl) and radial from KDR upto PPI (Incl).110/11 KV Veeyanoor and Pechiparai SS will avail total shutdown to be approved by SE/KKEDC/NGL and SE/O/TIN.Hence no ss will be affected.
The pwd demand will be met out by other standby machines at Dam Power House.
During the LC periiod, the remaining 3 X 100 MVA Auto TRs will be in service. 110 KV Kalapatty SS and Poomalur SS under total shutdown.
POSSIBLE Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 9:00
Possible Thu, Sep 14, 2017 9:00
Possible Thu, Sep 14, 2017 10:00
POSSIBLE Thu, Sep 14, 2017 9:00
No ss will be affected. Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
During the lc period all other 230 kv # are tied with grid. Hence there will be no interruption of supply.
SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
During the period of LC, the 230 KV SVC - Mambakkam # entire will be in OFF condition, hence there is no supply in the Feeder, 230 KV Mambakkam SS will avail supply from 400 KV SPDR SS via 230 KV SPR-Mambakkam #.
During the period of shutdown the entire load of 230KV SIPCOT Mambakkam SS [Approximately: 45MW] will be fed from 400KV Sriperumbudur SS through 230KV SIPCOT Mambakkam - Sriperumbudur feeder without interruption.
During the LC period there will be no supply in 230KV Bus-I and 230KV Bus-II will be in service. Hence no substation affected.
No ss will be affected. During the above LC period 230KV sterlite SS will be radially fed from 230KV Anupankulam SS
Both ends L.C to be avalied Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 10:00
POSSIBLE Thu, Sep 14, 2017 10:00
NOT POSSIBLE
1.230KV TTPS-STERLITE FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS.2.29A & 29B ISOLATORS KEPT OPEN CONDITION.3.EARTH SWITCH SHOULD BE CLOSED CONDITION AT BOTH ENDS.
During LC Period there will be no supply in the entire feeder.
Other 230 KV feeders will share the loads
repeat of 60289
Subject to the load condition, 1.230KV OKM & S.D.Palayam #s will be cut off,2.Auto Tr. II will be cut 0ff,3.Thungavi SS G.C-II will be transferred to 230KV Udt SS / 110KV Poolavadi #,4.110KV Ingur-I & II will be kept radial from other End,5.Hence Load will be with limits of other two Auto Trs.& No SS will be affected,Hence No SS will be affected.
During the shutdown period, there will be No interruption to the EHT Consumer . Concurence also obtained from the concerned.
No generation in PH-1 POSSIBLE Thu, Sep 14, 2017 9:00
No Generation in PH-1 POSSIBLE Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 10:00
Possible Thu, Sep 14, 2017 9:00
Approved Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 8:00
POSSIBLE Thu, Sep 14, 2017 10:00
During the LC period, the feeder will be radial from other end. Hence no interruption to any SS.
Other 230 KV feeders will be in service
CAPACITOR BANK II IS IN SERVICE AND SUBJECT TO THE VOLTAGE CONDITION
No interruption of supply Load fed through 400 KV MTPS stage II-II feeder
DURING THE LC PERIOD,SEETHAPARPANALLUR SS WILL BE RADIALLY FED FROM O.T.PATTI HENCE NO SS AFFECTED
NOT POSSIBLE
400/110KV ICT 4 AND 5 WILL BE IN SERVICE, LOAD WILL BE SHARED BY THE TWO TRANSFORMERS, NO FEEDER OR SS IS AFFECTED
POSSIBLE Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 9:00
Possible Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 10:00
possible Thu, Sep 14, 2017 9:00
During the LC period Loads of Auto II will be shared by Auto I and III, Hence no ss affected
EE/O/CKNI has also programmed Line LC. During the LC period there will be no supply in the entire feeder
230 KV BUS A will be in service and 230 KV BUS B will be in stand by
1)During LC period 110kv RNPM-UDPT # radially fed from UDPT end2)110kv Oddanchatram SS availing total shutdown L/R 22mw. Hence no supply interruption to any SS.
During the LC Period 230KV Main bus will be in service.
During the above LC period 1)110KV Koppampatty SS also avaling total shutdown,110KV Thuraiyur SS,110KV Mangoon SS,110KV T.Pet SS Loads will be transfer to 110KV Perambalur -II Feeder of Kallakudy Grid SS
During 400/230 KV Auto Transformer II LC Period, 400/230 KV Auto Transformer I will be in Service Condition. Hence there will be no interruption of supply.
Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 10:00
Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
110 KV Pochampally SS, 110 KV Uthangarai SS, 110 KV availing Total Shutdown Total Relief : 35 MW, the Station load will Managed by keeping Auto Transformer I & III and also 230 KV Shoolagiri , 2 No's Grid feeder in service and SSREL Supply fed through 230 KV Singarapet SS
1&2) possible
No interruption to any SS. All other feeders will be in tied condition. Already AEE/Mtce/Thiruvarur applied LC on the same day.
Other end also availing total shutdown.
repeat of 61346
During the LC period all other 230KV feeders are in tied condition. Hence there will be no interruption of supply to any other SS.
During the LC period,1) other end also will avail LC on the same day,2) Thirukkanurpatti 110 KV SS will avail shutdown on the same day (Load relief : 9 MW),3) all other 230 KV feeders will be in tied condition,4) no supply interruption to any SS.
NOT POSSIBLE
POSSIBLE Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 8:00
Possible Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
During the LC period,1) this feeder will be radial from NTKudi 230 KV SS upto 110 KV Eachankottai SS, 2) 110 KV Thirukkanurpatti SS will avail shutdown on the same day (Load relief: 9 MW),3) all other 110 KV feeders will be in tied condition,4) no supply interruption to any SS.
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
During the period of shutdown, S.P.Koil-Kalpakkam I Feeder and Kalpakkam-Acharapakkam and Kalpakkam- Echur Feeders will be in service
230 KV Deviakurichy- STCMS & Singapuram Feeders will be in service
Unit in Service, all 400KV and 230KV feeder are in service Except 230KV Thingalur feeder
repeat of 60844
1. No SS will be affected during LC period.
repeat of 61346
Possible Thu, Sep 14, 2017 10:00
possible Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 9:00
1.230KV GIS Koyambedu SS (CMRL)2.100MVA Auto Transformer - I3.Approved by SE/O/N4.No Load Transfer required and no interruption to the consumer.5.Auto Transfromer - II will be in service.
During the LC period:1) the 110KV Arani # H/T at SPT end 2) 110KV chengam SS also availing Total Shutdown Hence, there is no interruption of power supply.
a)Other end also avail shutdown. b)All other 230 KV feeders will be in service. c)There will be no interruption of supply to any other feeders.
NOT POSSIBLE
DEPENDING UPON LOAD CONDITION
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
Approved Thu, Sep 14, 2017 9:00
Possible Thu, Sep 14, 2017 9:00
Possible Thu, Sep 14, 2017 8:00
Possible Thu, Sep 14, 2017 11:00
Possible Thu, Sep 14, 2017 10:00
Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
During LC period no SS will be affected. Necessary concurrence obtained from SE/EEDC/Erode.
During the period of 230kv Alamathy &230kv Tiruvalam feeders are in service condition
All other feeder will be in service
During the period of shutdown 230KV Bus-II will be put into service.
During the period of shutdown 230/110kV Auto transformer-I will be in service,Hence No interruption.
1) The Deviakurichy 230KV SS availing Breaker, CT’s maintenances work .2) There will be no interruption any other SS.
repeat of 61278
1. During LC period, 110 KV Micro - Moyar Feeder, Micro end breaker only will be hand tripped. The feeder will be fed from Moyar end radially. Hence no SS will be affected.2. During LC period, power evacuation will be done through 110 KV Micro - Bhavanisagar 110 KV SS Feeder. Hence, generation loss will not arise.
POSSIBLE Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 10:00
POSSIBLE Thu, Sep 14, 2017 10:00
Standby possible Thu, Sep 14, 2017 8:00
possible Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
110 KV Veerasigamani WF SS, PuliyangudiSS,Naranapuram SS, Viswanathaperi SS will be radially fed from 110 KV Nallamanayaganpatti SS.
During the LC period, the other end has also proposed LC on the same date and no other SS will be affected and M/S. Sterlite-CPP generation (if available) will be exported to 230KV APKM SS please.
DURING THE LC PERIOD THERE WILL BE NO SUPPLY TO 33LV SRF1 TO 4. IF WIND GENERATION AVALIABLE ON THE DAY THE POWER TR.3 LOADS WILL BE TRANSFERRED TO OTHER POWER TRS AND POWER TR3 ONLY TAKEN FOR MTCE WORK
During LC Period1).110KV Madampatti,Devarayapuram,Peedampalli and Anthiyur SS under Total Shut Down.2)Remaining Auto 2 and 3 catter the SS loads.3)No SS will be affected.
THE ABOVE FEEDER LOADS WILL BE FED FROM 230KV MYVADI LINK I & II FEEDERS
possible Thu, Sep 14, 2017 9:00
possible Thu, Sep 14, 2017 9:00
POSSIBLE Thu, Sep 14, 2017 10:00
POSSIBLE Thu, Sep 14, 2017 9:00
Possible Thu, Sep 14, 2017 9:00
Thu, Sep 14, 2017 8:00
During LC period 1).110KV OKM-TDLR 1# radially up to 110KV MDK SS from OKM end.2). 110KV MMPTY,DVPM ss under total shut down.3).No SS will be affected
During LC period .1).110KV Peedampalli SS under total shut down.2)Necessary concurrence obtained from L&T EHT consumer.(No supply )3)Other No SS will be affected.
During the LC period there will be no supply in the entire feeder and other end also will be applying LC on the same day. Hence no SS affected during the L.C. period .
1) During the LC period there will be NO supply in this feeder. 2) Other end also avail LC on same day. 3) Concurrence obtained from SE/NCES/TIN.
Auto Tr.I& III will be in service. No load transfer required
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE
Possible Fri, Sep 15, 2017 14:00
Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
PROGRAMMED LC Possible Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
1 A) The line isolator will be kept off 1B) 110 Madurapakkam # 1 will be backfed by Madurapakkam # 2 by closing Bus coupler at Madurapakkam ss 2A) The line isolator will be kept off 2B) 110 Madurapakkam # 2 will be backfed by Madurapakkam # 1 by closing Bus coupler at Madurapakkam ss
110KV SR Pudur feeder-I radial from SR Pudur to peachipparai SS
During the LC period, the feeder will be radial from 230 KV Thudialur SS.
During the LC period The 110 KV SRP - ARMI I # radial from ARMI upto Perungudi (incl). Hence no SS will be affected.
SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER
During the LC Period all other 230 KV # are tied with grid.hence there will be no interruption of supply.
POSSIBLE Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 10:00
Possible Fri, Sep 15, 2017 9:00
Other end is also availing L.C. POSSIBLE Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
During LC Period There will be no supply in the entire feeder
Subject to the wind generation, 1.110KV Thungavi # will be will be kept radil from 230KV Udt SS / 110KV Poolavadi #, 2.110KV Pethappampatty # will be kept radil from 230KV Udt SS / 110KV PNPM #, 3.110KV Ingur-I & II will be kept radial from other end,4. Auto Trs. I&III will be cut off, 5. Hence Load will be with limits of other one Auto Tr.& No SS will be affected.
Other 230 KV feeders will be in service
During the LC period 1) both ends breaker will be in Handtrip condition2) other 3 no’s 110KV feeders will be in service, except 110KV SSREL feeder which is radial from Karimangalam 230KV SS and hence no interruption of supply
During the LC period Auto Transformer I will feed 110KV Bus I and Auto Transformer II will feed 110KV Bus I. No SS will be affected.
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
110KV S.P KOIL #-II-Tied condition
During the LC period,these conditions will be done one by one1.110KV Mettur feeder will be Radially in service from other end.2.110KV Barrage III feeder will be Radially in service from other end.3.110KV Anthiyur feeder supply will be extended to 110/22KV Thalavaipet SS.4.110KV Thalavaipet feeder supply will be extended to 110/22KV Anthiyur SS.5.110KV Gobi feeder will be Radially in service from other end.
EE / O / CKNI has also programmed for maintenance and for relay setting revision
POSSIBLE Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
EE / O / Alagarkoil has also programmed for maintenance and for relay setting revision
No interruption of supply Load fed through 230KV Karimangalam feeder
Periyakulam ss and Kodaikanal ss will be under total shut down
No interruption of supply Load fed through 400 KV BUS I
During the above LC period there will be no supply to the all 33KV and 11KV feeders.The concurrence of SE/KEDC/Kgiri and SE/O/Tvlm had obtained.
Fri, Sep 15, 2017 8:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 10:00
DURING THE LC PERIOD,UTHUMALAI SS WILL BE RADIALLY FED FROM VEERASIGAMANI.HENCE NO SS AFFECTED.
NOT POSSIBLE
(110KV Annur SS and Sellappam palayam SS total shut down) 110KV Padhuvampalli SS and 110KV Karuvalur SS loads transfered to 110kV Thekkalur feeder .110kV Avinashi SS and 110kV Vanjipalayam SS fed from 230kV Arasur SS through 110KV Arasur - Karuvalur1 #. 110KV KVLR-Nambiyur loads fed by 230KV Gobi(SS).
(110KV Annur SS and Sellappam palayam SS total shut down) 110KV Padhuvampalli SS and 110KV Karuvalur SS loads transfered to 110kV Thekkalur feeder .110kV Avinashi SS and 110kV Vanjipalayam SS fed from 230kV Arasur SS through 110KV Arasur - Karuvalur #. 110KV KVLR-Nambiyur loads fed by 230KV Gobi(SS)Bus - B will be in service.
230KV Bus Bar protection will be switched off.
Possible Fri, Sep 15, 2017 9:00
Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 10:00
{110KV Annur SS total shutdown}
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
NOT POSSIBLE
1)During the LC period SKPY feeder under shutdown condition
110 KV Bus A & B will be independent. Hence no interruption of supply.
Programmed Tentative LC for Maintenance work on 15.09.2017 at Barrage Power House-3
During LC period 110kv RNPM-SBT II # will be radially fed from SBT end. If necessary 110kv Vadamadurai SS load will be transfered to 110kv SBT -ALDR #.Hence no supply interruption to any other SS.
During the LC Period other 230KV feeder will be in service.
During the LC period no SS will be affected.
Possible Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
Radially fed from other end. Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
230 KV SSP – II # will be in service condition. Concurrence Already obtained from M/s. SAIL Ltd.,
No interruption to any SS. All other feeders will be in tied condition.
No interruption to any SS. Already LC proposed by AEE/MTCE/Thiruvarur on the same day.
110KV Thingalur SS availing total shutdown.
During the LC period no interruption of supply to any other SS.
Auto Transformer - II will cater the load
Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
During the LC period,1) other end also will avail LC on the same day,2) Poondi 110 KV SS will avail shutdown on the same day (Load relief : 8 MW),3) all other 230 KV feeders will be in tied condition,4) no supply interruption to any SS.
NOT POSSIBLE
1. 230KV MTPS feeder LC will be availed at both ends.2. 3Nos 230KV feeder will be in service.3. There will be no interruption to any SS or feeder
Programmed Tentative LC for Maintenance work on 15.09.2017 at Barrage Power House-3
1.110 KV PERIYA KODIVERY -GOBI FEEDER RADIALLY FED FROM GOBI END,SO SUPPLY TO INTER SS MAY FED FROM GOBI END2.110 Kv PERIYA KODIVERY -MAYAR FEEDER RADIALLY FED FROM MOYAR END,SO SUPPLY TO 110 KV SHENBAGAPUDUR SS FED FROM MOYAR END.3.CONCURRANCEOBTAINED FROMSE/GEDC/GOBI ANDBAS.4.110 KVPERIYAKODIVERY SSMAY AVAIL TOTALSHUTDOWN
Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 10:00
Possible Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 8:00
a)Other end also avail shutdown. b)All other 230 KV feeders will be in service. c)There will be no interruption of supply to any other feeders.
NOT POSSIBLE
DEPENDING UPON LOAD CONDITION
During the Period of Shut down the 110KV Periyapalayam SS availing Total Shut down. Concurance to be obtained from JR Metals EHT
DURING THE LC PERIOD,1) 110KV LINK # I WILL BE IN HAND TRIP CONDITION AT BOTH END AND 110KV LINK # II BOTH END TIED 2) HENCE, THERE IS NO INTERRUPTION OF SUPPLY.
SUBJECT TO WIND GENERATION,1.110KV PNPM-INGUR-I #( PNPM-KURUKKATHI#)/ 230KV PNPM SS WILL BE KEPT RADIAL UP TO KUNDADAM SS,2.110KV PNPM # / 230KV KURUKKATHI SS WILL BE KEPT RADIAL UP TO 110KV UTHIYUR SS,Hence No SS will be affected.NO WBD CONCURRENCE ISSUED BY SE/NCES/UDT.
POSSIBLE Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 8:00
Possible Fri, Sep 15, 2017 9:00
During the LC period, a) 110KV Trichy-Srirangam feeder will be radially fed from 230kv samayapuram SS upto 110KV Kambarasampettai SS. b) All other 110KV feeders are in tied condition. c) there will be no interruption of supply to any other feeder and SS. d) Necessary concurrence obtained from other 230KV Samayapuram SS end.
1) 110KV BPH4-NSPM#& 110KV BPH4-PKPM # BOTH WILL BE IN SERVICE.2) Unit - I and Unit- II WILL BE IN SERVICE OR STAND BY AS as per the existing PWD demand.3) On the same day BPH3 also programmed to avail LC on 110 KV BPH4 - BPH3 #.
1. 230KV Salem – MTPS feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches LC. 4. There will be no interruption to any SS.
Fri, Sep 15, 2017 9:00
Fri, Sep 15, 2017 8:00
Possible Fri, Sep 15, 2017 9:00
During the period of LC i) Auto-Tr-I ,HV-I,LV, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS Loads.i) The 110KV Capacitor Bank –I and 110KV Capacitor Bank-II one by one will be in ‘OFF’ Condition iii) The 230KV Link-II, 230KV Chittoor interstate feeders,230KV Link-I # and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
Approval from SE/Operation
All other feeder will be in service
Already approved on 14.9.17
During LC period110KV Rasipuram SS will be transferred to 110KV Salem-Mallur feeder.110KV Namagiripet SS will be transferred to 110KV DV'Kurichy- Thammampatty feeder.110KV Sendamangalam SS will be transferred to 230KV Valayapatty-Pudhansandai feeder.110KV Namakkal SS will be transferred to 230KV Valayapatty-Namakkal feeder.No supply interruption.
POSSIBLE Fri, Sep 15, 2017 9:00
POSSIBLE Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Postponed Fri, Sep 15, 2017 8:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
Possible Fri, Sep 15, 2017 9:00
During the LC period there is no interruption of supply to any SS.Other end SS also availing LC on the same date
During the LC period 110KV Mandapam SS will be radial from Aarkay Plant.
With out no supply interruption to Railway traction as Tirupattur
During the LC period 1)110KV BPH3-BPH2# and 110KV BPH3-ANTHIYUR# will be in service. 2) Unit I & II will be in service / standby to meet out the PWD Demand. 3) There will be No Loss of Generation during this LC Period. NOTE :On the same day, BPH4 will also programmed to avail the Monthly maintenance Work.
1. Other end availing LC2. Other 3 Nos 230 KV feeders will be in service
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
During LC period 1).Other 230 KV feeders catter the SS loads.2).No SS will be affected
Possible Fri, Sep 15, 2017 9:00
Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 10:00
POSSIBLE Sat, Sep 16, 2017 14:00
110KV Sriperumbudur -Porur I Feeder will be in service.
During the LC period, the feeder radial from other end.
At the time of LC1.110 KV Echur - Vandavsi # the 110 KV Echur - Vandavasi # Bkr will be HT and isolators are kept open, and 110 KV Vandavasi Load transferred to 230 KV Acharapakkam SS. After completion of Work, 110 KV Echur - Vandavasi # Bkr will be charged and isolators are kept closed.Depend upon load condition the transferred Load will be bring back to 230 KV Echur Substation. Hence no interruption to the substation
The feeder normally radial from 230 KV CBE SS
During the LC period the 110kv Radhapuram SS is proposed to take Total SD on 16.09.2017.from 09.00 to 17.00hrs.
110kv Navaladi SS will be fed from 110kv Udayathoor fdr of 230kv Sankaneri ss & 110kv supply radial upto Udaythoor ss switch end
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 13:00
Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
LC programmed at other end also
FEEDER TO BE KEPT RADIAL FROM KAMUTHI 400 KV SS TO KAMUTHI 110 KV SS INCLUDING KAMUTHI, TAMILPADI. KADALADI TO BE UNDER TOTAL SHUTDOWN
FEEDER TO BE KEPT TIED BET. KVNR & KMTHI 400 KV SS. SEC. BET. KMTHI TO TMPDI WILL BE UNDER LC. TAMILPADI SS LOADS TO BE TRD. TO ANPKM FEEDING OR TAMILPADI SS TO BE UNDER TOTAL SHUTDOWN
i)Auto Transformer LC will be take one by one, ii) all 230Kv & 110KV eeders will be in service, iii) Kadaperi# to be radially fed from 230KV Kadaperi SS, iv) If necessary, 110KV singaperumal Kovil feeder-I will be radially fed from 230KV Singaperumal Kovil SS.
To be discuss
During the LC period there will be no supply in 230KV Anuppankulam Feeder,Breaker (201-52) & CT,CVT,LAS. Hence no substation affected.
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
1. 230KV HV-I breaker, Auto-I, 110KV LV-I breaker and Karimangalm 110KV feeder breaker to be hand tripped. BS/LS isolators to be opened.2. 230KV HV-II breaker, Auto-II, 110KV LV-II breaker to be hand tripped. BS/LS isolators to be opened.3. LC should be availed one by one in Auto-I & II.4. Krishnagiri 110KV SS is availing total shut down on the above date. Concurrence obtained from SE/KEDC/Krishnagiri, SE/O/Thiruvalam, total shut down proposed at Krishnagiri 110/33-11KV SS as per approval received from CE/Distn/Vellore.5. The loads of Gurubarapally 110KV SS and 110KV Hosur feeder will be within capacity of one Auto transformer.
During the LC period the feeder Radial from Theni SS up to Line side AB Switch at Periyar end. NO SS will be affected.
During the period of shutdown,the 110KV Arani SS availing Total Shut Down.Hence no interruption of supply.
Possible Sat, Sep 16, 2017 9:00
Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 10:00
Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
NIL Possible Sat, Sep 16, 2017 8:00
During the period of LC,1)110KV Arani SS (40 MW) availing Total Shutdown,2)Auto transformer I and II are in service and cater the station loads.Hence no interruption of supply.
During the LC Period 110KV Vijayapathi SS Supply Radially Fed From SR Puthoor Arumuganeri Feeder-II by Closing BUS Coupler Switch-II at Koodankulam SS.
1.During the above Shutdown Period 230KV SMPM SS will be radial from 230KV TRICHY SS . 2.Other end Poyyur SS also availing LC on that day. 3.Concurrence obtained from Trichy Auto SS 4. No interruption to any other 110 KV SS.
During the period of LC,all other 4 No's 230KV feeders will be in service(OCC approval obtained).Hence no interruption of supply.
OCC Approved 134th/137
During LC period there will be no supply in the entire feeder
Possible Sat, Sep 16, 2017 10:00
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 11:00
Subject to the wind generation, 1.110KV Thungavi # will be will be kept radil from 230KV Udt SS / 110KV Poolavadi #, 2.110KV Pethappampatty # will be kept radil from 230KV Udt SS / 110KV PNPM #, 3.110KV Ingur-I & II will be kept radial from other end,4. Auto Trs. I&III will be cut off, 5. Hence Load will be with limits of other one Auto Tr.& No SS will be affected.
AUTO TR I will be in service.Industrial estate SS,Othakadai SS,IT Park SS ,Thaniyamangalam SS under S/D.If necessary 110kv Alkl-Sembatty 1 feeder tie will be kept opened at ALKL end.
Feeder will be radial from other end.,INDUSTRIAL Estate SS will be under S/D.If necessary Anupanadi SS loads will be transferred to 110KV PSQ-Sakthi sugar feeder
Feeder will be radial from PSQ upto IT Park ss. Feeder will be radial from ALKL upto Othakadai SS.
Possible Sat, Sep 16, 2017 9:00
Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
During the LC period both ends 110KV LINK II breakers will be in Handtrip conditionother 3 no’s 110KV feeders will be in service except 110KV SSREL feeder which is radial from Karimangalam 230KV SS and hence no interruption of supply
1) Chinnavarikkam 2) Pernambut 3) Paravakkal 4) Vaniyambadi 5) Alangayam 6) Vinnamangalam (GC) SS availing total shutdown
No generation in PH-1&2All 110KV feeder radial upto Kodayar PH end.
During the LC period,1. RNPM II # will be radial from Sembatti upto Gandhigramam SS and Angunagar SS is availing total shutdown, Vadamadurai SS will be changed over to 110KV Alundur #.2. Alundur # will be radial from other end upto Sengurichi SS.Hence no interruption to any SS.
POSSIBLE Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 8:00
1) 110/33-11KV Virudhunagar will be under total shutdown 2) 110kv Railway traction loads and 110KV Aviyur SS loads will be transferred to 110KV Pasumalai - Thullukkapatti Feeder. 3) Hence No interruption of Supply to any SS
1.ALL OTHER 3 NOS. 230 KV FEEDERS ARE IN SERVICE,IT MAY CATER THE LOAD.2.OTHER END MAY ALSO AVAIL LC
No interruption of supply Load fed through 230KV Karimangalam feeder
During the Lc period the station load will be managed by other two Auto transormers
110KV Kodikurichi WF SS will be fed from 110 KV Tenkasi - Papanasam # by closing of AB Switch towards Tenkasi at Kodikurichi SS
NOT POSSIBLE
1)230KV Thiruvalam Link-I feeder will be in off condition.2)230KV Thiruvalam Link-II feeder and all other 400KV feeders,230KV feeders,ICTs will be in service
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE
POSSIBLE Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
During the LC period, the loads of Auto III will be shared by Auto I and II. Hence no ss affected.
The 110 KV Nathapattu SS,110 KV Chidambaram SS,110 KV Panruti Urban SS will be availing total shutdown. Semmandalam SS load will be transferred to the 110 KV Cuddalore – Chitrasur Feeder. Hence no interruption of supply.
During the Lc period 110KV Malco I & III feeders will be in service.
During 230 KV Bus B LC Period, 230 KV Bus A will be in service condition. Hence there will be no interruption of supply.
During the period of L/C time,1. 110 KV Kanji SS and 110 KV Samuthiram SS availing total S/D,2. Autotransformer-I will be OFF condition.3. Autotransformer-II will be in service and cater the station loads. Hence there is no interruption of supply please.
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 10:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
During the period of L/C time,1. 110 KV Kanji SS avialing total S/D,2. 110 KV Solar Generation and 110 KV Adhamangalam SS loads will be fed from 230 KV Arni Substation. Hence there is no interruption of supply please.
No interruption to any SS. The 110KV Thirupanandal, Thirupurambium and Jayankondam SS proposed to shutdown. 110KV Papakudy SS supply will be fed from Neively TS I.
During the LC Period, shutdown will be availed during that date and backfeeding will be availed through Kayathar - Maniyachi #
No interruption to any SS. All other feeders will be in tied condition.
1. It is Ideal feeder hence there is no interruption of power supply. 2.110 KV Adhiyamankottai SS carryout monthly maintenance work for their 110 KV SS End.
110KV Erode SS availing total shutdown.
