… · xls file · web view · 2013-07-317/31/2013 28.93. 7/31/2013 19.29. 7/31/2013 74.78....

4605
Current Posting Information Type 07/31/13 205013 $28.93 07/31/13 205013 $19.29 07/31/13 205013 $74.78 07/31/13 205013 $84.13 Post Date W.O. #/ S.O. # Speed Type Current Charge Current Credit Work Order # PF-98839 Credit - Labor Work Order # PF-108492 Credit - Labor Work Order # PF-108492 Credit - Labor Work Order # PF-111333 Credit - Labor

Upload: dodang

Post on 07-Apr-2018

225 views

Category:

Documents


5 download

TRANSCRIPT

Posted ChargesCurrent Posting InformationWork Order SummaryPost DateW.O. #/S.O. #SpeedTypeCurrentChargeCurrentCreditTypeAction RequestedBuildingLocationDescriptionLaborParts/OtherWO Total07/31/13Work Order # PF-98839205013$28.93Credit - LaborASSIST CAPITAL PLANNING AT WOLF LEDGES ENGINEERING BUILDING DURING CONSTRUCTION.HVAC, ELECTRICAL, AND PLUMBING.KEEP OPEN FOR PROJECT DURATION - MAY, 2012. NO CHARGE.CONTACT JASON WEISMAN @ EXTENSION 6298 WITH QUESTIONS2/4/13 DETERMINE THE ELECTRICAL INFORMATION (VOLTAGE/PHASING/ETC.) ON THE LIGHT POLE AT THE TOP OF THE STAIRS BETWEEN AERC AND BCCEAkronAkronAkron Campus07/31/13Work Order # PF-108492205013$19.29Credit - LaborPM Annual - Vault Cleanout Inspection Service~UTI~UTI-TUTunnels07/31/13Work Order # PF-108492205013$74.78Credit - LaborPM Annual - Vault Cleanout Inspection Service~UTI~UTI-TUTunnels07/31/13Work Order # PF-111333205013$84.13Credit - LaborCHANGE LIGHTS IN COMMON AREASFY 12/13ASECASECAuburn Science and Engineering Ctr.07/31/13Work Order # PF-111345205013$67.50Credit - LaborCHANGE LIGHTS IN COMMON AREAS.FY 12/13SHSSHS-CIRCCirculation07/31/13Work Order # PF-111384205013$28.93Credit - LaborLIGHTS REPAIR & REPLACE LOT 26FY 12/13PDNPDN-100Vehicle Storage07/31/13Work Order # PF-111384205013$9.64Credit - LaborLIGHTS REPAIR & REPLACE LOT 26FY 12/13PDNPDN-100Vehicle Storage07/31/13Work Order # PF-111384205013$65.43Credit - LaborLIGHTS REPAIR & REPLACE LOT 26FY 12/13PDNPDN-100Vehicle Storage07/31/13Work Order # PF-111384205013$46.74Credit - LaborLIGHTS REPAIR & REPLACE LOT 26FY 12/13PDNPDN-100Vehicle Storage07/31/13Work Order # PF-111385205013$56.09Credit - LaborREPAIR AND OR REPLACE LIGHTSFY 12/13PDEPDEParking Deck East07/31/13Work Order # PF-111385205013$46.74Credit - LaborREPAIR AND OR REPLACE LIGHTSFY 12/13PDEPDEParking Deck East07/31/13Work Order # PF-111386205013$38.57Credit - LaborNECESSARY LIGHTING REPAIRSFY 12/13SHSSHS-AVehicle Storage07/31/13Work Order # PF-111388205013$56.09Credit - LaborNECESSARY LIGHTING REPAIRSFY 12/13PAHPAH-AVehicle Storage07/31/13Work Order # PF-111389205013$37.39Credit - LaborNECESSARY LIGHTING REPAIRSFY 12/13RDRD-AVehicle Storage07/31/13Work Order # PF-111390205013$46.74Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$84.13Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$37.39Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$46.74Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$37.39Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$46.74Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$93.48Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$46.74Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$125.35Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$57.86Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$77.14Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111390205013$86.78Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111405205013$28.04Credit - Labor^ (QSI) REPLACE EXTERIOR LIGHTS TO BE SPLIT ACCORDINGLY FY 12/13QSIQSIThe Quaker Square Inn at The U of A07/31/13Work Order # PF-111405205013$37.39Credit - Labor^ (QSI) REPLACE EXTERIOR LIGHTS TO BE SPLIT ACCORDINGLY FY 12/13QSIQSIThe Quaker Square Inn at The U of A07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$41.52Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$27.68Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$41.52Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$55.36Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$27.68Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$55.36Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$27.68Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$41.52Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$27.68Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$41.52Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$41.52Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$27.68Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$83.04Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$55.36Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111512205020$69.20Credit - LaborCLEAN, REPAIR AND REPLACE MATSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111522205013$18.70Credit - LaborS55-519, FORD PICK UPFY 12/13 FOR FUELING VEHICLESUA122283UA122283Ford Ranger Pickup Truck (1998)07/31/13Work Order # PF-111523205013$65.43Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111523205013$28.04Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111523205013$28.04Credit - LaborLIGHTING REPAIR SIDEWALKS/WALKWAYS/COMMONSFY 12/13~UTI~UTI-OLOutdoor Lighting, Non-Auxiliary07/31/13Work Order # PF-111528205040$83.27Credit - LaborREPAIR AND SERVICE SMALL HAND AND POWER TOOLS, SUCH AS HEDGE TRIMMERS, TILLERS, AERATORS AND EDGERS.FY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111530205013$74.78Credit - LaborNECESSARY LIGHTING REPAIRS IN ALL SURFACE LOTSFY 12/13~ARE~ARE-PLALLParking Lot07/31/13Work Order # PF-111530205013$65.43Credit - LaborNECESSARY LIGHTING REPAIRS IN ALL SURFACE LOTSFY 12/13~ARE~ARE-PLALLParking Lot07/31/13Work Order # PF-111538205071$23.25Credit - LaborPICK UP AND DELIVER PACKETS FOR THE BOARD OF TRUSTEE'S(REGULAR TIME) FY 12/13STUNSTUN-337Office Service07/31/13Work Order # PF-111539205070$31.00Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205070$46.50Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205070$54.25Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205070$54.25Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205070$62.00Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205070$23.25Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205040$219.53Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111539205040$37.85Credit - LaborGI CAMPUS TRASH CANSFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111542205040$30.28Credit - LaborHOUSING CAMPUS TRASH CANS AND ROLL OFF DUMPSTER SERVICEFY 12/13~ARE~AREAreas Outside07/31/13Work Order # PF-111544205040$22.71Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$23.25Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$46.50Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$38.75Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$15.50Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$15.50Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$15.50Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$15.50Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$31.00Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$38.75Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111544205070$23.25Credit - LaborLARGE PACKAGE DELIVERYFY 12/13PFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111548205070$15.50Credit - LaborRENTAL LABOR ONLY; THIS IS USED TO CHARGE LABOR TO WHEN DELIVERING ITEMS IN WHICH LABOR IS PART OF THE RENTAL FEE"NO RENTAL FEES SHOULD BE ADDED TO THIS W.O." FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$38.75Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$15.50Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$46.50Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$54.25Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$62.00Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$38.75Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$62.00Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$62.00Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$54.25Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$54.25Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$15.50Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205070$15.50Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$62.00Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$60.26Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$65.28Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$40.17Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$15.06Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$15.06Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$30.13Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$60.26Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$50.22Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$50.22Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$40.17Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$15.06Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111555205071$52.73Credit - LaborPICK UP CAMPUS RECYCLING MATERIALSFY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111604205040$196.82Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$30.28Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$45.42Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$143.83Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$143.83Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$227.10Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$30.28Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$257.38Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$227.10Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$227.10Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$30.28Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$90.84Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$52.99Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$83.27Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$30.28Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$52.99Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$83.27Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$60.56Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$52.99Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111604205040$52.99Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$143.83Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$196.82Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$83.27Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$113.55Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$30.28Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$166.54Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$196.82Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205040$143.83Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111605205013$37.39Credit - LaborGENERAL CAMPUS LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-111606205040$30.28Credit - LaborTURF MAINTENANCE FOR OUTLYING PROPERTIES. FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-111610205040$30.28Credit - LaborLANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-QSIQSI - Quaker Square Inn07/31/13Work Order # PF-111620205040$30.28Credit - LaborLANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-TOWNTOWN - Grounds07/31/13Work Order # PF-111622205040$30.28Credit - LaborLANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-EXCEXC - Grounds07/31/13Work Order # PF-111625205040$60.56Credit - LaborLANDSCAPE & GROUND MAINTENANCE LOT 1 NOT TO INCLUDE IRRIGATIONFY 12/13~ARE~ARE-PDEPDE - Grounds07/31/13Work Order # PF-111634205013$56.09Credit - LaborNECESSARY LIGHTING REPAIRS SPWC. SVCS.:MOVE GENIE LFT TO MAKE REPAIRSFY 12/13SCPDSCPD-CIRCCirculation07/31/13Work Order # PF-112298205040$37.85Credit - LaborPREP FIELD FOR SOCCER GAMESFY 12/13~ARE~ARE-JF-SCCFLDJF - Soccer Field07/31/13Work Order # PF-112298205040$37.85Credit - LaborPREP FIELD FOR SOCCER GAMESFY 12/13~ARE~ARE-JF-SCCFLDJF - Soccer Field07/31/13Work Order # PF-112298205040$83.27Credit - LaborPREP FIELD FOR SOCCER GAMESFY 12/13~ARE~ARE-JF-SCCFLDJF - Soccer Field07/31/13Work Order # PF-112300205040$45.42Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112300205040$60.56Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112300205040$45.42Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112300205040$60.56Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112300205040$22.71Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112300205040$30.28Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112300205040$30.28Credit - LaborPRE-GAME WORK FOR BASEBALL FIELDFY 12/13~ARE~ARE-JF-BSEBLLJF - Baseball Field07/31/13Work Order # PF-112309205010$18.70Credit - LaborELEVATOR REPAIRSFY 12/13LINCLINC-CIRC-ELEV-1Elevator No. 107/31/13Work Order # PF-112309205010$18.70Credit - LaborELEVATOR REPAIRSFY 12/13LINCLINC-CIRC-ELEV-1Elevator No. 107/31/13Work Order # PF-112310205013$18.70Credit - LaborMAINTENANCE ON E.J. THOMAS FOUNTAINFY 12/13~ARE~ARE-EJFE.J. Fountain07/31/13Work Order # PF-112311205013$140.21Credit - LaborCLEAN SHOP

