www.wagner.com

Development of long span composite truss bridges

Marcus O'Dempsey

Page 2: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Contents

• WCFT products

• WCFT solutions

• Developing composite truss bridges

Page 3: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

WCFT Product

Page 4: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Section properties

Physical properties Characteristic values

Insert

End Cap

Page 5: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

WCFT ProductProduct guide- Characteristic value of mechanical properties

and physical properties- ASTM 7290

Design guide- ASCE Pre-standard (final ver.)- Work examples

ASTM 7290 -Standard Practice for Evaluating Material Property Characteristic Values for Polymeric Composite for Civil Engineering Structural ApplicationsASCE Pre-Standard for Load and Resistance Factor Design (LRFD) of Pultruded Fiber Reinforced Polymer (FRP) Structures (Final) (2010)

Page 6: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Electrical crossarm

Wagners Solutions

Page 7: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Boardwalk

Wagners CFT Solutions

Marina

Page 8: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Timber Bridge Rehabilitation

Wagners Solutions

Page 9: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 10: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Timber Bridge Rehabilitation

Page 11: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Timber Bridge Rehabilitation

Pile Strengthening Bridge Widening

Page 12: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 13: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Composite Bridge

Wagners Solutions

Page 14: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Baio Bridges, Whyanbeel QLD

Page 15: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 16: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 17: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 18: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 19: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Engineering Development • Stage 1

– Truss composite bridges bridge– Post-cure bolt joint for 80°C design temperature

• Stage 2– Grout filled composite truss bridge for long span– Ambient cure bolt joint for 80°C design temperature

• Design criteria (AS2156, AS5100, AS1170)- Dead Load : 0.3 KPa- Live Load : 5.0 KPa (Pedestrian)- Vehicle load : 4 ton (Emergency vehicle at low speed)- Deflection Limit: L/250- Design temperature : up to 80 °C

Page 20: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stage 1 • Structural specification

Span: 12 - 14 meters / Height : 2.0 meterTop-chord - 2 x 125SHS / Bottom-chord - 2 x 125 SHS / Webs - 1 x 250BRB

• Bolted jointDevelop post-cure glue system for 80°C design temperature Evaluate design strength for both ambient and 80°C design temperature

• Truss systemPerformance under static design load (Proof loading: AS/NZ 1170.0)Prove fatigue performance with 1,000,000 cycles of loading

Page 21: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stage 2 • Structural specification

Span: 23 meters / Height : 2.2 metersTop-chord - 2 x Grout-filled 250 BRB / Bottom-chord - 2 x 250 BRB / Webs - 1 x 250 BRB

• Bolted jointFurther development, ambient cure glue system for eliminating post-cure procedure Evaluate design strength for the range of design temperature between ambient and 80°C

• Grout filled truss systemPerformance under static design load (Proof loading: AS/NZW 1170.0)Comparative study with and without grout-filling method

Page 22: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stage 1 - 1,000,000 cycles of loading (Fatigue)

Page 23: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stage 2 - Grout-filled truss (Comparative study)

31%

Page 24: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stages 1 and 2 - Bolted jointWith post-cure glue (Stage 1)

With ambient-cure glue (Stage 2)

# 10 repeated test results, $ Determined in accordance with ASTM D7290

Test results – Stage 2

Page 25: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stage 1 – Clewley Park FootbridgeToowoomba, QLD

Page 26: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Page 27: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com

Stage 2 - Mercy Footbridge replacementDalby QLD

Page 28: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey

www.wagner.com