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
During the LC period the following SS has programmed total shutdown on the same day. Hence there will be no interruption of supply to (1) 110 KV Nagappattinam SS (2) 110 KV Thiruthuraipoondi SS (3)110 KV Thirukuvalai SS (4)110 KV Voimedu SS.(5) 110KV Surakudi SS - Karaikkal (6)110 KV Kovilvenni SS (7)110KV Vaduvur SS (8) 110 KV Kodavasal (9) 110KV Thiruvarur SS.(10) 110 KV Thiruvarur - Thanjavur feeder breaker will be opened at Thiruvarur end.110 KV Thanjavur urban SS,110KV Manimandapam SS, 110 KV Mariamman kovil SS, 110 KV Ayyampettai SS, 110 KV Poondi SS and loads will be fed radially from 110KV Grid SS/Thanjavur. (11) 110 KV Mannargudi SS load will be fed radially from T(K)GTPS, 110KV Mannargudi feeder tie opened at Thiruvarur end. (12) 110 KV Peralam SS and 110KV Neelagudy SS load will be fed radially from 110KV Grid SS During the LC period 110KV BUS LC entire at 230KV Substation, Thiruvarur. Hence there will be no interruption of supply to any other SS.
During the LC period 110KV BUS LC entire at 230KV Substation, Thiruvarur. Hence there will be no interruption of supply to any other SS.
POSSIBLE Sat, Sep 16, 2017 10:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 8:00
UNIT-1 in shutdown condition Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 8:00
1)DURING THE LC PERIOD,110KV ORATHANADU SS (11KV only availed shutdown) and 110KV THIRUKKANURPATTY SS, 110KV ECHANKOTTAI SS AND 110KV ORATHANADU SS RADIALLY FED 2Nos. 100MVA Auto Transformer-I and III will be in service . 110KV K.R.Thoppur-II feeder will be radically fed from other end. Hasthampatty 110KV SS will be availing Total shutdown. There will be no interruption to any SS or Feeder
110KV Jayankondam SS aviailing total shutdown on 16.09.2017 no interruption to any other SS
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
i.During the period of shutdown, Auto Tr.II and IV will be in service.ii.During the period of shutdown, S.P.Koil-Kalpakkam I and II ,Kalpakkam - Echur Feeders will be in service.
110 KV Krishnapuram Feeder radial from 230KV SS Perambalur end
1. No SS will be affected during LC period. 2. 110KV Kaspapettai SS has programmed total shut down on 16.09.2017 3. 110KV Elumathur SS supply will be fed from Pugalur 230KVSS
1. No SS will be affected during LC period.
During the LC period, a)An Other 100 MVA Auto Transformer -II will be in service. b)All 110 KV feeders will be in service. c)There will be no interruption of supply to any other feeders.
DEPENDING UPON LOAD CONDITION
Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
During the LC period, a) Intermediate 110KV Thuvakudi SS load Relief 12.7 MW & 110KV Thiruverumbur SS load Relief 7.5MW also avail total shut down. b) All other 110 KV feeders will be in service. c)There will be no interruption of supply to any other feeder's and ss.
NOT POSSIBLE
KANGEYAM TOTAL SHUT DOWN ON THAT DAY
OTHER END IS ALSO AVAILING LC ON THAT DAY
During the period of LCi. 110 KV Thiruvalam – Vellore II feeder line LC in between 230KV Thiruvalam SS and 110KV Katpadi SS. ii. The 110KV Vellore loads will be transferred to 230 KV Arani SS.. iii. The 110KV Thorapadi SS, Katpadi SS are availing total shutdown.Hence there will be no interruption of supply please.
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 8:00
During the period of LCi. 110 KV Thiruvalam – Gudiyatham feeder line LC in between from 230 KV Thiruvalam SS and 110 KV Pakkam SS. ii.110 KV Vaduganthangal SS of VEDC/Vellore and 110KV Pakkam SS of TEDC/Thirupattur are availing total Shutdown.Hence there will be no interruption of supply please.
During the period of LC i. 230KV Thiruvalam – Link I feeder Breakers both end will be in “ OFF†condition at 400KV �Thiruvalam & 230KV Thiruvalam SS. ii. All other 230 KV feeders 230KV Link II, 230KV S.P.Koil & 230 KV Singarapet feeders are in service.Hence there will be no interruption of supply please.
During the period of shutdown,Except 110KV Vyasarpadi Feeder .All other feeders and equipment will be in service.
POSSIBLE Sat, Sep 16, 2017 8:00
POSSIBLE Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 13:00
During the LC period, Auto Transformer-I, II & III, HV-I, II & III, LV-I, II & III will be under hand tripped condition . 230KV APKM-MDU, 230kv APKM-KYTR, and 230 KV APKM - Sterlite feeder will be radial from other end. 110KV Aruppukottai SS loads will be transferred to 110KV Kavanoor - Kamuthi feeder for which concurrence obtained fromEE/O/Kavanoor and 110KV APKM - PSQ # Radial fed from other end, If necessary. Hence No SS affected.
During the LC period 110 KV Virudhunagar SS will be availing total shut down. 110 KV Aviyoor SS & Railway Traction SS load will be transferred to 110 KV PSQ - Thulukkapatti feeder. Hence no ss affected
DURING THE LC PERIOD,1) 110KV LINK # II BOTH END HAND TRIP CONDITION AND 110KV LINK I # TIED AT BOTH END.2) HENCE, THERE IS NO INTERRUPTION OF POWER SUPPLY.
During the LC period the 110 KV Paraipatty SS will be availing total shut down. Hence no SS will be affected.
Sat, Sep 16, 2017 13:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
During the LC period the 110 KV Kovilpatti SS under total shut down and 110 KV Duraisamipuram SS will be radially fed from Kayathar SS end. Hence no SS will be affected.
NOT POSSIBLE
During LC period 110 KV Erode SS and 110 KV Kaspapettai SS will be under Total shutdown condition.All other feeder to be kept under back charged condition.Necessary concurrence obtained form SE/EEDC/Erode.
1)The 110kv Tiruttanni ss,110kv Tiruvallur ss and poonimangadu ss availing Total shutdown
1)the 110kv Tirutanni SS ,110KV Tiruvallur ss &110kv poonomangadu ss availing Total shutdown work
1. Thayanur # H/T at Auto SS VPM. The feeder will be radial from Echur Auto SS. 2. Gingee SS availing Total shutdown. 3.Hence No interruption of supply to any SS.
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
During the period of LCi) The 110KV Thorapadi SS, 110KV Katpadi SS ,110KV Vaduganthangal SS, of VEDC/Vellore and 110KV Pakkam SS of TEDC/Thirupattur are availing Total shutdown on 16.09.2017.The Total Shutdown approved and concurrence obtained by Chief Engineer/Distribution / VelloreThe 110KV Vellore SS Loads will fed from 230KV Arani SS.ii) Auto-Tr-III ,HV-III,LV-III, Auto-Tr-I ,HV-I,LV-I Auto –Tr-IV,HV-IV,LV-IV , will be in service and cater the SS Loads.iii) Auto-Tr-II ,HV-II,LV-II will be in ‘OFF’ Condition.vii) The 110KV Vellore-II and 110KV Gudiyattam feeder,110kv Western Bus will be in ‘OFF’ Condition vi) The 230KV Link-I Feeder will be in ‘OFF’ condition v) The 230KV Link-II Feeder, 230KV Chittoor interstate feeders, and 230KV Mosur feeders will be in service and cater the SS Loads. 1. Villupuram 110KVSS is availing total shut down.
Ulundurpet 110 KV SS Total shutdown maintenance work.On that dayPillaiyarkuppam ss supply fed from TV Nallur feeder Villupuram Auto SS.
During the period of S/D, The 110 KV Manali feeder will be in back charged condition
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
1) Deviakurichy 230KV SS Krishnapuram feeder monthely maintenances work Breaker,CT ‘s.2) Perambalur 230KV SS radial fed from upto Dhanalashmi Srinivasan Sugar Pvt Ltd End. 3) There will be no interruption of supply any other SS.
230KV SS Thiruvarur has proposed 110KV bus LC on that day and station supply to 230KV SS Thiruvarur will maintained thro 110KV K.Venni-K.Vasal feeder by closing the 110KV bus coupler breaker at our end. Hence Auto transformer-I and Auto transformer-II will be in isolated condition.
1.110 KV Papanasam-Servalar Feeder –II will be service 2.110 KV isolator towards Papanasam will be kept opened in Servalar and 110 KV isolator towards Servalar will be kept opened in Papanasam. Hence no SS will be affected
POSSIBLE Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Sat, Sep 16, 2017 10:00
a) During the LC period, Auto Transformer II will be in service and there will be no interruption in supply please.b) During the L.C period, the 110KV Town SS will be in shutdown condition and no other SS will be affected. At 110KV Town SS the AB switch towards 230KV Sipcot SS will be kept opened condition.
During the LC period, the other end has also proposed LC on the same date and no other SS will be affected please.
1).Other 3 Nos 230 KV Feeders will be in service2).110 KV Santhaipet SS and Arul puram SS availing total shutdown3). OCC Approval obtained
1). 110 KV Santhaipet SS and Arul puram SS availing total shutdown2). No other SS will be affected
Present PWD demand is 250C/s. During the LC period, the respective feeder will be radial from other end. Hence No SS will be affected.
NOT POSSIBLE
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
POSSIBLE Sat, Sep 16, 2017 9:00
Both end LC applied. Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
1.Auto Tr.I & II Top & Bottom Bus Isolator will be closed
Inter SS will be radially fed from other end
DURING THE LC PERIOD 230KV MYVADY LINK II FEEDER WILL CATER LOAD OF THE 230 KV MYVADY LINK I FEEDER
During LC period.1).110KV OKM-TDLR-1 # kept radial from 230 KV TDLR SS end .2).No SS willbe affected
1) During the LC period there will be NO supply in P.Tr-2 and its 33KV feeders. 2) If there is wind generation its 33KV feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
110KV Sriperumbudur -Porur II Feeder will be in service.
110KV Kadapperi - S.Pkoil # and 110KV Korttur-Kadapperi I #
radial from other end.
Possible Sat, Sep 16, 2017 10:00
HT consumers will be informed Possible Sat, Sep 16, 2017 9:00
possible Sat, Sep 16, 2017 10:00
Sat, Sep 16, 2017 9:00
postponed Sat, Sep 16, 2017 9:00
Possible Sat, Sep 16, 2017 9:00
During the period of shutdown1) 110KV TCS Feeder will not be in service.2) 110KV TCS Feeder load will be fed from 110KV SIRUSERI SUBSTATION.
Other four 230 KV Feeders will be in service
During the LC period all other 230KV feeders are in tied condition. Hence there will be no interruption of supply to any other SS.
Unit in service, All 400KV and 230KV feeders are in service except 230KV Thingalur feeder
i.During the period of shutdown, S.P.Koil-Kalpakkam I & II,S.P.Koil -Echur Feeders will be in service.ii.During the period of shutdown, Auto Tr.I & IV will be in service.
Possible Sun, Sep 17, 2017 9:00
NIL Possible Sun, Sep 17, 2017 8:00
Sun, Sep 17, 2017 10:00
Possible Sun, Sep 17, 2017 9:00
Possible Sun, Sep 17, 2017 9:00
Possible Sun, Sep 17, 2017 10:00
1. During the LC Perioed ,230 KV SPR # Line switch and 230 kv SVC # Line switch will be kept opened at the Nokia ss end. 2. 110 kv Loads of EHT Consumer M/S Nokia india LTD , Will be transferred to 110 kv spr-mosurII feeder being fed by 400 kv sv chatram ss 3. concurrence obtained from EHT consumer M/S Nokia india LTD and HT Consumer M/s Motherson Automotive LTD.
1.400/110 KV ICT#2 200 MVA will not be in service.2. 400/110 KV ICT#1 200 MVA will be in service.
OCC approved,item No.134th/135
During the above LC period there will be no interruption to the Hosur 230KV SS.The 230KV Yerrandahally loads avail to somanahally end.The concurrence of SE/KEDC/Kgiri and SE/O/Tvlm had obtained.
During the period of L/C time, 230 KV Transfer Bus will be OFF condition and there is no interruption of supply to any of the Substation
For Quarterly maintenance work.
Possible Sun, Sep 17, 2017 9:00
Standby Possible Sun, Sep 17, 2017 8:00
Possible Sun, Sep 17, 2017 8:00
Possible Sun, Sep 17, 2017 10:00
Possible Sun, Sep 17, 2017 9:00
Approved Sun, Sep 17, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
1). Sunday Load relief expected2). Other 3 Nos Auto Transformers will be in service3). No other SS will be affected
Unit under shutdown condition, SF6 Breaker open condition
During the period of shutdown 1.)110KV SHOLINGANALLUR FEEDER will not be inservice. 2.)110KV Sholinganallur feeder Load will be transferred to 230KV KITS Park SS.
230KV Tharamani # will be in service feeding the entire KITS SS loads Velachery SS loads to be transferred to 230KV Guindy SS or Tharamani SS
1. Auto III & Bus Section II Isolator will not be in service. 2. All other 110KV Feeders, 230KV Feeders, Auto I & II will be in service.
110 KV Arasur SS under total shutdown.
Mon, Sep 18, 2017 9:00
PROGRAMMED LC Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
POSSIBLE Mon, Sep 18, 2017 9:00
All feeders are in service Possible Mon, Sep 18, 2017 9:00
Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
POSSIBLE Mon, Sep 18, 2017 9:00
During the LC period 230 KV SR Puthur - Sankaneri feeder will be in service.Hence No SS will be affected.
NOT POSSIBLE
Mettupalaym SS under TSD. 110KV ASR I & ASR II feeders will be fed radially from ASR end, TDLR I & TDLR II feeders will be fed radially from TDLR end
MAIN LINE WILL BE KEPT IN TIED CONDITION. THONDI TO BE AVAILED SHUTDOWN
Auto Transformer -II will not be in service loads to be cattered by other Auto Transformer-I
During the period of shutdown,the 110KV Santhavasal SS availing total shutdown.Hence no interruption of supply.
During the LC period the 110 KV Kalayarkoil & madagupatty SS Under Total Shutdown.The 110 KV KKDI-SVGA # Will be radial up to 110KV kallal SS.Hence there will be no interruption of supply
POSSIBLE Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 8:00
Possible Mon, Sep 18, 2017 9:00
Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Mon, Sep 18, 2017 9:00
Supply will be radial upto Erichanatham SS
66KV ATHIPALLI SS, CHERAMBADI SS, UPPATTI SS AND GUDALUR SS WILL AVAIL TOTAL SHUT DOWN.
During the LC period both ends 230 KV MTPS # breakers will be in Handtrip condition, other 6 no’s 230KV feeders will be in service and hence no interruption of supply
1)400/230KV ICT-II in Off condition.2)400/230KV ICT-I,All other 400KV feeders and 230KV feeders will be in service.
OCC Approved 134th/169
During the Lc period 100MVA Auto transformer II will be in service.
3 Auto are in parallel. other 2 Auto will share the load.
1)Concurrence will be obtained from M/s. JSW Ltd.,2)110 KV Nangavally SS & 110KV Tharamangalam SS Loads will be fed from Mettur 230 KVSS
During the lc period SLR feeder no-II Will caters the load
During the LC period the # will be radial from other end. Hence no ss affected
NOT POSSIBLE
Possible Mon, Sep 18, 2017 8:00
Postponed Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 7:00
POSSIBLE Mon, Sep 18, 2017 8:00
Mon, Sep 18, 2017 8:00
Approved Mon, Sep 18, 2017 9:00
Mon, Sep 18, 2017 10:00
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
Unit in Service, All 400KV and 230KV Feeders are in service except 230KV Thingalur feeder
Auto Transformer II will be in service. 110 KV Deviakurichy-Singipuram feeder I and II will be kept radial from Singipuram 230kV SS end
DURING THE LC PERIOD,1.KARISALPATTI SS WILL BE RADIALLY FED FROM MELAKALLUR 2.MELAPALAYAM SS WILL BE RADIALLY FED FROM SANKANERI HENCE NO SS AFFECTED.
DURING THE LC PERIOD,KALUGUMALAI WILL BE RADIALLY FED FROM K.G.PATTI HENCE NO SS AFFECTED.
NOT POSSIBLE
DEPENDING UPON LOAD CONDITION
During the Period of Shut down the 230KV Sulurpet feeder Tie open at 230KV Gummidipoondi SS end , Concurance to be obtained from OD/230KV SS Sulurpet
OCC Approved 134th/141
Possible Mon, Sep 18, 2017 9:00
POSSIBLE Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
During LC period no SS will be affected. Necessary concurrence obtained from SE/EEDC/Erode.
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
During the period of 230kv Alamathy and 230kv Athipattu feeders are in service condition
The 110 KV Ramapuram,SRMC SS fed from 110 KV Porur SS & 110 KV Nulumbur SS fed from 110 KV KTR-Kadaperi II feeder
1)Pudhanchandai 230KV SS radial fed from upto Namagripet 110KV SS End 3)Deviakurichi 230KV SS radial fed from upto Mettla 110KV SS End 4)There will be no interruption of supply any other SS.
OTHER TWO UNITS AND ALL FEEDERS WILL BE IN SERVICE
POSSIBLE Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
Possible Mon, Sep 18, 2017 9:00
POSSIBLE Mon, Sep 18, 2017 9:00
1.110 KV Uthumalai SS will be fed from 400 KV Kanarpatty SS and 110 KV Veerasigamani SS will be fed from Kodikuruchi-Veerasigamani feeder-2 by closing Bus coupler switch at veerasigamani SS end ,2.110 KV isolator towards Uthumalai will be kept opened in Veerasigamani and 110 KV isolator towards Veerasigamani will be kept opened in Uthumalai. Hence no SS will be affected
DURING THE LC PERIOD 230KV MYVADY LINK I FEEDER WILL CATER LOAD OF THE 230 KV MYVADY LINK II FEEDER
During LC Period .1)110KV OKM-R.S.Puram 1 feeder loads will be transferred to 110KV R.S.Puram-2 #.2).No SS will be affected.
1) During the LC period there will be NO supply in P.Tr-3 and its 33KV feeders. 2) If there is wind generation its 33KV feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
Both end LC applied. Possible Mon, Sep 18, 2017 9:00
Tue, Sep 19, 2017 9:00
Postponed Tue, Sep 19, 2017 9:00
Postponed Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto TKY SS (incl) and radial from KDR upto VNR (Incl).Hence no ss will be affected.
The Feeder will be in service from other end.
The other end will also propose to avail LC on the same day.
During the LC period, the remaining 5 Nos. 230 KV feeders are in service.
LC programmed at other end also
PENNA-VALUTHUR TO BE IN SERVICE
POSSIBLE Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
No ss will be affected. POSSIBLE Tue, Sep 19, 2017 9:00
110 KV T.NALLUR SS ALSO AVAILING TOTAL SHUT DOWN AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY.
i) The 100MVA Auto Transformer-II is feeding load only to the 110KV GC of 230KV SIPCOT Mambakkam SS.ii) The 110KV GC load of 230KV SIPCOT Mambakkam SS will be “0 MW†during the above �proposed L.C. period, since there is total shutdown in the entire 11KV and 33KV side, for monthly maintenance works.
During the LC period there will be no supply in 230KV Sangaraperi-2 feeder Main breaker (212-52) & CT,CVT. Hence no substation affected.
1. Both end breakers to be tripped2.Both end bus and line isolators to be opened3.Both end earth switches to be closed condition
POSSIBLE Tue, Sep 19, 2017 10:00
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 10:00
During the above period of shut down a) 110KV Valadi SS avial toal shutdown on the same day. b) 110KV Thennur SS , 110KV Thiruvanaikoil SS will be fed radially from 110KV Trichy Grid SS. c) 110KV Poovalur SS, M/s.Kothari EHT SC will be fed radially from 230KV Samayapuram Auto SS. d). The line Isolator towards 110KV Valadi SS at 110KV Thirvanaikoil ss will be Kept opend and earth switch closed. e)The line Isolator towards 110KV Valady ss at 110KV Poovalur SS will be Kept opend and earth switch closed. f) Necessary concurrence has been obtained from M/s.Kothari EHT Service for switching operation. g)There will be no interuption to any other SS/EHT consumers.
During LC period there will be no supply in the entire feeder
During the LC period 110 KV Devakottai ss load will be transferred to 110 KV KKDI - VLDR # & 110 KV sakkavayal SS under total shut down.Hence there will be no interruption of supply.
1.230KV Grid #, Hence No SS will be affected,2.230KV OKM SS will also avail LC at their end.
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 10:00
Possible Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
Tue, Sep 19, 2017 9:00
Other 230 KV feeders will be in service
UPTO Thirupathur SS will be fed from kkdi. UPTO Thaniyamangalam SS will be fed from ALKL
During the above shutdown period the 230 KV Eachangadu ss will be Radially fed from 230KV Poyyur ss.
110 KV S.P.Koil - # I & II - Tied condition.
1.ALL OTHER 3 NOS. 230 KV FEEDERS ARE IN SERVICE,IT MAY CATER THE LOAD.2.OTHER END MAY ALSO AVAIL LC
During the L C Period supply radial from Kinnimangalam .
During the LC period,1. 110KV Bus section I & II will be in service.2. 110KV DGL SS and Sembatti power SS will be availing total shutdown.3. 110KV PSQ, AKL I & II will be kept radial from other end.4. 110KV Capacitor bank I & II will be under LC.No interruption to any SS. Necessary concurrence obtained from other end.
EE/O/Veeranam has also applied LC on 230 KV Veeranam # breaker on the same day 19.09.2017.
NOT POSSIBLE
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 10:00
POSSIBLE Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 10:00
Possible Tue, Sep 19, 2017 9:00
During the LC 110 KV Rasinga puram SS under shut down
110KV LOAD WILL BE SHARED BY 400/110KV ICT 3 AND 5, NO FEEDER OR SS IS AFFECTED
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
The 110 KV Capperhills SS and 110 KV Panruti Rural SS availing total shutdown. Hence no interruption of supply
110 KV Panruti Rural SS availing total shutdown
During above period of shut down 1)110KV Kallakudy -I ( Siruvachur) feeder tie will be opened at Perambalur SS 2)The remaining loads will be fed Through Auto Transfermer III(100MVA) of Perambalur Auto SS.
During 110 KV Salem I # LC period, 110 KV Salem II # will be service condition. Hence, there will be no interruption of supply.
Possible Tue, Sep 19, 2017 9:00
No SS will be affected. Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 10:00
Possible Tue, Sep 19, 2017 9:00
Radially fed from other end. Possible Tue, Sep 19, 2017 9:00
During the period of L/C time,1. 230 KV T.V.Malai-Singarapet # will be OFF condition at both ends.2. Other 21 Nos 230 KV T.V.Mali-Neveli TS-I & Villupuram feeders will be in service. Hence there is no interruption of supply please.
During the LC period 230KV BUS - II will be in service. Hence there will be no interruption of supply to any other SS.
1) DURING THE LC PERIOD 110/33-11KV VADASERI SS WILL AVAIL TOTAL SHUTDOWN 2) NO INTERRUPTION TO ANY SUBSTATIONS AND ALL OTHER 110KV FEEDERS ARE TIED CONDITION.
Auto Transformer-I will cater the load
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 10:00
Possible Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 8:00
Possible Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
110KV Sankari feeder will be radically fed from other end. Veerapandai 110KV SS will be availing Total shutdown. There will be no interruption to any SS or feeder
During the LC period there will be no interruption to any SS. Supply will be fed from 230 KV NT kudi SS upto 110 KV Vadasery SS radially.
230kv breaker in tripped condition. 230kv line and bus isolator in open condition.
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
During the period of shutdown, S.P.koil -Kalpakkam-II and Kalpakkam-Acharapakkam and Kalpakkam-Echur Feeders will be in service.
DURING THE LC PERIOD,1) 110KV POCHAMPALLI SIPCOT # HAND TRIP AT SINGARAPET SS END 2) 110KV POCHAMPALLI SIPCOT SS AVAILING TOTAL SHUTDOWN.3) HENCE THERE IS NO INTERRUPTION OF SUPPLY.
During the LC period 110 KV ESI SS load will be fed from 230/110 KV NNPTY SS. Hence no SS will be affected.
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
InterSLDC Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 8:00
During the L.C Period, HV III Breaker and LV III Breaker are tripped condition. 110KV Thanthonimalai SS,110KV Veppampalayam SS are proposed total shutdown.There is no interruption to any SS.load contain with in two auto transformer(I & II).
During the LC period a) other 2 nos. 100MVA Auto Transformer will be in service. b) There will be no interruption of supply to any of the SS and feeders. C) Necessary concurrence obtained from SE/O/Trichy.
1.) The 110 KV line between Thirukoilur and Ariyalur SS will be kept off.2.) The feeder will be radial from Deviyakuruchi end up to Ariyalur and radial from Villupuram end up to Thirukoilur.3.) 110 KV Devaradiarkuppam SS availing total shutdown. No interruption of supply to any SS.
The 110 KV Ramapuram,SRMC SS fed from 110 KV Porur SS & 110 KV Nulumbur SS fed from 110 KV KTR-Kadaperi II feeder
Idle Line portion Possible Tue, Sep 19, 2017 9:00
Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
Tue, Sep 19, 2017 9:00
DURING THE L.C PERIOD, STATION LOADS WILL BE CATER BY AUTO TR NO :II
Postponed,Possible
During the LC period 110KV Valuthur - Karaikudi feeder will be radial upto R.S. Mangalam SS from Karaikudi SS.110 KV Salaigramam SS will be availing total shut down. Hence, there is
1. During LC period, it is expected that all machines of MHPH & RBCPH will be under shutdown condition due to Nil / insufficient demand. Hence generation loss will not arise.2. During LC period, only 110 KV GC & 11 KV LV breakers only will be hand tripped. 110 KV feeders will not be affected.
DURING THE L.C PERIOD,1.SANKARI 110KV FEEDER RADIALLY CHARGED FROM OTHER END.
Tue, Sep 19, 2017 9:00
Tue, Sep 19, 2017 10:00
POSSIBLE Tue, Sep 19, 2017 9:00
Tue, Sep 19, 2017 10:00
No SS will be affected. POSSIBLE Tue, Sep 19, 2017 9:00
1.110 KV surandai will be fed from Uthumalai SS by closing the isolator towards uthumalai at Surandai SS end.2.110 KV isolator towards Keelaveeranam will be kept opened in Surandai and 110 KV isolator towards Surandai will be kept opened in Keelaveeranam.Hence no SS will be affected .
NOT POSSIBLE
During the LC Period there will be no supply in the entire 230kV Veeranam-Kodikuruchi Feeder.Concurrence obtained from SE/NCES/TIRUNELVELI.
NOT POSSIBLE
During the L.C period, 110 KV Sipcot SS will be in shut down condition &110 KV Vagaikulam SS and 110KV Kombukaranatham SS will be radially fed from other end. At 110KV Sipcot SS the AB switch towards 230KV Sipcot SS will be kept opened condition and no other SS will be affected please
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
Possible Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
POSSIBLE Tue, Sep 19, 2017 9:00
Wed, Sep 20, 2017 9:00
During LC period.1).110KV OKM -TDLR 2 # kept radial upto 110KV S.N.Palayam SS from 230KV OKM end2).110 KV OKM -TDLR 2# kept radial from 230 KV TDLR ss up to 110KV Somayampalayam SS.3).No SS will be affected.
During the LC period 110 KV Reddiyapatti SS, 110KV Rajapalayam SS and 110KV Alangulam Substation will be availing total monthly shutdown on that day. Hence no SS affected.
During Lc period.1). Other 230 KV feeders catter the SS loads.2).No SS will be affected
During the LC period 110 KV Reddiyapatti SS, 110KV Rajapalayam SS and 110KV Alangulam Substation will be availing total monthly shutdown on that day. Hence no SS affected.
During the LC period 110 KV Reddiyapatti SS, 110KV Rajapalayam SS and 110KV Alangulam Substation will be availing total monthly shutdown on that day. Hence no SS affected.