FY 12/13PFOCPFOC-212Shop07/31/13Work Order # PF-112311205013$65.43Credit - LaborCLEAN SHOP

FY 12/13PFOCPFOC-212Shop07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$121.29Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$381.15Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$202.15Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$381.15Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$192.04Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112312205050$303.23Credit - LaborENERGY CENTER OPERATIONS

FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-112315205040$136.26Credit - LaborSTAIGER GARDEN LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-112315205040$136.26Credit - LaborSTAIGER GARDEN LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-112318205040$30.28Credit - Labor* BALLARD GARDEN LANDSCAPE MAINTENANCEFY 12/13~ARE~ARE-GRGrounds07/31/13Work Order # PF-112322205013$56.09Credit - LaborWATER TREATMENT FOR ENERGY CENTER HTHW AND CW LOOPS

FY 12/13PFOCPFOC-51Mechanical07/31/13Work Order # PF-112324205013$38.57Credit - Labor^ (RD) WATER TREATMENT

FY 12/13RDRDRobertson Dining Hall07/31/13Work Order # PF-112326205013$46.74Credit - LaborWATER TREATMENT

FY 12/13BCBC-12Mechanical07/31/13Work Order # PF-112580205013$9.64Credit - LaborBASE OF THE CHARLES KNIGHT STATUE IS CRACKED, STATUE IS LOCATED ON THE SOUTHWEST SIDE OF POLYMER SCIENCE~ARE~ARE-ADArchitectural Designs07/31/13Work Order # PF-112580205013$144.64Credit - LaborBASE OF THE CHARLES KNIGHT STATUE IS CRACKED, STATUE IS LOCATED ON THE SOUTHWEST SIDE OF POLYMER SCIENCE~ARE~ARE-ADArchitectural Designs07/31/13Work Order # PF-112580205013$289.28Credit - LaborBASE OF THE CHARLES KNIGHT STATUE IS CRACKED, STATUE IS LOCATED ON THE SOUTHWEST SIDE OF POLYMER SCIENCE~ARE~ARE-ADArchitectural Designs07/31/13Work Order # PF-112580205013$250.71Credit - LaborBASE OF THE CHARLES KNIGHT STATUE IS CRACKED, STATUE IS LOCATED ON THE SOUTHWEST SIDE OF POLYMER SCIENCE~ARE~ARE-ADArchitectural Designs07/31/13Work Order # PF-112580205013$231.42Credit - LaborBASE OF THE CHARLES KNIGHT STATUE IS CRACKED, STATUE IS LOCATED ON THE SOUTHWEST SIDE OF POLYMER SCIENCE~ARE~ARE-ADArchitectural Designs07/31/13Work Order # PF-112580205013$38.57Credit - LaborBASE OF THE CHARLES KNIGHT STATUE IS CRACKED, STATUE IS LOCATED ON THE SOUTHWEST SIDE OF POLYMER SCIENCE~ARE~ARE-ADArchitectural Designs07/31/13Work Order # PF-112735205013$18.70Credit - LaborGAS KUBOTA PF-026FY 12/13UA132257UA132257Kubota RTV 1100 (2009)07/31/13Work Order # PF-112736205013$18.70Credit - LaborGAS KUBOTA PF-029FY 12/13UA131814UA131814Kubota RTV 1100 (2009)07/31/13Work Order # PF-114301205013$280.43Credit - LaborBUILDING AUTOMATION AND CONTROL OPERATIONS FOR THE AKRON CAMPUS FY 12/13AkronAkronAkron Campus07/31/13Work Order # PF-118854205013$186.95Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$280.43Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$77.14Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$221.78Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$144.64Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$231.42Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$57.86Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$289.28Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$67.50Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$38.57Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$144.64Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-118854205013$144.64Credit - LaborCONNECT EYEWASH DRAIN INTO ACTUAL DRAIN SYSTEMOLRCOLRC-115Research/Nonclass Laboratory07/31/13Work Order # PF-119630205013$21.83Credit - LaborPM Annual Water Treatment Glycol SystemBRHBRHBulger Residence Hall07/31/13Work Order # PF-119630205013$18.70Credit - LaborPM Annual Water Treatment Glycol SystemBRHBRHBulger Residence Hall07/31/13Work Order # PF-119631205013$21.83Credit - LaborPM Annual Water Treatment Glycol SystemICSICSInfoCision Stadium / Summa Field07/31/13Work Order # PF-119631205013$43.66Credit - LaborPM Annual Water Treatment Glycol SystemICSICSInfoCision Stadium / Summa Field07/31/13Work Order # PF-119632205013$21.83Credit - LaborPM Annual Water Treatment Glycol SystemORHORHOrr Resident Hall07/31/13Work Order # PF-119633205013$28.04Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall07/31/13Work Order # PF-119633205013$43.66Credit - LaborPM Annual Water Treatment Glycol SystemRDRDRobertson Dining Hall07/31/13Work Order # PF-119634205013$21.83Credit - LaborPM Annual Water Treatment Glycol SystemRRHRRHRitchie Residence Hall07/31/13Work Order # PF-119635205013$120.07Credit - LaborPM Annual Water Treatment Glycol SystemSMRHSMRHSisler-McFawn Residence Hall07/31/13Work Order # PF-119635205013$28.04Credit - LaborPM Annual Water Treatment Glycol SystemSMRHSMRHSisler-McFawn Residence Hall07/31/13Work Order # PF-119636205013$32.75Credit - LaborPM Annual Water Treatment Glycol SystemASECASECAuburn Science and Engineering Ctr.07/31/13Work Order # PF-119638205013$21.83Credit - LaborPM Annual Water Treatment Glycol SystemLHLHLeigh Hall07/31/13Work Order # PF-119638205013$32.75Credit - LaborPM Annual Water Treatment Glycol SystemLHLHLeigh Hall07/31/13Work Order # PF-119640205013$21.83Credit - LaborPM Annual Water Treatment Glycol SystemNPICNPICNational Polymer Innovation Center07/31/13Work Order # PF-119641205013$43.66Credit - LaborPM Annual Water Treatment Glycol SystemPMUCPMUCMartin University Center07/31/13Work Order # PF-120065205013$327.85Credit - Labor*CONTRACTOR TO REPLACE CAST IRON WATER CELL IN BOILERPAINT SHOP TO PAINT NEW METAL FLASHING FOR BOILER FLUE'S TO MATCH BUILDING EXTERIOR TRIMCCDCCD-7-BLR-1 (RETIRED)Boiler No. 1 (SID: 228938) (RETIRED)07/31/13Work Order # PF-120065205013$144.64Credit - Labor*CONTRACTOR TO REPLACE CAST IRON WATER CELL IN BOILERPAINT SHOP TO PAINT NEW METAL FLASHING FOR BOILER FLUE'S TO MATCH BUILDING EXTERIOR TRIMCCDCCD-7-BLR-1 (RETIRED)Boiler No. 1 (SID: 228938) (RETIRED)07/31/13Work Order # PF-120065205013$327.85Credit - Labor*CONTRACTOR TO REPLACE CAST IRON WATER CELL IN BOILERPAINT SHOP TO PAINT NEW METAL FLASHING FOR BOILER FLUE'S TO MATCH BUILDING EXTERIOR TRIMCCDCCD-7-BLR-1 (RETIRED)Boiler No. 1 (SID: 228938) (RETIRED)07/31/13Work Order # PF-120065205013$183.21Credit - Labor*CONTRACTOR TO REPLACE CAST IRON WATER CELL IN BOILERPAINT SHOP TO PAINT NEW METAL FLASHING FOR BOILER FLUE'S TO MATCH BUILDING EXTERIOR TRIMCCDCCD-7-BLR-1 (RETIRED)Boiler No. 1 (SID: 228938) (RETIRED)07/31/13Work Order # PF-120065205013$183.21Credit - Labor*CONTRACTOR TO REPLACE CAST IRON WATER CELL IN BOILERPAINT SHOP TO PAINT NEW METAL FLASHING FOR BOILER FLUE'S TO MATCH BUILDING EXTERIOR TRIMCCDCCD-7-BLR-1 (RETIRED)Boiler No. 1 (SID: 228938) (RETIRED)07/31/13Work Order # PF-120641205013$9.64Credit - LaborMONITOR BAY WINDOW LEAK AND CEILING TILE REPAIR (NEED LARGE MANLIFT FOR PROPER REPAIRS)CBACBA-430Office07/31/13Work Order # PF-120641205013$125.35Credit - LaborMONITOR BAY WINDOW LEAK AND CEILING TILE REPAIR (NEED LARGE MANLIFT FOR PROPER REPAIRS)CBACBA-430Office07/31/13Work Order # PF-120641205013$86.78Credit - LaborMONITOR BAY WINDOW LEAK AND CEILING TILE REPAIR (NEED LARGE MANLIFT FOR PROPER REPAIRS)CBACBA-430Office07/31/13Work Order # PF-120642205013$144.64Credit - LaborCEILING LEAK AND CEILING TILE REPAIRCBACBA-367Office07/31/13Work Order # PF-120642205013$125.35Credit - LaborCEILING LEAK AND CEILING TILE REPAIRCBACBA-367Office07/31/13Work Order # PF-120642205013$28.93Credit - LaborCEILING LEAK AND CEILING TILE REPAIRCBACBA-367Office07/31/13Work Order # PF-120642205013$9.64Credit - LaborCEILING LEAK AND CEILING TILE REPAIRCBACBA-367Office07/31/13Work Order # PF-120642205013$67.50Credit - LaborCEILING LEAK AND CEILING TILE REPAIRCBACBA-367Office07/31/13Work Order # PF-120644205013$48.21Credit - LaborCEILING LEAK AND CEILING TILE REPAIRPOLPOL-134Conference Room07/31/13Work Order # PF-120918205040$90.84Credit - LaborTRACK COSTS OF PHASE II OF COLEMAN COMMON FOUNTAINS~ARE~ARE-SWSidewalks/Walkways/Commons07/31/13Work Order # PF-122606205013$96.43Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-122606205013$96.43Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-122606205013$38.57Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-122606205013$48.98Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-122606205013$38.57Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-122606205013$48.98Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-122606205013$212.14Credit - LaborCONTRACTOR CAHILL TO REPAIR LEAKING SPRINKLER LINE IN ATRIUMCASCAS-CIRCCirculation07/31/13Work Order # PF-123029205013$140.21Credit - LaborPAINT COMMON AREASGDYRGDYR-CIRCCirculation07/31/13Work Order # PF-123029205013$140.21Credit - LaborPAINT COMMON AREASGDYRGDYR-CIRCCirculation07/31/13Work Order # PF-123159205013$192.85Credit - LaborREPAIR LIGHTED "UA" SIGN ON N.E. CORNER OF POLSKY BLDG.POLPOLPolsky Building07/31/13Work Order # PF-123159205013$106.07Credit - LaborREPAIR LIGHTED "UA" SIGN ON N.E. CORNER OF POLSKY BLDG.POLPOLPolsky Building07/31/13Work Order # PF-123159205013$192.85Credit - LaborREPAIR LIGHTED "UA" SIGN ON N.E. CORNER OF POLSKY BLDG.POLPOLPolsky Building07/31/13Work Order # PF-123159205013$192.85Credit - LaborREPAIR LIGHTED "UA" SIGN ON N.E. CORNER OF POLSKY BLDG.POLPOLPolsky Building07/31/13Work Order # PF-123541205013$43.66Credit - LaborINVESTIGATE WATER LEAKS THROUGH RIBBON AND BROW WINDOWS FOR CAPITAL PLANNING.ICSICSInfoCision Stadium / Summa Field07/31/13Work Order # PF-123613205013$48.21Credit - LaborPM Annual - Backflow PreventerCRHCRH-220-BFP-3Backflow Preventer No. 3 (1" Custodial)07/31/13Work Order # PF-123614205013$48.21Credit - LaborPM Annual - Backflow PreventerCRHCRH-220-BFP-4Backflow Preventer No. 4 (3/4" Custodial)07/31/13Work Order # PF-123615205013$48.21Credit - LaborPM Annual - Backflow PreventerCRHCRH-70-BFP-1Backflow Preventer No. 1 (4" Domestic)07/31/13Work Order # PF-123616205013$48.21Credit - LaborPM Annual - Backflow PreventerCRHCRH-70-BFP-2Backflow Preventer No. 2 (21/2" Irrigation)07/31/13Work Order # PF-123617205013$57.86Credit - LaborPM Annual - Backflow PreventerFOLKFOLK-163-BFP-3Backflow Preventer No. 3 (1" Heating Water)07/31/13Work Order # PF-123626205013$48.21Credit - LaborPM Annual - Backflow PreventerGTTFGTTF-CIRC-BFP-1Backflow Preventer No. 1 (11/2" Domestic)07/31/13Work Order # PF-123626205013$48.21Credit - LaborPM Annual - Backflow PreventerGTTFGTTF-CIRC-BFP-1Backflow Preventer No. 1 (11/2" Domestic)07/31/13Work Order # PF-123628205013$48.21Credit - LaborPM Annual - Backflow PreventerJARJAR-19-BFP-1Backflow Preventer No. 1 (4" Domestic)07/31/13Work Order # PF-123635205013$48.21Credit - LaborPM Annual - Backflow PreventerKOKO-301A-BFP-6Backflow Preventer No. 1 (3/4" Humidifier)07/31/13Work Order # PF-123636205013$48.21Credit - LaborPM Annual - Backflow PreventerKOKO-301A-BFP-7Backflow Preventer No. 2 (Bypass For BFP-1)07/31/13Work Order # PF-123637205013$48.21Credit - LaborPM Annual - Backflow PreventerKOKO-5-BFP-8Backflow Preventer No. 1 (1/2" Heating)07/31/13Work Order # PF-123640205013$48.21Credit - LaborPM Annual - Backflow PreventerLHLH-116-BFP-1Backflow Preventer No. 1 (4" Domestic)07/31/13Work Order # PF-123641205013$48.21Credit - LaborPM Annual - Backflow PreventerLHLH-116-BFP-2Backflow Preventer No. 2 (2" Irrigation)07/31/13Work Order # PF-123658205013$48.21Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-1Backflow Preventer No. 1 (3" Chilled Water)07/31/13Work Order # PF-123659205013$48.21Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-2Backflow Preventer No. 2 (1" Heating Water)07/31/13Work Order # PF-123660205013$48.21Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-3Backflow Preventer No. 3 (1" Air Compressor)07/31/13Work Order # PF-123661205013$48.21Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-4Backflow Preventer No. 4 (1" Air Compressor)07/31/13Work Order # PF-123662205013$48.21Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-5Backflow Preventer No. 5 (11/4" HW Make Up)07/31/13Work Order # PF-123663205013$48.21Credit - LaborPM Annual - Backflow PreventerPFOCPFOC-51-BFP-6Backflow Preventer No. 6 (11/2" HW Make Up)07/31/13Work Order # PF-123675205013$48.21Credit - LaborPM Annual - Backflow PreventerSHNSHN-20-BFP-2Backflow Preventer No. 2 (8" Fire)07/31/13Work Order # PF-123676205013$48.21Credit - LaborPM Annual - Backflow PreventerSHNSHN-20-BFP-3Backflow Preventer No. 3 (1" Boiler)07/31/13Work Order # PF-123677205013$48.21Credit - LaborPM Annual - Backflow PreventerSHNSHN-20-BFP-4Backflow Preventer No. 4 (1" Stem Generator)07/31/13Work Order # PF-123678205013$48.21Credit - LaborPM Annual - Backflow PreventerSHNSHN-20-BFP-5Backflow Preventer No. 5 (1" Heating Water)07/31/13Work Order # PF-123687205013$48.21Credit - LaborPM Annual - Backflow PreventerWHITWHIT-104-BFP-1Backflow Preventer No. 1 (3" Domestic)07/31/13Work Order # PF-123688205013$48.21Credit - LaborPM Annual - Backflow PreventerWHITWHIT-104-BFP-3Backflow Preventer No. 3 (3/4" Heating Water)07/31/13Work Order # PF-123689205013$48.21Credit - LaborPM Annual - Backflow PreventerWHITWHIT-104-BFP-2Backflow Preventer No. 2 (6" Fire)07/31/13Work Order # PF-123690205013$48.21Credit - LaborPM Annual - Backflow PreventerZOOKZOOK-3-BFP-1Backflow Preventer No. 1 (4" Domestic)07/31/13Work Order # PF-123691205013$48.21Credit - LaborPM Annual - Backflow PreventerZOOKZOOK-3-BFP-2Backflow Preventer No. 2 (1" Emerg. Generator)07/31/13Work Order # PF-123692205013$48.21Credit - LaborPM Annual - Backflow PreventerZOOKZOOK-3-BFP-3Backflow Preventer No. 3 (3/4" Heating Water)07/31/13Work Order # PF-123732205013$48.21Credit - LaborPM Annual - Backflow PreventerQSIQSI-1-BFP-1Backflow Preventer No. 1 (4" Domestic) (^ (SILOS))07/31/13Work Order # PF-123736205013$48.21Credit - LaborPM Annual - Backflow PreventerQSIQSI-R120-BFP-6Backflow Preventer No. 6 (4" Fire) (^ (RETAIL))07/31/13Work Order # PF-123933205013$65.43Credit - LaborPM Water Treatment - NitratesGRCGRCGrant High Rise07/31/13Work Order # PF-123934205013$21.83Credit - LaborPM Water Treatment - NitratesONATONATOcasek Natatorium07/31/13Work Order # PF-123936205013$21.83Credit - LaborPM Water Treatment - NitratesSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-123936205013$21.83Credit - LaborPM Water Treatment - NitratesSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-123936205013$37.39Credit - LaborPM Water Treatment - NitratesSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-123936205013$21.83Credit - LaborPM Water Treatment - NitratesSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-123936205013$21.83Credit - LaborPM Water Treatment - NitratesSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-123936205013$43.66Credit - LaborPM Water Treatment - NitratesSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-123937205013$32.75Credit - LaborPM Water Treatment - NitratesSRWCSRWCStudent Recreation and Wellness Ctr07/31/13Work Order # PF-123938205013$21.83Credit - LaborPM Water Treatment - NitratesSTUNSTUNStudent Union07/31/13Work Order # PF-123939205013$21.83Credit - LaborPM Water Treatment - NitratesASECASECAuburn Science and Engineering Ctr.07/31/13Work Order # PF-123941205013$21.83Credit - LaborPM Water Treatment - NitratesBCCEBCCEBuckingham Building07/31/13Work Order # PF-123942205013$21.83Credit - LaborPM Water Treatment - NitratesBHBHBuchtel Hall07/31/13Work Order # PF-123943205013$21.83Credit - LaborPM Water Treatment - NitratesCASCASCollege of Arts and Sciences07/31/13Work Order # PF-123944205013$10.92Credit - LaborPM Water Treatment - NitratesCBACBABusiness Administration Building07/31/13Work Order # PF-123949205013$43.66Credit - LaborPM Water Treatment - NitratesGHGHGuzzetta Hall07/31/13Work Order # PF-123950205013$32.75Credit - LaborPM Water Treatment - NitratesJARJARJames A. Rhodes Health and PE07/31/13Work Order # PF-123950205013$21.83Credit - LaborPM Water Treatment - NitratesJARJARJames A. Rhodes Health and PE07/31/13Work Order # PF-123952205013$21.83Credit - LaborPM Water Treatment - NitratesKOKOKolbe Hall07/31/13Work Order # PF-123953205013$32.75Credit - LaborPM Water Treatment - NitratesLAWLAWMcDowell Law Center07/31/13Work Order # PF-123954205013$21.83Credit - LaborPM Water Treatment - NitratesLHLHLeigh Hall07/31/13Work Order # PF-123954205013$32.75Credit - LaborPM Water Treatment - NitratesLHLHLeigh Hall07/31/13Work Order # PF-123955205013$32.75Credit - LaborPM Water Treatment - NitratesLIBLIBBierce Library07/31/13Work Order # PF-123956205013$32.75Credit - LaborPM Water Treatment - NitratesNPICNPICNational Polymer Innovation Center07/31/13Work Order # PF-123956205013$32.75Credit - LaborPM Water Treatment - NitratesNPICNPICNational Polymer Innovation Center07/31/13Work Order # PF-123961205013$21.83Credit - LaborPM Water Treatment - NitratesSHNSHNSchrank Hall (North)07/31/13Work Order # PF-123961205013$43.66Credit - LaborPM Water Treatment - NitratesSHNSHNSchrank Hall (North)07/31/13Work Order # PF-123961205013$32.75Credit - LaborPM Water Treatment - NitratesSHNSHNSchrank Hall (North)07/31/13Work Order # PF-123962205013$21.83Credit - LaborPM Water Treatment - NitratesSISISimmons Hall07/31/13Work Order # PF-123965205013$21.83Credit - LaborPM Water Treatment - NitratesWHITWHITWhitby Hall07/31/13Work Order # PF-123966205013$32.75Credit - LaborPM Water Treatment - NitratesPFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-124270205013$18.70Credit - LaborPM Water Treatment - Water SoftenerBCBC-17-WTRC-1Water Softener/Conditioner No. 107/31/13Work Order # PF-124270205013$18.70Credit - LaborPM Water Treatment - Water SoftenerBCBC-17-WTRC-1Water Softener/Conditioner No. 107/31/13Work Order # PF-124271205013$21.83Credit - LaborPM Water Treatment - Water SoftenerPFOCPFOC-51-WTRC-1Water Softener/Conditioner No.107/31/13Work Order # PF-124271205013$21.83Credit - LaborPM Water Treatment - Water SoftenerPFOCPFOC-51-WTRC-1Water Softener/Conditioner No.107/31/13Work Order # PF-124272205013$10.92Credit - LaborPM Water Treatment - Water SoftenerRDRD-9-WTRC-1Water Softener Conditioner No. 1 (^ (RD))07/31/13Work Order # PF-124272205013$28.04Credit - LaborPM Water Treatment - Water SoftenerRDRD-9-WTRC-1Water Softener Conditioner No. 1 (^ (RD))07/31/13Work Order # PF-124273205013$87.32Credit - LaborPM Water Treatment - Water SoftenerSHNSHN-20-WTRC-1Water Softener/Conditioner No. 107/31/13Work Order # PF-124273205013$21.83Credit - LaborPM Water Treatment - Water SoftenerSHNSHN-20-WTRC-1Water Softener/Conditioner No. 107/31/13Work Order # PF-124277205013$125.35Credit - LaborPM Annual - Backflow PreventerSHNSHN-20-BFP-1Backflow Preventer No. 1 (8" Domestic)07/31/13Work Order # PF-124371205013$48.21Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-KO-RF-BFP-4Backflow Preventer No. 1 (3/4" Humidifier)07/31/13Work Order # PF-124372205013$48.21Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-KO-RF-BFP-5Backflow Preventer No. 2 (3/4" Bypass For #1)07/31/13Work Order # PF-124374205013$48.21Credit - LaborPM Annual - Backflow PreventerFOLKFOLK-108-BFP-6Backflow Preventer No. 607/31/13Work Order # PF-125008205013$18.70Credit - LaborS55631, FORD PICK UPFY 12/13 FOR FUELING VEHICLESUA131935UA131935Ford Ranger Pickup Truck (2010)07/31/13Work Order # PF-125036205013$38.57Credit - LaborBACK HALLWAY OFF OF SCHUMACHER KITCHEN CHECK AND EMPTY ROOF LEAK BUCKETSQSIQSI-145Food Facility Service07/31/13Work Order # PF-125036205013$19.29Credit - LaborBACK HALLWAY OFF OF SCHUMACHER KITCHEN CHECK AND EMPTY ROOF LEAK BUCKETSQSIQSI-145Food Facility Service07/31/13Work Order # PF-125036205013$28.93Credit - LaborBACK HALLWAY OFF OF SCHUMACHER KITCHEN CHECK AND EMPTY ROOF LEAK BUCKETSQSIQSI-145Food Facility Service07/31/13Work Order # PF-125625205013$43.66Credit - LaborPM Water Treatment - Nitrates~UTI~UTI-HTHigh Temperature System07/31/13Work Order # PF-125720205013$48.21Credit - LaborPM Annual - Backflow PreventerQSIQSI-R120-BFP-16Backflow Preventer No. 16 (3/4" Detector) (^ (RETAIL))07/31/13Work Order # PF-125722205013$57.86Credit - LaborPM Annual - Backflow PreventerFOLKFOLK-108-BFP-4Backflow Preventer No. 4 (6" Fire)07/31/13Work Order # PF-125723205013$48.21Credit - LaborPM Annual - Backflow PreventerFOLKFOLK-108-BFP-5Backflow Preventer No. 5 (2.5" Domestic)07/31/13Work Order # PF-126269205013$57.86Credit - LaborTHERE ARE CEILING ISSUES IN AREA ASB 130. THE CEILING IS LEAKING AGAIN.REPLACE DAMAGED CEILING TILESASBASB-130Office Service07/31/13Work Order # PF-126269205013$19.29Credit - LaborTHERE ARE CEILING ISSUES IN AREA ASB 130. THE CEILING IS LEAKING AGAIN.REPLACE DAMAGED CEILING TILESASBASB-130Office Service07/31/13Work Order # PF-126269205013$144.64Credit - LaborTHERE ARE CEILING ISSUES IN AREA ASB 130. THE CEILING IS LEAKING AGAIN.REPLACE DAMAGED CEILING TILESASBASB-130Office Service07/31/13Work Order # PF-126368205013$9.35Credit - LaborCADET PF-025FY 12/13 FOR FUELING VEHICLESUA132070UA132070Cub Cadet 4X4 EFI (2010)07/31/13Work Order # PF-126787205040$7.65Credit - Labor#25 KUBOTA NEEDS HEADLIGHT BULB FROM THE STOCKROOMUA131004UA131004Kubota (2005)07/31/13Work Order # PF-126869205013$67.50Credit - LaborFIX LIGHTS IN BUILDINGPFOCPFOCPhysical Facilities Op Center07/31/13Work Order # PF-126887205013$106.07Credit - LaborADD TEMP SENSOR TO READ DOMESTIC HOT WATER TEMP AND PRESSURESRHSRHSpanton Residence Hall07/31/13Work Order # PF-126887205013$77.14Credit - LaborADD TEMP SENSOR TO READ DOMESTIC HOT WATER TEMP AND PRESSURESRHSRHSpanton Residence Hall07/31/13Work Order # PF-126923205070$7.17Credit - LaborSUPPLY AND INSTALL NEW COMMERCIAL CARPET FOR QSI FRONT DESK AREA. MESSINA FLOORS TO COMPLETE. SPECIAL SERVICES TO MOVE CABINET/FURNITURE.QSIQSI-113Office Service07/31/13Work Order # PF-126949205013$18.70Credit - LaborNORTH TOWER, FLOOR 2B BY ROOM 52,URINAL ON THE RIGHT SIDE IS CLOGGED AND FLOOR DRAIN IS ALSO CLOGGEDASECASEC-60Toilet and Restroom07/31/13Work Order # PF-126949205013$37.39Credit - LaborNORTH TOWER, FLOOR 2B BY ROOM 52,URINAL ON THE RIGHT SIDE IS CLOGGED AND FLOOR DRAIN IS ALSO CLOGGEDASECASEC-60Toilet and Restroom07/31/13Work Order # PF-127475205013$261.73Credit - LaborPM Annual - Emergency Exit Lighting InspectionGDYRGDYRGoodyear Polymer Center07/31/13Work Order # PF-127495205013$67.50Credit - LaborPM Annual - Emergency Exit Lighting InspectionPOLPOLPolsky Building07/31/13Work Order # PF-127958205013$106.07Credit - LaborPULL TUBE BUNDLE HYDRO AND CHANGE GASKETS IN SPRINGCASCAS-146-HEX-1Heat Exchanger No. 107/31/13Work Order # PF-127958205013$57.86Credit - LaborPULL TUBE BUNDLE HYDRO AND CHANGE GASKETS IN SPRINGCASCAS-146-HEX-1Heat Exchanger No. 107/31/13Work Order # PF-127958205013$57.86Credit - LaborPULL TUBE BUNDLE HYDRO AND CHANGE GASKETS IN SPRINGCASCAS-146-HEX-1Heat Exchanger No. 107/31/13Work Order # PF-127958205013$86.78Credit - LaborPULL TUBE BUNDLE HYDRO AND CHANGE GASKETS IN SPRINGCASCAS-146-HEX-1Heat Exchanger No. 107/31/13Work Order # PF-128268205013$9.64Credit - LaborTOUCH-UP AND REPAIR WOODWORK AT QUAKER STATION; QUESTIONS AND TO SCHEDULE A WALK THROUGH CAN BE DONE THROUGH GARY GOLDBERG AT [email protected] OR X6404 (ESTIMATE SHOULD GO TO GARY GOLDBERG)QSIQSIThe Quaker Square Inn at The U of A07/31/13Work Order # PF-128438205013$19.29Credit - LaborREPAIR OR REPLACE ARENA LIGHTSJARJAR-70Athletic or