xer free user manual

33
Contents User Manual // Overview & Function

Upload: ali-cheema

Post on 16-Aug-2015

248 views

Category:

Documents


6 download

DESCRIPTION

XER Manual

TRANSCRIPT

ContentsUser Manual // Overview & Function2ContentsContentsXER Toolkit Overview6Manage Workbooks 7Discard7Merge7Opening project(s) from an XER fle 8Opening Projects & Baselines8Importing project from Primavera database9Selecting current project10Save current project as baseline11Baseline Management11Import baseline project from XER fle12Importing baseline project from Primavera database13Deleting13Clearing Current Baseline13Column Schemes14The current column scheme15Adding a column to the current scheme15Deleting column(s) from the current scheme16Changing the position of a column in the current scheme16Format column settings17Saving the current column scheme18Set a saved column scheme as the current scheme19Delete a saved column scheme20Export column scheme20Import column scheme20Layout Settings21Gantt Viewer21Draw Gantt22Table Display Options23Gantt Options 24Variance Column Formats26Colour schemes27Applying a date range flter28Advanced Filters29User defned flters30Task Grouping33WBS Default34User defned group structure35Modifying a user defned group structure36Group scheme management 37Delete / Export / Import grouping scheme38Detailed activity report39General Reports39Activities Export40Detailed Relationships Export Report414ContentsSchedule Quality42Overview42Summary Screen Options43Viewing detailed check results44Adjusting red / amber / green thresholds44Resetting all defaults 45Filter by activity code45Filter by WBS 46Filter by Task Status46Summary / Dashboard reports47Quality check defnitions & detail windows48Missing logic (tasks without predecessors or successors)48Open ended tasks48Relationships with leads or lags50Relationships Ratio51Constraints52Float53Duration55Invalid Dates56Missing Resources57Late Activities 58Assignment dates59Calendar Viewer60Overview60Detailed View 61Yearly wall-chart62Directly from P663Jump back to the contents at anytime, by click the contents icon in the bottom right corner of each page.Contents6ContentsThe XER Toolkit is an Excel addin that provides intelligent access to primavera schedule data stored within an XER fle or Primaveras underpinning database.The objective of the XER Toolkit is to help drive successful project delivery by providing tools that assist with improving the quality of project schedules.It achieves this by:Promoting schedule visibility and understanding throughout a project team. Providing the ability to pinpoint defcient aspects of a project schedule which can then be resolved.Providing tools that make graphical analysis of schedule data both simple to use and outputs that are easy to understand.The Toolkit operates entirely within the MS Excel environment and does not rely on or require any other software installation.The Toolkit uses Excels built-in database technology and can therefore handle and operate large multi-project XER fles.The original XER fle/ Primavera database is never altered or affected by the XER Toolkits operation.All outputs are produced in standard Excel workbooks and can be saved or discarded by the user.The outputs can be manipulated by the user the same as any other Excel spreadsheet.XER Toolkit OverviewWhen using the XER Toolkit, most of the options on Excels standard FILE menu are greyed out.Therefore in order to open and save Excel workbooks, including XER Toolkit outputs, use the manage workbooks function on the main toolkit menu.NewCreate a new, blank workbook.OpenOpen an existing workbook.CloseClose all workbooks that are currently selected in the workbook list. Changes will not be saved. SaveSave all workbooks currently selected in workbook list.If a single workbook is selected in the list, then the option to Save As will be offered.DiscardAll of the workbooks currently selected in the workbook list will be closed, changes will be discarded and the fles will be deleted from disc.MergeEvery visible worksheet within the currently selected workbooks will be merged into a single, new workbook.Manage Workbooks XER Toolkit Overview8ContentsThe XER Toolkit does not alter source data.Instead, projects are initially imported to the XER Toolkits database. The toolkit provides ability to import source data from XER fles or directly from the Primavera database.Opening project(s) from an XER fleOpening Projects & Baselines1.From main toolkit menu, Select Get new data from.2.Select Open XER 3.If project data has previously been imported to the toolkit, then you will be asked if it is ok to lose this data.4.Select the XER fle containing the project(s) to be imported. NB: The XER Toolkit provides analysis and viewing tools for single projects.However, it can open XER fles containing multiple projects, from which the current project can then be selected.5.Once the toolkit has opened and imported the XER fle, a Contents form will appear detailing the contents of the imported data.The items within the list relate to the table records that were exported from the P6 database to the XER fle.E.g. Table TASK contains information relating to the project(s) tasks e.g. early/ late dates, durations, summary units etc.12345Importing project from Primavera database1.From main toolkit menu, Select Get new data from.2.Select P6 database3.Enter database connection details and click connect NB: The XER Toolkit uses the Primavera database priv user account and can connect with either to an Oracle or MS SQL Server.Login details for the priv user account are therefore required in order to make direct connection with the database.If unsure, please refer to your database administrator.4.Once connected, projects can be selected from the EPS tree within the Projects window.5.Once desired project is selected, click Import project (Click Import Project as baseline if directly importing to the XER Toolkits baseline database). NB: Use the display options to refne the project tree contents.1234&510ContentsSelecting current project1.Once an XER fle has been opened, or a project imported from the Primavera database, the Project drop down list will be populated with the currently available projects.Simply select the project