No SS affected, since no SS connected in between the Reddiapatti and ESI SS.
Possible Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
Approved Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 10:00
PROGRAMMED LC Possible Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
The other end will also propose to avail LC on the same day.
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
During the LC period, the remaining 2X24 MVAR Capacitor Banks will be in service.
During the LC period, the remaining 5 Nos. 230 KV feeders are in service.
During the LC period Auto Tr II & III will be in service.
There will be no supply to 110kv Samugarengapuram 10 (1) SS suzlon SS. Samugarenagpuram ss proposed to avail SD on 20.09.2017 during the LC period
1. Scheduled shutdowm at 110/22/11KV Kaundampalayam SS.
Possible Wed, Sep 20, 2017 10:00
Possible Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
400KV PCGIL (Arasur) feeder I will be in service.
LC programmed at other end also.
230KV/110KV Auto tr I will be in service
During the period of LC, 400/ 110 KV, 200 MVA Auto-Transformer-III will be in OFF condition. 400/ 110 KV, 200 MVA Auto-Transformer-IV will cater the loads of 110 KV Feeders with out interruption.
OCC approved,item No.134th/178
i) All 230KV feeders transferred to 230KV BUS 'B' , ii) 230KV Tie-Breaker will be Opened, iii) All other feeders are in service
POSSIBLE Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 10:00
No ss will be affected. POSSIBLE Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 10:00
During the LC period there will be no supply in 400KV Main Breaker for ICT-2 (410-52) 400KV Tie Breaker for ICT-2 & ICT-3 (411-52) & 230KV LV Breaker for ICT-2 (206-52), 400/230KV ICT-2. Hence no substation affected.
During the LC period there will be no supply in entire power transformer -II and 33KV Ramco Windfarm Enercon feeders concurrence obtained from SE/NCES/TIN.
1.230KV TTPS-KAYATHAR - I FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS.2.29A & 29B ISOLATORS KEPT OPEN CONDITION.3.EARTH SWITCH SHOULD BE CLOSED CONDITION AT BOTH ENDS.
(a) All 110KV feeders will be in service radially fed from opposite ends up to BPH 2/NPTs line side isolators (kept opened condition), (b) Units 1 & 2 will be standby condition & (c) There will be generation loss, based on PWD Demand.
Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
NIL Possible Wed, Sep 20, 2017 8:00
possible Wed, Sep 20, 2017 10:00
possible Wed, Sep 20, 2017 8:00
possible Wed, Sep 20, 2017 9:00
During the period of LC,other 4 No's 230KV feeders will be in service.Both 230KV Bhavini- I & II feeders will be in common Bus.Hence no interruption of supply please.
To be discuss
During LC Period There will be no supply in the entire feeder
During the LC period other 2 auto transformer will cater the SS load. Hence there will be no interruption of supply.
1. Subject to the wind generation, Thungavi SS G.C-II will be transferred to 230KV Udt SS / 110KV Poolavadi #,2. Hence No SS will be affected.
DURING THE LC PERIOD UNIT NO.3 UNDER NOT STANDBY CONDITION
During the LC period both ends 230KV Arani # breakers will be in Handtrip condition, other 6 no’s 230KV feeders will be in service and hence no interruption of supply
Possible Wed, Sep 20, 2017 9:00
Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
Approved Wed, Sep 20, 2017 9:00
During the LC period,Auto Transformer I will be in service , No SS will be affected.
Auto-Transformer-III will be fed by 400 KV HV-III breaker
OCC approved,item No.134th/179
1) 110/11KV Kappalur SS will be under total shutdown. 2) At Tirumangalam SS the switch towards Kappalur SS will be kept opened. 3) The feeder will be kept radial from Kinnimangalam SS upto Tirumangalam SS 4)Hence No interruption of Supply to any SS
CAPACITOR BANK I IS IN SERVICE AND SUBJECT TO THE VOLTAGE CONDITION
POSSIBLE Wed, Sep 20, 2017 8:00
POSSIBLE Wed, Sep 20, 2017 9:00
During the LC period,1. 110KV Bus section I & III will be in service.2. Auto II will be in off condition by opening HV and LV breakers.3. 110KV PSQ, AKL I and II will be in tie condition.4. M/s. Shriram will curtail their load.4. 110KV Alundur, RNPM I, II, Udumalpet, Theni I and II will be kept radial from other end.5. 110KV RNPM III # will be radial from other end by closing series switch at Vedasandur towards SBT SS.6. 110KV DGL # and Sembatti power SS will be radial from Sembatti SS.7. Sithargalnatham, AMNR, Natham, Kosavapatti, Thamaraipadi, Vadamadurai, V.N.Patti, Reddiyarchatram and Pappampatti SS are availing total shutdown. (Total relief : 88.39 MW)
During the LC period,the feeders will be in hand tripped condition at both ends. Concurrence obtained from other end.
POSSIBLE Wed, Sep 20, 2017 9:00
possible Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 11:00
POSSIBLE Wed, Sep 20, 2017 9:00
1.Auto - I Will be out of service2.Auto -II & III will cater the SS Load
110 KV Maruthur SS will be fed from 110 KV Sandinallah SS
During the LC period, 1. 110KV Bus section III will be in service and Bus section II will be under LC. 2. Auto I & III will be in off condition by opening HV and LV breakers. 3. 110KV PSQ, AKL I and II will be in tie condition. 4. M/s. Shriram will curtail their load. 5. 110KV Alundur, RNPM I, II, Udumalpet, Theni I and II will be kept radial from other end. 6. 110KV RNPM III # will be radial from other end by closing series switch at Vedasandur towards SBT SS. 7. 110KV DGL # and Sembatti power SS will be radial from Sembatti SS. 8. Sithargalnatham, AMNR, Natham, Kosavapatti, Thamaraipadi, Vadamadurai, V.N.Patti, Reddiyarchatram and Pappampatti SS are availing total shutdown. (Total relief : 88.39 MW)
During the LC period, Other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
postponed Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 10:00
1)230KV THiruvalam Link-II feeder will be in Off condition.2)230KV Thiruvalam Link-I feeder and all other 400KV feeders,230KV feeders,ICTs will be in service
During the LC period other two Auto transformers will be in service and scatter the load
All the loads will be transferred to 230 KV Cuddalore – Neyveli TS -1 # . Hence no interruption of supply.
110 KV Veppur SS ,Tholudur SS to be radially fed from Neyveli TS I end( In feeder II). 110KV Bethasamuthram SS to be radially from Deviahurichi end( In feeder I) and 110KV Adari SS & M.Parur SS to be radially from NLY TS-I end( In Feeder I).110 KV Chinna salem SS will be availing TSD
During the Lc Period 110KV Rc plant feeder radially fed from Singarapet SS end upto M/sRc plant
During the LC Period, the 110 KV Thalaiyuthu # will be radial from Thalaiyuthu to Pettai SS. Hence No SS affected.
Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
postponed Wed, Sep 20, 2017 9:00
Postponed Wed, Sep 20, 2017 9:00
During the lc period, the feeder will be radial from other end. Hence no ss affected
NOT POSSIBLE
No interruption to any SS. All other feeders will be in tied condition.
During 400/110 KV Auto Transformer III LC Period, 1)110 KV Salem # II will be kept radial from 230KVSS Salem end2)110 KV Salem # I will be BACK CHARGED from 230KVSS Salem end , 3)110 Vembadithalam SS avail total Shut down 20.9.174)110KV Barrage-II # Radially fed from Barrage PH-II end and 110KV Edappady SS avail Total shutdown on 20.9.175)Concurrence will be obtained from M/S.JSW for transfer of loads to Mettur 230KVSS6)110KV Nangavally SS and Tharamangalam SS loads will be Radially fed from 230KVSS Mettur7)110 KV Thumbipady # will be fed from Mettur 230 KVSS. Hence there will be no interruption of supply
During LC Period, 110 KV Edappady SS will be avail total shut down on (20.9.17).110KV Poolampatty and Ettikuttaimedu SS will be fed from Barrage PH-II end
possible Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
possible Wed, Sep 20, 2017 9:00
Radially fed from other end possible Wed, Sep 20, 2017 9:00
possible Wed, Sep 20, 2017 9:00
Wed, Sep 20, 2017 9:00
During LC Period, 110 KV Vembadithalam SS will avail total shut down on (20.9.17).
During the LC period no interruption of supply to any other SS.
During the period of shutdown, 110 KV M.M.Nagar SS is availing total shutdown.
110 KV Neyveli # II will be kept radial from TS -I end.
2Nos. 100MVA Auto Transformer-I and II will be in service and 110KV Rasipuram feeder will be radically fed from other end. Mallur 110KV SS and Rasipuram 110KV SS will be availing total shutdown. There will be no interruption to any SS or feeder.
During the period of LC i. 230KV Thiruvalam – Link II feeder Breakers both end will be in “ OFF†condition at 400KV �Thiruvalam & 230KV Thiruvalam SS. ii. All other 230 KV feeders 230KV Link I, Singarapet, S.P.Koil feeders are in service.Hence there will be no interruption of supply please.
Possible Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
possible Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
During the period of shutdown,Except 100 MVA Auto Transformer -III. All other feeders and equipment will be in service.
DEPENDING UPON LOAD CONDITION
DURING THE LC PERIOD,1) 110KV THOPPUR SS TOWARDS SINGARAPET SIDE ISOLATORS KEPT OPEN AND BLINK FOR OPENING BOTH END.2) 110KV METTUR # I RADIAL FROM OTHER END3) HENCE THERE IS NO INTERRUPTION OF SUPPLY
During the LC period the 110 KV Capacitor Bank - II will be Hand Tripped condition.
During the LC period, there will be no supply in 230 KV Pugalur - Pudansanthai feeder since other end also availing L.C on the same period.
During the LC period, there will be no supply in 230 KV Pugalur - Paramathy II feeder. Hence There is no interruption to any SS,LC approved in 134 th OCC meeting
Possible Wed, Sep 20, 2017 9:00
Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
1. 110KV Salem – Rasipuram feeder breakers kept hand tripped at Salem ends.2. Bus and line switches kept opened at Salem end and Earth Switch closed at Salem end.. 3. Series Switch towards Salem SS will be kept opened at Mallur 110KV SS and Earth provided towards Salem side at Mallur 110KV SS. 4. Rasipuram 110KV SS and Mallur 110KV SS will be availing Total Shutdown.5. There will be no interruption to any SS.
During the period of LC i) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS Loads.ii) The 230KV Link-II # will be in ‘OFF’ Conditioniii) The 230KV Chittoor Interstate feeder, 230KV Link-I # and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
Both the SS availing LC on the Same Feeder
Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 0:00
POSSIBLE Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
Wed, Sep 20, 2017 9:00
on this day 230KV Neyveli TS-II feeder Breaker ,Isolators and CT’S Maintance work to be Carried out. The Ulundurpet Auto SS (except 110KV Kovanur feeder) load roughly 50 MW to be met out by Auto SS Villupuram and 110KV Ko-Poovanur feeder load (10MW) will be fed by Deviyakurichi Auto SS
To be discuss
During LC period230KV Unjanai and Valayapatty feeders will be kept tied with grid.230KV Pugalur SS also availing LC in the same feeder at opposite end.No supply interruption.
During the LC Period there is no interruption of supply to any SS.Other end SS availing LC on the same date.
During the LC period there is no interruption of supply to any SS.Other end SS availing LC on the same date
DURING THE LC PERIOD MACHINE-1, 2 & 4 ARE IN STANDBY CONDITION AND BOTH 230KV FEEDERS ARE IN SERVICE. PWD DEMAND 700C/S MEET OUT THROUGH DAM PH MACHINES.
POSSIBLE Wed, Sep 20, 2017 9:00
No SS will be affected. POSSIBLE Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
During the L.C period, the 110KV Sipcot -TTN#-II will be in `off ` condition at both ends and the other end has also proposed LC on the same date. Since there is no intermediate SS, no other SS will be affected please.
1. 110 KV TDLR SS under Total shut down2. 110 KV PNP SS under Total shut down3. 110 KV Kathirnayakan palayam SS under total down4. 110 KV Madhampallayam SS will be fed from KMDI SS.5. 110 KV Arasur & KMDI-II feeder will be radially fed from other end.
(a) During the above L.C period Unit 1 & 2 will be in standby condition at present PWD demand 700 c/s let out through barrage gate.(b) The other end MDPH applied L.C on that day on 20.09.2017.(c) 110 KV BPH – 1 to BPH-2 feeder will be in service.
repeat Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 8:00
LC taken one by one. Possible Wed, Sep 20, 2017 9:00
Possible Wed, Sep 20, 2017 9:00
LC will be taken one by one. Possoble Wed, Sep 20, 2017 9:00
Approval by Wed, Sep 20, 2017 9:00
POSSIBLE Wed, Sep 20, 2017 9:00
possible Wed, Sep 20, 2017 10:00
1. 110 KV TDLR SS under Total shut down2. 110 KV PNP SS under Total shut down3. 110 KV Kathirnayakan palayam SS under total down4. 110 KV Madhampallayam SS will be fed from KMDI SS.5. 110 KV Arasur & KMDI-II feeder will be radially fed from other end.
During LC period1).110KV Podanur SS under total shut down.2).110KV Irugur SS loads will be transferred to 230 KV Coimbatore SS3).No SS will be affected.
SF6 breaker open condition, MODS are open condition
Other two auto transformer I & III will share the loads.
16MVA Pr.Tr.I & II will be in service cater the entire 11KV
loads.
230KV Sriperumbudur -Tharamani # & 230KV
Kalivanthapattu -Tharamani # will be in service.
50 MVA Power Transformer II will be in service
Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 10:00
Possible Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 9:00
1.Both ends will be H/T and kept opened 2. Other 230KV Acharapakkam feeder & T.V.malai will be in service. 3.Hence No interruption of supply to any SS.
To be discuss
The pwd demand will be met out by other standby machines at Dam Power House.
During the LC period 110/11 KV Aralvaimozhi SS ,Muppandal SS will avail backfeeding from 110 KV SRP-Sankaneri feeder. Hence no ss will be affected.
NOT POSSIBLE
DURING THE LC PERIOD THERE WILL BE NO SUPPLY TO 3KV SIMRAN 1 TO 4. IF WIND GEN . AVAILABLE ON TH DAY POWER TR.4 LOADS WILL BE FED FROM OTHER POWER TRS & POWER TR4 ONLY TAKEN FOR MTCE WORK
1. 110/11KV Kallimadai SS , KPR Mill EHT, Sulur railway traction EHT will be fed from 230KV Arasur SS.
FEEDER TO BE KEPT RADIAL FROM KARAIKUDI UPTO R.S.MANGALAM. SALAIGRAMAM TO BE AVAILED SHUTDOWN
POSSIBLE Thu, Sep 21, 2017 9:00
No ss will be affected. POSSIBLE Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 10:00
POSSIBLE Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 9:00
PUDUKKOTTAI 230 KV SS LOAD WILL BE MAINTAINED FROM 230 KV KARAIKKUDY PG FEEDER AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS. OTHER END ALSO AVAILING SHUTDOWN.
Power transformer -I will not be in service, loads to be cattered by the other two Power transformers
(A)During the LC period 110KV SMPM-Srirangam feeder will be radially fed from 230 KV Auto SS-Trichy. (B) 110KV Samayapuram SS is also availing shutdown on that day. (C) Concurrence obtained from 230KV Auto SS, Trichy. (D) No interuption to any other 110 KV SS
During the LC period the feeder both end Bus and Line AB Switch kept open. NO SS will be affected.
1.230KV TTPS-KAYATHAR - II FEEDER BREAKER IS IN TRIPPED CONDITION AT BOTH ENDS.2.29A & 29B ISOLATORS KEPT OPEN CONDITION.3.EARTH SWITCH SHOULD BE CLOSED CONDITION AT BOTH ENDS.
POSSIBLE Thu, Sep 21, 2017 9:00
possible Thu, Sep 21, 2017 10:00
Possible Thu, Sep 21, 2017 9:00
possible Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 9:00
During the LC period,Vadipatti SS will be under total shutdown. Hence no interruption
1.230KV Grid #, Hence No SS will be affected,2.230KV S.D.Palayam SS will also avail LC at their end.
Other 230 KV feeders will be in service
1. 110 KV KAVUNDAPADI SS MAY AVAIL TOTAL SHUTDOWN2.NO OTHER SS WILL AFFECTED
1) The Jumper at Aarasadi SS from 110 KV Pasumalai - Arasaradi SC Feeder will be kept open 2) 110/33-11KV Arasaradi SS will be interruption on 21.09.2017 from 08.00 to 13.00 Hrs and under shutdown on 26.09.2017 from 09.00 Hrs to 14 Hrs 3) Switch No 1 will be kept open at Pasumalai 110KV SS 4) Concurrence obtained from SE/Metro EDC Madurai 5) LC could be Entered only for 3 days . whereas the actual LC Required is from 21.09.2017 to 26.09.2017
1.Auto - II Will be out of service2.Auto -I & III will cater the SS Load
POSSIBLE Thu, Sep 21, 2017 8:00During the LC period, 1. 110KV Bus section II & III will be in service. 2. Auto I & III will be in off condition by opening HV and LV breakers. 3. 110KV PSQ, AKL I and II will be in tie condition. 4. M/s. Shriram will curtail their load. 5. 110KV Alundur, RNPM I, II, Udumalpet, Theni I and II will be kept radial from other end. 6. 110KV RNPM III # will be radial from other end by closing series switch at Vedasandur towards SBT SS. 7. 110KV DGL # and Sembatti power SS will be radial from Sembatti SS. 8. RRPM, V.K.Patti, Ayyalur, Sengurichi, Sendurai, Gandhigramam, Kannivadi, Minukkampatti, S.V.Patti and Thadicombu SS are availing total shutdown. (Total relief : 133.9 MW).9. If necessary, Vadamadurai SS loads will be transferred to 110KV Alundur #. Necessary concurrence obtained from other end.
POSSIBLE Thu, Sep 21, 2017 11:00
POSSIBLE Thu, Sep 21, 2017 9:00
During the LC period, 1. 110KV Bus section III will be in service and Bus section I will be under LC. 2. Auto II will be in off condition by opening HV and LV breakers. 3. 110KV PSQ, AKL I and II will be in tie condition. 4. M/s. Shriram will curtail their load. 5. 110KV Alundur, RNPM I, II, Udumalpet, Theni I and II will be kept radial from other end. 6. 110KV RNPM III # will be radial from other end by closing series switch at Vedasandur towards SBT SS. 7. 110KV DGL # and Sembatti power SS will be radial from Sembatti SS. 8. RRPM, V.K.Patti, Ayyalur, Sengurichi, Sendurai, Gandhigramam, Kannivadi, Minukkampatti, S.V.Patti and Thadicombu SS are availing total shutdown. (Total relief : 133.9 MW).9. If necessary, Vadamadurai SS loads will be transferred to 110KV Alundur #. Necessary concurrence obtained from other end.
During the LC period, Thadicombu SS is availing total shutdown, the feeder will be radial from other end upto V.N.Patti SS by closing series switch at Vedasandur SS towards SBT SS. Hence no interruption to any SS.
POSSIBLE Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 10:00
POSSIBLE Thu, Sep 21, 2017 9:00
During the LC period, the feeders will be in tripped condition at both ends.
110KV LOAD WILL BE SHARED BY 400/110KV ICT 3 AND 4, NO FEEDER OR SS AFFECTED
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected.
Possible Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 10:00
possible Thu, Sep 21, 2017 5:00
POSSIBLE Thu, Sep 21, 2017 9:00
possible Thu, Sep 21, 2017 9:00
The 110 KV B.Mutlur SS&110 KV K.M.Koil SS will be availing total shutdown.110 KV Cuddalore – LANCO # tie will be opened at Chidambaram end. Hence no interruption of supply.
Both K.R.Thoppur SS & Thingalur SS have Programmed for Maintenance work on that day
During the above period of shut down i)110KV Perambalur-Koothur Feeder Radilay fed from 230KV Poyyur SS. ii)There will be no interruption to any other SS/EHT Consumer
DURING LC PERIOD THE ABOVE FEEDER LOADS WILL CATER WITH MYVADI LINK I FEEDER
No interruption to any SS. The 110KV Palaiyur SS proposed to shutdown.
During the lc period 110KV Pollachi SS shutdown condition
Possible Thu, Sep 21, 2017 9:00
possible Thu, Sep 21, 2017 9:00
The feeder will be back charged. Possible Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 10:00
Possible Thu, Sep 21, 2017 10:00
110 KV Kariamangalam availing total shut down. Expected load relief : 50 MW. The station loads will be managed by keeping Auto Transformer - I & II and 230 KV Palavadi (Already Mettur #) feeder in service and also 2 No's Grid feeder in service.
During LC Period, 110 KV Thumbipady SS will be avail total shut down on (21.9.17).
1) DURING THE LC PERIOD, 110KV OKKANADU KEELAIYUR SS AVAILED TOTAL SHUTDOWN. 2) 110KV ULLIKKOTTAI SS RADIALLY FED FROM T(K)GTPS AND 110KV MANNARGUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS. 3) NO INTERRUPTION TO ANY SUBSTATION.
DURING THE PERIOD OF SHUTDOWN 110KV ALMY-HVF # WILL NOT BE IN SERVICE.
Possible Thu, Sep 21, 2017 8:00
Possible Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 8:00
POSSIBLE Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
During the period of shutdown, The above feeder will be radially fed from other end.
DURING THE LC PERIOD,VIJAYAPURI SS WILL BE RADIALLY FED FROM N.SUBBIAHPURAM HENCE NO SS AFFECTED.
NOT POSSIBLE
During the LC period, a) Other end also avail shutdown. b) All other 230 KV feeders will be in service. c) There will be no interruption of supply to any other feeders.
During the period of LCi The 110KV Kanchipuram – Kaveripakkam Feeder breaker will be in ‘OFF’ Condition ( Line LC in between 110 KV Pallur -110 KV Kanchipuram and 110 KV Damal SS). ii The 110 KV Damal SS is availing total Shutdown. Hence there will be no interruption of supply please.
Possible Thu, Sep 21, 2017 10:00
possible Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
possible Thu, Sep 21, 2017 10:00
Thu, Sep 21, 2017 9:00
Concurance to be obtained for 1/2 an hour Supply interupption from M/s. bhatiya , 110kv periyapalayam SS back feeding may be arranged from alamathy 400 kv ss
During LC period no SS will be affected.110 KV Ingur III feeder is under back charge condition. Necessary concurrence obtained from SE/EEDC/Erode.
1.) The feeder will be kept off between 110 KV Chetpet and Gingee SS.2.) 110 KV Thayanur SS availing total Shutdown. No interruption of supply to any SS.
230 KV Sadayapalayam-Palladam feeder in service.
During the period of LCi) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II, Auto-Tr-III ,HV-III,LV-III Auto –Tr-IV,HV-IV,LV-IV will be in service and cater the SS Loads.ii) The 110KV Vellore-I Feeder, will be in ‘OFF’ Conditioniii) The 230KV Link-II feeder, 230KV Link-I Feeder, 230KV Chittoor interstate feeders, and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
To be discuss
Possible Thu, Sep 21, 2017 8:00
POSSIBLE Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 9:00
Thu, Sep 21, 2017 10:00
The 110 KV Nulumbur SS fed from 110 KV KTR-Kadaperi I feeder, 110 KV Chembarapakkam SS fed from 230 KV Kadaperi SS
During the LC period there is no interruption of supply to any SS.other end SS availing LC on the same date.
1.110 KV Keelapavoor SS ,Alangulam SS,New Alangulam SS ,Keelaveeranam SS will be fed from Kodikuruchi SS. 2.110 KV isolator towards Kanarpatty will be kept opened in Alangulam SS and 110 KV isolator towards Alangulam will be kept opened in Kannarpatty.Hence no SS will be affected .
NOT POSSIBLE
POSSIBLE Thu, Sep 21, 2017 9:00
POSSIBLE Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
Possible Thu, Sep 21, 2017 9:00
postponed Thu, Sep 21, 2017 9:00
a)110KV Uthumalai -Surrandai Feeder Breaker with CTb)110 KV Uthumalai -Auro mira FeederBreaker with CT No SS affected during the L.c period sincea)It is radiel upto 110 KV Surrendai SSb)The 110KV Auro-Mira power plant is under DC The L.C Work is to be carried out by the AEE/Mtce/110/33-11KV Uthumalai SS.
No SS will be affected. During this above LC period 110KV Town SS will be fed from 230KV Sipcot SS
During LC period.1).110KV KKD,MDK and Sidco SS under total shut down2).Other Auto Transformer 1 and 2 catter the SS loads.3).No Other SS will be affected
230KV Sriperumbudur -Tharamani # & 230KV
Kalivanthapattu -Tharamani # will be in service.
Auto Tr.I& II will be in service. No load transfer required
DURING THE L.C PERIOD, OTHER END ALSO PROGRAMMED TO AVAIL L.C ON THE SAME FEEDER ON THAT DAY.
postponed Thu, Sep 21, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
postponed Fri, Sep 22, 2017 9:00
Fri, Sep 22, 2017 10:00
POSSIBLE Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
During LC period230KV Pugalur and Valayapatty feeders will be kept tied with grid.230KV Unjanai SS also availing LC in the same feeder at opposite end.No supply interruption.
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
Koundampalayam SS under total shut downLC will be taken one by one.
During the LC period, the 110 KV Arasur - Kaniyur feeder loads will befed via 110 KV Arasur - Palladam feeder
DURING THE LC PERIOD THERE WILL BE NO SUPPLY TO ENTIRE FEDER. OTHER END WILL BE INFORMED.
NOT POSSIBLE
230KV/110KV Auto Tr I will be in service
i) All 230KV feeders transferred to 230KV BUS 'A' , ii) 230KV Tie-Breaker will be Opened, iii) All other feeders are in service
POSSIBLE Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
Postponed Fri, Sep 22, 2017 10:00
Possible Fri, Sep 22, 2017 9:00
No ss will be affected. During this above LC period 110KV KKLM SS will be radially fed from 110KV ARNI SS and 110KV Radhapuram SS will be radially fed from 230KV SRPudur SS.
During LC period, feeder will be radial from Theni upto K.Vilakku. 110 KV Elumalai and Chinnakattlai SS availing Total Shutdown and 110 KV Aundipatti SS load will be transferred to 110KV KMLM-Theni-I feeder.
Subject to the wind generation, 1.230KV Myvadi I&II #s will be cut off,2.Auto Tr. I&III will be cut 0ff,3.Thungavi SS G.C-II will be transferred to 230KV Udt SS / 110KV Poolavadi #,4.110KV Ingur-I & II will be kept radial from other End,5.Hence Load will be with limits of other one Auto Tr.& No SS will be affected,Hence No SS will be affected.
During the LC period both ends 230 KV Thiruvalam # breakers will be in Handtrip condition, other 6 no’s 230KV feeders will be in service and hence no interruption of supply
Possible Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
postponed Fri, Sep 22, 2017 9:00
postponed Fri, Sep 22, 2017 9:00
Fri, Sep 22, 2017 10:00
During the LC period,110/22KV Thalavaipet SS will avail supply from 110KV Anthiyur Feeder.No SS will be affected.
1)Auto Transformer -1 will be in Service. 2)110/33-11KV Anuppanadi SS and 110/11KV Avaniyapuram SS will be under Shutdown
1) The Feeder is already kept radial from Alagarkoil SS upto Vandiyur SS feeding Othkadai, IT Park SS, Industrial Estate SS and Vandiyur SS 2)110/33-11 KV Anuppanadi SS and 110/11KV Avaniyapuram SS will be under Shut down.