Phys. Education07/31/13Work Order # PF-128491205013$21.83Credit - LaborWTR-GLYCAERCAERCU of A Engineering Research Center07/31/13Work Order # PF-128506205013$202.49Credit - LaborREPAIR SOFFITSMCUCMCUCMedina County University Center07/31/13Work Order # PF-128506205013$202.49Credit - LaborREPAIR SOFFITSMCUCMCUCMedina County University Center07/31/13Work Order # PF-128569205013$9.64Credit - LaborPAINT THE 3RD FLOOR; CONTACT STEVE AT X6677 OR 330-256-1475 TO SCHEDULE ESTIMATE SO THAT HE CAN MEET WITH YOU. PROCEED WITH ALL WORK IN THE LINKED DOCUMENT THAT WAS APROVED BY THE DEPARTMENT.CARP.: CEILING WORK, COVE BASE AND ADD VISION LIGHT TO DOORELE SHOP TO REMOVE SMOKE DETECTORS AND RE-INSTALLOLRCOLRCOlson Research Center07/31/13Work Order # PF-128569205013$38.57Credit - LaborPAINT THE 3RD FLOOR; CONTACT STEVE AT X6677 OR 330-256-1475 TO SCHEDULE ESTIMATE SO THAT HE CAN MEET WITH YOU. PROCEED WITH ALL WORK IN THE LINKED DOCUMENT THAT WAS APROVED BY THE DEPARTMENT.CARP.: CEILING WORK, COVE BASE AND ADD VISION LIGHT TO DOORELE SHOP TO REMOVE SMOKE DETECTORS AND RE-INSTALLOLRCOLRCOlson Research Center07/31/13Work Order # PF-128756205013$106.07Credit - LaborINSPECT BENT DOMESTIC HOT WATER PIPE, CAUSED BY SOMEONE HANGING FROM IT. PIPE IS LOCATED OUTSIDE OF MENS BASKETBALL LOCKER ROOMJARJAR-CIRCCirculation07/31/13Work Order # PF-128756205013$144.64Credit - LaborINSPECT BENT DOMESTIC HOT WATER PIPE, CAUSED BY SOMEONE HANGING FROM IT. PIPE IS LOCATED OUTSIDE OF MENS BASKETBALL LOCKER ROOMJARJAR-CIRCCirculation07/31/13Work Order # PF-128756205013$106.07Credit - LaborINSPECT BENT DOMESTIC HOT WATER PIPE, CAUSED BY SOMEONE HANGING FROM IT. PIPE IS LOCATED OUTSIDE OF MENS BASKETBALL LOCKER ROOMJARJAR-CIRCCirculation07/31/13Work Order # PF-128782205013$67.50Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$269.99Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$269.99Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$269.99Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$106.07Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$269.99Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$269.99Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$38.57Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$106.07Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$144.64Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$86.78Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$144.64Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$86.78Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$125.35Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$269.99Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$125.35Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$37.39Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$280.43Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$261.73Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$56.09Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$140.21Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$56.09Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$121.52Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$38.57Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128782205013$38.57Credit - LaborINSTALL TRACK LIGHTS IN FOLK HALLWAYS TO LIGHT DISPLAYS. CALL BOB X5966 WITH QUESTIONSFOLKFOLK-CIRCCirculation07/31/13Work Order # PF-128811205013$67.50Credit - LaborREPLACE BELTS AND VIBRATION SENSORS~ARE~ARE-POL-RF-CT-1Cooling Tower No. 107/31/13Work Order # PF-128811205013$86.78Credit - LaborREPLACE BELTS AND VIBRATION SENSORS~ARE~ARE-POL-RF-CT-1Cooling Tower No. 107/31/13Work Order # PF-128811205013$86.78Credit - LaborREPLACE BELTS AND VIBRATION SENSORS~ARE~ARE-POL-RF-CT-1Cooling Tower No. 107/31/13Work Order # PF-128812205013$38.57Credit - LaborREPLACE BELTS AND VIBRATION SENSORS~ARE~ARE-POL-RF-CT-2Cooling Tower No. 207/31/13Work Order # PF-128812205013$77.14Credit - LaborREPLACE BELTS AND VIBRATION SENSORS~ARE~ARE-POL-RF-CT-2Cooling Tower No. 207/31/13Work Order # PF-128814205013$106.07Credit - LaborREPLACE BELTS AND VIBRATION SENSORS~ARE~ARE-POL-RF-CT-3Cooling Tower No.307/31/13Work Order # PF-128841205013$77.14Credit - LaborBOTTOM OF DOOR IS CRACKED AND INSULATION IS FALLING OUTPAINT DOORQSIQSI-214Guest Room07/31/13Work Order # PF-128841205013$77.14Credit - LaborBOTTOM OF DOOR IS CRACKED AND INSULATION IS FALLING OUTPAINT DOORQSIQSI-214Guest Room07/31/13Work Order # PF-128841205013$106.07Credit - LaborBOTTOM OF DOOR IS CRACKED AND INSULATION IS FALLING OUTPAINT DOORQSIQSI-214Guest Room07/31/13Work Order # PF-128944205013$391.87Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$391.87Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$391.87Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$289.28Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$19.29Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$77.14Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$144.64Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$38.57Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$67.50Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$212.14Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$122.46Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$67.50Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$19.29Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205013$48.21Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205040$30.61Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-128944205070$28.66Credit - LaborWATER LEAKING IN VAULTSPEC SVCS.:MOVE CONTENTS OUT OF OFFICE 143A, STORE IN SECURE AREA UNTIL WORK IS COMPLETED.ICSICS-141Mechanical07/31/13Work Order # PF-129115205013$56.09Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129115205013$37.39Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129116205013$38.57Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-2Air Cooled Condensing Unit No. 207/31/13Work Order # PF-129116205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-2Air Cooled Condensing Unit No. 207/31/13Work Order # PF-129116205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-2Air Cooled Condensing Unit No. 207/31/13Work Order # PF-129117205013$106.07Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-3Air Cooled Condensing Unit No. 307/31/13Work Order # PF-129118205013$28.93Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-5Air Cooled Condensing Unit No. 507/31/13Work Order # PF-129118205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-AAC-GN-ACCU-5Air Cooled Condensing Unit No. 507/31/13Work Order # PF-129144205013$67.50Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EB-GE-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129166205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-BRH-RF-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129166205013$28.93Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-BRH-RF-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129166205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-BRH-RF-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129166205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-BRH-RF-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129166205013$38.57Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-BRH-RF-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129206205013$67.50Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129206205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-1Air Cooled Condensing Unit No. 107/31/13Work Order # PF-129207205013$96.43Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-2Air Cooled Condensing Unit No. 207/31/13Work Order # PF-129207205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-2Air Cooled Condensing Unit No. 207/31/13Work Order # PF-129208205013$86.78Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-3Air Cooled Condensing Unit No. 307/31/13Work Order # PF-129209205013$38.57Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-4Air Cooled Condensing Unit No. 407/31/13Work Order # PF-129209205013$67.50Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-4Air Cooled Condensing Unit No. 407/31/13Work Order # PF-129209205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-GW-ACCU-4Air Cooled Condensing Unit No. 407/31/13Work Order # PF-129297205013$32.75Credit - LaborPM Annual Water Treatment - Condenser Water SystemORHORHOrr Resident Hall07/31/13Work Order # PF-129297205013$32.75Credit - LaborPM Annual Water Treatment - Condenser Water SystemORHORHOrr Resident Hall07/31/13Work Order # PF-129297205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemORHORHOrr Resident Hall07/31/13Work Order # PF-129298205013$21.83Credit - LaborPM Annual Water Treatment - Condenser Water SystemSMRHSMRHSisler-McFawn Residence Hall07/31/13Work Order # PF-129298205013$32.75Credit - LaborPM Annual Water Treatment - Condenser Water SystemSMRHSMRHSisler-McFawn Residence Hall07/31/13Work Order # PF-129298205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemSMRHSMRHSisler-McFawn Residence Hall07/31/13Work Order # PF-129299205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemPOLPOLPolsky Building07/31/13Work Order # PF-129299205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemPOLPOLPolsky Building07/31/13Work Order # PF-129299205013$65.49Credit - LaborPM Annual Water Treatment - Condenser Water SystemPOLPOLPolsky Building07/31/13Work Order # PF-129300205013$46.74Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center07/31/13Work Order # PF-129300205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center07/31/13Work Order # PF-129300205013$54.58Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center07/31/13Work Order # PF-129300205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center07/31/13Work Order # PF-129300205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center07/31/13Work Order # PF-129319205013$74.78Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-11Roof Top Unit No. 1107/31/13Work Order # PF-129319205013$37.39Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-11Roof Top Unit No. 1107/31/13Work Order # PF-129319205013$56.09Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-11Roof Top Unit No. 1107/31/13Work Order # PF-129320205013$18.70Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$112.17Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$46.74Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$46.74Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$46.74Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$57.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$57.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$57.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$9.64Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129320205013$9.64Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129321205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-4Roof Top Unit No. 407/31/13Work Order # PF-129321205013$38.57Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-4Roof Top Unit No. 407/31/13Work Order # PF-129321205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-4Roof Top Unit No. 407/31/13Work Order # PF-129321205013$144.64Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-4Roof Top Unit No. 407/31/13Work Order # PF-129321205013$65.43Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-4Roof Top Unit No. 407/31/13Work Order # PF-129322205013$18.70Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$37.39Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$28.04Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$57.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$144.64Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$28.93Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129322205013$19.29Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-5Roof Top Unit No. 507/31/13Work Order # PF-129323205013$57.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-6Roof Top Unit No. 607/31/13Work Order # PF-129324205013$48.21Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-7Roof Top Unit No. 707/31/13Work Order # PF-129324205013$48.21Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-7Roof Top Unit No. 707/31/13Work Order # PF-129324205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-7Roof Top Unit No. 707/31/13Work Order # PF-129325205013$96.43Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-8Roof Top Unit No. 807/31/13Work Order # PF-129325205013$77.14Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-8Roof Top Unit No. 807/31/13Work Order # PF-129326205013$67.50Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CBA-RF-RTU-1Roof Top Unit No. 107/31/13Work Order # PF-129327205013$28.93Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-9Roof Top Unit No. 907/31/13Work Order # PF-129327205013$86.78Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-9Roof Top Unit No. 907/31/13Work Order # PF-129327205013$57.86Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-ASB-RF-RTU-9Roof Top Unit No. 907/31/13Work Order # PF-129328205013$38.57Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CBA-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129328205013$48.21Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-CBA-RF-RTU-2Roof Top Unit No. 207/31/13Work Order # PF-129471205013$93.48Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-1Cooling Tower No. 107/31/13Work Order # PF-129471205013$21.83Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-1Cooling Tower No. 107/31/13Work Order # PF-129471205013$43.66Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-1Cooling Tower No. 107/31/13Work Order # PF-129472205013$21.83Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-2Cooling Tower No. 207/31/13Work Order # PF-129473205013$21.83Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-3Cooling Tower No. 307/31/13Work Order # PF-129501205013$38.57Credit - LaborPM Semi-Annual - Roof Top UnitSTUNSTUN-65-HVU-1Heating Ventilating Unit #1 (Electric Room)07/31/13Work Order # PF-129501205013$48.21Credit - LaborPM Semi-Annual - Roof Top UnitSTUNSTUN-65-HVU-1Heating Ventilating Unit #1 (Electric Room)07/31/13Work Order # PF-129547205013$18.70Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-SH-GE-ACCU-30*Air Cooled Condensing Unit No. 30 (* 309601-50%, 301902-50%)07/31/13Work Order # PF-129547205013$56.09Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-SH-GE-ACCU-30*Air Cooled Condensing Unit No. 30 (* 309601-50%, 301902-50%)07/31/13Work Order # PF-129547205013$65.43Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-SH-GE-ACCU-30*Air Cooled Condensing Unit No. 30 (* 309601-50%, 301902-50%)07/31/13Work Order # PF-129548205013$74.78Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-SH-GW-ACCU-10*Air Cooled Condensing Unit No. 10 (* 309601-50%, 301902-50%)07/31/13Work Order # PF-129548205013$46.74Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-SH-GW-ACCU-10*Air Cooled Condensing Unit No. 10 (* 309601-50%, 301902-50%)07/31/13Work Order # PF-129559205013$77.14Credit - LaborPM Annual - Backflow PreventerAERCAERC-104-BFP-1Backflow Preventer No. 1 (3")07/31/13Work Order # PF-129673205013$144.64Credit - LaborCBA BUILDING IS VERY HOT PARTICULARLY THE SECOND FLOOR (CBA 201, 235, 260).CBACBA-51-HEX-1Heat Exchanger No. 107/31/13Work Order # PF-129673205013$19.29Credit - LaborCBA BUILDING IS VERY HOT PARTICULARLY THE SECOND FLOOR (CBA 201, 235, 260).CBACBA-51-HEX-1Heat Exchanger No. 107/31/13Work Order # PF-129693205013$9.64Credit - LaborPAINT ALL