to be viewed/ analysed. NB: If projects appear in the drop down list that were not exported to the current XER fle, this refects that inter-project relationship links exist between the projects exported and these additional projects.If this is the case, then minimal data is exported in relation to the external projects.OverviewSave current project as baselineBaseline projects can be imported into the toolkits database.They can then be analysed and compared against the current project.There is no limit to the number of baseline projects that can be saved within the toolkits database. Once a baseline project has been imported, it will appear in the Baseline dropdown list within the main toolkit menu.Baseline analysis can then be carried out between the current project and any available baseline project by simply selecting it from the drop down list.Baseline Management1.From the main toolkit menu, select the project to be saved as a baseline from the Project drop-down list.2.Click Manage Baselines3.Click Save current project as baseline.4.Enter reference description and click ok. NB: This reference description entered here will appear in the main toolkit menus Baseline drop-down list.1&23412ContentsImport baseline project from XER fle1.Select Manage Baselines from the main toolkit menu.2.Click Import baseline from XER File.3.Select XER fle that contains thebaseline project.4.Select the project from available list. 5.Enter reference description and click ok. NB: This reference description entered here will appear in the main toolkit menus Baseline drop-down list.14325Importing baseline project from Primavera databaseImporting baseline project from Primavera database1.Refer to Importing project from Primavera database with the exception of the fnal step.2.Once desired project is selected, click Import project as baseline. 3.Enter reference description and click ok. NB: This reference description entered here will appear in the main toolkit menus Baseline drop-down list.Deleting1.Select the baseline project to be deleted from the list.2.Click on the Delete baseline button. Clearing Current Baseline3.To clear the currently selected baseline from the main toolkit menus drop-down list, click the Clear Current Baseline project.31&21-314ContentsColumn schemes are used by various functions within the XER Toolkit. They defne the activity data content that the user wishes to display in an output table.The XER Toolkit is pre-loaded with a basic column scheme (Activity ID/ Description/ Start/ Finish).Users can also defne and save as many additional column schemes as required.Saved column schemes can be exported and shared with other toolkit users.Column Schemes1.Select the column type2.Select the required column(s)3.Select the column in the current scheme that is to appear directly to the right of the added columns.Skip this step if you simply want to add the new columns to the far right of the data table4.Click the Add Icon icon NB: In order to select multiple columns, press and hold the keyboard Ctrl key and then select by clicking with mouse the columns to be inserted.The current column scheme is defned by the columns that appear in the Column selected list. All toolkit outputs that include a data table will include the columns defned by the current column scheme.The Column appearing at the top of the list will appear as the leftmost column in the data table and the column at the bottom of the list will appear as the rightmost column in the data table.The current column schemeAdding a column to the current scheme142&316ContentsDeleting column(s) from the current schemeChanging the position of a column in the current scheme1.Select the columns to be deleted2.Click the delete column icon NB: In order to select multiple columns, press and hold the keyboard Ctrl key and then select by clicking with mouse the columns to be deleted.1.Select the columns to be moved. 2.Click the Up icon to move the column left in the output data table. Conversely, click the Down icon to move the column right.1212Format column settings1.Select the columns to be formatted. 2.Click the Settings icon.3.All column settings refer to the data table formats for toolkit outputs.A. Date FormatB. Activity Code Format123ABA B18ContentsSaving the current column scheme1.Click the Save icon2.Enter a new scheme name or if an existing scheme is to be overwritten, select it from the list3.Click Save123Set a saved column scheme as the current scheme1.Click the Open icon.2.Select the scheme to be set as the current scheme.3.Click Open12320ContentsDelete a saved column scheme1.Select column scheme to be deleted.2.Click the Delete iconExport column scheme1.Select column scheme to be exported.3.Click the Export icon and then choose a flename.Import column scheme3. Click the Import icon.4. Select fle containing columnscheme(s)5. Click open6. Select column scheme(s) to beimported.7. Click ImportWhen opening or saving a column scheme, there are options to delete/ import and export pre-saved column schemes.1234567OverviewThe toolkit provides an export function for producing gantt charts (or data tables) within Excel worksheets.The outputs can be saved as standard workbooks that can be shared with and accessed by anyone that has Excel.As a result, anyone engaged with the schedule in this format can beneft from the familiar functionality that Microsoft Excel provides as standard, including the ability to search, format, annotate and flter.Layout SettingsThe XER Toolkit provides the ability to format the look and feel of the schedule output.From the main toolkit menu, select Gantt Viewer.1.Select layout settings.2.Update options as required (see below for description)OR3.Restore all default settings4.Click Ok to apply settings.Gantt Viewer122Contents2a2b2d2c2e342a - Draw GanttData table Gantt chartGantt chart can be included or excluded2b - Table Display Options2a - Table with grid lines 2b - Table without grid lines35411.Display horizontal sight lines:The number of rows between a horizontal line in the Gantt chart area (excluding grouping rows).2.Display table gridlines: MS Excel borders can automatically be applied to the table area, or left.3.Wrap text: Text will wrap in cell when too long to ft on a single line.4.Critical path