1.SUPPLY TO 110 KV KUGALUR SS MAY FED FROM 230 KV THINGALUR SS2.NO OTHER SS WILL AFFECTED
No interruption of supply Load fed through 230KV Karimangalam - Mettur feeder
No interruption of supply Load fed through 400 KV BUS II
1.400/230 KV ICT#3 315 MVA will not be in service.2. 400/230 KV ICT4&5 315 MVA will be in service.
OCC approved,item No.134th/187
Possible Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
110 KV S.P.Koil - # I - Tied condition.
1.Auto - III Will be out of service2.Auto -I & II will cater the SS Load
Mtc of entire Line .Nosupply condition.
110 KV Madampallayam SS proposed for Total Shut down
During the LC period, other end is also availing LC.
During the LC period Loads of Auto I will be shared by Auto II and III. Hence, no ss affected.
EE/O/CKNI has also programmed Line LC section between KNMLM and Kanavilakku. Andipatty SS will change over to Theni I feeder,110KV Chinnakatalai,Elumalai SS availing Total shutdown. During the LC period the feeder will be radial from Theni upto Kanavilakku SS.
possible Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
230KV Tunnel Power House have programmed for Maintenance work on 22.09.2017
Spic Pharma - Under D.C. from 21.11.2011
Alternate supply from TSII end . (TSD in 230 KV Ulpt Auto SS- ULPT –VPM)
During the LC Period other 230KV feeders will be in service.
During the LC period, the feeder will be radial from other end. Hence no ss affected
NOT POSSIBLE
110 KV Bargur and 110/33 KV Penneswaramadam are availing total shut down. Expected load relief : 35 MW. The station loads will be managed by keeping Auto Transformer - I, II & III and 230 KV Shoolagiri and Mettur feeder are in service and also 1 No Grid feeder in service.
During the lc period AUTO TRANSFORMER-II will caters the load
Possible Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
Fri, Sep 22, 2017 8:00
Possible Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
1)230KV Thiruvalam-Singarapet feeder will be in off condition.2)All other 400kv feeders,230KV feeders and ICTs will be in service
During LC Period 230 KV SSP – I # will be in service condition. Concurrence Already obtained from M/s. SAIL Ltd.,
110 KV Neyveli # I will be kept Radial from TS-I end
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
NOT POSSIBLE
During the period of LC i. 230KV Thiruvalam – Singarapet feeder Breakers both end will be in “ OFF†condition at �400KV Thiruvalam & 230KV Singarapet SS. ii. All other 230 KV feeders 230KV Link I, Link II, S. P.Koil feeders are in service.Hence there will be no interruption of supply please.
DEPENDING UPON LOAD CONDITION
possible Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
All feeders are in service Possible Fri, Sep 22, 2017 9:00
DURING THE LC PERIOD,1) 110KV MECHERRY SS TOWARDS SINGARAPET SIDE ISOLATORS KEPT OPEN AND BLINK FOR OPENING BOTH END. 2) 110KV METTUR # II RADIAL FROM OTHER END3) HENCE THERE IS NO INTERRUPTION OF SUPPLY
During the LC period , a) 110KV Trichy - Punalkulam feeder will be radially fed from Punalkulam 110 KV Grid SS upto 110KV Mathur SS. b) 110 KV Punalkulam feeder line switch at 110 KV Mathur SS towards 230 KV Trichy SS will be kept open. c) 110KV Mathur SS also availing total shutdown. d) Necessary concurrence obtained from other end 230KV Tanjore SS. e)All other 110KV feeders will be In tied condition. f) No interruption of supply to any of the SS.
Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
possible Fri, Sep 22, 2017 9:00
Fri, Sep 22, 2017 9:00
During the period of LC i) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS Loads.ii) The 230KV Chittoor Interstate feeder will be in ‘OFF’ Condition iii) The 230KV Link-II, 230KV Link-I # and 230KV Mosur feeders will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
OCC approved,item No.134th/156
110KV R.S.Madai SS will be fed radial from Kaavanoor SS.During the LC period 110KV VGTPS - Phase I line2, 3,4 and VGTPS Phase II line 3 will be in service. Hence there is
DURING THE LC PERIOD ALL THE MACHINES ARE IN STANDBY CONDITION AND 230KV MTPH - MTPS FEEDERS ARE IN SERVICE. PWD DEMAND 700C/S MEET OUT THROUGH DAM PH MACHINES.
possible Fri, Sep 22, 2017 9:00
postponed Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
Possible Fri, Sep 22, 2017 9:00
1).110 KV Palladam SS , Pongalur SS and Elavanthy SS availing total shutdown2).110KV Mudalipalayam loads will be transferred to Ingur 230 KV SS3). Other 3 Nos Auto Transformers will be in service
1).110 KV Palladam SS availing total shutdown 2). 110 KV Veerapandy SS Naranapuram SS and Kalivelampatty SS will fed thruo 110 KV Palladam feeder of 230 KV Palladam SS3). No other SS will be affected
1).110 KV Pongalur SS and Elalvalnthy SS availing total Shutdown2). No other SS will be affected
3 AUTOS ARE IN PARALLEL . LOADS ARE SHARED WITH OTHER TWO AUTOS.
POSSIBLE Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS , 110KV Srivilliputtur SS and 110KV Nallamanaickenpatti SS will be availing total Monthly shutdown on that day. 110KV Viswanathaperi-Veerasigamani-II feeder and 110KV Kodikurichi -Kadayanallur Feeder radial from other end and concurrence obtained from other end.Hence no SS affected.
During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS , 110KV Srivilliputtur SS and 110KV Nallamanaickenpatti SS will be availing total Monthly shutdown on that day. 110KV Viswanathaperi-Veerasigamani-II feeder and 110KV Kodikurichi -Kadayanallur Feeder radial from other end and concurrence obtained from other end.Hence no SS affected.
POSSIBLE Fri, Sep 22, 2017 10:00
Possible Fri, Sep 22, 2017 9:00
POSSIBLE Fri, Sep 22, 2017 9:00
Both end LC applied. Possible Fri, Sep 22, 2017 9:00
Sat, Sep 23, 2017 9:00
During the LC period 110 KV Thottiapatti SS, 110KV Padikasuvaithanpatti SS , 110KV Srivilliputtur SS and 110KV Nallamanaickenpatti SS will be availing total Monthly shutdown on that day. 110KV Viswanathaperi-Veerasigamani-II feeder and 110KV Kodikurichi -Kadayanallur Feeder radial from other end and concurrence obtained from other end.Hence no SS affected.
During LC period.1).110KV OKM-NGM 1# kept radial from 110KV NGM SS end up to 110KV Panapatty SS2).No other SS will be affected
1) During the LC period there will be NO supply in P.Tr-4 and its 33KV feeders. 2) If there is wind generation its 33KV feeders paralleled with other power transformers. 3) No SS will be affected. 4) Concurrence obtained from SE/NCES/TIN.
All the loads will be transferred to 230 KV Cuddalore – TAQA # . Hence no interruption of supply.
To be discuss
Sat, Sep 23, 2017 9:00
Sat, Sep 23, 2017 8:00
Sat, Sep 23, 2017 9:00
possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
All the loads will be transferred to 230 KV Cuddalore – TAQA # . Hence no interruption of supply.
To be discuss
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
During the LC period there will be no supply in 230KV Madurai feeder Main Breaker (202-52) & CT,CVT. Hence no substation affected.
Other two Auto Tr. I & III will share the loads
At the time of LC1.230 KV Echur -Kalpakkam # breaker will be HT, and Load transferred to other end SS no supply , the supply is fed from 230 KV Arani SS, in case of over load to 230 KV Arani SS,(The 110 KV mazhaiyur # Load transferred to 230 KV Villupuram SS and 110 KV, Vandavasi SS Load transferred to 230 KV Acharapakkam SS). There is no interruption of supply to any of the Substation.
POSSIBLE Sat, Sep 23, 2017 9:00
possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
During the LC period the 110 KV SRP-KDR II # radial from SRP upto TKY (excl).110/11 KV Marthandam, Kuzhithurai,Munchirai and Nadaikavu SS will avail total shut down to be approved by SE/O/TIN and SE/KKEDC/Ngl. Parasalai SS will avail Back feeding from KSEB. Necessary concurrence may be obtained from SRLDC/ Bangaluru. Hence no SS will be affected.
1. Sulur traction EHT service will be fed from 230KV Arasur SS of 110KV ASR - Thingallur #. 2.110KV Kallimadai SS will be fed from 230KV CBE SS. 3. No supply to KPR EHT service. 4. Scheduled shutdown at 110/11KV CBE SS.
ILYNGDI AND MRVMNGLM LOADS TO BE TRD. TO 110 KVNR-MMDU # AND KEPT IN TIED CONDN.Paramkudi ss availed total S/D
POSSIBLE Sat, Sep 23, 2017 8:00
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
Sat, Sep 23, 2017 9:00
110 KV SIPCOT SS, 110 KV URBAN SS, 110 KV THIRUMAYAM SS, 110 KV KONNAIYUR SS IN 110 KV SIPCOT FEEDER AVAILING TOTAL SHUTDOWN. 110 KV ALIYANALAI SS, 110 KV NAGUDY SS, 110 KV KODIKKULAM SS AVAILING TOTAL SHUT DOWN AND HENCE THERE WILL BE NO INTERRUPTION OF SUPPLY TO ANY SS.110 KV SUPPLY FOR 110 KV PUDUKKOTTAI SS IS BACK FED THROUGH KARAIKKUDY 230 KV SS. CONCURRANCE OBTAINED FROM EE/O/KARAIKKUDY.AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS.
During period of LC, the 110 KV SVC - Palayaseevaram feeder entire will be in OFF Condition. Concurrence to be obtained from EHT Consumers M/s. JET Assosiates and M/s. Danfoss.
No ss will be affected. During this above LC period 110KV Vagaikulam SS will be radially fed from 230KV Auto SS.
Feeder to be kept radial from 230 K.V Udayathur S.S
POSSIBLE Sat, Sep 23, 2017 10:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
During the above Shutdown Period 100 MVA Auto Transformer I will be in service. No interruption to any other SS
During the period of shutdown,the 110KV Mambakkam SS and 110KV Sirungattur SS availing total shutdown.Hence no interruption of supply.
During the period of shutdown,the 110KV Timiri SS availing total shutdown.Hence no interruption of supply
During the period of LC,1)Auto transformer II and III are in service and cater the station loads,2)The 110KV Mambakkam SS,110KV Sirungattur SS and 110KV Thimiri SS availing Total Shutdown.Hence no interruption of supply.
During the LC period there will be no supply in 230KV Bus Coupler. Hence no substation affected.
During LC period there will be no supply in the entire feeder
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
NIL Possible Sat, Sep 23, 2017 8:00
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
MONTHLY MAINTENANCE, 230 KV-K.R.THOPPUR FEEDER , 230 KV DEVIYAKURICHI FEEDER AND 230 KV TRANSFER BUS, AUTO TRANSFORMER-II WILL BE NOT IN SERVICE.THERE IS ONLY ONE AUTO TRANSFORMER. 110 KV BUS WILL BE IN SERVICE.110 KV DEVIYAKURICHI-II FEEDER WILL FED RADIALY FROM OTHER END WHILE TAKING LC ON 110 KV DEVIYAKURICHI-II FEEDER(110 KV ATTUR SS TSD ON 23.09.2017.)
During the LC period all other 230KV # tied with grid. The Executive Engineer/Operation/N.TKUDI agreed to arrange for load relief. Hence there will be no interruption of supply.
AUTO TR II will be in service.Thiruppalai SS , VandiyurSS,Melur,Narasingampatty SS under S/D. If necessary 110kv Alkl-Sembatty 1 feeder tie will be kept opened at ALKL end.
Feeder will be radial from other end..ThiruppalaiSS S/D
POSSIBLE Sat, Sep 23, 2017 10:00
Possible Sat, Sep 23, 2017 9:00
DURING THE ABOVE SHUTDOWN PERIOD Supply to M/S SASL CO- GENARATION WILL BE Fed BY CLOSING THE BUSCOUPLER SWITCH NO 44 AT 110 KV PENNADAM SS AND THERE WILL BE NO INTERRUPTION TO EHT CONSUMER. Vridhachalam 110KV SS is aiso avialing shutdown on the same day.
During the LC period 1. 110KV Tirupattur # Breaker will be in hand trip condition at both ends2) 110KV Tirupattur SS and 110KV Korattty SS Total shutdown approved3) 110 KV Tirupattur Railway traction SS load will be fed to 230 KV SS Vinnamangalam through 110 KV Vinnamangalam – Tirupattur #.hence no interruption of supply.
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 10:00
POSSIBLE Sat, Sep 23, 2017 9:00
During the LC period, 1) 110 KV LV 1 breaker will be in handtrip condition and Auto transformer I will be in off condition2) The Auto transformer II, III and all 110 KV feeders will be in service except 110KV Tirupattur Feeder, hence no interruption of supply3) The 110KV Tirupattur SS total shutdown approved.4) The 110KV Tirupattur Railway Traction SS loads will be fed from Vinnamangalam 230KV SS and hence no interruption of Supply.
During the above work 1) The 80 MVA Auto Tr I & 50 MVA Auto Tr II were parelleled by closing the 110 KV Buscoupler breaker 2) Eachangadu 230 KV SS loads will be fed from the other Auto Transformer -II and 110 KV Vridhachalam SS is also avail total shut down hence the Loads will be with in one transformer capacity.
110KV SR Pudur Feeder No.II radial from SR Pudur to Peachipparai SS
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
1) Anaicut 2) Ambur 3) Somalapuram, 4) Vadakathipatty availing total shutdown
EE / O/ 400KV Kayathar has also programmed
During the LC period,110/22KV Anthiyur SS will avail total shut down as already approved.No SS will be affected.
During the LC period, Auto Transformer II will be in service , No SS will be affected.
1.110 KV SHENBAGAPUDUR SS MAY AVAIL TOTAL SHUTDOWN2.AUTO TRANSFORMER II AND III ARE IN SERVICE,IT MAY CATER THE LOAD
Sat, Sep 23, 2017 9:00
Postponed Sat, Sep 23, 2017 9:00
postponed Sat, Sep 23, 2017 9:00
1) The feeder will be kept radial from the other end 2) In the 230 Pasumalai - Kayathar # Bus and Line isolators at Pasumalai SS will be kept opened.
No interruption of supply Load fed through 400 KV Paalavadi-Thiruvalam I feeder
No interruption of supply Load fed through 400 KV Paalavadi-MTPS -II I feeder
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
possible Sat, Sep 23, 2017 9:00
1.110 KV Tenkasi SS,Kadayam SS,Shencottai SS WILL BE UNDER SHOUTDOWN2.110 KV Keelapavoor WF SS will be fed from 110 KV Papanasam- Kayathar #3.Papanasam PH will be tied with 110 KV Kayathar -Papanasam # by closing of AB Switch at Rastha SS end.
During the LC 110 KV Uthama palayam SS under shut down
110KV UTHUMALAI SS IS AVAILING MONTHLY MAINTENANCE ON THE SAME DATE LC ALREADY APPROVED BY SE/TEDC, SO NO SS AFFECTED
{ 110kv Avinashi SS total shut down and 110kv KVLR- ASR II feeder kept radial from 230 ASR SS and 110 kv Earipalayam SS ,TCS EHT and 110kV Vajipalyam kept radially fed thro 110kv ASR -KVLR feeder I from 230kv ASR SS}110KV KVLR-Nambiyur loads fed from 230KV Gobi(SS)
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 10:00
possible Sat, Sep 23, 2017 9:00
B-Bus will be in service110kv Avinashi SS total shut down and 110kv KVLR- ASR II feeder kept radial from 230 ASR SS and 110 kv Earipalayam SS ,TCS EHT and 110kV Vajipalyam kept radially fed thro 110kv ASR -KVLR feeder I from 230kv ASR SS110KV KVLR-Nambiyur loads fed from 230KV Gobi(SS)
{110kv Avinashi SS total shut down and 110kv KVLR- ASR I feeder kept radial from 230kV ASR SS}.
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
J.K. Pharma - Under D.C. from 25.06.2004
During the above period of shut down i) 110KV Krishnapuram SS,110KV Esanai SS 110KV Mangalamedu SS and Dhanalakshmi sugars will be radially fed from 230KV Deviyakurichy SS.
During the Lc period. 110KV Malco I & II feeders will be in service.
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 10:00
No interruption to any SS. The 110KV Sakkottai and Urban SS proposed to shutdown. All other feeders will be in tied condition.
No interruption to any SS. The 110KV Sakkottai and Urban SS proposed to shutdown.
During the period of L/C time,1. 110 KV Tiruvannamalai SS and 110 KV vinnavanur SS will be availing total S/D,.2. Autotransformer-II will be OFF condition,3. Autotransformer-I will be in servic and cater the station loads.
During the period of L/C time, 110 KV Tiruvannamalai SS availing total S/D, Hence there is no interruption of supply please.
During the period of L/C time,1. 110 KV Vinnavanur SS availing total S/D,2. 110 KV Bannari Sugars and 110 KV Chenganm SS will be radially fed from 110 KV Singarapet Grid SS. Hence there is no interrruption of supply please.
No interruption to any SS. The 110KV Sakkottai and Urban SS proposed to shutdown. All other feeders will be in tied condition.
POSSIBLE Sat, Sep 23, 2017 10:00
possible Sat, Sep 23, 2017 9:00
possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 10:00
No interruption to any SS. Auto transformer II load will be managed by Auto Trfr -I.
It is a Ideal charged feeder hence no interruption of power supply
During LC Period 400 KV Bus Section No : II will be in service. Hence there will be no interruption of supply to Auto transformers I , II,III
During the LC period the 110KV Kodavasal SS supply will be fed from 230KV SS Thiruvarur and the 110KV Kumbakonam (Sakkottai) SS Supply will be from the 110KV KGTPS Generating station. Hence there will be no interruption of supply to any other SS.
1) DURING THE LC PERIOD, 110KV PATTUKKOTTAI, PATTUKKOTTAI URBAN, PERAVURANI, SETHUBAVACHATHIRAM, KEERAMANGALAM, URANIPURAM AND KARAMBAKUDI SS AVAILED TOTAL SHUTDOWN (LR:80 MW).2)230/110KV NEMMELI THIPPIYAKUDI SS RADIALLY FED FROM 230KV THIRUVARUR SS. 3) NO INTERRUPTION TO ANY SS AND ALL OTHER FEEDERS ARE TIED CONDITION.
Radially fed from other end possible Sat, Sep 23, 2017 9:00
possible Sat, Sep 23, 2017 8:00
Radially fed from other end possible Sat, Sep 23, 2017 9:00
postponed Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 8:00
Possible Sat, Sep 23, 2017 9:00
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
110KV Singapuram-I will be radially fed from other end. There will be no interruption to any SS or feeder.
During the LC period, a) 110KV Alundur - Sempatty feeder radially fed from 230 KV SS sempatty SS up to vaiyampatty 110 KV SS. b) 110 KV vaiyampatty SS availing total shutdown. c)All other 110 KV feeder's will be in service. d)There will be no interruption of supply to any other feeder's and ss.
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
During the period of LCiii. 110 KV Railway I feeder breaker will be in “ OFF†condition at �both end.iv. 110 KV Railway II feeder will be in service.Hence there will be no interruption of supply please.
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
During the period of LCi. 110 KV Sugar mill feeder breaker will be in “ OFF†condition at both �end . Hence there will be no interruption of supply please.
During the period of LCi The 110KV Kaveripakkam Feeder will be in ‘OFF’ Condition(In between 230 KV Thiruvalam SS and 110 KV Sipcot SS).ii. The 110 KV Kaveripakkam SS is availing total Shutdown. iii. The 110 KV Sipcot SS loads will be transferred to 230KV Arani SS. Hence there will be no interruption of supply please.
During the period of LCi. 110 KV Thiruvalam – M.V.Puram feeder line LC in between from 230 KV Thiruvalam SS to 110 KV Sholinghur SS.ii. The 110KV M.V.Puram SS, 110KV Mukundrayapuram SS, 110KV Sholinghur SS (11kv loads), are availing Total Shutdown Hence there will be no interruption of supply please.
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 10:00
Possible Sat, Sep 23, 2017 9:00
During the period of LCi. 110 KV Mosur– Sholinghur feeder line LC in between from 230KV Mosur SS and 110 KV Sholinghur SS.ii. The 110KV Sholinghur SS (33kv loads) is availing Total Shutdown Hence there will be no interruption of supply please.
During the period of LCiii. 110 KV Anaicut – V.Patty feeder line LC in between from 110 KV Anaicut SS and 110 KV V.Patty SS.iv. The 110KV Anaicut SS, 110KV V.Patty are availing Total Shutdown Hence there will be no interruption of supply please
concurance may be obtained from M/s. kamatchi ( CPP )
During the period of LCi. 110 KV Arani - Kaveripakkam line LC in between from 110 KV Timiri SS to 110 KV Kaveripakam SS.ii. 110 KV Timiri SS is availing total Shutdown.Hence there will be no interruption of supply please.
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
postponed Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
During the LC period 110 KV Sattur SS will be availing total shut down. Hence No SS will be affected.
During the LC period other end also availing LC.
During LC period no SS will be affected. Necessary concurrence obtained from SE/EEDC/Erode.
During the LC period a) Trichy 110 KV Grid SS availing total shut down for monthly maintenance works. b) 110 KV Iyyarmalai SS and 110 KV Pettavaithalai SS loads will be managed through 110KV Pugalur - Puliyur - Trichy feeder and M/s Welspun Solar power. c) All other 110 KV feeders will be in service. d) there will be no interruption of supply to any of the SS.
Inter sldc Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
1. Thirukoilur # H/T at 230 Kv Auto Ss. Thefeeder will be radial from other end.2. Auto Tfr I will be in service.3. 110 KV Thirukoilur and Kallakuruchi sub-stations availing total shutdown.4. Hence No interruption of supply to anySS.And1.) The 110 KV line between Karanaiperichanur and Thirukoilur will be kept off.2.) The feeder will be radial from Deviyakuruchi end up to Thirukoilur SS and radial from Villupuram up to Karanaiperichanur SS. 3.) 110 KV Thirukoilur and Kallakuruchi sub-stations availing total shutdown. No interruption of supply to any SS.
The 110 KV kadampathur SS and 110 KV Kakalur SS availing Total shutdown
The 110 KV Kadampathur SS ,kakalur SS ,Sholinghur SS,and AJ pet SS availing Total shutdown.
The 110 KV Sholinghur and 110 KV AJ Pet SS availing total shutdown.
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
All other feeder in service. Possible Sat, Sep 23, 2017 6:00
Possible Sat, Sep 23, 2017 9:00
1.110KV AB Switch at Tindivanam SS towards Villupuram 110KV SS side will be kept open.2.110KV Tindivanam SS will be availing total shut down.3.Hence no interruption of supply in any SS.
During the period of LCi) 110KV Kaveripakkam SS, 110kv M.V.Puram SS,110KV M.R.Puram SS,110kv sholinghur SS are availing Total shutdown on 23.09.2017. The total shutdown approved and concurrence obtained by CE/Distribution/Vellore. The 110KV SIPCOT SS Loads Will fed from 230KV Arani SSii) Auto –Tr-II,HV-II,LV-II, and Auto –Tr-III,HV-III,LV-III, will be in service and cater the SS Loads.iii) Auto-Tr-IV ,HV-IV,LV-IV and Auto-Tr-I ,HV-I,LV-I, will be in ‘OFF’ Condition.iv) The 110KV Sugar Mill Feeder ,110KV Railway-I Feeder,110KV M.V.Puram Feeder and 110KV Kaveripakkam feeder will be in ‘OFF’ conditionv) The 230KV Chittoor interstate feeders,230KV Link-II # 230KV Link-I Feeder and 230KV Mosur feeder will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
110KV/11KV Ko.Poovanur SS Total shutdown maintenance work.
POSSIBLE Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
POSSIBLE Sat, Sep 23, 2017 10:00
KUMBAKONAM SAKOTTAI SS AND URBAN SS WILL BE AVAILING TOTAL SHUTDOWN. HENCE NO INTERRUPTION OF SUPPLY.ALL OTHER FEEDERS WILL BE IN TIED CONDITION
During the LC period Auto Transformer I & II will be in service. Hence there is 'no' interruption in power evacuation
ALL OTHER 100MVA AUTO TRS 1 & 3 WILL BE IN SERVICE
1) Singapuram 230KV SS Deviakurichy II feeder monthely maintenances work Breaker,CT ‘s and Attur 110KV SS availing total shutdown on that day2)Deviakurichi 230KV SS radial fed from upto P.G.Palayam 110KV SS End3)There will be no interruption of supply any other SS.
during the LC period 110kv sakottai ss will be in total shut down .Hence there will no interruption to any SS
POSSIBLE Sat, Sep 23, 2017 10:00
POSSIBLE Sat, Sep 23, 2017 10:00
Sat, Sep 23, 2017 9:00
Sat, Sep 23, 2017 9:00
Sat, Sep 23, 2017 10:00
During the LC period,1) 110 KV Punalkulam - Trichy feeder will be radial from 230 KV Trichy SS upto 110 KV Veeramarasanpettai SS,2) Concurrence obtain from EE/O/ Trichy, SICGILSOL (SEVA GAS)/ Puthukudi for blink operation3) no supply interruption to any SS.
During the LC period,1) 110 KV Kumbakonam Urban SS and 110 KV Saakkottai SS will avail shutdown on the same day,2) no supply interruption to any SS.
1.110 KV Tenkasi SS ,110 KV Keelapavoor ,110 KV Shencottah and 110 KV Kadayam SS will be fed from Kodikuruchi SS and 110 KV Rastha SS will be fed from Kayathar SS by closing the Buscoupler isolator at Rastha SS end ,2.110 KV isolator towards Kadayam will be kept opened in Rastha SS and Papanasam Power House and 110 KV isolator towards Papanasam and Rastha will be kept opened in Kadayam SS .Hence no SS will be affected .
NOT POSSIBLE
Sat, Sep 23, 2017 10:00
POSSIBLE Sat, Sep 23, 2017 13:00
POSSIBLE Sat, Sep 23, 2017 10:00
POSSIBLE Sat, Sep 23, 2017 10:00
POSSIBLE Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
Both end LC applied. Possible Sat, Sep 23, 2017 9:00
Possible Sat, Sep 23, 2017 9:00
NO SS affected since total shut down to be availed at 110 KV Veerasigamani feeder between 13.00 hrs to 16.00hrsTHE L.C work is to be carried out by the AEE/Mtce/110/33-11 KV Uthumalai Grid SS
The work carried out the M/c under Jack condition.
Present PWD demand is 250C/s. During the LC period, the respective feeder will be radial from other end. Hence No SS will be affected.
No SS will be affected. During this above LC period 110KV Vagaikulam SS will be fed from 230KV Sipcot SS
During LC period.1).110KV OKM-Udumalpet 2 feeder kept radial from 110KV Udumalpet SS end.2).No SS will be affected
110KV Kadapperi - S.Pkoil # and 110KV Korttur-Kadapperi I #
radial from other end.
Possible Sat, Sep 23, 2017 9:00
possible Sat, Sep 23, 2017 10:00
Possible Sun, Sep 24, 2017 9:00
Sun, Sep 24, 2017 9:00
Possible Sun, Sep 24, 2017 9:00
UNIT-2 in shutdown condition possible Sun, Sep 24, 2017 9:00
Possible Sun, Sep 24, 2017 10:00
Possible Sun, Sep 24, 2017 7:00
A33KV HT consumer will be informed. 11KV Medavakkam # loads will be transferred to 110KV Sholinganallur SS , 11OMR # loads will be transferred to 33KV Thoraipakkam SS, 11KV Varthapuram & Ragavendra # loads will be transferred to 110KV Perumbakkam SS
Other three Auto Transformers will be in service
during the LC Period the 230KV supply Will be fed from 230 KV Nokia -SV Chartram Feeder Without interruption of power supply.