STAIRWELLSOLRCOLRC-CIRCCirculation07/31/13Work Order # PF-129717205013$18.70Credit - LaborLocation: Olson Research 109Request: Flooding in hallwayUnit: ZoneDispatcher: Brian Crisan (89)OLRCOLRC-109Research/Nonclass Laboratory07/31/13Work Order # PF-129779205013$144.64Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$192.85Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$38.57Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$125.35Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$73.48Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$144.64Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$163.92Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$144.64Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$231.42Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$212.14Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$269.99Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$67.50Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$289.28Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129779205013$24.49Credit - LaborASSIST CAPITAL PLANNING WITH PERFORMANCE CONTRACTAkronAkronAkron Campus07/31/13Work Order # PF-129810205013$57.86Credit - LaborINVESTIGATE CONDENSATE LINEWBBWBB-CIRC-BLR-1Boiler No. 1 (SID# 185991)07/31/13Work Order # PF-129845205013$19.29Credit - Labor2ND FLOOR, INSPECT WHAT IS CAUSING SHAKING/VIBRATIONLHLH-600-AHU-1Air Handling Unit No. 107/31/13Work Order # PF-129849205013$125.35Credit - Labor201C,D,E,F REMOVE WALL MOUNT SHELVES, BULLETIN BOARDS, WALLPAPER AND PAINT ROOMS WHITE. CLEAN AND WAX FLOORSHALLWAY COMMON TO THOSE ROOMS STRIP COLUMNS OF WOOD TRIM AND CARPET AND PAINT WHITE, CLEAN AND WAX FLOORSPAINT ELEVATOR LOBBY IN BASEMENT OF OLSON WHITE;CARP AND PAINT SHOP-CONTACT BUILDING SERVICES WHEN YOUR WORK IS COMPLETED IF THE WORK ORDER PROCEEDS-SEE MARK HOLTMAN TO SCHEDULE WORKOLRCOLRCOlson Research Center07/31/13Work Order # PF-129849205013$366.42Credit - Labor201C,D,E,F REMOVE WALL MOUNT SHELVES, BULLETIN BOARDS, WALLPAPER AND PAINT ROOMS WHITE. CLEAN AND WAX FLOORSHALLWAY COMMON TO THOSE ROOMS STRIP COLUMNS OF WOOD TRIM AND CARPET AND PAINT WHITE, CLEAN AND WAX FLOORSPAINT ELEVATOR LOBBY IN BASEMENT OF OLSON WHITE;CARP AND PAINT SHOP-CONTACT BUILDING SERVICES WHEN YOUR WORK IS COMPLETED IF THE WORK ORDER PROCEEDS-SEE MARK HOLTMAN TO SCHEDULE WORKOLRCOLRCOlson Research Center07/31/13Work Order # PF-129849205013$366.42Credit - Labor201C,D,E,F REMOVE WALL MOUNT SHELVES, BULLETIN BOARDS, WALLPAPER AND PAINT ROOMS WHITE. CLEAN AND WAX FLOORSHALLWAY COMMON TO THOSE ROOMS STRIP COLUMNS OF WOOD TRIM AND CARPET AND PAINT WHITE, CLEAN AND WAX FLOORSPAINT ELEVATOR LOBBY IN BASEMENT OF OLSON WHITE;CARP AND PAINT SHOP-CONTACT BUILDING SERVICES WHEN YOUR WORK IS COMPLETED IF THE WORK ORDER PROCEEDS-SEE MARK HOLTMAN TO SCHEDULE WORKOLRCOLRCOlson Research Center07/31/13Work Order # PF-129849205013$125.35Credit - Labor201C,D,E,F REMOVE WALL MOUNT SHELVES, BULLETIN BOARDS, WALLPAPER AND PAINT ROOMS WHITE. CLEAN AND WAX FLOORSHALLWAY COMMON TO THOSE ROOMS STRIP COLUMNS OF WOOD TRIM AND CARPET AND PAINT WHITE, CLEAN AND WAX FLOORSPAINT ELEVATOR LOBBY IN BASEMENT OF OLSON WHITE;CARP AND PAINT SHOP-CONTACT BUILDING SERVICES WHEN YOUR WORK IS COMPLETED IF THE WORK ORDER PROCEEDS-SEE MARK HOLTMAN TO SCHEDULE WORKOLRCOLRCOlson Research Center07/31/13Work Order # PF-129849205013$250.71Credit - Labor201C,D,E,F REMOVE WALL MOUNT SHELVES, BULLETIN BOARDS, WALLPAPER AND PAINT ROOMS WHITE. CLEAN AND WAX FLOORSHALLWAY COMMON TO THOSE ROOMS STRIP COLUMNS OF WOOD TRIM AND CARPET AND PAINT WHITE, CLEAN AND WAX FLOORSPAINT ELEVATOR LOBBY IN BASEMENT OF OLSON WHITE;CARP AND PAINT SHOP-CONTACT BUILDING SERVICES WHEN YOUR WORK IS COMPLETED IF THE WORK ORDER PROCEEDS-SEE MARK HOLTMAN TO SCHEDULE WORKOLRCOLRCOlson Research Center07/31/13Work Order # PF-129849205013$250.71Credit - Labor201C,D,E,F REMOVE WALL MOUNT SHELVES, BULLETIN BOARDS, WALLPAPER AND PAINT ROOMS WHITE. CLEAN AND WAX FLOORSHALLWAY COMMON TO THOSE ROOMS STRIP COLUMNS OF WOOD TRIM AND CARPET AND PAINT WHITE, CLEAN AND WAX FLOORSPAINT ELEVATOR LOBBY IN BASEMENT OF OLSON WHITE;CARP AND PAINT SHOP-CONTACT BUILDING SERVICES WHEN YOUR WORK IS COMPLETED IF THE WORK ORDER PROCEEDS-SEE MARK HOLTMAN TO SCHEDULE WORKOLRCOLRCOlson Research Center07/31/13Work Order # PF-129869205013$67.50Credit - LaborINSTALL WALL-TALKER MATERIAL IN THE STUDY ROOMS ON THE 2ND AND 3RD FLOOR OF BIERCE. WE HAVE THE WALL-TALKER MATERIAL IN BIERCE 52C. WE WILL ALSO NEED AN ESTIMATE TO INSTALL MARKER TRAYS IN EACH OF THE ROOMS THAT THE WALL-TALKER IS INSTALLED.LIBLIB-CIRCCirculation07/31/13Work Order # PF-129869205013$67.50Credit - LaborINSTALL WALL-TALKER MATERIAL IN THE STUDY ROOMS ON THE 2ND AND 3RD FLOOR OF BIERCE. WE HAVE THE WALL-TALKER MATERIAL IN BIERCE 52C. WE WILL ALSO NEED AN ESTIMATE TO INSTALL MARKER TRAYS IN EACH OF THE ROOMS THAT THE WALL-TALKER IS INSTALLED.LIBLIB-CIRCCirculation07/31/13Work Order # PF-129869205013$67.50Credit - LaborINSTALL WALL-TALKER MATERIAL IN THE STUDY ROOMS ON THE 2ND AND 3RD FLOOR OF BIERCE. WE HAVE THE WALL-TALKER MATERIAL IN BIERCE 52C. WE WILL ALSO NEED AN ESTIMATE TO INSTALL MARKER TRAYS IN EACH OF THE ROOMS THAT THE WALL-TALKER IS INSTALLED.LIBLIB-CIRCCirculation07/31/13Work Order # PF-129914205040$95.70Credit - LaborMAINTENANCE OF ZIPPY TOPIARY, JAR CUL DE SAC~ARE~ARE-GRGrounds07/31/13Work Order # PF-129945205013$67.50Credit - LaborMOTOR BLOWNWIRE MOTORJARJAR-19-COMPR-1Air Compressor No. 107/31/13Work Order # PF-129945205013$67.50Credit - LaborMOTOR BLOWNWIRE MOTORJARJAR-19-COMPR-1Air Compressor No. 107/31/13Work Order # PF-129978205013$19.29Credit - LaborCLEAN OUT TRASH AND PAINT FLOOR OF BOILER ROOMPOLPOL-801Mechanical07/31/13Work Order # PF-130067205013$38.57Credit - LaborCOLDCFCCFC-241Office07/31/13Work Order # PF-130149205013$77.14Credit - LaborPM Semi-Annual - InterceptorICSICS-174-INT-10Interceptor No. 1007/31/13Work Order # PF-130152205013$121.52Credit - LaborPM Semi-Annual - InterceptorQSIQSI-145B-INT-3Interceptor No. 307/31/13Work Order # PF-130153205013$84.13Credit - LaborPM Semi-Annual - InterceptorQSIQSI-156-INT-1Interceptor No. 107/31/13Work Order # PF-130156205013$38.57Credit - LaborPM Semi-Annual - InterceptorRDRD-117-INT-1Interceptor No. 107/31/13Work Order # PF-130157205013$28.04Credit - LaborPM Semi-Annual - InterceptorSTUNSTUN-220-INT-1Interceptor No. 107/31/13Work Order # PF-130167205013$67.50Credit - LaborFAN DAMAGED ON HANGING HEATER INSIDE OF ELECTRIC ROOMPOLPOL-615Mechanical07/31/13Work Order # PF-130203205013$38.57Credit - LaborLOW TEMP ALARMEXCEXC-44-AHU-4Air Handling Unit No. 4 (Serves Starbucks Exchange St.)07/31/13Work Order # PF-130210205013$28.93Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$28.93Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$28.93Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$18.70Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$19.29Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$28.93Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130210205013$38.57Credit - LaborHIGH WATER LEVEL ALARM GOING OFF, SUMP PUMP NOT PUMPINGELEC TO WORK ON PANEL AND REWIRE PUMPCARP.:BUILD 2 PUMP STANDSSHNSHN-20-SMP-1Sump Pump No. 107/31/13Work Order # PF-130294205013$144.64Credit - LaborPLAY IN COUPLING BETWEEN SF BLOWERSLHLH-111-AHU-4Air Handling Unit No. 407/31/13Work Order # PF-130294205013$48.21Credit - LaborPLAY IN COUPLING BETWEEN SF BLOWERSLHLH-111-AHU-4Air Handling Unit No. 407/31/13Work Order # PF-130294205013$28.93Credit - LaborPLAY IN COUPLING BETWEEN SF BLOWERSLHLH-111-AHU-4Air Handling Unit No. 407/31/13Work Order # PF-130296205013$86.78Credit - LaborTIERED ROOM BETWEEN NORTH TOWER AND THE SOUTH TOWER - MIDDLE STAIRWELL,FIRST STEP HAS TORN RUBBER TREAD