All Other Auto-Transformers will be in service
OCC approved,item No.134th/193
Other 230 KV feeders will be in service
For Quarterly maintenance work.
During the period of shutdown 30KV NCTPS feeder will radially fed the entire loads of 230KV Kilpauk SS
Standby Possible Sun, Sep 24, 2017 8:00
Possible Sun, Sep 24, 2017 8:00
LC will be taken one by one. Possible Sun, Sep 24, 2017 9:00
Possible Sun, Sep 24, 2017 10:00
Approved Sun, Sep 24, 2017 9:00
Sun, Sep 24, 2017 8:00
Mon, Sep 25, 2017 10:00
Unit under shutdown condition, SF6 Breaker open condition
During the period of shutdown. 1) 100MVA AUTO TRANSFORMER-II will not be inservice. 2.)110KV Sholinganallur feeder Load will be transferred to 230KV KITS Park SS.
1. 230KV Manali Feeder only will not be in service. 2. All other 110KV Feeders, 230KV Feeders, Auto I, II & III will be in service.
1.Both End Breaker Open Condition. 2.Both End Bus & Line Mods Open Condition. 3.Both End Earth Switch Closed Condition.
During the above shutdown period the 230 KV Eachangadu ss will be Radially fed from 230 kv Eachangadu- Neyveli TSI #. 230 KV POYYUR SS end is also availing LC On that Day.
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
No ss will be affected. POSSIBLE Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
During the Auto transformer-III LC period, the Auto Transformer - I & II will be in service and Load will be shared by Auto Transformer I & II. Hence there will be no interruption of supply.
Other 230 KV feeders will share the loads
During the LC period, the remaining 5 Nos. 230 KV feeders are in service. LC programmed at other end also.
During the LC period 110/11 KV Palavoor SS will avail supply from 110 KV SR Puthur - Kanyakumari feeder. Hence no ss will be affected.
NOT POSSIBLE
Power transformer -II will not be in service loads to be cattered by the other two Power transformer
1. Both end breakers to be tripped2.Both end bus and line isolators to be opened3.Both end earth switches to be closed condition
Mon, Sep 25, 2017 9:00
NIL Mon, Sep 25, 2017 8:00
POSSIBLE Mon, Sep 25, 2017 10:00
POSSIBLE Mon, Sep 25, 2017 10:00
MONTHLY MAINTENANCE. Only one Auto Transformer is available and Auto Transformer will not be in service and 230 KV main bus and 110 kv bus will be in service and there will be no interruption to any SS(110 kv Udayapatty TSD is on 25.09.2017).110 kv salem-I feeder will be fed radially from other end.
DURING THE ABOVE SHUTDOWN PERIOD 110 KV PENNADAM SS IS ALSO AVAILING TOTAL SHUT DOWN and normaly the feeder is radial from Eachangadu 230 KV SS.
During the above work, 1) The 80 MVA Auto Tr I & 50 MVA Auto Tr II were parelleled by closing the 110 KV Buscoupler breaker 2) Eachangadu 230 KV SS loads will be fed from the other Auto Transformer -I and 110 KV pennadam SS is also avail total shut down hence the Loads will be with in one transformer capacity.
POSSIBLE Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
EE / EM - III / TTPS has also programmed
1) 110/33-11KV Arasaradi SS will be under shutdown 2) Switch No 1 will be kept open at Pasumalai 110KV SS 3) Hence there is no interruption of Supply to any SS
During the LC period, 110KV Baarage III feeder will be radially fed from other end.
ALL 230 KV FEEDERS AND AUTO TRANSFORMER 1.II AND III ARE CONNECTED IN BUS I ,BUS II IDLY CHARGED THROUGH 230 KV BUS COUPLER BREAKER
No interruption of supply Load fed through 230KV Karimangalam Sub station for 110 Kv Pennagaram and Dharmapuri feeder
OCC has already approved for both end LC
1)Thalayuthu SS will be avail total shutdown2)The # will be radial from sempatti up to papampatty and radiol from other end up to M.N patty,no interruption any SS
POSSIBLE Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
During LC period other end also programmed for availing LC.
During the Lc period 110KV MDPH II Feeder will be in service & 110KV MDPH I feeder radially fed from MDPH end upto Mettur Auto ss
During the LC period 110KV ALR-SLR FEEDER NO-I will caters the load
Both End Monthly maintenance work
During the LC Period 400 KV Bus Section No : I will be in service. Hence there will be no interruption of supply to Auto transformers I , II,III.
Other end also availing total shutdown.
During the LC peirod the 110KV Thiruvarur - T.R.Pattinam feeder is an idle feeder (Radial from Thiruvarur end). Hence there will be no interruption of supply to any other SS.
During the LC period,1) all 110 & 230 KV feeders will be in tied condition,2) 230 KV Bus-Coupler breaker is already kept in standby condition,3) no supply interruption to any SS.
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 8:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 8:00
POSSIBLE Mon, Sep 25, 2017 8:00
230kv breaker in tripped condition. 230kv line and bus isolator in open condition.
Unit in Service, all 400KV and 230KV feeder are in service Except 230KV Thingalur feeder
During the LC period, a)Alundur End Only LC work. b)All other 230 KV feeders will be in service. c)There will be no interruption of supply to any other feeders.
DURING THE LC PERIOD,SEETHAPARPANALLUR WILL BE NO SUPPLY IN ENTIRE LINE HENCE NO SS AFFECTED
NOT POSSIBLE
DEPENDING UPON LOAD CONDITION
DURING THE LC PERIOD,SEETHAPARPANALLUR SS WILL BE RADIALLY FED FROM KAYATHAR HENCE NO SS AFFECTED
DURING THE LC PERIOD,THERE WILL BE NO SUPPLY ENTIRE LINE.CONCURRENCE TO BE OBTAINED FROM SRLY
POSSIBLE Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
POSSIBLE Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
Possible Mon, Sep 25, 2017 9:00
During the LC period 110 KV MRPM SS, Velayuthapuram SS, 110 KV EHT Ramalinga mills and Thulukkapatti SS under total shut down.110 KV APK SS loads will be transfer to 110 KV Kavanoor-Kamuthi #, along with all solar generation. Hence No SS affected.
During the LC period both ends availing LC.
During the LC period there will be no supply in 230 KV Pugalur - Ranganathapuram feeder since other end also availing L.C for monthly maintenance work.
1. 110KV Singapuram-I feeder hand tripped at both end to open the series Switch towards Udayapatty 110KV SS at Kitchipalayam 110KV SS and to open the series Switch towards Kitchipalayam 110KV SS at Udayapatty 110KV SS. 2. Earth provided at Udayapatty 110KV SS towards Kitchipalayam 110KV SS and in Kitchipalayam 110KV SS towards Udayapatty 110KV SS. 3. Udayapatty 110KV SS will be availing total shutdown. 4. There will be no interruption to any SS.
230 KV Athipattu and 230 KV Thiruvalam feeders are in service condition .
Possible Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 9:00
1.110KV AB Switch at Valavanur SS towards Villupuram SS side will be kept open2.110KV Valavanur SS& 110KV Kandamangalam SS will be availing Total shutdown. 3.Hence no interruption of supply in any SS. And1.) The feeder will be kept off between 110 KV Villupuram Grid SS and 110 KV Madurapakkam SS .2.) 110 KV Valavanur and Kandamangalam Sub-stations availing total Shutdown. No interruption of supply to any SS.
During LC period 110KV KN Patty SS will be back fed through 110KV PSI-Rasipuram feeder. 110KV Namagiripet SS will be back fed through 110KV DVK-Thammampatty feeder. 110KV Sendamangalam SS will be back fed through 110KV Valayapatty - Pudhansandai feeder. Other 110KV SS normally fed by this station will be fed by Auto-I. No supply interruption.
POSSIBLE Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 10:00
Mon, Sep 25, 2017 9:00
Mon, Sep 25, 2017 4:00
During the LC period 110KV VGTPS - Phase I line1, 3,4 and VGTPS Phasse II line 3 will be in service. Hence there is
110 KV Kannarpatti -Keelaveeranam feeder supply is to be extended up to this SS end by closing 110KV line swith towards Uthumalai SS at 110 KV Surrandai SSNo SS affected .(110 KV Kanarpatti- Keelaveeranam feeder supply is not to be extended up to 110 Kv Veerasigamani Ss Breaker is under idle condition at this UTHUMALAI SS end now.The L.C work is to be carried out by the AEE/Mtce/110/33-11 KV Grid SS
NOT POSSIBLE
POOLAVADY-1)POOLAVADY SS WILL BE ON TOTAL SHUTDOWN 2)THUNGAVI SS LOADS WILL BE FED FROM PONNAPURAM 230KV SS ** THUNGAVI SS FED FROM PONNAPURAM SS DURING THE LC PERIOD
230KV Sriperumbudur -Tharamani # & 230KV KITS -
Tharamani # will be in service.
other end also proposed L.C . Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 9:00
During LC period there will be no supply in the entire feeder
1. S.N Palayam under total shutdown and other inter SS will fed from OKM II feeder. LC will be taken one by one.
1. Keeranatham SS & koilpalayam SS will be fed radially from TDLR SS & KMDI SS.
At the Time of LC1. The 110 KV Echur - Kaliyampoondi # Bkr will be H/T Condition. After completion of work 110 KV Echur - Kaliyampoondi # Bkr will be charge (Hence it is ideally charged) No interruption of supply.
During the LC period, the feeder will be radial from 230 KV Karuvalur SS.
During the LC period The 110 KV SRP - SNRI # radial from SNRI upto Perungudi (incl). Hence no SS will be affected.
NOT POSSIBLE
possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 10:00
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 10:00
No ss will be affected. POSSIBLE Tue, Sep 26, 2017 9:00
During the LC period, the remaining 5 Nos. 230 KV feeders are in service. LC programmed at other end also.
DURING THE LC PERIOD THERE WILL BE NO SUPPLY TO ENTIRE FEEDER. OTHER END ALSO LC APPLIED
FEEDER TO BE KEPT RADIAL FROM VGTPS
During the LC period there will be no supply in entire power transformer -III and 33KV Micon-I,Micon-II,Micon-VI feeders concurrence obtained from SE/NCES/TIN.
POSSIBLE Tue, Sep 26, 2017 10:00
POSSIBLE Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
1. During the above LC Period, 110Kv Kallakudy II # Breaker is in H/T condition at 230KV Tahtchankurichy SS . 2.110Kv Thatchankurichy II# Breaker is in H/T condition at 110KV kallakudy Grid SS. 3.Bus and Line Isolator towards 110KV Kallakudy Grid SS will be kept in open condition at 230KV Thatchankurichy SS. 4.Line Isolator towards 230KV Thatchankurichy SS will be kept in open condition at 110KV Kallakudy Grid SS. 5. Earth switch will be kept in closed condition at 110Kv Kallakudy grid ss and 230KV Thatchankurichy SS. 6.110 KV Kallakudi-I # will be in tied condition. 7.There will be no interruption to any other SS.
1. Both end breakers to be tripped2.Both end bus and line isolators to be opened3.Both end earth switches to be closed condition
During the period of shutdown,the 110KV Kilpallipattu SS, 110KV Sathumadurai SS availing total shutdown.Hence no interruption of supply.
POSSIBLE Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 10:00
Other end is also availing LC POSSIBLE Tue, Sep 26, 2017 9:00
During the LC period there will be no supply in 400 KV Main Breaker for ICT3 (412-52), 400 KV Tie Breaker for ICT2 & ICT3 (411-52), 230KV LV Breaker for ICT3 (203-52). 400/230KV ICT3. Hence no substation affected.
During the period of LC, 1)Auto transformer I and III are in service and cater the station loads, 2)The 110KV Kilpallipattu SS and 110KV Sathumadurai SS availing Total Shutdown.Hence no interruption of supply.
During LC Period there will be no supply in the entire feeder
During the the LC period there is no generation in TCP grid. Consent obtained from company. Hence there is no interruption of supply.
1.230KV Grid #, Hence No SS will be affected,2.230KV Myvadi SS will also avail LC at their end.
possible Tue, Sep 26, 2017 9:00
No generation in PH-2 POSSIBLE Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 10:00
possible Tue, Sep 26, 2017 9:00
During the LC period both ends breaker will be in Handtrip condition, other 6 no’s 230KV feeders will be in service and hence no interruption of supply
EE / O / Kinnimangalam has also programmed
The Tie Breaker isolator already kept in Stand by condition.
THE FEEDER WILL BE RADIALLY FED FROM 230KV KODIKURICHI SS, NO SS AFFECTED
NOT POSSIBLE
110KV Thekalur SS Total shut down,KPR(EHT) load transferred to 110kv Kvlr-ASR feeder II.
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 10:00
POSSIBLE Tue, Sep 26, 2017 10:00
POSSIBLE Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
During the LC period there will be no supply in the entire feeder. EE/O/PSQ has also programmed on Line LC and Breaker.
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
110 KV Capacitor Bank I will be in service
Approval by SE Operation
During the LC period the feeder will be radial from other end. Hence no interruption to any SS.
During above period of shut down 1)110KV Krishnapuram feeder tie will be opened at Perambalur SS. 2)The remaining loads will be fed Through Auto Transfermer I(100MVA) of Perambalur Auto SS.
During the LC period, Palani SS is availing total shutdown and the feeder will be radial from SBT upto S.V.Patti and radial from other end upto Pappampatti SS. Hence no interruption to any SS.
During the Lc period 110KV Malco II & III feeders will be in service.
Possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
NO SS WILL BE AFECTED possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
During the period of L/C time, 110 KV Thandrampet SS availing total S/D. Hence there is no interruption of supply please.
No interruption to any SS. The 110KV Manalmedu SS proposed to shutdown.
Both End Monthly maintenance works
110KV Nambiyur SS will be fed from 230KV Gobi(SS).Previously 110 KVLR-Nambiyur # LC was applied on 05.09.2017, but 230KV Gobi SS applied LC on 110KV Gobi Bhavanisagar Feeder (110kV Nambiyur SS fed from 110kV Gobi-Bhavanisagar #)on 05.08.17 So, LC date for 110kV KVLR-Nambiyur # is changed to 26.09.2017
During the LC period no interruption of supply to any other SS.
Other end availing total shutdown on that day
POSSIBLE Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
During the LC period,1) 110 KV Punalkulam - Trichy feeder will be radial from Trichy 230 KV SS upto Punalkulam 110 KV Grid SS,2) Punalkulam 110 KV Grid SS & Veeramarasanpettai 110 KV SS will avail shutdown on the same day,3) other end (i.e. Punalkulam 110 KV Grid SS) also will avail LC on the same day,4) all other 110 KV feeders will be in tied condition,5) no supply interruption to any SS.
During the period of shutdown, The above feeder will be radially fed from other end.
110KV Deviakurichy - Singipuram feeder- I will be kept radial from Singipuram 230KV SS end.
230KV Link-I feeder LC will be availed at both ends. 3Nos 230KV feeder will be in service. There will be no interruption to any SS or Feeder.
During the LC period, a) 230KV Alundur - Alagarkoil feeder both end availing Total Shutdown. b) All other 230 KV feeder's will be in service. c) There will be no interruption of supply to any other feeders & ss.
possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 10:00
Possible Tue, Sep 26, 2017 9:00
DEPENDING UPON LOAD CONDITION
DEPENDING UPON LOAD CONDITION
During the period of LC i. 230KV Thiruvalam – Mosur feeder Breakers both end will be in “ OFF†condition at 230KV �Thiruvalam & 230KV Mosur SS. ii. All other 230 KV feeders 230KV Link I, Link II, Chittoor feeders are in service.Hence there will be no interruption of supply please.
Concarance obtained from half an hour supply interruption from TCPL Feeder I ,II ,OPG, HITECH,TLSION,AEE/Gummidipoondi AEE/ O&M /panjetty
During the period of LCi. 110 KV Arani - Kanamangalam feeder line LC in between from 110 KV Kilpalipet and 110 KV Thorapadi SS. ii. The 110KV Kilpallipet SS & 10KV Sathumadurai SS are availing total shutdown.Hence there will be no interruption of supply please.
possible Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 8:00
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
DURING THE LC PERIOD,1) SAMALPATTI RAILWAY # I HAND TRIP CONDITION AT SINGARAPET SS END2) THE SAMALPATTI RAILWAY TRACTION LOAD FED FROM 110 KV SAMALPATTI RAILWAY # II3) HENCE, THERE IS NO INTERRUPTION OF SUPPLY
DURING THE LC PERIOD,RASTHA SS WILL BE RADIALLY FED FROM KAYATHAR
NOT POSSIBLE
(a) During the LC Period 110 KV Perumal Patti SS will be radially fed from 110 KV Kayathar SS and 110 KV Mudangiar SS & Seithur SS will be under Total shut down (b) During the LC period 110 KV Sangarankoil SS will be radially fed from 110 KV Kayathar SS. Hence no ss will be affected.
During the LC period, the other end also availing LC on the same date. Hence no ss will be affected.
During the LC period, there will be no supply on the above feeder. Concurrence obtained from M/s Regen power Tech.Paruthiyur.
POSSIBLE Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
During LC period, 1) 110KV Kovilur feeder Line switch towards Trichy 230KV SS will be kept opened at 110KV Kavalkaranpatti SS. 2) 110KV Kovilur feeder Line switch towards Kavalkaranpatti SS will be kept opened at Trichy 230KV SS. 3)110KV Manapparai SS availing total shut down for monthly maintenance works. 4) 110KV Trichy - Kovilur feeder will be radial from 110KV Kovilur SS up to 110KV SS Kavalkaranpatti SS. 5) All other 110KV feeders will be in tied condition. 6) There will be no interruption of supply to any of the intermediate SS. 7) Necessary concurrence obtained from 230 KV Renganathapuram SS.
1. 230KV Salem – KR Thoppur Link-I feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches LC. 4. There will be no interruption to any SS.
All 110 KV and 230 KV feeders are in service condition,
possible Tue, Sep 26, 2017 9:00
Possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
1)T.Gode SS Total shutdown2) Other feeders will cater the load.
During the period of LC i) Auto-Tr-I ,HV-I,LV-I, Auto-Tr-II ,HV-II,LV-II , Auto –Tr-III,HV-III,LV-III, and Auto –Tr-IV,HV-IV,LV-IV, will be in service and cater the SS Loads.ii) The 230KV Mosur feeders will be in ‘OFF’ Conditioniii) The 230KV Chittoor Interstate feeder, 230KV Link-II # , 230KV Link-I # and will be in service and cater the SS Loads. Hence there will be no interruption of supply please.
DURING THE L.C PERIOD,1& 2) NALLUR AND TIRUCHENGODE 110KVSS ALSO PROGRAMMED TO AVAIL L.C ON THAT DAY.3.) SATION LOADS WILL BE CATER BY AUTO TR NO :I
postponed Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 10:00
POSSIBLE Tue, Sep 26, 2017 9:00
During LC period110KV Sendamangalam and Valayapatty SS availing Total Shut down.110KV Rasipuram SS will be back fed through 110KV Salem-Mallur feeder.110KV Namagiripet SS will be back fed through 110KV DVK-Thammampatty feeder.Other 110KV Substations fed by this station will be fed by Auto-I.No supply interruption.
110 KV Papanasam – Servalar –I Feeder will be in service 110 KV isolator towards Papanasam will be kept opened in Servalar and 110 KV isolator towards Servalar will be kept opened in Papanasam. Hence no SS will be affected
During the L.C period, the other end has also proposed LC on the same date and no SS will be affected please.
No SS will be affected.During the LC Period 110KV Manjaneerkayal SS will be fed from 110KV Arumuganeri SS
possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
possible Tue, Sep 26, 2017 9:00
POSSIBLE Tue, Sep 26, 2017 10:00
possible Tue, Sep 26, 2017 9:00
Both end LC applied. possible Tue, Sep 26, 2017 9:00
Tue, Sep 26, 2017 4:00
1).110 KV Tirupur SS and Mudalipalayam SS will be availing total shutdown2).110 KV Kumar Nagar SS will be fed from Ingur 230 KV SS 3). Other 3 Nos Auto Transformers will be in service
1).110 KV Tirupur SS and Mudalipalayam SS will be availing total shutdown2).110 KV Kumar Nagar SS will be fed from Ingur 230 KV SS
NO FEEDERS WILL BE AFFECTED DURING THE LC PERIOD
During the LC Period there will be no supply in the entire feeder and other end also will be applying LC on the same day.No SS affected during the L.C period.
During LC period.1).110KV OKM-NGM 2# kept radial from 110KV NGM SS end 2).No other SS will be affected.
230KV Sriperumbudur -Tharamani # & 230KV KITS -
Tharamani # will be in service.
possible Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 10:00
possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 8:00
During LC period there is no SS will be affected since there is interconnected ss will be fed from other end
DURING THE LC PERIOD THERE WILL BE NO SUPPLY TO ENTIRE FEEDER. OTHER END ALSO LC APPLIED
LC programmed at other end also
(a) During the above LC period, 110 kV LMBPH 1# and 110KV K.R.Thoopur # will be in service. ( 110 KV LMBPH – 2 to K.R.Thoppur feeder now radialy fed from LMBPH – 2, up to KR Thoppur s.s Line side isolator.) (b) Units 1 & 2 will be in service / standby, as per PWD demand. (c) The other end LMBPH –3 applied L.C on that day (27.09.2017)
) During the LC period 1)110KV BPH3-BPH4# and 110KV BPH3-ANTHIYUR# will be in service. 2) Unit I & II will be in service / standby to meet out the PWD Demand. 3) There will be No Loss of Generation during this LC Period.
NO SUPPLY IN THE FEEDER POSSIBLE Wed, Sep 27, 2017 9:00
Wed, Sep 27, 2017 9:00
Possible Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 10:00
No ss will be affected. POSSIBLE Wed, Sep 27, 2017 9:00
Both ends L.C to be availed. Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
Possible Wed, Sep 27, 2017 9:00
During the period of LC, 400/ 110 KV, 200 MVA Auto-Transformer-IV will be in OFF condition. 400/ 110 KV, 200 MVA Auto-Transformer-III will cater the loads of 110 KV Feeders with out interruption.
OCC approved,item No.134th/201
1.During the LC period there will be NO supply on the entire feeder2.All other feeders are in service
During the LC period there will be no Interruption of supply in 230KV and 33KV feeders concurrence obtained from SE/NCES/TIN.
During the LC period there will be no supply in 230KV Kayathar-1 feeder main breaker (204-52) & CT,CVT,LAS. Hence no substation affected.
During the period of LC,All other 4 Nos. 230KV feeders will be in service.Hence no interruption of supply.
POSSIBLE Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
NIL possible Wed, Sep 27, 2017 8:00
possible Wed, Sep 27, 2017 10:00
Possible Wed, Sep 27, 2017 9:00
During LC period there will be no supply in the entire feeder
MONTHLY MAINTENANCE at both ends.
During the LC period the 110 KV DVKT # will be radial upto 110 KV SAKKAVAYAL SS and 110 KV Devakottai SS under TSD. Hence there will be no interruption of supply.
Subject to the wind generation, 1.110KV Pethappampatty # will be kept radial from 230KV Udt SS / 110KV Pnpm # up to kottamagalam ss ,2.Hence No SS will be affected.
Other 230 KV feeders will be in service
possible Wed, Sep 27, 2017 9:00
No generation in PH-2 POSSIBLE Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
Wed, Sep 27, 2017 10:00
During the shutdown period,1) 110KV SSREL # Breaker already in hand trip condition at Singarapet end and radial from Karimangalam 230KV SS.2) Line Isolator towards Singarapet SS will be kept opened at Uthangharai 110KV SS by availing blink in 110KV SSREL feeder from SSREL end and hence no interruption of supply.
During the LC period, Other end also programmed to avail maintenance . No SS will be affected.
SUPPLY TO 110 KV GOBI SS MAY FED FROM 110 KV ANTHIYUR FEEDER BY CLOSING SWITCH AT 110 KV GOBI
400/230 KV ICT#5 315 MVA will be in service via Tie breaker 8(1)52.
OCC approved,item No.134th/200
Possible Wed, Sep 27, 2017 9:00
Possible Wed, Sep 27, 2017 9:00
Wed, Sep 27, 2017 9:00
Wed, Sep 27, 2017 9:00
110 KV Kits park feeder load ( 110 KV Madampakkam SS ) To be transferred to 230 KV SS Kits park
110 KV Kits park feeder load ( 110 KV Madampakkam SS ) To be transferred to 230 KV SS Kits park
During the LC period 1.110KV Kadayanallur SS and 110KV Achanputhur SS Will be radially fed from 230KV Nalamanaickenpatti SS. 2. 110KV Kodikurichi - Kayathar will be radially fed from 230/110 KV KANARPATTY SS.The load of 110kv Kodikurichi - tenkasi - Papanasam # will be transferd to 110KV Kayathar - Papanasam by closing of Bus coupler switch at Rastha and radially upto Line switch of Tenksai feeder 3. The load of 110kv Kodikurichi Wind form feeder will be transferd to 110KV Kayathar - Papanasam by closing of AB switch towards Tenkasi at Kodikurichi Wind from SS, Auto 1 will be out of service, Auto II and Auto III will Carter the ss load 4. 110 KV Bus coupler switch 5089 BC will be kept in open codition 5. Concurrence obtained from SE /Wind farm / Tin for wind Block 6. Hence No SS will be affected.
NOT POSSIBLE
110 KV Capacitor Bank II will be in service
Approval by SE/Operation
postponed Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 10:00
POSSIBLE Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 8:00
Both MTPS II –Thingalur have Programmed for Maintenance work on that day.
230 KV Sadayapalayam-Ponnapuram feeder in service.
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
During the LC period the feeder will be radial from other end upto S.V.Patti SS. Hence no interruption to any SS.
During the Lc period other 110KV feeders and 110KV main bus will be in service
POSSIBLE Wed, Sep 27, 2017 9:00
AKY SS TOTAL S/D possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
postponed Wed, Sep 27, 2017 9:00
1)During LC period 230/110kv Auto Transformer II will be in service and cater station load.2)110kv chinnakkampatty SS avail total shutdown L/R 8.9mw.3)110kv RNPM-SBT I # Radially fed from SBT end.4)110kv RNPM-PGLR # radially fed from pugalur end.Hence no supply interruption to any other SS .
During LC Period, 110 KV Karuppur SS will be avail total shut down.and 110KV Hasthampatty & Kandampatty SS Loads will be fed by 230KVSS salem
During the LC period 110KV Neelagudy SS supply will be fed from 230KV SS Thiruvarur and 110KV Peralam SS & 110KV Perambur SS supply will be fed from 110Kv Grid SS Mayiladuthurai. Hence there will be no interruption of supply to any other SS.
Unit in service, All 400KV and 230KV Feeder are in service except 230KV Thingalur
Possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
Possible Wed, Sep 27, 2017 10:00
POSSIBLE Wed, Sep 27, 2017 8:00
i.During the period of shutdown, Auto Tr.I & II will be in service.ii.During the period of shutdown, 230 KV S.V.Chathram -Sriperumbudur Feeder will be in service.
230 KV STCMS & Valayapatty Feeders will be in service.
During the LC period, a)Other end also availing shut down. and Intermediate 110KV Manikandam SS Also avail total shut down. b) All other 110 KV feeders will be in service c)There will be no interruption of supply to any other feeder's and ss.
Concarance to be obtained from M/S. SANMAR
DURING THE LC PERIOD,1.KARIVALEMVANTHANALLUR WILL BE RADIALLY FED FROM KAYATHAR 2.PERUMALPATTI WILL BE RADIALLY FED FROM K.G.PATTI HENCE NO SS AFFECTED.
POSSIBLE Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
Possible Wed, Sep 27, 2017 9:00
During the LC period, a) other end also availing shutdown for monthly maintenance work b) Intermediate 110 KV Manikandam SS also availing Total shutdown c) All other 110 KV feeders will be in service d) There will be no interruption of supply to any other feeders & SS.
During the LC period, a) other end also availing shutdown for monthly maintenance work b) Intermediate 110 KV Manikandam SS also availing Total shutdown c) All other 110 KV feeders will be in service d) There will be no interruption of supply to any other feeders & SS.
No interruption to any SS. All other feeders will be in tied condition.
1. The 110KV isolator switch at Vettavalam Ss towards Villupuram side will be kept open condition.2. The feeder will be kept radial from T.V.Malai 230KV SS end.3. Vettavalam SS in T.V.Malai # is availing total shutdown.4. Hence no interruption of supply in any SS.
Possible Wed, Sep 27, 2017 9:00
All other feeder in service. Possible Wed, Sep 27, 2017 6:00
POSSIBLE Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
During the period of LC230 KV Bus A and 230 BUS B will be independent. Hence no interruption of supply.
During the LC period Auto Transformer II & III will be in service. Hence there is 'no' interruption in power evacuation
During LC period230KV transfer Bus-A/B will idly charged through Bus Coupler CB and CTs.No supply interruption.
1) The Deviakurichy & Singapuram both 230KV SS availing Breaker, CT’s maintenances work .2) There will be no interruption any other SS.
possible Wed, Sep 27, 2017 9:00
Wed, Sep 27, 2017 9:00
POSSIBLE Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 9:00
DURING THE LC PERIOD MACHINE-1, 2 & 3 ARE IN STANDBY CONDITION AND BOTH 230KV FEEDERS ARE IN SERVICE. PWD DEMAND 700C/S MEET OUT THROUGH DAM PH MACHINES.
During the LC period, the other end has also proposed LC on the same date and no other SS will be affected please.
During LC period 1). Other 3 Nos 230 KV Feeders will be in service2).No other SS will be affected
NO FEEDERS WILL BE AFFECTED DURING THE LC PERIOD
During LC period.1).110KV S.N.Palayam and 110KV Kuniyamuthur under total Shut down2).Remaining Auto Tr.1 and 3 will be catter the SS Loads.3)No SS will be affected
POSSIBLE Wed, Sep 27, 2017 9:00
possible Wed, Sep 27, 2017 8:00
LC applied. possible Wed, Sep 27, 2017 9:00
Possible Wed, Sep 27, 2017 9:00
Idly charged feeder possible Wed, Sep 27, 2017 10:00postponed Thu, Sep 28, 2017 8:00
POSSIBLE Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
1) During the LC period there will be NO supply in this feeder. 2) Other end also avail LC on same day. 3) Concurrence obtained from SE/NCES/TIN.
SF6 breaker open condition, MODS are open condition
110KV Kadapperi - S.Pkoil # and 110KV Korttur-Kadapperi I #
radial from other end.
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
During the LC period 110 KV SR Puthur - KDR I feeder will be radial from SRP upto PPI SS (incl) .Hence no ss will be affected.
During the LC period, the remaining 2X24 MVAR Capacitor Banks will be in service.
Keeranatham SS will be under TSD & TDLR II feeder will be fed radially from TDLR end
POSSIBLE Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 10:00
No generation in PH-1 POSSIBLE Thu, Sep 28, 2017 9:00
SINCE BOTH ENDS LC TO BE AVAILED NO SUPPLY IN THE FEEDER.
PUDUKKOTTAI 230 KV SS LOADS WILL BE MAINTAINED FROM 230 KV ALUNDHUR FEEDER AND HENCE THERE WILL BE NO INTERUPTION OF SUPPLY TO ANY SS.
During the LC period the feeder Radial from Kayathar up to Line side AB Switch at Periyar end. NO SS will be affected.
During the LC period there will be no supply in 230KV kayathar-2 feeder Main breaker (205-52) & CT,CVT. Hence no substation affected.
NOT POSSIBLE
All the 230 KV feeders fed through A-Bus
1.230KV Grid #, Hence No SS will be affected,2.230KV Myvadi SS will also avail LC at their end.
POSSIBLE Thu, Sep 28, 2017 10:00
possible Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 10:00
POSSIBLE Thu, Sep 28, 2017 9:00
During the above Shutdown Period, 110KV Vengaimandalam SS is also availing total shutdown on that same day. 1) Back feeding to 110 KV Musiri # will be made thro' 110 KV Valayapatty - Thotiiyam # at 230KV Valayapatty SS. and supply will be extended upto 110KV Vengaimandalam SS. 2) 110 KV Musiri # Breaker at 230 KV SMPM SS will be in H/T condition Bus and line isolator towards 110KV Vengaimandalam SS is Kept opened and earth switch closed . 3) At 110KV vengaimandalam SS towards 230KV Samayapuram SS Isolator is kept in open condition and Earth switch closed condition. 4)Informed & necessary concurence obtained from EE/O/VALAYAPATTY. 5)There will be interruption to M/s. Arise EHT SC during switching Operations and necessary concurence obtained and there is no interupation to any other During the shutdown period110 KV Capacitor bank II breaker will be in off condition
The 230 feeder loads & Auto loads will be transferred from 230 KV Bus B to 230 KV Bus A before LC,. Hence No interruption of supply. After completion of work 230 KV B Bus will be Kept in stand by.
EE / O / Kinnimangalam has also programmed
possible Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
Thu, Sep 28, 2017 9:00
Thu, Sep 28, 2017 10:00
POSSIBLE Thu, Sep 28, 2017 9:00
SUBJECT TO THE LOAD CONDITION OF 110 KV BHAVANISAGAR FEEDR AND 110 KV PERIYAKODIVERY FEEDER
During the LC period, Supply will be radial from Gobi end upto T.N.palayam SS.No SS will be affected.
1.110 KV Echantha SS Load will be transferred through 110 KV Veerasigamani II to Nalamanaickanpatti # by closing of AB Switch towards veersigamani at Echantha SS.2. 110 KV Kodikurichi - Veerasigamani II # will be tied with 110 KV Nalamanaickanpatti SS by closing of AB Switch at Nalamanaickanpatti SS towards 230 KV Nalamanaickanpatti SS.3.110 KV Bus coupler switch 5089 BC will be in open condition.4.Hence no SS Will affected.
NOT POSSIBLE
110KV KEELAVEERANAM SS AND 110KV SURANDAI SS WILL BE FEED THROUGH 110KV UTHUMALI FEEDER VIA SURANDAI FEEDER AT 110KV UTHUMALI SS. NO SS AFFECTED
NOT POSSIBLE
During the LC period there will be no supply in the entire feeder. EE/O/PSQ has also programmed on Line LC and Breaker.
POSSIBLE Thu, Sep 28, 2017 10:00
Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
Radially fed from other end. possible Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
Idle Breaker.There will be no interruption to the Consumer
During the LC period, other end also avails LC and there will be no supply in the entire line. Hence no ss affected
NOT POSSIBLE
During LC period the TBC breaker is in standby condition
Both End Monthly maintenance works
During the LC period 230KV BUS - I will be in service. Hence there will be no interruption of supply to any other SS.
During the LC period all other 230Kv feeders are in tied condition. Hence there will be no interruption of supply to any other SS.
During the LC period,1) other end (i.e. Lines wing / Thiruvarur) also will avail LC on the same day, 2) all other 230 KV feeders will be in tied condition,3) no supply interruption to any SS.
possible Thu, Sep 28, 2017 8:00
possible Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
1.Both End Breaker Open Condition.2.Both End Bus & Line Mods Open Condition.3.Both End Earth Switch Closed Condition.
Unit in Service, all 400KV and 230KV feeder are in service Except 230KV Thingalur feeder
230KV Link-II feeder LC will be availed at both ends. 3Nos 230KV feeder will be in service. There will be no interruption to any SS or Feeder.
During the LC period, a)An Other 100 MVA Auto Transformer -I will be in service. b) All 110 KV feeders will be in service. c) There will be no interruption of supply to any other feeders.
DURING THE LC PERIOD,1) SAMALPATTI RAILWAY # II HAND TRIP CONDITION AT SINGARAPET SS END2) THE SAMALPATTI RAILWAY TRACTION LOAD FED FROM 110 KV SAMALPATTI RAILWAY # I3) HENCE, THERE IS NO INTERRUPTION OF SUPPLY
possible Thu, Sep 28, 2017 9:00
All feeders are in service Possible Thu, Sep 28, 2017 9:00
Possible Thu, Sep 28, 2017 8:00
Other feeder will cater the load possible Thu, Sep 28, 2017 9:00
POSSIBLE Thu, Sep 28, 2017 9:00
possible Thu, Sep 28, 2017 9:00
Thu, Sep 28, 2017 9:00
Thu, Sep 28, 2017 10:00
POSSIBLE Thu, Sep 28, 2017 10:00
POSSIBLE Thu, Sep 28, 2017 9:00
1. 230KV Salem - KR Thoppur Link-II feeder breakers kept hand tripped at both ends. 2. Bus and line switches kept opened at both ends. 3. Both ends are availing breaker and line switches LC. 4. There will be no interruption to any SS.
The 110 KV Korattur-Sembium I feeder fed from 110 KV Korattur-Sembium II feeder
During the LC period 230KV Valuthur - Karaikudi and Alagarkovil feeders will be in service. Hence, there is
The pwd demand will be met out by other standby machines at Dam Power House.
Present PWD demand is 250C/s. During the LC period, the respective feeder will be radial from other end. Hence No SS will be affected.
No SS will be affected. During this above LC period all 110KV feeders will be fed from 230KV Sipcot SS & 110 KV Arni SS
possible Thu, Sep 28, 2017 9:00
Both end LC applied. possible Thu, Sep 28, 2017 9:00
Possible Fri, Sep 29, 2017 8:00
Possible Fri, Sep 29, 2017 4:00
Possible Sat, Sep 30, 2017 9:00
possible Sat, Sep 30, 2017 9:00
During LC period 1). All 4 Nos 230 KV feeders will be in service2). All 4 Nos Auto Transformers will be in service
The 110 KV Korattur-Sembium II feeder fed from 110 KV Korattur-Sembium I feeder
230KV Kalivanthapattu -Tharamani # & 230KV KITS -
Tharamani # will be in service.
Other 230 KV feeders will be in service
During LC period 1). Load relief expected due to pooja holidays2). 110 KV Mudalipalayam SS will be fed from 230 KV Ingur SS3).Auto Transformer III will be subsitituted with TBC through Transfer bus4). Auto transformer I will be inservice5). 230 KV OKM # and PGCIL # will be in service6). 230 Sadayapalayam #, Auto transformer II and IV will be hand tripped
TAMIL NADU TRANSMISSION CORPORATION LIMITEDConsolidation of LC for the month of September 2017 at 8th TNSOCC Meeting
Transmission Lines / Elements DetailsTo date To time Remarks SE Approval
Fri, Sep 1, 2017 17:00 1
Fri, Sep 1, 2017 14:00 1 SUb Somanur TSD
Fri, Sep 1, 2017 16:00 1
Fri, Sep 1, 2017 14:00 1
Fri, Sep 1, 2017 17:00 1
Fri, Sep 1, 2017 17:00 1 Approved
No. of days
Sub to Auto load after Somanur TSD
Approved Subject to total shutdown
Approved Subject to total shutdown
Sub to Kallimadai TSD, KPR EHT & Sulur traction trf to Arasur
Approved Subject to total shutdown
Subject to wind generation
Sub to WInd generation
Approved Subject to wind Generation
Approved in 134 th OCC vide Sl. No 88
Fri, Sep 1, 2017 14:00 1 Approved
Fri, Sep 1, 2017 14:00 1 Sub to #1 loading Approved
Fri, Sep 1, 2017 17:00 1
Fri, Sep 1, 2017 17:00 1 REPEAT Cancelled
Fri, Sep 1, 2017 17:00 1 REPEAT Cancelled
Fri, Sep 1, 2017 17:00 1 Approved
Fri, Sep 1, 2017 14:00 1 Approved
Fri, Sep 1, 2017 13:00 1
All loads will be fed through any one of the 230 KV Bus
SUB TO WIND GEN AND GRID CONDITION
Approved Subject to wind Generation
Already breaker defect at MTPS 2
SUB TO TOTAL S/D
Approved Subject to Total shutdown
Fri, Sep 1, 2017 17:00 1 Approved
Fri, Sep 1, 2017 17:00 1 Approved
Fri, Sep 1, 2017 17:00 1 wrong entry Cancelled
Fri, Sep 1, 2017 17:00 1 wrong entry Cancelled
Fri, Sep 1, 2017 17:00 1 wrong entry Cancelled
SUB TO LOAD CONDITION
SUB TO LOAD CONDITON
Fri, Sep 1, 2017 17:00 1 Sub to #2 loading Approved
Fri, Sep 1, 2017 14:00 1 Approved
Fri, Sep 1, 2017 17:00 1 Approved
Fri, Sep 1, 2017 17:00 1 Approved
Sat, Sep 2, 2017 14:00 1 Approved
Sat, Sep 2, 2017 17:00 1 Cancelled
Sat, Sep 2, 2017 17:00 1 Approved
Sat, Sep 2, 2017 17:00 1 Cancelled
Sat, Sep 2, 2017 17:00 1 Cancelled
Sub to 230 KV OKM-Myvadi # loading
LC MAY BE PROGRAMMED ALONG WITH MMTC ON 01.09.2017
Approved in 134th OCC vide Sl No. 90
Subject to CBD Concurrence
Sat, Sep 2, 2017 17:00 1 Cancelled
Sat, Sep 2, 2017 17:00 1 Approved
Sat, Sep 2, 2017 13:00 1 Approval by CBD Approved
Sat, Sep 2, 2017 18:00 1
Sun, Sep 3, 2017 14:00 1
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved Subject to wind Generation
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved Subject to wind Generation
Sun, Sep 3, 2017 17:00 1 Approved
Sun, Sep 3, 2017 17:00 1 Approved
Sun, Sep 3, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 5 Approved
Sun, Sep 3, 2017 17:00 1 Approved
Sun, Sep 3, 2017 7:00 1 Approved
Subject to concurrence from EHT Consumers
LC requested 06/09/2017 but OCC approved on 03/09/2017
Inter loads fed from BBi
5 Days LC for 87 GT relay replacement & Main Exciter armature turning work
Sun, Sep 3, 2017 17:00 1 Approved
Sun, Sep 3, 2017 18:00 1 Approved
Sun, Sep 3, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Unit 3 under COH Postponed
Mon, Sep 4, 2017 14:00 1 Approved
Mon, Sep 4, 2017 14:00 1 Postponed
Mon, Sep 4, 2017 17:00 1 Approved
TDLR GC loads fed through Karamadai #1 and Arasur & Karamadai #2 loads fed from other end
Sub to inflow and grid condition
Inter loads fed from Karamadai
DUE TO WIND GEN
Sub to load condition
Mon, Sep 4, 2017 17:00 1
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 13:00 1
Mon, Sep 4, 2017 14:00 1
Mon, Sep 4, 2017 17:00 1 Approved
SUB TO TOTAL S/D OF ANANDUR
Approved Subject to total shutdown
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved Subject to wind Generation
Approved Subject to load condition
SUB TO LOAD CONDITION.
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1
Mon, Sep 4, 2017 17:00 1
SUB TO LOAD CONDITION.
Sub to Kundah generation
SUB TO WIND GEN AND LOAD CONDITION.
Approved Subject to wind Generation
SUB TO LOAD CONDITION AND WIND GEN
Approved Subject to wind Generation
Mon, Sep 4, 2017 15:00 1 Approved
Mon, Sep 4, 2017 15:00 1 Cancelled
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 14:00 1 Approved
Mon, Sep 4, 2017 17:00 1
Sub to load condition
Inter loads fed from Karimangalam
Sub to load condition
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND LOAD CONDITION.
Approved Subject to wind Generation
Mon, Sep 4, 2017 15:00 1 Cancelled
Mon, Sep 4, 2017 16:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 5 Long LC Approved
Sub to Kadamparai Gen/Punp
Approved in 134th OCC vide Sl No. 108
Thoppur & Bommidi traction loads fed from SNPT110
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Postponed
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Subject to voltage Approved
Sub to load condition
DUE TO WIND GEN
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Mon, Sep 4, 2017 16:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Subject to voltage Approved
Mon, Sep 4, 2017 16:00 1 Postponed
Uthukuli ss loads will be transfered to PLDM 230
ALREADY UNDER LC
programmed after wind season
Wed, Sep 6, 2017 18:00 3 Postponedprogrammed after wind season
Wed, Sep 6, 2017 18:00 3 Approved
Fri, Sep 8, 2017 17:00 5 Postponed
RECOMMENDATION SENT ON 22.08.2017
programmed after wind season
Sat, Sep 9, 2017 17:00 6 Postponed
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 WRONG ENTRY Cancelled
programmed after wind season
To be mention the condition clearly
auto loads with in limit
Mon, Sep 4, 2017 17:00 1 Postponed
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
Mon, Sep 4, 2017 17:00 1 Approved
DUE TO WIND GEN
SUB TO LOAD CONDITION.
Sub to Palladam110 trf to Arasur
Inter loads fed from both ends and sub to #1 loading
Thu, Sep 7, 2017 17:00 4 Postponed
Mon, Sep 4, 2017 17:00 1 Approved
Tue, Sep 5, 2017 13:00 1 Approved
Tue, Sep 5, 2017 15:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
22 Days daily LC , May programmed after wind season over
Sub to load condition
Approved in 134th OCC vide Sl. No. 97
SUB TO LOAD CONDITION.
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
APPD IN 134 OCC VIDE ITEM NO.114
APPD IN 134 OCC VIDE ITEM NO.114
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
SUB TO LOAD CONDITION AND TOTAL S/D.
Conditions to be mentioned clearly
SUB TO LOAD CONDITION.
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 15:00 1 Approved
SUB TO LOAD CONDITION AND NEY ICT LOADING
Inter loads fed from DKY
110 KV Gobi - Bhavanisagar # and Bhavanisagar110 bus LC recommended
Subject to EE/SLDC/Erode Concurrence
Sub to load condition
SUB TO LOAD CONDITION.
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 13:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Postponed
Tue, Sep 5, 2017 17:00 1 Approved
Sub to load condition
SUB TO WIND GEN AND LOAD CONDITION.
DUE TO WIND GEN
SUB TO LOAD CONDITION.
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Other #s will cater the load
Bhavanisagar110 & Karatupalayam TSD, Nambiyur trf to Karuvalur
SUB TO LOAD CONDITION AND SUB TO AVIYUR TOTAL S/D
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 14:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO WIND GEN. APPD IN 134 OCC VIDE ITEM NO.112
110 KV Gobi - Bhavanisagar # and Bhavanisagar110 bus LC recommended
Subject to EE/SLDC/Erode Concurrence
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Postponed
Tue, Sep 5, 2017 17:00 1
SUB TO LOAD CONDITION.
Sub to 230 KV DKY-TAQA # rie condition
Power Trf 2 under outage
SUB TO LOAD CONDITION AND TOTAL S/D
Approved Subject to total shutdown
Tue, Sep 5, 2017 17:00 1 REPEAT Cancelled
Tue, Sep 5, 2017 16:00 1 Approved
Tue, Sep 5, 2017 16:00 1 Approved
Tue, Sep 5, 2017 16:00 1 Approved
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Inter loads fed from Ingur
230 KV KRT # will cater the load
Tue, Sep 5, 2017 17:00 1
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 16:00 1
SUB TO LOAD CONDITION AND TOTAL S/D
Approved Subject to total shutdown
SUB TO LOAD CONDITION AND TOTAL S/D
To be scheduled with SIPCOT& PeriyandipalayamTSD ( since 110 KV Palladam - SIPCOT 2 # will be over load)
Subject to EE/SLDC/Erode Concurrence
Tue, Sep 5, 2017 6:00 1 Approved
Tue, Sep 5, 2017 13:00 1 Postponed
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 12:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 16:00 1 Approved
Bhavanisagar 110 TSD
DUE TO WIND GEN
SUB TO LOAD CONDITION.
Sub to load condition
SUB TO LOAD CONDITION AND NEY ICT LOADING
Tue, Sep 5, 2017 17:00 1
Tue, Sep 5, 2017 17:00 1 Approved
SUB TO LOAD CONDITION AND ERODE/SLDC CONCURRENCE
Subject to EE/SLDC/Erode Concurrence
SUB TO LOAD CONDITION.
Tue, Sep 5, 2017 14:00 1 ApprovedSUB TO LOAD CONDITION
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Cancelled
Tue, Sep 5, 2017 16:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 idle charged line Approved
Tue, Sep 5, 2017 16:00 1 Cancelled
Tue, Sep 5, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 17:00 2 Cancelled
Tue, Sep 5, 2017 17:00 1 idle charged line Approved
Tue, Sep 5, 2017 15:00 1 ApprovedSUB TO LOAD CONDITION AND CONCURRENCE FROM CNI
Tue, Sep 5, 2017 18:00 1 Approved
Tue, Sep 5, 2017 17:00 1 REPEAT Cancelled
Tue, Sep 5, 2017 17:00 1 WRONG ENTRY Cancelled
Tue, Sep 5, 2017 17:00 1 WRONG ENTRY Cancelled
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 14:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
# will kept radial from Gobi 230kv ss up to BSR 110kv ss
Sub to grid voltage
Inter loads fed from TDLR
Sub to KPH 4 generation
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 17:00 1 Approved
Tue, Sep 5, 2017 8:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 16:00 1 approved
Wed, Sep 6, 2017 14:00 1 Postponed
Sub to load condition
SUB TO WIND GEN AND LOAD CONDITION.
Approved Subject to wind Generation
Sub to Kadamparai gen/pump
Sub to KPH 4 generation
DUE TO WIND GEN
Wed, Sep 6, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 17:00 1
Wed, Sep 6, 2017 17:00 1 Approved
Sulur and Neelambur ss TSD, other auto's will cater the load
Sulur ss TSD, Poomalur and Thirunagar ss will transfer to 110kv ASR-karuvalur#1
SUB TO WIND GEN AND GRID CONDITION.
Approved Subject to wind Generation
subject to load condition for Jumper tightness checking at T.LOC No:524 & 525 River Crossing Towers
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
SRLDC/BLR may be addressed .ICT 1&2 will be in service to cater the load. (OCC approved 134 th OCC / 124)
SUB TO LOAD CONDITION.
BPH 1 bus LC recommended vide p id no: 60301
SUB TO KKDI AUTO LOADING
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1
Wed, Sep 6, 2017 13:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 15:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
110kv Kurukathi - Ponnapuram #1 section LC recommended
Subject to wind generation
SUB TO LOAD CONDITION.
other feeders will be in service to cater the load
Auto 1&2 load with in limit
# 2 will cater the load ( OCC approval to be obtained)
SUB TO WIND GEN AND LOAD CONDITION.
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Sun, Sep 10, 2017 18:00 5 Approved
Wed, Sep 6, 2017 16:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
LONG LC NOTE TO BE PUT UP.
230kv Aliyar - UDPT # will be in service to cater the load
1) Bagalur Minnager and Nariganapuram SS TSD 2) 230kv HSR - MTR# will be in service to cater the load (134th OCC/Sl.no: 103)
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 16:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Bus A under idle charge condition, Bus B in service
Auto 1 will be in service to cater the load, BPH 1 Bus LC recommended
Wed, Sep 6, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 13:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Postponed
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 subject to voltage Approved
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
DUE TO WIND GEN
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Wed, Sep 6, 2017 17:00 1
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 13:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 15:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
DUE TO LOAD CONDITION. LC MAY BE PROGRAMMED WITH MORE TOTAL S/D
Approved Subject to total shutdown
feeder will kept radial from TNGLR 230 end
SUB TO LOAD CONDITION.
feeder will kept radial from Arni 230 end
Wed, Sep 6, 2017 13:00 1 Approved
Wed, Sep 6, 2017 15:00 1 Cancelled
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 13:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 15:00 1 Approved
subject to bus voltage
Wed, Sep 6, 2017 18:00 1 Cancelled
Wed, Sep 6, 2017 16:00 1
Wed, Sep 6, 2017 17:00 1
Wed, Sep 6, 2017 17:00 1 Approved
DUE TO LOAD CONDITION. LC MAY BE PROGRAMMED WITH MORE TOTAL S/D
Approved Subject to total shutdown
CONDITION NOT MENTIONED
Subject to EE/SLDC/Madurai Concurrence
SUB TO LOAD CONDITION.APPD IN 134 OCC VIDE ITEM NO.102
Wed, Sep 6, 2017 17:00 1
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
SUB TO CONCURRENCE FROM ERODE/SLDC
Approved Subject to load condition
idle charged line section
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
1) Already in hand tripped condition 2) already in Hand tripped condition 3) # will kept radial from Nallur ss and Namakkal loads transfer to Valayapatty ss 3) Sendamangalam loads transfer to Valayapatty ss
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 14:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Postponed
Wed, Sep 6, 2017 18:00 1 Approved
subject to bus voltage
subject to bus voltage
SUB TO LOAD CONDITION.
Sub. to Mettur demand
DUE TO WIND GEN. THIS LC APPD IN OCC ON 12.09.2017
feeder kept both end radial, TLC work for LILO to Rasipalayam ss
Wed, Sep 6, 2017 22:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Cancelled
Wed, Sep 6, 2017 17:00 1
other feeders will cater the load,230kv bus bar protection kept off at TDLR
subject to EE/SLDC/Erode Concurrence
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 13:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 12:00 1
Mettur demand 700c/s, let out through barrage gate, Unit 1&2 under standby condition
# 1 & 2, will be in service to cater the load
# 2 &3 , will be in service to cater the load
Approval by SE/operation
Wed, Sep 6, 2017 8:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 17 Hrs 1 Approved
Wed, Sep 6, 2017 17.00 1 Approved
Wed, Sep 6, 2017 10:00 1 Approved
Wed, Sep 6, 2017 17:00 1 Approved
Wed, Sep 6, 2017 16:00 1 Approved
Wed, Sep 6, 2017 17:00 1 approved
subject to replacement of CT's at PSI 230 end lc recommended on 06.09.2017
BPH 1 bus LC recommended on 06.09.2017
Fri, Sep 8, 2017 18:00 3
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 15:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Postponed
Thu, Sep 7, 2017 16:00 1 Peelamedu ss TSD Approved
Approved Subject to Grid condition
Mettur demand 700c/s will met by other units
Auto 1,3 &4 will be in service
DUE TO WIND GEN
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Postponed
Thu, Sep 7, 2017 14:00 1 Postponed
Thu, Sep 7, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.APPD IN 134 OCC VIDE ITEM NO.107
DUE TO WIND GEN. APPD IN 134 OCC VIDE ITEM NO.127
SUB TO WIND GEN AND LOAD CONDITION.
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
SUB TO TTPS 3 M/C CONDITION
SUB TO LOAD CONDITION.
subject to Mettur demand
Thu, Sep 7, 2017 17:00 1
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Cancelled
Thu, Sep 7, 2017 13:00 1 Approved
to be scheduled during any one ss TSD
subject to EE/SLDC/Erode Concurrence
Subject to the wind generation, 1.Thungavi SS G.C-II will be transferred to 230KV Udt SS / 110KV Poolavadi # 2. 110KV Ingur-I & II will be kept radial from other end
subject to Kundah ph 4 generation
SUB TO LOAD CONDITION.
Thu, Sep 7, 2017 14:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Postponed
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 14:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
other feeders will be in service to cater the load
DUE TO WIND GEN
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
# will kept radial from Anthiyur230
Thu, Sep 7, 2017 14:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND LOAD CONDITION.