ZONE MAINTENANCE WAS NOT CALLEDASECASEC-120Classroom07/31/13Work Order # PF-130334205013$77.14Credit - LaborSOUTH HALL LOUNGE 229 HAS A BROKEN WINDOW.SHSH-229Sleep/Study Service07/31/13Work Order # PF-130334205013$77.14Credit - LaborSOUTH HALL LOUNGE 229 HAS A BROKEN WINDOW.SHSH-229Sleep/Study Service07/31/13Work Order # PF-130474205013$37.39Credit - LaborTEC INSTALLATION IN 109,117A AND B, 119A AND B AND 125AOLINOLINOlin Hall07/31/13Work Order # PF-130476205013$37.39Credit - LaborTEC INSTALLATIONJARJAR-151Classroom07/31/13Work Order # PF-130477205013$37.39Credit - LaborTEC INSTALLATION, ROOMS 351,354,359,362 AND 450SHNSHNSchrank Hall (North)07/31/13Work Order # PF-130478205013$28.04Credit - LaborINSTALLATION OF TEC IN ROOMS 108,110,112,126,133,222 AND 229SHSSHSSchrank Hall (South)07/31/13Work Order # PF-130496205013$38.57Credit - LaborDURING FIRE ALARM TESTING IT WAS FOUND THAT WE CAN NOT BYPASS THE SPEAKER AND STROBE CIRCUITS PROPERLY FOR TESTING.WILL HAVE TO GET OUTSIDE CONTRACTOR TO REPAIRAERCAERCU of A Engineering Research Center07/31/13Work Order # PF-130497205013$38.57Credit - LaborDURING FIRE ALARM TESTING IT WAS FOUND THAT WE CAN NOT BYPASS THE SPEAKER AND STROBE CIRCUITS PROPERLY FOR TESTING.WILL HAVE TO GET OUTSIDE CONTRACTOR TO REPAIRRDWYRDWYRoadway Building07/31/13Work Order # PF-130498205013$9.64Credit - LaborDURING FIRE ALARM TESTING IT WAS FOUND THAT WE CAN NOT BYPASS THE SPEAKER AND STROBE CIRCUITS PROPERLY FOR TESTING.WILL HAVE TO GET OUTSIDE CONTRACTOR TO REPAIRSPCRSPCRSpicer Residence Hall07/31/13Work Order # PF-130500205013$9.64Credit - LaborDURING FIRE ALARM TESTING IT WAS FOUND THAT WE CAN NOT BYPASS THE SPEAKER AND STROBE CIRCUITS PROPERLY FOR TESTING.WILL HAVE TO GET OUTSIDE CONTRACTOR TO REPAIRNPICNPICNational Polymer Innovation Center07/31/13Work Order # PF-130521205013$121.52Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$74.78Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$65.43Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$121.52Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$74.78Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$188.00Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$149.56Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$0.00Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$140.21Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$28.04Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130521205013$28.04Credit - LaborPOWER FOR INSTALLATION OF (2) UV SANITIZERS SERVING THE LEISURE POOL AND SPA AT THE SRWC.SRWCSRWC-132ARecreation07/31/13Work Order # PF-130536205013$9.64Credit - LaborNEAR CARROLL ST AND LOT 18, SIDEWALK L