Thu, Sep 7, 2017 16:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 15:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 14:00 1 Approved
SUB TO LOAD CONDITION AND TOTAL S/D
SUB TO LOAD CONDITION.
subject to load condition
SUB TO LOAD CONDITION.
Thu, Sep 7, 2017 13:00 1 Approved
Thu, Sep 7, 2017 16:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Cancelled
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 14:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION AND TOTAL S/D
feeder entire LC, Ramiyanahally, Papperettipatty and Harur ss loads fed from SNPT230
SUB TO LOAD CONDITION.
# 2 will be in service to cater the load
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 16:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
subject to load condition
SUB TO LOAD CONDITION.
subject to load condition
subject to load condition
SUB TO LOAD CONDITION AND TOTAL S/D
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 13:00 1 Approved
Thu, Sep 7, 2017 13:00 1 Cancelled
Mon, Sep 11, 2017 9:00 5 Approved
Thu, Sep 7, 2017 15:00 1 Approved
RCC structure renovation work
SUB TO LOAD CONDITION.
LONG LC NOTE TO BE PUT UP
Thu, Sep 7, 2017 16:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Cancelled
SUB TO LOAD CONDITION AND TOTAL S/D
SUB TO TOTAL S/D
Thu, Sep 7, 2017 19:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 10:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
CT replacement work, Namakkal loads transfered to Valayapatty 230
# kept both end radial
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Cancelled
Thu, Sep 7, 2017 18:00 1 Approved
Thu, Sep 7, 2017 14:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO TTPS 3 M/C CONDITION
Auto 1&2 will be in service
# 2 loads will be transfer to #1
110kv Kurukkathi - Ingur #1 and 110kv Kurukkathi - PPM # 1 will kept in tied condition
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 17:00 1 Approved
Thu, Sep 7, 2017 14:00 1 Approved
Fri, Sep 8, 2017 17:00 1 approved
Fri, Sep 8, 2017 17:00 1 Approved
subject to load condition
230kv Kurukathi - PLDM# LC recommended, 110kv Kurukkathi - Ingur #1 and 110kv Kurukkathi - PPM # 1 will kept in tied condition
subject to kadamparai ph generation
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 16:00 1 Approved
Sub to load condition
Sub to wind generation
Fri, Sep 8, 2017 17:00 1 Postponed
Fri, Sep 8, 2017 16:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 13:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 14:00 1
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
DUE TO WIND GEN
Sub to 230 KV OKM-TDLR # loading
#1 will cater the load
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION.
Approved Subject to wind Generation
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 13:00 1 Approved
Fri, Sep 8, 2017 15:00 1 Approved
Fri, Sep 8, 2017 14:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 13:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Sub to wind generation
230 KV MTPS1 # will cater the load
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND LOAD CONDITION.
230 KV MTR # will be in service
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 14:00 1 Approved
Fri, Sep 8, 2017 14:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Postponed
Fri, Sep 8, 2017 14:00 1 Approved
other #s will cater the load
LONG LC FROM 7.9.17 TO 11.9.17
Kempatty & Uddanapally TSD and 230 KV Soolagiri # will cater the load
DUE TO WIND GEN
Poolankinar TSD and #2 will cater the load
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Postponed
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
Other #s will cater the load
Power Trf 2 under outage
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
#1 will cater the load
SUB TO WIND GEN AND LOAD CONDITION.
Vellichandai & Pennagaram TSD
SUB TO LOAD CONDITION.
Sub to inter loads fed from Vilupuram
Fri, Sep 8, 2017 17:00 1 WRONG ENTRY Cancelled
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 13:00 1 Approval by CBD Approved
Fri, Sep 8, 2017 16:00 1
Sub to load condition
DUE TO LOAD CONDITION. PROGRAMMED ALONG WITH TOTAL S/D
Approved Subject to total shutdown
SUB TO LOAD CONDITION.
DUE TO LOAD CONDITION. PROGRAMMED ALONG WITH TOTAL S/D
Approved Subject to total shutdown
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 14:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 17:00 1 WRONG ENTRY Cancelled
Fri, Sep 8, 2017 17:00 1 Postponed
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 12:00 1 Postponed
Sub to 230 KV DKY-TAQA # tie condition
Sub to Grid voltage
SUB TO LOAD CONDITION.
DUE TO WIND GEN
SUB TO LOAD CONDITION.
DUE TO WIND GEN
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 15:00 1 Postponed
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 11:00 1 Approved
Fri, Sep 8, 2017 14:00 1 Approved
Fri, Sep 8, 2017 17:00 1 Approved
Fri, Sep 8, 2017 12:00 1 Approved
Fri, Sep 8, 2017 14:00 1 Approved
Sub to 230 KV OKM-TDLR # loading
DUE TO WIND GEN.
Sub to load condition
Inter loads fed from Ingur
Inter loads fed from Ingur
Sub to wind generation
Fri, Sep 8, 2017 17.00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
SUB TO WIND GEN.CONCURRENCE FROM SE/NCES/TIN
SUB TO WIND GEN
SUB TO LOAD CONDITION
Sub to 230 KV DKY-TAQA # tie
Sub to 230 KV DKY-TAQA # tie
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 16:00 1 Cancelled
Sat, Sep 9, 2017 14:00 1 Approved
Sat, Sep 9, 2017 16:00 1 Approved
Sat, Sep 9, 2017 13:00 1 Approved
Sub to 230 KV DKY-TAQA # tie
Suriyampalayam TSD and SWTP water works fed from BPH4
Sub to Mettukadai TSD
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Approved
Sat, Sep 9, 2017 17:00 1 Cancelled
Sun, Sep 10, 2017 17:00 1 Approved
Sun, Sep 10, 2017 13:00 1
Sun, Sep 10, 2017 13:00 1
Sun, Sep 10, 2017 12:00 1 Approved
Approval by CBD
Approval by CBD
Sun, Sep 10, 2017 9:00 1 Approved
Sun, Sep 10, 2017 17 Hrs 1 Approved
Sun, Sep 10, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Subject to voltage Approved
Mon, Sep 11, 2017 14:00 1 Postponed
Mon, Sep 11, 2017 17:00 1 Cancelled
Mon, Sep 11, 2017 16:00 1 Cancelled
Mon, Sep 11, 2017 17:00 1 Approved
Preponed to 10.9.17
#1 will kept radial form Udpt110, # 2 will be in tied condition
DUE TO WIND GEN
SUB TO LOAD CONDITION AND TOTAL S/D
Mon, Sep 11, 2017 14:00 1
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Approved Subject to wind Generation
SUB TO NORMALIZATION OF 230KV PGLR-RNPM # BKR AT PGLR
SUB TO WIND GEN AND LOAD CONDITION.
other auto's in service to cater the load
SUB TO WIND GEN AND LOAD CONDITION.
Mon, Sep 11, 2017 17:00 1 Postponed
Mon, Sep 11, 2017 16:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 16:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
DUE TO WIND GEN
subject to Aliyar ph generation
SUB TO NORMALIZATION OF 230KV PGLR-RNPM # BKR AT PGLR
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1
Mon, Sep 11, 2017 17:00 1
all the loads will be transfered to BUS B
SUB TO WIND GEN AND LOAD CONDITION.
DUE TO LOAD CONDITION AND LC MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Approved Subject to total shutdown
DUE TO LOAD CONDITION AND LC MAY BE PROGRAMMED ALONG WITH TOTAL S/D
Approved Subject to total shutdown
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Postponed
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
# will kept radial from Singapuram230
110kv PLDM-SipcotII # LC recommended P id no: 60243
SUB TO TOTAL S/D
SUB TO APPROVAL OF LONG LC
Mon, Sep 11, 2017 14:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
Mon, Sep 11, 2017 15:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
SUB TO WIND GEN AND LOAD CONDITION.
# 1 will be in service
SUB TO LOAD CONDITION.
other units in service
subject to load condition
Mon, Sep 11, 2017 17:00 1 Postponed
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
Mon, Sep 11, 2017 14:00 1 Approved
DUE TO WIND GEN
Alugumalai ss TSD, Mudalipalayam loads transfer to Ingur 230
Alugumalai ss TSD, Mudalipalayam loads transfer to Ingur 230
subject to load condition
other auto's in service to cater the load
110kv OKM - TDLR # 2 loads transfer to TDLR 230
Mon, Sep 11, 2017 17:00 1
Mon, Sep 11, 2017 17:00 1 Approved
Mon, Sep 11, 2017 8:00 1 Approved
Tue, Sep 12, 2017 15:00 1 Approved
feeder will kept radial from Renganathapuram230 up to Melkaraipatti
Approved Subject to wind Generation
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Mettur town and Kolathur ss loads transfered to 110MTR - Anthiyur #
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 12:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
# will kept radial from Karamadai 230
SUB TO WIND GEN AND TOTAL S/D. CONCURRENCE FROM TRACTION
Subject to 230kv MTPS 1 - KRT # 2 loading
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Postponed
SUB TO LOAD CONDITION AND TOTAL S/D.
SUB TO LOAD CONDITION AND TOTAL S/D OF ERVADI SS
DUE TO WIND GEN
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 14:00 1 Approved
Soolagiri # SRLDC may be addressed (134th OCC/ sl no.111), Subject to Guruparapalli110, SipcotII and Soolagiri ss - TSD, Krishnagiri ss loads transfered to Kariamangalam 230 and Vencraft EHT to Gen set.
SUB TO LOAD CONDITION.
SUB TO WIND GEN
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO TTPS 3 M/C CONDITION
SUB TO CONCURRENCE FROM IND BHARATH
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 14:00 1 Approved
Tue, Sep 12, 2017 16:00 1 Approved
Tue, Sep 12, 2017 14:00 1 Approved
Tue, Sep 12, 2017 13:00 1 Approved
Subject to Auto 1&2 loading due to Wind generation
# will kept radial from Kariamangalam 230
Gurubarapally end entire bus LC p id : 60553
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Tue, Sep 12, 2017 14:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Postponed
Tue, Sep 12, 2017 17:00 1
SUB TO LOAD CONDITION.
DUE TO WIND GEN
DUE TO LOAD CONDITION. LC MAY BE PROGRAMMED ALONG WITH S/D
Subject to wind generation
Tue, Sep 12, 2017 14:00 1 Approved
Tue, Sep 12, 2017 16:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Gurubarapally 110 TSD
subject to Aliyar PH generation
SUB TO WIND GEN: APPD IN 134 OCC VIDE ITEM NO.139
110KV Karuvalur SS TSD.110KV paduvampalli SS and Selapapalayam SS fed from Arasur 230kv SS
SUB TO LOAD CONDITION.
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 16:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 16:00 1 Approved
Tue, Sep 12, 2017 17:00 1 cancelled
SUB TO LOAD CONDITION.
subject to #1 loading
subject to wind generation
SUB TO LOAD CONDITION AND NEY ICT LOADING
Tue, Sep 12, 2017 15:00 1 Approved
Tue, Sep 12, 2017 16:00 1 Approved
Tue, Sep 12, 2017 14:00 1 Approved
Tue, Sep 12, 2017 17:00 1 cancelled
Tue, Sep 12, 2017 17:00 1 Approved
SUB TO LOAD CONDITION AND TOTAL S/D
Gandhinagar ss TSD
SUB TO LOAD CONDITION.
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Auto loading with in limit
SUB TO LOAD CONDITION.
subject to Kundah ph generation
# will kept radial from Singapuram230
Tue, Sep 12, 2017 16:00 1 cancelled
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 13:00 1 cancelled
Tue, Sep 12, 2017 13:00 1 Approved
Tue, Sep 12, 2017 14:00 1 Approved
Tue, Sep 12, 2017 16:00 1 Approved
110kv Ingur - Erode #3, will be tied, Thiruvachi # wll kept radial from Erode 110kv ss
subject to other auto's loading
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION AND NEY ICT LOADING
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 18:00 1 Approved
SUB TO LOAD CONDITION.
subject to feeder kept redial from PSI230kv ss
# will kept radial from Gobi 230kv ss
Tue, Sep 12, 2017 17:00 1 WRONG ENTRY cancelled
Tue, Sep 12, 2017 17:00 1 Postponed
Tue, Sep 12, 2017 17:00 1 WRONG ENTRY cancelled
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 15:00 1 Approved
Tue, Sep 12, 2017 14:00 1 Approved
DUE TO WIND GEN
SUB TO TTPS 3 M/C CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
subject to wind and # will kept radial from UDPT110
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 12:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 17:00 1 Approved
Tue, Sep 12, 2017 8:00 1 Approved
subject to load transfer to PPM 230
SUB TO WIND GEN AND LOAD CONDITION.
subject to 230kv Myvadi - OKM # loading
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 12:00 1 Approved
# will kept radial form UDPT 110, #1 kept in tied condition
# will kept radial form Karuvalur 230, subject to Karuvalur ss auto load
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
SRLDC may be addressed(134th OCC/ sl.no: 128), # 1 will be in service
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION.
# 1 will be in service to cater the load
subject to wind generation
subject to Grid condition
Wed, Sep 13, 2017 15:00 1 Approved
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 13:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Auto 1 & 3, will be in service to cater the load
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
110 KV KAVILIPALAYAM SS AND PUNGAMPALLY SS TSD,.and # kept radial from Moyar end
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
SUB TO LOAD CONDITION
110KV Zuzuvadi SS and TVS EHT - TSD
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Other feeders will be in service
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 13:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Postponed
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 14:00 1 cancelled
all loads will be transfered to Bus A
SUB TO LOAD CONDITION.
DUE TO WIND GEN
110KV PerumanallurSS, Nethaji Appreal park SS and Velampalayam SS - TSD , Auto 1 will be in service
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
110KV PerumanallurSS, Nethaji Appreal park SS and Velampalayam SS - TSD, for line stringing work
SUB TO LOAD CONDITION.
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 cancelled
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 13:00 1
subject to #1 kept radial from KR thoppur ss
SUB TO LOAD CONDITION.
Elumathur unit under shutdown, # over load at PGLR 230 end
subject to EE/SLDC/Erode Concurrence
Wed, Sep 13, 2017 16:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 16:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 18:00 1 Approved
Wed, Sep 13, 2017 17:00 1 ApprovedSUB TO LOAD CONDITION.
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Postponed
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 14:00 1 Approved
Wed, Sep 13, 2017 15:00 1 Approved
Wed, Sep 13, 2017 14:00 1 Approved
Unit 2&3 will be in service
subject to Mettur demand
DUE TO WIND GEN
# will kept radial from Karamadai 230
# will kept radial from Sandynallah ss end, Maruthur ss TSD
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Subject to 230kv Myvadi - Anaikadavu # loading
Wed, Sep 13, 2017 16:00 1 cancelled
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17:00 1 cancelled
Wed, Sep 13, 2017 12:00 1 Approved
Wed, Sep 13, 2017 17:00 1 Approved
Wed, Sep 13, 2017 17 Hrs 1 Approved
Wed, Sep 13, 2017 17.00 1 Approved
Wed, Sep 13, 2017 10:00 1 Approved
SRLDC may be addressed ( 134th OCC/ sl.no: 122)
Wed, Sep 13, 2017 17:00 1 Approved
Thu, Sep 14, 2017 15:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 approved
Thu, Sep 14, 2017 15:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
subject to Mettur demand
110 KV Kalapatty SS and Poomalur SS - TSD, Auto 1,2&4 will be in service.
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Thu, Sep 14, 2017 14:00 1 Postponed
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 14:00 1 cancelled
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
DUE TO WIND GEN
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION.
subject to wind generation
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 SUB TO KOD 1 LC Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 subject to voltage Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Postponed
Thu, Sep 14, 2017 17:00 1 Approved
SUB TO GRID CONDITION
SUB TO LOAD CONDITION.
SRLDC may be addressed( 134th OCC/ sl no: 132), # 2 will be in service
DUE TO WIND GEN
SUB TO WIND GEN: APPD IN 134 OCC VIDE ITEM NO.153
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 14:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 15:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND CONCURRENCE FROM SLDC/ERODE
idly charged condition
SUB TO LOAD CONDITION.
SRLDC may be addressed(134th OCC/ sl no: 155), ICT 1 will be in service to cater the load
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 16:00 1 Approved
Thu, Sep 14, 2017 14:00 1 cancelled
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1
110 KV Pochampally SS and Uthangarai SS - TSD.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
DUE TO LOAD CONDITION. MORE S/D NEEDED. 9 MW S/D NOT ENOUGH
Approved Subject to total shutdown
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 cancelled
Thu, Sep 14, 2017 16:00 1 cancelled
SUB TO LOAD CONDITION AND NT KUDI AUTO LOADING
subject to Kundah ph generation
subject to 230kv DKY - TAQA # in tied condition
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 15:00 1 Approved
Thu, Sep 14, 2017 17:00 1
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
10KV chengam SS - TSD
DUE TO LOAD CONDITION. MORE S/D NEEDED. 9 MW S/D NOT ENOUGH
Approved Subject to total shutdown
subject to normalisation of 230kv Thingalur - MTPS II #
SUB TO WIND GEN AND LOAD CONDITION
Thu, Sep 14, 2017 13:00 1 subject to voltage Approved
Thu, Sep 14, 2017 14:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 cancelled
Thu, Sep 14, 2017 18:00 1 Approvedfeeder will kept redial from Gobi 230 end
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 17:00 1 WRONG ENTRY cancelled
Thu, Sep 14, 2017 15:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
Thu, Sep 14, 2017 14:00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
subject to Kundah ph 4 generation
110KV Madampatti,Devarayapuram,Peedampalli and Anthiyur SS - TSD, Auto 2&3 will be in service
230kv Aliyar - Kadamparai # will be in service
Thu, Sep 14, 2017 14:00 1 Approved
Thu, Sep 14, 2017 14:00 1 Approved
Thu, Sep 14, 2017 16:00 1 Approved
Thu, Sep 14, 2017 19:00 1 Approved
Thu, Sep 14, 2017 17.00 1 Approved
Thu, Sep 14, 2017 17:00 1 Approved
110KV Madavampatty and Devarayapuram ss TSD
110KV Peedampalli SS under total shut down, concurrence obtained from L&T EHT consumer.
SUB TO WIND GEN AND LOAD CONDITION
SUB TO WIND GEN AND LOAD CONDITION
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 16:00 1 Approved
Fri, Sep 15, 2017 14:00 1 Approved
Fri, Sep 15, 2017 14:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Inter loads fed from TDLR
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Other # s will cater the load
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Postponed
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 16:00 1 Approved
Fri, Sep 15, 2017 15:00 1 Approved
Fri, Sep 15, 2017 15:00 1 Approved
SUB TO LOAD CONDITION.
To be scheduled after wind season over
SUB TO LOAD CONDITION.
Link #2 will cater the load
Equal division of load possible
Fri, Sep 15, 2017 14:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Inter loads fed from other end
SUB TO LOAD CONDITION.
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 2
Fri, Sep 15, 2017 14:00 1 Sub to TSD Approved
SUB TO LOAD CONDITION.
Other #s will cater the load
SUB TO TOTAL S/D
2 days LC, OCC approval to be obtained
Addressed to SRLDC for approval
Fri, Sep 15, 2017 17:00 1 Postponed
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
DUE TO WIND GEN
Annur & Sellappampalayam TSD and Sub to load
230 KV Bus A will be inservice
Bus bar protection kept off
Fri, Sep 15, 2017 17:00 1 Annur TSD Approved
Fri, Sep 15, 2017 17:00 1 Postponed
Fri, Sep 15, 2017 16:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1
Fri, Sep 15, 2017 14:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
DUE TO WIND GEN
Sub to SKPY generation
Auto Trf 1 LC recommended at Pallakapalayam
subject to EE/SLDC/Erode Concurrence
SUB TO LOAD CONDITION.
Other #s will cater the load
Main Bus will be inservice
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 16:00 1 Approved
Fri, Sep 15, 2017 14:00 1 Thingalur TSD Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
#2 will be inservice
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sub to Thevour & Pallakapalayam TSD
Sub to load condition
Fri, Sep 15, 2017 17:00 1
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1
Fri, Sep 15, 2017 17:00 1 Approved
DUE TO LOAD CONDITION. MORE TOTAL S/D NEEDED. 8 MW S/D NOT ENOUGH
Approved Subject to total shutdown
Other #s will cater the load
Auto Trf 1 LC recommended at Pallakapalayam
Subject to EE/SLDC/ErodeConcurrence
One by one, sub to load condition
Fri, Sep 15, 2017 17:00 1
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 15:00 1 Approved
Wed, Sep 20, 2017 17:00 6 Postponed
DUE TO LOAD CONDITION. MORE TOTAL S/D NEEDED. 8 MW S/D NOT ENOUGH
Approved Subject to total shutdown
Traction #2 will be inservice
Subject to EHT consumer concurrence
#2 will cater the load
11 days daily basis, May be scheduled after wind season over
Fri, Sep 15, 2017 16:00 1 Approved
Fri, Sep 15, 2017 17:00 1
Fri, Sep 15, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Auto Trf 1 LC recommended at Pallakapalayam
subject to EE/SLDC/Erode Concurrence
Other #s will cater the load
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 ApprovedSub to load condition
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 17:00 1 Approved
Fri, Sep 15, 2017 14:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
To be availed one by one
Auto Trf 1 LC recommended at Pallakapalayam
subject to EE/SLDC/Erode Concurrence
Other # s will cater the load
Sub to load condition
Other # s will cater the load
Fri, Sep 15, 2017 14:00 1 Approved
Sat, Sep 16, 2017 13:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Inter loads fed from CBE
SUB TO WIND GEN AND GRID CONDITION.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 13:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Other #s will cater the load
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 13:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sub to Krishnagiri TSD and Auto trf 1 & 2 to be availed one by one
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 14:00 1
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Standby unit Approved
Subject to wind generation
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION.
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 15:00 1 Approved
Sat, Sep 16, 2017 11:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sub to wind generation
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Link #1 will cater the load
SUB TO WIND GEN AND GRID CONDITION
SUB TO LOAD CONDITION.
Sat, Sep 16, 2017 13:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 13:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Postponed
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 16:00 1 Approved
SUB TO LOAD CONDITION.
Sub to other feeder loading
Dharmapuri # loads fed from Karimangalam
SUB TO WIND GEN AND LOAD CONDITION.
DUE TO WIND GEN
SUB TO WIND GEN AND TTPS GEN
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Sub to MAlco generation
230 KV Bus A will be inservice
Sat, Sep 16, 2017 15:00 1 Approved
Sat, Sep 16, 2017 16:00 1 Approved
Sat, Sep 16, 2017 17:00 1 SE/O/APPROVAL Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
SUB TO TOTAL S/D AND CONCURRENCE FROM CNI
SUB TO TOTAL S/D IN TVR AREA
Sub to Krishnagiri TSD
Auto trf 2 will cater load
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 18:00 1 Approved
Mon, Sep 18, 2017 17:00 3 Postponed
Sat, Sep 16, 2017 17:00 1 Approved
SUB TO LOAD CONDITION AND TJR AUTO LOADING.
Sub to Auto load and Hasthampatti TSD
SUB TO TOTAL S/D
3 days LC and Sub to inflow & grid condition
Sub to Kundah PH 2 generation
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 16:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Inter loads fed from Perambalur
Sub to Kaspapettai TSD
Other #s will cater the load
SUB TO LOAD CONDITION.
Sub to load condition
Sat, Sep 16, 2017 17:00 1 Postponed
Sat, Sep 16, 2017 17:00 1 Sub to Auto load Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
DUE TO 110 BUS LC AT TVR
Other #s will cater the load
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 12:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 13:00 1 Approved
Sat, Sep 16, 2017 15:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Link #1 will cater the load
SUB TO LOAD CONDITION.
Sat, Sep 16, 2017 17:00 1 Postponed
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 15:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
DUE TO WIND GEN AND ALSO 230 BUS LC AT ANPKM,
Sub to Erode & Kaspapettai TSD
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 WRONG ENTRY Cancelled
Sat, Sep 16, 2017 17:00 1 Approved
Inter loads fed from Perambalur
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 12:00 1
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Approved in 134th OCC vide Sl No. 138
Sandaipettai & Arulpuram TSD
DUE TO WIND GEN
Subject to wind generation
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Sub to #2 loading Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Sub to #2 loading Approved
Sat, Sep 16, 2017 14:00 1 Approved
Sat, Sep 16, 2017 12:00 1 Approved
Both bus will be paralleled through Auto trf 2 & 3 switches
Inter loads fed from Arasur
Inter loads fed from TDLR
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17.00 1 Approved
Sat, Sep 16, 2017 17.00 1 Approved
Sat, Sep 16, 2017 17:00 1 approved
Sat, Sep 16, 2017 17:00 1 Approved
Sat, Sep 16, 2017 17:00 1 Approved
Sun, Sep 17, 2017 17:00 1 Approved
Sun, Sep 17, 2017 17:00 1 Approved
Sun, Sep 17, 2017 17:00 1 Approved
Sun, Sep 17, 2017 14:00 1 Approved
Sun, Sep 17, 2017 14:00 1 Approved
Sun, Sep 17, 2017 17:00 1 Approved
Subject to concurrence from EHT Consumers
Unit 5 under standby
Approved in 134th OCC vide Sl No. 140
Sun, Sep 17, 2017 17:00 1 Sub to Auto load Approved
Sun, Sep 17, 2017 17:00 1 Sub to inflow Approved
Sun, Sep 17, 2017 17:00 1 Approved
Sun, Sep 17, 2017 17:00 1 Approved
Sun, Sep 17, 2017 17.00 1 Approved
Sun, Sep 17, 2017 17 Hrs 1 Approved
Mon, Sep 18, 2017 16:00 1 Approved
Sub to grid condition
Sub to Arasur local TSD
Mon, Sep 18, 2017 17:00 1 Postponed
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 14:00 1
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
DUE TO WIND GEN
Other #s will cater the load
Any one 230 KV Bus will be inservice
SUB TO TOTAL S/D OF THONDI
Subject to wind generation
SUB TO LOAD CONDITION AND TOTAL S/D
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 14:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 14:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Postponed
SUB TO TRANSFER OF T KALUPATTI SS TO 110 ANPKM-PSQ# .
All inter loads SS availing TSD
Other #s will cater the load
Sub to load condition
Sub to load condition
Sub to JSW concurrance
Sub to Sholayar PH 1&2 generation
DUE TO WIND GEN
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Postponed
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Sub to Kundah PH 2 generation
230 KV MTPS1-SNPT # LC recommended
Subject to EE/SLDC/Erode Concurrence
Sub to load condition
SUB TO WIND GEN AND LOAD CONDITION.
DUE TO WIND GEN
Sub to grid voltage
Mon, Sep 18, 2017 13:00 1 Approved
Mon, Sep 18, 2017 16:00 1 Approved
Mon, Sep 18, 2017 14:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
110 KV Ingur # 3 to be tied
SUB TO LOAD CONDITION.
Inter loads fed from both ends
Sub to PUSHEP gen & Grid condition
Mon, Sep 18, 2017 17:00 1 LINE IDLE Approved
Thu, Sep 21, 2017 17:00 4 Approved
Mon, Sep 18, 2017 14:00 1 Approved
Mon, Sep 18, 2017 17:00 1 Approved
3 Days LC for C&R panel replacement and Sub to load condition
RS Puram # 1 loads trf to RS Puram # 2
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Thu, Sep 21, 2017 17:00 4 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 15:00 1
Tue, Sep 19, 2017 15:00 1
Tue, Sep 19, 2017 16:00 1 Approved
Tue, Sep 19, 2017 14:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
3 Days LC for C&R panel replacement and Sub to load condition
110 KV Pallakapalayam - BPH 4 # LC recommended
Subject to EE/SLDC/Erode Concurrence
110 KV Pallakapalayam - BPH 4 # LC recommended
Subject to EE/SLDC/Erode Concurrence
Other #s will cater the load
Sub to PUSHEP generation
SUB TO LOAD CONDITION.
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
SUB TO TOTAL S/D
SUB TO WIND GEN
SUB TO LOAD CONDITION AND TTPS GEN.
SUB TO TTPS 3 M/C CONDITION
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION AND TTPS GEN.
Other #s will cater the load
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 13:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 14:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Postponed
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION AND 230 TRY-ALDR#1&2 LOADING
Other #s will cater the load
SUB TO WIND GEN
SUB TO LOAD CONDITION.
DUE TO WIND GEN
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 16:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
SUB TO WIND GEN AND GRID CONDITION. CONCURRENCE FROM WIND GENERATORS
SUB TO WIND GEN: APPD IN 134 OCC VIDE ITEM NO.173
SUB TO TTPS 3 M/C CONDITION
SUB TO LOAD CONDITION.
Salem traction will be fed through #2
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 14:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Sub to Auto load Approved
Tue, Sep 19, 2017 17:00 1 Approved
Kavindapadi fed from Gobi
SUB TO TOTAL S/D
Inter loads fed from BPH4
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 15:00 1 Approved
Tue, Sep 19, 2017 14:00 1 Approved
Sub to veerapandi TSD
SUB TO TOTAL S/D
Sub to PUSHEP generation
Sub to Kundah PH2 generation
Sub to Pochampalli SIpcot TSD
SUB TO LOAD CONDITION.
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 16:00 1 Approved
Tue, Sep 19, 2017 14:00 1 approved
Tue, Sep 19, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 18:00 1 Approved
Thu, Sep 21, 2017 17:00 3 Approved
Tue, Sep 19, 2017 17:00 1 wrong entry Cancelled
Elanagar fed from Unjanai and already Rasipuram fed from Salem
Sankari # LC recommended, Sub to Auto load
1.Subject to EE/SLDC/Erode Concurrence 2. Approved
SUB TO LOAD CONDITION.
Sub to PWD demand
Sub to load condition
Tue, Sep 19, 2017 17:00 1
Tue, Sep 19, 2017 17:00 1 Postponed
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 WRONG ENTRY Cancelled
Tue, Sep 19, 2017 17:00 1 Approved
DUE TO WIND GEN
Subject to wind generation
DUE TO WIND GEN
SUB TO LOAD CONDITION.
SUB TO TTPS 3 M/C CONDITION
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 17:00 1 Approved
Tue, Sep 19, 2017 14:00 1 Approved
Tue, Sep 19, 2017 15:00 1 Approved
Tue, Sep 19, 2017 16:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Inter loads fed from both ends
SUB TO LOAD CONDITION AND TOTAL S/D.
Other #s will cater the load
SUB TO TOTAL S/D
SUB TO TOTAL S/D
Wed, Sep 20, 2017 15:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Thu, Sep 21, 2017 18:00 2 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 15:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 16:00 1 Approved
Sub to PWD demand and BPH2 LC approval
Inter loads fed from OKM and Sub to load condition
Sub to grid voltage
2 days LC for Main 1 relay replacement
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO GRID CONDITION
Sub o load condition
One by one to be availed
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 11:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Approved in 134th OCC vide Sl No. 149
Providing jumper at loc 2 in 230 KV Karamadai - Shenbagapudr
SUB TO LOAD CONDITION.
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 15:00 1 Approved
SUB TO WIND GEN: APPD IN 134 OCC VIDE ITEM NO.173
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO TTPS 3 M/C CONDITION
SUB TO TTPS 3 M/C CONDITION
Sub to PWD demand, Edapadi TSD,and other inter loads fed from KRT
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
Unit 6 under standby
Sub to wind generation
Sub to grid condition
other #s will cater the load
Wed, Sep 20, 2017 15:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Sub to load condition
SUB TO TOTAL S/D
Sub to grid voltage
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
SUB TO LOAD CONDITION AND TOTAL S/D.
SUB TO WIND GEN LOAD CONDITION. CONCURRENCE FROM ERODE/SLDC
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 15:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Sub to inter loads fed from Sandinallah
SUB TO LOAD CONDITION AND TOTAL S/D.
SUB TO TTPS 3 M/C CONDITION
Wed, Sep 20, 2017 17:00 1 Postponed
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Postponed
Wed, Sep 20, 2017 13:00 1 Approved
Possible with Total shutdown
SUB TO LOAD CONDITION.
Possible with Total shutdown
110 KV SNPT- MTR #1 LC recommended
SUB TO LOAD CONDITION.
Wed, Sep 20, 2017 17:00 1
Wed, Sep 20, 2017 16:00 1 Approved
Wed, Sep 20, 2017 17:00 1
Wed, Sep 20, 2017 17:00 1
DUE TO WIND GEN
Subject to wind generation
SUB TO LOAD CONDITION.
TSd to be programmed in any one of the inter load SS in Salem #2
Approved Subject to total shutdown
BPH2 Bus LC recommended
Subject to EE/SLDC/Erode Concurrence
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Postponed
Already all inter loads fed from other end
inter loads fed from NLY TS1
Sub to load condition
Sub to load condition
Possible with Total shutdown
Wed, Sep 20, 2017 13:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 15:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Sub to Aux bus in service
Inter loads fed from MTR
SUB TO LOAD CONDITION AND CONCURRENCE FROM ERODE/SLDC
SUB TO LOAD CONDITION. APPD IN 134 OCC VIDE ITEM NO.145
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 15:00 1 Postponed
Wed, Sep 20, 2017 17:00 1 Approved
Sub to Mallur & Rasipuram TSD
Possible with Total shutdown
Sub to 230 KV DKY-TAQA # tie
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 0:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 WRONG ENTRY Cancelled
Sub to 230 KV DKY-TAQA # tie
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sub to PWD demand
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 18:00 1 Approved
Wed, Sep 20, 2017 16:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
TDLR local, PN Palayam, Katirnaickenpalayam , AQUA EHT TSD. Maddampalayam fed from Karamadai
Sub to PWD demand and BPH2 LC approval
Wed, Sep 20, 2017 18:00 1 Cancelled
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 17:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 18:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 12:00 1 Approved
Wed, Sep 20, 2017 14:00 1 Approved
Wed, Sep 20, 2017 17.00 1 Approved
Pothanur TSD, Irugur trf to CBE
Sub to Kundah generation
One by one to be availed
Other Auto Trfs will cater the load
Sub to Kundah PH2 generation
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 15:00 1 Approved
Thu, Sep 21, 2017 14:00 1 Postponed
Thu, Sep 21, 2017 15:00 1 Approved
Thu, Sep 21, 2017 16:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Sub to PWD demand
DUE TO WIND GEN
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Sub to inter loads fed from Arasur
SUB TO LOAD CONDITION
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 14:00 1
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 13:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
SUB TO LOAD CONDITION
SUB TO TTPS 3 M/C CONDITION
Subject to wind generation
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Kavindapadi TSd Approved
Mon, Sep 25, 2017 18:00 5
Thu, Sep 21, 2017 17:00 1
SUB TO TOTAL S/D
Sub to load condition
LONG LC NOTE TO BE PUT UP:BP COPY, DRAWINGS TO BE FURNISHED; CONCURRENCE FROM CE/D/MDU TO BE OBTAINED SINCE CITY LOADS
Subject to EE/SLDC/Madurai Concurrence
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Approved Subject to wind Generation
Thu, Sep 21, 2017 17:00 1 SUB TO LOAD CONDITION AND TOTAL S/D
Approved Subject to total shutdown
Thu, Sep 21, 2017 15:00 1
Thu, Sep 21, 2017 17:00 1 Approved
SUB TO LOAD CONDITION AND TOTAL S/D
Approved Subject to total shutdown
SUB TO LOAD CONDITION
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
SUB TO WIND GEN AND LOAD CONDITION: CONCURRENCE FROM SLDC/ERODE
SUB TO WIND GEN: APPD IN 134 OCC VIDE ITEM NO.184
SUB TO TTPS 3 M/C CONDITION
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 14:00 1 Approved
Sat, Sep 23, 2017 17:00 3 Approved
Thu, Sep 21, 2017 16:00 1 Approved
Thu, Sep 21, 2017 14:00 1 Approved
Sub to 230 kV Thingalur-MTPS2 # in service
SUB TO LOAD CONDITION
3 days LC for C&R panel replacement and sub to load condition
SUB TO LOAD CONDITION
sub to Pollachi TSD
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 14:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Karimangalam110 TSD, Soolagiri # LC approved in 134th OCC vide Sl. No. 152
Sub to thumbipady TSD
Inter loads fed from Gobi
SUB TO LOAD CONDITION
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Sub to Kundah generation
DUE TO WIND GEN
Subject to wind generation
SUB TO LOAD CONDITION
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 13:00 1 Approved
Thu, Sep 21, 2017 14:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Postponed
Already inter loads fed from Ingur
Sub to load condition
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 WRONG ENTRY Cancelled
Thu, Sep 21, 2017 17:00 1 Postponed
Thu, Sep 21, 2017 17:00 1 Cancelled
SUB TO LOAD CONDITION
DUE TO WIND GEN
Thu, Sep 21, 2017 13:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
Thu, Sep 21, 2017 14:00 1 Approved
Thu, Sep 21, 2017 17.00 1 Approved
Thu, Sep 21, 2017 17:00 1 Approved
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
Sub to load condition
Postponed to 21.09.17 since bus LC recomended at Singapuram
Thu, Sep 21, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 14:00 1 Approved
Fri, Sep 22, 2017 14:00 1
Fri, Sep 22, 2017 15:00 1 Postponed
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Postponed to 21.09.17 since bus LC recomended at Singapuram
Sub to load condition
one by one to be availed
Auto Tr 3 LC recommended at PLDM
Subject to EE/SLDC/Erode Concurrence
DUE TO WIND GEN:APPD IN 134 OCC VIDE ITEM NO.158
SUB TO LOAD CONDITION
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Postponed
Fri, Sep 22, 2017 14:00 1 Approved
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO WIND GEN AND TOTAL S/D
Bus LC may programmed after shifting Myadi bay
Sub to load condition
Fri, Sep 22, 2017 15:00 1 Approved
Fri, Sep 22, 2017 14:00 1 Approved
Fri, Sep 22, 2017 14:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1
Sat, Sep 23, 2017 17:00 2
Fri, Sep 22, 2017 17:00 1 Approved
Thalavaipettai TSD
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
Inter loads fed from Thingalur
OCC approval to be obtained
Addressed to SRLDC for approval
OCC approval to be obtained
Addressed to SRLDC for approval
Fri, Sep 22, 2017 14:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO LOAD CONDITION
Maddampalayam TSD
SUB TO LOAD CONDITION
SUB TO LOAD CONDITION
SUB TO WIND GEN AND LOAD CONDITION
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 16:00 1 Approved
Sub to load condition
Sub to load condition
DUE TO WIND GEN
Subject to wind generation
Sub to Bargur & Penneswaramadam TSD
Auto trf 2 will cater the load
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Postponed
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Steel plant #1 will cater the load
inter loads fed from NLY TS1
DUE TO WIND GEN:APPD IN 134 OCC VIDE ITEM NO.158
Sub to load condition
Fri, Sep 22, 2017 15:00 1 Approved
Fri, Sep 22, 2017 16:00 1 Approved
Fri, Sep 22, 2017 14:00 1 Approved
Inter loads fed from MTR
SUB TO LOAD CONDITION
Fri, Sep 22, 2017 15:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 WRONG ENTRY Cancelled
SUB TO LOAD CONDITION
Sub to load condition
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Palladam,Pongalue & Elavanthi TSD and sub to load condition
To be scheduled Veerapandi availing TSD
Approved Subject to Total Shutdown
Pongalur & Elavanthy TSD
Sub to load condition
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 14:00 1 Approved
SUB TO LOAD CONDITION
SUB TO TOTAL S/D
Fri, Sep 22, 2017 12:00 1 Approved
Fri, Sep 22, 2017 14:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Fri, Sep 22, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
SUB. TO LOAD CONDNS. WIND GEN. & NO BLOCKIN OF WIND GEN.
Sub to load condition
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
Sub to load condition
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sub to load condition
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
SUB TO TOTAL S/D: APPD IN 134 OCC VIDE ITEM NO.160
KPR EHT TSD, Sulur traction fed from ASR, Coimbatore110 KV SS TSD
SUB TO TOTAL S/D
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 14:00 1
SUB TO TOTAL S/D
Subject to EHT Concurrence
SUB TO LOAD CONDITION.
Subject to wind generation
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 12:00 1 Approved
Sub to 230 KV DKY-TAQA # tie
SUB TO LOAD CONDITION AND TOTAL S/D.
Unit 2 under standby
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 14:00 1 Approved
SUB TO LOAD CONDITION.
Thirupathur TSD, Traction trf to Vinnamangalam
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Auto Trf 2&3 will cater the load
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Anthiyur TSD Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Anaicut, Ambur, Somalapuram, Vadakathipatty TSD
SUB TO LOAD CONDITION.
Sub to load condition
Sub to load condition
Wed, Sep 27, 2017 14:00 5
Sat, Sep 23, 2017 17:00 1
Sat, Sep 23, 2017 17:00 1
LONG LC NOTE TO BE PUTUP
Subject to EE/SLDC/Madurai Concurrence
OCC approval to be obtained
Addressed to SRLDC for approval
OCC approval to be obtained
Addressed to SRLDC for approval
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 13:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
SUB TO WIND GEN AND GRID CONDITION
SUB TO TOTAL S/D
SUB TO WIND GEN AND GRID CONDITION
Sub to load after TSD & load trf
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
230 KV Bus A will be in service
Avinashi TSD and other inter loads fed from Arasur
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION AND CONCURRENCE FROM ERODE/SLDC.
Sub to normalization of # 1&2
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 16:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO TOTAL S/D
SUB TO TOTAL S/D
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
inter loads fed from Palavadi
Approved in 134th OCC vide Sl no.190
SUB TO TOTAL S/D OF KUMBAKONAM SS
SUB TO LOAD CONDITION AND TOTAL S/D
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Postponed
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 14:00 1 Approved
Sub to load condition
Sub to Kundah PH2 generation
Sub to load condition
230 KV Bus LC recommended at Singapuram
SUB TO LOAD CONDITION AND CONCURRENCE FROM TRACTION
SUB TO CONCURRENCE FROM M/S ICL
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Subject to kamatchi (EHT) concurrence
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 13:00 1
Sat, Sep 23, 2017 16:00 1 Approved
SUB TO TOTAL S/D
SUB TO LOAD CONDITION.
110 KV PKPLM-BKB1 LC recommended
Subject to EE/SLDC/Erode Concurrence
SUB TO LOAD CONDITION.
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 9:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
SUB TO TOTAL S/D
SUB TO LOAD CONDITION.
Attur TSD and other inter loads fed from DKY
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 17:00 1 WRONG ENTRY Cancelled
Sat, Sep 23, 2017 17:00 1
Sat, Sep 23, 2017 17:00 1 WRONG ENTRY Cancelled
SUB TO LOAD CONDITION.
SUB TO TOTAL S/D
DUE TO WIND GEN
Subect to Wind Generation
Sat, Sep 23, 2017 17:00 1 WRONG ENTRY Cancelled
Sat, Sep 23, 2017 16:00 1 Approved
Sat, Sep 23, 2017 15:00 1 Approved
Sat, Sep 23, 2017 12:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 14:00 1 Approved
Sat, Sep 23, 2017 17:00 1 Approved
Sat, Sep 23, 2017 12:00 1 Approved
SUB TO LOAD CONDITION.
Sub to loading condition
Approved in 134th OCC vide Sl no. 159
Sat, Sep 23, 2017 17.00 1 Approved
Sat, Sep 23, 2017 17.00 1 Approved
Sun, Sep 24, 2017 14:00 1 Approved
Sun, Sep 24, 2017 17:00 1 Approved
Sun, Sep 24, 2017 17:00 1 Approved
Sun, Sep 24, 2017 17:00 1 sub to inflow Approved
Sun, Sep 24, 2017 17:00 1 Approved
Sun, Sep 24, 2017 13:00 1 Approved
Sun, Sep 24, 2017 17:00 1 Sub to inflow Approved
Sun, Sep 24, 2017 17:00 1 Sub to inflow Approved
Sun, Sep 24, 2017 14:00 1 Approved
Sun, Sep 24, 2017 17:00 1 Approved
Sun, Sep 24, 2017 17 Hrs 1 Approved
Sun, Sep 24, 2017 17:00 1
Mon, Sep 25, 2017 17:00 1 Approved
Sub to load condition
Approved subject to Kundah generation
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 14:00 1 Approved
Mon, Sep 25, 2017 18:00 1 Approved
Mon, Sep 25, 2017 14:00 1
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 14:00 1
Mon, Sep 25, 2017 17:00 1 Approved
DUE TO WIND GEN
Subject to wind generation
SUB TO LOAD CONDITION.
Subject to wind generation
SUB TO LOAD CONDITION.
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
SUB TO TOTAL S/D
SUB TO LOAD CONDITION.
Mon, Sep 25, 2017 14:00 1 Approved
Mon, Sep 25, 2017 14:00 1 Approved
Mon, Sep 25, 2017 15:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Postponed
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO TOTAL S/D
SUB TO LOAD CONDITION.APPD IN 134 OCC VIDE ITEM NO.164
SUB TO WIND GEN. CONCURRENCE FROM SLDC/ERODE
Mon, Sep 25, 2017 16:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 14:00 1 Postponed
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
Due to SPH 2 unit I/S
OCC approved134th/196
Mon, Sep 25, 2017 17:00 1 approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 REPEAT Cancelled
Mon, Sep 25, 2017 17:00 1 Approved
OCC approved134th/197
SUB TO LOAD CONDITION.APPD IN 134 OCC VIDE ITEM NO.161
DUE TO WIND GEN
Subject to wind generation
SUB TO CONCURRENCE FROM TRACTION
Mon, Sep 25, 2017 14:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1
Mon, Sep 25, 2017 14:00 1 Approved
SUB TO LOAD CONDITION AND CONCURRENCE FROM EE/O/KVNR
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Subject to EE/SLDC/Erode Concurrence
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 17:00 1 Subject to KN Patty total shutdown
Mon, Sep 25, 2017 17:00 1 Approved
Mon, Sep 25, 2017 12:00 1
Mon, Sep 25, 2017 17:00 1
Mon, Sep 25, 2017 8:00 1 Approved
SUB TO LOAD CONDITION.
DUE TO WIND GEN
Subject to wind generation
Subject to wind generation
Tue, Sep 26, 2017 16:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 17:00 1
subject to the feeder being kept radial from okm ss end and to be availed one by one
subject to the feeder being kept radial from either end
subject to the feeder being kept radial from karuvalur ss end
DUE TO WIND GEN
Subject to wind generation
Wed, Sep 27, 2017 18:00 2 Approved
Tue, Sep 26, 2017 15:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
subject to the load condition existing
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND NO BLOCKING OF WIND GEN
SUB TO TTPS GEN AND LOAD CONDITION.
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO TTPS GEN AND LOAD CONDITION.
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 16:00 1 Approved
SUB TO WIND GEN AND : APPD IN 134 OCC VIDE ITEM NO.199
SUB TO LOAD CONDITION.
SUB TO CONCURRENCE FROM M/S TCP
subject to the other feeder loading limit and the wind generation support being available
SUB TO LOAD CONDITION.
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1
Tue, Sep 26, 2017 17:00 1 Approved
subject to sldc chennai concurrence
AFTER S/D OF KOD 2 M/C
occ approved and srldc to be addressed; however subject to load condition existing
SUB TO LOAD CONDITION.
DUE TO WIND GEN.
Subject to wind generation
subject to thekkalur ss availing tsd and transfer of eht loads
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 16:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND CONCURRENCE FROM ERODE/SLDC
subject to malco concurrence
Tue, Sep 26, 2017 15:00 1 Approved
Tue, Sep 26, 2017 16:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
SUB TO TOTAL S/D
subject to the link feeder 2 loading limit
subject to nambiyur ss being fed from gobi ss
subject to division of loads
SUB TO LOAD CONDITION.
subject to the load condition existing
Tue, Sep 26, 2017 16:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
subject to the load condition existing
subject to the link feeder 2 loading limit
SUB TO LOAD CONDITION.
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
subject to the load condition existing
subject to the other auto trs loading limit
subject to EHT Concurrence
Tue, Sep 26, 2017 15:00 1 Approved
Tue, Sep 26, 2017 17:00 1
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
other feeder 2 will be in service
DUE TO WIND GEN
Subject to wind generation
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
SUB TO WIND GEN AND GRID CONDITION. CONCURRENCE FROM WIND GENERATORS
Tue, Sep 26, 2017 16:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
SUB TO LOAD CONDITION.
subject to the link feeder 2 loading limit
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 15:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
subject to tsd being availed and 110 kv unjani to sankagiri feeder to be kept in service
subject to the tsd being availed only
Tue, Sep 26, 2017 17:00 1
Tue, Sep 26, 2017 17:00 1 WRONG ENTRY Cancelled
Tue, Sep 26, 2017 17:00 1 . Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Cancelled
Tue, Sep 26, 2017 17:00 1 Approved
to replace the bus coupler CTs first and then avail the auto tr lc
subject to EE/SLDC/Erode Concurrence
SUB TO TTPS GEN AND LOAD CONDITION.
SUB TO WIND GEN AND LOAD CONDITION.
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 16:00 1 Approved
Tue, Sep 26, 2017 14:00 1 Approved
Tue, Sep 26, 2017 17:00 1 Approved
Tue, Sep 26, 2017 8:00 1 Approved
subject to the tsd relief and the other auto trs loading limit
subject to transfer of kumar nagar ss to ingur ss feed
subject to the voltage profile in the grid
SUB TO LOAD CONDITION.
subject to the feeder being kept radial from negamam ss end
subject to the other feeder loading limit and the wind generation support being available
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 15:00 1 Approved
Wed, Sep 27, 2017 14:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
subject to the feeder being kept radial from ponnapuram ss
SUB TO WIND GEN AND LOAD CONDITION.
subject to the load condition existing
subject to the load condition existing
subject to the load condition existing
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 14:00 1
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Subject to wind generation
LINE IDLY CHARGED FROM 400KYR FOR WANT OF CT AT 230 KYR SS
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
subject to the load condition existing
SUB TO TOTAL S/D
other units will be available
subject to the feeder being kept radial from udumalpet ss end
Wed, Sep 27, 2017 14:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 15:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
already in tripped condition and blink to be given for isolation
AFTER S/D OF KOD 2 M/C
subject to the load condition existing after issue of lc in 110 kv bph 3 to 2 feeder
subject to the feeder being kept radial from anthiyur ss end
Wed, Sep 27, 2017 14:00 1 Approved
Wed, Sep 27, 2017 14:00 1 Approved
Wed, Sep 27, 2017 17:00 1
Wed, Sep 27, 2017 17:00 1 Approved
DUE TO WIND GEN
Subject to wind generation
Wed, Sep 27, 2017 17:00 1 Postponed
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 18:00 1 Approved
the line was kept idle from 08.05.2016 and breaker being replaced today on 24.08.2017
subject to the load condition and the wind generation existing
LINE IDLY CHARGED FROM 400KYR FOR WANT OF CT AT 230 KYR SS
SUB TO WIND GEN AND CONCURRENCE FROM SLDC/ERODE
subject to the load condition existing after issue of lc in 110 kv bph 3 to 2 feeder
Wed, Sep 27, 2017 16:00 1 Approved
Wed, Sep 27, 2017 14:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Postponed
SUB TO LOAD CONDITION.
subject to the tsd relief
subject to the tsd relief and the feeder being kept radial from salem ss end
SUB TO LOAD CONDITION.
the line was kept idle from 08.05.2016 and breaker being replaced today on 24.08.2017
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
subject to the load condition existing
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.
Wed, Sep 27, 2017 16:00 1 Approved
Wed, Sep 27, 2017 16:00 1 Approved
Wed, Sep 27, 2017 16:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
SUB TO TOTAL S/D
SUB TO TOTAL S/D
SUB TO LOAD CONDITION.
Thu, Sep 28, 2017 17:00 2 Approved
Wed, Sep 27, 2017 9:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
subject to any one of the 230 kv bus being in service without interruption; only one bus will be permitted
subject to the load condition existing
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 WRONG ENTRY Cancelled
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
demand will be met out by dam ph machines
SUB TO LOAD CONDITION.
subject to the load condition and the wind generation existing
subject to the voltage profile in the grid
subject to the wind generation support being available or the tsd relief
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 17:00 1 Approved
Wed, Sep 27, 2017 12:00 1 Approved
Wed, Sep 27, 2017 17.00 1 ApprovedThu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 14:00 1 Approved
Thu, Sep 28, 2017 14:00 1 Approved
SUB TO LOAD CONDITION.
subject to the load condition existing
all the feeders are connected with both the bus
to be scheduled on 28.09.2017 along with the other end lc
SUB TO WIND GEN AND CONCURRENCE FROM TRACTION FOR BLINK
subject to the voltage profile in the grid
subject to the feeder being kept radial from thudiyalur ss end after tsd relief
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 13:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Postponed
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
SUB TO LOAD CONDITION.
SUB TO LOAD CONDITION.APPD IN 134 OCC VIDE ITEM NO.169
SUB TO WIND GEN AND LOAD CONDITION.
DUE TO OUTAGE OF FEEDER 1
subject to the wind generation support being available only
SUB TO GRID CONDITION
Thu, Sep 28, 2017 17:00 1
Thu, Sep 28, 2017 16:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 14:00 1 Approved
SUB TO CONCURRENCE FROM SLDC/ERODE
Subject to EE/SLDC/Erode Concurrence
subject to the voltage profile in the grid
SUB TO LOAD CONDITION.
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 15:00 1 Approved
Thu, Sep 28, 2017 17:00 1
Thu, Sep 28, 2017 17:00 1
Thu, Sep 28, 2017 17:00 1 Approved
subject to the division of loads and auto tr 1 loading limit
subject to the feeder being kept radial from gobi ss end
DUE TO WIND GEN
Subject to wind generation
DUE TO WIND GEN
Subject to wind generation
SUB TO LOAD CONDITION.
Thu, Sep 28, 2017 12:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Postponed
Thu, Sep 28, 2017 14:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
DUE TO OUTAGE OF FEEDER 1
subject to the other link feeder 1 loading limit
SUB. TO LOAD & WG DUE TO SPLIT BUS OPERATION
SUB TO LOAD CONDITION.
subject to the load condition existing
SUB TO LOAD CONDITION.
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 15:00 1 Approved
subject to the load condition existing
occ approved and srldc addressed; subject to load condition
Addressed to SRLDC for approval
subject to the other link feeder 1 loading limit
SUB TO LOAD CONDITION.
subject to railway feeder 1 being in service
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 14:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 15:00 1 Approved
Thu, Sep 28, 2017 17:00 1 WRONG ENTRY Cancelled
Thu, Sep 28, 2017 17:00 1 Cancelled
Thu, Sep 28, 2017 12:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
subject to the other link feeder 1 loading limit
subject to the load condition existing
SUB TO LOAD CONDITION.
other machines will be available
SUB TO LOAD CONDITION.
Thu, Sep 28, 2017 17:00 1 Approved
Thu, Sep 28, 2017 17:00 1 Approved
Fri, Sep 29, 2017 17:00 1 Approved
Fri, Sep 29, 2017 8:00 1 Approved
Sat, Sep 30, 2017 17:00 1 Approved
Sat, Sep 30, 2017 17:00 1
subject to the condition that the main bus to be in service
subject to the wind generation support being available only
subject to the approval of CE Coimbatore and the load condition existing; 230 KV Palladam to Kurukathi feeder too would be affected
Subject to EE/SLDC/ Erode Concurrence